JP6889440B2 - Measurement management system, construction support system, measurement management method and construction support method - Google Patents
Measurement management system, construction support system, measurement management method and construction support method Download PDFInfo
- Publication number
- JP6889440B2 JP6889440B2 JP2017037048A JP2017037048A JP6889440B2 JP 6889440 B2 JP6889440 B2 JP 6889440B2 JP 2017037048 A JP2017037048 A JP 2017037048A JP 2017037048 A JP2017037048 A JP 2017037048A JP 6889440 B2 JP6889440 B2 JP 6889440B2
- Authority
- JP
- Japan
- Prior art keywords
- measurement result
- measurement
- information
- time
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Repair (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
Description
本発明は、例えば、軌道や路面など計測対象物の近傍での施工による変位を計測装置によって計測し、計測結果に基づいて施工の可否を判定する計測管理システム及び計測管理方法、並びに、これらを用いた施工支援システム、計測管理方法及び施工支援方法に関する。 The present invention provides, for example, a measurement management system and a measurement management method for measuring displacement due to construction in the vicinity of a measurement object such as a track or a road surface with a measuring device and determining whether or not construction is possible based on the measurement result. Regarding the construction support system, measurement management method and construction support method used.
従来より、走行時の振動および自然環境により軌道や路面などが変位して不具合が発生するおそれがあり、例えば、特許文献1では、軌道などの変位を計測する軌道狂い計測システムが提案されている。
Conventionally, there is a possibility that a track or a road surface may be displaced due to vibration during traveling and a natural environment to cause a problem. For example,
特許文献1では、一端部を構造物に固定され順次水平方向に配設された所定長さの複数の基準ロッドと、各基準ロッドの他端部に設けられたターゲットと、各ターゲットに対応位置して構造物に固定され、ターゲットとの水平方向の離間距離を計測する非触覚変位センサとから構成され、例えば、列車走行時の振動および自然環境による軌道などの変位を低コストで計測できるとされている。
In
このような軌道や路面などの変位は、例えば、薬液注入などの施工を近傍で行っている場合に薬液の圧力が作用することによって生じるおそれがある。つまり、軌道や路面などの近傍での施工によって軌道や路面などに変位が生じるおそれがあるため、例えば、特許文献1に提案されるような計測方法で軌道や路面などの変位を監視しながら施工し、軌道や路面などが変位する傾向を検出すると施工を停止するように運用されている。
Such displacement of the track or road surface may occur due to the action of the pressure of the chemical solution when, for example, construction such as injection of the chemical solution is performed in the vicinity. That is, since there is a possibility that the track or road surface may be displaced due to the construction in the vicinity of the track or road surface, for example, the construction is performed while monitoring the displacement of the track or road surface by the measurement method proposed in
しかしながら、軌道や路面などを計測する計測結果を管理する場所と、例えば薬液注入を施工する施工箇所とが離れており、計測結果を管理する場所と、施工箇所とを通信回線でつなぎ、送信された計測結果を施工箇所で確認しながら施工することが多い。そのため、例えば、通信異常によって計測結果をリアルタイムに受信できずに、施工によって軌道や路面に不具合が生じていても施工を停止できないという事態が生じるおそれがあった。 However, the place where the measurement result for measuring the track and the road surface is managed and the construction place where the chemical injection is performed are separated, and the place where the measurement result is managed and the construction place are connected by a communication line and transmitted. In many cases, the construction is performed while checking the measurement results at the construction site. Therefore, for example, there is a possibility that the measurement result cannot be received in real time due to a communication abnormality, and the construction cannot be stopped even if there is a problem in the track or the road surface due to the construction.
そこで本発明は、計測結果を確認しながらの施工について、計測結果の送受信に生じる不具合を検出することができる計測管理システム、施工支援システム、計測管理方法及び施工支援方法を提供することを目的とする。 Therefore, an object of the present invention is to provide a measurement management system, a construction support system, a measurement management method, and a construction support method that can detect defects that occur in transmission and reception of measurement results for construction while checking the measurement results. To do.
この発明は、近傍での施工による計測対象物の変位を計測装置によって計測し、計測結果に基づいて施工の可否を判定する計測管理システムあるいは計測管理方法であって、前記計測結果を計測結果情報として送受信する送受信部、及び前記計測装置から受信した前記計測結果情報を格納する情報格納部が備えられた計測結果管理装置と、該計測結果管理装置から送信された前記計測結果情報を受信する受信部、計時部及び、前記計測結果情報の送受信の成否を判定する通信異常検出部が備えられた通信異常検出装置とで構成され、前記計測結果情報には計測時刻に関する時刻情報が含まれ、前記情報格納部に格納された最新の前記計測結果情報を格納計測結果情報とするとともに、前記受信部が前記計測結果管理装置から受信した前記計測結果情報を受信計測結果情報とし、前記通信異常検出部は、前記受信計測結果情報の時刻情報と前記格納計測結果情報の時刻情報を比較し、前記時刻情報が一致しない場合において、不一致状態の継続時間が第一の所定時間以上である場合に通信異常と判定し、前記受信計測結果情報の時刻情報と前記計時部の時刻情報とを比較し、その差分の時間を示す時間比較結果が第二の所定時間以上である場合に通信異常と判定する構成であることを特徴する。 The present invention is a measurement management system or a measurement management method that measures the displacement of a measurement object due to construction in the vicinity by a measuring device and determines whether or not construction is possible based on the measurement result, and the measurement result is the measurement result information. A measurement result management device provided with a transmission / reception unit for transmitting and receiving as, and an information storage unit for storing the measurement result information received from the measurement device, and a reception for receiving the measurement result information transmitted from the measurement result management device. It is composed of a unit, a time measuring unit, and a communication abnormality detecting device provided with a communication abnormality detecting unit for determining the success or failure of transmission / reception of the measurement result information, and the measurement result information includes time information related to the measurement time. The latest measurement result information stored in the information storage unit is used as the stored measurement result information, and the measurement result information received by the reception unit from the measurement result management device is used as the reception measurement result information, and the communication abnormality detection unit is used. Compares the time information of the received measurement result information with the time information of the stored measurement result information, and when the time information does not match, the communication abnormality occurs when the duration of the mismatched state is equal to or longer than the first predetermined time. Is determined, the time information of the received measurement result information is compared with the time information of the time measuring unit, and when the time comparison result indicating the difference time is equal to or longer than the second predetermined time, it is determined as a communication abnormality. It is characterized by being.
上記計測対象物は、軌道や路面など、供用する際に変位することで不具合が生じるおそれがある対象物を含むものとする。
上記施工は、薬液注入、杭の建立、地盤の掘削、あるいは近接構造物の構築など、計測対象物が施工によって変位するおそれのある施工を含むものとする。
The measurement object shall include an object such as a track or a road surface, which may cause a problem due to displacement during operation.
The above construction shall include construction such as injection of chemicals, erection of piles, excavation of the ground, construction of adjacent structures, etc., where the object to be measured may be displaced by the construction.
