JP3293234B2 - Piping installation device - Google Patents
Piping installation deviceInfo
- Publication number
- JP3293234B2 JP3293234B2 JP11704393A JP11704393A JP3293234B2 JP 3293234 B2 JP3293234 B2 JP 3293234B2 JP 11704393 A JP11704393 A JP 11704393A JP 11704393 A JP11704393 A JP 11704393A JP 3293234 B2 JP3293234 B2 JP 3293234B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- welding
- tube
- machine
- inspection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Automatic Assembly (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、配管据付装置に関する
ものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a piping installation device.
【0002】[0002]
【従来の技術】ごみの真空輸送用配管やガス管等の各種
配管は、通常、地中に形成された共同溝内等に据え付け
られたり、或いは地下埋設される。2. Description of the Related Art Various pipes such as pipes for vacuum transport of refuse and gas pipes are usually installed in common trenches formed underground or buried underground.
【0003】従来、配管の据付作業は、共同溝や地下へ
の搬入口から管材をクレーン等で吊り降ろした後、共同
溝の天井部に固定された吊フックに掛けたワイヤを利用
して作業員が前記管材を台車に載せたり、或いはクレー
ン等から直接台車に管材を吊り降ろし、該台車を管材の
据付地点まで運び、該据付地点において、据付済みの管
材に対し、共同溝の天井部に固定された吊フックに掛け
たワイヤを利用して前記管材の芯出しを行う(サポート
にパイプをころがし、芯出治具にて芯出しを行う方法も
ある)と共に溶接を行い、更に管材の溶接箇所における
検査を行い、以下、同様な操作を繰り返す、というよう
に全て人力に頼っているのが現状であった。[0003] Conventionally, piping installation work is performed by using a wire hung on a hanging hook fixed to the ceiling portion of a common ditch after hanging a pipe material from a carry-in entrance into a common ditch or underground with a crane or the like. A worker puts the tubing on the trolley or suspends the tubing from the crane or the like directly on the trolley, carries the trolley to the installation point of the tubing, and at the installation point, the installed tubing is placed on the ceiling of the common groove. Using the wire hung on the fixed hanging hook, the pipe is centered (the pipe is rolled on the support and the centering jig is also used), and welding is performed. In the current situation, inspections are performed at locations, and similar operations are repeated thereafter, all of which rely on human power.
【0004】[0004]
【発明が解決しようとする課題】しかしながら、前述の
如く配管の据付作業を全て人力に頼っているのでは、作
業員の負担が非常に大きく、しかも、安全面や作業効率
の点で多くの問題を有していた。However, as described above, since all the installation work of pipes depends on human power, the burden on the worker is very large, and there are many problems in terms of safety and work efficiency. Had.
【0005】本発明は、斯かる実情に鑑み、作業員の負
担を削減し得、且つ安全性並びに作業効率の向上を図り
得る配管据付装置を提供しようとするものである。The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a pipe installation apparatus capable of reducing a burden on an operator and improving safety and work efficiency.
【0006】[0006]
【課題を解決するための手段】本発明は、据え付けるべ
き管材の長手方向と平行に敷設された搬送レール上を走
行可能な走行台車と、該走行台車に前記搬送レールと直
角な横方向に移動可能且つ昇降可能に設けられた管材把
持具とを有する管材搬送支持機と、 搬送レール上に配置
される管材搬送支持機及び管材を跨ぐように且つ該管材
に沿って移動自在に配設された溶接補助本体フレーム
に、管材の溶接時に管材内部に嵌挿する溶接補助装置を
搭載してなる管材溶接補助機と、 搬送レール上に配置さ
れる管材搬送支持機及び管材を跨ぐように且つ管材に沿
って移動自在に配設された溶接本体フレームに、管材の
溶接を行う溶接装置を搭載してなる管材溶接機と、 搬送
レール上に配置される管材搬送支持機及び管材を跨ぐよ
うに且つ管材に沿って移動自在に配設された検査本体フ
レームに、管材の検査を行う検査装置を搭載してなる管
材検査機とを備えたことを特徴とする配管据付装置にか
かるものである。SUMMARY OF THE INVENTION The present invention is directed to a traveling vehicle capable of traveling on a transport rail laid in parallel with a longitudinal direction of a pipe to be installed, and moving the transport vehicle in a lateral direction perpendicular to the transport rail. Tube transport supporter having a pipe gripper provided so as to be capable of moving up and down , and disposed on a transport rail
Tubing transport support device and tubing
Welding auxiliary body frame movably arranged along
In addition, a welding auxiliary device that fits inside the pipe when welding
The pipe welding auxiliary machine installed on the
Tubing transfer support machine and tubing
Of the pipe material to the welding body frame
Pipe material welding machine equipped with welding equipment for welding and transport
It straddles the tubing transfer support device and tubing arranged on the rail.
Of the inspection body arranged movably along the pipe
A tube equipped with an inspection device for inspecting the tube material on the frame
The present invention relates to a piping installation device including a material inspection machine .
【0007】又、搬入される管材を一旦受けてから管材
搬送支持機へ受け渡す管材送出機を備えることもでき
る。[0007] Further, it is also possible to provide a tube feeder which once receives the tube to be carried in and then transfers it to the tube transfer supporter.
【0008】更に又、据え付けるべき管材を跨ぐように
且つ該管材に沿って移動自在に配設された溶接補助本体
フレームに、管材の半径と略等しい半径を有する半円管
状の支持部材を、管材と直角な横方向へ移動可能に且つ
昇降可能に設け、該支持部材に、管材の溶接時に管材内
部に嵌挿する溶接補助装置を搭載してなる管材溶接補助
機と、据え付けるべき管材を跨ぐように且つ該管材に沿
って移動自在に配設された溶接本体フレームに、リング
を縦に半割りとしたクランプ式の環状ガイドレールを管
材に対し開閉可能となるよう配設し、該環状ガイドレー
ルに管材溶接用の溶接台車を周回可能に搭載してなる管
材溶接機と、据え付けるべき管材を跨ぐように且つ該管
材に沿って移動自在に配設された検査本体フレームに、
リングを縦に半割りとしたクランプ式の環状ガイドレー
ルを管材に対し開閉可能となるよう配設し、該環状ガイ
ドレールに管材検査用の検査台車を周回可能に搭載して
なる管材検査機とを備えるのが有効である。[0008] Furthermore, the welding auxiliary body frame which is movably disposed along the and tube material so as to straddle the to tubing installing a support member of semicylindrical having a substantially equal radius to the radius of the tube, tubing A pipe material welding auxiliary machine, which is provided so as to be movable in a horizontal direction perpendicular to the pipe and is capable of ascending and descending, and on which a welding auxiliary device is mounted on the support member so as to be inserted into the pipe material during welding of the pipe material, and a pipe material to be installed. A clamp-type annular guide rail having a ring vertically divided so as to be openable and closable with respect to the pipe material, on the welding body frame movably disposed along the pipe material; A pipe welding machine having a welding bogie for pipe material welding rotatably mounted thereon, and an inspection body frame arranged movably along the pipe material so as to straddle the pipe material to be installed,
A pipe material inspection machine in which a clamp-type annular guide rail in which a ring is vertically divided is arranged so as to be openable and closable with respect to the pipe material, and an inspection cart for pipe material inspection is mounted on the annular guide rail so as to be able to rotate. It is effective to provide
【0009】[0009]
【作用】従って、搬入される管材を管材搬送支持機の管
材把持具で受けた状態で、走行台車が搬送レールに沿っ
て据付地点まで走行して行き、該据付地点において、前
記管材を支持している管材把持具が搬送レールと直角な
横方向に移動され且つ昇降され、これにより管材の芯出
しが行われ、据付作業が行われ、この後、更に、管材の
溶接、検査に至るまで一貫して機械的に行えるようにな
る。Accordingly, in a state in which the pipe material to be carried in is received by the pipe material gripping tool of the pipe material transfer support machine, the traveling carriage travels along the transfer rail to the installation point, and the pipe material is supported at the installation point. The tube gripper is moved in a lateral direction perpendicular to the transport rail and moved up and down, thereby centering the tube and performing the installation work .
It is possible to perform mechanically consistently from welding to inspection .
【0010】又、搬入される管材を管材送出機によって
一旦受けてから管材搬送支持機へ受け渡すようにすれ
ば、搬入口が管材搬送支持機の上方に形成されていない
ような場合に有効となる。[0010] Further, if the pipe material to be carried in is once received by the pipe material delivery device and then delivered to the tube material transport support device, it is effective when the carry-in port is not formed above the tube material transport support device. Become.
【0011】更に又、据え付けるべき管材を跨ぐように
且つ該管材に沿って移動自在に配設された溶接補助本体
フレームに、管材の半径と略等しい半径を有する半円管
状の支持部材を、管材と直角な横方向へ移動可能に且つ
昇降可能に設け、該支持部材に、管材の溶接時に管材内
部に嵌挿する溶接補助装置を搭載してなる管材溶接補助
機と、据え付けるべき管材を跨ぐように且つ該管材に沿
って移動自在に配設された溶接本体フレームに、リング
を縦に半割りとしたクランプ式の環状ガイドレールを管
材に対し開閉可能となるよう配設し、該環状ガイドレー
ルに管材溶接用の溶接台車を周回可能に搭載してなる管
材溶接機と、据え付けるべき管材を跨ぐように且つ該管
材に沿って移動自在に配設された検査本体フレームに、
リングを縦に半割りとしたクランプ式の環状ガイドレー
ルを管材に対し開閉可能となるよう配設し、該環状ガイ
ドレールに管材検査用の検査台車を周回可能に搭載して
なる管材検査機とを備えたものの場合には、半円管状の
支持部材から溶接補助装置を円滑に管材内部へ嵌挿し
得、又、管材溶接機による管材の溶接時には、クランプ
式の環状ガイドレールを管材に対し、容易に着脱でき、
溶接作業性が向上され、又、管材検査機による管材の検
査時には、クランプ式の環状ガイドレールを管材に対し
容易に着脱でき、検査作業性も向上される。[0011] Furthermore, the welding auxiliary body frame which is movably disposed along the and tube material so as to straddle the to tubing installing a support member of semicylindrical having a substantially equal radius to the radius of the tube, tubing A pipe material welding auxiliary machine, which is provided so as to be movable in a horizontal direction perpendicular to the pipe and is capable of ascending and descending, and on which a welding auxiliary device is mounted on the support member so as to be inserted into the pipe material during welding of the pipe material, and a pipe material to be installed. A clamp-type annular guide rail having a ring vertically divided so as to be openable and closable with respect to the pipe material, on the welding body frame movably disposed along the pipe material; A pipe welding machine having a welding bogie for pipe material welding rotatably mounted thereon, and an inspection body frame arranged movably along the pipe material so as to straddle the pipe material to be installed,
A pipe material inspection machine in which a clamp-type annular guide rail in which a ring is vertically divided is arranged so as to be openable and closable with respect to the pipe material, and an inspection cart for pipe material inspection is mounted on the annular guide rail so as to be able to rotate. In the case of the one provided with, it is possible to smoothly insert the welding assist device from the semi-circular tubular support member into the pipe material, and when welding the pipe material by the pipe material welding machine, the clamp-type annular guide rail to the pipe material, It can be easily attached and detached,
The welding workability is improved, and the clamp-type annular guide rail can be easily attached to and detached from the pipe material when the pipe material is inspected by the pipe material inspection machine, and the inspection workability is also improved.
【0012】[0012]
【実施例】以下、本発明の実施例を図面を参照しつつ説
明する。Embodiments of the present invention will be described below with reference to the drawings.
【0013】図1〜20は本発明の一実施例であって、
図中、1は地中に形成された共同溝、2は共同溝1の搬
入口であり、共同溝1内の床部3上には、共同溝1の長
手方向に延びる搬送レール4が敷設されている。1 to 20 show an embodiment of the present invention.
In the figure, 1 is a common groove formed underground, 2 is a carry-in entrance of the common groove 1, and a transport rail 4 extending in the longitudinal direction of the common groove 1 is laid on a floor 3 in the common groove 1. Have been.
【0014】前記共同溝1の搬入口2の下部には、図1
〜3に示す如く、搬入される管材5を一旦受けてから後
述する管材搬送支持機7へ受け渡す管材送出機6を配置
すると共に、前記搬送レール4上には、前記管材送出機
6から受け渡された管材5を据付地点へ搬送する管材搬
送支持機7を走行自在に設けてある。尚、図3中、13
8は主梁である。At the lower part of the entrance 2 of the common groove 1, FIG.
As shown in FIGS. 1 to 3, a pipe feeder 6 for receiving a pipe 5 to be carried in and then transferring it to a pipe transfer supporter 7 described later is arranged. A tubing transfer support machine 7 for transferring the transferred tubing 5 to the installation point is provided so as to be freely movable. Incidentally, in FIG.
8 is a main beam.
【0015】前記管材送出機6は、図4及び図5に示す
如く、ブレーキ付キャスタ8を有する基台9上に、管材
5の長手方向に延びる支持台10を昇降用シリンダ11
により駆動されるパンタグラフ式の昇降機構12を介し
て昇降可能に設け、前記支持台10の長手方向両端部上
に、管材5の長手方向と直角な方向に延びる筒状の外側
フレーム13を配設し、該外側フレーム13に内側フレ
ーム14を、管材搬送支持機7側へ伸縮用モータ15に
よるピニオン16の駆動により伸縮可能に嵌挿せしめ、
前記内側フレーム14上に、搬入口2から搬入される管
材5を載置可能な受台車17を、送出用モータ18によ
る駆動スプロケット19とチェーン20の駆動により移
動可能に設けて成る構成を有している。図中、21は内
側フレームの伸縮動作をサポートするガイドローラ、2
2はピニオン16と噛合するラックギア、23はチェー
ン20が掛け回される補助スプロケットである。尚、前
記管材送出機6としては、図4及び図5に示す形式のも
のに限らず、例えば、管材搬送支持機7側へ向け下り勾
配を有する傾斜フレームを備え、搬入される管材5を一
旦傾斜フレーム上に受けてから該傾斜フレーム上をころ
がし、管材搬送支持機7へ受け渡す形式のものを採用し
てもよい。As shown in FIG. 4 and FIG. 5, the tube feeder 6 includes a support 9 extending in the longitudinal direction of the tube 5 on a base 9 having casters 8 with brakes.
Is provided so as to be able to ascend and descend via a pantograph-type elevating mechanism 12 driven by the above, and a tubular outer frame 13 extending in a direction perpendicular to the longitudinal direction of the tube material 5 is provided on both longitudinal ends of the support base 10. Then, the inner frame 14 is fitted into the outer frame 13 in such a manner that the inner frame 14 can be extended and contracted by driving the pinion 16 by the telescopic motor 15 on the tube material transporting support machine 7 side,
On the inner frame 14, there is provided a receiving carriage 17 on which the tube material 5 loaded from the loading port 2 can be mounted so as to be movable by driving the drive sprocket 19 and the chain 20 by the delivery motor 18. ing. In the figure, 21 is a guide roller for supporting the expansion and contraction of the inner frame, 2
2 is a rack gear meshing with the pinion 16, and 23 is an auxiliary sprocket around which the chain 20 is wound. Note that the pipe material feeder 6 is not limited to the type shown in FIGS. 4 and 5, and includes, for example, an inclined frame having a downward slope toward the pipe material transfer support device 7 so that the pipe material 5 to be carried in is temporarily stopped. After receiving on the inclined frame, the roller may be rolled on the inclined frame and transferred to the tube transporting and supporting machine 7.
【0016】前記管材搬送支持機7は、図6〜8に示す
如く、搬送レール4上を走行用モータ24によるベルト
25の駆動により走行可能な走行台車26に、搬送レー
ル4と直角な方向に延びる横移動用ガイドレール27を
取り付け、該横移動用ガイドレール27にスライドブロ
ック28を横移動用モータ29によるボールネジ30の
駆動により摺動可能に設け、該スライドブロック28上
に、管材5を抱え込む形で把持する管材把持具31を昇
降用ジャッキ32の駆動により昇降ガイド33に沿って
昇降可能に設けてなる構成を有している。前記管材把持
具31は、固定アーム34と、該固定アーム34に開閉
用シリンダ35の駆動によりピン36を支点として開閉
可能に枢着された開閉アーム37とを備え、前記固定ア
ーム34の上端部と前記開閉アーム37の先端部には夫
々、ローラ38,39を回転自在に取り付けると共に、
前記固定アーム34の中間部には、回転用モータ40に
よるベルト41の駆動により回転可能なローラ42を取
り付け、前記開閉アーム37を閉じた状態で管材5を前
記ローラ38,39,42により三点支持し得、且つこ
の状態で前記ローラ42を回転駆動することにより、管
材5を回転し得るようにしてある。As shown in FIGS. 6 to 8, the tube material transporting support machine 7 is mounted on a traveling vehicle 26 which can travel on the transport rail 4 by driving a belt 25 by a traveling motor 24 in a direction perpendicular to the transport rail 4. An extended lateral movement guide rail 27 is attached, and a slide block 28 is slidably provided on the lateral movement guide rail 27 by driving a ball screw 30 by a lateral movement motor 29, and the tube 5 is held on the slide block 28. It has a configuration in which a tube material gripping tool 31 to be gripped in a form is provided so as to be able to move up and down along a lifting guide 33 by driving a lifting jack 32. The tube gripper 31 includes a fixed arm 34 and an opening / closing arm 37 pivotally connected to the fixed arm 34 so as to be opened and closed about a pin 36 by driving an opening / closing cylinder 35. And rollers 38 and 39 are rotatably attached to the tip of the opening / closing arm 37, respectively.
A roller 42 that is rotatable by driving a belt 41 by a rotation motor 40 is attached to an intermediate portion of the fixed arm 34, and the tube 5 is three-pointed by the rollers 38, 39, 42 with the opening and closing arm 37 closed. The tube 5 can be rotated by driving the roller 42 in this state.
【0017】尚、本実施例の場合、管材搬送支持機7は
管材5の長手方向に所要間隔をあけて二個配置されてい
るが、据付地点へ向けての進行方向後側に位置する管材
搬送支持機7には、走行用モータ24等の駆動装置は設
けていない。又、図中、43は管材搬送支持機7を共同
溝1内に搬入して搬送レール4上に設置したり、或いは
撤去する際に用いる吊フック、136は走行用モータ2
4付の管材搬送支持機7からもう一方の管材搬送支持機
7側へ延びる連結アーム、137は連結アーム136を
把持解放可能な自動連結装置である。In this embodiment, the two pipe transporters 7 are arranged at a required interval in the longitudinal direction of the pipe 5, but the pipe transport supporters 7 are located at the rear in the traveling direction toward the installation point. The transport support device 7 is not provided with a drive device such as the traveling motor 24. In the drawing, reference numeral 43 denotes a hanging hook used when the tube material transfer support device 7 is loaded into the common groove 1 and set on or removed from the transfer rail 4, and 136 is a traveling motor 2.
A connecting arm 137 extending from the tube transfer supporter 7 with the attachment 4 to the other tube transfer supporter 7 is an automatic connection device capable of gripping and releasing the connection arm 136.
【0018】又、前記二個の管材搬送支持機7の間の搬
送レール4上には、前記管材送出機6の内側フレーム1
4先端部を仮受けするフレーム支持治具44を配置して
あり、該フレーム支持治具44は、図6及び図9に示す
如く、搬送レール4上を走行自在な台車45上に、前記
内側フレーム14を支持するローラ46を配置して構成
してある。尚、図中、47はフレーム支持治具44を共
同溝1内に搬入して搬送レール4上に設置したり、或い
は撤去する際に用いる吊フックである。On the transport rail 4 between the two pipe transporters 7, the inner frame 1 of the pipe feeder 6 is mounted.
4, a frame support jig 44 for temporarily receiving the front end portion is arranged. The frame support jig 44 is mounted on a carriage 45 that can travel on the transport rail 4 as shown in FIGS. A roller 46 for supporting the frame 14 is arranged and configured. In the drawing, reference numeral 47 denotes a hanging hook used when the frame support jig 44 is carried into the common groove 1 and is set on the transport rail 4 or is removed.
【0019】一方、図10〜12は、前記管材搬送支持
機7によって管材5が搬送される据付地点を表わすもの
であり、該据付地点には、配管サポート48と配管支持
機49によって支えられ既に据付を完了している管材
5’が設置されていると共に、新たに据え付ける管材5
の加工を行うための管材加工機50と、管材5,5’の
溶接時に管材5,5’内部に嵌挿するための管材溶接補
助機51と、管材5,5’の溶接を行うための管材溶接
機52と、管材5,5’の検査を行うための管材検査機
53とを夫々、管材5,5’に沿って移動自在に配備し
てある。尚、前記配管支持機49は、前記管材搬送支持
機7と略同様な構造を有している。On the other hand, FIGS. 10 to 12 show installation points at which the pipe 5 is transported by the pipe transporting and supporting machine 7, and the installation points are already supported by a pipe support 48 and a pipe supporting machine 49. The newly installed tubing 5 'has been installed, and the newly installed tubing 5' has been installed.
, A pipe material welding auxiliary machine 51 for inserting into the pipe materials 5, 5 'when welding the pipe materials 5, 5', and a pipe material welding machine 51 for performing welding of the pipe materials 5, 5 '. A pipe welding machine 52 and a pipe inspection machine 53 for inspecting the pipes 5 and 5 'are provided movably along the pipes 5 and 5', respectively. The pipe support 49 has substantially the same structure as that of the pipe transfer support 7.
【0020】前記管材加工機50は、図13及び図14
に示す如く、搬送レール4上に配置される管材搬送支持
機7及び管材5,5’を跨ぐように且つ管材5,5’に
沿って床部3上を移動自在に配設された加工本体フレー
ム54に、管材5端部切断用のガス切断機55と、該ガ
ス切断機55によって切断した管材5端面の仕上用の研
削機56とからなる加工機器57を搭載してなる構成を
有している。FIG. 13 and FIG.
As shown in the figure, a processing body disposed movably on the floor 3 so as to straddle the tube material transfer support device 7 and the tube materials 5 and 5 'arranged on the transfer rail 4 and along the tube materials 5 and 5'. The frame 54 has a configuration in which a processing device 57 including a gas cutter 55 for cutting the end of the tube 5 and a grinder 56 for finishing the end of the tube 5 cut by the gas cutter 55 is mounted. ing.
【0021】前記ガス切断機55は、加工本体フレーム
54上に管材5と直角な方向に延びるよう取り付けられ
た横送用レール58に、横送台59を横送用シリンダ6
0の駆動により移動可能に設け、該横送台59上に昇降
台61を昇降用シリンダ62の駆動により昇降可能に設
け、該昇降台61に傾斜台63を傾動用シリンダ64の
駆動によりピン65を支点として傾動可能に設け、該傾
斜台63に、所望のガスを充填したガスボンベ66,6
7に接続されたガスバーナトーチ68を取り付けて構成
してある。又、前記研削機56は、加工本体フレーム5
4に固定されたブラケット69上に管材5と直角な方向
に延びる横送用レール70を取り付け、該横送用レール
70に、横送台71を横送用モータ72の駆動により移
動可能に設け、該横送台71上にフリーベアリング73
を介して旋回台74を旋回自在に設け、該旋回台74上
に管材5と平行な方向に延びるよう取り付けられた寸動
用ガイドレール75に、寸動台76を寸動用モータ77
の駆動により移動可能に設け、該寸動台76上に、駆動
モータ78によって回転駆動される砥石79を有するグ
ラインダ80を設置して構成してある。The gas cutting machine 55 is provided with a traverse table 59 and a traverse cylinder 6 on a traverse rail 58 mounted on the processing body frame 54 so as to extend in a direction perpendicular to the tube 5.
0 is provided so as to be movable by driving of a vertical movement table 59, and a lifting table 61 is provided on the traversing table 59 so as to be liftable by driving a lifting cylinder 62, and a tilt table 63 is mounted on the lifting table 61 by driving a tilting cylinder 64. Are provided so as to be tiltable with the fulcrum as a fulcrum.
A gas burner torch 68 connected to 7 is attached. Further, the grinding machine 56 is provided with the processing body frame 5.
A traverse rail 70 extending in a direction perpendicular to the tube 5 is mounted on a bracket 69 fixed to the bracket 4, and a traverse table 71 is provided on the traverse rail 70 so as to be movable by driving a traverse motor 72. , A free bearing 73 on the traversing table 71
A swing table 74 is provided so as to be freely rotatable through the guide, and a jog table 76 is mounted on a jogging guide rail 75 mounted on the swivel table 74 so as to extend in a direction parallel to the pipe member 5.
And a grinder 80 having a grindstone 79 rotated and driven by a drive motor 78 is provided on the inching table 76.
【0022】尚、図中、81は管材加工機50を共同溝
1内に搬入したり、或いは撤去する際に用いる吊フック
である。In the drawing, reference numeral 81 denotes a hanging hook used when the pipe processing machine 50 is carried into or removed from the common groove 1.
【0023】前記管材溶接補助機51は、図15及び図
16に示す如く、搬送レール4上に配置される管材搬送
支持機7及び管材5,5’を跨ぐように且つ管材5,
5’に沿って床部3上を移動自在に配設された溶接補助
本体フレーム82に、昇降基台83を昇降用モータ84
によるワイヤドラム85に巻掛けたワイヤ86の巻上
げ、巻下げにより上下方向に延びるガイド部材87に沿
って昇降可能に設け、該昇降基台83に横送台88を横
送用モータ89の駆動により管材5と直角な方向へ移動
可能に設け、該横送台88に、管材5の半径と略等しい
半径を有する半円管状の支持部材90を、昇降用モータ
91によるスクリュジャッキ92の駆動により昇降ガイ
ド93に沿って昇降可能に設け、該支持部材90に、管
材5,5’の溶接時に管材5,5’内部に嵌挿する溶接
補助装置94を搭載してなる構成を有している。As shown in FIG. 15 and FIG. 16, the pipe welding auxiliary machine 51 is arranged so as to straddle the pipe transport supporter 7 and the pipes 5, 5 'arranged on the transport rail 4 and to extend over the pipes 5, 5'.
An elevating base 83 is attached to an elevating base 83 on a welding auxiliary body frame 82 movably disposed on the floor 3 along 5 ′.
The wire 86 wound around the wire drum 85 is lifted up and down along a guide member 87 extending in the vertical direction by the lowering and lowering. A semicircular support member 90 having a radius substantially equal to the radius of the tube member 5 is moved up and down on the traversing table 88 by driving a screw jack 92 by an elevating motor 91. It has a configuration in which it is provided so as to be able to move up and down along a guide 93, and a welding auxiliary device 94 that is inserted into the pipe members 5, 5 'when the pipe members 5, 5' is welded is mounted on the support member 90.
【0024】前記溶接補助装置94は、前記支持部材9
0上から管材5内部を自走可能な油圧ユニット95と、
該油圧ユニット95により半径方向に拡縮される裏波用
裏当治具96とからなり、管材5,5’の継目部分にお
いて裏波用裏当治具96を半径方向に拡張させることに
より、管材5,5’の継目部分の断面形状を真円化せし
めると共に、管材溶接機52による溶接時に、裏波ビー
ドの溶接不良や溶融金属が溶け落ちるのを防ぐようにし
てある。The welding assist device 94 includes the support member 9.
A hydraulic unit 95 capable of self-propelling inside the tube 5 from above,
A back-side backing jig 96 radially expanded and contracted by the hydraulic unit 95, and the back-side backing jig 96 is radially expanded at a joint portion of the pipe members 5 and 5 ', whereby the tube material is expanded. The cross-sectional shape of the joint portion of 5 and 5 'is made to be a perfect circle, and at the time of welding by the pipe material welding machine 52, poor welding of the Uranami bead and melting of the molten metal are prevented.
【0025】尚、図中、97は昇降基台83を下降させ
て搬送レール4上に載置する際のレール受治具、98は
管材溶接補助機51を共同溝1内に搬入したり、或いは
撤去する際に用いる吊フックである。In the drawing, reference numeral 97 denotes a rail receiving jig for lowering the elevating base 83 and mounting it on the transport rail 4; 98, a pipe material welding auxiliary machine 51 which is carried into the common groove 1; Or it is a hanging hook used when removing.
【0026】前記管材溶接機52は、図17及び図18
に示す如く、搬送レール4上に配置される管材搬送支持
機7及び管材5,5’を跨ぐように且つ管材5,5’に
沿って移動自在に配設された溶接本体フレーム99に、
管材5,5’の溶接を行う溶接装置100を搭載してな
る構成を有している。The pipe welding machine 52 is shown in FIGS.
As shown in the figure, a welding main body frame 99 movably arranged along the pipe members 5, 5 'so as to straddle the tube material transporting support machine 7 and the tube members 5, 5' arranged on the transfer rail 4,
It has a configuration in which a welding device 100 for welding the pipe members 5, 5 'is mounted.
【0027】前記溶接装置100は、前記溶接本体フレ
ーム99に昇降用ジャッキ101の駆動により昇降可能
に取り付けられた昇降台102に対し、横送台103を
横送用モータ104の駆動により管材5,5’と直角と
なる横方向に移動可能となるよう設け、該横送台103
に、リングを縦に半割りとしたクランプ式の環状ガイド
レール105を、開閉用タンデムシリンダ106の駆動
によりピン107を支点として開閉可能に取り付け、該
環状ガイドレール105に、溶接台車108を周回用モ
ータ109による走行ローラ110の駆動により周回可
能に搭載し、該溶接台車108に、溶接トーチ111を
ピン112を支点に角度調整自在に且つ管材5,5’の
継目に対して高さ調整自在に取り付けて構成してある。The welding apparatus 100 is adapted to drive a horizontal feed table 103 by driving a horizontal feeding motor 104 to a pipe member 5 with respect to a lifting table 102 which is mounted on the welding main body frame 99 so as to be able to move up and down by driving a lifting jack 101. 5 'is provided so as to be movable in the horizontal direction at right angles to 5'.
In addition, a clamp-type annular guide rail 105 in which a ring is vertically divided into half is mounted so as to be openable and closable by driving a tandem cylinder 106 for opening and closing with a pin 107 as a fulcrum. The traveling roller 110 is driven by a motor 109 so as to be rotatable. A welding torch 111 is mounted on the welding carriage 108 with a pin 112 as a fulcrum so that the angle can be freely adjusted and the height of the welding torch 111 can be freely adjusted with respect to the joint of the pipe members 5 and 5 ′. It is attached and configured.
【0028】尚、図中、113は環状ガイドレール10
5を閉じた状態で連結固定するストッパ、114は溶接
用のワイヤを巻き取ってあるワイヤリール、115はワ
イヤ送給装置、116は溶接電源、117は溶接用制御
盤、118は管材溶接機52を共同溝1内に搬入した
り、或いは撤去する際に用いる吊フックである。In the figure, reference numeral 113 denotes an annular guide rail 10.
A stopper for connecting and fixing 5 in a closed state, 114 is a wire reel on which a welding wire is wound, 115 is a wire feeder, 116 is a welding power supply, 117 is a welding control panel, and 118 is a pipe welding machine 52 Is a hanging hook used when carrying in or removing from the common groove 1.
【0029】前記管材検査機53は、図19及び図20
に示す如く、搬送レール4上に配置される管材搬送支持
機7及び管材5,5’を跨ぐように且つ管材5,5’に
沿って移動自在に配設された検査本体フレーム119
に、管材5,5’の検査を行う検査装置120を搭載し
てなる構成を有している。FIG. 19 and FIG.
As shown in the figure, an inspection main body frame 119 movably disposed along the tube members 5, 5 'so as to straddle the tube member transfer support device 7 and the tube members 5, 5' arranged on the transfer rail 4.
And an inspection device 120 for inspecting the pipe members 5 and 5 '.
【0030】前記検査装置120は、前記検査本体フレ
ーム119に昇降用ジャッキ121の駆動により昇降可
能に取り付けられた昇降台122に対し、横送台123
を横送用モータ124の駆動により管材5,5’と直角
となる横方向に移動可能となるよう設け、該横送台12
3に、リングを縦に半割りとしたクランプ式の環状ガイ
ドレール125を、開閉用タンデムシリンダ126の駆
動によりピン127を支点として開閉可能に取り付け、
該環状ガイドレール125に、検査台車128を周回用
モータ129による走行ローラ130の駆動により周回
可能に搭載し、該検査台車128にX線発生装置131
を取り付けて構成してある。又、前記検査装置120の
制御器132については、X線による人体への影響を考
慮し、X線発生装置131から所定の距離だけ離れた位
置で操作を行えるように、前記検査本体フレーム119
とは別の補助フレーム133上に搭載してある。The inspection device 120 is provided with a traverse table 123 which is mounted on the inspection main body frame 119 so as to be able to move up and down by driving a lifting jack 121.
Is provided so as to be movable in the horizontal direction perpendicular to the pipe members 5 and 5 ′ by driving the traverse motor 124.
3, a clamp-type annular guide rail 125 in which a ring is vertically divided into half is mounted so as to be openable and closable around a pin 127 by driving a tandem cylinder 126 for opening and closing.
An inspection carriage 128 is mounted on the annular guide rail 125 so as to be able to rotate by driving a traveling roller 130 by a rotation motor 129, and an X-ray generator 131 is mounted on the inspection carriage 128.
Is attached. Further, the controller 132 of the inspection apparatus 120 is designed so that the inspection body frame 119 can be operated at a predetermined distance from the X-ray generator 131 in consideration of the influence of the X-ray on the human body.
It is mounted on a separate auxiliary frame 133.
【0031】尚、図中、134は環状ガイドレール12
5を閉じた状態で連結固定するストッパ、135は管材
検査機53を共同溝1内に搬入したり、或いは撤去する
際に用いる吊フックである。In the figure, reference numeral 134 denotes an annular guide rail 12.
A stopper 135 for connecting and fixing the pipe member 5 in a closed state is a hanging hook used when the tube material inspection machine 53 is carried into or removed from the common groove 1.
【0032】次に、上記実施例の作動を説明する。Next, the operation of the above embodiment will be described.
【0033】先ず、共同溝1の搬入口2から管材5をク
レーン等で吊り降ろして管材送出機6の受台車17上に
載置すると、管材送出機6の内側フレーム14が伸縮用
モータ15によるピニオン16の駆動により図5に示す
如く伸張し、該内側フレーム14先端部が図6及び図9
に示すフレーム支持治具44上に掛け渡されると共に、
前記管材5を載置した受台車17が送出用モータ18に
よる駆動スプロケット19とチェーン20の駆動により
図5に示す如く内側フレーム14先端側へ送り出され
る。First, when the pipe 5 is suspended from the entrance 2 of the common groove 1 by a crane or the like and placed on the receiving carriage 17 of the pipe feeder 6, the inner frame 14 of the pipe feeder 6 is driven by the telescopic motor 15. When the pinion 16 is driven, the inner frame 14 is extended as shown in FIG.
And is hung over a frame support jig 44 shown in FIG.
The receiving truck 17 on which the tube material 5 is placed is sent out to the front end side of the inner frame 14 by driving the drive sprocket 19 and the chain 20 by the sending motor 18 as shown in FIG.
【0034】前記受台車17が内側フレーム14先端側
へ送り出され、図7に仮想線で示す如く開かれた状態に
ある管材搬送支持機7の管材把持具31の開閉アーム3
7上に管材5が位置すると、該開閉アーム37が開閉用
シリンダ35の収縮動作によりピン36を中心に回動
し、管材5を抱え込む形で固定アーム34側へ移動さ
せ、これにより前記管材5がローラ38,39,42に
より三点支持された状態となる。The opening / closing arm 3 of the tube holder 31 of the tube conveying and supporting machine 7 is opened as shown by the phantom line in FIG.
When the tube 5 is positioned on the pipe 7, the opening / closing arm 37 is rotated about the pin 36 by the contraction operation of the opening / closing cylinder 35, and is moved toward the fixed arm 34 while holding the tube 5. Are supported at three points by the rollers 38, 39 and 42.
【0035】前記管材5が管材搬送支持機7上に載置さ
れると、前記管材送出機6の内側フレーム14が収縮す
ると共に、受台車17が搬入口2の下側の元の位置に復
帰し、この後、前記管材5を載置した管材搬送支持機7
が搬送レール4に沿って据付地点へ走行して行く。When the tube 5 is placed on the tube transporting and supporting machine 7, the inner frame 14 of the tube delivering device 6 contracts and the receiving truck 17 returns to its original position below the entrance 2. After that, the tube material transfer support device 7 on which the tube material 5 is placed
Travels along the transport rail 4 to the installation point.
【0036】ここで、前記管材送出機6の反管材搬送支
持機7側にカウンタウェイト等を設けたりして管材5の
送り出し時に前記管材送出機6の転倒が防止でき、且つ
フレーム先端にパイプを載せた時に荷重に耐えることが
できる場合には、前記管材送出機6の内側フレーム14
先端部を支持するフレーム支持治具44は必ずしも設け
る必要はなく、又、前記共同溝1の搬入口2が管材搬送
支持機7の上側に設けられているような場合には、前記
管材送出機6は必ずしも設ける必要がないことは言うま
でもない。Here, a counterweight or the like may be provided on the side of the tube material feeder 6 opposite to the tube material transfer support device 7 so that the tube material feeder 6 can be prevented from tipping over when the tube material 5 is sent out, and a pipe is provided at the end of the frame. If it can withstand the load when placed, the inner frame 14 of the tube feeder 6
It is not always necessary to provide the frame support jig 44 for supporting the distal end portion. In the case where the carry-in port 2 of the common groove 1 is provided above the tube material transfer support device 7, the tube material delivery device Needless to say, 6 need not always be provided.
【0037】前記管材5を載置した管材搬送支持機7が
据付地点に到達すると、先ず、図8に示すスライドブロ
ック28を横移動用モータ29によるボールネジ30の
駆動により横方向へ移動させると共に、管材把持具31
を昇降用ジャッキ32の駆動により昇降ガイド33に沿
って昇降させ、既に据付済みの管材5’に対し管材5の
芯出しが行われる。When the tube material transfer supporter 7 on which the tube member 5 is mounted reaches the installation point, first, the slide block 28 shown in FIG. 8 is moved in the lateral direction by driving the ball screw 30 by the motor 29 for lateral movement. Pipe gripper 31
Is moved up and down along the elevating guide 33 by driving the elevating jack 32, and the centering of the tube member 5 ′ is performed on the already installed tube member 5 ′.
【0038】前記管材5の芯出しが完了すると、前記据
付済みの管材5’の後端部に対する管材5の先端部の現
場合せが行われ、管材5の加工が必要な場合には、図1
3及び図14に示す如く、管材5の先端部に管材加工機
50が配置され、該管材加工機50のガス切断機55の
管材5に対する高さ方向、横方向等の位置調整が行われ
た後、ガスバーナトーチ68から火炎を放射した状態
で、前記管材搬送支持機7の回転用モータ40によるロ
ーラ42の駆動により管材5が回転され、該管材5の先
端部が切断され、更に、前記ガスバーナトーチ68をピ
ン65を中心に所望の角度に傾斜させた状態で、切断時
と同様に管材5を回転させることにより、管材5の開先
加工が行われる。尚、管材5の開先加工については、ガ
スバーナトーチ68の他にもう一つガスバーナトーチを
設けることによって管材5の切断と同時に行うことも可
能である。When the centering of the tube 5 is completed, the front end of the tube 5 is aligned with the rear end of the installed tube 5 ′.
As shown in FIG. 3 and FIG. 14, a pipe material processing machine 50 is disposed at the tip end of the pipe material 5, and the position adjustment of the gas cutting machine 55 of the pipe material processing machine 50 with respect to the pipe material 5 in the height direction, the lateral direction, and the like is performed. Thereafter, in a state where the flame is radiated from the gas burner torch 68, the pipe member 5 is rotated by driving the roller 42 by the rotation motor 40 of the tube material transporting support machine 7, and the tip of the tube member 5 is cut off. With the torch 68 being tilted at a desired angle about the pin 65, the pipe 5 is rotated by rotating the pipe 5 in the same manner as when cutting, so that the groove of the pipe 5 is processed. The groove processing of the tube 5 can be performed simultaneously with the cutting of the tube 5 by providing another gas burner torch in addition to the gas burner torch 68.
【0039】前記管材5の切断、開先加工が完了する
と、研削機56の砥石79が管材5の切断面に所望の面
圧で押し付けられつつ駆動モータ78により回転駆動さ
れた状態で、前記管材搬送支持機7の回転用モータ40
によるローラ42の駆動により管材5が回転され、管材
5の切断面の仕上が行われ、更に前記砥石79を管材5
の開先面に所望の面圧で押し付けつつ前記管材5を回転
させることにより、管材5の開先面の仕上が行われる。When the cutting and beveling of the tube material 5 are completed, the grindstone 79 of the grinder 56 is rotated by a driving motor 78 while being pressed against the cut surface of the tube material 5 at a desired surface pressure. Rotation motor 40 of transport support machine 7
The rotation of the roller 42 causes the pipe member 5 to rotate, so that the cut surface of the pipe member 5 is finished.
The groove of the tube 5 is finished by rotating the tube 5 while pressing the groove with a desired surface pressure.
【0040】尚、据付済みの管材5’の後端部に対し、
管材5の先端部をそのまま接合できるような場合には、
前記管材加工機50は必ずしも使用する必要がないこと
は言うまでもない。In addition, with respect to the rear end of the installed pipe member 5 ',
If the tip of the tube 5 can be joined as it is,
It goes without saying that the tube processing machine 50 does not necessarily need to be used.
【0041】前記加工が必要とされた管材5に対する加
工が完了したら、管材加工機50を図10に示す如く管
材5’の先端側へ移動させると共に、管材搬送支持機7
を搬送レール4に沿って管材5’側へ移動させ、該管材
5’の後端面と管材5の先端面とが溶接に際して適切な
ルート間隔となるよう、位置決めセンサによるマークの
検知等により管材5の位置調整を行い、更に管材溶接補
助機51を図10と図15及び図16に示す如く管材5
の後端部に移動させる。When the processing of the pipe material 5 requiring the above processing is completed, the pipe material processing machine 50 is moved to the distal end side of the pipe material 5 'as shown in FIG.
Is moved along the transport rail 4 toward the pipe member 5 ′, and the position of the pipe member 5 ′ is detected by a positioning sensor or the like so that the rear end surface of the tube member 5 ′ and the front end surface of the tube member 5 have an appropriate route interval during welding. , And the pipe welding auxiliary machine 51 is connected to the pipe 5 as shown in FIGS.
To the rear end.
【0042】前記管材溶接補助機51を管材5の後端部
に移動させた状態で、昇降基台83を昇降用モータ84
によるワイヤドラム85に巻掛けたワイヤ86の巻下げ
によりガイド部材87に沿って下降させると、昇降基台
83がレール受治具97を介して搬送レール4上に載置
され、この状態で横送台88が横送用モータ89の駆動
により管材5と直角な横方向へ移動されると共に、支持
部材90が昇降用モータ91によるスクリュジャッキ9
2の駆動により昇降ガイド93に沿って昇降され、前記
支持部材90の先端面が管材5の後端面に接続されるよ
うに位置調整がなされる。With the pipe material welding auxiliary machine 51 moved to the rear end of the pipe material 5, the lifting base 83 is moved up and down by a motor 84.
When the wire 86 wound around the wire drum 85 is lowered along the guide member 87, the elevating base 83 is mounted on the transport rail 4 via the rail receiving jig 97, and in this state, The feeder 88 is moved in a lateral direction perpendicular to the tube 5 by the driving of the traverse motor 89, and the support member 90 is moved by the lifting motor 91 to the screw jack 9.
The support member 90 is moved up and down along the elevating guide 93 by the drive of 2, and the position is adjusted so that the front end surface of the support member 90 is connected to the rear end surface of the tube 5.
【0043】前記支持部材90の位置調整によりその先
端面が管材5の後端面に接続される形となると、溶接補
助装置94が支持部材90から管材5内部を自走して行
き、裏波用裏当治具96が管材5,5’の継目部分に到
達したことがセンサ等により検知されると、溶接補助装
置94が停止すると共に、油圧ユニット95から送給さ
れる油圧により前記裏波用裏当治具96が半径方向に拡
張され、管材5,5’の継目部分が真円となるよう矯正
される。When the position of the support member 90 is adjusted so that the front end surface thereof is connected to the rear end surface of the tube member 5, the welding assist device 94 self-propelled from the support member 90 inside the tube member 5, and When it is detected by a sensor or the like that the backing jig 96 has reached the seam portion of the pipe members 5 and 5 ′, the welding assist device 94 is stopped and the hydraulic pressure supplied from the hydraulic unit 95 is used to stop the welding. The backing jig 96 is expanded in the radial direction, and the joints of the pipe members 5, 5 'are corrected so as to be a perfect circle.
【0044】前記裏波用裏当治具96が管材5,5’の
継目部分内部に嵌挿されると、図18に仮想線で示す如
く環状ガイドレール105を開いた状態に保持してある
管材溶接機52が、図10と図17及び図18に示す如
く、管材5,5’の継目部分に移動され、昇降用ジャッ
キ101の駆動により昇降台102が昇降されると共
に、横送台103が横送用モータ104の駆動により管
材5,5’と直角となる横方向に移動されて、管材5,
5’の継目部分に対する溶接トーチ111の位置調整が
行われ、この後、開閉用タンデムシリンダ106を伸張
させると、前記環状ガイドレール105が図18に示す
如く管材5’をクランプするように閉じ、ストッパ11
3によって固定される。When the back contact jig 96 is inserted into the joint of the tube members 5 and 5 ', the tube member 105 holds the annular guide rail 105 open as shown by the phantom line in FIG. The welding machine 52 is moved to the joint portion of the pipe members 5 and 5 'as shown in FIGS. 10, 17 and 18, and the lifting table 102 is moved up and down by driving the lifting jack 101. By driving the traverse motor 104, the tubing 5, 5 'is moved in a lateral direction perpendicular to the tubing 5, 5'.
When the position of the welding torch 111 is adjusted with respect to the joint portion 5 ', and then the tandem cylinder 106 for opening and closing is extended, the annular guide rail 105 closes so as to clamp the pipe 5' as shown in FIG. Stopper 11
3 fixed.
【0045】前記環状ガイドレール105がセットされ
ると、溶接トーチ111の先行角度調整、上下位置調整
等が行われつつ、溶接台車108が周回用モータ109
による走行ローラ110の駆動により環状ガイドレール
105に沿って管材5,5’の外周を周回し、管材5,
5’の継目部分における初層の溶接が行われる。When the annular guide rail 105 is set, the welding carriage 108 is rotated by the circling motor 109 while the leading angle of the welding torch 111 is adjusted and the vertical position is adjusted.
Is driven around the outer circumference of the pipes 5 and 5 ′ along the annular guide rail 105 by the driving of the running rollers 110,
The first layer is welded at the 5 'seam.
【0046】前記管材5,5’の継目部分における初層
の溶接が完了すると、前記裏波用裏当治具96が半径方
向に収縮して溶接補助装置94が管材溶接補助機51の
支持部材90上に戻る一方、前記環状ガイドレール10
5が一旦開かれた後、図10に示される管材5先端側の
管材搬送支持機7の管材把持具31並びに管材5’後端
側の配管支持機49の管材把持具による管材5,5’の
支持状態が解除され、該管材搬送支持機7並びに配管支
持機49が管材5の後端側へ移動し、該配管支持機49
によって管材5の後端部が支持されると共に、管材5の
後端部側を支持していた管材搬送支持機7の管材把持具
31による管材5の支持状態が解除され、該管材搬送支
持機7の自動連結装置137に対し走行用モータ24付
の管材搬送支持機7の連結アーム136が接続され、両
者の間にフレーム支持治具44が収まった状態で、駆動
装置のない管材搬送支持機7とフレーム支持治具44と
が前記管材5の先端側を支持していた走行用モータ24
付の管材搬送支持機7と一緒に前記搬入口2側へ復帰
し、次に搬入されてくる新しい管材5のために待機す
る。When the welding of the first layer at the joint portion of the pipe members 5 and 5 'is completed, the backing backing jig 96 for contraction in the radial direction contracts in the radial direction, and the welding auxiliary device 94 causes the support member of the pipe material welding auxiliary machine 51 to be supported. 90, the annular guide rail 10
After the tube 5 is once opened, the pipe members 5 and 5 'are shown in FIG. 10 by the tube gripper 31 of the tube transporter 7 on the front end side of the tube 5 and the tube holder 5 of the pipe supporter 49 on the rear end side of the tube 5'. Is released, and the pipe material transport support device 7 and the pipe support device 49 move to the rear end side of the pipe material 5, and the pipe support device 49
The support of the tube 5 by the tube gripper 31 of the tube transport support machine 7 that supported the rear end of the tube 5 is released while supporting the rear end of the tube 5 by the tube transport. 7 is connected to the connecting arm 136 of the tube transporting and supporting machine 7 with the motor 24 for traveling, and the frame transporting jig 44 is fitted between the two. 7 and the frame support jig 44 support the distal end side of the tube material 5
It returns to the carry-in port 2 side together with the attached tube material transfer support machine 7, and waits for a new tube material 5 to be carried in next.
【0047】前記配管支持機49が管材溶接機52をく
ぐるように管材5の後端側へ移動した後、管材溶接機5
2の前記環状ガイドレール105が再び閉じ、前述の初
層の溶接と同様に二層目以降の溶接が行われる。After the pipe supporter 49 moves to the rear end side of the pipe 5 so as to pass through the pipe welder 52, the pipe welder 5
The second annular guide rail 105 is closed again, and the welding of the second and subsequent layers is performed in the same manner as the welding of the first layer.
【0048】前記管材溶接機52による管材5,5’の
溶接が完了すると、環状ガイドレール105を開いた状
態で管材溶接機52が管材5の後端側へ移動され、前述
と同様の作業により何本かの管材5が継ぎ足されて行
き、この後、管材検査機53が環状ガイドレール125
を開いた状態で図10に示す如く管材5’側から図19
及び図20に示す如く管材5,5’の継目部分へ移動さ
れる。When the welding of the pipes 5, 5 'by the pipe welding machine 52 is completed, the pipe welding machine 52 is moved to the rear end side of the pipe 5 with the annular guide rail 105 opened, and the same operation as described above is performed. Several pipes 5 are added, and thereafter, the pipe inspection machine 53 is connected to the annular guide rail 125.
In the opened state, as shown in FIG.
And as shown in FIG. 20, it is moved to the joint part of the pipe members 5, 5 '.
【0049】前記管材検査機53が管材5,5’の継目
部分へ移動されると、検査対象部にフィルムを載せたマ
グネットチェック(図示せず)が取り付けられ、又、昇
降用ジャッキ121の駆動により昇降台122が昇降さ
れると共に、横送台123が横送用モータ124の駆動
により管材5,5’と直角となる横方向に移動されて、
管材5,5’の継目部分に対するX線発生装置131の
位置調整が行われ、この後、開閉用タンデムシリンダ1
26を伸張させると、前記環状ガイドレール125が図
20に示す如く管材5’をクランプするように閉じ、ス
トッパ134によって固定される。When the pipe inspection machine 53 is moved to the joint of the pipes 5 and 5 ', a magnet check (not shown) on which a film is mounted is attached to the inspection target portion, and the lifting jack 121 is driven. The elevating table 122 is moved up and down, and the traversing table 123 is moved by driving the traversing motor 124 in the horizontal direction perpendicular to the pipes 5 and 5 ′.
The position of the X-ray generator 131 is adjusted with respect to the joint portion of the pipe members 5, 5 ', and thereafter, the tandem cylinder 1 for opening and closing is opened.
When the tube 26 is extended, the annular guide rail 125 is closed so as to clamp the tube 5 ′ as shown in FIG.
【0050】前記環状ガイドレール125がセットされ
ると、検査台車128が周回用モータ129による走行
ローラ130の駆動により環状ガイドレール125に沿
って管材5’の外周を移動して、前記フィルムと180
゜反対の位置にX線発生装置131が設置され、管材
5,5’の継目部分におけるX線撮影が行われる。尚、
X線撮影は全ての管材5,5’について行うとは限らな
い。When the annular guide rail 125 is set, the inspection carriage 128 moves on the outer periphery of the tube 5 'along the annular guide rail 125 by driving the running roller 130 by the circulating motor 129, and the film 180
X The X-ray generator 131 is installed at the opposite position, and X-ray imaging is performed at the joint between the pipe members 5 and 5 ′. still,
X-ray photography is not always performed on all the tubes 5, 5 '.
【0051】以下、前述と同様の作業が繰り返され、管
材5が順次継ぎ足されて行く。Thereafter, the same operation as described above is repeated, and the pipe members 5 are sequentially added.
【0052】こうして、全て人力に頼っていた配管の据
付作業を機械的に処理することが可能となり、作業員の
負担を大幅に削減することができると共に、安全性並び
に作業効率の向上を図ることが可能となる。In this way, it becomes possible to mechanically process the installation work of the pipe, which has all relied on human power, and it is possible to greatly reduce the burden on the workers and to improve the safety and the work efficiency. Becomes possible.
【0053】尚、本発明の配管据付装置は、上述の実施
例にのみ限定されるものではなく、本発明の要旨を逸脱
しない範囲内において種々変更を加え得ることは勿論で
ある。It should be noted that the piping installation apparatus of the present invention is not limited to the above-described embodiment, and it is needless to say that various modifications can be made without departing from the gist of the present invention.
【0054】[0054]
【発明の効果】以上、説明したように本発明の配管据付
装置によれば、作業員の負担を削減し得、且つ安全性並
びに作業効率の向上を図り得るという優れた効果を奏し
得る。As described above, according to the piping installation apparatus of the present invention, it is possible to provide an excellent effect that the burden on the operator can be reduced, and the safety and the working efficiency can be improved.
【図1】本発明の一実施例の管材送出作業状態を表わす
概略側面図である。FIG. 1 is a schematic side view showing a pipe feeding operation state according to an embodiment of the present invention.
【図2】図1のII−II矢視図である。FIG. 2 is a view taken in the direction of arrows II-II in FIG.
【図3】図1のIII−III矢視図である。FIG. 3 is a view taken in the direction of arrows III-III in FIG. 1;
【図4】本発明の一実施例における管材送出機を表わす
側面図である。FIG. 4 is a side view showing a tube feeder according to one embodiment of the present invention.
【図5】図4のV−V矢視図である。FIG. 5 is a view taken in the direction of arrows VV in FIG. 4;
【図6】本発明の一実施例における管材搬送支持機と管
材送出機の内側フレームの支持治具を表わす側面図であ
る。FIG. 6 is a side view showing a jig for supporting an inner frame of the tube material transporting support device and the tube material delivery device in one embodiment of the present invention.
【図7】図6のVII−VII矢視図である。FIG. 7 is a view taken along the line VII-VII in FIG. 6;
【図8】本発明の一実施例における管材搬送支持機の芯
出し機構を表わす概略斜視図である。FIG. 8 is a schematic perspective view showing a centering mechanism of the tube transporting and supporting machine in one embodiment of the present invention.
【図9】図6のIX−IX矢視図である。FIG. 9 is a view taken in the direction of arrows IX-IX in FIG. 6;
【図10】本発明の一実施例の管材据付作業状態を表わ
す概略側面図である。FIG. 10 is a schematic side view showing a pipe material installation operation state according to one embodiment of the present invention.
【図11】図10のXI−XI矢視図である。FIG. 11 is a view as viewed in the direction of arrows XI-XI in FIG. 10;
【図12】図10のXII−XII矢視図である。12 is a view taken in the direction of arrows XII-XII in FIG. 10;
【図13】本発明の一実施例における管材加工機を表わ
す側面図である。FIG. 13 is a side view showing a tube processing machine according to an embodiment of the present invention.
【図14】図13のXIV−XIV矢視図である。FIG. 14 is a view taken in the direction of arrows XIV-XIV in FIG. 13;
【図15】本発明の一実施例における管材溶接補助機を
表わす側面図である。FIG. 15 is a side view showing a tube welding auxiliary machine in one embodiment of the present invention.
【図16】図15のXVI−XVI矢視図である。FIG. 16 is a view taken in the direction of arrows XVI-XVI in FIG. 15;
【図17】本発明の一実施例における管材溶接機を表わ
す側面図である。FIG. 17 is a side view showing a pipe welding machine in one embodiment of the present invention.
【図18】図17のXVIII−XVIII矢視図であ
る。18 is a view taken in the direction of arrows XVIII-XVIII in FIG. 17;
【図19】本発明の一実施例における管材検査機を表わ
す側面図である。FIG. 19 is a side view showing a tube inspection machine in one embodiment of the present invention.
【図20】図19のXX−XX矢視図である。FIG. 20 is a view taken along the line XX-XX in FIG. 19;
4 搬送レール 5 管材 5’ 管材 6 管材送出機 7 管材搬送支持機 26 走行台車 31 管材把持具 51 管材溶接補助機 52 管材溶接機 53 管材検査機 82 溶接補助本体フレーム 94 溶接補助装置 99 溶接本体フレーム 100 溶接装置 119 検査本体フレーム 120 検査装置 Reference Signs List 4 transport rail 5 pipe 5 'pipe 6 pipe feeder 7 pipe transport supporter 26 traveling cart 31 pipe gripper 51 pipe welding auxiliary machine 52 pipe welding machine 53 pipe inspection machine 82 welding auxiliary body frame 94 welding auxiliary apparatus 99 welding main body frame Reference Signs List 100 welding equipment 119 inspection body frame 120 inspection equipment
フロントページの続き (56)参考文献 特開 昭63−255424(JP,A) 特開 昭53−125355(JP,A) 特開 平5−106763(JP,A) 特開 平5−106762(JP,A) 特開 平5−192881(JP,A) 特開 平5−192883(JP,A) 実公 平6−703(JP,Y2) (58)調査した分野(Int.Cl.7,DB名) F16L 1/00 B23P 21/00 E02B 9/06 E02F 5/10 Continuation of the front page (56) References JP-A-63-255424 (JP, A) JP-A-53-125355 (JP, A) JP-A-5-106676 (JP, A) JP-A-5-106762 (JP) JP-A-5-192883 (JP, A) JP-A-5-192883 (JP, A) JP 6-703 (JP, Y2) (58) Fields investigated (Int. Cl. 7 , DB Name) F16L 1/00 B23P 21/00 E02B 9/06 E02F 5/10
Claims (3)
敷設された搬送レール上を走行可能な走行台車と、該走
行台車に前記搬送レールと直角な横方向に移動可能且つ
昇降可能に設けられた管材把持具とを有する管材搬送支
持機と、 搬送レール上に配置される管材搬送支持機及び管材を跨
ぐように且つ該管材に沿って移動自在に配設された溶接
補助本体フレームに、管材の溶接時に管材内部に嵌挿す
る溶接補助装置を搭載してなる管材溶接補助機と、 搬送レール上に配置される管材搬送支持機及び管材を跨
ぐように且つ管材に沿って移動自在に配設された溶接本
体フレームに、管材の溶接を行う溶接装置を搭載してな
る管材溶接機と、 搬送レール上に配置される管材搬送支持機及び管材を跨
ぐように且つ管材に沿って移動自在に配設された検査本
体フレームに、管材の検査を行う検査装置を搭載してな
る管材検査機と を備えたことを特徴とする配管据付装
置。1. In parallel with the longitudinal direction of the tubing to be installed
A traveling vehicle capable of traveling on the laid transport rail;
The carriage can be moved in a horizontal direction perpendicular to the transport rail and
A pipe conveying support having a pipe gripper provided so as to be movable up and down
MachineWhen, Straddling the tubing transfer support machine and tubing placed on the transfer rail
Welding arbitrarily arranged along the pipe material
Insert the tube into the auxiliary body frame when welding the tube
Pipe welding auxiliary machine equipped with a welding auxiliary device Straddling the tubing transfer support machine and tubing placed on the transfer rail
Welding book arranged so that it can move freely along the pipe material
Do not mount a welding device for welding pipes on the body frame.
Pipe welding machine Straddling the tubing transfer support machine and tubing placed on the transfer rail
Inspection book arranged so that it can move freely along the pipe material
Do not mount an inspection device to inspect the pipe material on the body frame.
Pipe inspection machine Piping installation characterized by having
Place.
送支持機へ受け渡す管材送出機を備えた請求項1記載の
配管据付装置。2. The piping installation apparatus according to claim 1, further comprising a pipe feeder that once receives the pipe to be carried in and then transfers the pipe to a pipe transfer supporter.
管材に沿って移動自在に配設された溶接補助本体フレー
ムに、管材の半径と略等しい半径を有する半円管状の支
持部材を、管材と直角な横方向へ移動可能に且つ昇降可
能に設け、該支持部材に、管材の溶接時に管材内部に嵌
挿する溶接補助装置を搭載してなる管材溶接補助機と、
据え付けるべき管材を跨ぐように且つ該管材に沿って移
動自在に配設された溶接本体フレームに、リングを縦に
半割りとしたクランプ式の環状ガイドレールを管材に対
し開閉可能となるよう配設し、該環状ガイドレールに管
材溶接用の溶接台車を周回可能に搭載してなる管材溶接
機と、据え付けるべき管材を跨ぐように且つ該管材に沿
って移動自在に配設された検査本体フレームに、リング
を縦に半割りとしたクランプ式の環状ガイドレールを管
材に対し開閉可能となるよう配設し、該環状ガイドレー
ルに管材検査用の検査台車を周回可能に搭載してなる管
材検査機とを備えたことを特徴とする配管据付装置。3. A semi-circular tubular support member having a radius substantially equal to the radius of a pipe member is provided on a welding auxiliary body frame disposed so as to straddle a pipe member to be installed and to be movable along the tube member. A pipe material welding auxiliary machine, which is provided so as to be movable in a transverse direction at right angles and can be raised and lowered, and the supporting member is equipped with a welding auxiliary device that is inserted into the pipe material when welding the pipe material;
A clamp-type annular guide rail with a half-length ring is provided on a welded body frame that is movably arranged along the tube and over the tube to be installed so that it can be opened and closed with respect to the tube. A tubular welding machine having a welding cart for welding a tubular material mounted on the annular guide rail so as to be rotatable, and an inspection main body frame movably disposed along the tubular material so as to straddle the tubular material to be installed. , A pipe inspection machine comprising a clamp-type annular guide rail with a ring divided in half vertically and arranged to be openable and closable with respect to the pipe, and an inspection cart for inspection of the pipe mounted on the annular guide rail so as to be able to orbit. And a pipe installation device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11704393A JP3293234B2 (en) | 1993-05-19 | 1993-05-19 | Piping installation device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11704393A JP3293234B2 (en) | 1993-05-19 | 1993-05-19 | Piping installation device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06331061A JPH06331061A (en) | 1994-11-29 |
| JP3293234B2 true JP3293234B2 (en) | 2002-06-17 |
Family
ID=14702027
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11704393A Expired - Fee Related JP3293234B2 (en) | 1993-05-19 | 1993-05-19 | Piping installation device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3293234B2 (en) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5109181B2 (en) * | 2007-10-17 | 2012-12-26 | 日鉄パイプライン株式会社 | Tube transport device |
| JP5195482B2 (en) * | 2008-02-19 | 2013-05-08 | Jfeエンジニアリング株式会社 | Pipeline laying method |
| JP2009249823A (en) * | 2008-04-01 | 2009-10-29 | Kurimoto Kasei Kogyo Kk | Pipe conveying carriage |
| CN102218630B (en) * | 2011-05-31 | 2015-06-17 | 上海前山石油管道技术有限公司 | Pipeline machining machine |
| RU2571161C2 (en) | 2011-07-01 | 2015-12-20 | Наката Мэньюфэкчеринг Ко., Лтд. | Clamping device for pipe and unit for hydraulic pressure tests |
| JP6042646B2 (en) * | 2012-06-28 | 2016-12-14 | 高砂熱学工業株式会社 | How to replace piping |
| KR101652353B1 (en) * | 2014-08-29 | 2016-09-01 | 삼성중공업 주식회사 | Pipeline laying vessel applied Abandonment and recovery method using reel |
| JP6772562B2 (en) * | 2016-06-02 | 2020-10-21 | 日本製鉄株式会社 | Long tube manufacturing equipment |
| CN108655647B (en) * | 2018-06-22 | 2023-07-11 | 浙江海洋大学 | Device for assembling and welding pile legs of ocean platform |
| CN115538557B (en) * | 2022-09-29 | 2026-01-20 | 中国一冶集团有限公司 | An automated installation device and method for concrete socket pipes |
| CN117298492B (en) * | 2023-09-18 | 2026-01-09 | 广州市安装集团有限公司 | A method and mechanism for installing a horizontal fire protection main pipe |
-
1993
- 1993-05-19 JP JP11704393A patent/JP3293234B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06331061A (en) | 1994-11-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3293234B2 (en) | Piping installation device | |
| JPH0542913A (en) | Packing apparatus | |
| CN108136550A (en) | The pipe of welding module with rotatable connection is creeped welder;With the method for such pipe crawling device welded pipe | |
| CN113478128A (en) | Pipe conveying butt joint positioning system for long-distance pipeline installation | |
| US4130204A (en) | Side boom pipe laying crane with pipe section alignment feature | |
| CN118905546A (en) | Mounting device for blast furnace gas pipeline | |
| JP2000135594A (en) | Automatic welding equipment for steel columns | |
| US3969905A (en) | Method and apparatus for laying pipelines | |
| JP3300223B2 (en) | Segment transport method and segment transport device | |
| JP6420598B2 (en) | Pipe joint joining device | |
| JP6392032B2 (en) | Pipe joint joining device | |
| CN116460470A (en) | A main chord intelligent welding production line | |
| JP3466007B2 (en) | Underground transport truck and underground transport method | |
| JP3763367B2 (en) | Segment loading device and segment loading method | |
| JPH06262394A (en) | Steel pipe sheet pile joint transfer tack welding equipment | |
| JP4078988B2 (en) | Lined installation method and lined installation device for existing horseshoe-shaped waterway | |
| JPH0322399Y2 (en) | ||
| JP2922748B2 (en) | Gas cutting method and cutting equipment for coiled steel sheet | |
| JPH0890221A (en) | Bevel processing equipment for cylindrical workpieces | |
| JP3441153B2 (en) | Automatic method of joining and sending mud pipes in muddy water shield method | |
| JPH08313172A (en) | Method and device for replacing hopper liner | |
| KR102936081B1 (en) | Cooperative Robot-based Inner and Outer Composite Welding System | |
| JPH10131700A (en) | Tunnel pipe installation trolley and pipe installation method in tunnel | |
| JPH0336628B2 (en) | ||
| JPH06185297A (en) | Segment carry-out device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |