JP3241545B2 - Construction management system for construction near business lines - Google Patents
Construction management system for construction near business linesInfo
- Publication number
- JP3241545B2 JP3241545B2 JP25513694A JP25513694A JP3241545B2 JP 3241545 B2 JP3241545 B2 JP 3241545B2 JP 25513694 A JP25513694 A JP 25513694A JP 25513694 A JP25513694 A JP 25513694A JP 3241545 B2 JP3241545 B2 JP 3241545B2
- Authority
- JP
- Japan
- Prior art keywords
- management
- data
- construction
- site
- management data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 44
- 238000009430 construction management Methods 0.000 title claims description 34
- 238000012544 monitoring process Methods 0.000 claims description 31
- 230000005540 biological transmission Effects 0.000 claims description 23
- 230000002194 synthesizing effect Effects 0.000 claims description 15
- 238000001514 detection method Methods 0.000 claims description 9
- 239000002131 composite material Substances 0.000 claims description 6
- 238000005259 measurement Methods 0.000 description 17
- 238000000034 method Methods 0.000 description 15
- 230000002159 abnormal effect Effects 0.000 description 9
- 238000012545 processing Methods 0.000 description 7
- 230000005856 abnormality Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000001747 exhibiting effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、鉄道の営業線に近接
した工事の施工管理システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction management system for construction close to a railway business line.
【0002】[0002]
【従来の技術】鉄道の営業線に近接した工事を行う際に
は、列車の運行に支障を来さないように安全対策に留意
する必要がある。その1つに、軌道敷の高さや傾斜を安
全に列車が運行できるように維持することがある。その
ために、従来から工事施工の際には、沈下計,応力計,歪
計等の各種センサを設置することによって対応してい
る。2. Description of the Related Art When performing construction near a railway business line, it is necessary to pay attention to safety measures so as not to hinder the operation of the train. One of them is to maintain the height and inclination of the track so that the train can be operated safely. To this end, various types of sensors, such as a subsidence gauge, a stress gauge, and a strain gauge, have been conventionally used for construction work.
【0003】図4は、上述のような軌道敷の高さや傾斜
を安全に維持する施工管理システムの概略図である。工
事現場に設置された上記各種のセンサ1によって検出さ
れたデータは、データ収録装置2によって定時に(ある
いは常時)収録されて現場事務所等に設置されている計
測用パソコン3に伝送される。そして、計測用パソコン
3によって上記各種のデータを処理して上記軌道敷にお
ける安全性に関する管理データを算出してモニタ4の画
面に表示する。こうして、現場職員は、現場事務所でモ
ニタ4の画面上で上記管理データが管理水準を越えてい
ないかをチェックできるのである。FIG. 4 is a schematic diagram of a construction management system for safely maintaining the height and inclination of the track pad as described above. Data detected by the various sensors 1 installed at the construction site is recorded at regular (or always) times by the data recording device 2 and transmitted to the measurement personal computer 3 installed at the site office or the like. Then, the above-mentioned various data are processed by the measuring personal computer 3 to calculate management data relating to the safety at the railroad track, and display it on the screen of the monitor 4. Thus, the field staff can check on the screen of the monitor 4 at the field office whether the management data has exceeded the management level.
【0004】そして、上記管理データが管理水準を越え
た場合には、現場職員は異常を示した施工現場に急行し
て現場の作業状態をチェックする。そして、上記チェッ
クの結果を元に、鉄道会社の軌道管理者(以下、営業線
管理者と言う)と打ち合わせを行って対応策を協議する
のである。[0004] When the management data exceeds the management level, the site staff rushes to the construction site showing the abnormality to check the work condition of the site. Then, based on the result of the above check, a meeting is performed with the track manager of the railway company (hereinafter referred to as a business line manager) to discuss countermeasures.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、上述し
たような営業線近接工事における施工管理システムにお
いては、上記管理データが管理水準を越えた際には、営
業線管理者は異常施工現場に急行して施工管理者と協議
しなければ現場状況を理解できず、緊急の際にはその対
応が遅れがちになるという問題がある。However, in the construction management system for the construction near the sales line as described above, when the management data exceeds the management level, the sales line manager rushes to the abnormal construction site. Without consultation with the construction manager, there is a problem that the situation of the site cannot be understood, and the response tends to be delayed in an emergency.
【0006】そこで、この発明の目的は、営業線管理者
が迅速に異常施工現場の状況を把握できる営業線近接工
事の施工管理システムを提供することにある。SUMMARY OF THE INVENTION It is therefore an object of the present invention to provide a construction management system for a construction work in the vicinity of a sales line, which enables a sales line manager to quickly grasp the situation of an abnormal construction site.
