JP3208826B2 - Control device for structural testing machine - Google Patents
Control device for structural testing machineInfo
- Publication number
- JP3208826B2 JP3208826B2 JP07872192A JP7872192A JP3208826B2 JP 3208826 B2 JP3208826 B2 JP 3208826B2 JP 07872192 A JP07872192 A JP 07872192A JP 7872192 A JP7872192 A JP 7872192A JP 3208826 B2 JP3208826 B2 JP 3208826B2
- Authority
- JP
- Japan
- Prior art keywords
- load
- signal
- correction coefficient
- target
- target signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Description
【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION
【0001】[0001]
【産業上の利用分野】この発明は、航空機や建築物など
の構造物を構成する複数個の構成要素の静的強度試験や
疲労試験などを行う構造物試験機の制御装置に係り、特
に、フィードバック制御中の負荷信号の補正に関するも
のである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a control apparatus for a structural test machine for performing a static strength test, a fatigue test, and the like of a plurality of components constituting a structure such as an aircraft and a building. It relates to correction of a load signal during feedback control.
【0002】[0002]
【従来の技術】従来、この種のフィードバック制御中の
負荷信号の補正を行う構造物試験機の制御装置として、
図5に示すようなものが知られている。以下、図に従っ
て説明する。2. Description of the Related Art Conventionally, as a control device of a structural test machine for correcting a load signal during this kind of feedback control,
The one shown in FIG. 5 is known. Hereinafter, description will be made with reference to the drawings.
【0003】21は、構造物の各構成要素から計測され
た応答信号をデジタル信号に変換する信号変換部、22
は、信号変換部21によってデジタル信号に変換された
応答信号のピーク(山)とトラフ(谷)を検出し、検出
したピークとトラフから応答信号の振幅を求め、目標信
号の振幅との差(ε)を検出する応答信号解析部、23
は、応答信号解析部22により得られた差εに基づいて
次回に出力する負荷信号の補正計算を行う補正演算部、
24は、補正演算部23の補正計算に用いられる補正係
数(n)が記憶されている記憶装置、25は、補正演算
部23により計算された負荷信号を構造物の各構成要素
に出力する負荷信号出力部である。[0003] Reference numeral 21 denotes a signal converter for converting a response signal measured from each component of the structure into a digital signal.
Detects a peak (crest) and a trough (trough) of the response signal converted into a digital signal by the signal conversion unit 21, obtains an amplitude of the response signal from the detected peak and the trough, and calculates a difference between the amplitude of the target signal ( response signal analyzer for detecting ε), 23
Is a correction operation unit that performs a correction calculation of a load signal to be output next time based on the difference ε obtained by the response signal analysis unit 22,
Reference numeral 24 denotes a storage device in which the correction coefficient (n) used for the correction calculation of the correction calculation unit 23 is stored. Reference numeral 25 denotes a load that outputs the load signal calculated by the correction calculation unit 23 to each component of the structure. It is a signal output unit.
【0004】なお、図6は、計測した応答信号と、目標
信号との差を示す図である。図6中の実線の波形は目標
信号であり、点線の波形は応答信号である。図6(a)
は、応答信号が目標信号より小さい場合を示し、図6
(b)は、逆に応答信号が目標信号より大きい場合を示
す。FIG. 6 is a diagram showing a difference between a measured response signal and a target signal. The waveform of the solid line in FIG. 6 is the target signal, and the waveform of the dotted line is the response signal. FIG. 6 (a)
FIG. 6 shows a case where the response signal is smaller than the target signal.
(B) shows a case where the response signal is larger than the target signal.
【0005】上述の応答信号解析部22は、計測した応
答信号のピークとトラフから振幅Resp を求め、目標信
号の振幅Rangeとの差ε((Range−Resp )/2)を
求める。補正演算部23は、記憶装置24に記憶されて
いる補正係数nと応答信号解析部22によって求められ
たεとに基づいて、次式(1)で表される補正計算を応
答信号のピークとトラフが検出されるたびに行う。 負荷信号 = 目標信号 + (1/n) × ε ………(1) すなわち、補正演算部23は、応答信号と目標信号との
ずれを徐々に補正し、目標信号に近い応答信号を得られ
るように負荷信号を上記の補正計算によって求める。[0005] The above-described response signal analyzing unit 22 obtains an amplitude R esp from the peak and trough of the measured response signal, determines the difference between the target signal amplitude R ange ε ((R ange -R esp) / 2) . Based on the correction coefficient n stored in the storage device 24 and ε obtained by the response signal analysis unit 22, the correction calculation unit 23 calculates the correction calculation represented by the following equation (1) as the peak of the response signal. Perform each time a trough is detected. Load signal = Target signal + (1 / n) × ε (1) That is, the correction operation unit 23 gradually corrects the deviation between the response signal and the target signal, and obtains a response signal close to the target signal. Thus, the load signal is obtained by the above-described correction calculation.
【0006】[0006]
【発明が解決しようとする課題】しかしながら、このよ
うな構成を有する従来例の場合には、次のような問題が
ある。However, the prior art having such a structure has the following problems.
【0007】すなわち、この種の構造物の試験では、そ
の構成要素に対して異なる振幅の目標信号を組み合わせ
て連続的に作用させていくのであるが、前回の目標信号
が相違すると今回の目標信号が同じであっても、計測さ
れる応答信号と、目標信号との間に大きな違いが生じる
ことが経験的に認められる。例えば、前回の荷重として
7tに相当する目標信号を加え、その後に今回の荷重と
して10tに相当する目標信号を加えた場合に計測され
る応答信号と、前回の荷重として6tに相当する目標信
号を加え、その後に今回の荷重として10tに相当する
目標信号を加えた場合に計測される応答信号とでは、そ
れぞれ10tに相当する目標信号との差が異なってくる
のである。このように前回の目標信号と今回の目標信号
との組合せパターン(以下、負荷パターンという)の相
違によって、計測される応答信号と、目標信号との差が
異なってくるにもかかわらず、従来例では上述のように
負荷パターンにかかわりなく一定の補正係数で目標信号
を補正して負荷信号を作成していたので、負荷点に対し
て目標信号に忠実な負荷を与えることができないという
問題点がある。That is, in a test of this type of structure, target signals having different amplitudes are continuously applied to the constituent elements, and if the previous target signal is different, the current target signal is different. It is empirically recognized that a large difference occurs between the measured response signal and the target signal even if the values are the same. For example, a response signal measured when a target signal corresponding to 7 t is added as the previous load, and then a target signal corresponding to 10 t is added as the current load, and a target signal corresponding to 6 t as the previous load are calculated. In addition, the difference between the target signal corresponding to 10 t and the response signal measured when a target signal corresponding to 10 t is subsequently added as the current load is different. Although the difference between the measured response signal and the target signal differs due to the difference in the combination pattern (hereinafter referred to as a load pattern) between the previous target signal and the current target signal, As described above, since the target signal is corrected with a constant correction coefficient regardless of the load pattern to generate the load signal, there is a problem that a load faithful to the target signal cannot be given to the load point. is there.
【0008】さらに、この種の構造物の試験では、各構
成要素の負荷点に対して並列的に負荷を作用させている
ので、各負荷点は互いに干渉を受ける。このように負荷
点間の干渉があるために、応答信号と目標信号との間に
差が生じることもある。しかも、負荷点間の干渉は、常
に一定のものでないので、従来例のように一定の補正係
数で目標信号を補正して負荷信号を作成しても、負荷点
に対して目標信号に忠実な負荷を与えることが困難であ
る。Further, in this type of structure test, since loads are applied in parallel to the load points of the components, the load points interfere with each other. The interference between the load points may cause a difference between the response signal and the target signal. In addition, since the interference between the load points is not always constant, even if the load signal is created by correcting the target signal with a fixed correction coefficient as in the conventional example, the load signal is faithful to the target signal. It is difficult to apply a load.
【0009】この発明は、このような事情に鑑みてなさ
れたものであって、構造物の複数個の構成要素に対する
試験において、負荷パターンの相違や負荷点間の相互干
渉の影響を受けずに負荷信号を正確に補正し、各負荷点
でのフィードバック制御の精度を向上することができる
構造物試験機の制御装置を提供することを目的とする。SUMMARY OF THE INVENTION The present invention has been made in view of such circumstances, and has been made without being affected by differences in load patterns and mutual interference between load points in a test on a plurality of components of a structure. An object of the present invention is to provide a control device for a structural test machine capable of accurately correcting a load signal and improving the accuracy of feedback control at each load point.
【0010】[0010]
【課題を解決するための手段】この発明は、このような
目的を達成するために、次のような構成をとる。すなわ
ち、この発明は、被試験構造物の複数個の負荷点に対し
てそれぞれ個別に負荷信号を出力する負荷信号出力手段
と、前記構造物の複数個の負荷点からそれぞれ個別に応
答信号を入力する応答信号入力手段と、前回の目標信号
と今回の目標信号との組合せである負荷パターンごとに
負荷信号を補正するための補正係数を記憶する補正係数
記憶手段と、前記応答信号入力手段から入力された応答
信号とそれに対応した目標信号との差分に基づいて新た
な補正係数を算出し、前記補正係数記憶手段に記憶され
た補正係数を更新する補正係数更新手段と、前記補正係
数記憶手段に記憶された補正係数を用いて次回に発生さ
せる負荷パターンに応じた負荷信号を算出する演算手段
とを備えたものである。The present invention has the following configuration to achieve the above object. That is, the present invention provides load signal output means for individually outputting a load signal to each of a plurality of load points of a structure under test, and individually input response signals from a plurality of load points of the structure. Response signal input means, correction coefficient storage means for storing a correction coefficient for correcting a load signal for each load pattern which is a combination of the previous target signal and the current target signal, and input from the response signal input means. A new correction coefficient is calculated based on the difference between the obtained response signal and the corresponding target signal, and a correction coefficient updating unit that updates the correction coefficient stored in the correction coefficient storage unit; and a correction coefficient storage unit. And a calculating means for calculating a load signal according to a load pattern to be generated next time using the stored correction coefficient.
【0011】[0011]
【作用】この発明の作用は次のとおりである。ある種の
負荷パターンの負荷信号を出力する場合、演算手段は補
正係数記憶手段から、当該負荷パターンに対応した補正
係数を読み出し、その補正係数を使って目標信号を補正
することにより、負荷パターンに応じた負荷信号を算出
する。この負荷信号は負荷信号出力手段を介して、構造
物の各負荷点に出力される。構造物の各負荷点で計測さ
れた応答信号は、応答信号入力手段から取り込まれる。
補正係数更新手段は、入力された応答信号とそれに対応
した目標信号との差分に基づいて新たな補正係数を算出
し、補正係数記憶手段に記憶された補正係数を更新す
る。次に、同じ負荷パターンの負荷信号を出力する場合
は、補正係数記憶手段に記憶された新たな補正係数を使
って、負荷信号が算出される。以下、応答信号が入力さ
れるごとに、上述の補正係数の更新を行っていく。The operation of the present invention is as follows. When outputting a load signal of a certain type of load pattern, the calculating means reads a correction coefficient corresponding to the load pattern from the correction coefficient storage means, and corrects the target signal using the correction coefficient to obtain a load pattern. Calculate the corresponding load signal. This load signal is output to each load point of the structure via the load signal output means. Response signals measured at each load point of the structure are taken in from response signal input means.
The correction coefficient updating means calculates a new correction coefficient based on the difference between the input response signal and the corresponding target signal, and updates the correction coefficient stored in the correction coefficient storage means. Next, when outputting a load signal of the same load pattern, the load signal is calculated using the new correction coefficient stored in the correction coefficient storage means. Hereinafter, each time a response signal is input, the above-described correction coefficient is updated.
【0012】[0012]
【実施例】以下、図面を参照してこの発明の一実施例を
説明する。図1は、本実施例に係る構造物試験機の制御
装置の概略構成を示すブロック図である。An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram illustrating a schematic configuration of a control device of the structural test machine according to the present embodiment.
【0013】図1において、1は、構造試験用アナログ
制御装置(図示せず)から入力した応答信号をデジタル
信号に変換するA/D(Analog to Digital)変換器であ
る。A/D変換器1は、構造物の各負荷点に対応した複
数個のチャネルを備えている。このA/D変換器1は、
この発明の応答信号入力手段に相当する。In FIG. 1, reference numeral 1 denotes an A / D (Analog to Digital) converter for converting a response signal input from a structural test analog controller (not shown) into a digital signal. The A / D converter 1 has a plurality of channels corresponding to each load point of the structure. This A / D converter 1
This corresponds to the response signal input means of the present invention.
【0014】2は、構造試験用アナログ制御装置(図示
せず)に対してデジタル信号で記憶されている負荷信号
をアナログ信号に変換して出力するD/A(Digital to
Analog)変換器である。D/A変換器2は、構造物の各
負荷点に対応した複数個のチャネルを備えている。この
D/A変換器2は、この発明の負荷信号出力手段に相当
する。Reference numeral 2 denotes a D / A (Digital to Digital Output) which converts a load signal stored as a digital signal into an analog signal and outputs the analog signal to a structural test analog controller (not shown).
Analog) converter. The D / A converter 2 has a plurality of channels corresponding to each load point of the structure. This D / A converter 2 corresponds to the load signal output means of the present invention.
【0015】10は構造物試験機の制御装置を示してい
る。構造物試験機の制御装置10は、補助記憶装置3、
CPU(中央処理装置:Central Processing Unit )
4、RAM(Ramdom Access Memory)5、CRT(Cath
ode Ray Tube)および、K/B(Key Board )からなる
入出力装置6、入出力インターフェイス7により構成さ
れている。Reference numeral 10 denotes a control device of the structural test machine. The control device 10 of the structural test machine includes an auxiliary storage device 3,
CPU (Central Processing Unit)
4, RAM (Ramdom Access Memory) 5, CRT (Cath
ode Ray Tube), an input / output device 6 composed of a K / B (Key Board), and an input / output interface 7.
【0016】補助記憶装置3には、後述する負荷信号の
補正処理の手順(プログラム)や、構造物試験に用いる
目標信号に関するデータ、負荷信号を補正するための補
正係数に関するデータなどがあらかじめ記憶されてい
る。CPU4は、補助記憶装置3に記憶されているプロ
グラムに従って、負荷信号の算出処理や補正係数の更新
処理などを行うもので、この発明の演算手段および、補
正係数更新手段に相当する。RAM5は、補助記憶装置
3から読み出された補正係数などを記憶するもので、こ
の発明の補正係数記憶手段に相当する。The auxiliary storage device 3 previously stores a procedure (program) of a load signal correction process described later, data on a target signal used for a structural test, data on a correction coefficient for correcting the load signal, and the like. ing. The CPU 4 performs calculation processing of a load signal, update processing of a correction coefficient, and the like according to a program stored in the auxiliary storage device 3, and corresponds to a calculation means and a correction coefficient update means of the present invention. The RAM 5 stores the correction coefficient and the like read from the auxiliary storage device 3, and corresponds to the correction coefficient storage unit of the present invention.
【0017】CPU4、RAM5と、A/D変換器1、
D/A変換器2、補助記憶装置3、入出力装置6は、入
出力インターフェイス7により接続されている。CPU 4, RAM 5, A / D converter 1,
The D / A converter 2, the auxiliary storage device 3, and the input / output device 6 are connected by an input / output interface 7.
【0018】次に、上述の構成を備えた構造物試験機の
制御装置の補正処理を、図2に従って説明する。構造物
の各構成要素から計測された応答信号は、A/D変換器
1によってデジタル信号に変換され、構造物試験機の制
御装置10に取り込まれる(ステップS1)。Next, a correction process of the control device of the structural test machine having the above-described configuration will be described with reference to FIG. The response signal measured from each component of the structure is converted into a digital signal by the A / D converter 1 and taken into the control device 10 of the structure test machine (step S1).
【0019】次に、ステップS1で取り込まれた応答信
号のピークとトラフを検出し、図6の応答信号の振幅R
esp を求める(ステップS2)。また、求めた振幅R
esp とそれに対応する目標信号の振幅は、入出力装置6
に表示される。Next, the peak and the trough of the response signal taken in step S1 are detected, and the amplitude R of the response signal shown in FIG.
esp is obtained (step S2). In addition, the obtained amplitude R
The amplitude of esp and the corresponding target signal is
Will be displayed.
【0020】CRT6の表示を参照してオペレータは、
補正係数の更新を行うか否かを判断し、入出力装置6か
ら入力する。なお、この判断については、後述する。入
出力装置6からの入力指示に従って、補正係数を更新す
るか否かを判定し(ステップS3)、補正係数を更新す
るのであれば、ステップS4の補正係数更新処理を実行
し、補正係数を更新しないのであれば、ステップS5の
補正計算処理を実行する。Referring to the display on the CRT 6, the operator:
It is determined whether or not the correction coefficient is to be updated, and input from the input / output device 6. This determination will be described later. In accordance with an input instruction from the input / output device 6, it is determined whether or not to update the correction coefficient (step S3). If the correction coefficient is to be updated, a correction coefficient update process of step S4 is executed to update the correction coefficient. If not, the correction calculation processing of step S5 is executed.
【0021】ここで、図3を参照してRAM5に記憶さ
れた補正係数について説明する。負荷信号を補正するた
めの補正係数は、ある負荷に相当する目標荷重とその目
標荷重の出力の1回前に出力した目標荷重との組合せ
(負荷パターン)に対応付けたマトリクス状に記憶され
ている。これは、上述したように、前回の目標信号が相
違すると今回の目標信号が同じであっても、計測される
応答信号と、目標信号との間に大きな違いが生じること
が経験的に認められるからである。例えば、図4の
(a)に示すように、3tに相当する目標荷重の出力か
ら4tに相当する目標荷重を出力する際に、4tに相当
する目標荷重を出力するための負荷信号を得るための補
正係数としてはM34を用いるが、図4の(b)に示すよ
うに、2tに相当する目標荷重の出力から4tに相当す
る目標荷重を出力する際に、4tに相当する目標荷重を
出力するための負荷信号を得るための補正係数としては
別の補正係数M24が用いられる。Here, the correction coefficients stored in the RAM 5 will be described with reference to FIG. The correction coefficient for correcting the load signal is stored in a matrix corresponding to a combination (load pattern) of a target load corresponding to a certain load and a target load output one time before the output of the target load. I have. As described above, it is empirically recognized that, as described above, if the previous target signal is different, even if the current target signal is the same, a large difference occurs between the measured response signal and the target signal. Because. For example, as shown in FIG. 4A, when a target load corresponding to 4t is output from a target load output corresponding to 3t, a load signal for outputting a target load corresponding to 4t is obtained. the uses a M 34 as correction coefficient, as shown in FIG. 4 (b), when outputting the target load corresponding to 4t from the output of the target load corresponding to 2t, the target load corresponding to 4t the correction factor for obtaining a load signal for outputting another correction coefficient M 24 is used.
【0022】以下、上述の補正係数の更新を行うか否か
の判断について説明する。補正係数は、以下のステップ
S5で述べるように、試験中に次回出力させる負荷信号
の補正計算に用いられるものであり、その更新は、以下
のステップS4で述べるように、応答信号と目標信号と
に基づいて、その差分を徐々に目標信号に近づけていく
ものである。しかし、補正の目的は、目標信号に相当す
る荷重が負荷点にかかるような負荷信号が出力されるよ
うに、出力負荷信号を調整することにある。従って、上
述の入出力装置6に表示された応答信号の振幅と目標信
号の振幅とに基づいて、負荷点に目標荷重に相当する荷
重がかかるような負荷信号が既に出力されていると判断
したのであれば、それ以上の補正係数の更新は不要であ
る。すなわち、現在記憶している補正係数に基づいて補
正計算を行うことにより最適な補正が行われていると判
断できるからである。また、最適な補正係数であるにも
係わらずその更新を行ったとき、通常の状態であれば、
以下の式(2)からも明らかなように、(Range −
Resp )が0となり、補正係数の値は変更されないので
あるが、各負荷点間で突発的な相互干渉等が発生したと
きには、その影響を受けて、最適な状態の補正係数は、
一時的な影響を受けて計算された補正係数に更新されて
しまうことになる。従って、最適な状態で補正している
と判断した時点で、補正係数の更新を行わないように指
示することにより、突発的な相互干渉等の影響を排除す
ることが可能となる。Hereinafter, a description will be given of a determination as to whether or not to update the correction coefficient. The correction coefficient is used in the correction calculation of the load signal to be output next time during the test as described in step S5 below, and is updated by the response signal and the target signal as described in step S4 below. , The difference gradually approaches the target signal. However, the purpose of the correction is to adjust the output load signal so that a load signal such that a load corresponding to the target signal is applied to the load point is output. Therefore, based on the amplitude of the response signal and the amplitude of the target signal displayed on the input / output device 6 described above, it is determined that a load signal such that a load corresponding to the target load is applied to the load point has already been output. In this case, no further update of the correction coefficient is required. That is, it is possible to determine that the optimum correction is being performed by performing the correction calculation based on the currently stored correction coefficient. Also, when the update is performed in spite of the optimal correction coefficient, if it is in a normal state,
As is clear from the following equation (2), (R ange −
R esp ) becomes 0 and the value of the correction coefficient is not changed. However, when sudden mutual interference or the like occurs between the load points, the correction coefficient in the optimum state is affected by the influence and the like.
The correction coefficient calculated under the temporary influence is updated. Therefore, by instructing not to update the correction coefficient when it is determined that the correction is performed in an optimal state, it is possible to eliminate the influence of sudden interference and the like.
【0023】次に、ステップS4で行われる補正係数の
更新処理を説明する。ステップS4では、ステップS2
で求められた応答信号の振幅Resp と、今回に出力した
目標信号の振幅Rangeと、比例定数Gと、RAM5より
読み込まれた現在の補正係数Mold に基づいて、新しい
補正係数Mnew を次式(2)によって求める。 Mnew = Mold + G × ( Range − Resp ) / Range ………(2) ここで、比例定数Gは、RangeとResp との差に乗ずる
定数で、各試験機ごとに決められた補正の重みである。
また、現在の補正係数Mold としては、例えば、前回に
3tに相当する目標荷重を出力して応答信号が入力さ
れ、その次に4tに相当する目標信号を出力して応答信
号が入力された場合、4tの目標信号に対する応答信号
について補正係数の更新を行う際には、図3中の補正係
数M34が現在の補正係数Mold として用いられる。そし
て、計算された新しい補正係数Mnewは、RAM5の読
み出したMold 、先の例ではM34が記憶されていた場所
に上書きで書き込まれる(ステップS4)。Next, the process of updating the correction coefficient performed in step S4 will be described. In step S4, step S2
A new correction coefficient M new is calculated based on the amplitude R esp of the response signal obtained in the above, the amplitude R ange of the target signal output this time, the proportionality constant G, and the current correction coefficient M old read from the RAM 5. It is determined by the following equation (2). M new = M old + G × ( Range −R esp ) / R ange (2) Here, the proportionality constant G is a constant multiplied by the difference between R ange and R esp, and for each tester. This is the determined correction weight.
Further, as the current correction coefficient M old , for example, a response signal is input by outputting a target load corresponding to 3 t last time, and then a response signal is input by outputting a target signal corresponding to 4 t. If, when updating the correction coefficients for the response signal to 4t target signal of the correction coefficient M 34 in FIG. 3 is used as the current correction factor M old. Then, the calculated new correction coefficient M new is written in the location where M old , which was read out from the RAM 5, in the previous example, M 34 was stored (step S 4).
【0024】ステップS5の補正計算処理は次のように
行われる。すなわち、補正計算処理は、今回出力した目
標信号と次回出力させる目標信号の組合せにより該当す
る補正係数(1度も更新されていない場合の初期値は、
1.0)をRAM5から読み込む。例えば、今回に4t
に相当する目標信号を既に出力し、次回に5tに相当す
る目標荷重を出力しようとする場合には、図3の例で
は、1回前に出力した目標荷重4t、出力する目標荷重
5tに相当する負荷パターンの補正係数であるM45をR
AM5から読み込む。読み込んだ補正係数Mと、次回出
力しようとする目標信号の振幅Rangeと、マッピング係
数MPとに基づいて次回出力させる負荷信号Commandを
次式(3)により算出する。 Command = MP × M × Range ………(3) ここで、マッピング係数MPは、試験装置全体の応答を
調節するための定数である。The correction calculation process in step S5 is performed as follows. In other words, the correction calculation processing is performed based on the combination of the target signal output this time and the target signal to be output next time (the initial value in the case where the correction signal has never been updated is:
1.0) is read from the RAM 5. For example, this time 4t
In the example of FIG. 3, when the target signal corresponding to the target load has already been output and the target load corresponding to 5 t is to be output next time, the target load corresponding to 4 t output immediately before and the target load 5 t output corresponding to the M 45 is a correction coefficient of a load pattern for R
Read from AM5. The load signal Command to be output next time is calculated by the following equation (3) based on the read correction coefficient M, the amplitude R ange of the target signal to be output next time, and the mapping coefficient MP. C ommand = MP × M × R ange ......... (3) , where the mapping coefficients MP is a constant for adjusting the response of the entire test apparatus.
【0025】ステップS5で計算された負荷信号は、出
力タイミングになれば、D/A変換器2から出力される
(ステップS6)。そして、再びステップS1の処理に
戻り、例えば、先の例で5tに相当する目標信号につい
て補正した負荷信号Commandを出力し、その応答信号が
入力されると、ステップS2、S4の処理を行うことに
より、1回前に出力した目標荷重4t、出力する目標荷
重5tに相当する負荷パターンの補正係数であるM45を
上式(2)に基づいて更新する。The load signal calculated in step S5 is output from the D / A converter 2 when the output timing comes (step S6). Then, returning to the processing of step S1, for example, the load signal Command corrected for the target signal corresponding to 5t in the above example is output, and when the response signal is input, the processing of steps S2 and S4 is performed. it allows one pre-target load 4t outputted to be updated based on the above equation M 45 is a correction coefficient of a load pattern corresponding to the target load 5t for outputting (2).
【0026】以上の処理を繰り返し実行することによ
り、RAM5に記憶された負荷パターンごとの補正係数
が次々と更新されていく。したがって、次に同じ負荷パ
ターンが現れた場合には、更新された補正係数を使って
負荷信号が算出されるので、構造物の各負荷点相互の干
渉の影響による目標信号と応答信号との誤差が少なくな
り、各負荷点に対して目標信号に忠実な負荷信号を与え
ることができるようになる。By repeatedly executing the above processing, the correction coefficient for each load pattern stored in the RAM 5 is updated one after another. Therefore, when the same load pattern appears next time, the load signal is calculated using the updated correction coefficient, and the error between the target signal and the response signal due to the influence of interference between the load points of the structure. And a load signal faithful to the target signal can be given to each load point.
【0027】[0027]
【発明の効果】以上の説明から明らかなように、この発
明によれば、出力する目標信号と1回前に出力した目標
信号との組合せである負荷パターンごとに定められた補
正係数を使って、出力する負荷信号を算出しているの
で、従来例のように1回前に出力された負荷信号の影響
によって、目標信号に対して応答信号が大きくずれるこ
とがなく、目標信号に忠実な負荷を負荷点に与えること
ができる。As is apparent from the above description, according to the present invention, a correction coefficient determined for each load pattern, which is a combination of a target signal to be output and a target signal output immediately before, is used. Since the load signal to be output is calculated, the response signal does not greatly deviate from the target signal due to the influence of the load signal output immediately before as in the conventional example, and the load signal faithful to the target signal is obtained. At the load point.
【0028】また、この発明によれば、計測された応答
信号に基づいて、負荷パターンごとの補正係数を順次更
新し、次に同じ負荷パターンが現れた場合には、更新さ
れた補正係数を使って負荷信号が算出されるので、負荷
点相互に干渉があって一時的に目標信号と応答信号との
間に誤差が生じても、次第にその誤差が小さくなり、目
標信号に忠実な負荷を与えることができるようになる。Further, according to the present invention, the correction coefficient for each load pattern is sequentially updated based on the measured response signal, and when the same load pattern appears next, the updated correction coefficient is used. Since the load signal is calculated, even if there is interference between the load points and an error temporarily occurs between the target signal and the response signal, the error gradually decreases and a faithful load is applied to the target signal. Will be able to do it.
【図1】本実施例に係る構造物試験機の制御装置の概略
構成を示すブロック図である。FIG. 1 is a block diagram illustrating a schematic configuration of a control device of a structural test machine according to an embodiment.
【図2】本実施例に係る構造物試験機の制御装置の補正
手順を示すフローチャートである。FIG. 2 is a flowchart illustrating a correction procedure of the control device of the structural test machine according to the present embodiment.
【図3】RAMに記憶された負荷パターンごとの補正係
数の模式図である。FIG. 3 is a schematic diagram of a correction coefficient for each load pattern stored in a RAM.
【図4】負荷パターンとその補正係数の説明図である。FIG. 4 is an explanatory diagram of a load pattern and its correction coefficient.
【図5】従来技術の概略構成を示したブロック図であ
る。FIG. 5 is a block diagram showing a schematic configuration of a conventional technique.
【図6】計測した応答信号と目標信号との差を示す図で
ある。FIG. 6 is a diagram illustrating a difference between a measured response signal and a target signal.
1 A/D(Analog to Digital )変換器 2 D/A(Digital to Analog )変換器 3 補助記憶装置 4 CPU(中央処理装置:Central Processing Unit
) 5 RAM(Random Access Memory) 6 入出力装置 7 入出力インターフェース 10 構造物試験機の制御装置Reference Signs List 1 A / D (Analog to Digital) converter 2 D / A (Digital to Analog) converter 3 Auxiliary storage device 4 CPU (Central Processing Unit)
5) RAM (Random Access Memory) 6 I / O device 7 I / O interface 10 Control device for structural test machine
Claims (1)
それぞれ個別に負荷信号を出力する負荷信号出力手段
と、前記構造物の複数個の負荷点からそれぞれ個別に応
答信号を入力する応答信号入力手段と、前回の目標信号
と今回の目標信号との組合せである負荷パターンごとに
負荷信号を補正するための補正係数を記憶する補正係数
記憶手段と、前記応答信号入力手段から入力された応答
信号とそれに対応した目標信号との差分に基づいて新た
な補正係数を算出し、前記補正係数記憶手段に記憶され
た補正係数を更新する補正係数更新手段と、前記補正係
数記憶手段に記憶された補正係数を用いて次回に発生さ
せる負荷パターンに応じた負荷信号を算出する演算手段
とを備えたことを特徴とする構造物試験機の制御装置。1. Load signal output means for individually outputting load signals to a plurality of load points of a structure under test, and response signals individually input from a plurality of load points of the structure. Response signal input means, correction coefficient storage means for storing a correction coefficient for correcting a load signal for each load pattern which is a combination of the previous target signal and the current target signal, and input from the response signal input means. Correction coefficient updating means for calculating a new correction coefficient based on the difference between the response signal and the corresponding target signal, and updating the correction coefficient stored in the correction coefficient storage means; and storing the correction coefficient in the correction coefficient storage means. And a calculating means for calculating a load signal according to a load pattern to be generated next time using the corrected correction coefficient.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP07872192A JP3208826B2 (en) | 1992-02-27 | 1992-02-27 | Control device for structural testing machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP07872192A JP3208826B2 (en) | 1992-02-27 | 1992-02-27 | Control device for structural testing machine |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05240732A JPH05240732A (en) | 1993-09-17 |
| JP3208826B2 true JP3208826B2 (en) | 2001-09-17 |
Family
ID=13669749
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP07872192A Expired - Fee Related JP3208826B2 (en) | 1992-02-27 | 1992-02-27 | Control device for structural testing machine |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3208826B2 (en) |
-
1992
- 1992-02-27 JP JP07872192A patent/JP3208826B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH05240732A (en) | 1993-09-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0148982B2 (en) | ||
| JP3208826B2 (en) | Control device for structural testing machine | |
| US6281944B1 (en) | Apparatus and method for correcting non-linear characteristics in display device | |
| JPH10145231A (en) | A / D converter and data correction method in D / A converter | |
| JPH0369115B2 (en) | ||
| JP6468144B2 (en) | Fatigue testing machine | |
| JP2009100242A (en) | Automatic adjustment system for digital controller | |
| JP3432343B2 (en) | Plant monitoring equipment | |
| JP3570056B2 (en) | Material testing machine | |
| KR100279049B1 (en) | A device and techique of the calibration of piezo-electric pressure transducer | |
| JP2624920B2 (en) | Vertical amplifier calibration system for multi-phenomenon oscilloscope | |
| SU1402052A1 (en) | Method and device for loading structures for strength test | |
| SU607185A1 (en) | Device for programme-control of stand for article and structure specimen testing | |
| JP2935297B2 (en) | Automatic calibration equipment for measuring instruments | |
| JP5743233B2 (en) | Display device, image quality adjustment method, and program | |
| JPH09184871A (en) | Automatic calibrating apparatus for semiconductor testing system | |
| JPH04323568A (en) | Analogue measuring circuit | |
| JPH0363542A (en) | Material testing machine | |
| JP2663741B2 (en) | Material testing machine with learning function | |
| JPH10227837A (en) | Test voltage calibration apparatus and method for semiconductor test equipment | |
| JPH1038780A (en) | Fatigue testing machine | |
| JPH10253795A (en) | Output adjustment circuit of nuclear instrumentation | |
| JP2672690B2 (en) | Semiconductor device testing method | |
| JPH10164612A (en) | Landing correction device | |
| JPH05231982A (en) | Control device for structure testing machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080713 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090713 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100713 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100713 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110713 Year of fee payment: 10 |
|
| LAPS | Cancellation because of no payment of annual fees |