この発明により、計測結果を確認しながらの施工について、計測結果の送受信に生じる不具合を検出することができる。
具体的には、計測時刻に関する時刻情報が含まれた、計測結果管理装置の情報格納部に格納された格納計測結果情報の時刻情報と、通信異常検出装置の受信部が受信した受信計測結果情報の時刻情報とを比較し、前記時刻情報が一致しない場合において、不一致状態の継続時間(以下において不一致継続時間という)が第一の所定時間以上である場合は計測結果管理装置から前記通信異常検出装置に計測結果情報が送信されていない、あるいは前記通信異常検出装置で前記計測結果情報を受信できていない、つまり計測結果情報の送受信における通信異常を検出することができる。また、前記受信計測結果情報の時刻情報と前記計時部の時刻情報とを比較し、その差分の時間を示す時間比較結果が第二の所定時間以上である場合は計測装置から前記計測結果を送信できていない、あるいは前記計測結果管理装置で前記計測結果を受信できていない、つまり計測結果情報の送受信における通信異常を検出することができる。したがって、最新の計測結果情報に基づかないおそれがあるため、施工を停止することができる。
According to the present invention, it is possible to detect a defect that occurs in the transmission and reception of the measurement result in the construction while confirming the measurement result.
Specifically, the time information of the stored measurement result information stored in the information storage unit of the measurement result management device, which includes the time information related to the measurement time, and the reception measurement result information received by the reception unit of the communication abnormality detection device. When the time information does not match and the duration of the mismatch state (hereinafter referred to as the mismatch duration) is equal to or longer than the first predetermined time, the measurement result management device detects the communication abnormality. The measurement result information has not been transmitted to the device, or the communication abnormality detection device has not received the measurement result information, that is, it is possible to detect a communication abnormality in the transmission / reception of the measurement result information. Further, the time information of the received measurement result information is compared with the time information of the time measuring unit, and when the time comparison result indicating the difference time is equal to or longer than the second predetermined time, the measurement result is transmitted from the measuring device. It is possible to detect a communication abnormality in the transmission / reception of the measurement result information, that is, the measurement result is not received or the measurement result management device cannot receive the measurement result. Therefore, the construction can be stopped because it may not be based on the latest measurement result information.
このように、格納計測結果情報と受信計測結果情報との時刻を比較しデータの同時性を図る不一致継続時間と、前記格納計測結果情報と前記時刻情報とを比較した差分の時間を検出し時刻の同時性を図る時間比較結果との二種の時間の比較結果を、それぞれ異なる時間間隔に基づいて判定するため、例えば、通信異常によって前記計測結果情報をリアルタイムに受信できず、施工によって軌道や路面に不具合が生じていても施工を停止できないという事態の発生を確実に防止することができる。 In this way, the time of the discrepancy that compares the time of the stored measurement result information and the received measurement result information to achieve data simultaneity and the time of the difference between the stored measurement result information and the time information are detected and the time is detected. Since the comparison result of the two types of time with the time comparison result aiming at the simultaneousity of the two types of time is judged based on different time intervals, for example, the measurement result information cannot be received in real time due to a communication abnormality, and the trajectory or It is possible to reliably prevent the occurrence of a situation in which construction cannot be stopped even if there is a problem on the road surface.
この発明の態様として、前記計測結果管理装置は、前記送受信部が備えられた計測結果管理端末装置と、前記送受信部、及び前記情報格納部が備えられた計測結果管理サーバとで構成されていてもよい。 As an aspect of the present invention, the measurement result management device includes a measurement result management terminal device provided with the transmission / reception unit, the transmission / reception unit, and a measurement result management server provided with the information storage unit. May be good.
この発明により、前記計測結果情報が記憶されたサーバにアクセスすることで、前記計測結果情報を確認することができる。
また、前記計測結果管理端末装置と前記計測結果管理サーバとの間に通信不具合が生じ、前記計測結果情報をリアルタイムに受信できず、施工によって軌道や路面に不具合が生じていても施工を停止できないという事態の発生を確実に防止することができる。
According to the present invention, the measurement result information can be confirmed by accessing the server in which the measurement result information is stored.
In addition, a communication failure occurs between the measurement result management terminal device and the measurement result management server, the measurement result information cannot be received in real time, and construction cannot be stopped even if there is a problem with the track or road surface due to construction. It is possible to surely prevent the occurrence of such a situation.
またこの発明の態様として、前記通信異常検出装置は、前記受信部、及び前記通信異常検出部が備えられた通信異常検出端末装置と、施工機械を制御する施工制御端末装置と接続され、判定結果を出力する判定結果出力装置とで構成されていてもよい。 Further, as an aspect of the present invention, the communication abnormality detecting device is connected to the receiving unit, the communication abnormality detecting terminal device provided with the communication abnormality detecting unit, and the construction control terminal device for controlling the construction machine, and the determination result is obtained. It may be composed of a determination result output device that outputs.
上記判定結果出力装置は、判定結果を表示する表示装置、施工不可との判定結果に基づいて警報を報知する報知装置、施工機械の制御情報として施工制御端末に判定結果情報として出力する出力装置、あるいは、これらの組み合わせとしてもよい。 The judgment result output device includes a display device that displays the judgment result, a notification device that notifies an alarm based on the judgment result that construction is not possible, and an output device that outputs judgment result information to the construction control terminal as control information of the construction machine. Alternatively, it may be a combination of these.
この発明により、通信異常の検出結果に基づく施工の可否について出力できるため、施工管理者は前記判定結果を確実に認識することができる。
また、前記判定結果に基づいて前記施工機械を制御することができる。
According to the present invention, it is possible to output whether or not the construction is possible based on the detection result of the communication abnormality, so that the construction manager can surely recognize the determination result.
In addition, the construction machine can be controlled based on the determination result.
またこの発明の態様として、前記第一の所定時間が、施工による影響の出現が予想される影響出現時間に基づく時間間隔以上に設定され、前記第二の所定時間が、前記計測装置による計測に要する計測所要時間に基づく時間間隔以上に設定されていてもよい。 Further, as an aspect of the present invention, the first predetermined time is set to be equal to or longer than a time interval based on the effect appearance time expected to appear due to construction, and the second predetermined time is measured by the measuring device. It may be set to be longer than the time interval based on the required measurement time.
この発明により、前記通信異常検出装置が前記計測装置から受信した前記計測結果情報が最新の計測結果であるか否かを判定でき、前記計測結果管理装置が前記計測装置から受信した前記計測結果情報が最新の計測結果であるか否かを判定し、通信異常を検出することができる。したがって、リアルタイムな計測結果に基づいて施工の可否を前記計測結果情報に基づいて判定することができる。 According to the present invention, the communication abnormality detection device can determine whether or not the measurement result information received from the measurement device is the latest measurement result, and the measurement result management device receives the measurement result information from the measurement device. Is the latest measurement result or not, and a communication abnormality can be detected. Therefore, it is possible to determine whether or not construction is possible based on the measurement result information in real time.
またこの発明の態様として、前記計測対象物が軌道であり、前記計測装置が、前記軌道に沿って配置され、前記軌道の変位を計測するリンク型変位計であってもよい。
この発明により、正確に軌道の変位を計測し、施工に反映することができる。
Further, as an aspect of the present invention, the measurement object may be an orbit, and the measuring device may be a link type displacement meter which is arranged along the orbit and measures the displacement of the orbit.
According to the present invention, the displacement of the track can be accurately measured and reflected in the construction.
またこの発明は、上述の計測管理システムと、前記計測装置、前記計測結果管理装置及び前記通信異常検出装置、並びに各装置間の故障を検知する故障検知システムと、前記計測管理システムにおける前記通信異常検出部による判定結果及び前記故障検知システムによる検知結果の少なくとも一方に基づき施工に関する警報を出力する警報出力システムとが備えられている施工支援システムあるいは施工支援方法であることを特徴とする。 The present invention also includes the above-mentioned measurement management system, the measurement device, the measurement result management device, the communication abnormality detection device, a failure detection system for detecting a failure between the devices, and the communication abnormality in the measurement management system. The construction support system or the construction support method is provided with an alarm output system that outputs an alarm regarding construction based on at least one of the determination result by the detection unit and the detection result by the failure detection system.
この発明により、システムの故障を検知できるため、例えば、通信異常のみならずシステムの故障に基づいて、前記計測結果情報をリアルタイムに受信できず、施工によって軌道や路面に不具合が生じていても施工を停止できないという事態の発生を確実に防止することができるとともに、警報を出力することができる。 Since the system failure can be detected by the present invention, for example, the measurement result information cannot be received in real time based on not only the communication abnormality but also the system failure, and the construction can be performed even if the track or the road surface is defective due to the construction. It is possible to reliably prevent the occurrence of a situation in which the system cannot be stopped, and it is possible to output an alarm.
本発明により、計測結果を確認しながらの施工について、計測結果の送受信に生じる不具合を検出することができる計測管理システム、施工支援システム、計測管理方法及び施工支援方法を提供することができる。 INDUSTRIAL APPLICABILITY According to the present invention, it is possible to provide a measurement management system, a construction support system, a measurement management method, and a construction support method that can detect defects that occur in transmission and reception of measurement results for construction while confirming the measurement results.
以下、本発明による計測管理システム1について、図1乃至図5とともに説明する。
なお、図1は計測管理システム1の概要図を示し、図2は計測管理システム1のブロック図を示し、図3は取り付け状態のリンク型変位計100aの概略断面図を示し、図4はモニタ画面460の概略図を示し、図5は計測管理方法のフロー図を示している。
Hereinafter, the
Note that FIG. 1 shows a schematic view of the
施工支援システムとしても機能する計測管理システム1は、計測装置100が接続された計測結果管理端末装置10、インターネット上に配置された計測結果管理サーバ20、計測対象物120である軌道120aの近傍の施工箇所の近くに配置され、施工管理端末装置200が接続された計測結果受信用端末装置30、及び通信異常検出端末装置40で構成されている。
The
なお、以下の説明では、薬液注入装置210a(施工装置210)を用いて、計測対象物120である軌道120aの近傍で地盤改良するための薬液を注入する施工において、計測装置100としてリンク型変位計100aで軌道120aにおけるレール123の変位を計測する場合の計測管理方法及び施工支援方法について説明するが、近接構造物の構築や近接箇所の掘削などの施工内容、施工装置210、あるいは軌道120aなどの計測対象物120はこれに限定されず、施工内容な施工装置に対する計測対象物120の計測管理を適宜の計測装置100を用いて計測管理システム1によって行ってもよい。
In the following description, in the construction in which the chemical
計測結果管理端末装置10は、施工箇所と離れた計測管理場所に配置されたコンピュータであり、制御部11、情報格納部として機能する記憶部12、第一計時部13、送受信部14、警報部15、表示部16、及び操作部17を備えている。
The measurement result
制御部11は、CPUとROMとRAMで構成されており、以下の機能的構成を備えている。詳述すると、制御部11には、記憶部12、第一計時部13、送受信部14、警報部15、表示部16、及び操作部17が接続され、記憶部12に記憶された各種制御プログラムを実行して、接続された各種機器を制御することができる。
The
また、制御部11は、記憶部12に記憶する測定プログラムを実行し、接続された計測装置100を制御するとともに、後述する第一計時部13で管理する時刻を計測時刻の時刻情報とともに計測結果をデータとして盛り込んだ計測結果情報を作成する。
Further, the
さらに、警報判定処理部としても機能する制御部11には、記憶部12に記憶する警報プログラムを実行することで、取得した計測結果と、記憶部12に記憶する『警戒値』、『停止値』及び『限界値』とを比較して警戒レベルを判定するとともに、警報を出力するか否かを判定する警報判定処理を行うことができる。
Further, the
また、故障検知部としても機能する制御部11は、記憶部12に記憶する故障検知プログラムを実行し、計測管理システム1における『2重起動』、『断線』、『絶縁不良』、『故障』、『水準異常』、及び『通信異常』を検知することができる。
Further, the
なお、故障検知プログラムにおいて、『2重起動』は計測結果管理端末装置10において計測装置100による計測ができない状態となる測定プログラムの2重起動を検知し、『断線』は計測装置100における信号線の断線を検知し、『絶縁不良』は計測装置100における信号線の絶縁不良を検知し、『故障』は計測装置100の故障を検知し、『水準異常』は水準計の故障を検知し、『通信異常』は通信異常を検知するように構成している。
In the failure detection program, "double activation" detects double activation of the measurement program in which the measurement result
情報格納部として機能する記憶部12は、計測装置100による計測結果である計測結果情報を実計測結果情報として格納するとともに、各種制御プログラムや上述の警報判定プログラムを記憶している。
The
第一計時部13は、時刻を管理する時刻管理部である。
送受信部14は、制御部11の制御によって、インターネット網Inを介して、計測結果管理サーバ20及び計測結果受信用端末装置30と各種情報を送受信するインターフェイスである。
The
The transmission /
警報部15は、警報判定処理部としても機能する制御部11による警報判定処理により、計測結果が警報値を超えている場合に出力する装置であり、出力方法としては、色の異なるパトランプによる光の出力、音声や音による出力、あるいは光と音の出力などを出力するように構成することができる。
The
表示部16は、CRTや液晶などで構成されたモニタであり、各種情報を表示することができる。
操作部17は、キーボードやマウス、タッチパッドなど適宜の入力手段で構成している。なお、操作部17としては、タッチスクリーンの表示部16で構成してもよい。
The
The
このように構成された計測結果管理端末装置10は、上述したように計測装置100が接続されており、計測装置100を制御して、計測対象物120を計測することができる。
上述したように、本実施形態では、計測対象物120を軌道120aとするとともに、軌道120aの記憶部123の変位を計測するリンク型変位計100aを計測装置100をとして用いており、これらについて以下で簡単に説明する。
The measurement result
As described above, in the present embodiment, the
軌道120aは、図3に示すように、道床121の上において延伸方向に所定間隔を隔てて設置され複数本の枕木122と、枕木122に対して延伸直交方向に間隔を隔てて固定された2本のレール123とで構成されている。
As shown in FIG. 3, the
計測装置100として用いるリンク型変位計100aは、延長方向に長く、正方形断面の筒状体である外枠101と、外枠101の内部に、抜き差し可能に収容され、複数のリンク(図示省略)によって屈曲可能に連結された変位計102と、変位変換手段である一対の歪ゲージ(図示省略)とで構成されている。
The link
このように構成されたリンク型変位計100aは、図3に示すように軌道120aのレール123に対して、所定間隔を隔てて複数箇所に取付け治具103で固定され、上記歪ゲージによって、レール123の水平方向及び鉛直方向の変位を計測し、施工に反映することができる。
As shown in FIG. 3, the link
計測結果管理サーバ20はインターネットInに接続され、計測結果管理端末装置10から送信された計測結果情報を格納する外部サーバであり、インターネットInを介して、計測結果管理端末装置10や計測結果受信用端末装置30からアクセス可能に構成されている。
The measurement
計測結果管理サーバ20は、制御部21、計測結果管理端末装置10から送信された計測結果情報を格納する情報格納部として機能する記憶部22、及び送受信部24を備えている。なお、計測結果管理サーバ20は、図示省略するが表示部や操作部を備えていてもよい。また、制御部21、記憶部22、及び送受信部24は、計測結果管理端末装置10における制御部11、記憶部12、及び送受信部14と同様の構成であるため、詳細な説明を省略する。
The measurement
施工装置210を制御・管理する施工管理端末装置200が接続された計測結果受信用端末装置30は、施工箇所の近くに配置されたコンピュータであり、制御部31、記憶部32、送受信部34、警報部35、表示部36、及び操作部37が接続され、記憶部32に記憶された各種制御プログラムを実行して、接続された各種機器を制御することができる。
The measurement result receiving
なお、制御部31、記憶部32、送受信部34、警報部35、表示部36、及び操作部37は、計測結果管理端末装置10における制御部11、記憶部12、送受信部14、警報部15、表示部16、及び操作部17と同様の構成であるため、詳細な説明を省略する。
The
施工管理端末装置200は、例えば、ノート型のコンピュータであり、施工装置210である薬液注入装置210aと接続され、薬液注入装置210aの稼働・停止、薬液の注入量、あるいは薬液の注入間隔等を制御管理することができる。
なお、施工管理端末装置200によって制御・管理される薬液注入装置210aについては、一般的な薬液注入装置であり、詳細な説明は省略する。
The construction
The
通信異常検出端末装置40は、いわゆるプログラマブル・ロジック・コントローラ(programmable logic controller:PLC)という、計測結果管理端末装置10や計測結果受信用端末装置30とは機構やシステムが異なる制御装置であり、計測結果受信用端末装置30に接続されるとともに、制御部41、第二計時部43、表示部46、及び非常停止操作部47が備えられている。
なお、第二計時部43は、計測結果管理端末装置10における第一計時部13と同様の構成であるため、詳細な説明を省略する。
The communication abnormality
Since the
制御部41は、PLC制御可能であり、通信異常検出部として機能することができる。
詳述すると、通信異常検出部のひとつである時刻比較部として機能する制御部41は、計測結果管理端末装置10の記憶部12、計測結果管理サーバ20の記憶部22、あるいは計測結果受信用端末装置30の記憶部32に格納された計測結果情報に盛り込まれた計測時刻を比較し、比較結果に基づいて計測結果情報の送受信の正否を判定し、つまり通信異常を検出し、検出結果に基づいて施工の可否を判定することができる。
The control unit 41 can control PLC and can function as a communication abnormality detection unit.
More specifically, the control unit 41, which functions as a time comparison unit, which is one of the communication abnormality detection units, is a
また、故障検知部としても機能する制御部41は、故障検知プログラムを実行した計測結果管理端末装置10から受信した情報に基づいて、計測管理システム1における『2重起動』、『断線』、『絶縁不良』、『故障』、『水準異常』、及び『通信異常』を検知することができる。
Further, the control unit 41, which also functions as a failure detection unit, has "double activation", "disconnection", and "disconnection" in the
表示部46は、CRTや液晶などで構成されたモニタであり、図4に示すモニタ画面460を表示することができる。
表示部46に表示されるモニタ画面460は、停止リセットボタン461と、警告灯表示部462と、監視モニタ表示部470とが表示されている。
The
The
停止リセットボタン461は、上述の通信異常検出部として機能した制御部41が通信異常の検出に基づいて施工停止と判定した場合における停止状態をリセット処理するためのボタンである。
The
警告灯表示部462は、安全状態を示す緑のパトランプのイラストを表示する安全表示部462aと、警告状態を示す赤のパトランプのイラストを表示する警告表示部462bとが上下に並べて配置されている。
In the warning
監視モニタ表示部470は、『警告ON』表示部471、『警戒値情報』表示部472、『エラー情報』表示部473、『データ同時性』表示部474、『時間同時性』表示部475及び『計測結果時刻情報』表示部476が、上からこの順に配置されている。
The monitoring
『警告ON』表示部471は、表示ランプ部471aと、3つの詳細表示ランプ部471bとが配置されており、本実施形態においては、『Failure』の出力OFF状態、『故障検知』の出力OFF状態、及び『警報』の出力OFF状態のいずれかが検出されると3つの詳細表示ランプ部471bのうち対応するいずれかが点灯するとともに、表示ランプ部471aが点灯し、『Failure』の出力OFF状態、『故障検知』の出力OFF状態、及び『警報』の出力OFF状態のいずれかも検出されない場合、つまり全ての出力がONである場合に表示ランプ部471aは点灯しないように構成されている。
The "warning ON"
『警戒値情報』表示部472は、表示ランプ部472aと、警戒値レベル表示ランプ部472bとが配置されており、本実施形態においては、計測結果管理端末装置10によって実行された警報判定処理に基づく計測結果の警戒値レベルによって警戒値レベル表示ランプ部472bのうち対応するいずれかが点灯するとともに、表示ランプ部472aが点灯する構成である。計測結果管理端末装置10によって実行された警報判定処理に基づいて計測結果がいずれの警戒レベルに該当しない場合は、『警戒値情報』表示部472のいずれも点灯しない構成である。
The "warning value information" display unit 472 includes a
『エラー情報』表示部473は、表示ランプ部473aと、6つの故障内容表示ランプ部473bとが配置されており、本実施形態においては、計測結果管理端末装置10の制御部11による故障検知処理によって、『2重起動』、『断線』、『絶縁不良』、『故障』、『水準異常』、及び『通信異常』のいずれかが検知され、その情報を通信異常検出端末装置40が受信した場合、6つの故障内容表示ランプ部473bのうち対応するいずれかが点灯するとともに、表示ランプ部473aが点灯する構成である。計測結果管理端末装置10の制御部11によって実行された故障検知処理によっていずれの故障も検知されない場合は、『エラー情報』表示部473のいずれも点灯しない構成である。
The "error information" display unit 473 is arranged with a
『データ同時性』表示部474は、表示ランプ部474aが配置されており、本実施形態においては、制御部41によって実行される時刻比較処理によって、計測結果管理端末装置10の記憶部12あるいは計測結果管理サーバ20の記憶部22に格納された計測結果情報である実計測結果情報のうち最新の実計測結果情報に盛り込まれた時刻情報(計測時刻)と、計測結果受信用端末装置30が計測結果管理サーバ20を経由して受信した計測結果情報である受信計測結果情報のうち最新の受信計測結果情報に盛り込まれた時刻情報とが一致しない場合において、更新された最新の受信計測結果情報に盛り込まれた時刻情報が一致するまでの間の時間、つまり不一致継続時間が第一の所定時間より長い場合、換言すると、第一の所定時間内に、最新の受信計測結果情報に盛り込まれた時刻情報が一致しない場合、計測結果受信用端末装置30が計測結果管理サーバ20を経由して受信した最新の受信計測結果情報が最新の計測結果に基づいていないとして表示ランプ部474aが点灯する構成であり、時刻比較結果が第一の所定時間より短い場合、計測結果受信用端末装置30が計測結果管理サーバ20を経由して受信した最新の受信計測結果情報が最新の計測結果に基づいているとして表示ランプ部474aは点灯しない構成である。
A
『時間同時性』表示部475は、表示ランプ部475aと、差分時間表示部475bとが配置されており、本実施形態においては、制御部41によって実行される時刻比較処理によって、計測結果受信用端末装置30が計測結果管理サーバ20を経由して受信した計測結果情報である受信計測結果情報のうち最新の受信計測結果情報に盛り込まれた時刻情報と、第二計時部43による時刻情報との差分の時間を示す時間比較結果が第二の所定時間より長い場合、計測結果管理サーバ20の記憶部22に格納された格納計測結果情報が最新の計測結果に基づいていないとして表示ランプ部475aが点灯するとともに、実計測結果情報に盛り込まれた時刻情報と、第二計時部43による時刻情報との差分を差分時間表示部475bに表示する構成であり、時刻比較結果が第二の所定時間より短い場合、最新の格納計測結果情報が最新の計測結果に基づいているとして表示ランプ部475aは点灯しない構成である。
The "time simultaneity"
『計測結果時刻情報』表示部476は、制御部41によって実行される時刻比較処理をするために用いる各計測結果情報を表示する表示部であり、計測結果管理端末装置10の記憶部12に格納された実計測結果情報のうち最新の実計測結果情報に盛り込まれた時刻情報(計測時刻)を表示する計測結果管理端末装置情報表示部476aと、受信計測結果情報のうち最新の受信計測結果情報に盛り込まれた時刻情報を表示する計測結果受信用端末装置情報表示部476bと、通信異常検出端末装置40における第二計時部43による時刻情報を表示する通信異常検出端末装置情報表示部476cとが上からこの順で配置されている。
The “measurement result time information”
非常停止操作部47は、プッシュボタンスイッチで構成され、緊急時に施工装置210による施工を緊急停止する場合に押下するボタンであり、非常停止操作部47が押下されると、施工管理端末装置200を介さずに施工装置210の稼働を停止することができる。
The emergency
このように構成された計測管理システム1による計測管理方法を用いた施工支援方法について図5とともに以下で説明する。
まず、計測を開始するにあたり、条件設定がされていない場合(ステップs1:No)は条件設定を行う。
The construction support method using the measurement management method by the
First, when starting the measurement, if the condition is not set (step s1: No), the condition is set.
詳述すると、警報判定処理において計測結果と比較する『警戒値』、『停止値』及び『限界値』や、時刻比較処理によって基準となる第一の所定時間及び第二の所定時間などが設定される条件となる。
なお、本実施形態において、時刻比較処理によって基準となる第一の所定時間は、薬液注入装置210aにおける薬注施工における施工状況を計測する計測間隔である60秒を設定し、第二の所定時間は、リンク型変位計100aによる1回の計測に要する時間90秒を設定している。なお、この所定時間は適宜設定すればよい。
More specifically, the "warning value", "stop value" and "limit value" to be compared with the measurement result in the alarm judgment process, the first predetermined time and the second predetermined time to be the reference by the time comparison process, etc. are set. It becomes a condition to be done.
In the present embodiment, the first predetermined time as a reference by the time comparison process is set to 60 seconds, which is a measurement interval for measuring the construction status in the chemical injection construction in the
条件設定がされていた場合(ステップs1:Yes)や条件設定がされてから(ステップs2)、薬液注入装置210aによる施工及びリンク型変位計100aによる計測を開始する(ステップs3)。
そして、軌道120aによる施工及びリンク型変位計100aによる計測を開始すると、計測結果管理端末装置10の制御部11によって故障検知処理を実行し、上述したような『2重起動』、『断線』、『絶縁不良』、『故障』、『水準異常』、及び『通信異常』のいずれかが検知され、その情報を通信異常検出端末装置40が受信した場合(ステップs4:No)、監視モニタ表示部470の『エラー情報』表示部473に検知結果を表示するとともに、リンク型変位計100aによる計測結果が反映できないおそれがあるため、通信異常検出端末装置40から計測結果受信用端末装置30を介して施工管理端末装置200に施工停止情報を送信し、施工管理端末装置200を介して薬液注入装置210aによる施工停止し(ステップs9)、本計測管理を終了する。
When the condition is set (step s1: Yes) or after the condition is set (step s2), the construction by the
Then, when the construction by the
計測結果管理端末装置10の制御部11による故障検知処理により故障が検知されない場合(ステップs4:Yes)、リンク型変位計100aからの計測結果情報を計測結果管理端末装置10の記憶部12に実計測結果情報として格納するとともに、インターネットInを介して計測結果管理端末装置10から計測結果管理サーバ20に送信し、記憶部22に格納計測結果情報として格納する。さらに、計測結果受信用端末装置30はインターネットInを介して、計測結果管理サーバ20の記憶部22に格納された格納計測結果情報を受信し、記憶部32に受信計測結果情報として記憶する(ステップs5)。
When a failure is not detected by the failure detection process by the
また、計測結果管理端末装置10において警報判定処理を実行し、記憶部12に格納された実計測結果情報と、設定された条件である警戒レベルとを比較して、計測結果が警戒レベルのうち、警戒値レベルを超える場合(ステップs6:No)、監視モニタ表示部470の『警戒値情報』表示部472に判定結果を表示するとともに、警告灯表示部462の警告表示部462bを表示し、警報部15及び警報部35を稼働させる(ステップs7)。
Further, the measurement result
なお、警報判定処理による判定結果が警戒レベルを超える場合であっても施工可能な『警戒値』レベルである場合(ステップs8:Yes)、ステップs5に戻り、計測結果情報の送受信を続ける。
逆に、警報判定処理による判定結果が警戒レベルを超える場合において施工不可である『停止値』や『限界値』レベルである場合(ステップs8:No)、通信異常検出端末装置40から計測結果受信用端末装置30を介して施工管理端末装置200に施工停止情報を送信し、施工管理端末装置200を介して薬液注入装置210aによる施工停止し(ステップs9)、本計測管理を終了する。
If the determination result by the alarm determination process exceeds the alert level but is at the "alert value" level that can be constructed (step s8: Yes), the process returns to step s5 and the transmission / reception of measurement result information is continued.
On the contrary, when the judgment result by the alarm judgment process exceeds the warning level and the construction is impossible at the "stop value" or "limit value" level (step s8: No), the measurement result is received from the communication abnormality
なお、計測結果管理端末装置10による警報判定処理の結果、警戒レベルを超えない場合(ステップs6:Yes)、制御部41によって時刻比較処理を実行し(ステップs10)、その際に比較対象となる実計測結果情報、格納計測結果情報及び受信計測結果情報について『計測結果時刻情報』表示部476に表示する。
If the alarm determination process by the measurement result
時刻比較処理の結果、計測結果管理端末装置10の記憶部12に格納された計測結果情報である実計測結果情報のうち最新の実計測結果情報に盛り込まれた時刻情報(計測時刻)と、計測結果受信用端末装置30が計測結果管理サーバ20を経由して受信した計測結果情報である受信計測結果情報のうち最新の受信計測結果情報に盛り込まれた時刻情報とが一致しない状態が継続した時間である不一致継続時間が第一の所定時間(本実施形態では60秒)より長い場合(ステップs11:No)、計測結果受信用端末装置30が計測結果管理サーバ20を経由して受信した最新の受信計測結果情報が最新の計測結果に基づいていない、つまり計測結果情報の送受信において通信異常が生じており、『データ同時性』がなく、最新の計測結果に基づく管理ができないとして、監視モニタ表示部470の表示ランプ部474aが点灯するとともに、通信異常検出端末装置40から計測結果受信用端末装置30を介して施工管理端末装置200に施工停止情報を送信し、施工管理端末装置200を介して薬液注入装置210aによる施工停止し(ステップs9)、本計測管理を終了する。
As a result of the time comparison process, the time information (measurement time) included in the latest actual measurement result information among the actual measurement result information which is the measurement result information stored in the
計測結果管理端末装置10の記憶部12に格納された最新の実計測結果情報に盛り込まれた時刻情報(計測時刻)と、計測結果受信用端末装置30が計測結果管理サーバ20を経由して受信した最新の受信計測結果情報に盛り込まれた時刻情報とが一致しない状態が継続した時間である不一致継続時間が第一の所定時間(本実施形態では60秒)より短い場合(ステップs11:Yes)であっても、時刻比較処理の結果、計測結果受信用端末装置30が計測結果管理サーバ20を経由して受信した計測結果情報である受信計測結果情報のうち最新の受信計測結果情報に盛り込まれた時刻情報と、通信異常検出端末装置40における第二計時部43による時刻情報との差分の時間を示す時間比較結果が第二の所定時間(本実施形態では90秒)より長い場合(ステップs12:No)、計測結果受信用端末装置30が受信した最新の受信計測結果情報が最新の計測結果に基づいていない、計測結果情報の送受信において通信異常が生じており、つまり『時間同時性』がなく、最新の計測結果に基づく管理ができないとして、監視モニタ表示部470の表示ランプ部475aが点灯するとともに、通信異常検出端末装置40から計測結果受信用端末装置30を介して施工管理端末装置200に施工停止情報を送信し、施工管理端末装置200を介して薬液注入装置210aによる施工停止し(ステップs9)、本計測管理を終了する。
The time information (measurement time) included in the latest actual measurement result information stored in the
計測結果管理端末装置10の記憶部12に格納された最新の実計測結果情報に盛り込まれた時刻情報(計測時刻)と、計測結果管理サーバ20の記憶部22に格納された格納計測結果情報に盛り込まれた時刻情報との差分の時間を示す時間比較結果が第二の所定時間(本実施形態では90秒)より短い場合(ステップs11:Yes)、適切な計測結果に基づく計測管理を行いながら施工装置210による施工を実施できているとして、施工装置210による施工が終了するまで(ステップs13:No)をこれらの処理を繰り返し実行し、施工装置210による施工完了に伴って(ステップs13:Yes)、本計測管理を終了する。
The time information (measurement time) included in the latest actual measurement result information stored in the
上述したように、近傍での施工による記憶部120の変位を計測装置100(リンク型変位計100a)によって計測し、計測結果に基づいて施工の可否を判定する計測管理システム1あるいは計測管理方法であって、計測結果を計測結果情報として送受信する送受信部14,24、及び計測装置100(リンク型変位計100a)から受信した計測結果情報を格納する記憶部12,22が備えられた計測結果管理端末装置10及び計測結果管理サーバ20と、計測結果管理端末装置10及び計測結果管理サーバ20から送信された計測結果情報を受信する送受信部34、第二計時部43及び、計測結果情報の送受信の成否を判定する制御部41が備えられた計測結果受信用端末装置30及び通信異常検出端末装置40とで構成され、計測結果情報には計測時刻に関する時刻情報が含まれ、記憶部12,22に格納された最新の計測結果情報を格納計測結果情報とするとともに、送受信部34が計測装置100(リンク型変位計100a)から受信した計測結果情報を受信計測結果情報とし、制御部41は、受信計測結果情報の時刻情報と格納計測結果情報の時刻情報を比較し、前記時刻情報が一致しない場合において、不一致継続時間が第一の所定時間以上である場合に通信異常と判定し、受信計測結果情報の時刻情報と第二計時部43の時刻情報とを比較し、その差分の時間を示す時間比較結果が第二の所定時間以上である場合に通信異常と判定するため、計測結果を確認しながらの施工について、計測結果の送受信に生じる不具合を検出することができる。
As described above, the
具体的には、計測時刻に関する時刻情報が含まれた、計測結果管理端末装置10及び計測結果管理サーバ20の記憶部12,22に格納された格納計測結果情報と、計測結果受信用端末装置30及び通信異常検出端末装置40の送受信部34が受信した受信計測結果情報とを比較し、前記時刻情報が一致しない場合において、不一致継続時間が第一の所定時間以上である場合、つまり、計測結果管理端末装置10及び計測結果管理サーバ20から計測結果受信用端末装置30及び通信異常検出端末装置40に計測結果情報が送信されていない、あるいは計測結果受信用端末装置30及び通信異常検出端末装置40で計測結果情報を受信できていない、つまり計測結果情報の送受信における通信異常を検出することができる。また、受信計測結果情報の時刻情報と第二計時部43の時刻情報とを比較し、その差分の時間を示す時間比較結果が第二の所定時間以上である場合、つまり、計測装置100(リンク型変位計100a)から計測結果を送信できていない、あるいは計測結果管理端末装置10及び計測結果管理サーバ20で計測結果を受信できていない、つまり計測結果情報の送受信における通信異常を検出することができる。したがって、最新の計測結果情報に基づかないおそれがあるため、施工を停止することができる。
Specifically, the stored measurement result information stored in the
このように、格納計測結果情報と受信計測結果情報との時刻を比較しデータの同時性を図る不一致継続時間と、前記格納計測結果情報と前記時刻情報とを比較した差分の時間を検出し時刻の同時性を図る時間比較結果との二種の時間の比較結果をそれぞれ異なる時間間隔に基づいて判定するため、例えば、通信異常によって計測結果情報をリアルタイムに受信できず、施工によって記憶部120aに不具合が生じていても施工を停止できないという事態の発生を確実に防止することができる。
In this way, the time of the discrepancy that compares the time of the stored measurement result information and the received measurement result information to achieve data simultaneity and the time of the difference between the stored measurement result information and the time information are detected and the time is detected. Since the comparison result of the two types of time with the time comparison result is judged based on different time intervals, for example, the measurement result information cannot be received in real time due to a communication abnormality, and the
また、第一計時部13及び送受信部14が備えられた計測結果管理端末装置10と、送受信部24、及び記憶部22が備えられた計測結果管理サーバ20とがあり、計測結果情報が記憶部22に記憶された計測結果管理サーバ20に計測結果受信用端末装置30及び通信異常検出端末装置40からアクセスすることで、計測結果情報を確認することができる。
Further, there is a measurement result
また、計測結果管理端末装置10と計測結果管理サーバ20との間に通信不具合が生じ、計測結果情報をリアルタイムに受信できず、施工によって軌道120aや路面に不具合が生じていても施工を停止できないという事態の発生を確実に防止することができる。
In addition, a communication failure occurs between the measurement result
また、制御部41が備えられた通信異常検出端末装置40と、送受信部34を備えるとともに、施工管理端末装置200を介して施工装置210(薬液注入装置210a)を制御する計測結果受信用端末装置30とがあり、判定結果を出力する通信異常検出端末装置40に表示部46が備えられているため、通信異常の検出結果に基づく施工の可否について出力でき、施工管理者は判定結果を確実に認識することができる。
また、判定結果に基づいて施工装置210(薬液注入装置210a)を制御することができる。
Further, a communication abnormality
Further, the construction device 210 (chemical
また、第一の所定時間が、施工装置210(薬液注入装置210a)による施工の影響の出現が予想される影響出現時間に基づく時間間隔以上に設定され、第二の所定時間が、計測装置100(リンク型変位計100a)による計測に要する計測所要時間に基づく時間間隔以上に設定されているため、計測結果受信用端末装置30が受信した計測結果情報が最新の計測結果かつ施工の可否判定に有効なデータであるか否かを判定でき、計測結果管理端末装置10に格納する計測結果情報が最新の計測結果であるか否かを判定できる。したがって、リアルタイムな計測結果に基づいて施工の可否を計測結果情報に基づいて判定することができる。
Further, the first predetermined time is set to be equal to or longer than the time interval based on the effect appearance time expected to appear due to the construction by the construction device 210 (
また、時刻比較処理を実行する際、計測結果管理端末装置10や計測結果受信用端末装置30における管理時刻と、計測結果管理端末装置10や計測結果受信用端末装置30とはシステムや構成が異なる制御装置である通信異常検出端末装置40における管理時刻とを比較するため、より正確な比較を実行することができる。
Further, when executing the time comparison process, the system and configuration of the management time in the measurement result
また、計測装置100として、軌道120aに沿って配置され、軌道120aの変位を計測するリンク型変位計100aを用いているため、正確に軌道120aの変位を計測し、施工に反映することができる。
Further, since the link
また、計測管理システム1を用い、各装置間の故障を検知する故障検知処理を実行し、計測管理による判定結果及び故障検知処理による検知結果の少なくとも一方に基づき施工に関する警報を出力する警報判定処理を実行するため、計測管理システム1における故障を検知でき、例えば、通信異常のみならずシステムの故障に基づいて、計測結果情報をリアルタイムに受信できず、施工によって軌道120aや路面に不具合が生じていても施工を停止できないという事態の発生を確実に防止することができるとともに、警報を出力することができる。
Further, the
この発明の構成と、上述の実施形態との対応において、この発明の計時部は第二計時部43に対応し、
以下同様に、
計測対象物及び軌道は軌道120aに対応し、
計測装置は計測装置100に対応し、
送受信部は送受信部14,24に対応し、
情報格納部は記憶部12,22に対応し、
計測結果管理装置は計測結果管理端末装置10及び/または計測結果管理サーバ20に対応し、
受信部は送受信部34に対応し、
通信異常検出部は制御部41に対応し、
通信異常検出装置は計測結果受信用端末装置30及び通信異常検出端末装置40に対応し、
計測管理システムは計測管理システム1に対応し、
計測結果管理端末装置は計測結果管理端末装置10に対応し、
計測結果管理サーバは計測結果管理サーバ20に対応し、
通信異常検出端末装置は通信異常検出端末装置40に対応し、
施工機械は施工装置210(薬液注入装置210a)に対応し、
施工制御端末装置は計測結果受信用端末装置30に対応し、
判定結果出力装置は表示部46に対応し、
リンク型変位計はリンク型変位計100aに対応し、
故障検知システムは故障検知処理を実行する計測管理システム1に対応し、
警報出力システムは警報判定処理を実行する計測管理システム1に対応し、
施工支援システムは計測管理システム1に対応するが、この発明は、上述の実施形態の構成のみに限定されるものではなく、多くの実施の形態を得ることができる。
In correspondence between the configuration of the present invention and the above-described embodiment, the timekeeping unit of the present invention corresponds to the
Similarly below
The object to be measured and the orbit correspond to the
The measuring device corresponds to the
The transmitter / receiver corresponds to the transmitter /
The information storage unit corresponds to the
The measurement result management device corresponds to the measurement result
The receiving unit corresponds to the transmitting / receiving
The communication abnormality detection unit corresponds to the control unit 41,
The communication abnormality detection device corresponds to the measurement result receiving
The measurement management system corresponds to the
The measurement result management terminal device corresponds to the measurement result
The measurement result management server corresponds to the measurement
The communication abnormality detection terminal device corresponds to the communication abnormality
The construction machine corresponds to the construction device 210 (
The construction control terminal device corresponds to the measurement result receiving
The determination result output device corresponds to the
The link type displacement meter corresponds to the link
The failure detection system corresponds to the
The alarm output system corresponds to the
Although the construction support system corresponds to the
例えば、計測結果管理端末装置10及び計測結果管理サーバ20を一体的に構成してもよいし、計測結果受信用端末装置30及び通信異常検出端末装置40を一体で構成してもよい。
また、軌道120aの変位を計測するためにリンク型変位計100aを用いたが、計測装置100として、例えば、自動追尾型のトータルステーション等を用いてもよい。
For example, the measurement result
Further, although the link
1…計測管理システム
10…計測結果管理端末装置
20…計測結果管理サーバ
22…記憶部
24…送受信部
30…計測結果受信用端末装置
34…送受信部
40…通信異常検出端末装置
41…制御部
43…第二計時部
46…表示部
100…計測装置
100a…リンク型変位計
120a…軌道
210…施工装置
210a…薬液注入装置
1 ...
Claims (8)
前記計測結果を計測結果情報として送受信する送受信部、及び前記計測装置から受信した前記計測結果情報を格納する情報格納部が備えられた計測結果管理装置と、
該計測結果管理装置から送信された前記計測結果情報を受信する受信部、計時部及び、前記計測結果情報の送受信の成否を判定する通信異常検出部が備えられた通信異常検出装置とで構成され、
前記計測結果情報には計測時刻に関する時刻情報が含まれ、
前記情報格納部に格納された最新の前記計測結果情報を格納計測結果情報とするとともに、
前記受信部が前記計測結果管理装置から受信した前記計測結果情報を受信計測結果情報とし、
前記通信異常検出部は、
前記受信計測結果情報の時刻情報と前記格納計測結果情報の時刻情報を比較し、前記時刻情報が一致しない場合において、不一致状態の継続時間が第一の所定時間以上である場合に通信異常と判定し、
前記受信計測結果情報の時刻情報と前記計時部の時刻情報とを比較し、その差分の時間を示す時間比較結果が第二の所定時間以上である場合に通信異常と判定する構成である
計測管理システム。 It is a measurement management system that measures the displacement of the object to be measured due to construction in the vicinity with a measuring device and judges whether or not construction is possible based on the measurement result.
A measurement result management device provided with a transmission / reception unit that transmits / receives the measurement result as measurement result information and an information storage unit that stores the measurement result information received from the measurement device.
It is composed of a receiving unit for receiving the measurement result information transmitted from the measurement result management device, a time measuring unit, and a communication abnormality detecting device provided with a communication abnormality detecting unit for determining the success or failure of transmission / reception of the measurement result information. ,
The measurement result information includes time information related to the measurement time.
The latest measurement result information stored in the information storage unit is used as the stored measurement result information, and is also used.
The measurement result information received by the receiving unit from the measurement result management device is used as the received measurement result information.
The communication abnormality detection unit is
The time information of the received measurement result information and the time information of the stored measurement result information are compared, and when the time information does not match, it is determined that the communication is abnormal when the duration of the mismatch state is equal to or longer than the first predetermined time. And
Measurement management is a configuration in which the time information of the received measurement result information is compared with the time information of the timekeeping unit, and when the time comparison result indicating the difference time is equal to or longer than the second predetermined time, a communication abnormality is determined. system.
前記送受信部が備えられた計測結果管理端末装置と、
前記送受信部、及び前記情報格納部が備えられた計測結果管理サーバとで構成されている
請求項1に記載の計測管理システム。 The measurement result management device is
A measurement result management terminal device equipped with the transmission / reception unit, and
The measurement management system according to claim 1, further comprising the transmission / reception unit and the measurement result management server provided with the information storage unit.
前記受信部、及び前記通信異常検出部が備えられた通信異常検出端末装置と、
施工機械を制御する施工制御端末装置と接続され、判定結果を出力する判定結果出力装置とで構成されている
請求項1または2に記載の計測管理システム。 The communication abnormality detection device is
A communication abnormality detection terminal device provided with the receiving unit and the communication abnormality detecting unit, and
The measurement management system according to claim 1 or 2, which is connected to a construction control terminal device that controls a construction machine and is composed of a judgment result output device that outputs a judgment result.
前記第二の所定時間が、前記計測装置による計測に要する計測所要時間に基づく時間間隔以上に設定されている
請求項1乃至3のうちいずれかに記載の計測管理システム。 The first predetermined time is set to be equal to or longer than the time interval based on the impact appearance time in which the appearance of the impact due to construction is expected.
The measurement management system according to any one of claims 1 to 3, wherein the second predetermined time is set to be equal to or longer than a time interval based on the measurement required time required for measurement by the measuring device.
前記計測装置が、前記軌道に沿って配置され、前記軌道の変位を計測するリンク型変位計である
請求項1乃至4のうちいずれかに記載の計測管理システム。 The object to be measured is an orbit,
The measurement management system according to any one of claims 1 to 4, wherein the measuring device is arranged along the track and is a link type displacement meter that measures the displacement of the track.
前記計測装置、前記計測結果管理装置及び前記通信異常検出装置、並びに各装置間の故障を検知する故障検知システムと、
前記計測管理システムにおける前記通信異常検出部による判定結果及び前記故障検知システムによる検知結果の少なくとも一方に基づき施工に関する警報を出力する警報出力システムとが備えられている
施工支援システム。 The measurement management system according to any one of claims 1 to 5.
The measuring device, the measurement result management device, the communication abnormality detection device, and a failure detection system for detecting a failure between the devices.
A construction support system including an alarm output system that outputs an alarm regarding construction based on at least one of a determination result by the communication abnormality detection unit and a detection result by the failure detection system in the measurement management system.
前記計測結果及び計測時刻に関する時刻情報を含む計測結果情報を計測結果管理装置の情報格納部に記憶するとともに、通信異常検出装置に送信し、
前記情報格納部に格納された最新の前記計測結果情報である格納計測結果情報の時刻情報と、前記通信異常検出装置が前記計測装置から受信した前記計測結果情報である受信計測結果情報の時刻情報とを比較し、前記時刻情報が一致しない場合において、不一致状態の継続時間が第一の所定時間以上である場合に通信異常と判定し、
前記受信計測結果情報の時刻情報と計時部の時刻情報とを比較し、その差分の時間を示す時間比較結果が第二の所定時間以上である場合に通信異常と判定する
計測管理方法。 It is a measurement management method that measures the displacement of the object to be measured due to construction in the vicinity with a measuring device and determines whether or not construction is possible based on the measurement result.
The measurement result information including the measurement result and the time information related to the measurement time is stored in the information storage unit of the measurement result management device and transmitted to the communication abnormality detection device.
The time information of the stored measurement result information, which is the latest measurement result information stored in the information storage unit, and the time information of the received measurement result information, which is the measurement result information received by the communication abnormality detection device from the measurement device. When the time information does not match, and if the duration of the mismatched state is equal to or longer than the first predetermined time, it is determined that the communication is abnormal.
The received measurement result is compared with the time information and the time information of the total time of the information, the time comparison result is a second determining measurement management method, a communication error is equal to or greater than a predetermined time indicating the time of the difference.
前記計測装置、前記計測結果管理装置及び前記通信異常検出装置、並びに各装置間における故障の検知結果との少なくとも一方に基づき施工に関する警報を出力する
施工支援方法。 The determination result by the measurement management method according to claim 7 and
A construction support method that outputs an alarm regarding construction based on at least one of the measurement device, the measurement result management device, the communication abnormality detection device, and a failure detection result between the devices.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017037048A JP6889440B2 (en) | 2017-02-28 | 2017-02-28 | Measurement management system, construction support system, measurement management method and construction support method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017037048A JP6889440B2 (en) | 2017-02-28 | 2017-02-28 | Measurement management system, construction support system, measurement management method and construction support method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2018141327A JP2018141327A (en) | 2018-09-13 |
| JP6889440B2 true JP6889440B2 (en) | 2021-06-18 |
Family
ID=63527691
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017037048A Active JP6889440B2 (en) | 2017-02-28 | 2017-02-28 | Measurement management system, construction support system, measurement management method and construction support method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6889440B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113931830A (en) * | 2021-11-12 | 2022-01-14 | 华能伊敏煤电有限责任公司 | Combined type variable frequency control system and method for open-pit coal mine open-drainage system |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3241545B2 (en) * | 1994-10-20 | 2001-12-25 | 株式会社奥村組 | Construction management system for construction near business lines |
| JPH1098548A (en) * | 1996-09-20 | 1998-04-14 | Secom Co Ltd | Communications system |
| JP4299572B2 (en) * | 2003-04-18 | 2009-07-22 | 日本電気株式会社 | Failure notification method and failure notification method |
| JP4671994B2 (en) * | 2007-08-27 | 2011-04-20 | 東日本旅客鉄道株式会社 | Measurement management method of link displacement meter |
| JP6761285B2 (en) * | 2016-06-20 | 2020-09-23 | 五洋建設株式会社 | Construction management system and method in chemical injection method |
-
2017
- 2017-02-28 JP JP2017037048A patent/JP6889440B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2018141327A (en) | 2018-09-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103613017B (en) | Tower crane lifting alliance state online monitoring system and method for supervising | |
| US8788240B2 (en) | Monitoring method of vertical displacement and vertical deflection change of building construction elements, especially of the roof, and a system for realization of this method | |
| KR101815121B1 (en) | Apparatus and method for building physical status monitoring using integrated smart sensor and management server | |
| JP2012525587A (en) | Position monitoring system for mobile machines | |
| CN104464158B (en) | Fire alarm linkage control method and system | |
| CN110618632A (en) | Remote monitoring system, aerial work platform and remote monitoring method | |
| KR20140147621A (en) | Apparatus and Method for Fault Control of Water Quality Sensor | |
| JP6552674B1 (en) | Inspection system | |
| JP6889440B2 (en) | Measurement management system, construction support system, measurement management method and construction support method | |
| KR20190080258A (en) | Muti danger sensing system for slope | |
| KR20200005765A (en) | Method and apparatus for determining road state from vehicle g-sensor measure | |
| KR101747233B1 (en) | System and method for providing information of road surface condition | |
| CN117761578A (en) | Rail transit signal system grounding network fault positioning method | |
| JP2011107760A (en) | Device of detecting plant abnormality | |
| CN113761027B (en) | Calibration method and device for calibrating flameout state of vehicle-mounted equipment based on GPS data and computer readable storage medium | |
| KR101915500B1 (en) | Dragging Detector | |
| KR102186746B1 (en) | Method for management and construction of structure using measuring device system | |
| CN109211431B (en) | Distributed optical fiber temperature monitoring method and system | |
| JP2009053041A (en) | Measurement management method of link displacement meter | |
| CN108445472A (en) | A kind of ultrasonic sensor can not normally detect the fault detection method of barrier | |
| KR20230043538A (en) | System for monitoring safety of temporary scaffolding | |
| KR20190092707A (en) | Apparatus for detecting failure of sensor of atmosphere environment | |
| KR20230036802A (en) | Fire detecting system for enhancing accuracy and reliability of fire detection | |
| KR20210004769A (en) | System for monitoring the safety status of facilities | |
| JP2003344558A (en) | Rainfall amount observation system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170413 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20191118 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20200923 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20201020 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20201215 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210413 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210512 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6889440 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |