JP3238142B2 - Empty pallet management system in molding factory - Google Patents
Empty pallet management system in molding factoryInfo
- Publication number
- JP3238142B2 JP3238142B2 JP24160999A JP24160999A JP3238142B2 JP 3238142 B2 JP3238142 B2 JP 3238142B2 JP 24160999 A JP24160999 A JP 24160999A JP 24160999 A JP24160999 A JP 24160999A JP 3238142 B2 JP3238142 B2 JP 3238142B2
- Authority
- JP
- Japan
- Prior art keywords
- molding
- pallet
- empty
- time
- pallets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/60—Electric or hybrid propulsion means for production processes
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi-Process Working Machines And Systems (AREA)
- General Factory Administration (AREA)
- Warehouses Or Storage Devices (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、複数の成形ステー
ションと、自動倉庫と、無人搬送車とを具備する成形工
場において成形品を収納する空パレットの管理システム
の技術分野に属し、特に各成形ステーションに空パレッ
トを過不足なく準備できるようにしたものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention belongs to the technical field of an empty pallet management system for storing molded products in a molding factory having a plurality of molding stations, an automatic warehouse, and an automatic guided vehicle. Empty pallets can be prepared at the station without any excess or shortage.
【0002】[0002]
【従来の技術】一般に、成形工場は、図1に示すよう
に、成形機41、取出機42および成形品ストック装置
43を具備する複数の成形ステーション40と、前記各
成形ステーション40で生産した成形品を保管する自動
倉庫31と、前記各成形ステーション40と前記自動倉
庫31との間を往復して成形品および空パレットpを搬
送する無人搬送車32とを具備する。このような成形工
場において成形品を収納するための空パレットpは、従
来、作業者がコンピュータに指定日時を入力して、この
コンピュータにより現在から前記指定日時までの設定時
間において使用される空パレット数を予測演算させて、
そして、作業者がこの空パレット数分のパレットを準備
するようにしていた。これにより、各成形ステーション
40は、前記指定日時までに使用する空パレットpが準
備されているから、指定日時までの間にパレット不足が
生じて成形作業を中止するようなことが防止される。2. Description of the Related Art Generally, as shown in FIG. 1, a molding factory comprises a plurality of molding stations 40 each having a molding machine 41, a take-out machine 42 and a molded article stocking device 43, and moldings produced at each of the molding stations 40. An automatic warehouse 31 for storing articles, and an unmanned transport vehicle 32 for transporting molded articles and empty pallets p reciprocating between the molding stations 40 and the automatic warehouse 31 are provided. Conventionally, an empty pallet p for storing molded articles in such a molding factory is an empty pallet which is used by a worker by inputting a designated date and time to a computer and using the computer for a set time from the present to the designated date and time. Let us predict the number,
Then, an operator prepares pallets for the number of empty pallets. Thus, in each molding station 40, since the empty pallets p to be used by the designated date and time are prepared, it is possible to prevent the pallet shortage from occurring until the designated date and time and stop the molding operation.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、前記の
ような空パレット数の予測演算によると、前記指定日時
までに成形ステーション40のどれかが生産終了する場
合、その成形ステーション40においては生産が完了し
てから指定日時までの時間分だけ余分に空パレットpが
準備されてしまうという問題がある。例えば、現在から
指定日時までの設定時間が4時間である場合、仮に3号
成形ステーション40が今から2時間後に生産完了する
としても、4時間分の空パレットpが準備要求されるか
ら、2時間分の空パレットpが余分に準備要求されてし
まう〔設定時間(4時間)−3号成形ステーション残り
時間(2時間)=不必要な時間(2時間)〕。この場
合、作業者に余分な空パレットpを準備させることとな
り、且つ、成形工場内に余分な空パレットpを滞留させ
ることにもなる。However, according to the above-described calculation of the number of empty pallets, if any one of the molding stations 40 is to be completed by the designated date and time, the production is completed at that molding station 40. Then, there is a problem that an extra empty pallet p is prepared for a time corresponding to the time until the designated date and time. For example, if the set time from the present time to the designated date and time is 4 hours, even if the No. 3 molding station 40 completes the production 2 hours after now, an empty pallet p for 4 hours is required to be prepared. An extra preparation for the empty pallet p for the time is required [set time (4 hours) -3 molding station remaining time (2 hours) = unnecessary time (2 hours)]. In this case, the operator prepares an extra empty pallet p, and the extra empty pallet p stays in the molding factory.
【0004】本発明は、『成形機、取出機および成形品
ストック装置を具備する複数の成形ステーションと、前
記各成形ステーションで生産した成形品を予め定められ
た数をパレットに積載して保管する自動倉庫と、前記各
成形ステーションと前記自動倉庫との間を往復して予め
定められた数のパレットを積み重ねた一山毎に成形品お
よび空パレットを搬送する無人搬送車とを具備する成形
工場において成形品の搬送及び自動倉庫での保管に使用
する空パレットの管理システム』において、指定日時ま
での間に成形ステーションが実際に必要な数の空パレッ
トの準備要求が行えるようにすることを課題とする。According to the present invention, a plurality of molding stations each including a molding machine, a take-out machine, and a molded article stocking apparatus, and a predetermined number of molded articles produced at each of the molding stations are stacked and stored on a pallet. A molding factory comprising an automatic warehouse, and an unmanned transporter that transports molded articles and empty pallets for each pile in which a predetermined number of pallets are stacked while reciprocating between the molding stations and the automatic warehouse. In the management system for empty pallets used for transporting molded articles and storing them in automatic warehouses, it is necessary to enable the molding station to make a request for the preparation of the required number of empty pallets by the designated date and time. And
【0005】[0005]
【課題を解決するための手段】前記課題を解決するため
に講じた技術的手段は、次のようである。『 前記各成
形ステーションに接続された成形ステーションコンピュ
ータと、前記自動倉庫および前記無人搬送車に接続され
た物流制御コンピュータと、パレットの種別毎に定めら
れた一山あたりのパレット数データと一パレットあたり
の成形ショット数データとを格納するパレットデータベ
ース、前記各成形ステーションの最新の成形状況データ
を格納する成形状況データベースおよび前記自動倉庫と
前記各成形品ストック装置の最新のパレット在庫状況デ
ータを格納するパレット在庫状況データベースを具備す
るエリアサーバーコンピュータと、前記エリアサーバー
コンピュータ内の各データベースにアクセスしてデータ
を読み出し空パレットの山の不足数である不足空山数を
パレット種別毎に求めるエリア管理コンピュータと、前
記各コンピュータを接続する信号回線とを設け、前記エ
リア管理コンピュータは、指定日時の入力部と、現在か
ら前記指定日時までの設定時間を求める設定時間演算部
と、前記パレットデータベースと前記成形状況データベ
ースとに格納されたデータを読み出して前記成形ステー
ション毎に『一山あたりのパレット数×一パレットあた
りの成形ショット数×成形サイクル時間』の演算を行
い、成形品を回収したパレットが前記一山になるまでの
一山単位生産時間を成形ステーション毎に求める一山単
位生産時間演算部と、前記成形状況データベースに格納
されたデータを読み出して前記成形ステーション毎に
『成形サイクル時間×(生産残数/1ショットあたりの
成形数)』の演算を行い、現在から生産予定数の生産が
完了するまでの残り時間を成形ステーション毎に求める
残り時間演算部と、前記成形ステーション毎に前記残り
時間と前記設定時間のうちの短い方の時間を必要時間と
する必要時間演算部と、前記成形ステーション毎に前記
必要時間を前記一山単位生産時間で割算してパレットの
必要空山数を演算し、この成形ステーション毎の必要空
山数をパレット種別毎に総和してパレット種別毎の必要
空山数を求める必要空山数演算部と、前記成形状況デー
タベースと前記パレット在庫状況データベースとに格納
されたデータを読み出して前記成形品ストック装置にお
けるパレットの空山数と前記自動倉庫におけるパレット
の空山数とを加算してパレット種別毎の在庫空山数を求
める在庫空山数演算部と、前記在庫空山数から前記必要
空山数を引算してパレット種別毎の不足空山数を求める
不足空山数演算部とを具備する、ことを特徴とする。』 前記技術的手段は、次のように作用する。The technical means taken to solve the above-mentioned problems are as follows. "A molding station computer connected to each of the molding stations, a logistics control computer connected to the automatic warehouse and the automatic guided vehicle, pallet number data per hill determined for each type of pallet, and data per pallet. A pallet database for storing molding shot number data, a molding situation database for storing the latest molding situation data of each molding station, and a pallet for storing the latest pallet inventory situation data for the automatic warehouse and each molded article stocking apparatus. An area server computer having a stock status database, an area management computer for accessing each database in the area server computer to read data, and finding an insufficient number of empty mountains, which is an insufficient number of empty pallet mountains, for each pallet type; Each A signal line connecting a computer, the area management computer includes a designated date and time input unit, a set time computing unit that calculates a set time from the present time to the designated date and time, the pallet database and the molding situation database. The stored data is read out and the calculation of “the number of pallets per hill × the number of molding shots per pallet × the molding cycle time” is performed for each molding station until the pallet from which the molded product is collected becomes the single hill. And a production unit for calculating the production time per mountain for each molding station, and reading out the data stored in the molding situation database, and reading "molding cycle time × (remaining production number / 1 shot)" for each molding station. The number of moldings per unit) is calculated, and the remaining time from the current time until the production of the planned number of productions is completed is molded A required time calculating unit that determines the shorter time of the remaining time and the set time as a required time for each molding station; and calculates the required time for each molding station. The required number of empty hills for each molding station is calculated by dividing the required number of empty hills for each pallet by calculating the required number of empty hills for each molding station. Reading the data stored in the molding status database and the pallet inventory status database, adding the number of empty pallets of the pallet in the molded article stock apparatus and the number of empty pallets of the pallet in the automatic warehouse, and calculating the inventory empty mountain for each pallet type. A stock empty mountain count calculation unit for calculating the number of empty mountains, and subtracting the required empty mountain count from the stock empty mountain count to obtain the number of empty mountains for each pallet type. Comprising a Mel lack Sorayama number calculation unit, characterized in that. The technical means operates as follows.
【0006】前記エリア管理コンピュータに指定日時を
入力すると、前記必要時間に応じたパレットの必要空山
数が求められ、更に成形品ストック装置および自動倉庫
の在庫空山数を前記必要空山数から差し引いた不足空山
数がパレットの種別毎に演算される。When the designated date and time are input to the area management computer, the required number of empty pallets of the pallets according to the required time is obtained, and furthermore, the shortage obtained by subtracting the number of empty cavities of the stocking device and the automatic warehouse from the required number of empty hills. The number of empty mountains is calculated for each pallet type.
【0007】ここで、不足空山数とは、前記指定日時ま
でに必要なパレットを多段に積み重ねた状態にある山の
不足数をいう。なお、パレットは成形工場内の成形ステ
ーションと自動倉庫との間を往復して移送されるため、
一山あたりのパレット数はその高さや重量からパレット
の種別毎に予め定められている。Here, the number of missing hills means the number of hills in which the required pallets are stacked in multiple stages by the designated date and time. In addition, since the pallets are transferred back and forth between the molding station in the molding factory and the automatic warehouse,
The number of pallets per hill is predetermined for each type of pallet based on its height and weight.
【0008】前記不足空山数を演算するに際し、現在か
ら指定日時までの設定時間をそのまま使用するのではな
く、この設定時間を、前記必要時間演算部によって成形
ステーション毎の現在から生産予定数の生産が完了する
までの残り時間と比較してその短い方を必要時間として
用いる。そのため、前記指定日時までに成形ステーショ
ンのどれかが生産終了する場合は、前記必要空山数演算
部によって前記残り時間に応じた必要空山数が演算され
るから、実際に各成形ステーションが必要とするパレッ
トの空山数分だけが求められ、必要以上の空山数が準備
要求されることがない。In calculating the number of vacant vacant mountains, the set time from the present time to the designated date and time is not used as it is, but the set time is calculated by the necessary time calculation unit from the present time to the number of production scheduled for each molding station. The shorter time is used as the required time as compared with the remaining time until the completion. Therefore, if any one of the molding stations ends production by the designated date and time, the required empty mountain count according to the remaining time is calculated by the required empty mountain count calculation unit, so that each molding station is actually required. Only the number of empty pallets on the pallet is required, and there is no need to prepare more empty hills than necessary.
【0009】また、前記残り時間は、各成形ステーショ
ンの最新の成形状況データに基づいて演算されるから、
成形サイクルや取出サイクルに変動が生じた場合でもそ
の最新の実績データに応じて必要空山数が演算される。
なお、前記成形状況データに含まれる成形機の成形サイ
クル時間としては、その成形ステーションにおいて初め
て生産する成形品については実績データが存在しないか
ら、この場合は設計上の既定値を前記成形状況データベ
ースに登録しておき、この既定値を成形サイクル時間と
して用いる。The remaining time is calculated based on the latest molding state data of each molding station.
Even when a change occurs in the molding cycle or the removal cycle, the required number of empty hills is calculated according to the latest actual data.
Incidentally, as the molding cycle time of the molding machine included in the molding situation data, since there is no actual data for the molded article produced at the molding station for the first time, in this case, a default value in design is stored in the molding situation database. It is registered and this default value is used as the molding cycle time.
【0010】さらに、前記在庫空山数は、自動倉庫およ
び成形品ストック装置の最新のパレット在庫状況データ
に基づいて演算されるから、自動倉庫や成形品ストック
装置において後工程から空パレットの入出庫が行われて
も最新の在庫空山数が演算される。Further, since the number of empty stocks is calculated based on the latest pallet stock status data of the automatic warehouse and the article stocking apparatus, the empty pallets can be loaded and unloaded from the post-process in the automatic warehouse and the article stocking apparatus. Even if it is performed, the latest stock empty mountain count is calculated.
【0011】[0011]
【発明の効果】以上のように、本発明によれば、成形ス
テーションの残り時間を採り入れて不足空山数を求める
ようにしたから、実際に各成形ステーションが必要とす
るパレットの空山数分だけが求められて必要以上の空山
数が準備要求されることがない。As described above, according to the present invention, the number of empty hills is obtained by taking the remaining time of the molding station, so that only the number of empty pallets of the pallets actually required by each molding station is obtained. There is no need to prepare more than necessary empty mountains.
【0012】従って、作業者は余分な空パレットの準備
作業を行わずに済むから、その分作業者の労力を軽減す
ることができ、また、成形工場内に余分な空パレットを
滞留させることもないから、成形工場内の省スペース化
や工場内空間の有効利用を図ることができる。Accordingly, the operator does not need to perform an extra empty pallet preparation operation, so that the labor of the operator can be reduced correspondingly, and the extra empty pallet can be retained in the molding factory. Therefore, it is possible to save space in the molding factory and to effectively use the space in the factory.
【0013】また、不足空山数の演算に際し、最新の成
形状況データおよび最新のパレット在庫状況データに基
づいて演算されるから、指定日時までの実際に必要な分
だけの空パレットを過不足なく確実に準備することがで
きる。In calculating the number of vacant vacancies, the pallet is calculated based on the latest molding situation data and the latest pallet stock situation data. Can be prepared.
【0014】[0014]
【発明の実施の形態】以下に、本発明の実施の形態を図
面を参照しながら説明する。Embodiments of the present invention will be described below with reference to the drawings.
【0015】図1は、成形工場の概要を示す斜視図であ
り、図1に示すように成形工場は、成形機41、取出機
42および成形品ストック装置43を具備する複数の成
形ステーション40と、前記各成形ステーション40で
生産した成形品を保管する自動倉庫31と、前記各成形
ステーション40と前記自動倉庫31との間を往復して
予め定められた数のパレットpを積み重ねた一山(m)毎
に成形品および空パレットpを搬送する無人搬送車32
とを具備する。図1に示す成形工場では、前記成形ステ
ーション40は6台(1号〜6号成形ステーション)有
し、自動倉庫31は2個(J1,J2)有し、無人搬送
車32は2台(1号車,2号車)有する。FIG. 1 is a perspective view showing the outline of a molding factory. As shown in FIG. 1, the molding factory includes a plurality of molding stations 40 each having a molding machine 41, an unloader 42, and a molded article stocking device 43. A pile of a predetermined number of pallets p stacked back and forth between each molding station 40 and the automatic warehouse 31, and an automatic warehouse 31 for storing molded products produced at each of the molding stations 40. m) Automatic guided vehicle 32 that transports the molded product and empty pallet p for each
And In the molding factory shown in FIG. 1, the molding station 40 has six (No. 1 to No. 6 molding stations), the automatic warehouse 31 has two (J1, J2), and the automatic guided vehicle 32 has two (1 Car No. 2).
【0016】図2は、前記成形工場における空パレット
管理システムの構成図を示し、図2に示すように、この
空パレット管理システムは、前記各成形ステーション4
0に接続された成形ステーションコンピュータ4と、前
記自動倉庫31および前記無人搬送車32に接続された
物流制御コンピュータ3と、データベース20を具備す
るエリアサーバーコンピュータ2と、不足空山数を求め
るためのエリア管理コンピュータ1と、前記各コンピュ
ータ1〜4を接続する信号回線5とを具備する。ここ
で、前記不足空山数とは、所定の指定日時までに必要な
パレットpを多段に積み重ねた状態にある山(m)の不足
数をいう。なお、パレットpは成形工場内の成形ステー
ション40と自動倉庫31との間を往復して移送される
ため、一山(m)あたりのパレット数はその高さや重量か
らパレットpの種別毎に予め定められている。FIG. 2 shows a configuration diagram of an empty pallet management system in the molding factory. As shown in FIG.
0, a logistics control computer 3 connected to the automatic warehouse 31 and the automatic guided vehicle 32, an area server computer 2 having a database 20, and an area for determining the number of empty vacant mountains. The system includes a management computer 1 and a signal line 5 connecting the computers 1 to 4. Here, the insufficient number of empty mountains refers to the insufficient number of mountains (m) in a state where required pallets p are stacked in multiple stages by a specified date and time. Since the pallets p are transferred back and forth between the molding station 40 and the automatic warehouse 31 in the molding factory, the number of pallets per mountain (m) is determined in advance for each type of pallets p from the height and weight. Stipulated.
【0017】前記成形ステーションコンピュータ4は、
入力された生産予定数の成形品の生産指示をするよう
に、これに接続された成形機41、取出機42および成
形品ストック装置43の作動制御を行う。また、この成
形ステーションコンピュータ4は、最新の成形状況デー
タ(成形機41の成形サイクル時間、成形機41の1シ
ョットあたりの成形数、取出機42の取出サイクル時
間、生産残数、使用パレットpの種別など)および成形
品ストック装置43における最新のパレット在庫状況デ
ータ(パレット種別毎の空山数)を前記エリアサーバー
コンピュータ2に送信する。ここで、前記空山数とは、
パレット種別毎に空パレットpを多段に積み重ねた状態
にある山(m)の数をいう。送信のタイミングとしては、
一定数の成形品を生産した時点、一回の生産が完了した
時点、成形機の1成形サイクル毎、あるいは、所定時間
毎など、適宜の時点で送信する。なお、前記成形状況デ
ータのうち、取出機41の取出サイクル時間は、通常、
成形機41の成形サイクル時間と一致しているので、こ
の成形状況データから除いても良い。The molding station computer 4 comprises:
The operation of the molding machine 41, the unloader 42, and the molding stocking device 43 connected thereto is controlled so as to instruct the production of the inputted planned number of moldings. Further, the molding station computer 4 stores the latest molding state data (the molding cycle time of the molding machine 41, the number of moldings per shot of the molding machine 41, the unloading cycle time of the unloading machine 42, the remaining production number, and the number of pallets p used). And the latest pallet inventory status data (the number of vacant mountains for each pallet type) in the molded product stock device 43 is transmitted to the area server computer 2. Here, the number of empty mountains is
The number of mountains (m) in a state where empty pallets p are stacked in multiple stages for each pallet type. As the transmission timing,
The transmission is performed at an appropriate time, such as when a certain number of molded articles are produced, when one production is completed, every molding cycle of the molding machine, or every predetermined time. Incidentally, in the molding condition data, the unloading cycle time of the unloader 41 is usually
Since it coincides with the molding cycle time of the molding machine 41, it may be excluded from this molding situation data.
【0018】前記物流制御コンピュータ3は、自動倉庫
31における成形品や空パレットpの入出庫管理を行う
と共に、無人搬送車32の走行、停止を指示する。ま
た、この物流制御コンピュータ3は、自動倉庫31にお
ける最新のパレット在庫状況(パレット種別毎の空山
数)を前記エリアサーバーコンピュータ2に送信する。
送信のタイミングとしては、パレットpの入出庫が行わ
れる毎、所定時間毎など、適宜の時点で送信する。The distribution control computer 3 manages the entry and exit of the molded articles and the empty pallets p in the automatic warehouse 31, and instructs the traveling and stopping of the automatic guided vehicle 32. The distribution control computer 3 transmits the latest pallet stock status (the number of empty mountains for each pallet type) in the automatic warehouse 31 to the area server computer 2.
As the transmission timing, the pallet p is transmitted at an appropriate time, such as every time the pallet p is loaded and unloaded, every predetermined time, and the like.
【0019】前記エリアサーバコンピュータ2は、前記
成形ステーションコンピュータ4から送信されてきた最
新の成形状況データおよび前記物流制御コンピュータ3
から送信されてきた最新のパレット在庫状況データを受
信すると共に、そのデータをデータベース20の所定箇
所に格納する。このデータベース20は、図3〜図5に
示すように、成形状況データベース21(図3参照)、
パレット在庫状況データベース22(図4参照)および
パレットデータベース23(図5参照)を具備する。The area server computer 2 stores the latest molding state data transmitted from the molding station computer 4 and the distribution control computer 3
Receives the latest pallet inventory status data transmitted from the company, and stores the data in a predetermined location of the database 20. As shown in FIGS. 3 to 5, the database 20 includes a molding status database 21 (see FIG. 3),
The pallet inventory status database 22 (see FIG. 4) and the pallet database 23 (see FIG. 5) are provided.
【0020】成形状況データベース21は、前記成形ス
テーションコンピュータ4から送信されてきた最新の成
形状況データを逐次格納し、その内容として、図3に示
すように、成形ステーション40毎に成形機41の成形
サイクル時間、成形機41の1ショットあたりの成形数
(取出機42によって一回に取出される成形品の取出数
と同数)、取出機42の取出サイクル時間、生産残数お
よび現在使用しているパレットpの種別のデータからな
る。なお、前記成形状況データに含まれる成形機41の
成形サイクル時間としては、その成形ステーション40
において初めて生産する成形品については実績データが
存在しないから、この場合は設計上の既定値を前記成形
状況データベース21に登録しておき、この既定値を成
形サイクル時間として用いる。The molding status database 21 sequentially stores the latest molding status data transmitted from the molding station computer 4, and includes, as shown in FIG. The cycle time, the number of moldings per shot of the molding machine 41 (the same number as the number of molded articles taken out at one time by the unloading machine 42), the unloading cycle time of the unloading machine 42, the number of remaining products, and the currently used It consists of data of the type of the pallet p. The molding cycle time of the molding machine 41 included in the molding situation data is the molding station 40
Since there is no actual data for a molded article produced for the first time, in this case, a default value in design is registered in the molding situation database 21 and this default value is used as a molding cycle time.
【0021】パレット在庫状況データベース22は、前
記成形ステーションコンピュータ4および前記物流制御
コンピュータ3から送信されてきた最新のパレット在庫
状況データを逐次格納し、その内容として、図4に示す
ように、パレット種別毎における、成形品ストック装置
43のパレット空山数および自動倉庫31のパレット空
山数のデータからなる。The pallet inventory status database 22 sequentially stores the latest pallet inventory status data transmitted from the molding station computer 4 and the physical distribution control computer 3, and includes, as shown in FIG. In each case, data of the number of empty pallets of the molded article stock device 43 and the number of empty pallets of the automatic warehouse 31 are included.
【0022】パレットデータベース23は、予め登録さ
れたパレットデータであり、その内容は、図5に示すよ
うに、パレット種別毎においてパレットpを積み重ねて
山(m)の状態にするときに必要な一山あたりのパレット
数のデータと一パレットあたりの成形ショット数、ま
た、成形品の種別毎において使用するパレットpの種別
およびその一パレットpあたりの成形品収納個数のデー
タとからなる。なお、この一山あたりのパレット数や成
形品収納個数のデータは、パレットpのサイズ・重量
や、成形品のサイズ・形状・重量などにより予め決定さ
れるものである。また、一パレットあたりの成形ショッ
ト数データは、前記一パレットあたりの成形品収納個数
を前記成形状況データにおける成形機41の1ショット
あたりの成形数で割算して求めたものであり、エリアサ
ーバーコンピュータ2で演算される。The pallet database 23 is pallet data registered in advance. The contents of the pallet database 23 are necessary for stacking the pallets p for each pallet type to form a mountain (m) as shown in FIG. It consists of data on the number of pallets per hill, the number of molding shots per pallet, data on the type of pallets p used for each type of molded product, and data on the number of molded products stored per pallet p. The data of the number of pallets and the number of molded articles stored in each hill are determined in advance based on the size and weight of the pallets p, the size, shape, and weight of molded articles. The molding shot number data per pallet is obtained by dividing the number of molded articles stored per pallet by the number of moldings per shot of the molding machine 41 in the molding situation data. The calculation is performed by the computer 2.
【0023】前記エリア管理コンピュータ1は、前記エ
リアサーバーコンピュータ2を介して各データベース2
1〜23にアクセスして必要なデータを読み出してパレ
ット種別毎に不足空山数を求める。図6は、エリア管理
コンピュータ1の概略構成を示すブロック図であり、図
6に示すように、このエリア管理コンピュータ1は、一
山単位生産時間演算部11、残り時間演算部12、設定
時間演算部13、必要時間演算部14、必要空山数演算
部15、在庫空山数演算部16および不足空山数演算部
17を具備する。The area management computer 1 communicates with each database 2 via the area server computer 2.
1 to 23, necessary data is read, and the number of empty vacancies is obtained for each pallet type. FIG. 6 is a block diagram showing a schematic configuration of the area management computer 1. As shown in FIG. 6, the area management computer 1 includes a mountain-based production time calculation unit 11, a remaining time calculation unit 12, and a set time calculation unit. It comprises a unit 13, a required time calculating unit 14, a required empty mountain number calculating unit 15, a stock empty mountain number calculating unit 16, and an insufficient empty mountain number calculating unit 17.
【0024】前記一山単位生産時間演算部11は、前記
成形ステーション40毎に成形品を回収したパレットp
が積み重ねられた一山(m)の状態になるまでの一山単位
生産時間を演算する機能部である。前記残り時間演算部
12は、前記成形ステーション40毎に現在から生産予
定数の生産が完了するまでの残り時間を演算する機能部
である。前記設定時間演算部13は、現在から指定日時
までの設定時間を演算する機能部である。この設定時間
演算部13は、エリア管理コンピュータ1に装備するキ
ーボードなどの指定日時入力部13aからの指定日時が
入力される。前記必要時間演算部14は、前記成形ステ
ーション40毎に前記残り時間と前記設定時間とを比較
して小さい方を必要時間と決定する機能部である。前記
必要空山数演算部15は、前記成形ステーション40毎
に前記必要時間を前記一山単位生産時間で割算してパレ
ットの必要空山数を演算し、この成形ステーション40
毎の必要空山数をパレット種別毎に総和してパレット種
別毎の必要空山数を演算する機能部である。前記在庫空
山数演算部16は、前記成形品ストック装置43におけ
るパレットpの空山数と前記自動倉庫31におけるパレ
ットpの空山数とを加算してパレット種別毎の在庫空山
数を演算する機能部である。前記不足空山数演算部17
は、前記在庫空山数から前記必要空山数を引算してパレ
ット種別毎の不足空山数を演算する機能部である。ま
た、この不足空山数演算部17は、ここで求めた不足空
山数をエリア管理コンピュータ1に装備する表示部18
に出力する。The hill-based production time calculation unit 11 is provided with a pallet p for collecting molded products for each molding station 40.
Is a functional unit that calculates the production time per mountain until the pile reaches the state of the pile (m). The remaining time calculating unit 12 is a functional unit that calculates the remaining time from the current time until the production of the planned number of production is completed for each of the molding stations 40. The set time calculation unit 13 is a functional unit that calculates a set time from the present to a designated date and time. The set time calculation unit 13 receives a designated date and time from a designated date and time input unit 13a such as a keyboard provided in the area management computer 1. The required time calculation unit 14 is a functional unit that compares the remaining time and the set time for each molding station 40 and determines the smaller one as the required time. The required empty mountain count calculating unit 15 calculates the required empty mountain count of the pallet by dividing the required time by the one mountain unit production time for each molding station 40.
The required number of empty mountains for each pallet type is calculated by summing up the required number of empty mountains for each pallet type. The inventory empty mountain count calculation unit 16 is a functional unit that calculates the inventory empty mountain count for each pallet type by adding the empty mountain count of the pallet p in the molded article stock device 43 and the empty mountain count of the pallet p in the automatic warehouse 31. is there. Insufficient empty mountain count calculation unit 17
Is a functional unit that subtracts the required empty mountain count from the stock empty mountain count and calculates the insufficient empty mountain count for each pallet type. Further, the insufficient empty mountain count calculating section 17 displays the number of insufficient empty mountains determined here on the display section 18 provided in the area management computer 1.
Output to
【0025】次に、前記エリア管理コンピュータ1によ
る不足空山数の演算動作を説明する。Next, the operation of calculating the number of vacant mountains by the area management computer 1 will be described.
【0026】図7は、この演算動作の概略を示すフロー
チャートであり、図7に示すように、エリア管理コンピ
ュータ1の指定日時入力部13aから指定日時が入力さ
れると、ステップS1において、設定時間演算部13に
おいて現在から前記指定日時までの設定時間が演算され
る。例えば、前記設定日時を1999年11月11日2
3時と入力し、現在の時刻が1999年11月11日1
9時であるとすると、設定時間としては4時間となる。FIG. 7 is a flow chart showing the outline of this calculation operation. As shown in FIG. 7, when the designated date and time is input from the designated date and time input section 13a of the area management computer 1, the set time is set in step S1. The calculation unit 13 calculates a set time from the present to the specified date and time. For example, when the set date and time is November 11, 1999 2
Enter 3 o'clock and the current time is 1 November 11, 1999
If it is 9 o'clock, the set time is 4 hours.
【0027】ステップS2では、一山単位生産時間演算
部11において成形ステーション40毎に成形品を回収
したパレットpが積み重ねられた状態の山(m)になるま
での一山単位生産時間が下記の演算式に従って演算され
る。In step S2, the production time per mountain unit until the pallets p from which the molded products are collected at the molding station 40 in the mountain-based production time calculation unit 11 are stacked (m) is as follows. It is calculated according to the calculation formula.
【0028】一山単位生産時間 = 一山あたりのパレ
ット数×一パレットあたりの成形ショット数×成形サイ
クル時間 この演算式における一山あたりのパレット数と一パレッ
トあたりの成形ショット数は、前記エリアサーバーコン
ピュータ2のデータベース20におけるパレットデータ
ベース23から読み出したデータが用いられる。また、
成形サイクル時間は、前記エリアサーバーコンピュータ
2のデータベース20における成形状況データベース2
1から最新の情報を読み出したデータが用いられる。従
って、仮に成形サイクルに変動が生じた場合はその変動
後の最新情報に応じた一山単位生産時間が求められるこ
ととなる。The production time per mountain = the number of pallets per mountain × the number of molding shots per pallet × the molding cycle time The number of pallets per mountain and the number of molding shots per pallet in this equation are determined by the area server. Data read from the pallet database 23 in the database 20 of the computer 2 is used. Also,
The molding cycle time is stored in the molding status database 2 in the database 20 of the area server computer 2.
Data obtained by reading the latest information from 1 is used. Therefore, if a change occurs in the molding cycle, the production time per mountain unit according to the latest information after the change is obtained.
【0029】成形ショット数は、成形機41において1
回の成形動作で生産される成形品の数を言うが、取出機
42によって1回に取出される成形品の取出数と同数で
ある。従って、成形ショット数に代えて取出機42の取
出数を用いても良い。そして、この一パレットあたりの
成形ショット数に、1回の成形サイクル時間をかける
と、一パレットに成形品を収納させるのに必要な時間が
求められることとなる。よって、この一パレットに成形
品を収納させるのに必要な時間に、一山あたりのパレッ
ト数をかけると、一山単位生産時間が求められることと
なる。The number of molding shots is 1 in the molding machine 41.
The number of molded products produced in one molding operation is the same as the number of molded products extracted by the unloader 42 at one time. Therefore, the number of ejections of the ejection machine 42 may be used instead of the number of molding shots. If one molding cycle time is applied to the number of molding shots per pallet, the time required to store the molded product on one pallet is obtained. Therefore, if the number of pallets per hill is multiplied by the time required to store the molded product on one pallet, the production time per hill is obtained.
【0030】ステップS3では、残り時間演算部12に
おいて成形ステーション40毎に現在から生産予定数の
生産が完了するまでの残り時間が下記の演算式に従って
演算される。In step S3, the remaining time calculator 12 calculates the remaining time from the present to the end of the production of the planned number of production for each molding station 40 according to the following formula.
【0031】残り時間 = 成形サイクル時間×(生産
残数/1ショットあたりの成形数) この演算式における、成形サイクル時間、生産残数およ
び1ショットあたりの成形数の各データは、前記エリア
サーバーコンピュータ2のデータベース20における成
形状況データベース21から最新の情報を読み出したデ
ータが用いられる。ただし、成形ショット数は、前記ス
テップS2にて既に読み出したものを用いる。すなわ
ち、同じデータを再度データベース20から読み出すこ
とを行わないようにすることでアクセス時間の短縮を図
っている。Remaining time = molding cycle time × (number of remaining production / number of moldings per shot) In this equation, the data of the molding cycle time, the number of remaining productions, and the number of moldings per shot are obtained from the area server computer. Data obtained by reading the latest information from the molding status database 21 in the second database 20 is used. However, the number of molding shots used is the one already read in step S2. That is, access time is reduced by preventing the same data from being read from the database 20 again.
【0032】前記演算式中の(生産残数/1ショットあ
たりの成形数)の演算によって生産残数分の成形品を生
産するのに必要な成形機41の成形サイクル数が求めら
れることとなる。よって、この成形サイクル数に、1回
の成形サイクル時間をかけると、残り時間が求められる
こととなる。The number of molding cycles of the molding machine 41 required to produce molded products corresponding to the number of remaining productions is obtained by calculating (the number of remaining productions / the number of moldings per shot) in the above equation. . Therefore, if one molding cycle time is multiplied by the number of molding cycles, the remaining time is obtained.
【0033】ステップS4では、必要時間演算部14に
よって前記成形ステーション40毎に前記ステップS3
で求めた残り時間と前記ステップS1で求めた設定時間
とを比較して小さい方を必要時間と決定する。例えば、
ステップS1で求めた設定時間が4時間であったとし、
仮に3号成形ステーション40の残り時間がステップS
3で求めた時間が2時間であったとすると、このステッ
プS4においては3号成形ステーション40の残り時間
である2時間を必要時間と決定することとなる。一方、
3号成形ステーション40の残り時間が6時間であった
とすると、4時間であった前記設定時間を必要時間と決
定することとなる。In step S4, the necessary time calculation unit 14 performs the processing in step S3 for each of the molding stations 40.
The remaining time determined in step S1 is compared with the set time determined in step S1, and the smaller one is determined as the required time. For example,
Assuming that the set time obtained in step S1 is 4 hours,
If the remaining time of No. 3 molding station 40 is step S
Assuming that the time obtained in 3 is 2 hours, in this step S4, 2 hours which is the remaining time of the No. 3 molding station 40 is determined as the required time. on the other hand,
Assuming that the remaining time of the No. 3 molding station 40 is 6 hours, the set time of 4 hours is determined as the required time.
【0034】ステップS5では、必要空山数演算部15
によって前記成形ステーション40毎に前記ステップS
4で求めた必要時間を前記ステップS2で求めた一山単
位生産時間で割算してパレットの必要空山数を演算し、
次いでこの成形ステーション40毎の必要空山数をパレ
ット種別毎に総和してパレット種別毎の必要空山数を演
算する。In step S5, the required empty mountain number calculation unit 15
The step S for each molding station 40
The required time obtained in step 4 is divided by the one-mount production time obtained in step S2 to calculate the required number of empty pallets on the pallet.
Next, the required number of empty mountains for each molding station 40 is summed up for each pallet type to calculate the required number of empty mountains for each pallet type.
【0035】この演算において必要時間を一山単位生産
時間で割算したときに生じる端数は繰り上げることとす
る。また、ここで求めた必要空山数は、現在から指定日
時までの設定時間(ステップS1)をそのまま使用する
のではなく、この設定時間を、前記ステップS4におい
て成形ステーション40毎の現在から生産予定数の生産
が完了するまでの残り時間(ステップS3)と比較して
小さい方を必要時間として用いるため、前記指定日時ま
でに成形ステーション40のどれかが生産終了する場合
は、前記必要空山数演算部15によって前記残り時間に
応じた必要空山数が演算されるから、実際に生産された
成形品を収納するために必要な空山数が正確に演算され
ることとなる。In this operation, the fraction generated when the required time is divided by the production time per mountain is rounded up. The required number of vacant mountains obtained here does not use the set time (step S1) from the present to the designated date and time as it is. Is used as the required time as compared with the remaining time (step S3) until the completion of the production of the molding station 40, if any of the molding stations 40 is to be completed by the designated date and time, Since the required number of empty hills according to the remaining time is calculated by 15, the number of empty hills necessary for storing the actually produced molded product is accurately calculated.
【0036】ステップS6では、在庫空山数演算部16
によって前記成形品ストック装置43におけるパレット
pの空山数と前記自動倉庫31におけるパレットpの空
山数とを加算してパレット種別毎の在庫空山数が演算さ
れる。In step S6, the stock empty mountain count calculation unit 16
Thus, the number of empty mountains of the pallets p in the molded article stock device 43 and the number of empty mountains of the pallets p in the automatic warehouse 31 are added to calculate the number of empty mountains of each pallet type.
【0037】成形品ストック装置43におけるパレット
pの空山数と自動倉庫31におけるパレットpの空山数
は、前記エリアサーバーコンピュータ2のデータベース
20におけるパレット在庫状況データベース22から最
新の情報を読み出して用いられる。従って、仮に自動倉
庫31や成形品ストック装置43において後工程から空
パレットpの入出庫が生じても最新情報に応じた在庫空
山数が求められることとなる。The number of empty peaks of the pallets p in the molded article stock apparatus 43 and the number of empty peaks of the pallets p in the automatic warehouse 31 are used by reading the latest information from the pallet inventory status database 22 in the database 20 of the area server computer 2. Therefore, even if the empty pallet p is moved in and out of the automatic warehouse 31 and the molded article stocking apparatus 43 in a later process, the number of empty hills according to the latest information is obtained.
【0038】ステップS7では、不足空山数演算部17
によって前記ステップS6で求めた在庫空山数から前記
ステップS5で求めた必要空山数を引算してパレット種
別毎の不足空山数が演算される。すなわち、(在庫空山
数−必要空山数)の演算を行い、その値が負の場合これ
を不足空山数とする。一方、(在庫空山数−必要空山
数)の値が正の場合はこれを余剰空山数とする。また、
同時にパレット種別毎に(不足空山数×一山あたりのパ
レット数)を演算し不足パレット数を求め、(余剰空山
数×一山あたりのパレット数)を演算し余剰空パレット
数をも求める。In step S7, the number of empty vacant mountains calculating section 17
Then, the required number of empty mountains obtained in step S5 is subtracted from the number of empty mountains obtained in step S6 to calculate the number of insufficient empty mountains for each pallet type. That is, the calculation of (the number of empty mountains in stock−the number of necessary empty mountains) is performed, and when the value is negative, this is regarded as the number of insufficient empty mountains. On the other hand, when the value of (the number of empty vacant mountains−the number of necessary empty hills) is positive, this is set as the surplus empty mountain number. Also,
At the same time, for each pallet type, (the number of vacant empty mountains × the number of pallets per mountain) is calculated to obtain the number of insufficient pallets, and (the number of surplus empty mountains × the number of pallets per mountain) is calculated to obtain the number of excess empty pallets.
【0039】以上で不足空山数の演算動作は終了する
が、このステップS7における演算結果は、エリア管理
コンピュータ1における表示部18において空山準備画
面として画面表示される。The operation for calculating the number of empty vacancies is completed as described above. The calculation result in step S7 is displayed on the display unit 18 of the area management computer 1 as an empty mountain preparation screen.
【0040】図8は、この表示部18における空山準備
画面を示す。図8を参照して、この空山準備画面の下半
分程度にパレット種別毎(パレット種類:L,S,M,
M1,S1,・・・)に不足山数(不足空山数を意味す
る。)および余剰山数(余剰空山数を意味する。)を棒
グラフにて表す。なお、この不足山数および余剰山数
は、前記自動倉庫31の倉庫No.(J1,J2)に応
じて表示されている。これは、例えば、倉庫No.J1
の自動倉庫31は成形ステーション40の1号機〜3号
機までの成形品およびパレットpを保管するようにし、
倉庫No.J2の自動倉庫31は成形ステーション40
の4号機〜6号機までの成形品およびパレットpを保管
するようにして、このような2つのグループに分けて各
グループ毎にエリア管理コンピュータ1によって不足空
山数の前記演算処理(ステップS1〜ステップS7)を
行うようにしているからである。FIG. 8 shows an empty mountain preparation screen on the display unit 18. Referring to FIG. 8, each pallet type (pallet type: L, S, M,
M1, S1,...) Show the number of insufficient mountains (meaning the number of insufficient empty mountains) and the number of surplus mountains (meaning the number of extra empty mountains) in a bar graph. The number of insufficient mountains and the number of surplus mountains are determined by the warehouse number of the automatic warehouse 31. (J1, J2) are displayed. This is, for example, the warehouse No. J1
The automatic warehouse 31 stores molding products and pallets p of the first to third molding stations 40, and
Warehouse No. J2 automatic warehouse 31 is a molding station 40
The molded products and pallets p of No. 4 to No. 6 are stored and divided into such two groups, and the area management computer 1 calculates the number of vacant mountains by the area management computer 1 for each group (steps S1 to S1). This is because S7) is performed.
【0041】また、この空山準備画面の右上部分には、
倉庫No.J1,J2に分けてパレット種類毎に、不足
山(不足空山数を意味する。)、不足パレット(不足空
パレット数を意味する。)、余剰山(余剰空山数を意味
する。)および余剰パレット(余剰空パレット数を意味
する。)の各数値が表示される。この表示画面では右端
の三角印をクリックすることにより画面スクロールす
る。In the upper right part of the sky mountain preparation screen,
Warehouse No. Insufficient mountains (meaning the number of insufficient empty pallets), insufficient pallets (meaning the number of insufficient empty pallets), surplus mountains (meaning the number of excess empty mountains), and extra pallets for each pallet type divided into J1 and J2. (Meaning the number of surplus empty pallets) is displayed. In this display screen, the screen is scrolled by clicking the triangle at the right end.
【0042】一方、最初にエリア管理コンピュータ1に
入力した指定日時は、この空山準備画面の左上部分に表
示されている。On the other hand, the designated date and time input first to the area management computer 1 is displayed in the upper left portion of the empty mountain preparation screen.
【0043】以上のように、本実施の形態による空パレ
ット管理システムによれば、エリア管理コンピュータ1
の指定日時入力部13aから入力された指定日時までの
間に、各成形ステーション40において実際に生産され
た成形品を収納するために必要な不足空山数が正確に且
つ瞬時に演算されることとなる。従って、作業者は余分
な空パレットpの準備作業を行わずに済むから、その
分、作業者の労力を軽減することができる。また、成形
工場内に余分な空パレットpを滞留させることもなくな
るから、成形工場内の省スペース化や工場内空間を有効
利用することができる。また、不足空山数の演算に際
し、最新の成形状況データおよび最新のパレット在庫状
況データに基づいて演算されるから、指定日時までの実
際に必要な分だけの空パレットpを過不足なく確実に準
備することができる。さらには、前記不足空山数を棒グ
ラフや数値によってエリア管理コンピュータ1における
表示部18に画面表示することにより、数種類あるパレ
ットpの不足空山数を目視で瞬時に確認することができ
るから、空山準備に際しての作業者の作業効率をより一
層向上させることができる。As described above, according to the empty pallet management system according to the present embodiment, the area management computer 1
Between the specified date and time input from the specified date and time input unit 13a, the number of vacant hills necessary to store the molded product actually produced in each molding station 40 is accurately and instantaneously calculated. Become. Therefore, the operator does not need to perform an extra work of preparing the empty pallet p, so that the labor of the operator can be reduced correspondingly. In addition, since an unnecessary empty pallet p does not stay in the molding factory, the space in the molding factory can be saved and the space in the factory can be effectively used. In addition, when calculating the number of vacant vacancies, the pallet is calculated based on the latest molding situation data and the latest pallet stock situation data. can do. Further, by displaying the number of insufficient hills on the display unit 18 of the area management computer 1 in a bar graph or a numerical value on the screen, the number of vacant hills of several types of pallets p can be visually confirmed instantaneously. Work efficiency of the worker can be further improved.
【0044】なお、前記エリア管理コンピュータ1内の
各演算部11〜17は、所定のハードウエアまたはソフ
トウエアにより構成することができる。The arithmetic units 11 to 17 in the area management computer 1 can be constituted by predetermined hardware or software.
【0045】また、成形ステーション40の数、自動倉
庫31の数、無人搬送車32の数は、成形工場毎に任意
に増減することができ、また、自動倉庫31と無人搬送
車32は1つ具備するものであっても良い。The number of the molding stations 40, the number of the automatic warehouses 31, and the number of the automatic guided vehicles 32 can be arbitrarily increased or decreased for each molding factory. It may be provided.
【0046】また、図7に示すステップS1〜S7の不
足空山数の演算処理は、現在から指定日時入力部に入力
された指定日時までの設定時間を求める設定時間演算ス
テップと、前記パレットデータベース23と前記成形状
況データベース21とに格納されたデータを読み出して
前記成形ステーション40毎に『一山あたりのパレット
数×一パレットあたりの成形ショット数×成形サイクル
時間』の演算を行い、成形品を回収したパレットpが前
記一山になるまでの一山単位生産時間を成形ステーショ
ン40毎に求める一山単位生産時間演算ステップと、前
記成形状況データベース21に格納されたデータを読み
出して前記成形ステーション40毎に『成形サイクル時
間×(生産残数/1ショットあたりの成形数)』の演算
を行い、現在から生産予定数の生産が完了するまでの残
り時間を成形ステーション40毎に求める残り時間演算
ステップと、前記成形ステーション40毎に前記残り時
間と前記設定時間のうちの短い方の時間を必要時間とす
る必要時間演算ステップと、前記成形ステーション40
毎に前記必要時間を前記一山単位生産時間で割算してパ
レットpの必要空山数を演算し、この成形ステーション
40毎の必要空山数をパレット種別毎に総和してパレッ
ト種別毎の必要空山数を求める必要空山数演算ステップ
と、前記成形状況データベース21と前記パレット在庫
状況データベース22とに格納されたデータを読み出し
て前記成形品ストック装置43におけるパレットpの空
山数と前記自動倉庫31におけるパレットpの空山数と
を加算してパレット種別毎の在庫空山数を求める在庫空
山数演算ステップと、前記在庫空山数から前記必要空山
数を引算してパレット種別毎の不足空山数を求める不足
空山数演算ステップとを実行するプログラムを、例え
ば、インターネット回線からダウンロードしたり、前記
プログラムを記録した記録媒体からインストールして、
前記エリア管理コンピュータ1において実行するように
しても良い。The processing for calculating the number of vacant hills in steps S1 to S7 shown in FIG. 7 includes a set time calculating step for obtaining a set time from the present time to a specified date and time input to the specified date and time input unit; And the data stored in the molding status database 21 are read out, and an operation of “the number of pallets per hill × the number of molding shots per pallet × the molding cycle time” is performed for each molding station 40 to collect molded products. A single-mount production time calculating step of obtaining a single-mount production time for each molding station 40 until the set pallet p becomes the single peak; and reading data stored in the molding status database 21 to read out the data of each molding station 40. Calculate the molding cycle time x (number of remaining production / number of moldings per shot) A remaining time calculation step for obtaining the remaining time until the production of the planned number is completed for each molding station 40, and the shorter of the remaining time and the set time for each of the molding stations 40 needs to be the required time A time calculating step;
For each pallet type, the required time is divided by the one-mount production time to calculate the required number of vacant hills for the pallet p. The number of empty hills required for calculating the number of pallets, the data stored in the molding status database 21 and the pallet inventory status database 22 are read out, and the number of empty pallets p in the molded article stock device 43 and the pallets in the automatic warehouse 31 are read. calculating the number of empty hills in stock for each pallet type by adding the number of empty hills to p; and the insufficient hills for calculating the number of empty hills in each pallet type by subtracting the required number of empty mountains from the number of empty stocks in inventory. A program for executing the number calculation step, for example, by downloading from an Internet line or recording the program Be installed from a recording medium,
The program may be executed in the area management computer 1.
【図1】成形工場の概要を示す斜視図である。FIG. 1 is a perspective view showing an outline of a molding factory.
【図2】実施の形態による成形工場における空パレット
管理システムを示す構成図である。FIG. 2 is a configuration diagram showing an empty pallet management system in a molding factory according to the embodiment.
【図3】成形状況データベース21のデータ内容を示す
模式図である。FIG. 3 is a schematic diagram showing data contents of a molding status database 21;
【図4】パレット在庫状況データベース22のデータ内
容を示す模式図である。FIG. 4 is a schematic diagram showing data contents of a pallet inventory status database 22.
【図5】パレットデータベース23のデータ内容を示す
模式図である。FIG. 5 is a schematic diagram showing data contents of a pallet database 23;
【図6】エリア管理コンピュータ1の概略構成を示すブ
ロック図である。FIG. 6 is a block diagram illustrating a schematic configuration of an area management computer 1.
【図7】エリア管理コンピュータ1による不足空山数の
演算動作の概略を示すフローチャートである。FIG. 7 is a flowchart illustrating an outline of an operation of calculating the number of insufficient empty mountains by the area management computer 1.
【図8】表示部18における空山準備画面を示す模式図
である。8 is a schematic diagram showing an empty mountain preparation screen on the display unit 18. FIG.
1 エリア管理コンピュータ 2 エリアサーバーコンピュータ 3 物流制御コンピュータ 4 成形ステーションコンピュータ 5 信号回線 11 一山単位生産時間演算部 12 残り時間演算部 13 設定時間演算部 13a 指定日時入力部 14 必要時間演算部 15 必要空山数演算部 16 在庫空山数演算部 17 不足空山数演算部 18 表示部 20 データベース 31 自動倉庫 32 無人搬送車 40 成形ステーション 41 成形機 42 取出機 43 成形品ストック装置 Reference Signs List 1 area management computer 2 area server computer 3 distribution control computer 4 molding station computer 5 signal line 11 mountain-unit production time calculation unit 12 remaining time calculation unit 13 set time calculation unit 13a designated date / time input unit 14 required time calculation unit 15 required empty mountain Number calculation unit 16 Stock empty mountain count calculation unit 17 Insufficient empty mountain count calculation unit 18 Display unit 20 Database 31 Automatic warehouse 32 Automated guided vehicle 40 Molding station 41 Molding machine 42 Unloader 43 Molded goods stocking device
Claims (1)
置を具備する複数の成形ステーションと、前記各成形ス
テーションで生産した成形品を予め定められた数をパレ
ットに積載して保管する自動倉庫と、前記各成形ステー
ションと前記自動倉庫との間を往復して予め定められた
数のパレットを積み重ねた一山毎に成形品および空パレ
ットを搬送する無人搬送車とを具備する成形工場におい
て成形品の搬送及び自動倉庫での保管に使用する空パレ
ットの管理システムであって、 前記各成形ステーションに接続された成形ステーション
コンピュータと、 前記自動倉庫および前記無人搬送車に接続された物流制
御コンピュータと、 パレットの種別毎に定められた一山あたりのパレット数
データと一パレットあたりの成形ショット数データとを
格納するパレットデータベース、前記各成形ステーショ
ンの最新の成形状況データを格納する成形状況データベ
ースおよび前記自動倉庫と前記各成形品ストック装置の
最新のパレット在庫状況データを格納するパレット在庫
状況データベースを具備するエリアサーバーコンピュー
タと、 前記エリアサーバーコンピュータ内の各データベースに
アクセスしてデータを読み出し空パレットの山の不足数
である不足空山数をパレット種別毎に求めるエリア管理
コンピュータと、 前記各コンピュータを接続する信号回線とを設け、 前記エリア管理コンピュータは、 指定日時の入力部と、 現在から前記指定日時までの設定時間を求める設定時間
演算部と、 前記パレットデータベースと前記成形状況データベース
とに格納されたデータを読み出して前記成形ステーショ
ン毎に『一山あたりのパレット数×一パレットあたりの
成形ショット数×成形サイクル時間』の演算を行い、成
形品を回収したパレットが前記一山になるまでの一山単
位生産時間を成形ステーション毎に求める一山単位生産
時間演算部と、 前記成形状況データベースに格納されたデータを読み出
して前記成形ステーション毎に『成形サイクル時間×
(生産残数/1ショットあたりの成形数)』の演算を行
い、現在から生産予定数の生産が完了するまでの残り時
間を成形ステーション毎に求める残り時間演算部と、 前記成形ステーション毎に前記残り時間と前記設定時間
のうちの短い方の時間を必要時間とする必要時間演算部
と、 前記成形ステーション毎に前記必要時間を前記一山単位
生産時間で割算してパレットの必要空山数を演算し、こ
の成形ステーション毎の必要空山数をパレット種別毎に
総和してパレット種別毎の必要空山数を求める必要空山
数演算部と、 前記成形状況データベースと前記パレット在庫状況デー
タベースとに格納されたデータを読み出して前記成形品
ストック装置におけるパレットの空山数と前記自動倉庫
におけるパレットの空山数とを加算してパレット種別毎
の在庫空山数を求める在庫空山数演算部と、 前記在庫空山数から前記必要空山数を引算してパレット
種別毎の不足空山数を求める不足空山数演算部とを具備
する、ことを特徴とする成形工場の空パレット管理シス
テム。A plurality of molding stations each including a molding machine, a take-out machine, and a molded article stocking apparatus; and an automatic warehouse that stores a predetermined number of molded articles produced at each of the molding stations on a pallet and stores them. A molded article in a molding factory comprising an unmanned transporter for transporting a molded article and an empty pallet for each pile in which a predetermined number of pallets are stacked by reciprocating between the molding stations and the automatic warehouse. An empty pallet management system used for transportation and storage in an automatic warehouse, a molding station computer connected to each of the molding stations, a logistics control computer connected to the automatic warehouse and the automatic guided vehicle, Stores data on the number of pallets per hill defined for each type of pallet and data on the number of molding shots per pallet Area server comprising a pallet database to store, a molding status database storing the latest molding status data of each molding station, and a pallet inventory status database storing the latest pallet inventory status data of the automatic warehouse and each of the molded article stock devices. A computer, an area management computer that accesses each database in the area server computer, reads data, reads out the number of empty pallets that are the number of empty pallets, and obtains the number of vacant hills for each pallet type, and a signal line connecting the computers Wherein the area management computer reads a data stored in the input unit of a designated date and time, a set time calculation unit for calculating a set time from the present to the designated date and time, and the pallet database and the molding situation database. The above For each station, calculate the number of pallets per hill x the number of molding shots per pallet x the molding cycle time, and calculate the production time per hill until the pallet where the molded product is collected reaches the above-mentioned hill. A production time calculating unit for each mountain, which is obtained for each molding station, and reads out data stored in the molding situation database and reads “molding cycle time ×
(Remaining production number / number of moldings per shot)], and a remaining time calculation unit for obtaining the remaining time from the current time until the production of the planned number of productions is completed for each molding station; A required time calculating unit that sets a shorter time of the remaining time and the set time as a required time; and, for each molding station, divides the required time by the one-mount unit production time to determine the required number of empty pallets of the pallet. The required number of empty mountains for each molding station is summed up for each pallet type to calculate the required number of empty mountains for each pallet type, and the required empty mountain number calculation unit is stored in the molding status database and the pallet inventory status database. For each pallet type, the data is read and the number of empty pallets of the pallet in the article stocking apparatus and the number of empty pallets of the pallet in the automatic warehouse are added. A stock empty mountain count calculating unit for calculating the stock empty mountain count; and an insufficient sky mountain count calculating unit for subtracting the required empty mountain count from the stock empty mountain count to obtain the shortage mountain count for each pallet type. Empty pallet management system for molding plants.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24160999A JP3238142B2 (en) | 1999-08-27 | 1999-08-27 | Empty pallet management system in molding factory |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24160999A JP3238142B2 (en) | 1999-08-27 | 1999-08-27 | Empty pallet management system in molding factory |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001063806A JP2001063806A (en) | 2001-03-13 |
| JP3238142B2 true JP3238142B2 (en) | 2001-12-10 |
Family
ID=17076876
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP24160999A Expired - Fee Related JP3238142B2 (en) | 1999-08-27 | 1999-08-27 | Empty pallet management system in molding factory |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3238142B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102243580B1 (en) * | 2020-12-07 | 2021-04-22 | 주식회사 한성이에스 | Inventory management system |
| JP7805798B2 (en) * | 2022-01-25 | 2026-01-26 | 株式会社カネカ | Delivery system and delivery method |
-
1999
- 1999-08-27 JP JP24160999A patent/JP3238142B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001063806A (en) | 2001-03-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR0132990B1 (en) | Method and apparatus for scheduling parts deliverer managing parts deliverers | |
| JPH05270611A (en) | Automatic warehouse storage control device | |
| JP6877378B2 (en) | Product layout planning system and product layout planning method | |
| Sgarbossa et al. | Throughput models for a dual-bay VLM order picking system under different configurations | |
| JP3238142B2 (en) | Empty pallet management system in molding factory | |
| JP3219972U (en) | Delivery management device | |
| JP2004352384A (en) | Product inventory management system | |
| JPS60167814A (en) | Control device of conveyor system | |
| CN116873431B (en) | A multi-load AGV storage and transportation method based on slate intelligent warehouse | |
| JPH038602A (en) | Rack deciding method for automatic warehouse | |
| CN116119226B (en) | Cargo scheduling method of three-dimensional warehouse system | |
| JP3120514B2 (en) | Automatic warehouse control device | |
| JPH11208825A (en) | Optimal route determination device | |
| JP3973860B2 (en) | Warehousing / exiting control device and warehousing / exiting control method for automatic warehouse | |
| JPS63123703A (en) | In-storage control system in automatic warehouse | |
| JP2569575B2 (en) | Automatic warehouse equipment | |
| JPH0656220A (en) | Carrying-in-out control method of automated warehouse | |
| JPH0822685B2 (en) | Automatic warehouse issue system | |
| JP2000142926A (en) | Shipping management system | |
| JPH0891510A (en) | Stock control method for delivery warehouse | |
| JP4035900B2 (en) | Inventory parts management system and computer-readable storage medium | |
| JPS62121103A (en) | Computer control method in automated warehouse | |
| JP7239652B2 (en) | Outgoing management device | |
| CN119379179B (en) | Warehouse management method, computer program product, device and medium | |
| JPS6055401B2 (en) | Three-dimensional automated warehouse |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |