Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP2988566B2 - Construction method of underground diaphragm wall - Google Patents
[go: Go Back, main page]

JP2988566B2 - Construction method of underground diaphragm wall - Google Patents

Construction method of underground diaphragm wall

Info

Publication number
JP2988566B2
JP2988566B2 JP6188874A JP18887494A JP2988566B2 JP 2988566 B2 JP2988566 B2 JP 2988566B2 JP 6188874 A JP6188874 A JP 6188874A JP 18887494 A JP18887494 A JP 18887494A JP 2988566 B2 JP2988566 B2 JP 2988566B2
Authority
JP
Japan
Prior art keywords
forming plate
wall
wall forming
concrete
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP6188874A
Other languages
Japanese (ja)
Other versions
JPH0827779A (en
Inventor
正 金子
秀樹 篠原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OOBAYASHIGUMI KK
Original Assignee
OOBAYASHIGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OOBAYASHIGUMI KK filed Critical OOBAYASHIGUMI KK
Priority to JP6188874A priority Critical patent/JP2988566B2/en
Publication of JPH0827779A publication Critical patent/JPH0827779A/en
Application granted granted Critical
Publication of JP2988566B2 publication Critical patent/JP2988566B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地中連続壁の構築方法
に係り、特に、崩壊性地盤において地中連続壁を構築す
る方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an underground continuous wall, and more particularly to a method for constructing an underground continuous wall in a collapsed ground.

【0002】[0002]

【従来の技術】いわゆる地中連続壁は、低騒音、大深
度、高遮水性を兼ね備えた技術であり、その広範囲な施
工性、精度、規模等の適応性の良さから単に仮設土留壁
としてでなく、そのまま本体壁としても利用しうるもの
である。
2. Description of the Related Art A so-called underground continuous wall is a technology that combines low noise, large depth, and high water-blocking properties. Instead, it can be used as it is as a main body wall.

【0003】地中連続壁を構築するには、まず、エレメ
ントあるいはパネルと呼ばれる5乃至6m程度のスパン
を溝状に掘削し、その溝内に鉄筋かごを建て込む。次い
で、トレミー管を介してコンクリートを打設し、1つの
RCパネルを完了する。
In order to construct an underground continuous wall, first, a span of about 5 to 6 m called an element or a panel is excavated in a groove shape, and a reinforcing steel cage is built in the groove. Next, concrete is poured through the tremy tube to complete one RC panel.

【0004】かかる工程を複数のパネルについて繰り返
し、所定長さの連続壁を構築する。
This process is repeated for a plurality of panels to construct a continuous wall of a predetermined length.

【0005】ここで、掘削の際、掘削壁面の崩壊を防ぐ
ために、ベントナイト泥水等の安定液を注入することが
不可欠であり、かかる泥水は、コンクリートを打設する
際にコンクリートに置換される。
Here, in excavation, it is essential to inject a stable liquid such as bentonite mud in order to prevent collapse of the excavated wall surface. Such mud is replaced by concrete when the concrete is poured.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、地表付
近が特に軟弱で崩壊しやすい地盤(例えば障害物撤去に
伴う埋戻し土、腐植土、超軟弱シルト層あるいは玉石層
を含む地盤)の場合には、泥水を用いて掘削を行っても
壁面の崩壊を防止することができないことがある。
However, when the ground surface is particularly soft and easily collapsed (for example, ground containing backfill soil, humus, ultra-soft silt layer or boulder layer due to removal of obstacles). However, even when excavation is performed using muddy water, the collapse of the wall surface may not be prevented.

【0007】図7(a) は、掘削壁面の崩壊によって、掘
削壁面1が設計上の掘削ライン2よりも外側に後退し、
当初予想しなかった凹部3が生じた様子を示したもので
ある。
FIG. 7A shows that the excavated wall 1 is retracted outside the designed excavation line 2 due to the collapse of the excavated wall.
This shows a state in which a concave portion 3 that was not expected at the beginning occurred.

【0008】このような状態でコンクリートを打設する
と、同図(b) に示すように、凹部3にもコンクリートが
充填されるが、設計上の掘削ライン2から突出した部分
4は、同図(c) に示すように、根切りの際にこれを削り
取らねばならない。
When concrete is poured in such a state, the concave portion 3 is filled with concrete as shown in FIG. 1B, but the portion 4 protruding from the designed excavation line 2 is As shown in (c), this must be removed during root cutting.

【0009】しかし、余分なコンクリート部分を削り取
るいわゆる「はつり」作業には騒音と粉塵を伴うのみな
らず、大変な労力と時間を要し、工程的にもコスト的に
も大きな問題となっていた。
However, the so-called "hanging" work for shaving off excess concrete not only involves noise and dust, but also requires a great deal of labor and time, and is a serious problem both in terms of process and cost. .

【0010】本発明は、上述した事情を考慮してなされ
たもので、崩壊性地盤内に構築する場合において根切り
後のはつり作業を実質的になくすことができる地中連続
壁の構築方法を提供することを目的とする。
[0010] The present invention has been made in view of the above-described circumstances, and provides a method of constructing an underground continuous wall capable of substantially eliminating the hanging work after root cutting when constructing in collapsed ground. The purpose is to provide.

【0011】[0011]

【課題を解決するための手段】上記目的を達成するた
め、本発明の地中連続壁の構築方法は請求項1に記載し
たように、安定液を注入しながら地盤を掘削して溝を形
成する工程と、当該溝内に壁面形成板を挿入する工程
と、該壁面形成板の裏側に流れ込むように前記溝内にコ
ンクリートを打設する工程と、当該コンクリートの初期
硬化後に前記壁面形成板を引き抜いて地中連続壁を形成
する工程とからなるものである。
In order to achieve the above object, a method of constructing an underground continuous wall according to the present invention, as described in claim 1, excavates the ground while injecting a stabilizing solution to form a groove. A step of inserting a wall forming plate into the groove, a step of casting concrete into the groove so as to flow into the back side of the wall forming plate, and the step of forming the wall forming plate after the concrete is initially hardened. And forming a continuous underground wall by drawing.

【0012】また、本発明の地中連続壁の構築方法は請
求項2に記載したように、安定液を注入しながら地盤を
掘削して溝を形成する工程と、当該溝内に壁面形成板を
挿入する工程と、該壁面形成板の裏側に流れ込むように
前記溝内にコンクリートを打設する工程と、当該コンク
リートが硬化するまでの間、前記壁面形成板を昇降させ
る工程と、前記コンクリートが硬化した後、前記壁面形
成板を引き抜いて地中連続壁を形成する工程とからなる
ものである。
According to a second aspect of the present invention, there is provided a method for constructing an underground continuous wall, comprising: excavating the ground while pouring a stabilizing solution to form a groove; Inserting a concrete into the groove so as to flow into the back side of the wall forming plate, and raising and lowering the wall forming plate until the concrete hardens. Forming the underground continuous wall by pulling out the wall forming plate after the concrete has hardened.

【0013】また、本発明の地中連続壁の構築方法は、
請求項1乃至2のいずれかに記載の壁面形成板の挿入工
程の前に、当該壁面形成板の表面に所定の潤滑剤を塗布
若しくは被着する工程を含むものである。
[0013] The method for constructing an underground continuous wall according to the present invention comprises:
Before the step of inserting the wall forming plate according to any one of claims 1 and 2, the method includes a step of applying or applying a predetermined lubricant to the surface of the wall forming plate.

【0014】また、本発明の地中連続壁を用いた根切り
方法は、請求項1乃至3のいずれかに記載の壁面形成板
の引抜き工程の後に、当該壁面形成板の裏側に流れ込ん
だコンクリートによって形成された突出部分を切り崩し
ながら前記地中連続壁の内側の地盤を根切りする工程を
含むものである。
Further, according to the root cutting method using the underground continuous wall of the present invention, the concrete poured into the back side of the wall forming plate after the step of drawing out the wall forming plate according to any one of claims 1 to 3. And cutting the ground inside the underground continuous wall while cutting off the protruding portion formed by the above.

【0015】[0015]

【作用】本発明の地中連続壁の構築方法においては、ま
ず、ベントナイト泥水等の安定液を注入しながら地盤を
掘削して溝を形成する。次いで、必要に応じて鉄筋かご
を建て込んだ後、壁面形成板を溝内に挿入する。
In the method of constructing an underground continuous wall according to the present invention, first, a ground is excavated while a stable liquid such as bentonite mud is injected to form a trench. Next, after the reinforcing cage is erected as necessary, the wall forming plate is inserted into the groove.

【0016】ここで、壁面形成板は、設計上の壁面位置
に沿って配置する。
Here, the wall surface forming plate is disposed along the designed wall surface position.

【0017】次に、溝内にコンクリートを打設する。Next, concrete is poured into the groove.

【0018】次に、コンクリートの初期硬化後、例えば
2乃至3時間後に、上述の壁面形成板を溝内から引き抜
く。
Next, after the initial hardening of the concrete, for example, 2 to 3 hours, the above-mentioned wall forming plate is pulled out from the inside of the groove.

【0019】ここで、コンクリートは完全に硬化してい
ないため、壁面形成板を引き抜く際、周囲のコンクリー
トとの間に大きな摩擦力が生じることはなく、比較的小
さな力でこれを引き抜くことができる。
Here, since the concrete is not completely hardened, a large frictional force does not occur between the concrete and the surrounding concrete when the wall forming plate is pulled out, and it can be pulled out with a relatively small force. .

【0020】また、壁面形成板の裏側に流れ込んだコン
クリートによる突出部分は、根切り底より下方において
本体側とつながっている以外は本体側と縁が切れてい
る。
The protruding portion of the concrete that has flowed into the back side of the wall forming plate has an edge cut off from the main body side except for being connected to the main body side below the root bottom.

【0021】そのため、根切りの際にその突出部分を容
易に崩落させることができ、はつり作業は実質的に不要
となる。
[0021] Therefore, the protruding portion can be easily collapsed at the time of root cutting, and the hanging operation is substantially unnecessary.

【0022】なお、壁面形成板の挿入前に当該壁面形成
板の表面に予め所定の潤滑剤を塗布若しくは被着してお
けば、壁面形成板の引抜きはさらに容易になる。
If a predetermined lubricant is previously applied or applied to the surface of the wall forming plate before the wall forming plate is inserted, the wall forming plate can be more easily pulled out.

【0023】また、本発明の地中連続壁の構築方法にお
いては、上述したと同様、地盤を掘削して溝を形成し、
当該溝内に壁面形成板を挿入する。
In the method of constructing an underground continuous wall according to the present invention, as described above, the ground is excavated to form a groove,
A wall forming plate is inserted into the groove.

【0024】次に、溝内にコンクリートを打設する。Next, concrete is poured into the groove.

【0025】次に、コンクリートが硬化するまでの間、
壁面形成板を昇降させてコンクリートとの縁を切ってお
く。
Next, until the concrete hardens,
The wall forming plate is raised and lowered to cut off the edge with concrete.

【0026】次に、コンクリートが硬化した後、壁面形
成板を溝内から引き抜く。
Next, after the concrete has hardened, the wall forming plate is pulled out of the groove.

【0027】ここで、壁面形成板とコンクリートとの縁
を切ってあるため、壁面形成板を引き抜く際、周囲のコ
ンクリートとの間に大きな摩擦を生じることなく、容易
にこれを引き抜くことができる。
Here, since the edge between the wall forming plate and the concrete is cut, when the wall forming plate is pulled out, it can be easily pulled out without generating large friction between the surrounding concrete and the concrete.

【0028】また、壁面形成板の裏側に流れ込んだコン
クリートによる突出部分は、根切り底より下方において
本体側とつながっている以外は本体側と縁が切れてい
る。
The protruding portion of the concrete flowing into the back side of the wall forming plate has an edge cut off from the main body side except for being connected to the main body side below the root bottom.

【0029】そのため、根切りの際にその突出部分を容
易に崩落させることができ、はつり作業は実質的に不要
となる。
For this reason, the protruding portion can be easily collapsed at the time of root cutting, and the hanging work is substantially unnecessary.

【0030】なお、壁面形成板の挿入前に当該壁面形成
板の表面に予め所定の潤滑剤を塗布若しくは被着してお
けば、壁面形成板の引抜きはさらに容易になる。
Note that if a predetermined lubricant is previously applied or applied to the surface of the wall forming plate before the wall forming plate is inserted, the wall forming plate can be more easily pulled out.

【0031】[0031]

【実施例】以下、本発明の地中連続壁の構築方法の実施
例について、添付図面を参照して説明する。なお、従来
技術と実質的に同一の部品等については同一の符号を付
してその説明を省略する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the method for constructing an underground continuous wall of the present invention will be described below with reference to the accompanying drawings. It is to be noted that the same reference numerals are given to components and the like that are substantially the same as those in the conventional technology, and description thereof will be omitted.

【0032】(第1実施例)図1は、本実施例の地中連
続壁の構築方法の手順を示したフローチャート、図2乃
至図4は、同じく断面図である。
(First Embodiment) FIG. 1 is a flowchart showing a procedure of a method of constructing an underground continuous wall according to this embodiment, and FIGS. 2 to 4 are sectional views of the same.

【0033】本実施例の構築方法を用いて地中連続壁を
構築するは、まず図2(a) に示すように、ベントナイト
泥水等の安定液11で掘削壁面の崩壊をできるだけ防止
しつつ1パネルに相当するスパン、例えば5乃至6m程
度のスパンをガイドトレンチ14に沿って掘削し、地盤
12内に溝13を形成する(ステップ101)。
The underground continuous wall is constructed using the construction method of this embodiment. First, as shown in FIG. 2 (a), the collapse of the excavated wall is prevented as much as possible with a stable liquid 11 such as bentonite mud. A span corresponding to the panel, for example, a span of about 5 to 6 m is excavated along the guide trench 14 to form a groove 13 in the ground 12 (step 101).

【0034】ここで、溝13は、本来、設計上の掘削ラ
イン15に沿って掘削されるはずであるが、地盤12が
崩壊性地盤であるため、掘削中に凹部17が生じ、実際
の掘削壁面16は、設計上の掘削ライン15よりも外側
に後退している。
Here, the trench 13 should be originally excavated along the designed excavation line 15, but since the ground 12 is a collapsible ground, a concave portion 17 is formed during excavation, and the actual excavation is performed. The wall surface 16 retreats outside the designed excavation line 15.

【0035】次いで、図2(b) に示すように、溝13内
に鉄筋かご21を建て込む(ステップ102)。
Next, as shown in FIG. 2B, a reinforcing cage 21 is built in the groove 13 (step 102).

【0036】一方、壁面形成板22の表面、好ましくは
両面に所定の潤滑剤31を塗布若しくは被着しておく
(ステップ103)。
On the other hand, a predetermined lubricant 31 is applied or applied to the surface, preferably both surfaces, of the wall forming plate 22 (step 103).

【0037】壁面形成板22は、例えば20mm程度の
厚みの鉄板で構成し、その高さを、当該壁面形成板22
の上端がコンクリート天端を若干上回り、下端が根切り
底を若干下回る程度とするのがよい。
The wall forming plate 22 is made of, for example, an iron plate having a thickness of about 20 mm, and its height is set to the wall forming plate 22.
It is recommended that the upper end of the slab is slightly above the top of the concrete and the lower end is slightly below the bottom of the root.

【0038】潤滑剤31は、例えば液体状の潤滑油若し
くは半固体状のグリースを選択しこれを壁面形成板22
に塗布する形態で使用してもよいし、高分子系の固体潤
滑剤を選択しこれを壁面形成板22の表面に付着して数
十μmの被膜を形成する形態で使用してもよい。
As the lubricant 31, for example, a liquid lubricating oil or a semi-solid grease is selected and the lubricating oil is applied to the wall forming plate 22.
It may be used in a form in which it is applied to the surface, or in a form in which a polymer-based solid lubricant is selected and adhered to the surface of the wall forming plate 22 to form a coating of several tens of μm.

【0039】次に、図3(a) に示すように、壁面形成板
22を根切り側の掘削壁面(同図では右側)と鉄筋かご
21との間に挿入し、地中連続壁の設計上の壁面位置に
てこれらを保持する(ステップ104)。
Next, as shown in FIG. 3A, the wall forming plate 22 is inserted between the excavation wall on the root cutting side (the right side in the figure) and the reinforcing cage 21 to design the underground continuous wall. These are held at the upper wall position (step 104).

【0040】次に、図3(b) に示すように、溝13内に
コンクリートを打設する(ステップ105)。なお、必
要に応じてコンクリート打設前にロッキングパイプを溝
13の先端部に建て込んでおき、次のパネルの掘削に備
える。
Next, as shown in FIG. 3B, concrete is poured into the groove 13 (step 105). If necessary, a rocking pipe is erected at the end of the groove 13 before concrete is poured, so as to be ready for the next panel excavation.

【0041】次に、コンクリートの初期硬化後、例えば
打設から2乃至3時間経過後、同図の矢印に示すように
壁面形成板22を溝13内から引き抜いて地中連続壁2
3を形成するとともに(ステップ106)、ロッキング
パイプを建て込んだ場合にはこれも引き抜く。
Next, after the initial hardening of the concrete, for example, two to three hours after the casting, the wall forming plate 22 is pulled out from the inside of the groove 13 as shown by the arrow in FIG.
3 is formed (step 106), and when the locking pipe is erected, it is also pulled out.

【0042】初期硬化に至る時間は、コンクリートの性
状、打設時の気温等を考慮しながら適宜設定するのがよ
い。
The time required for the initial hardening may be appropriately set in consideration of the properties of the concrete, the temperature at the time of casting, and the like.

【0043】なお、打設したコンクリートは、上述した
壁面形成板22の裏側の凹部17にも流れ込み、本体で
ある地中連続壁23から根切り側に突出した突出部分2
4が形成される。
The poured concrete also flows into the recess 17 on the back side of the wall forming plate 22 described above, and projects from the underground continuous wall 23 as the main body to the root cutting side.
4 are formed.

【0044】壁面形成板22を引き抜くに際しては、上
述したように、壁面形成板22の表面に潤滑剤31を塗
布若しくは被着してあり、かつコンクリートは完全に硬
化していないため、周囲のコンクリートとの間に大きな
摩擦力が生じることはなく、比較的小さな力で引き抜く
ことができる。
When the wall forming plate 22 is pulled out, as described above, the lubricant 31 is applied or applied to the surface of the wall forming plate 22 and the concrete is not completely hardened. A large frictional force does not occur between them, and they can be pulled out with a relatively small force.

【0045】以上の手順を所定長さの連続壁が構築され
るまで繰り返す(ステップ107)。
The above procedure is repeated until a continuous wall of a predetermined length is constructed (step 107).

【0046】連続壁を構築した後は、図4に示すよう
に、突出部分24を崩しながら根切りを行う(ステップ
108)。
After constructing the continuous wall, as shown in FIG. 4, root cutting is performed while breaking the protruding portion 24 (step 108).

【0047】ここで、壁面形成板22の裏側に流れ込ん
だコンクリートによる突出部分24は、根切り底より下
方において本体側とつながっている以外は本体側と縁が
切れている。
Here, the protruding portion 24 made of concrete flowing into the back side of the wall forming plate 22 has an edge cut off from the main body side except that it is connected to the main body side below the root cut bottom.

【0048】そのため、根切りの際にその突出部分24
を容易に崩落させることができ、はつり作業は実質的に
不要となる 以上説明したように、本実施例の地中連続壁の構築方法
によれば、壁面形成板の表面に予め潤滑剤を付着させて
おくとともに、壁面形成板の引抜き時期をコンクリート
の初期硬化後としたので、壁面形成板を引き抜く際に大
きな摩擦力が発生するのを回避することができ、比較的
小さな力で壁面形成板を引き抜くことができる。
Therefore, at the time of root cutting, the projecting portion 24
As described above, according to the method of constructing the underground continuous wall of the present embodiment, the lubricant is previously attached to the surface of the wall forming plate. In addition, since the time to pull out the wall forming plate is after the initial hardening of the concrete, it is possible to avoid the generation of a large frictional force when pulling out the wall forming plate, and the wall forming plate can be removed with a relatively small force. Can be pulled out.

【0049】そして、壁面形成板の裏側に回ったコンク
リートで形成された突出部分は、壁面形成板によって本
体と縁が切られており、根切りの際に容易にこれを切り
崩すことができ、はつり作業は実質的に不要となる。
The protruding portion made of concrete which has been turned to the back side of the wall forming plate has its edge cut off from the main body by the wall forming plate, so that it can be easily cut off at the time of root cutting. Work is virtually unnecessary.

【0050】本実施例では特に言及しなかったが、溝を
掘削する前に予め自硬性安定液等による地盤改良を施
し、壁面の崩壊を最小限に抑えるようにしてもよい。
Although not particularly mentioned in the present embodiment, the ground may be improved in advance with a self-hardening stabilizer before excavating the trench to minimize the collapse of the wall surface.

【0051】また、本実施例では、後のパネルの掘削の
都合上、コンクリート打設前にロッキングパイプを挿入
するようにしたが、ハイドロフレーズ掘削機等を用いて
掘削時に先行パネルのコンクリート部分を同時にカッテ
ィングするような場合には、かかるロッキングパイプは
必要ないことは言うまでもない。
In this embodiment, the rocking pipe is inserted before the concrete is cast for the purpose of excavating the panel later. However, the concrete portion of the preceding panel is excavated at the time of excavation using a hydrophrase excavator or the like. Needless to say, in the case of cutting at the same time, such a locking pipe is not necessary.

【0052】(第2実施例)次に、第2実施例について
説明する。なお、第1実施例と実質的に同一の部品等に
ついては同一の符号を付してその説明を省略する。
(Second Embodiment) Next, a second embodiment will be described. Note that the same reference numerals are given to components and the like that are substantially the same as those in the first embodiment, and description thereof will be omitted.

【0053】図5は、本実施例の地中連続壁の構築方法
の手順を示したフローチャートである。
FIG. 5 is a flowchart showing the procedure of the method of constructing an underground continuous wall according to this embodiment.

【0054】ここで、ステップ111乃至115につい
ては、図1のステップ101乃至105とほぼ同様であ
るのでここではその詳細な説明を省略し、コンクリート
を打設する工程(ステップ115)以降について説明す
る。
Here, steps 111 to 115 are almost the same as steps 101 to 105 in FIG. 1, so that detailed description thereof will be omitted here, and the step of placing concrete (step 115) and subsequent steps will be described. .

【0055】コンクリートを打設してから当該コンクリ
ートが硬化するまでの間、壁面形成板22を継続的にか
つわずかの距離だけ繰り返し昇降させる(ステップ11
6)。
From the time the concrete is cast to the time the concrete hardens, the wall forming plate 22 is repeatedly raised and lowered continuously and by a small distance (step 11).
6).

【0056】図6は、壁面形成板22を昇降させる機構
例を示した鉛直断面図である。
FIG. 6 is a vertical sectional view showing an example of a mechanism for moving the wall forming plate 22 up and down.

【0057】同図でわかるように、壁面形成板22の上
方には所定の角孔45を設けた吊上げ部43を取り付け
てあり、当該角孔45にガイドトレンチ14上の2本の
H型鋼41に架け渡されたH型鋼42を挿通することに
より、壁面形成板22を吊持するようになっている。
As shown in the figure, a lifting portion 43 having a predetermined square hole 45 is attached above the wall forming plate 22, and the two H-shaped steels 41 on the guide trench 14 are provided in the square hole 45. The wall forming plate 22 is hung by inserting the H-shaped steel 42 bridged between them.

【0058】また、ガイドトレンチ14とH型鋼42と
の間には油圧ジャッキ44を介装してある。
A hydraulic jack 44 is interposed between the guide trench 14 and the H-shaped steel 42.

【0059】かかる機構においては、図6(a) に示すよ
うに油圧ジャッキ44の油圧を解放して壁面形成板22
を下方位置に降ろすことができるとともに、図6(b) に
示すように油圧ジャッキ44を作動させて壁面形成板2
2を上方位置に持ち上げることができるようになってい
る。なお、壁面形成板22は、下方位置においてはH型
鋼41で支持され、上方位置においては油圧ジャッキ4
4で支持される。
In this mechanism, as shown in FIG. 6 (a), the hydraulic pressure of the hydraulic jack 44 is released and the wall forming plate 22 is released.
Can be lowered to the lower position, and the hydraulic jack 44 is operated to operate the wall forming plate 2 as shown in FIG.
2 can be lifted to an upper position. The wall forming plate 22 is supported by the H-shaped steel 41 at the lower position, and is provided at the upper position by the hydraulic jack 4.
Supported by 4.

【0060】コンクリートが硬化するまではこのような
昇降を所定回数だけ繰り返し、壁面形成板22と周囲の
コンクリートとの縁を切っておく。なお、繰り返しの回
数あるいは昇降距離(上方位置と下方位置との間隔)に
ついては、生コンクリートの性状、潤滑剤31の性質等
を考慮して適宜定める。
Until the concrete is hardened, such ascending and descending are repeated a predetermined number of times to cut off the edge between the wall forming plate 22 and the surrounding concrete. The number of repetitions or the elevating distance (the distance between the upper position and the lower position) is appropriately determined in consideration of the properties of the ready-mixed concrete, the properties of the lubricant 31, and the like.

【0061】次に、コンクリートが硬化した後、壁面形
成板22を溝13内から引き抜くとともに(ステップ1
17)、ロッキングパイプを建て込んだ場合にはこれも
引き抜く。
Next, after the concrete has hardened, the wall forming plate 22 is pulled out of the groove 13 (step 1).
17) If the locking pipe is built, pull it out.

【0062】ここで、壁面形成板22の表面には潤滑剤
31が塗布若しくは被着されており、かつコンクリート
との縁を切ってあるため、壁面形成板22を引き抜く
際、周囲のコンクリートとの間にほとんど摩擦を生じる
ことなく、容易にこれを引き抜くことができる。
Here, since the surface of the wall forming plate 22 is coated or coated with the lubricant 31 and is cut off from the edge of the concrete, when the wall forming plate 22 is pulled out, the surface of the wall forming plate 22 is in contact with the surrounding concrete. It can be easily pulled out with little friction between them.

【0063】以上の手順を所定長さの連続壁が構築され
るまで繰り返す(ステップ118)。
The above procedure is repeated until a continuous wall of a predetermined length is constructed (step 118).

【0064】連続壁を構築した後は、第1実施例の図4
と同様、突出部分24を崩しながら根切りを行う(ステ
ップ119)。
After the construction of the continuous wall, FIG.
Similarly to the above, root cutting is performed while breaking the protruding portion 24 (step 119).

【0065】ここで、壁面形成板22の裏側に流れ込ん
だコンクリートによる突出部分24は、根切り底より下
方において本体側とつながっている以外は本体側と縁が
切れている。
Here, the protruding portion 24 made of concrete flowing into the back side of the wall forming plate 22 has an edge cut off from the main body side except that it is connected to the main body side below the root bottom.

【0066】そのため、根切りの際にその突出部分24
を容易に崩落させることができ、はつり作業は実質的に
不要となる 以上説明したように、本実施例の地中連続壁の構築方法
によれば、壁面形成板の表面に予め潤滑剤を付着させて
おくとともに、コンクリートが打設されてから硬化する
までの間、壁面形成板を継続的に繰り返し昇降させるよ
うにしたので、壁面形成板を引き抜く際に大きな摩擦力
が発生するのを回避することができ、比較的小さな力で
壁面形成板を引き抜くことができる。
Therefore, at the time of root cutting, the projecting portion 24
As described above, according to the method of constructing the underground continuous wall of the present embodiment, the lubricant is previously attached to the surface of the wall forming plate. In addition, the wall forming plate is raised and lowered continuously repeatedly from the time the concrete is cast to the time it hardens, so that a large frictional force is avoided when the wall forming plate is pulled out. The wall forming plate can be pulled out with a relatively small force.

【0067】そして、壁面形成板の裏側に回ったコンク
リートで形成された突出部分は、壁面形成板によって本
体と縁が切られており、根切りの際に容易にこれを切り
崩すことができ、はつり作業は実質的に不要となる。
The protruding portion formed of concrete which has turned to the back side of the wall forming plate has its edge cut off from the main body by the wall forming plate, and can be easily cut off at the time of root cutting. Work is virtually unnecessary.

【0068】[0068]

【発明の効果】以上述べたように、本発明の地中連続壁
の構築方法によれば、崩壊性地盤内に構築する場合にお
いて根切り後のはつり作業を実質的になくすことができ
る。
As described above, according to the method of constructing an underground continuous wall according to the present invention, when constructing in the collapsed ground, the hanging work after root cutting can be substantially eliminated.

【0069】また、本発明の地中連続壁を用いた根切り
方法によれば、崩壊性地盤内に構築する場合において根
切り後のはつり作業を実質的になくすことができる。
In addition, according to the root cutting method using the underground continuous wall according to the present invention, in the case of constructing in the collapsed ground, the hanging work after the root cutting can be substantially eliminated.

【0070】[0070]

【図面の簡単な説明】[Brief description of the drawings]

【図1】第1実施例に係る地中連続壁の構築方法及び根
切り方法の手順を示したフローチャート。
FIG. 1 is a flowchart illustrating a procedure of a method of constructing an underground continuous wall and a method of root cutting according to a first embodiment.

【図2】(a)は、地盤に溝を形成した様子を示す鉛直断
面図、(b)は掘削した溝内に鉄筋かごを建て込んだ様子
を示す鉛直断面図。
FIG. 2A is a vertical cross-sectional view showing a state in which a groove is formed in the ground, and FIG. 2B is a vertical cross-sectional view showing a state in which a reinforcing cage is built in an excavated groove.

【図3】(a)は、溝内に壁面形成板を挿入した様子を示
す鉛直断面図、(b)は、溝内にコンクリートを打設し、
続いて壁面形成板を引き抜く様子を示す鉛直断面図。
FIG. 3 (a) is a vertical sectional view showing a state in which a wall forming plate is inserted into a groove, and (b) is a method in which concrete is poured into the groove.
Subsequently, a vertical sectional view showing a state in which the wall forming plate is pulled out.

【図4】根切りを行う際に突出部分を切り崩す様子を示
す鉛直断面図。
FIG. 4 is a vertical sectional view showing a state in which a protruding portion is cut off when root cutting is performed.

【図5】第2実施例に係る地中連続壁の構築方法及び根
切り方法の手順を示したフローチャート。
FIG. 5 is a flowchart illustrating a procedure of a method of constructing an underground continuous wall and a method of root cutting according to the second embodiment.

【図6】(a) は、油圧ジャッキの油圧を解放して壁面形
成板を下方に降ろした状態を示した鉛直詳細断面図、
(b) は、油圧ジャッキを作動させて壁面形成板を上方に
持ち上げた状態を示した鉛直詳細断面図。
FIG. 6 (a) is a detailed vertical sectional view showing a state in which the hydraulic pressure of the hydraulic jack is released and the wall forming plate is lowered.
(b) is a vertical detailed sectional view showing a state in which the hydraulic jack is operated to lift the wall forming plate upward.

【図7】地中連続壁を構築し、引き続いて根切りを行う
従来の技術を示したものであり、(a) は、地盤に溝を形
成した様子を示す鉛直断面図、(b) は、溝内にコンクリ
ートを打設した様子を示す鉛直断面図、(c) は、根切り
を行った様子を示す鉛直断面図。
FIG. 7 shows a conventional technique of constructing an underground continuous wall and subsequently performing root cutting, (a) is a vertical sectional view showing a state in which a groove is formed in the ground, and (b) is a vertical sectional view. And FIG. 4C is a vertical sectional view showing a state where concrete is poured into the groove, and FIG. 4C is a vertical sectional view showing a state where root cutting is performed.

【符号の説明】[Explanation of symbols]

13 溝 22 壁面形成板 23 地中連続壁 24 突出部分 101 掘削工程 103 潤滑剤付着工程 104 壁面形成板の挿入工程 105 コンクリート打設工程 106 壁面形成板の引抜き工程 108 根切り工程 111 掘削工程 113 潤滑剤付着工程 114 壁面形成板の挿入工程 115 コンクリート打設工程 116 壁面形成板の昇降工程 117 壁面形成板の引抜き工程 119 根切り工程 DESCRIPTION OF SYMBOLS 13 Groove 22 Wall forming plate 23 Underground continuous wall 24 Projecting part 101 Excavation process 103 Lubricant attaching process 104 Inserting wall forming plate 105 Concrete placing process 106 Pulling out wall forming plate 108 Root cutting process 111 Excavating process 113 Lubrication Adhering step 114 Inserting wall forming board 115 Concrete placing step 116 Elevating step of wall forming board 117 Pulling out wall forming board 119 Root cutting step

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E02D 5/18 - 5/20 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) E02D 5/18-5/20

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 安定液を注入しながら地盤を掘削して溝
を形成する工程と、当該溝内に壁面形成板を挿入する工
程と、該壁面形成板の裏側に流れ込むように前記溝内に
コンクリートを打設する工程と、当該コンクリートの初
期硬化後に前記壁面形成板を引き抜いて地中連続壁を形
成する工程とからなることを特徴とする地中連続壁の構
築方法。
1. A step of excavating the ground while injecting a stabilizing liquid to form a groove, a step of inserting a wall forming plate into the groove, and inserting the wall forming plate into the groove so as to flow into the back side of the wall forming plate. A method of constructing an underground continuous wall, comprising: a step of placing concrete; and a step of forming the underground continuous wall by extracting the wall forming plate after the concrete has been initially hardened.
【請求項2】 安定液を注入しながら地盤を掘削して溝
を形成する工程と、当該溝内に壁面形成板を挿入する工
程と、該壁面形成板の裏側に流れ込むように前記溝内に
コンクリートを打設する工程と、当該コンクリートが硬
化するまでの間、前記壁面形成板を昇降させる工程と、
前記コンクリートが硬化した後、前記壁面形成板を引き
抜いて地中連続壁を形成する工程とからなることを特徴
とする地中連続壁の構築方法。
2. A step of excavating the ground while injecting a stabilizing liquid to form a groove, a step of inserting a wall forming plate into the groove, and inserting the wall forming plate into the groove so as to flow into the back side of the wall forming plate. A step of placing concrete, and a step of raising and lowering the wall forming plate until the concrete hardens,
Forming the underground continuous wall by drawing out the wall-forming plate after the concrete has hardened, thereby forming an underground continuous wall.
【請求項3】 前記壁面形成板の挿入工程の前に、当該
壁面形成板の表面に所定の潤滑剤を塗布若しくは被着す
る工程を含む請求項1乃至2のいずれかに記載の地中連
続壁の構築方法。
3. The underground continuity according to claim 1, further comprising a step of applying or applying a predetermined lubricant to the surface of the wall forming plate before the step of inserting the wall forming plate. How to build a wall.
【請求項4】 前記壁面形成板の引抜き工程の後に、当
該壁面形成板の裏側に流れ込んだコンクリートによって
形成された突出部分を切り崩しながら前記地中連続壁の
内側の地盤を根切りする工程を含む請求項1乃至3のい
ずれかに記載の地中連続壁を用いた根切り方法。
4. The method according to claim 1, further comprising, after the step of extracting the wall forming plate, a step of root cutting the ground inside the underground continuous wall while cutting off a protruding portion formed by the concrete flowing into the back side of the wall forming plate. A root cutting method using the underground continuous wall according to any one of claims 1 to 3.
JP6188874A 1994-07-19 1994-07-19 Construction method of underground diaphragm wall Expired - Fee Related JP2988566B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6188874A JP2988566B2 (en) 1994-07-19 1994-07-19 Construction method of underground diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6188874A JP2988566B2 (en) 1994-07-19 1994-07-19 Construction method of underground diaphragm wall

Publications (2)

Publication Number Publication Date
JPH0827779A JPH0827779A (en) 1996-01-30
JP2988566B2 true JP2988566B2 (en) 1999-12-13

Family

ID=16231391

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6188874A Expired - Fee Related JP2988566B2 (en) 1994-07-19 1994-07-19 Construction method of underground diaphragm wall

Country Status (1)

Country Link
JP (1) JP2988566B2 (en)

Also Published As

Publication number Publication date
JPH0827779A (en) 1996-01-30

Similar Documents

Publication Publication Date Title
JP2022502586A (en) Grouting consolidation method of ready-made piles guided by all-casing excavation, and the ready-made piles
JP2000008623A (en) Structural restoration method
US6164873A (en) Double-wing deformable stop-end pipe for forming the joining surfaces of concrete-cast wall elements
JP2988566B2 (en) Construction method of underground diaphragm wall
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building
JPH0574677B2 (en)
JPH0776845A (en) How to lay open caisson
JP2874906B2 (en) Shaft construction method
JP2996113B2 (en) How to build a shaft
JP2955120B2 (en) Drainage pipe laying method
JP2988564B2 (en) Construction method of underground diaphragm wall
JPH08209687A (en) Partial casing pile method
JP2988565B2 (en) Construction method of underground diaphragm wall
JPH10252064A (en) Method for constructing cast-in-site pile
JPH0468407B2 (en)
JP2023088083A (en) Earth retaining wall removal method
JPH07119471B2 (en) Board blister prevention method using an earth anchor
JP3050470B2 (en) How to build a trussed pillar
JP2024172995A (en) Earth retaining method
JPH0610345A (en) Confirmation and increase method for support force of cast-in-place pile
JP2007177447A (en) Removal method of existing underground structure
JPH10140557A (en) Construction method of cast-in-place continuous wall with hollow part
JPH03257280A (en) Construction method of vertical shaft
JPS61158520A (en) Pile constructing method
JPS5857576B2 (en) Pile foundation construction method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990909

LAPS Cancellation because of no payment of annual fees