JP3073277B2 - Excavation method for steel tower foundation holes - Google Patents
Excavation method for steel tower foundation holesInfo
- Publication number
- JP3073277B2 JP3073277B2 JP03216116A JP21611691A JP3073277B2 JP 3073277 B2 JP3073277 B2 JP 3073277B2 JP 03216116 A JP03216116 A JP 03216116A JP 21611691 A JP21611691 A JP 21611691A JP 3073277 B2 JP3073277 B2 JP 3073277B2
- Authority
- JP
- Japan
- Prior art keywords
- hole
- explosive
- explosives
- excavated
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Foundations (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は鉄塔基礎穴等の掘削方
法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for excavating a steel tower foundation hole or the like.
【0002】[0002]
【従来の技術】例えば送電線の鉄塔を建てるために、そ
の基礎穴が掘削される。従来では、添付の図面の図6に
示したように、所定大きさの穴Hを掘削中、固い岩盤G
に当たるとダイナマイトD等の爆薬を爆発させて破砕し
掘削を行うというのが、一般的であった。2. Description of the Related Art For example, in order to build a power transmission tower, a foundation hole is excavated. Conventionally, as shown in FIG. 6 of the accompanying drawings, a solid rock G
In general, explosives such as dynamite D are exploded to crush and excavate.
【0003】しかしながら、この従来方法にあっては、
掘削作業中岩盤に突き当たると発破をかけるという、場
当たり的な作業であるために、作業効率が悪く、また時
間がかかるという問題を有していた。However, in this conventional method,
This is an ad hoc operation in which the blasting occurs when the rock strikes the rock during the excavation operation, so that the operation efficiency is low and it takes time.
【0004】[0004]
【発明が解決しようとする課題】そこで、この発明は、
穴の掘削前に掘削予定穴位置に爆薬を配置し、爆破する
ことにより予め破砕し、その後土石類を取り除くことに
よって、短時間で効率良く穴の掘削ができる新規な方法
を提案するものである。SUMMARY OF THE INVENTION Therefore, the present invention
It proposes a new method that can efficiently excavate holes in a short time by arranging explosives at the position of the hole to be excavated before digging the hole, crushing it by blasting in advance, and then removing debris. .
【0005】[0005]
【課題を解決するための手段】すなわち、この発明は、
掘削予定穴のほぼ中心に空洞の立て坑を形成し、前記立
て坑の外側に、内部に複数の爆薬を装填した管体を、必
要に応じ内外周に、ほぼ環状に埋設し、前記各管体に
は、前記立て坑に向かって開口する切欠窓部が形成され
ていて、前記各爆薬は該切欠窓部に対応する位置に配置
されており、前記各管体内の爆薬を、管体が内外周に配
置されているときは、内側から、順次爆発せしめ、その
後、爆破された掘削予定穴内の土石類を取り除いて穴を
掘削することを特徴とする鉄塔基礎穴等の掘削方法に係
る。That is, the present invention provides:
A hollow shaft was formed substantially at the center of the hole to be excavated, and a tube loaded with a plurality of explosives was buried outside the shaft in a substantially annular shape on the inner and outer peripheries as necessary. A cutout window that opens toward the shaft is formed in the body, and each of the explosives is arranged at a position corresponding to the cutout window. The present invention relates to a method for excavating a steel tower foundation hole or the like, characterized in that when it is arranged on the inner and outer peripheries, it explodes sequentially from the inside, and thereafter, the hole is excavated by removing the debris in the blasted excavation hole.
【0006】[0006]
【実施例】以下添付の図面に従って、この発明の実施例
を説明すると、図1はこの発明の掘削方法の一例を示す
断面図、図2はその平面図、図3は爆薬を装填した管体
の一部を省略した正面図、図4はその上面図、図5は図
3の5−5線における断面図である。DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the accompanying drawings. FIG. 1 is a sectional view showing an example of an excavating method of the present invention, FIG. 2 is a plan view thereof, and FIG. FIG. 4 is a top view of FIG. 3, and FIG. 5 is a sectional view taken along line 5-5 in FIG.
【0007】図1に図示したように、この発明方法にあ
っては、まず、掘削予定穴S部分のほぼ中心に空洞の立
て坑11が形成される。この空洞の立て坑11は、後述
する爆薬による爆発を中心部に向かって誘導するもの
で、概ね20ないし30センチメートル程度の直径で、
ほぼ穴の深さと同じ長さで形成される。As shown in FIG. 1, in the method of the present invention, first, a hollow shaft 11 is formed substantially at the center of a portion S to be excavated. The hollow shaft 11 guides an explosive explosive described later toward the center, and has a diameter of about 20 to 30 cm.
It is formed with a length substantially equal to the depth of the hole.
【0008】次いで、前記立て坑11の外側に、内部に
複数の爆薬を装填した管体20,20,20…、21,
21,21…がほぼ環状に埋設される。管体は、図1お
よび図2のように、必要に応じ内外周に形成される。図
の符号20は内周列の管体、21は外周列の管体を表
す。Next, a plurality of explosive-loaded tubes 20, 20, 20,...
Are buried in a substantially annular shape. The tube is formed on the inner and outer peripheries as needed, as shown in FIGS. In the figure, reference numeral 20 denotes a pipe in the inner peripheral row, and 21 denotes a pipe in the outer peripheral row.
【0009】各管体20(21)は、例えば鉄管または
プラスチック管弁よりなり、図3に示すように、その正
面側に切欠窓部25,25,25…が形成されていて、
爆薬30はこの切欠窓部に対応する位置に配置されてい
る。そして、管体の土中への埋設に際しては、この切欠
窓部25が前記した予定穴S中心の立て坑11に向かっ
て開口するように配置される。図の符号31はダイナマ
イト等の爆薬30の導火線、35はその起爆装置であ
る。なお、図4の上面図における符号29は管体上部に
設けた窓部位置を示すマーキングである。Each pipe body 20 (21) is made of, for example, an iron pipe or a plastic pipe valve, and has cutout windows 25, 25, 25,.
The explosive 30 is arranged at a position corresponding to the cutout window. When the pipe is buried in the soil, the cutout window 25 is disposed so as to open toward the shaft 11 at the center of the predetermined hole S. In the figure, reference numeral 31 denotes a fuse for the explosive 30 such as dynamite, and 35 denotes a detonator. Reference numeral 29 in the top view of FIG. 4 is a mark indicating the position of the window provided on the upper part of the tube.
【0010】また、図5からよりよく理解されるよう
に、爆薬30を管体20(21)内の切欠窓部25の内
側位置に配置するために、砂もしくはモルタルまたはプ
ラスチック等の充填材40で固定することが好ましくす
すめられる。実施例では、エポキシ樹脂によって爆薬3
0が固定されている。Further, as can be better understood from FIG. 5, in order to dispose the explosive 30 inside the cutout window 25 in the tubular body 20 (21), a filler 40 such as sand or mortar or plastic is used. It is recommended to fix with. In the embodiment, the explosive 3 is made of epoxy resin.
0 is fixed.
【0011】なお、管体20(21)の埋設配置に際し
ては、予め予定穴の地中へボーリング調査を行い、これ
により、管体の本数ならびに配置、管体内の爆薬の配置
数ないしその位置等を決め、そのボーリング穴に爆薬を
装填した管体を挿入、配置することが有利である。When the pipes 20 (21) are buried and arranged, a boring survey is carried out in advance to the underground of the predetermined hole, whereby the number and arrangement of the pipes, the number of explosives arranged in the pipes and their positions, etc. And it is advantageous to insert and arrange a tube loaded with explosive into the borehole.
【0012】管体の配置後、管体内の爆薬が爆発される
が、予定穴内の爆破を効果的に行うために、管体が内
周、外周に配置されているときは、その内周側から先
に、そして各管体にあっては下側に配置された爆薬から
上側へ向かって順次爆発せしめられる。なお、各管体に
あっては、上側から下側へ爆発させることもある。この
ような、連続時間差爆発は起爆装置35または雷管の調
整によって簡単に行うことができる。After the tube is disposed, the explosive in the tube explodes. When the tube is disposed on the inner periphery and outer periphery, in order to effectively explode the predetermined hole, the inner peripheral side thereof is disposed. The explosives are exploded from top to bottom and, in each tube, from the explosive arranged at the bottom. In addition, each pipe may explode from the upper side to the lower side. Such a continuous time difference explosion can be easily performed by adjusting the detonator 35 or the primer.
【0013】爆薬の爆発後、爆破された予定穴内の土石
類を取り除いて穴を掘削することによって予定された穴
が形成される。After the explosion of the explosive, the planned hole is formed by removing the debris in the blasted planned hole and excavating the hole.
【0014】[0014]
【発明の効果】上に説明したように、この発明によれ
ば、穴の掘削前に掘削予定穴位置に爆薬を配置し、爆破
することにより予め破砕し、その後土石類を取り除くこ
とによって、穴を形成するものであるから、短時間で効
率良く穴の掘削を行うことができる。As described above, according to the present invention, the explosive is arranged at the position of the hole to be excavated before the hole is excavated, crushed in advance by blasting, and thereafter, the debris is removed, whereby the hole is removed. The hole can be efficiently excavated in a short time.
【0015】特に、この発明方法によれば、掘削予定穴
のほぼ中心に空洞の立て坑を形成するとともに、前記立
て坑の外側に、前記立て坑に向かって開口する切欠窓部
が形成され該切欠窓部に対応する位置に爆薬を配置装填
した管体を、必要に応じ内外周に、ほぼ環状に埋設し、
かつ前記各管体内の爆薬を、管体が内外周に配置されて
いるときは、内側から、順次爆発せしめるようにしたも
のであるから、爆薬の爆発に際しては、その爆発が常に
中心に向かって誘導され、効果的な爆破を行うことがで
きる。[0015] In particular, according to the method of the present invention, a hollow shaft is formed substantially at the center of the hole to be excavated, and a cutout window opening toward the shaft is formed outside the shaft. A tube loaded with explosives at the position corresponding to the cutout window is buried in an annular shape on the inner and outer circumferences as necessary,
And, when the explosives in each of the tubes are to be exploded sequentially from the inside when the tubes are arranged on the inner and outer peripheries, when the explosives explode, the explosions always move toward the center. Guided and capable of effective blasting.
【図1】この発明の掘削方法の一例を示す断面図であ
る。FIG. 1 is a sectional view showing an example of an excavation method according to the present invention.
【図2】その平面図である。FIG. 2 is a plan view thereof.
【図3】爆薬を装填した管体の一部を省略した正面図で
ある。FIG. 3 is a front view in which a part of a tube loaded with an explosive is omitted.
【図4】その上面図である。FIG. 4 is a top view thereof.
【図5】図3の5−5線における断面図である。FIG. 5 is a sectional view taken along line 5-5 in FIG. 3;
【図6】従来の掘削方法を示す断面図である。FIG. 6 is a sectional view showing a conventional excavation method.
11 空洞の立て坑 20 管体(内周側) 21 管体(外周側) 25 切欠窓部 30 爆薬 DESCRIPTION OF SYMBOLS 11 Hollow shaft 20 Pipe (inner side) 21 Pipe (outer side) 25 Notch window 30 Explosive
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特公 昭62−20357(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E21D 1/00 E02D 27/32 E02D 27/42 E21D 9/00 ──────────────────────────────────────────────────続 き Continued on the front page (56) References JP-B-62-20357 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) E21D 1/00 E02D 27/32 E02D 27 / 42 E21D 9/00
Claims (2)
形成し、 前記立て坑の外側に、内部に複数の爆薬を装填した管体
を、必要に応じ内外周に、ほぼ環状に埋設し、 前記各管体には、前記立て坑に向かって開口する切欠窓
部が形成されていて、前記各爆薬は該切欠窓部に対応す
る位置に配置されており、 前記各管体内の爆薬を、管体が内外周に配置されている
ときは、内側から、順次爆発せしめ、 その後、爆破された掘削予定穴内の土石類を取り除いて
穴を掘削することを特徴とする鉄塔基礎穴等の掘削方
法。1. A hollow shaft is formed substantially at the center of a hole to be excavated, and a tube loaded with a plurality of explosives is buried outside the shaft in a substantially annular shape on the inner and outer peripheries as necessary. A cutout window opening toward the shaft is formed in each of the pipes, and each of the explosives is disposed at a position corresponding to the cutout window. When the pipes are arranged on the inner and outer perimeters, they are sequentially exploded from the inside, and then the soil is removed from the blasted holes to be drilled and the holes are excavated to drill holes. Drilling method.
窓部の内側位置に砂もしくはモルタルまたはプラスチッ
ク等の充填材によって固定されている鉄塔基礎穴等の掘
削方法。2. A method according to claim 1, wherein the explosive is fixed at a position inside the cutout window in the pipe by a filler such as sand, mortar or plastic.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP03216116A JP3073277B2 (en) | 1991-07-31 | 1991-07-31 | Excavation method for steel tower foundation holes |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP03216116A JP3073277B2 (en) | 1991-07-31 | 1991-07-31 | Excavation method for steel tower foundation holes |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0533577A JPH0533577A (en) | 1993-02-09 |
| JP3073277B2 true JP3073277B2 (en) | 2000-08-07 |
Family
ID=16683499
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP03216116A Expired - Lifetime JP3073277B2 (en) | 1991-07-31 | 1991-07-31 | Excavation method for steel tower foundation holes |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3073277B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2728071C2 (en) * | 2019-01-14 | 2020-07-28 | Федеральное государственное казённое учреждение "12 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации | Well expansion method |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010275722A (en) * | 2009-05-27 | 2010-12-09 | Hitachi Zosen Corp | Destruction method |
| KR100988052B1 (en) * | 2010-05-13 | 2010-10-18 | (주)청석엔지니어링 | City blast excavating method using ignition of ammo hole and detonator |
| CN103422494B (en) * | 2013-03-12 | 2015-09-23 | 中国建筑第四工程局有限公司 | Multi-layer rock original position drilling by blasting method and device in castinplace pile |
| JP6765836B2 (en) * | 2016-03-31 | 2020-10-07 | 株式会社大林組 | Structure demolition method |
| CN112482225B (en) * | 2020-11-16 | 2022-08-26 | 贵州路桥集团有限公司 | Arch bridge arch center excavation construction method |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6220357B2 (en) | 2015-03-13 | 2017-10-25 | 矢崎総業株式会社 | Vehicle operation system |
-
1991
- 1991-07-31 JP JP03216116A patent/JP3073277B2/en not_active Expired - Lifetime
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6220357B2 (en) | 2015-03-13 | 2017-10-25 | 矢崎総業株式会社 | Vehicle operation system |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2728071C2 (en) * | 2019-01-14 | 2020-07-28 | Федеральное государственное казённое учреждение "12 Центральный научно-исследовательский институт" Министерства обороны Российской Федерации | Well expansion method |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0533577A (en) | 1993-02-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EA005840B1 (en) | Wellbore internally oriented perforating system | |
| CN105443133B (en) | Subsurface rock beehive-shaped charge demolition set and method in a kind of non-excavating construction | |
| JP3073277B2 (en) | Excavation method for steel tower foundation holes | |
| KR102054098B1 (en) | Underwater bedrock blasting method and device and explosives used therefor | |
| US4069760A (en) | Method for driving a shaft with shaped charges | |
| JP2614396B2 (en) | Shaft excavation method by pre-boring | |
| CA1212252A (en) | Method of driving steel profiles into a rock substratum | |
| KR100362014B1 (en) | Tunnel pre-splitting blasting method | |
| JPH06510341A (en) | Method and apparatus for driving tubes into the ground and cartridges used therefor and for subsequent tube blasting | |
| JP4216957B2 (en) | Blast excavation method | |
| JPH0835389A (en) | Excavation method for underground structures | |
| JPH05247939A (en) | How to dismantle deep underground obstacles | |
| JP3486103B2 (en) | How to blast rock | |
| KR102268982B1 (en) | Three free face low-vibration excavation method by explosives | |
| JP2997402B2 (en) | Sheet pile press-in method | |
| CN113154975A (en) | Anti-slide pile pre-drilling blasting excavation method | |
| KR100403385B1 (en) | Method of excavating tunnel without exceeding boundary | |
| JPH02217589A (en) | Removal of underground obstruction in excavating work | |
| KR102627840B1 (en) | Apparatus for blasting and method having the same | |
| JPS5894598A (en) | Level drilling method and drill guide used therein | |
| SU898080A1 (en) | Mine shaft sinking method | |
| JPS6030837B2 (en) | Vertical shaft excavation method | |
| KR100438688B1 (en) | Method of excavating tunnel using free space | |
| KR19980044895A (en) | Rock blasting method | |
| JPS5942796B2 (en) | Tunnel NATM method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120602 Year of fee payment: 12 |