【0007】[0007]
【課題を解決するための手段】上記目的を達成するた
め、請求項1に係る発明の営業線近接工事の施工管理シ
ステムは、営業線に近接した施工現場に設置された計測
機器と、現場事務所に設置されて,上記計測機器からの
検出データに基づいて管理データを作成する管理データ
作成手段と、上記現場事務所に設置されて,少なくとも
上記管理データを表示する第1モニタと、上記現場事務
所に設置されて,上記管理データを含む施工管理情報を
送受信する第1送受信手段と、営業線管理部に設置され
て,上記第1送受信手段と上記施工管理情報を送受信す
る第2送受信手段と、上記営業線管理部に設置されて,
上記第2送受信手段からの施工管理情報に基づいて,少
なくとも上記管理データを表示する第2モニタと、上記
現場事務所に設置されて,上記管理データが1次管理水
準あるいは2次管理水準を越えるたか否かを監視して監
視結果を表す信号を出力する監視手段と、上記現場事務
所に設置されて,上記監視手段からの出力信号に基づい
て,上記管理データが上記1次管理水準よりも高い2次
管理水準を越えると,上記第1送受信手段に第2送受信
手段との送受信を行わせる制御信号を出力する制御手段
を備えたことを特徴としている。In order to achieve the above object, a construction management system for a construction near a sales line according to the first aspect of the present invention comprises a measuring device installed at a construction site near a sales line, A management data creation means installed at a location and creating management data based on the detection data from the measuring device; a first monitor installed at the site office and displaying at least the management data; A first transmission / reception means installed in an office for transmitting / receiving construction management information including the management data, and a second transmission / reception means installed in a business line management unit for transmitting / receiving the construction management information to / from the first transmission / reception means And it is installed in the above-mentioned sales line management department,
A second monitor for displaying at least the management data based on the construction management information from the second transmission / reception means; and a second monitor installed at the site office where the management data exceeds a primary management level or a secondary management level. Monitoring means for monitoring whether or not the monitoring data has been output and outputting a signal indicating the monitoring result; and, based on an output signal from the monitoring means, wherein the management data is higher than the primary management level. A control means for outputting a control signal for causing the first transmission / reception means to perform transmission / reception to / from the second transmission / reception means when the level exceeds the high secondary management level.
【0008】また、請求項2に係る発明は、請求項1に
係る発明の営業線近接工事の施工管理システムにおい
て、上記施工現場に設置されたカメラと、上記現場事務
所に設置されて,上記カメラからの画像データと上記管
理データとを取り込んで上記管理データと現場状況監視
画像との合成画像を生成し,この合成画像データを上記
第1モニタおよび第1送受信手段に送出する画像合成手
段を備えると共に、上記制御手段は、上記管理データが
1次管理水準を越えると上記画像合成手段に第1モニタ
への合成画像データの送出を行わせる一方、上記2次管
理水準を越えると上記画像合成手段に第1送受信手段へ
の合成画像データの送出を行わせる制御信号を出力する
画像合成手段制御部を有することを特徴としている。According to a second aspect of the present invention, there is provided the construction management system for the construction of a business line adjacent construction according to the first aspect of the present invention, wherein the camera installed at the construction site and the camera installed at the site office are provided. Image synthesizing means for taking in the image data from the camera and the management data to generate a synthesized image of the management data and the site situation monitoring image, and sending the synthesized image data to the first monitor and the first transmitting / receiving means. And the control means causes the image synthesizing means to transmit the synthesized image data to the first monitor when the management data exceeds the primary management level, and the image synthesis means when the management data exceeds the secondary management level. An image synthesizing means control section for outputting a control signal for causing the means to transmit the synthesized image data to the first transmitting / receiving means.
【0009】[0009]
【作用】請求項1に係る発明では、現場事務所におい
て、管理データ作成手段によって計測機器からの検出デ
ータに基づいて管理データが作成され、この管理データ
が第1モニタに表示される。また、上記管理データが1
次管理水準または2次管理水準を越えたか否かが監視手
段によって監視される。そして、上記管理データが2次
管理水準を越えると、制御手段によって、第1送受信手
段に第2送受信手段との送受信を行わせる制御信号が出
力される。そうすると、上記第1送受信手段と第2送受
信手段との間で上記管理データを含む施工管理情報が送
受信される。そして、営業線管理部において、上記第2
送受信手段からの施工管理情報に基づいて、少なくとも
上記管理データが第2モニタに表示される。According to the first aspect of the invention, the management data is created by the management data creation means in the site office based on the detection data from the measuring device, and the management data is displayed on the first monitor. Also, if the management data is 1
The monitoring means monitors whether the level has exceeded the secondary management level or the secondary management level. When the management data exceeds the secondary management level, the control means outputs a control signal for causing the first transmitting / receiving means to perform transmission / reception with the second transmitting / receiving means. Then, construction management information including the management data is transmitted and received between the first transmitting / receiving means and the second transmitting / receiving means. Then, in the sales line management section, the second
At least the management data is displayed on the second monitor based on the construction management information from the transmitting / receiving means.
【0010】こうして、上記管理データが2次管理水準
を越えると自動的に営業線管理部に施工管理情報が伝送
されて、営業線管理者によって即座に施工現場の異状状
況を把握して対策が講じられる。In this way, when the management data exceeds the secondary management level, construction management information is automatically transmitted to the sales line management unit, and the sales line manager immediately grasps the abnormal situation of the construction site and takes measures. Taken.
【0011】また、請求項2に係る発明では、現場事務
所においては、画像合成手段によって、施工現場のカメ
ラからの画像データと上記管理データとが取り込まれて
上記管理データと現場状況監視画像との合成画像が生成
される。そして、上記管理データが上記1次管理水準を
越えると、上記制御手段における画像合成手段制御部に
よって、上記画像合成手段に対して制御信号が出力され
て合成画像データが上記第1モニタに送出されて上記合
成画像が表示される。さらに、上記管理データが上記2
次管理水準を越えると、上記画像合成手段制御部によっ
て、上記画像合成手段に対して制御信号が出力されて合
成画像データが上記第1送受信手段に送出される。そし
て、上記制御手段によって第1送受信手段に制御信号が
出力されると、上記第1送受信手段と第2送受信手段と
の間で上記施工管理情報が送受信される。こうして、営
業線管理部において、上記合成画像が第2モニタに表示
される。In the invention according to claim 2, in the site office, the image data from the camera at the construction site and the management data are fetched by the image synthesizing means, and the management data and the site status monitoring image are obtained. Is generated. When the management data exceeds the primary management level, a control signal is output to the image synthesizing means by the image synthesizing means control section of the control means, and the synthesized image data is sent to the first monitor. To display the composite image. Further, the management data is stored in the 2
When the next management level is exceeded, a control signal is output to the image synthesizing unit by the image synthesizing unit control unit, and the synthesized image data is sent to the first transmitting / receiving unit. When the control means outputs a control signal to the first transmitting / receiving means, the construction management information is transmitted / received between the first transmitting / receiving means and the second transmitting / receiving means. Thus, the sales line management unit displays the composite image on the second monitor.
【0012】[0012]
【実施例】以下、この発明を図示の実施例により詳細に
説明する。図1は本実施例の営業線近接工事の施工管理
システムにおけるブロック図である。本施工管理システ
ムにおいて、施工現場には、沈下計,応力計,歪計等の各
種センサ11と、この各種センサ11からの検出データ
を収録するデータ収録装置12、固定して設置される電
動ズーム機能付の高感度カラーカメラ13、必要に応じ
て現場作業員が携帯して操作する携帯用ビデオカメラ1
4が配置される。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the illustrated embodiments. FIG. 1 is a block diagram of a construction management system for construction work close to a sales line according to the present embodiment. In this construction management system, at the construction site, various sensors 11 such as a subsidence gauge, a stress gauge, and a strain gauge, a data recording device 12 for recording detection data from the various sensors 11, and a fixedly installed electric zoom High-sensitivity color camera 13 with function, portable video camera 1 to be carried and operated by field workers as needed
4 are arranged.
【0013】上記データ収録装置12からの検出データ
は現場事務所における計測用パソコン15に送出され
る。また、高感度カラーカメラ13および携帯用ビデオ
カメラ14からの画像信号は、現場事務所における映像
自動切替器16に送出される。上記現場事務所には、さ
らに、映像自動切替器16からの映像や計測用パソコン
15からの管理データを4画面に分割して組み合わせる
4画面切替器17、4画面切替器17からの映像を表示
するカラーモニタ18、4画面切替器17とディジタル
データ交換線とを接続する画像接続システム(VCS)1
9、計測用パソコン15の制御の下に映像自動切替器1
6,4画面切替器17,カラーモニタ18,VCS19,高
感度カラーカメラ13等を切り替え制御するリレー制御
部20等が備えられている。The detection data from the data recording device 12 is sent to a measuring personal computer 15 at the site office. The image signals from the high-sensitivity color camera 13 and the portable video camera 14 are sent to the automatic video switch 16 in the site office. The above-mentioned site office further displays the video from the automatic video switching unit 16 and the video from the four-screen switching unit 17 by dividing and combining the management data from the measurement personal computer 15 into four screens. Connection system (VCS) 1 for connecting a color monitor 18, a four-screen switch 17 and a digital data exchange line
9. Automatic video switch 1 under the control of personal computer 15 for measurement
A relay control unit 20 for switching and controlling the 6, 4 screen switching unit 17, color monitor 18, VCS 19, high-sensitivity color camera 13, and the like are provided.
【0014】ここで、上記現場事務所における計測用パ
ソコン15は、データ収録装置12から送出されてくる
沈下計,歪計の検出データに基づいて土留の傾き,レール
の沈下量等の管理データを算出する。また、応力計の検
出データに基づいて切梁の応力度や土留坑の応力度等の
管理データを算出する。そして、管理データが、内部メ
モリに格納されている1次管理値あるいは2次管理値を
越えたか否かを監視している。尚、こうして得られた管
理データは、上述のように映像自動切替器16からの映
像と4画面切替器17によって組合わされてカラーモニ
タ18に4画面に分割表示されるのである。Here, the measuring personal computer 15 at the site office manages the management data such as the inclination of the soil retaining and the amount of the rail subsidence based on the detection data of the subsidence meter and the strain meter transmitted from the data recording device 12. calculate. Also, based on the detection data of the stress meter, management data such as the stress level of the cutting beam and the stress level of the earth retaining pit are calculated. Then, it monitors whether the management data exceeds the primary management value or the secondary management value stored in the internal memory. The management data thus obtained is combined with the video from the automatic video switching unit 16 by the four-screen switching unit 17 and displayed on the color monitor 18 in four divided screens as described above.
【0015】上記現場事務所側の計測用パソコン15に
よって求められた管理データは、公衆電話回線を介して
営業線管理部における計測用パソコン26に送出可能に
なっている。また、現場事務所における4画面切替器1
7からの画像データはVCS19およびディジタルデー
タ交換線を介して営業線管理部のVCS27に送出可能
になっている。カラーモニタ28はVCS27によって
上記ディジタルデータ交換線と接続されて現場事務所側
の4画面切替器17からの映像を表示する。尚、21・
31は警報ブザー,22はVTR,23・30は操作器,2
4は画像変換器,25・29はモデムである。The management data obtained by the measuring personal computer 15 at the site office can be transmitted to the measuring personal computer 26 in the business line managing section via a public telephone line. In addition, a four-screen switching device 1 at the site office
7 can be sent to the VCS 27 of the business line management unit via the VCS 19 and the digital data exchange line. The color monitor 28 is connected to the digital data exchange line by the VCS 27 and displays an image from the four-screen switch 17 on the site office side. In addition, 21 ・
31 is an alarm buzzer, 22 is a VTR, 23 and 30 are operating devices, 2
4 is an image converter and 25 and 29 are modems.
【0016】上記計測用パソコン15は、上記内部メモ
リに格納されたカメラ制御データに従ってカメラ制御信
号をリレー制御部20を介して高感度カラーカメラ13
に出力し、高感度カラーカメラ13の上下左右の方向制
御やズーム制御等を行う。また、上記管理データが上記
1次管理値を越えた場合には、警報信号を警報ブザー2
1に送出する。さらに、上記2次管理値を越えた場合に
は、営業線管理部側の電話回線を呼び出して、管理デー
タを営業線管理部側の計測用パソコン26に電送する。
また、リレー制御部20を制御し、VCS19を上記デ
ィジタルデータ交換線に接続して営業線管理部側のカラ
ーモニタ28に現場事務所側のカラーモニタ18に対す
る画像データと同じ画像データを電送するのである。The measurement personal computer 15 transmits a camera control signal to the high-sensitivity color camera 13 via a relay control unit 20 in accordance with the camera control data stored in the internal memory.
, And controls the up, down, left, and right directions of the high-sensitivity color camera 13 and zoom control. If the management data exceeds the primary management value, an alarm signal is output to the alarm buzzer 2.
Send to 1. Further, when the value exceeds the secondary management value, the telephone line on the business line management unit side is called, and the management data is transmitted to the measurement personal computer 26 on the business line management unit side.
Also, since the relay controller 20 is controlled to connect the VCS 19 to the digital data exchange line and to transmit the same image data as the image data for the color monitor 18 at the site office to the color monitor 28 at the sales line manager. is there.
【0017】すなわち、上記計測用パソコン15によっ
て上記管理データ作成手段,監視手段および制御手段を
構成し、VCS19およびモデム25で上記第1送受信
手段を構成し、VCS27およびモデム29で上記第2
送受信手段を構成し、映像自動切替器16および4画面
切替器17で上記画像合成手段を構成するのである。That is, the measurement personal computer 15 constitutes the management data creation means, the monitoring means and the control means, the VCS 19 and the modem 25 constitute the first transmission / reception means, and the VCS 27 and the modem 29 constitute the second transmission / reception means.
The transmission / reception means is constituted, and the image synthesizing means is constituted by the automatic video switching unit 16 and the four-screen switching unit 17.
【0018】図2および図3は、上記現場事務所におけ
る計測用パソコン15によって行われる施工管理警報処
理動作のフローチャートである。以下、図1,図2およ
び図3に従って、施工管理警報処理動作について詳細に
説明する。ステップS1で、上記データ収録装置12に
よって定時にあるいは常時収録された検出データに基づ
いて上記管理データが求められる。また、リレー制御部
20を介して高感度カラーカメラ13に予め定められた
カメラ制御信号が送出されて、所定のアングルと倍率の
現場状況監視画像が収録される。FIGS. 2 and 3 are flowcharts of the construction management alarm processing operation performed by the measurement personal computer 15 in the site office. Hereinafter, the construction management alarm processing operation will be described in detail with reference to FIG. 1, FIG. 2 and FIG. In step S1, the management data is obtained based on the detection data recorded at regular or constant times by the data recording device 12. Further, a predetermined camera control signal is transmitted to the high-sensitivity color camera 13 via the relay control unit 20, and a site situation monitoring image at a predetermined angle and magnification is recorded.
【0019】ステップS2で、上記管理データが内部メ
モリに格納されている1次管理値を越えたか否かが判別
される。そして、越えていなければ管理データの算出と
現場状況監視画像の収録とを続行する。一方、越えてい
ればステップS3に進む。ステップS3で、上記内部メモ
リに格納されているセンサ位置データに基づいて、上記
異常値を呈した管理データに係るセンサの位置に高感度
カラーカメラ13が向けられて最適な倍率で現場状況監
視画像が収録される。ステップS4で、上記警報信号が
出力されて警報ブザー21によって警告音が出力され
る。さらに、上記管理データと現場状況監視画像とが現
場事務所側のカラーモニタ18に分割表示される。その
際に、映像自動切替器16に携帯用ビデオカメラ14か
らの画像信号が伝送されてきた場合には、この携帯用ビ
デオカメラ14の画像も分割表示される。In step S2, it is determined whether or not the management data has exceeded the primary management value stored in the internal memory. If not, the calculation of the management data and the recording of the site situation monitoring image are continued. On the other hand, if it exceeds, the process proceeds to step S3. In step S3, based on the sensor position data stored in the internal memory, the high-sensitivity color camera 13 is pointed to the position of the sensor related to the management data exhibiting the abnormal value, and the site situation monitoring image is displayed at the optimum magnification. Is recorded. In step S4, the alarm signal is output, and the alarm buzzer 21 outputs an alarm sound. Further, the management data and the site situation monitoring image are displayed separately on the color monitor 18 of the site office. At this time, if an image signal from the portable video camera 14 is transmitted to the automatic video switching unit 16, the image of the portable video camera 14 is also divided and displayed.
【0020】ここで、上記現場事務所側の施工管理者
は、カラーモニタ18に表示された各種管理データと現
場状況監視画像とを参照して異常の原因を調査し、調査
結果を施工現場に伝送して現場作業員に復旧に当たらせ
る。ステップS5で、上記管理データの算出および現場
状況監視画像の収録が行われる。ステップS6で、上記
管理データが上記内部メモリに格納されている2次管理
値(上記1次管理値より高く設定されている)を越えたか
否かが判別される。そして、越えていなればステップS
7に進み、越えていればステップS9に進む。ステップS
7で、上記管理データが未だ1次管理値を越えているか
否かが判別される。その結果、越えていれば上記ステッ
プS5に戻り、越えていなければステップS8に進む。ス
テップS8で、上記管理データが1次管理値より低下し
たことがカラーモニタ18に表示される。さらに、高感
度カラーカメラ13のアングルと倍率とが初期のアング
ルと倍率とに戻される。そうした後、ステップS19に進
む。Here, the construction manager at the site office examines the cause of the abnormality by referring to the various management data displayed on the color monitor 18 and the site situation monitoring image, and sends the investigation result to the construction site. Transmit the data and let field workers recover. In step S5, the management data is calculated and the site condition monitoring image is recorded. In step S6, it is determined whether or not the management data has exceeded a secondary management value (set higher than the primary management value) stored in the internal memory. If not, step S
The process proceeds to step S7, and if it exceeds, the process proceeds to step S9. Step S
At 7, it is determined whether or not the management data still exceeds the primary management value. As a result, if it has exceeded, the process returns to step S5, and if not, the process proceeds to step S8. In step S8, the color monitor 18 displays that the management data has fallen below the primary management value. Further, the angle and magnification of the high-sensitivity color camera 13 are returned to the initial angle and magnification. After that, the process proceeds to step S19.
【0021】ステップS9で、上記管理データが2次管
理値を越えたので、営業線管理部側の電話回線とVCS
27とが呼び出されて、計測用パソコン15からの管理
データと4画面切替器17からの画像データとが電送さ
れる。ステップS10で、上記営業線管理部側の計測用パ
ソコン26によって警報信号が出力されて警報ブザー3
1によって警告音が出力される。こうして、上記営業線
管理者に異常が告知される。以後、上記公衆電話回線と
ディジタルデータ交換線とを介して、施工管理者と営業
管理者とでカラーモニタ18,28に分割表示された管
理データと現場状況監視画像とを見ながら対応策が検討
される。その間にも、計測用パソコン15によって管理
データの監視が継続されている。In step S9, since the above management data exceeds the secondary management value, the telephone line on the business line management section side and the VCS
27 is called, and the management data from the measurement personal computer 15 and the image data from the four-screen switch 17 are transmitted. In step S10, an alarm signal is output by the measurement personal computer 26 on the business line management unit side, and the alarm buzzer 3
1 outputs a warning sound. Thus, the sales line manager is notified of the abnormality. Thereafter, the construction manager and the sales manager, through the public telephone line and the digital data exchange line, consider countermeasures while viewing the management data and the on-site status monitoring image displayed separately on the color monitors 18 and 28. Is done. In the meantime, monitoring of the management data is continued by the measurement personal computer 15.
【0022】ステップS11で、上記高感度カラーカメラ
13のアングルあるいは倍率の変更が指示されたか否か
が判別される。その結果、指示されていればステップS
12に進み、指示されていなければステップS13に進む。
ステップS12で、上記高感度カラーカメラ13にカメラ
制御信号が送出されて高感度カラーカメラ13のアング
ルあるいは倍率が指定値に変更される。ステップS13
で、上記管理データの算出および現場状況監視画像の収
録が行われる。ステップS14で、上記管理データが未だ
2次管理値を越えているか否かが判別される。その結
果、越えていなければステップS15に進み、越えていれ
ば上記ステップS11に戻って管理データ値の算出/監視
と現場状況監視画像の収録を続行する。In step S11, it is determined whether or not an instruction to change the angle or magnification of the high-sensitivity color camera 13 has been issued. As a result, if instructed, step S
The process proceeds to step S12, and if not instructed, the process proceeds to step S13.
In step S12, a camera control signal is sent to the high-sensitivity color camera 13, and the angle or magnification of the high-sensitivity color camera 13 is changed to a designated value. Step S13
Then, the management data is calculated and the site situation monitoring image is recorded. In step S14, it is determined whether or not the management data still exceeds the secondary management value. As a result, if it does not exceed, the process proceeds to step S15, and if it does, the process returns to step S11 to continue the calculation / monitoring of the management data value and the recording of the site situation monitoring image.
【0023】ステップS15で、上記管理データが2次管
理値より低下したことがカラーモニタ18,28に表示
される。ステップS16で、上記管理データの算出および
現場状況監視画像の収録が行われる。ステップS17で、
上記管理データが未だ1次管理値を越えているか否かが
判別される。そして、越えていなければステップS18に
進む。ステップS18で、上記管理データが1次管理値よ
り低下したことがカラーモニタ18,28に表示され
る。さらに、高感度カラーカメラ13のアングルと倍率
とが初期のアングルと倍率とに戻される。ステップS19
で、施工管理警報処理動作の終了が指示されているか否
かが判別される。その結果、指示されていなければ上記
ステップS1に戻って管理データの算出と現場状況監視
画像の収録が続行される。一方、指示されていれば施工
管理警報処理動作を終了する。In step S15, the fact that the management data has fallen below the secondary management value is displayed on the color monitors 18 and 28. In step S16, the management data is calculated and the site condition monitoring image is recorded. In step S17,
It is determined whether the management data still exceeds the primary management value. If not, the process proceeds to step S18. In step S18, it is displayed on the color monitors 18 and 28 that the management data has fallen below the primary management value. Further, the angle and magnification of the high-sensitivity color camera 13 are returned to the initial angle and magnification. Step S19
Then, it is determined whether or not the end of the construction management alarm processing operation is instructed. As a result, if not instructed, the process returns to the step S1, and the calculation of the management data and the recording of the site situation monitoring image are continued. On the other hand, if instructed, the construction management alarm processing operation ends.
【0024】このように、本実施例においては、上記管
理データの管理値として1次管理値と2次管理値との2
つの管理値を用いている。したがって、例えば、列車が
正常に運行できるレールの沈下量の許容値が2cmである
とすると。1次管理値を0.5cmとし2次管理値を1.5
cmとすることによって、レールの沈下量が0.5cmを越
えた場合には、列車を運行しつつ現場事務所側では原因
を追及して、施工方法の変更や補強等の補助工法の採用
を行うことができる。そして、レールの沈下量が1.5c
mを越えると、現場事務所側では上述の対策を続行しつ
つ営業管理部側では列車の徐行運転や間引き運転や運転
停止等の列車運転上の対策を検討できるのである。As described above, in the present embodiment, as the management value of the management data, two values of the primary management value and the secondary management value are used.
Two control values are used. Therefore, for example, suppose that the allowable value of the sinking amount of the rail that the train can normally operate is 2 cm. The primary control value is 0.5 cm and the secondary control value is 1.5
If the subsidence amount of the rail exceeds 0.5 cm by setting the length to 0.5 cm, the on-site office will investigate the cause while operating the train and change the construction method or adopt auxiliary methods such as reinforcement. It can be carried out. And the sinking amount of the rail is 1.5c
When the distance exceeds m, the site office can continue the above measures while the sales management department can consider measures for train operation such as slow operation, thinning operation, and operation stop of the train.
【0025】つまり、上記管理データが2次管理値を越
えて営業管理部に工事の異常が知らされた際には、既に
現場事務所側では異常の原因究明と対策が講じられてい
るので、営業管理者は速やかに状況判断ができ、列車運
転上の対策を迅速に講ずることができるのである。That is, when the above management data exceeds the secondary management value and the sales management department is notified of a construction abnormality, the cause of the abnormality has already been investigated and countermeasures have been taken at the site office side. The sales manager can quickly judge the situation and take quick measures for train operation.
【0026】上述のように、本実施例においては、施工
現場には各種センサ11,データ収録装置12,高感度カ
ラーカメラ13,携帯用ビデオカメラ14等を配置し、
現場事務所には計測用パソコン15,映像自動切替器1
6,4画面切替器17,カラーモニタ18,VCS19,警
報ブザー21等を設ける。さらに、営業線管理部には計
測用パソコン26,VCS27,カラーモニタ28,警報
ブザー31等を設けている。そして、現場事務所側の計
測用パソコン15によって、データ収録装置12からの
検出データに基づく管理データが1次管理値を越えるか
否かを監視するのである。As described above, in this embodiment, various sensors 11, a data recording device 12, a high-sensitivity color camera 13, a portable video camera 14, and the like are arranged at the construction site.
On-site office has a personal computer for measurement 15 and an automatic video switch 1
A 6, 4-screen switch 17, a color monitor 18, a VCS 19, an alarm buzzer 21 and the like are provided. Further, the sales line management unit is provided with a personal computer 26 for measurement, a VCS 27, a color monitor 28, an alarm buzzer 31, and the like. Then, the measurement personal computer 15 at the site office monitors whether the management data based on the detection data from the data recording device 12 exceeds the primary management value.
【0027】その結果、上記管理データが1次管理値を
越えると、計測用パソコン15は、高感度カラーカメラ
13のアングルと倍率を変更し、警告音を出力し、現場
事務所側のカラーモニタ18に管理データと現場状況監
視画像とを分割表示する。そして、更に監視を続け、上
記管理データが2次管理値を越えると、計測用パソコン
15は、営業線管理部側の電話回線を呼び出して営業線
管理部側の計測用パソコン26に上記管理データを電送
すると同時に、営業線管理部側のVCS27を呼び出し
てディジタルデータ交換線を介して営業線管理部側のカ
ラーモニタ28に画像データを電送するようにしてい
る。As a result, when the management data exceeds the primary management value, the measuring personal computer 15 changes the angle and magnification of the high-sensitivity color camera 13 and outputs a warning sound, and a color monitor at the site office side. 18 displays the management data and the site situation monitoring image in a divided manner. When the management data exceeds the secondary management value, the measurement personal computer 15 calls the telephone line of the business line management unit and sends the management data to the measurement personal computer 26 of the business line management unit. At the same time, the VCS 27 of the business line management unit is called to transmit the image data to the color monitor 28 of the business line management unit via the digital data exchange line.
【0028】したがって、本実施例によれば、上記管理
データが1次管理値を越えた場合には、列車を運行しつ
つ現場事務所側で原因を追及して施工方法の変更や補強
等の補助工法の採用を行うことができる。そして、上記
管理データが2次管理値を越えた場合には、営業線管理
部側では速やかに施工現場の状況を把握して列車運転上
の対策を検討できるのである。Therefore, according to the present embodiment, when the above management data exceeds the primary management value, the cause is investigated on the site office side while operating the train, and the construction method is changed or reinforced. Auxiliary method can be adopted. Then, when the management data exceeds the secondary management value, the sales line management section can quickly grasp the situation of the construction site and examine measures for train operation.
【0029】尚、上記施工管理警報処理動作の手順は、
図2および図3に示すフローチャートに限定されるもの
ではない。The procedure of the construction management alarm processing operation is as follows.
The present invention is not limited to the flowcharts shown in FIGS.
【0030】[0030]
【発明の効果】以上より明らかなように、請求項1に係
る発明の営業線近接工事の施工管理システムは、施工現
場には計測機器を設置し、現場事務所には管理データ作
成手段,第1モニタ,第1送受信手段,監視手段および制
御手段を設置し、営業線管理部には第2モニタおよび第
2送受信手段を設置して、上記制御手段は、上記管理デ
ータが上記1次管理水準よりも高い2次管理水準を越え
ると、上記第1送受信手段に第2送受信手段との上記管
理データを含む施工管理情報送の送受信を行わせる制御
信号を出力するので、上記管理データが上記2次管理水
準を越えた際に、営業管理者は、上記第2モニタに表示
された施工管理情報によって迅速に異常施工現場の状況
を把握できる。As is clear from the above description, the construction management system for the construction near the sales line according to the first aspect of the present invention has a measuring device installed in the construction site, a management data creating means in the site office, and 1 monitor, 1st transmission / reception means, monitoring means, and control means are installed, and a second monitor and 2nd transmission / reception means are installed in the business line management unit. If the secondary data exceeds a higher secondary management level, a control signal for causing the first transmission / reception means to transmit / receive construction management information including the management data to / from the second transmission / reception means is output. When exceeding the next management level, the sales manager can quickly grasp the situation of the abnormal construction site by the construction management information displayed on the second monitor.
【0031】しかも、既に上記管理データが上記1次管
理水準を越えた際に、上記現場事務所側では、列車を運
行しつつ異常施工の原因を追及して施工方法の変更や補
強等の補助工法の採用が行われているので、上記営業線
管理者に異常施工が知らされた場合には異常状態の進退
が明らかになったおり、列車運転上の対策を容易に講ず
ることができるのである。Further, when the management data has already exceeded the primary management level, the site office seeks the cause of the abnormal construction while operating the train and assists in changing the construction method or reinforcing the construction. Since the construction method has been adopted, when the above-mentioned business line manager is notified of abnormal construction, it is clear that the abnormal state has advanced and retreated, and it is possible to easily take measures for train operation. .
【0032】また、請求項2に係る発明の営業線近接工
事の施工管理システムは、上記施工現場にはカメラを設
置し、上記現場事務所には画像合成手段を設置して、上
記制御手段の画像合成手段制御部は、上記画像合成手段
に対して、上記管理データが1次管理水準を越えると上
記管理データと現場状況監視画像との合成画像データを
第1モニタへ送出させる制御信号を出力する一方、上記
2次管理水準を越えると上記合成画像データを第1送受
信手段へ送出させる制御信号を出力するので、上記管理
データが1次管理水準を越えると上記現場事務所側の第
1モニタに上記管理データと現場状況監視画像との合成
画像を表示して施工管理者の対策を支援し、2次管理水
準を越えると上記合成画像を営業線管理部側の第2モニ
タに表示して営業線管理者に異常施工の状況を速やかに
知らせることができる。Further, in the construction management system of the construction near the business line according to the second aspect of the present invention, a camera is installed at the construction site, an image synthesizing unit is installed at the site office, and The image synthesizing means control section outputs a control signal to the image synthesizing means for transmitting synthesized image data of the management data and the site situation monitoring image to the first monitor when the management data exceeds the primary management level. On the other hand, when the control data exceeds the secondary management level, a control signal for sending the synthesized image data to the first transmitting / receiving means is output. In addition, the composite image of the management data and the site situation monitoring image is displayed to assist the construction manager's measures. When the secondary management level is exceeded, the composite image is displayed on the second monitor of the sales line management unit. Sales It is possible to promptly notify the situation of abnormal construction to the administrator.
【図1】この発明の営業線近接工事の施工管理システム
におけるブロック図である。FIG. 1 is a block diagram of a construction management system for construction work close to a sales line according to the present invention.
【図2】図1における計測用パソコンによって行われる
施工管理警報処理動作のフローチャートである。FIG. 2 is a flowchart of a construction management alarm processing operation performed by the measurement personal computer in FIG. 1;
【図3】図2に続く施工管理警報処理動作のフローチャ
ートである。FIG. 3 is a flowchart of the construction management alarm processing operation continued from FIG. 2;
【図4】従来の営業線近接工事の施工管理システムの概
略図である。FIG. 4 is a schematic diagram of a conventional construction management system for construction work close to a business line.
11…各種センサ、 13…高感度カラ
ーカメラ、15,26…計測用パソコン、 16…
映像自動切替器、17…4画面切替器、
18,28…カラーモニタ、19,27…VCS、
20…リレー制御部、21,31…警報ブザ
ー。11 ... various sensors 13 ... high-sensitivity color camera 15, 26 ... personal computer for measurement 16 ...
Automatic image switch, 17 ... 4 screen switch,
18, 28 ... color monitor, 19, 27 ... VCS,
20: relay control unit, 21, 31: alarm buzzer.
フロントページの続き (56)参考文献 特開 昭54−42710(JP,A) 特開 平5−247903(JP,A) 特開 平1−286694(JP,A) (58)調査した分野(Int.Cl.7,DB名) E01B 35/00 - 35/12 B61L 27/00 G05B 23/02 G06F 17/60 Continuation of the front page (56) References JP-A-54-42710 (JP, A) JP-A-5-247903 (JP, A) JP-A-1-286694 (JP, A) (58) Fields investigated (Int) .Cl. 7 , DB name) E01B 35/00-35/12 B61L 27/00 G05B 23/02 G06F 17/60
Claims (2)
計測機器と、 現場事務所に設置されて、上記計測機器からの検出デー
タに基づいて管理データを作成する管理データ作成手段
と、 上記現場事務所に設置されて、少なくとも上記管理デー
タを表示する第1モニタと、 上記現場事務所に設置されて、上記管理データを含む施
工管理情報を送受信する第1送受信手段と、 営業線管理部に設置されて、上記第1送受信手段と上記
施工管理情報を送受信する第2送受信手段と、 上記営業線管理部に設置されて、上記第2送受信手段か
らの施工管理情報に基づいて、少なくとも上記管理デー
タを表示する第2モニタと、 上記現場事務所に設置されて、上記管理データが1次管
理水準あるいは2次管理水準を越えたか否かを監視して
監視結果を表す信号を出力する監視手段と、上記現場事
務所に設置されて、上記監視手段からの出力信号に基づ
いて、上記管理データが上記1次管理水準よりも高い2
次管理水準を越えると、上記第1送受信手段に、第2送
受信手段との送受信を行わせる制御信号を出力する制御
手段を備えたことを特徴とする営業線近接工事の施工管
理システム。A measuring device installed at a construction site close to a business line; a management data creating means installed at a site office and creating management data based on detection data from the measuring device; A first monitor that is installed in the site office and displays at least the management data; a first transmission and reception unit that is installed in the site office and transmits and receives construction management information including the management data; A second transmission / reception means for transmitting / receiving the construction management information to / from the first transmission / reception means, and a second transmission / reception means to be installed in the business line management unit and at least A second monitor for displaying management data; and a monitor installed at the site office for monitoring whether the management data has exceeded a primary management level or a secondary management level, and representing a monitoring result. A monitoring means for outputting a signal, wherein the management data is higher than the primary management level based on an output signal from the monitoring means, which is installed in the site office.
A construction management system for a work near a sales line, characterized in that the first transmission / reception means has a control means for outputting a control signal for causing transmission / reception to / from the second transmission / reception means when the next management level is exceeded.
管理システムにおいて、 上記施工現場に設置されたカメラと、 上記現場事務所に設置されて、上記カメラからの画像デ
ータと上記管理データとを取り込んで上記管理データと
現場状況監視画像との合成画像を生成し、この合成画像
データを上記第1モニタおよび第1送受信手段に送出す
る画像合成手段を備えると共に、 上記制御手段は、上記管理データが1次管理水準を越え
ると上記画像合成手段に第1モニタへの合成画像データ
の送出を行わせる一方、上記2次管理水準を越えると上
記画像合成手段に第1送受信手段への合成画像データの
送出を行わせる制御信号を出力する画像合成手段制御部
を有することを特徴とする営業線近接工事の施工管理シ
ステム。2. The construction management system according to claim 1, wherein the camera is installed at the construction site, and the image data from the camera and the management data are installed at the site office. To generate a composite image of the management data and the site situation monitoring image, and to transmit the composite image data to the first monitor and the first transmission / reception unit. When the management data exceeds the primary management level, the image synthesizing unit causes the synthesized image data to be transmitted to the first monitor, while when the management data exceeds the secondary management level, the image synthesizing unit transmits the synthesized image data to the first transmitting / receiving unit. A construction management system for a work near a sales line, comprising an image synthesizing means control unit for outputting a control signal for transmitting image data.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25513694A JP3241545B2 (en) | 1994-10-20 | 1994-10-20 | Construction management system for construction near business lines |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25513694A JP3241545B2 (en) | 1994-10-20 | 1994-10-20 | Construction management system for construction near business lines |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08123541A JPH08123541A (en) | 1996-05-17 |
| JP3241545B2 true JP3241545B2 (en) | 2001-12-25 |
Family
ID=17274588
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP25513694A Expired - Fee Related JP3241545B2 (en) | 1994-10-20 | 1994-10-20 | Construction management system for construction near business lines |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3241545B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4712348B2 (en) * | 2004-11-02 | 2011-06-29 | パナソニック株式会社 | Railroad crossing monitoring device |
| JP2010027076A (en) * | 2009-11-02 | 2010-02-04 | Asahi Kasei Engineering Kk | Equipment diagnostic method |
| JP6889440B2 (en) * | 2017-02-28 | 2021-06-18 | 鉄建建設株式会社 | Measurement management system, construction support system, measurement management method and construction support method |
| CN112411281A (en) * | 2020-11-20 | 2021-02-26 | 中铁宝桥集团有限公司 | Switch service state intelligent detection system and device |
-
1994
- 1994-10-20 JP JP25513694A patent/JP3241545B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08123541A (en) | 1996-05-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3241545B2 (en) | Construction management system for construction near business lines | |
| JPH06233419A (en) | Abnormal time assisting system for field machine | |
| JP2004234067A (en) | Remote monitoring system and monitoring device | |
| JP3307813B2 (en) | Equipment management equipment | |
| JPS60262094A (en) | Monitor device for plant | |
| JP3282613B2 (en) | Alarm transmission system. | |
| JPS5851312A (en) | Monitoring device for plant operation state | |
| JPH08311873A (en) | Safety management device for mountain retaining | |
| JPH0710408A (en) | Elevator failure response support system | |
| JPH0370098A (en) | Monitor device | |
| JPH10124137A (en) | Supervising device for river pump plant | |
| JP3922804B2 (en) | Image surveillance system | |
| JP4153158B2 (en) | Building group monitoring device and monitoring method thereof | |
| JP3148088B2 (en) | Remote monitoring device | |
| JPH06119581A (en) | Remote monitoring device | |
| JPH10188170A (en) | Disaster prevention system | |
| JPH08223800A (en) | Accident detection device for interconnection system | |
| JPH05105345A (en) | Remote monitor for elevator | |
| JPH0558300A (en) | Railroad crossing monitoring system | |
| JPS61163498A (en) | Alarm transmission | |
| JP2000115867A (en) | Equipment monitoring system | |
| JP3721006B2 (en) | Optical network monitoring system | |
| JPH01140398A (en) | Recorder | |
| JPH03211700A (en) | Landslide automatic watching device | |
| JPH0923484A (en) | Remote monitoring device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071019 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101019 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101019 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131019 Year of fee payment: 12 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |