JP3203704B2 - Automatic power outage scheduled section judgment method - Google Patents
[go: Go Back, main page]

JP3203704B2 - Automatic power outage scheduled section judgment method - Google Patents

Automatic power outage scheduled section judgment method

Info

Publication number
JP3203704B2
JP3203704B2 JP26514391A JP26514391A JP3203704B2 JP 3203704 B2 JP3203704 B2 JP 3203704B2 JP 26514391 A JP26514391 A JP 26514391A JP 26514391 A JP26514391 A JP 26514391A JP 3203704 B2 JP3203704 B2 JP 3203704B2
Authority
JP
Japan
Prior art keywords
construction
section
subject
work
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP26514391A
Other languages
Japanese (ja)
Other versions
JPH05111138A (en
Inventor
正樹 庄司
哲司 田中
担 添田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Original Assignee
Meidensha Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp filed Critical Meidensha Corp
Priority to JP26514391A priority Critical patent/JP3203704B2/en
Publication of JPH05111138A publication Critical patent/JPH05111138A/en
Application granted granted Critical
Publication of JP3203704B2 publication Critical patent/JP3203704B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Emergency Protection Circuit Devices (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、配電系統制御システム
で配電設備の工事のために停電が必要な線路区間を自動
判定する工事停電予定区間自動判定方式に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for automatically determining a planned power outage section in a power distribution system control system for automatically determining a line section requiring a power outage for the construction of power distribution facilities.

【0002】[0002]

【従来の技術】配電系統制御システムは、遠方制御の可
能な開閉器を配電線の各所に設置し、それらの開閉器を
配電の支社・営業所に設置された計算機から遠方操作す
ることで自動化し、これに事故自動復旧機能を付加して
停電時間の短縮等を図るものである。近年は、更に事故
時以外の日常の配電運用業務自動化機能を付加したもの
も増えつつある。図3は、そのような配電系統制御シス
テムの一例を示す構成図で、図中51は計算機、52は
操作卓、53は配電系統を示している。尚、本明細書の
各図において、●は開閉器、一は線路、□はCB、斜線
域は停電範囲、英大文字は区間名、英小文字は線路名、
点線矢印はデータ参照経路を示すものとする。さて、図
3に示したシステムで、配電設備の新設,変更,撤去な
どの工事が計画された場合、オペレータはシステム(計
算機51)に対して工事件名54を事前に登録する。登
録される内容は、工事日時と工事内容で、工事内容は対
象設備と工事種別である。対象設備とは例えば「開閉
器」で、工事種別とは例えば「新設」である。次に、登
録された工事件名54に対応して、工事に必要な現場作
業や開閉器操作などを作業件名55としてシステムに登
録する。作業件名55の内容は、切替・作業・切戻操作
の開始/終了日時と操作手順及び停電線路区間などであ
る。この停電線路区間は、現場作業の安全のため停電さ
せる線路の範囲であり、オペレータが工事対象設備の配
電線路上の位置から判断して入力する。それは例えばC
RTに配電線路図を表示してスタイラスペンで当該区間
をピックするような操作で行われる。尚、区間とは、開
閉器で区分された配電線路の集合である。このように事
前に登録した工事件名及び作業件名は、実施当日、操作
卓52のCRT画面に呼び出して実施する。工事件名5
4の場合、実施を指示すると、システムが管理している
配電系統データ56に工事件名の内容が反映する。例え
ば開閉器の新設工事であれば、当該開閉器が当該線路上
に新設されたように配電系統データ56を更新する。ま
た、作業件名55の場合、切替・作業・切戻の各操作の
実施を指示すると、当該操作手順に従って、開閉器遠方
監視制御手段57が開閉器を遠方制御したり、系統状態
を更新したりする。尚、作業時には、停電線路区間が事
前に設定したとおり実際に停電する。
2. Description of the Related Art Distribution system control systems are automated by installing switches that can be remotely controlled at various locations on distribution lines and remotely operating these switches from computers installed at distribution branch offices and sales offices. In addition, an automatic accident recovery function is added to this to shorten the power outage time. In recent years, there has been an increasing number of functions to which a function of automating daily power distribution operations other than at the time of an accident is added. FIG. 3 is a configuration diagram showing an example of such a distribution system control system. In the figure, reference numeral 51 denotes a computer, 52 denotes a console, and 53 denotes a distribution system. In each drawing of this specification, ● indicates a switch, one indicates a track, □ indicates a CB, a hatched area indicates a power outage range, uppercase letters indicate section names, lowercase letters indicate track names,
A dotted arrow indicates a data reference path. Now, in the system shown in FIG. 3, when construction such as new installation, change, or removal of distribution equipment is planned, the operator registers the construction subject 54 in advance in the system (computer 51). The registered contents are the construction date and the construction contents, and the construction contents are the target equipment and the construction type. The target facility is, for example, a “switch”, and the construction type is, for example, “new”. Next, corresponding to the registered construction subject 54, the on-site work and switch operation required for the construction are registered in the system as the work subject 55. The contents of the work subject 55 include the start / end date and time of the switching / work / return operation, the operation procedure, the section of the power line, and the like. The power line section is a range of a line where power is stopped for the safety of on-site work, and is input by an operator by judging from the position of the facility to be constructed on the distribution line. It is, for example, C
The operation is performed by displaying a distribution line diagram on the RT and picking the section with a stylus pen. Note that a section is a set of distribution lines divided by switches. The construction subject and the work subject registered in advance in this way are called up on the CRT screen of the console 52 and executed on the day of the implementation. Construction subject 5
In the case of 4, when execution is instructed, the contents of the construction subject are reflected in the distribution system data 56 managed by the system. For example, in the case of a new construction of a switch, the distribution system data 56 is updated as if the switch was newly installed on the track. Further, in the case of the work subject 55, when execution of each operation of switching, work, and return is instructed, the switch remote monitoring control means 57 remotely controls the switch or updates the system status according to the operation procedure. I do. At the time of work, the power outage will actually occur as the power outage section is set in advance.

【0003】[0003]

【発明が解決しようとする課題】ところで、従来の配電
系統制御システムでは、工事件名を登録する際に、どこ
の配電線路にどのような工事が行われるかを示す工事内
容を入力する。そして、この工事件名に対応する作業件
名を登録する際、工事のために停電が必要な線路区間を
入力する。「工事のために停電が必要な線路区間」と
は、安全作業のために停電させる必要最小限の線路の範
囲であり、停電は開閉器の操作によって行うので、区間
が単位となる。即ち、工事件名では図4(a)に示す如
く新設開閉器の指定を行い、作業件名では図4(b)に
示す如く停電線路区間の指定を行う。これは、工事件名
で工事箇所を入力したにも拘らず、作業件名で再び同様
の情報を入力しなければならないことになり、実際のオ
ペレーションではその都度工事箇所の配電線路図をCR
T上に表示し、スタイラスペン等で停電線路区間を指示
するほか、各種の関連メニュー項目を指示しなければな
らず、かなり繁雑な操作になる。また、工事件名と作業
件名とで同一情報を2度入力することになるが、業務分
担によりオペレータが異なる場合など、両者の不一致が
発生する可能性も高い。不一致のまま当該件名を実施す
ると、工事箇所が停電せずに危険な状況になったり、工
事に無関係な箇所が停電して害を及ぼしたりする。本発
明は、このような課題に鑑みて創案されたもので、入力
を省力化かつ迅速化し、入力ミスを防止して危険や被害
の発生を予防する工事停電予定区間自動判定方式を提供
することを目的としている。
By the way, in the conventional power distribution system control system, when registering a construction subject, the contents of the construction indicating what kind of construction is to be performed on which distribution line is input. Then, when registering a work subject corresponding to the construction subject, a track section requiring a power outage for construction is input. The "track section requiring a power outage for construction" is the minimum necessary range of a line that causes a power outage for safe work, and since the power outage is performed by operating a switch, the section is a unit. In other words, a new switch is designated in the construction subject as shown in FIG. 4A, and a stop line section is designated in the work subject as shown in FIG. 4B. This means that the same information must be entered again in the work subject, despite the fact that the work location was entered in the work subject.
It is displayed on T, and in addition to instructing the section of the power line section using a stylus pen or the like, various related menu items must be instructed, which is a rather complicated operation. In addition, the same information is input twice for the construction subject and the work subject. However, there is a high possibility that the two will be inconsistent when the operators are different due to work assignment. If the subject is implemented without discrepancy, the construction site will be in danger without a power outage, or a site unrelated to the construction will be harmed by a power outage. SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and provides a construction power outage scheduled section automatic determination method for saving labor and speeding up input, preventing input errors, and preventing danger and damage. It is an object.

【0004】[0004]

【課題を解決するための手段】本発明における上記課題
を解決するための手段は、工事日時と開閉器を含む工事
対象設備新設,変更工事内容を表す工事件名と、こ
の工事件名に対応する切替・切戻操作の開始/終了日時
と機器操作を含む作業件名とを事前に登録される配電系
統制御システムの工事停電予定区間自動判定方式におい
て、前記工事日時や工事箇所としての線路名を含むデー
タ項目を保存する工事件名データファイルと、この工事
件名に対応する作業件名を有し、かつ、前記作業件名登
録時に入力され工事件名と対応する工事件名キーワード
を有する作業件名データファイルと、前記開閉器で区分
された線路の集合よりなる区間と前記線路がどの区間に
属するかの線路と区間の関係が保存される線路区間デー
タファイルとを備え、前記作業件名登録時に入力された
工事件名キーワードより工事件名データファイルを参照
して工事箇所線路を取り出し、当該線路をキーとして前
記線路区間データファイルを検索して当該線路が所属す
る区間を取り出して停電区間と判定することを特徴とす
る工事停電予定区間自動判定方式とするものである。
Means for solving the above-mentioned problems in the present invention are: a construction title representing the construction date and time, and the contents of the construction of the new installation or change of the construction object equipment including the switch; In the system for automatically determining the scheduled power outage section of the distribution system control system in which the start / end dates and times of the switching / returning operation and the work subject including the device operation are registered in advance, the work date and time and the line name as the work location are used. A work subject data file for storing data items including the work subject, a work subject data file having a work subject corresponding to the work subject, and having a work subject keyword corresponding to the work subject entered at the time of the work subject registration; and A section comprising a set of lines divided by a switch and a line section data file for storing a relation between the line and the section to which the line belongs are provided. The construction subject line is retrieved by referring to the construction subject data file from the construction subject keyword input at the time of the work subject registration, and the section to which the line belongs is retrieved by searching the line section data file using the relevant line as a key. A construction power outage scheduled section automatic determination method is characterized in that it is determined as a power outage section.

【0005】[0005]

【作用】本発明は、配電系統制御システムのデータ構成
を改良することで入力を省力化した工事停電予定区間自
動判定方式である。本発明は、工事件名データファイル
と作業件名データファイルと線路区間データファイルと
を備え、工事件名データは工事箇所の線路を保存し、作
業件名データは対応する工事件名を参照するキーワード
を保存し、線路区間データは線路をキーにその所属区間
を検索されるようになっている。従って、作業件名登録
時に工事件名キーワードを入力しておくと、以降の所望
のタイミングで当該キーワードにより工事件名を参照
し、取り出した工事箇所の線路をキーに線路区間データ
ファイルを検索し、発見された所属区間を停電線路区間
と判定することができる。
According to the present invention, there is provided a system for automatically determining a scheduled power outage section in which the input is saved by improving the data configuration of the distribution system control system. The present invention includes a construction subject data file, a work subject data file, and a track section data file, the construction subject data saves a track of a construction location, the work subject data saves a keyword that refers to a corresponding construction subject, The track section data is searched for the section to which the track belongs by using the track as a key. Therefore, if the construction subject keyword is input when registering the work subject, the construction subject is referred to by the keyword at a desired timing thereafter, and the track section data file is searched by using the extracted construction track as a key and found. It can be determined that the assigned section is a stop line section.

【0006】[0006]

【実施例】以下、図面を参照して、本発明の実施例を詳
細に説明する。図1は、本発明の一実施例を示す構成図
である。同図において、1は工事件名データファイル、
2は作業件名データファイル、3は線路区間データファ
イル、4及び5は配電系統である。工事件名データは、
従来例と同様に各工事件名を表し、工事日時や工事箇所
としての線路名などのデータ項目を含んでいる。作業件
名データも、従来例と同様に各工事件名に対応する作業
件名を表すが、本発明では更に、当該件名に対応する工
事件名を参照可能なキーワードを含むものとする。これ
は例えば工事件名毎に付与された連続番号いわゆる件名
No.であったり、各工事に固有の名称や工事No.で
あってもよい。これらがデータ中に含まれていない場合
は、改めて設定するものとする。線路区間データは、線
路と区間の関係を表すもので、線路がどの区間に所属す
るかを表したり、区間を構成する線路の集合を表したり
し、それぞれ線路又は区間をキーにして参照できるもの
とする。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a configuration diagram showing one embodiment of the present invention. In the figure, 1 is a construction subject data file,
2 is a work subject data file, 3 is a track section data file, and 4 and 5 are distribution systems. Construction subject data
Similar to the conventional example, each construction subject is represented, and includes data items such as construction date and time and a track name as a construction location. The work subject data also represents the work subject corresponding to each construction subject, as in the conventional example. In the present invention, however, the work subject data further includes a keyword capable of referring to the construction subject corresponding to the subject. This is, for example, a serial number given to each construction subject, a so-called subject No. Or a unique name or construction number for each construction. It may be. If these are not included in the data, they will be set again. The track section data indicates the relationship between tracks and sections, and indicates to which section the track belongs, indicates a set of tracks that make up the section, and can be referenced using the track or section as a key. And

【0007】図2は、上記実施例の処理の一例を示す工
程図である。同図において、オペレータはまず、(1)
工事件名データ1の登録後、(2)作業件名データ2を
登録し、その際に当該工事件名のキーワードも入力す
る。次に(3)このキーワードにより対応する工事件名
データ1を参照し、工事箇所の線路を取り出す。更に
(4)当該線路をキーに線路区間データ3を検索して当
該線路が所属する区間を取り出し、(5)この区間を停
電線路区間と自動判定する。その後、この判定結果に基
づいて開閉器操作手順を自動作成したり、手動作成の場
合に支援情報をCRT上に表示したりする。尚、図2に
示した処理の(1)及び(2)はオペレータによる対話
処理であり、(3)〜(5)は計算機の自動処理であ
る。
FIG. 2 is a process chart showing an example of the processing of the above embodiment. In the figure, the operator first (1)
After the registration of the construction subject data 1, (2) the work subject data 2 is registered, and at that time, the keyword of the construction subject is also input. Next, (3) the construction line is taken out by referring to the construction subject data 1 corresponding to this keyword. Further, (4) the line section data 3 is searched using the line as a key, and the section to which the line belongs is taken out. (5) This section is automatically determined as a power line section. Thereafter, the switch operation procedure is automatically created based on the determination result, or the support information is displayed on the CRT in the case of manual creation. Note that (1) and (2) of the processing shown in FIG. 2 are interactive processing by the operator, and (3) to (5) are automatic processing of the computer.

【0008】本実施例は、下記の効果が明らかである。This embodiment has the following advantages.

【0009】(1)従来の方式では、停電区間を逐一入
力するので、入力オペレーションが繁雑であったが、本
発明では、停電区間の入力が不要になりオペレーション
が甚だ簡単になって、業務の省力化かつ迅速化が可能に
なる。
(1) In the conventional method, the input operation is complicated because the power failure section is input one by one. However, in the present invention, the input of the power failure section becomes unnecessary, and the operation is greatly simplified, and the business operation is simplified. Labor saving and speeding up become possible.

【0010】(2)従来の方式では、工事箇所及びそれ
に対応する停電区間をそれぞれ入力する必要があったた
め、不注意や誤認識に起因する入力ミスにより両者が不
一致になる恐れがあったが、本発明では、工事箇所を入
力するだけで、情報の入力が一元化され、入力ミスが完
全に防止でき、不一致が皆無になる。
(2) In the conventional method, since it is necessary to input the construction site and the corresponding power outage section, there is a possibility that the two may be inconsistent due to an input error caused by carelessness or erroneous recognition. In the present invention, input of information is unified by simply inputting a construction location, input errors can be completely prevented, and there is no inconsistency.

【0011】(3)上記(2)により、工事箇所と停電
区間とが不一致のまま作業が行われることがなくなり、
停電すべき箇所が通電していて危険だったり工事と無関
係の箇所が停電して生活,経済,社会に多大な被害を及
ぼしたりする危険を防止する。
(3) Due to the above (2), work is not performed while the construction location and the power outage section do not match,
Prevents the danger that power is lost at places where power is to be cut off and that is irrelevant to construction work, which could cause a great deal of damage to life, economy and society due to power cuts.

【0012】[0012]

【発明の効果】以上、述べた通り、本発明によれば、入
力を省力化かつ迅速化し、入力ミスを防止して危険や被
害の発生を予防する工事停電予定区間自動判定方式を提
供することができる。
As described above, according to the present invention, there is provided a system for automatically judging a planned power outage section which saves and speeds up input, prevents input errors, and prevents danger and damage. Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例の構成図。FIG. 1 is a configuration diagram of an embodiment of the present invention.

【図2】本発明の一実施例の工程図。FIG. 2 is a process chart of one embodiment of the present invention.

【図3】配電系統制御システムの構成図。FIG. 3 is a configuration diagram of a distribution system control system.

【図4】従来例の説明図。FIG. 4 is an explanatory diagram of a conventional example.

【符号の説明】[Explanation of symbols]

1…工事件名データファイル、2…作業件名データファ
イル、3…線路区間データファイル、4,5…配電系
統、●…開閉器、一…線路、□…CB、斜線域…停電範
囲、英大文字…区間名、英小文字…線路名、点線矢印…
データ参照経路。
1 ... Construction subject data file, 2 ... Work subject data file, 3 ... Track section data file, 4,5 ... Distribution system, ● ... Switch, 1 ... Track, □ ... CB, hatched area ... Power outage range, capital letters ... Section name, lowercase letter ... track name, dotted arrow ...
Data reference path.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭64−43028(JP,A) 特開 昭58−154340(JP,A) (58)調査した分野(Int.Cl.7,DB名) H02H 3/04 G06F 17/30 ────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-64-43028 (JP, A) JP-A-58-154340 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) H02H 3/04 G06F 17/30

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項】 工事日時と開閉器を含む工事対象設備
設,変更工事内容を表す工事件名と、この工事件名に
対応する切替・切戻操作の開始/終了日時と機器操作を
含む作業件名とを事前に登録される配電系統制御システ
ムの工事停電予定区間自動判定方式において、前記工事
日時や工事箇所としての線路名を含むデータ項目を保存
する工事件名データファイルと、この工事件名に対応す
る作業件名を有し、かつ、前記作業件名登録時に入力さ
れ工事件名と対応する工事件名キーワードを有する作業
件名データファイルと、前記開閉器で区分された線路の
集合よりなる区間と前記線路がどの区間に属するかの線
路と区間の関係が保存される線路区間データファイルと
を備え、前記作業件名登録時に入力された工事件名キー
ワードより工事件名データファイルを参照して工事箇所
線路を取り出し、当該線路をキーとして前記線路区間デ
ータファイルを検索して当該線路が所属する区間を取り
出して停電区間と判定することを特徴とする工事停電予
定区間自動判定方式。
Wherein] New <br/> setting construction relevant equipment including construction date and time switch, a work subject representing the construction work of the changes, the start / end time and equipment switchover and switchback operation corresponding to this construction subject In a construction power outage scheduled section automatic determination method of the distribution system control system in which the work subject including the operation is registered in advance, a construction subject data file storing data items including the construction date and time and the line name as a construction location, A work subject data file having a work subject corresponding to the work subject, and having a work subject keyword corresponding to the work subject entered at the time of the work subject registration, and a section including a set of tracks separated by the switch. A track section data file in which the relationship between the track and the section to which the track belongs is provided. A scheduled power outage section characterized by taking out the construction location line with reference to the name data file, searching the line section data file using the line as a key, extracting the section to which the line belongs, and determining the section as a power outage section Automatic judgment method.
JP26514391A 1991-10-15 1991-10-15 Automatic power outage scheduled section judgment method Expired - Fee Related JP3203704B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26514391A JP3203704B2 (en) 1991-10-15 1991-10-15 Automatic power outage scheduled section judgment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26514391A JP3203704B2 (en) 1991-10-15 1991-10-15 Automatic power outage scheduled section judgment method

Publications (2)

Publication Number Publication Date
JPH05111138A JPH05111138A (en) 1993-04-30
JP3203704B2 true JP3203704B2 (en) 2001-08-27

Family

ID=17413231

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26514391A Expired - Fee Related JP3203704B2 (en) 1991-10-15 1991-10-15 Automatic power outage scheduled section judgment method

Country Status (1)

Country Link
JP (1) JP3203704B2 (en)

Also Published As

Publication number Publication date
JPH05111138A (en) 1993-04-30

Similar Documents

Publication Publication Date Title
JP2892675B2 (en) Console device monitoring method and information processing system console control method
JP3203704B2 (en) Automatic power outage scheduled section judgment method
JP2592982B2 (en) On-site patrol support device
JP2000076049A (en) Program development management support device
JPH09282351A (en) Cad system
JP3178063B2 (en) Power outage section automatic judgment method
JP2001084025A (en) Plant monitoring and control equipment
JP3243911B2 (en) Normally open switching switch automatic judgment method
JPH11154011A (en) Plant maintenance planning support system
JP3327017B2 (en) Distribution facility work registration method in distribution system control system
JP3295930B2 (en) Executing program management method and apparatus, and recording medium
JP2856065B2 (en) Drawing management method and drawing management system
JP3284539B2 (en) Program library management system
JP3689596B2 (en) Product development process management system
JPH07163052A (en) Power system operation procedure table creation support device
JP2003208333A (en) Trace information retrieval apparatus and method
JPH05346882A (en) Data management system
JPH05334151A (en) Device for visualizing version number
JP2023107534A (en) Support system, support method and program
JP2774434B2 (en) Data processing device
JPH1117631A (en) Communication network monitor system
JP3986568B2 (en) System diagram display system
CN121963540A (en) An alarm system and method for a flight management system
JP3414775B2 (en) How to expand the logic chart display
JP3412075B2 (en) File management method of man-hour information

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090629

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090629

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100629

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110629

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees