JP3096643B2 - Tunnel widening method - Google Patents
[go: Go Back, main page]

JP3096643B2 - Tunnel widening method - Google Patents

Tunnel widening method

Info

Publication number
JP3096643B2
JP3096643B2 JP28093096A JP28093096A JP3096643B2 JP 3096643 B2 JP3096643 B2 JP 3096643B2 JP 28093096 A JP28093096 A JP 28093096A JP 28093096 A JP28093096 A JP 28093096A JP 3096643 B2 JP3096643 B2 JP 3096643B2
Authority
JP
Japan
Prior art keywords
tunnel
wall
widening
ground
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP28093096A
Other languages
Japanese (ja)
Other versions
JPH10121881A (en
Inventor
稔 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Sato Kogyo Co Ltd
Okumura Corp
Original Assignee
Fujita Corp
Sato Kogyo Co Ltd
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp, Sato Kogyo Co Ltd, Okumura Corp filed Critical Fujita Corp
Priority to JP28093096A priority Critical patent/JP3096643B2/en
Publication of JPH10121881A publication Critical patent/JPH10121881A/en
Application granted granted Critical
Publication of JP3096643B2 publication Critical patent/JP3096643B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明が属する技術分野】本発明はトンネル拡幅工法に
関し、更に詳細には、主として既設のトンネルから分岐
・合流トンネルの分岐・合流部あるいは非常駐車帯を設
けるためにトンネルを拡幅する工法に関し、先進導坑を
拡幅して本坑とする場合をも含む。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tunnel widening method, and more particularly, to a method for widening a tunnel in order to provide a branch / merge portion of a branch / merge tunnel or an emergency parking zone from an existing tunnel. This includes the case where the pit is widened to form the main pit.

【0002】[0002]

【従来の技術】既設のトンネルを拡幅して例えば分岐・
合流トンネルの分岐・合流部等を設ける場合、従来か
ら、ロックボルトによって地山の弛みを抑えながら掘削
する工法が一般的に採用されている。
2. Description of the Related Art Widening an existing tunnel, for example, for branching
In the case of providing a branching / merging portion of a merging tunnel, a method of excavating while suppressing loosening of the ground with a lock bolt has been generally adopted.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、ロック
ボルトによる支保のみでは大きなスペースの拡幅を安全
に施工することができないといった問題があった。
However, there is a problem that widening of a large space cannot be performed safely only by the support using the lock bolt.

【0004】従って、本発明の目的は大きなスペースの
拡幅を安全に施工することができるトンネル拡幅工法を
提供することにある。
Accordingly, it is an object of the present invention to provide a tunnel widening method capable of safely constructing a large space.

【0005】[0005]

【課題を解決するための手段】本発明に係るトンネル拡
幅工法(本工法)は、既設のトンネルの中から周辺地山
の少なくとも拡幅方向に対してロックボルトを打設する
工程Aと、当該トンネルの拡幅予定領域に対応する壁面
を補強中壁として残置し、拡幅予定領域を前記ロックボ
ルトの作用効果が低減しない範囲で、トンネル横断方向
及び縦断方向の二方向に地山アーチを形成しながら掘削
する工程Bと、工程Bによって露出した壁面にコンクリ
ートを吹き付ける工程Cと、前記補強中壁を撤去する工
程Dと、工程Cによって得た吹付けコンクリート壁面を
新たな補強中壁として残置し、拡幅予定領域を二次掘削
する工程Eとを含み、その後、新たな露出壁面を補強中
壁として掘削する工程を適宜繰り返すことを特徴とす
る。
The tunnel widening method (the present method) according to the present invention comprises a step A of placing a lock bolt in at least a widening direction of a surrounding ground from an existing tunnel; The wall corresponding to the area to be widened is left as a reinforcing middle wall, and the area to be widened is excavated while forming a ground arch in two directions, that is, in the transverse direction of the tunnel and in the longitudinal direction within a range where the effect of the lock bolt is not reduced. B, a step C of spraying concrete on the wall surface exposed in the step B, a step D of removing the reinforced middle wall, and the blown concrete wall obtained in the step C is left as a new reinforced middle wall to enlarge the width. And a step E of secondary excavation of the scheduled area, and thereafter, a step of excavating the newly exposed wall surface as a reinforcing middle wall is appropriately repeated.

【0006】また、前記工程Eに先行してロックボルト
を増し打ちすることができる。
Further, it is possible to increase the number of lock bolts prior to the step E.

【0007】従って、本工法は拡幅予定領域を手前の壁
面を補強中壁(センターダイヤフラム)として残しなが
ら一次、二次・・・と逐次掘削し、少なくとも一次掘削
においては補強中壁による支保の他、ロックボルト(一
次ロックボルト)によっても地山の応力開放(弛み)を
抑えるようにし、二次掘削以降においては必要に応じて
ロックボルトを増し打ちして、大きなスペースの拡幅を
安全圏の中で作業できるようにしたものである。なお、
補強中壁は一部作業入口として破られる。また、三次掘
削以降は必要に応じて行われる工程であって必須ではな
い。
Therefore, in this construction method, the area to be widened is excavated in order of primary, secondary, etc. while leaving the front wall as a reinforcing wall (center diaphragm). In addition, lock bolts (primary lock bolts) are also used to suppress the release of stress (looseness) in the ground, and after the second excavation, increase the number of lock bolts as necessary to expand the large space in the safety zone. It is made to work with. In addition,
The reinforced wall is partially broken as a working entrance. In addition, the steps after the third excavation are performed as necessary and are not essential.

【0008】「少なくとも拡幅方向に対してロックボル
トを打設する」とは、トンネル内から全方位における少
なくとも掘削を行う方向にロックボルトを放射状に打設
する趣旨であり、トンネル縦断面方向においては掘削予
定領域の全長が包含される。なお、ロックボルトの長さ
や打設本数あるいはピッチは地山条件(地山の強度や地
圧)に応じて適宜設定される。また、一次ロックボルト
は放射状に打設されて、奥へ行く程ピッチが拡大するた
め、二次掘削においてロックボルトを増し打ちする場
合、各一次ロックボルトの間に打設するようにする。
“Putting a lock bolt at least in the widening direction” means that the rock bolt is driven radially at least in a direction in which digging is performed in all directions from inside the tunnel. The total length of the area to be excavated is included. In addition, the length of the lock bolt, the number of the bolts, or the pitch is appropriately set in accordance with the ground conditions (ground strength and ground pressure). In addition, since the primary lock bolts are radially driven and the pitch increases as they go deeper, when the lock bolts are additionally driven in secondary excavation, they are driven between the primary lock bolts.

【0009】「ロックボルトの作用効果が低減しない範
囲」とは、ロックボルトが地山の応力開放(弛み)を確
実に抑えることができる範囲であり、補強中壁による支
保が含まれる。
[0009] The "range in which the operation effect of the lock bolt is not reduced" is a range in which the lock bolt can surely suppress the stress release (looseness) of the ground, and includes support by the reinforcing middle wall.

【0010】「トンネル横断方向及び縦断方向の二方向
に地山アーチを形成しながら掘削する」とは、地山に応
力集中が起こるようなコーナーを形成しないように掘削
する趣旨であり、従って、コンクリートを吹き付ける壁
面も縦横断面アーチ状となる。
"Excavation while forming a ground mountain arch in two directions, that is, a tunnel cross direction and a longitudinal direction" means that the ground is excavated so as not to form a corner where stress concentration occurs in the ground. The walls on which the concrete is sprayed also have an arched cross section.

【0011】なお、二次掘削においても同様に掘削す
る。
In the secondary excavation, excavation is performed in the same manner.

【0012】「露出した壁面にコンクリートを吹き付け
る」とは、新たに側壁を作り直して、一旦覆工を閉合
し、応力を再分配する趣旨である。
"Blowing concrete on the exposed wall surface" means that a new side wall is newly formed, the lining is closed once, and the stress is redistributed.

【0013】なお、ロックボルトや補強中壁として利用
する吹付けコンクリート壁面は、施工時点では無応力で
あるが、掘削の進行に伴い地山から圧縮力等を受けると
抵抗力を現出して、周辺地山と共に作業現場を縦横断面
アーチ状に包囲する抵抗帯を形成する。
[0013] The shot concrete wall surface used as a rock bolt or a reinforcing middle wall has no stress at the time of construction, but exhibits a resisting force when subjected to a compressive force or the like from the ground as the excavation proceeds. Together with the surrounding ground, a resistance zone is formed that surrounds the work site in a vertical and horizontal cross section arch.

【0014】[0014]

【実施例】以下、本発明の実施例を添付図面に基づいて
説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0015】図1は、既設のトンネル1に対して分岐・
合流トンネル(単線)2を合流させるため、トンネル周
辺地山を部分的に拡幅して設けた分岐・合流部10を便
宜的に示す平面説明図であり、この図の矢視II−II断面
が図2に示される。
FIG. 1 shows a branch to an existing tunnel 1.
FIG. 3 is a plan explanatory view for convenience showing a branching / merging portion 10 provided by partially widening the ground around the tunnel in order to merge the merging tunnel (single line) 2; As shown in FIG.

【0016】分岐・合流部10を得るための施工に当た
っては、まず、トンネル1の中から拡幅予定領域(分岐
・合流部)10のトンネル縦断方向全長を包含する全方
位に対して一次ロックボルト11a(太実線及び太破線
参照)を放射状に打設する。
In the construction for obtaining the branching / merging portion 10, first, the primary lock bolts 11 a for all directions including the entire length of the area to be widened (branching / merging portion) 10 in the tunnel longitudinal direction from the tunnel 1. (See thick solid line and thick broken line).

【0017】次に、本線トンネル1の拡幅予定領域10
に対応する壁面(12a)を作業入口部分(図示せず)
を除いて一次補強中壁12aとして残置し、拡幅予定領
域10を一次ロックボルト11a及び一次補強中壁12
aによって地山の弛みを確実に抑えることができる範囲
で一次掘削を行う。この際、応力集中が起きないように
トンネル横断方向及び縦断方向の二方向に地山アーチを
形成しながら拡幅して、一次拡幅部10aを得る。
Next, the area 10 to be widened in the main tunnel 1 will be described.
Wall (12a) corresponding to the work entrance (not shown)
, Except for the primary reinforcement middle wall 12a, and leave the area 10 to be widened with the primary lock bolt 11a and the primary reinforcement middle wall 12a.
The primary excavation is performed in a range in which the loosening of the ground can be reliably suppressed by a. At this time, the primary widening portion 10a is obtained by widening while forming a ground arch in two directions, that is, the tunnel cross direction and the longitudinal direction so that stress concentration does not occur.

【0018】次に、一次掘削によって新たに露出した壁
面(12b)に対しコンクリートを吹き付けて一旦覆工
を閉合し、応力の再分配を行う。次いで、一次補強中壁
12aを撤去する。
Next, concrete is sprayed on the wall surface (12b) newly exposed by the primary excavation, the lining is closed once, and the stress is redistributed. Next, the primary reinforcing middle wall 12a is removed.

【0019】次に、吹付けコンクリート壁面(12b)
から拡幅方向等に対して二次ロックボルト11bを増し
打ちする。この際、二次ロックボルト11bは各一次ロ
ックボルト11a間に打設される。
Next, the shot concrete wall surface (12b)
The secondary lock bolt 11b is additionally struck in the direction of widening or the like. At this time, the secondary lock bolts 11b are driven between the primary lock bolts 11a.

【0020】次に、吹付けコンクリート壁面(12b)
を二次補強中壁12bとして残置し(作業入口を除
く。)、一次掘削と同様に二次掘削を行って二次拡幅部
10bを得る。
Next, the shotcrete wall surface (12b)
Is left as a secondary reinforcing middle wall 12b (excluding the work entrance), and secondary excavation is performed in the same manner as primary excavation to obtain a secondary widened portion 10b.

【0021】その後、所定の覆工や二次補強中壁12b
の撤去等を経て、分岐・合流部10を得る。なお、拡幅
予定領域が更に大きい場合、三次、四次の掘削を適宜繰
り返す。
Thereafter, a predetermined lining or a secondary reinforcing middle wall 12b
The branching / merging section 10 is obtained through the removal of the above. If the area to be widened is even larger, the tertiary and quaternary excavations are repeated as appropriate.

【0022】また、以上の実施例では合流・分岐部10
を設ける場合を例に挙げたが、非常駐車帯を設ける場合
も同様に施工することができる。
In the above embodiment, the merging / branching unit 10
Although the case where the emergency parking zone is provided has been described as an example, the same construction can be applied when the emergency parking zone is provided.

【0023】[0023]

【発明の効果】以上に述べたように、本発明に係るトン
ネル拡幅工法では、拡幅予定領域をロックボルト及び補
強中壁によって地山の弛みを抑えながら一次掘削し、そ
の後も新たな補強中壁による支保等を得ながら逐次掘削
するため、大きなスペースの拡幅を安全に施工すること
ができ、剛体によって支保を得る場合に比べ、費用が安
く済む。
As described above, in the tunnel widening method according to the present invention, the area to be widened is primarily excavated by the rock bolts and the reinforcing middle wall while the loosening of the ground is suppressed, and thereafter, a new reinforcing middle wall is formed. Since the excavation is performed sequentially while obtaining the support, the widening of a large space can be performed safely, and the cost can be reduced as compared with the case where the support is obtained by a rigid body.

【図面の簡単な説明】[Brief description of the drawings]

【図1】既設のトンネル及び合流・分岐部を便宜的に示
す平面説明図である。
FIG. 1 is an explanatory plan view showing an existing tunnel and a merging / branching portion for convenience.

【図2】図1の矢視II-II断面図である。FIG. 2 is a sectional view taken along the line II-II of FIG.

【符号の説明】[Explanation of symbols]

1 トンネル 2 分岐・合流トンネル 10 分岐・合流部(拡幅予定領域) 10a 一次拡幅部 10b 二次拡幅部 11a 一次ロックボルト 11b 二次ロックボルト 12a 一次補強中壁(トンネルの側壁) 12b 二次補強中壁 DESCRIPTION OF SYMBOLS 1 Tunnel 2 Branching / merging tunnel 10 Branching / merging part (expected widening area) 10a Primary widening part 10b Secondary widening part 11a Primary lock bolt 11b Secondary lock bolt 12a Primary reinforcing middle wall (side wall of tunnel) 12b Secondary reinforcing wall

───────────────────────────────────────────────────── フロントページの続き (73)特許権者 000172813 佐藤工業株式会社 富山県富山市桜木町1番11号 (73)特許権者 000112668 株式会社フジタ 東京都渋谷区千駄ヶ谷四丁目6番15号 (73)特許権者 000140292 株式会社奥村組 大阪府大阪市阿倍野区松崎町2丁目2番 2号 (73)特許権者 390028015 株式会社地崎工業 東京都港区西新橋2丁目23番1号 (73)特許権者 000146928 株式会社森本組 大阪府大阪市天王寺区夕陽丘町4番11号 (72)発明者 山本 稔 東京都町田市玉川学園1−15−2 (56)参考文献 特開 平7−305589(JP,A) (58)調査した分野(Int.Cl.7,DB名) E21D 9/00 E21D 9/04 ──────────────────────────────────────────────────続 き Continued on the front page (73) Patent holder 000172813 Sato Kogyo Co., Ltd. 1-11, Sakuragicho, Toyama City, Toyama Prefecture (73) Patent holder 000112668 Fujita Co., Ltd. 4-6-115 Sendagaya, Shibuya-ku, Tokyo ( 73) Patent Holder 000140292 Okumura Gumi Co., Ltd. 2-2-2 Matsuzaki-cho, Abeno-ku, Osaka-shi, Osaka (73) Patent Holder 390028015 Chizaki Kogyo Co., Ltd. 2- 23-1, Nishishinbashi, Minato-ku, Tokyo (73) Patent Authority 000146928 Morimoto Gumi Co., Ltd. 4-11, Yuyooka-cho, Tennoji-ku, Osaka-shi, Osaka (72) Inventor Minoru Yamamoto 1-15-2, Tamagawa Gakuen, Machida-shi, Tokyo (56) References JP-A-7-305589 (JP) , A) (58) Field surveyed (Int. Cl. 7 , DB name) E21D 9/00 E21D 9/04

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 既設のトンネルの中から周辺地山の少な
くとも拡幅方向に対してロックボルトを打設する工程A
と、当該トンネルの拡幅予定領域に対応する壁面を補強
中壁として残置し、拡幅予定領域を前記ロックボルトの
作用効果が低減しない範囲で、トンネル横断方向及び縦
断方向の二方向に地山アーチを形成しながら掘削する工
程Bと、工程Bによって露出した壁面にコンクリートを
吹き付ける工程Cと、前記補強中壁を撤去する工程D
と、工程Cによって得た吹付けコンクリート壁面を新た
な補強中壁として残置し、拡幅予定領域を二次掘削する
工程Eとを含み、その後、新たな露出壁面を補強中壁と
して掘削する工程を適宜繰り返すことを特徴とするトン
ネル拡幅工法。
1. A step A of placing a lock bolt in at least a widening direction of a surrounding ground from an existing tunnel.
And, the wall corresponding to the planned widening area of the tunnel is left as a reinforcing middle wall, and the ground widening arch is formed in two directions in the tunnel transverse direction and the longitudinal direction in a range in which the effect of the lock bolt is not reduced. Step B of excavating while forming, Step C of spraying concrete on the wall surface exposed in Step B, and Step D of removing the reinforcing middle wall
And exposing the shotcrete wall surface obtained in step C as a new reinforcing wall, and secondary excavating the area to be widened, and then excavating the newly exposed wall surface as a reinforcing intermediate wall. A tunnel widening method characterized by repeating as appropriate.
【請求項2】 前記工程Eに先行してロックボルトを増
し打ちする請求項1に記載のトンネル拡幅工法。
2. The tunnel widening method according to claim 1, wherein lock bolts are additionally driven before the step E.
JP28093096A 1996-10-23 1996-10-23 Tunnel widening method Expired - Lifetime JP3096643B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28093096A JP3096643B2 (en) 1996-10-23 1996-10-23 Tunnel widening method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28093096A JP3096643B2 (en) 1996-10-23 1996-10-23 Tunnel widening method

Publications (2)

Publication Number Publication Date
JPH10121881A JPH10121881A (en) 1998-05-12
JP3096643B2 true JP3096643B2 (en) 2000-10-10

Family

ID=17631918

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28093096A Expired - Lifetime JP3096643B2 (en) 1996-10-23 1996-10-23 Tunnel widening method

Country Status (1)

Country Link
JP (1) JP3096643B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5609053B2 (en) * 2009-09-30 2014-10-22 株式会社大林組 Tunnel construction method and tunnel constructed by the construction method
CN113586068B (en) * 2021-09-09 2022-12-06 中国水利水电第四工程局有限公司 Equal-height tunnel intersection excavation supporting construction method

Also Published As

Publication number Publication date
JPH10121881A (en) 1998-05-12

Similar Documents

Publication Publication Date Title
JP4183470B2 (en) Underground structure and its construction method
CN211006756U (en) Interface structure of open cut station and large-span duplex arch buried tunnel
JP4687986B2 (en) Construction method of large section tunnel
JP2006322222A (en) Construction method of large section tunnel
JP3096643B2 (en) Tunnel widening method
JPH0835391A (en) Preceding leg reinforcing type fore piling method by heading
JP2000179299A (en) Large-section tunnel construction method
JP2979044B2 (en) Large-scale underground structures and their construction methods
JP6756892B1 (en) Underground skeleton and how to build an underground skeleton
JP3888993B2 (en) Tunnel widening method
CN118292893A (en) Existing shield tunnel expanding and excavating construction method
JP7456954B2 (en) Reinforcement structure and reinforcement method
JP2942874B2 (en) How to join tunnels
JP2593356B2 (en) Tunnel construction method
JP3999853B2 (en) How to build a tunnel
JP2663106B2 (en) Construction method of outer wall of propulsion pipe and large cavity
RU2854884C1 (en) Method of railway tunnel reconstruction
JPH11210369A (en) Submerged body
JP2700694B2 (en) How to build a large architectural space underground
JP3584416B2 (en) Tunnel and its construction method
JPH08165899A (en) Tunnel lining method using timbering concurrently serving as reinforcing bar
JP3900684B2 (en) Construction method for underground structures
JP2025113720A (en) Evaluation method of design load in tunnel widening construction and tunnel widening construction method
JPH09268878A (en) Tunnel excavation method
JP4500221B2 (en) Construction method of underground structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080804

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080804

Year of fee payment: 8

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

S631 Written request for registration of reclamation of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313631

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080804

Year of fee payment: 8

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090804

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 10

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 10

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 10

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 10

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 10

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110804

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120804

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130804

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130804

Year of fee payment: 13

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term