Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2924092B2 - Calendar material supply control device - Google Patents
[go: Go Back, main page]

JP2924092B2 - Calendar material supply control device - Google Patents

Calendar material supply control device

Info

Publication number
JP2924092B2
JP2924092B2 JP13687590A JP13687590A JP2924092B2 JP 2924092 B2 JP2924092 B2 JP 2924092B2 JP 13687590 A JP13687590 A JP 13687590A JP 13687590 A JP13687590 A JP 13687590A JP 2924092 B2 JP2924092 B2 JP 2924092B2
Authority
JP
Japan
Prior art keywords
calendar
amount
material supply
bank
sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP13687590A
Other languages
Japanese (ja)
Other versions
JPH0429813A (en
Inventor
和康 吉川
晴雄 和田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
Ishikawajima Harima Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Harima Heavy Industries Co Ltd filed Critical Ishikawajima Harima Heavy Industries Co Ltd
Priority to JP13687590A priority Critical patent/JP2924092B2/en
Publication of JPH0429813A publication Critical patent/JPH0429813A/en
Application granted granted Critical
Publication of JP2924092B2 publication Critical patent/JP2924092B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)
  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、カレンダの材料供給量制御装置に関するも
のである。
Description: TECHNICAL FIELD The present invention relates to a material supply control device for a calendar.

[従来の技術] 特公昭62-57486号公報に記載された従来のカレンダの
材料供給量制御装置を第3図・第4図を用いて説明す
る。
2. Description of the Related Art A conventional calendar material supply amount control apparatus described in Japanese Patent Publication No. 62-57486 will be described with reference to FIGS. 3 and 4. FIG.

図中1は材料供給装置である。 In the figure, reference numeral 1 denotes a material supply device.

32は材料供給装置1を構成する材料押出機、33は材料
供給装置1を構成するフィードコンベア、8は該材料供
給装置1を構成する平行な一対の混練ロール、9は材料
供給装置1を構成し材料3'の供給量を調節するナイフ装
置、10は前記混練ロール8の軸線と平行に配設されたス
クリュー、11はスクリュー10と平行に配設されたガイド
ロッド、12はスクリュー10を螺合され、且つガイドロッ
ド11を貫通されてガイドロッド11に沿い移動可能とさ
れ、更に先端を前記一方の混練ロール8の表面に接触配
置された移動ナイフ、13は移動ナイフ12とガイドロッド
11に取付けられた固定ナイフ31との間のナイフ幅、14は
スクリュー10にカップリング15を介して接続されたモー
タである。
32 is a material extruder constituting the material supply device 1, 33 is a feed conveyor constituting the material supply device 1, 8 is a pair of parallel kneading rolls constituting the material supply device 1, and 9 is a material supply device 1. A knife device 10 for adjusting the supply amount of the material 3 ', a screw 10 arranged in parallel with the axis of the kneading roll 8, a guide rod 11 arranged in parallel with the screw 10, and a screw 12 for the screw 10. And a movable knife having a distal end in contact with the surface of the one kneading roll 8, and a movable knife 12 and a guide rod
A knife width 14 between the fixed knife 31 and the fixed knife 31 attached to the motor 11 is a motor connected to the screw 10 via the coupling 15.

第3図中2は材料供給装置1から切出された材料3'を
カレンダ4のバンク4'へ搬送するスイングコンベアであ
って、該スイングコンベア2は下端部を中心として上端
部がスイングコンベア2の幅方向に往復揺動するように
なっている。
In FIG. 3, reference numeral 2 denotes a swing conveyor which conveys the material 3 'cut out from the material supply device 1 to the bank 4' of the calendar 4, and the upper end of the swing conveyor 2 is centered on the lower end thereof. Reciprocatingly swings in the width direction.

5はカレンダ4で圧延されたシート材6をシート材6'
に引伸しながら外部へ引出すテイクオフロール、7はシ
ート材6'を冷却するクーリングロールである。
Reference numeral 5 denotes a sheet material 6 rolled by a calendar 4 and a sheet material 6 '.
A take-off roll 7 is drawn out to the outside while being stretched, and a cooling roll 7 cools the sheet material 6 '.

第3図中37はモニタカメラ等のバンクセンサ、38はバ
ンクセンサ37で検出したバンク量を表わす信号、21はバ
ンク量信号38に基づいてナイフ幅調整信号27を出力する
演算制御装置、35はモータ14に取付けられた位置検出
器、36は位置検出器35からのフィードバック信号であ
る。
In FIG. 3, reference numeral 37 denotes a bank sensor such as a monitor camera, 38 denotes a signal representing the bank amount detected by the bank sensor 37, 21 denotes an arithmetic and control unit that outputs a knife width adjustment signal 27 based on the bank amount signal 38, and 35 denotes A position detector 36 attached to the motor 14 is a feedback signal from the position detector 35.

次に作動について説明する。 Next, the operation will be described.

先ず、材料供給装置1では、材料押出機32から材料3
を押出し該材料3をフィードコンベア33を介して一対の
混練ロール8,8'間に供給する。そして、混練ロール8,8'
は相対向部を下方へ向けて回転され、混練ロール8,8'間
の上部に供給された材料3を混練する。
First, in the material supply device 1, the material 3 is supplied from the material extruder 32.
And feeds the material 3 between a pair of kneading rolls 8, 8 'via a feed conveyor 33. And kneading rolls 8,8 '
Is rotated with the opposing portions facing downward to knead the material 3 supplied to the upper portion between the kneading rolls 8, 8 '.

該材料3の混練は、混練ロール8,8'間の上部の材料3
が混練ロール8,8'のロール間ギャップで押潰され、押潰
されてロール間ギャップ下方へ取出された材料3が一方
の混練ロール8に巻付いて再び混練ロール8,8'間の上部
へ戻されるという操作が繰返されることにより行われ
る。
The kneading of the material 3 is performed by mixing the upper material 3 between the kneading rolls 8 and 8 '.
Is crushed by the gap between the kneading rolls 8, 8 ', and the material 3 which has been crushed and taken out below the gap between the rolls is wound around one of the kneading rolls 8, and again the upper portion between the kneading rolls 8, 8'. This operation is performed by repeating the operation of returning to.

材料供給装置1の一部を構成するナイフ装置9では、
後述するように演算制御装置21からナイフ幅調整信号27
がモータ14に送られることにより、モータ14が駆動され
て、スクリュー10が所要数回転し、移動ナイフ12がガイ
ドロッド11に沿い移動して固定ナイフ31との間のナイフ
幅13が調整される。
In the knife device 9 constituting a part of the material supply device 1,
As described later, the knife width adjustment signal 27
Is sent to the motor 14, the motor 14 is driven, the screw 10 rotates a required number of times, the moving knife 12 moves along the guide rod 11, and the knife width 13 between the moving knife 12 and the fixed knife 31 is adjusted. .

これにより、混練ロール8に巻付いて混練ロール8,8'
間の上部へ戻される途中の材料3の一部が、移動ナイフ
12、固定ナイフ31によりナイフ幅13の分だけ切出され
る。
Thereby, it is wound around the kneading roll 8, and the kneading rolls 8, 8 '
A part of the material 3 being returned to the upper part between
12. The fixed knife 31 cuts out the knife 13 in width.

従って、材料供給装置1からのカレンダ4への材料供
給量はナイフ幅13に応じて決められる。
Therefore, the amount of material supplied from the material supply device 1 to the calendar 4 is determined according to the knife width 13.

スイングコンベア2では、ナイフ装置9により材料供
給装置1から切出された材料3'をカレンダ4のバンク4'
へ搬送する。
In the swing conveyor 2, the material 3 ′ cut from the material supply device 1 by the knife device 9 is transferred to the bank 4 ′ of the calendar 4.
Transport to

このとき、スイングコンベア2は、下端部を中心とし
て上端部がスイングコンベア2の幅方向へ往復揺動し
て、材料3'をカレンダ4のバンク4'に幅方向均一に供給
する。
At this time, the upper end of the swing conveyor 2 reciprocates in the width direction of the swing conveyor 2 around the lower end, and supplies the material 3 ′ to the bank 4 ′ of the calendar 4 uniformly in the width direction.

カレンダ4では、スイングコンベア2から搬送された
材料3'を各カレンダロールのロール間ギャップで成形し
て行き、シート材6を製造する。
In the calender 4, the material 3 ′ conveyed from the swing conveyor 2 is formed in the gap between the calender rolls to produce the sheet material 6.

カレンダ4で成形されたシート材6はテイクオフロー
ル5により引出されて6'となり、、その後クーリングロ
ール7で冷却されて外部へ導かれる。
The sheet material 6 formed by the calendar 4 is pulled out by the take-off roll 5 to become 6 ', and then cooled by the cooling roll 7 and guided to the outside.

カレンダ4のバンク4'におけるバンク量信号38は、バ
ンクセンサ37により検出され、演算制御装置21へ送られ
る。
The bank amount signal 38 in the bank 4 ′ of the calendar 4 is detected by the bank sensor 37 and sent to the arithmetic and control unit 21.

演算制御装置21では、バンクセンサ37からのバンク量
信号38が変化すると材料供給装置1にナイフ幅調整信号
27を送って、材料供給装置1のナイフ幅13を調整させバ
ンク4'の量が一定となるようにする。
When the bank amount signal 38 from the bank sensor 37 changes, the arithmetic and control unit 21 sends a knife width adjustment signal to the material supply device 1.
27, the knife width 13 of the material supply device 1 is adjusted so that the amount of the bank 4 'is constant.

[発明が解決しようとする課題] しかしながら、上記従来のカレンダの材料供給量制御
装置では、以下のような問題があった。
[Problems to be Solved by the Invention] However, the conventional material supply amount control device for a calendar has the following problems.

即ち、カレンダ4の成形速度を変化させた場合、バン
クセンサ37でバンク4'の量の増減が検出されそれに応じ
てナイフ幅13の調整が行われてから、切出された材料3'
がカレンダ4のバンク4'に到着するまでの間に、スイン
グコンベア2の材料搬送時間に相当する時間遅れが存在
し、この間にバンク4'の量が大きく変動するため、バン
ク量が安定するまでに長い時間が掛ってしまう。
That is, when the molding speed of the calendar 4 is changed, an increase or decrease in the amount of the bank 4 'is detected by the bank sensor 37, and the knife width 13 is adjusted accordingly.
There is a time delay corresponding to the material transport time of the swing conveyor 2 before the vehicle arrives at the bank 4 'of the calendar 4, and during this time the amount of the bank 4' fluctuates greatly. Takes a long time.

バンク4'の量が安定しないと、均一なシート材6を製
造する上で障害となる。
If the amount of the bank 4 ′ is not stable, it becomes an obstacle in producing a uniform sheet material 6.

本発明は上述の実情に鑑み、カレンダの成形速度の変
化の前後における過渡時のバンク量の変化をできるだけ
小さくするカレンダの材料供給量制御装置を提供するこ
とを目的とするものである。
The present invention has been made in view of the above circumstances, and has as its object to provide a calendar material supply amount control device that minimizes a change in the bank amount during transition before and after a change in the molding speed of the calendar.

[課題を解決するための手段] 本発明は、カレンダのバンク量を検出するバンクセン
サと、バンクセンサからのバンク量に基づき材料供給装
置に材料の供給量を変化させる信号を送る演算制御装置
とを備えたカレンダの材料供給量制御装置において、カ
レンダの成形速度を検出する成形速度検出器と、カレン
ダで成形されたシート材のシート幅及びシート厚さを検
出するシート幅検出器及びシート厚さ検出器と、成形速
度及びシート幅並にシート厚さを入力して、カレンダの
成形速度が変化した場合に、カレンダの成形速度が変更
されてから材料供給装置が材料供給量の変更を開始され
るまでの時間のカレンダの材料消費量と材料到達量との
偏差分及び材料供給装置が材料供給量の変更を開始され
てから材料供給量変更後の材料がカレンダに到達するま
での時間のカレンダの材料消費量と材料到達量との偏差
分により前記材料供給量を補正させる信号を前記材料供
給装置に送る演算制御装置とを備えたことを特徴とする
カレンダの材料供給量制御装置にかかるものである。
Means for Solving the Problems The present invention relates to a bank sensor for detecting a bank amount of a calendar, and an arithmetic and control unit for sending a signal for changing a material supply amount to a material supply device based on the bank amount from the bank sensor. In a calender material supply amount control device provided with a calender, a molding speed detector for detecting a calendering speed, a sheet width detector and a sheet thickness for detecting a sheet width and a sheet thickness of a sheet material formed by the calendar When the sheet thickness is inputted along with the detector, the forming speed and the sheet width, and the forming speed of the calendar is changed, the changing of the forming speed of the calendar causes the material supply device to start changing the material supply amount. The amount of deviation between the amount of material consumed and the amount of material reached in the calendar until the time until the material supply amount has changed, and the material after the change in the material supply amount has been An arithmetic control unit for sending a signal for correcting the material supply amount to the material supply device based on a deviation between the material consumption amount and the material arrival amount of the calendar until the time reaches the material amount of the calendar. The present invention relates to a supply amount control device.

[作用] 演算制御装置は、バンクセンサが検出したバンク量に
基づいて、材料供給装置に材料の供給量を変化させる信
号を送り、バンク量を一定とする。
[Operation] The arithmetic and control unit sends a signal for changing the material supply amount to the material supply device based on the bank amount detected by the bank sensor to make the bank amount constant.

カレンダの成形速度が変化しカレンダの材料消費量が
変更された時に、演算制御装置は、成形速度検出器から
の成形速度及びシート幅検出器からのシート幅並にシー
ト厚さ検出器からのシート厚さを入力して、材料供給装
置からカレンダへの材料供給量を、成形速度変更後のカ
レンダの材料消費量と等しい量に変更させると共に、カ
レンダの成形速度の変更が開始されてから材料供給装置
が材料供給量を変更を開始するまでの間に生じるカレン
ダの材料消費量と材料到達量との偏差分と、材料供給装
置が材料供給量の変更を開始してから材料供給量変更後
の材料がカレンダに到達するまでの間に生じるカレンダ
の材料消費量と材料到達量との偏差分とにより、前記材
料供給量を補正するよう材料供給装置のナイフ装置にナ
イフ幅調整信号を送る。
When the molding speed of the calendar is changed and the material consumption of the calendar is changed, the arithmetic and control unit determines the molding speed from the molding speed detector and the sheet width from the sheet width detector as well as the sheet from the sheet thickness detector. Enter the thickness and change the amount of material supplied from the material supply device to the calendar to an amount equal to the amount of material consumed by the calendar after changing the molding speed, and supply the material after the change in the molding speed of the calendar is started. The amount of deviation between the material consumption of the calendar and the amount of material that occurs before the device starts changing the material supply amount, and the difference between the material supply amount after the material supply device starts changing the material supply amount. A knife width adjustment signal is sent to the knife device of the material supply device to correct the material supply amount according to the deviation between the material consumption amount and the material arrival amount of the calendar that occurs until the material reaches the calendar. .

[実施例] 以下、本発明の実施例を図面を参照しつつ説明する。[Example] Hereinafter, an example of the present invention will be described with reference to the drawings.

第1図・第2図は本発明の一実施例である。 1 and 2 show an embodiment of the present invention.

28は演算制御装置であって、シート幅検出器16からの
シート幅22と、シート厚さ検出器17からのシート厚さ23
と、成形速度検出器18からの成形速度24と、ロール間ギ
ャップ検出器19からのロール間ギャップ25を入力し、こ
れらに基づいて後述する演算を行うことにより、カレン
ダ4の材料消費量を求めた後、材料供給装置1の材料供
給量をカレンダ4の材料消費量と一致させるために必要
なナイフ幅13を求めると共に、カレンダ4の成形速度24
即ち材料消費量が変更された場合には、カレンダ4の成
形速度が変更されてから材料供給装置1が材料供給量の
変更を開始するまでの時間t1のカレンダ4の材料消費量
と材料到達量との偏差分Q1と、材料供給装置1が材料供
給量の変更を開始してから材料供給量変更後の材料3が
カレンダ4に到達するまでの移送時間t2のカレンダ4の
材料消費量と材料到達量との偏差分Q2とを求め、材料消
費量変更後の材料供給量を材料消費量の偏差分Q1,Q2
補正するために必要なナイフ幅13を求めて、前記ナイフ
装置9のモータ14にナイフ幅調整信号29を送るようにな
っている。
Reference numeral 28 denotes an arithmetic and control unit, which includes a sheet width 22 from the sheet width detector 16 and a sheet thickness 23 from the sheet thickness detector 17.
And the molding speed 24 from the molding speed detector 18 and the inter-roll gap 25 from the inter-roll gap detector 19, and calculate the material consumption of the calendar 4 by performing an operation described later based on these. After that, the knife width 13 necessary for matching the material supply amount of the material supply device 1 with the material consumption amount of the calendar 4 is determined, and the forming speed 24 of the calendar 4 is determined.
That is, when the material consumption is changed, the material consumption of time t 1 calendar 4 from being changed molding rate calendar 4 until the material supply device 1 to initiate a change of the quantity of material fed and the material reaches the deviations to Q 1 to the amount, the material consumption of transport time t 2 calendar 4 up material 3 after the material supply volume change material supply apparatus 1 from the start of the change of the quantity of material fed reaches the calender 4 determine the amount and the deviation amount Q 2 of the material arrival quantity, seeking knife width 13 necessary for correcting the quantity of material fed after the material consumption changes in deviations Q 1, Q 2 of the material consumption, A knife width adjustment signal 29 is sent to the motor 14 of the knife device 9.

尚、図中34,34'はモータであって、モータ34には、混
練ロール8のロール速度26を検出する速度検出器20が設
けられている。モータ34'によるコンベア搬送速度はモ
ータ34による混練ロール8のロール表面速度にほぼ等し
い値にセットされる。
In the figure, reference numerals 34 and 34 'denote motors, and the motor 34 is provided with a speed detector 20 for detecting the roll speed 26 of the kneading roll 8. The conveyor conveyance speed by the motor 34 'is set to a value substantially equal to the roll surface speed of the kneading roll 8 by the motor 34.

次に作動について説明する。 Next, the operation will be described.

材料供給装置1で切出した材料3'をカレンダ4で成形
する作動、及びバンクセンサ37に基づいてバンク4'の量
を一定に保持する作動については第3図・第4図と同様
である。
The operation of forming the material 3 'cut out by the material supply device 1 with the calendar 4 and the operation of maintaining the amount of the bank 4' constant based on the bank sensor 37 are the same as those in FIGS.

シート材6'の製造量を変更する場合には、図示しない
成形速度設定器によりカレンダ4の成形速度24を変更す
る。
When changing the production amount of the sheet material 6 ', the molding speed 24 of the calendar 4 is changed by a molding speed setting device (not shown).

すると、カレンダ4は成形速度24が高速化或いは低速
化し、カレンダ4の材料消費量が変更される。
Then, the molding speed 24 of the calendar 4 is increased or decreased, and the material consumption of the calendar 4 is changed.

カレンダ4の成形速度24が変化すると、クーリングロ
ール7に設けた成形速度検出器18からの成形速度24も変
化し、該成形速度24の変化によって演算制御装置28はカ
レンダ4の成形速度24が変化したことを判断する。
When the molding speed 24 of the calendar 4 changes, the molding speed 24 from the molding speed detector 18 provided on the cooling roll 7 also changes, and the arithmetic control unit 28 changes the molding speed 24 of the calendar 4 according to the change of the molding speed 24. Determine what you have done.

カレンダ4の成形速度が変化すると演算制御装置28
は、成形速度検出器18からの成形速度24とシート幅検出
器16からのシート幅22とシート厚さ検出器17からのシー
ト厚さ23を掛けてカレンダ4の材料消費量を求め、求め
た材料消費量を、速度検出器20からの混練ロール8のロ
ール速度26とロール間ギャップ検出器19からのロール間
ギャップ21で割って材料供給装置1からの材料供給量を
前記材料消費量と等しくするためのナイフ幅13を求め、
材料供給装置1にナイフ幅調整信号29を送って、材料供
給装置1の材料供給量を調整する。
When the molding speed of the calendar 4 changes, the arithmetic and control unit 28
Is obtained by multiplying the molding speed 24 from the molding speed detector 18, the sheet width 22 from the sheet width detector 16 and the sheet thickness 23 from the sheet thickness detector 17 to obtain the material consumption of the calendar 4. The material consumption is divided by the roll speed 26 of the kneading roll 8 from the speed detector 20 and the inter-roll gap 21 from the inter-roll gap detector 19 to make the amount of material supplied from the material supply device 1 equal to the material consumption. To obtain a knife width of 13
A knife width adjustment signal 29 is sent to the material supply device 1 to adjust the material supply amount of the material supply device 1.

更に演算制御装置28は、カレンダ4の材料消費量が変
更されてから材料供給装置1が材料供給量の変更を開始
するまでの時間t1のカレンダ4の材料消費量と材料到達
量との偏差分Q1と、材料供給装置1が材料供給量の変更
を開始してから材料供給量変更後の材料3'がカレンダ4
に到達するまでの移送時間t2のカレンダ4の材料消費量
と材料到達量との偏差分Q2とを求め、求めた材料供給量
の偏差分Q1,Q2を合計して、カレンダ4の材料消費量変
更後の材料供給装置1の材料供給量の過不足分を求め、
更に該過不足分の材料供給量を補正するためのナイフ幅
13を求め、過不足分を補正したナイフ幅調整信号29を材
料供給装置1に送る。
Further, the arithmetic and control unit 28 calculates the deviation between the material consumption of the calendar 4 and the amount of material reached at the time t 1 from when the material consumption of the calendar 4 is changed to when the material supply device 1 starts to change the material supply. and minute Q 1, the material 3 after the material supply volume change material supply apparatus 1 from the start of the change of the quantity of material fed 'calendar 4
The deviations Q 2 with the material consumption and the material reaches the amount of the transfer time t 2 calendar 4 to reach determined sums the deviation obtained material supply amount Q 1, Q 2, the calendar 4 The excess or deficiency of the material supply amount of the material supply device 1 after the change of the material consumption amount is determined,
Further, a knife width for correcting the excess or deficiency of the material supply amount.
13 is obtained, and a knife width adjustment signal 29 in which the excess or deficiency is corrected is sent to the material supply device 1.

このようにすることにより、成形速度24の変化前後に
おいて、カレンダ4のバンク量の変動が少くなり、成形
速度24を変化させた場合でも均一なシート材6'の製造を
行うことができる。
By doing so, the fluctuation of the bank amount of the calendar 4 before and after the change of the molding speed 24 is reduced, and even when the molding speed 24 is changed, the uniform production of the sheet material 6 'can be performed.

以上を第2図のタイムチャートを用いて説明する。 The above is described with reference to the time chart of FIG.

演算制御装置28は、前記成形速度検出器18から送られ
て来る成形速度24を一定時間T1毎に取込んで、カレンダ
4の成形速度24を監視しており、且つスイングコンベア
2が揺動する時間と等しい材料供給量制御時間T2毎に、
材料供給装置1の材料供給量を制御している。
The arithmetic and control unit 28 is a ipecac a forming speed 24 sent from the forming speed detector 18 at predetermined time intervals T 1, monitors the molding rate 24 calendar 4, and the swing conveyor 2 is swung time equal quantity of material fed per control time T 2 to,
The material supply amount of the material supply device 1 is controlled.

初めカレンダ4の成形速度24をV1とし、この時のカレ
ンダ4の材料消費量をW1、材料供給装置1の材料供給量
をW1′(W1=W1′)、材料供給装置1から送り出された
材料3がスイングコンベア2に搬送されてカレンダ4の
バンク4′へ到達した時の材料到達量をW1″(W1′=
W1″)とすると、カレンダ4の成形速度24がA点で変化
を始めB点でV2となった場合、カレンダ4の材料消費量
W1は成形速度24と同じにA点で変化し始めB点でW2とな
る。
Initially, the molding speed 24 of the calendar 4 is V 1 , the material consumption of the calendar 4 at this time is W 1 , the material supply amount of the material supply device 1 is W 1 ′ (W 1 = W 1 ′), and the material supply device 1 bank 4 of fed material 3 is conveyed to the swing conveyor 2 calendar 4 'W 1 "of material reaching the amount of time that reaches the (W 1' =
W 1 ″), if the molding speed 24 of the calendar 4 starts to change at the point A and becomes V 2 at the point B, the material consumption of the calendar 4
W 1 starts to change at the point A as in the molding speed 24, and becomes W 2 at the point B.

一方、演算制御装置28がA点で成形速度24が変化した
ことを判断し、B点の後の成形速度検出値取込み時間で
あるC点で成形速度24がV2となったことを判断する。
On the other hand, the arithmetic and control unit 28 determines that the forming speed 24 at point A changes, forming speed 24 point C is a forming speed detection value acquisition time after the point B is determined that a V 2 .

すると、演算制御装置28はC点の後の材料供給量制御
時間であるD点で、材料供給装置1にナイフ幅調整信号
29を送って、材料供給量を以下のように変更する。即
ち、成形速度変更後の材料消費量W2を、時間t1の間の材
料消費量の偏差分Q1と時間t2の間の材料消費量の偏差分
Q2とで補正した材料供給量W3′とする。
Then, the arithmetic and control unit 28 sends the knife width adjustment signal to the material supply device 1 at the point D which is the material supply amount control time after the point C.
Send 29 to change the material supply as follows. That is, the material consumption W 2 of the changed forming speed, deviations of the material consumption during the deviations Q 1 and time t 2 of the material consumption during the time t 1
The material supply amount W 3 ′ corrected by Q 2 is used.

その後、演算制御装置28はF点で、材料供給装置1に
ナイフ幅調整信号29を送って、材料供給量を変更後の材
料消費量W2と等しいW2′に戻す。
Thereafter, at point F, the arithmetic and control unit 28 sends a knife width adjustment signal 29 to the material supply device 1 to return the material supply amount to W 2 ′, which is equal to the changed material consumption amount W 2 .

最後に、材料供給量W1′,W2′,W3′の求め方について
説明する。
Finally, a method of obtaining the material supply amounts W 1 ′, W 2 ′, and W 3 ′ will be described.

先ず、カレンダ4の材料消費量Wは、得られるシート
材6'のシート幅をS、シート厚さをH、シート材6'の成
形速度をV、シート材6'の比重をγとすると、(1)式
で求められる。
First, assuming that the material consumption W of the calendar 4 is S, the sheet width of the obtained sheet material 6 'is S, the sheet thickness is H, the forming speed of the sheet material 6' is V, and the specific gravity of the sheet material 6 'is γ. It is obtained by the equation (1).

W=S・H・V・γ …(1) 又、材料供給装置1の材料供給量W′は、ナイフ幅13
をN、混練ロール8,8'のロール間ギャップをG、混練ロ
ール8のロール速度をV′とすると、(2)式で求めら
れる。
W = S · H · V · γ (1) The material supply amount W ′ of the material supply device 1 is the knife width 13
Is N, the gap between the kneading rolls 8, 8 'is G, and the roll speed of the kneading rolls 8 is V'.

W′=N・G・V′・γ …(2) そして、カレンダ4における材料消費量Wと材料供給
装置1における材料供給量W′とが等しい場合に、カレ
ンダ4のバンク量は一定となるので、バンク量を一定と
するための条件はW=W′即ち(3)式となる。
W ′ = NGGV′γ (2) When the material consumption W in the calendar 4 and the material supply W ′ in the material supply device 1 are equal, the bank amount of the calendar 4 is constant. Therefore, the condition for keeping the bank amount constant is W = W ', that is, equation (3).

S・H・V・γ=N・G・V′・γ …(3) ここで、材料供給装置1における材料供給量W′は、
設定値である混練ロール8,8'のロール間ギャップG、混
練ロール8のロール速度V′を変更しない限り一定とな
るため、ナイフ幅Nにより変更されるので、(3)式を
ナイフ幅Nについてまとめると、 が得られる。
S · H · V · γ = NG · V ′ · γ (3) Here, the material supply amount W ′ in the material supply device 1 is:
Since the set values, ie, the gap G between the kneading rolls 8 and 8 ′ and the roll speed V ′ of the kneading rolls 8, are constant unless they are changed, they are changed by the knife width N. To summarize, Is obtained.

ここで、シート幅S、シート厚さH、混練ロール8,8'
のロール間ギャップG、材料速度V′はいずれも設定値
であり一定とされているため を定数kで表わすと、 N=k・V …(5) となる。
Here, sheet width S, sheet thickness H, kneading rolls 8, 8 '
Since the gap G between the rolls and the material speed V 'are set values and constant. Is represented by a constant k, N = k · V (5)

従って、材料供給量がW1′のときのナイフ幅N1は、
(5)式の右辺のVにV1を代入して N1=k・V1 …(6) となり、材料供給量がW2′のときのナイフ幅N2は(5)
式の右辺のVにV2を代入して N2=k・V2 …(7) となる。
Therefore, the knife width N 1 when the material supply amount of W 1 'is
(5) of the right side of the V by substituting V 1 N 1 = k · V 1 ... (6) , and the knife width N 2 when the material supply amount W 2 '(5)
By substituting V 2 for V on the right side of the equation, N 2 = k · V 2 (7)

又、材料供給量がW3′のときのナイフ幅N3は、以下の
ようになる。
Also, knife width N 3 when the quantity of material fed is W 3 'is as follows.

A点からD点までの総材料供給量の偏差分Q1を補正す
るためのナイフ幅NQ1は、A点からD点までの平均成形
速度を近似的に とすると、(5)式の右辺のVに速度差 を代入し、且つ右辺を材料供給量の制御時間T2のうちに
比例配分するために、 倍して となり又、D点からE点までの材料供給量の偏差分Q2
補正するためのナイフ幅NQ2は、(5)式の右辺のVに
速度差V2−V1を代入し、且つ右辺を材料供給量の制御時
間T2のうちに比例配分するために 倍して となる。
The knife width N Q1 for correcting the deviation Q 1 of the total material supply amount from the point A to the point D is approximately the average forming speed from the point A to the point D. Then, the velocity difference is given to V on the right side of equation (5). And to allocate the right side proportionally to the control time T 2 of the material supply amount, Multiply Further, the knife width N Q2 for correcting the deviation Q 2 of the material supply amount from the point D to the point E is obtained by substituting the speed difference V 2 −V 1 into V on the right side of the equation (5), and to prorating right within the control time T 2 of the quantity of material fed Multiply Becomes

従って、求めるナイフ幅N3は前記N2にNQ1とNQ2を合計
した N3=N2+NQ1+NQ2 …(10) として求められる。
Therefore, the knife width N 3 seeking is determined as the N 2 to N of the sum of N Q1 and N Q2 3 = N 2 + N Q1 + N Q2 ... (10).

F点以降はナイフ幅13をN2とする。F point subsequent to the knife width 13 and N 2.

以上は、カレンダ4の成形速度24を早める場合につい
て述べたが、成形速度24を遅くする場合も上記と同様で
ある。
Although the case where the molding speed 24 of the calendar 4 is increased has been described above, the case where the molding speed 24 is decreased is the same as above.

また、上記説明では材料供給量制御時間T2は検出にか
かる一定時間T1に較べ、十分長い場合について説明した
が、材料供給量制御時間T2を十分短くして、検出にかか
る一定時間T1に近いサイクルで制御することも、可能で
ある。
Further, the material supply amount control time T 2 are in the above description than the predetermined time T 1 according to the detection, has been described sufficiently long, the material supply amount control time T 2 is sufficiently short, according to the detected predetermined time T Control with a cycle close to 1 is also possible.

上記説明例では、混練ロール8,8'から材料3'を切出し
て、カレンダ4に供給する方法について説明したが、押
出機32からの材料を直接スイングコンベア2に供給する
押出機方式を採用しても可能である。
In the above description, the method of cutting out the material 3 ′ from the kneading rolls 8 and 8 ′ and supplying the material 3 ′ to the calendar 4 has been described. However, an extruder method of directly supplying the material from the extruder 32 to the swing conveyor 2 is adopted. It is possible.

尚、本発明のカレンダの材料供給量制御装置は上述の
実施例にのみ限定されるものではなく、本発明の要旨を
逸脱しない範囲内において種々変更を加え得ることは勿
論である。
It should be noted that the calendar material supply amount control device of the present invention is not limited to the above-described embodiment, and it is needless to say that various changes can be made without departing from the spirit of the present invention.

[発明の効果] 以上説明したように、本発明のカレンダの材料供給量
制御装置によれば下記の如き種々の優れた効果を奏し得
る。
[Effects of the Invention] As described above, according to the calendar material supply amount control device of the present invention, the following various excellent effects can be obtained.

カレンダの成形速度を変更させることによりカレンダ
の材料消費量が変化した時に、材料供給装置からカレン
ダへの材料供給量を成形速度変更後のカレンダの材料消
費量と等しい量に変更させると共に、最初の材料供給量
制御時間の間だけ、カレンダの成形速度の変更を開始し
てから材料供給装置が材料供給量を変更するまでの間の
カレンダの材料消費量の材料到達量に対する偏差分と、
材料供給装置が材料供給量の変更を開始してから材料供
給量変更後の材料がカレンダに到達するまでの間のカレ
ンダでの材料消費量の材料到達量に対する偏差分とによ
り前記材料供給量を補正するようにしたので、カレンダ
の成形速度変化の前後でカレンダのバンク量の変化を小
さく押えることができ、より均一なシート材を製造する
ことができる。
When the material consumption of the calendar changes by changing the molding speed of the calendar, the material supply amount from the material supply device to the calendar is changed to an amount equal to the material consumption of the calendar after the molding speed is changed, and Only during the material supply amount control time, a deviation amount of the material consumption of the calendar from the material arrival amount between the time when the change of the molding speed of the calendar is started and the time when the material supply device changes the material supply amount, and
The material supply amount is determined by a deviation amount of the material consumption amount in the calendar from the material supply amount start changing the material supply amount until the material after the material supply amount change reaches the calendar with respect to the material arrival amount. Since the correction is made, the change in the bank amount of the calendar before and after the change in the molding speed of the calendar can be kept small, and a more uniform sheet material can be manufactured.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の一実施例の概略全体図、第2図は本発
明の一実施例における材料供給量の制御のタイムチャー
ト、第3図は従来例の概略全体図、第4図は第3図にお
ける材料供給装置の平面図である。 図中1は材料供給装置、3,3'は材料、4はカレンダ、4'
はバンク、6,6'はシート材、16はシート幅検出器、17は
シート厚さ検出器、18は成形速度検出器、22はシート
幅、23はシート厚さ、24は成形速度、28は演算制御装
置、29は演算制御装置28から材料供給装置1へ送る信号
としてのナイフ幅調整信号、37はバンクセンサ、38はバ
ンク量信号、V1,V2はカレンダ4の成形速度、W1,W2はカ
レンダ4の材料消費量、W1′,W2′は材料供給装置1の
材料供給量、W1″,W2″はカレンダ4の材料到達量、t1
は成形速度が変更されてから材料供給量の変更が開始さ
れるまでの時間、Q1は時間t1の間の材料消費量と材料到
達量との偏差分、t2は材料供給量の変更が開始されてか
ら材料がカレンダに到達するまでの移送時間、Q2は時間
t2の間の材料消費量と材料到達量との偏差分、T2は材料
供給量制御時間を示す。
FIG. 1 is a schematic general view of one embodiment of the present invention, FIG. 2 is a time chart of control of a material supply amount in one embodiment of the present invention, FIG. 3 is a schematic general view of a conventional example, and FIG. FIG. 4 is a plan view of the material supply device in FIG. 3. In the figure, 1 is a material supply device, 3 and 3 'are materials, 4 is a calendar, 4'
Is the bank, 6, 6 'is the sheet material, 16 is the sheet width detector, 17 is the sheet thickness detector, 18 is the forming speed detector, 22 is the sheet width, 23 is the sheet thickness, 24 is the forming speed, 28 , A knife width adjustment signal as a signal sent from the arithmetic and control unit 28 to the material supply device 1, 37 a bank sensor, 38 a bank amount signal, V 1 and V 2 a molding speed of the calendar 4, W 1 , W 2 is the amount of material consumed by the calendar 4, W 1 ′, W 2 ′ is the amount of material supplied by the material supply device 1, W 1 ″, W 2 ″ is the amount of material reached by the calendar 4, t 1
Deviations of the material consumption and the material reaches the amount during the time from being changed molding rate to change quantity of material fed is started, Q 1 is the time t 1 is, t 2 Changing the quantity of material fed Time from the start of the process until the material reaches the calendar, Q 2 is the time
deviations of the material consumption and the material reaches the amount of between t 2, T 2 represents a material supply amount control time.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) B29C 43/22 - 43/24 B29C 43/32 - 43/34 B29C 43/58 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int. Cl. 6 , DB name) B29C 43/22-43/24 B29C 43/32-43/34 B29C 43/58

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】カレンダのバンク量を検出するバンクセン
サと、バンクセンサからのバンク量に基づき材料供給装
置に材料の供給量を変化させる信号を送る演算制御装置
とを備えたカレンダの材料供給量制御装置において、カ
レンダの成形速度を検出する成形速度検出器と、カレン
ダで成形されたシート材のシート幅及びシート厚さを検
出するシート幅検出器及びシート厚さ検出器と、成形速
度及びシート幅並にシート厚さを入力して、カレンダの
成形速度が変化した場合に、カレンダの成形速度が変更
されてから材料供給装置が材料供給量の変更を開始され
るまでの時間のカレンダの材料消費量と材料到達量との
偏差分及び材料供給装置が材料供給量の変更を開始され
てから材料供給量変更後の材料がカレンダに到達するま
での時間のカレンダの材料消費量と材料到達量との偏差
分により前記材料供給量を補正させる信号を前記材料供
給装置に送る演算制御装置とを備えたことを特徴とする
カレンダの材料供給量制御装置。
1. A material supply amount of a calendar comprising a bank sensor for detecting a bank amount of a calendar, and an arithmetic and control unit for sending a signal for changing a material supply amount to a material supply device based on the bank amount from the bank sensor. In the control device, a forming speed detector for detecting a forming speed of the calendar, a sheet width detector and a sheet thickness detector for detecting a sheet width and a sheet thickness of the sheet material formed by the calendar, a forming speed and a sheet When the molding speed of the calendar is changed by inputting the sheet thickness in the same width as the width, the material of the calendar is the time from when the molding speed of the calendar is changed to when the material supply device starts to change the material supply amount. The amount of deviation between the consumed amount and the material arrival amount, and the calender of the time from when the material supply device starts changing the material supply amount until the material after the material supply amount change reaches the calendar. Material supply amount control device of the calendar being characterized in that a calculation control unit which sends a signal to correct the quantity of material fed to the material supply device according to a deviation amount of the material consumption and the material reaches the amount of.
JP13687590A 1990-05-25 1990-05-25 Calendar material supply control device Expired - Fee Related JP2924092B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13687590A JP2924092B2 (en) 1990-05-25 1990-05-25 Calendar material supply control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13687590A JP2924092B2 (en) 1990-05-25 1990-05-25 Calendar material supply control device

Publications (2)

Publication Number Publication Date
JPH0429813A JPH0429813A (en) 1992-01-31
JP2924092B2 true JP2924092B2 (en) 1999-07-26

Family

ID=15185575

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13687590A Expired - Fee Related JP2924092B2 (en) 1990-05-25 1990-05-25 Calendar material supply control device

Country Status (1)

Country Link
JP (1) JP2924092B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4534370B2 (en) * 2001-03-15 2010-09-01 パナソニック電工株式会社 Transport method for phenolic resin molding materials
JP2013049139A (en) * 2011-08-30 2013-03-14 Ihi Corp Cut width display device of sheet material
JP6560031B2 (en) * 2015-06-11 2019-08-14 Toyo Tire株式会社 Rubber sheet manufacturing apparatus and manufacturing method

Also Published As

Publication number Publication date
JPH0429813A (en) 1992-01-31

Similar Documents

Publication Publication Date Title
US5124163A (en) Method for stretching dough
JPH03210142A (en) Extension of dough and device therefor
EP0657101B1 (en) Method and apparatus for quantifying a dough product
US5110277A (en) Dough-stretching roller apparatus
CN110370600B (en) Film thickness control system based on bolt self-positioning
EP0182563A2 (en) Apparatus and method of machining doughy material
US4428896A (en) Method of producing an extrudate of controlled size and shape from a roller die
CN104936759A (en) Apparatus and method for extruding elastomer mixture
FI79481B (en) FOERFARANDE OCH ANORDNING FOER OEVERVAKNING AV FRAMSTAELLNINGEN AV LAONGSTRAECKTA GUMMI- ELLER TERMOPLASTPROFILER PRESSADE AV EN ELLER FLERE BLANDNINGAR.
JP2924092B2 (en) Calendar material supply control device
JP3786505B2 (en) Bank amount control method, roll kneading device used therein, and roll kneading device group
JP3983064B2 (en) Rubber sheet molding equipment
JPS59103735A (en) Method for manufacturing thermoplastic resin extrusion molded products
JPH02137911A (en) Dimensional control device for molded material in inflation molding line
JPS6330112A (en) Cooling control method and device for sheet stock
JPH0815753B2 (en) Film width control device
JPH05245908A (en) Extruding quantity control method of extruder with gear pump and its apparatus
JP3156797B2 (en) Calendar bank amount control method
JPH02194917A (en) Automatic thickness changing device for thermoplastic resin sheet
JPH0777723B2 (en) Method and apparatus for controlling viscosity of kneading material
JP3516730B2 (en) Film forming method and forming apparatus
JPH07308953A (en) Extruded foam manufacturing method and manufacturing apparatus therefor
JPH05131480A (en) Controlling method of stock feeding to calender
JP3342917B2 (en) Method and apparatus for controlling shape of extruded rubber member
JP2005161527A (en) Calendar molding equipment

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080507

Year of fee payment: 9

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20080507

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080507

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090507

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090507

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20100507

LAPS Cancellation because of no payment of annual fees