JP3372145B2 - Pipe clamp device for measurement in reactor - Google Patents
Pipe clamp device for measurement in reactorInfo
- Publication number
- JP3372145B2 JP3372145B2 JP24933195A JP24933195A JP3372145B2 JP 3372145 B2 JP3372145 B2 JP 3372145B2 JP 24933195 A JP24933195 A JP 24933195A JP 24933195 A JP24933195 A JP 24933195A JP 3372145 B2 JP3372145 B2 JP 3372145B2
- Authority
- JP
- Japan
- Prior art keywords
- reactor
- measurement
- wedge
- jet pump
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Description
【発明の詳細な説明】
【0001】
【発明の属する技術分野】本発明は沸騰水型原子炉(B
WR)の原子炉圧力容器内に設置したジェットポンプの
ディフューザと計測用配管とを接続したサポートの溶接
部に生じる流体振動による応力を低減させるために使用
する原子炉内計測用配管クランプ装置に関する。
【0002】
【従来の技術】従来、沸騰水型原子炉では出力密度を大
きくするために原子炉圧力容器外部に設置した再循環ポ
ンプと原子炉圧力容器内部に設けたジェットポンプとを
組合せた、いわゆるジェットポンプシステムが採用され
ている。以下、このジェットポンプシステムを採用した
沸騰水型原子炉のジェットポンプについて説明する。
【0003】図8および図9を参照して従来例を説明す
る。図8はBWRの概略構成を示す縦断面図である。原
子炉圧力容器1内には冷却材2および炉心3が収容され
ており、この炉心3は図示しない複数の燃料集合体およ
び制御棒等から構成され、炉心シュラウド10内に収容さ
れている。
【0004】冷却材2は炉心3を上方に向って流通し、
その際、炉心3の核反応熱により昇温されて、水と蒸気
との二相流状態となる。二相流状態となった冷却材2
は、炉心3の上方に設置された気水分離器4内に流入
し、そこで水と蒸気とに分離される。このうち、蒸気は
気水分離器4の上方に設置された蒸気乾燥器5内に導入
され、乾燥蒸気となる。
【0005】乾燥蒸気は前記原子炉圧力容器1に接続さ
れた主蒸気管6を介して図示しない蒸気タービンに移送
され、発電に供される。一方、分離された水は炉心3と
原子炉圧力容器1との間のダウンカマ部7を流れて炉心
3の下方に流下する。炉心3の下方には制御棒案内管8
が設置されており、この制御棒案内管8を介して制御棒
が炉心3内に挿入・引抜される。制御棒案内管8の下方
には制御棒駆動機構9が設置されており、この制御棒駆
動機構9により制御棒の炉心3内への挿入や引抜が制御
される。
【0006】ダウンカマ部7内にはジェットポンプ11が
周方向に等間隔で複数設置されている。一方、原子炉圧
力容器1の外部には、図示しない再循環ポンプが設置さ
れており、この再循環ポンプ,ジェットポンプ11、およ
びこれら両者間に配設された再循環配管により、再循環
系が構成されている。そして、再循環ポンプによりジェ
ットポンプ11に駆動水が供給され、ジェットポンプ11の
作用により冷却材2が炉心内に強制循環される。
【0007】ジェットポンプ11は図9に図8の要部を拡
大して示すように、ライザー管12を有する。ライザー管
12は前記原子炉圧力容器1に固着されており、再循環ポ
ンプの再循環入口ノズル13から供給された冷却材2を炉
内に導入する。ライザー管12の上部には、トランジショ
ンピース14を介して一対のエルボ15(15A,15B)が接
続されている。
【0008】これら一対のエルボ15A,15Bには、一対
の混合ノズル16(16A,16B)を介して対のインレット
スロート17(17A,17B)が接続されている。この一対
のインレットスロート17A,17Bには、それぞれディフ
ューザ18(18A,18B)が接続されている。
【0009】そして、混合ノズル16A,16bにより、冷
却材2が噴射され、その際周囲から炉水が巻き込まれ、
この噴射された冷却材2および巻き込まれた水は、イン
レットスロート17A,17B内で混合される。その後、デ
ィフューザ18A,18Bにより静水頭の回復がなされる。
【0010】ところで、上記構成において、再循環ポン
プから送り込まれる冷却時の流れにより、流体振動が発
生する。この流体振動に対処するためにライザー管12は
前述したようにその下端を再循環入口ノズル13に溶着さ
れており、上端はライザブレース20を介して原子炉圧力
容器1に固定されている。
【0011】また、インレットスロート17A,17Bは、
上述した如くその上端を混合ノズル16A,16B、および
ベンドを介してトランジションピース14に機械的に接続
されるとともに、その下端はディフューザ18A,18Bの
上端の挿入されている。このように、ライザー管12およ
びインレットスロート17A,17Bはともに流体振動に十
分対処可能な構成となっている。
【0012】つぎに混合ノズル16A,16Bの上方の構成
について説明すると、トランジションピース14の両側に
は一対の耳部21が夫々形成されており、これらの耳部21
は上方に突出し、その上端部の内側には溝部22が形成さ
れている。この溝部22には、長さ方向中央部に向って増
大する長方形断面を有する一対のジェットポンプビーム
23が両端部を溝部22に嵌合して固定されている。
【0013】ジェットポンプビーム23の中央には、鉛直
方向に図示しないねじ穴が形成されており、このねじ穴
にはヘッドボルト28が螺合している。ヘッドボルト28の
上端には六角頭が形成されており、また下端には半丸頭
が形成されている。一方、エルボ15A,15Bには、上端
面が水平な台座部(図示せず)が形成されており、この
台座部には、座ぐり穴(図示せず)が形成されている。
この座ぐり穴内に球面座金を介してヘッドボルト28の半
丸頭が嵌合している。
【0014】なお、インレットスロート17A,17Bは原
子炉圧力容器1に固着されていないため、その上端部お
よびエルボ15A,15Bにはライザー管12を介して供給さ
れる駆動水の流入水圧が作用する。またエルボ15A,15
Bの他端に接続する図示しないノズルからディフューザ
18A,18B内に向って噴出される駆動水の噴出水圧等の
反力が上向きに作用する。この荷重に対抗するためにヘ
ッドボルト28がジェットポンプビーム23に螺合されてい
る。
【0015】なお、耳部21が定位置に固定されているの
で、ヘッドボルト28を螺合していくと、ジェットポンプ
ビーム23の上方に移動させられ、その両端は溝部22の上
壁面に当接した状態となる。これによって上向きの荷重
を受ける。
【0016】これとは逆にエルボ15A,15Bの上端部に
は、ヘッドボルト28を介して下向きの荷重が加わり、そ
の大きさは駆動水の反力等による上向きの荷重との関連
により決定される。ヘッドボルト28の六角頭にはキーパ
(図示せず)が着脱自在に嵌合している。このキーパは
支持板(図示せず)上に点溶接固着されている。支持板
は四角形をなしており、2本のボルトによりジェットポ
ンプビーム23の上面に固定されている。
【0017】インレットスロート17A,17Bは、ライザ
ー管12に固着したライザーブランケット25に取り付けら
れている。また、前記ディフューザ18A,18Bは、原子
炉圧力容器1に溶着されているシュラウドサポート26に
固定されている。
【0018】ジェットポンプ11は、冷却材を循環させる
ために他の機器に比較して厳しい状況下で使用される。
そのため、各部材には大きな負荷が作用し、特にライザ
ー管12をその中間にて支持するライザーブレース20には
厳しい応力が作用することになる。
【0019】また、ライザーブレース20は、ライザー管
12に発生する原子炉運転中の流体振動を抑制するととも
に、炭素鋼である原子炉圧力容器1とオーステナイト系
ステンレス鋼製であるライザー管12との間の熱膨張差を
吸収する。したがって、原子炉運転中には、上記熱膨張
差を吸収した状態で変形状態にある。
【0020】さて、原子力プラントの出力制御を行う上
で、通常運転中のジェットポンプ流量を測定することは
重要であり、このため、ディフューザ18A,18Bの上下
部に測定用配管19を設けて、運転中のディフューザ18の
上下部の静圧差を測定し、この測定値をプラント使用前
に測定した較正値とによりジェットポンプ流量を算出し
ている。
【0021】この計測用配管19はディフューザ上下部の
静圧孔に溶接されディフューザ18に固着されているサポ
ート24により溶接支持され、更に図10(a),(b)に
示したようにジェットポンプ11の下部において複雑な状
態で配置され、ジェットポンプ計測用ノズル27を経て炉
外配管と接続されている。
【0022】このジェットポンプ計測用ノズル27は原子
炉圧力容器1に対象位置に2箇所設けられている。この
ような構成のジェットポンプ11は再循環ポンプから送り
込まれる冷却時の流れにより、他の機器に比較して厳し
い条件下で使用される。
【0023】このため、各部材には大きな負荷が作用
し、特に計測用配管19はディフューザ18の流体振動の影
響を直接またはサポート24を介して受け、厳しい応力が
作用することになり、従って配管破断を生じることが十
分予想される。この計測用配管19が破断した場合は原子
炉の出力制御に支障を与えることになり、これを補修し
なければならない。
【0024】ここで、計測用配管は図10(b)から明ら
かなように原子炉圧力容器1とシュラウド10の環状空間
29に配置されるとともに、計装用配管19の上方にはライ
ザ管12およびインレットスロート17等が配置されてお
り、ライザブレース20,混合ノズル16,エルボ15等のジ
ェットポンプ構成部品が配置されている。
【0025】
【発明が解決しようとする課題】上記構成において、例
えばジェットポンプシステムの測定用配管19や溶接部等
に何等かの原因によってクラックや破断が生じた場合、
その補修作業は高放射線管理区域である炉心真上から遠
隔的に行う必要があり、従って当該配管部への接近は極
めて困難である。
【0026】このような破損した計測用配管19の補修手
段として、溶接により行うことが考えられるが、補修作
業は一般に水中作業となるため、補修装置として大がか
りなものが必要となり、かつ長期間の工事となる課題が
ある。また、これらの工事を放置しておくと一段と進行
してジェットポンプに亀裂が生じたりする可能性があ
り、原子炉の出力を制御するジェットポンプがそのよう
な状態になることは、他の構造物にも悪影響を与えるこ
とも考えられ、好ましくない課題がある。
【0027】本発明は上記課題を解決するためになされ
たもので、ジェットポンプディフューザ最下部のサポー
トと計測用配管の溶接部に生じる流体振動による応力を
低減できる原子炉内計測用配管クランプ装置を提供する
ことにある。
【0028】
【課題を解決するための手段】本発明は、沸騰水型原子
炉の原子炉圧力容器内に設けられたジェットポンプのデ
ィフューザと計測用配管を溶接により固定するサポート
を有し、このサポートと前記計測用配管の溶接部に生じ
る流体振動による応力を低減するための原子炉内計測用
配管クランプ装置において、前記ディフューザの外側に
当接するほぼ半円状アームと、このアームの一端部また
は両端部に設けられたボディと、このボディに締付けボ
ルトを介して設けられた固定用くさびと、この固定用く
さびに一端が嵌入され他端が前記計測用配管の外面に当
接し前記固定用くさびにピンを介して連結する押付け用
くさびとを具備し、前記ボディには前記締付けボルトに
隣接して前記締付けボルトのゆるみを止めるゆるみ止め
ボルトが設けられたことを特徴とする。
【0029】
【0030】
【発明の実施の形態】図1から図4を参照しながら本発
明に係る原子炉内計測用配管クランプ装置の第1の実施
の形態を説明する。図1は本第1実施の形態に係るクラ
ンプ装置を示す上面図、図2は図1を一部縦断面で示す
側面図、図3は図1のa部を拡大した上面図、図4は図
2のb部を拡大した一部縦断面図で示す側面図であり、
図中、図8から図10と同一部分には同一符号を付してい
る。
【0031】図1から図4において、符号30は半円状ア
ームで、このアーム30の一端側にはボディ31が設けら
れ、他端側には内面に突起32と上面に吊り耳33が設けら
れている。アーム30の内面中央部にも突起32が設けられ
ている。これらの突起32はディフューザ18の外面に当接
する。吊り耳33はアーム30のほぼ中央部上面とボディ31
の上面にも設けられている。
【0032】ボディ31には図3に示したように固定用く
さび34を挿入する固定用くさび穴35と、締付ボルト36の
ねじ部37をねじ込むねじ穴38と、締付ボルト36の上部軸
39を挿入する上部軸穴40と、ゆるみ止めボルト41のねじ
部42をねじ込むねじ穴43およびゆるみ止めボルト41のも
どし部材44を挿入する大径穴45が形成されている。
【0033】締付ボルト36の上部軸39とねじ部37との間
にはずれ防止用突起部材46が設けられ、締付ボルト36の
上端部にナット47の締付により座金48がボディ31の上端
面との間に介在される。
【0034】この座金48はゆるみ止めボルト41に形成さ
れた斜面を有する折り曲げ部材49の下降によって下方に
折り曲げられ、この折り曲げ部50により締付ボルト36の
回転を抑制し、もどし部材44の上昇によって座金48の折
り曲げ部50は反対側に折り曲げられてもどされる。な
お、符号51はストッパで、ゆるみ止めボルト41を緩めた
場合、つまり上昇させた場合に面52が接触して抜けるの
を防止する。
【0035】固定用くさび34の先端部には大形V字状溝
53が設けられており、この大形V字状溝53内に押付け用
くさび54が挿入しピン55により連結される。押付け用く
さび54にはピン55が挿入される長穴56が形成されてピン
55がスライド自在になっている。固定用くさび34にもピ
ン挿入用穴57が形成されている。
【0036】押付け用くさび54の先端部には計測用配管
19に接して押付ける小形V字状溝58が設けられている。
ボディ31にはサポート24の上面に接する指状支工59が設
けられている。この支工59はクランプ装置全体の荷重を
ディフューザ18と計測用配管19を溶接により固定してい
るサポート24の上面にかける部材である。
【0037】固定用くさび34と押付け用くさび54とはピ
ン55を軸にして回転自在となっているため、計測用配管
19の傾斜に沿って密接する構造となっている。吊り耳33
はディフューザ18の所定の位置に移動する際に使用され
る。
【0038】つぎに上記構成の原子炉内計測用配管クラ
ンプ装置の作用について図5および図6により説明す
る。図5は本実施の形態の計測用配管クランプ装置を原
子炉圧力容器内に配置する場合の吊降し状態を示す構成
図である。この図5に示すように、原子炉圧力容器1内
には、円筒状の炉心シュラウド10が設置され、この炉心
シュラウド10内においては、図示しない燃料集合体の上
端を支持する上部格子板60と、図示しない燃料支持金具
を介して燃料集合体の下方を支持する炉心支持板61とが
配設されている。そして、原子炉圧力容器1の上方には
燃料交換機62が配設されている。
【0039】この燃料交換機62にポール取扱い機構63を
介してポール64が吊降されている。すなわち、ポール取
扱い機構63は燃料交換機62に設けられているホイスト65
と、このホイスト65に巻回されているワイヤ66とからな
り、このワイヤ66にポール接続部67を介してポール64が
接続されている。
【0040】ポール64は、例えば一定長さのものが複数
本、ポール継手を介して連結された構成となっており、
このポール64の下端に上記図1から図4に示した原子炉
内計測用配管クランプ装置(以下、クランプ装置を記
す)68が接続されている。
【0041】ジェットポンプディフューザ18と計測用配
管19とに組込んだ状態のクランプ装置68で、片側が開放
している半円状30の内面に設けた2個の突起32をディフ
ューザ18の表面に接触する。
【0042】アーム30の端部には固定用くさび34が締付
ボルト36の回転によって上下動してディフューザ18の周
方向に移動し、前記突起32と同様に計測用配管19の外径
面と接触してディフューザ18と組合せて全体が固定され
る。固定用くさび34には押付け用くさび54が組込まれピ
ン55を軸に回転自在のため計装用配管19の傾斜に、密接
して係合する。
【0043】つぎに本実施態様に係るクランプ装置を用
いてジェットポンプ計測用配管19を固定保持する場合に
は以下の順序に従って行う。まず、原子炉の停止後に、
原子炉圧力容器1の上蓋を取外す。その後、蒸気乾燥器
およびシュラウドヘッドを機器貯蔵プールに移動し、そ
の後に作業を行う。この場合、図5に示すように燃料交
換機62のホイスト65によりクランプ装置68を吊降し、ジ
ェットポンプディフューザ18の所定の位置に仮設置す
る。
【0044】この状態でナットランナ69を下端に組込ん
だポール64を補助ホイスト65のワイヤ66で吊下げ、エル
ボの頭部吊り耳33の上に着座させ旋回させて締付ボルト
36の頭部を回転させる。締付ボルト36を回転させること
により固定用くさび34が下降し、押付け用くさび54が周
方向に移動し、計測用配管19を押し付けてディフューザ
18と一体に固定される。
【0045】つぎに締付ボルト36にナット47で締付け固
定された座金48をゆるみ止めボルト41をナットランナ69
で回転させ下降させることにより、ゆるみ止めボルト41
に設けられたテーパ状の折り曲げ部材49によって座金48
を曲げることができる。また、仮に座金48を元の状態に
復旧させる場合にはナットランナ69でゆるみボルト41を
逆回転させ、ゆるみボルト41の下側に設けられた円板形
突起状もどし部材44で座金48を平らな状態にでき締付ボ
ルト36を回転させることができる。
【0046】このような実施例によると原子炉圧力容器
1内に設置したジェットポンプディフューザ最下部のサ
ポートと計測用配管19の溶接部に生じる流体振動による
応力を低減させ、プラントの稼動率向上を図ることがで
きる。
【0047】なお、上記実施の形態ではアーム30の一端
部のボディ31に固定用くさび34や押付け用くさび54を設
けた例で説明したが、複数の計測用配管19を同時に固定
する場合にはアーム30の両端にボディ31を設けてこのボ
ディ31に上記と同様に固定用くさび34や押付け用くさび
54を設けることもできる。
【0048】つぎに、図7(a),(b)により本発明
に係るクランプ装置の第2の実施の形態を説明する。図
7(a)は本実施の形態の上面図であり、同(b)は
(a)における下部ボディ側から見た立面図である。ま
た図7中、図1から図4において同一部分または同様の
機能を有する部分には同一符号を付している。なお、説
明の都合上、アーム30の両端部について図の上方を上
部、図の下方を下部と記す。
【0049】本実施の形態が第1の実施の形態と異なる
点は半円状アーム30の両端部に計測用配管19を押付ける
部材を有するボディ31a,31bを設け、上部のボディ31
aに計測用配管19と面接触する押付け用くさび54を設
け、下部ボディ31bにディフューザ18を押し付けるよう
にして接触する上下に移動自在の保持ブロック74を設け
たことにある。
【0050】すなわち、アーム30の上部ボディ31aには
押付け用くさび54を支持するくさびサポート70と、サポ
ート24上に載る爪71がボルト72,73により取り付けられ
ている。爪71はアーム30やその他の部材からなるクラン
プ装置の荷重を支える支工の役目をしている。
【0051】一方、アームの下部ボディ31bには内面に
2個の突起32を有する弓状保持ブロック74の支持部74a
が嵌合により移動自在に固定用くさび34に設けられてい
る。固定用くさび34は例えば前述した図1から図4に示
したような構成で、下部ボディ31bに取り付けられてお
り、下部ボディ31aに設けた締付ボルト36を締付け、回
転させると前進し、また緩めると後退するようになって
いる。締付ボルト36を隣接してゆるみ止めボルト41が設
けられている。なお、符号75,76はクランプ装置吊上げ
用の穴である。
【0052】この第2の実施の形態は第1の実施の形態
と比較して計装用配管19を固定する位置が押付け用くさ
び54と反対方向で行うことができる構造となっている。
計測用配管19を押付け用くさび54で保持し、締付ボルト
36を回転させることにより保持ブロック74が前進してデ
ィフューザ18に接触し、保持ブロック74の突起32の2点
と押付け用くさび54の接触により計測用配管19をサポー
ト24に押付けて全体を固定することができる。
【0053】押付け用くさび54とくさびサポート70の組
立にはピン55が組込まれており、計測用配管19の面に対
し面接触が可能な構造となっており、計測用配管19の固
定を均一な面で強力に固定することができ、固定効果も
大きくなる利点がある。なお、上記実施の形態におい
て、締付ボルト36に座金48を一体的に加工することもで
きる。
【0054】
【発明の効果】本発明によれば、ジェットポンプのディ
フューザ最下部のサポートと計測用配管の溶接部に生じ
る流体振動を、ジェットポンプを据付けた状態で、水中
で遠隔操作により確実かつ短時間で防止することができ
る。また、半円状アームの一端に計測用配管と面接触す
る押付け用くさびを設け、そのアームの他端に保持ブロ
ックを設け、保持ブロック内の突起をディフューザに接
触させて全体を固定することにより、計測用配管を強固
に固定することができる。
【0055】したがって、作業員の放射線被曝量を大幅
に低減させることができ、しかも原子炉の健全性を確認
でき、安全に原子炉の運転ができるので、原子力発電プ
ラントの稼動率向上に大きく寄与できる。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a boiling water reactor (B).
TECHNICAL FIELD The present invention relates to a piping clamp device for measuring pipes in a reactor used for reducing stress caused by fluid vibration generated at a welded portion of a support connecting a diffuser of a jet pump and a measuring pipe installed in a reactor pressure vessel of a WR. Conventionally, in a boiling water reactor, a recirculation pump installed outside a reactor pressure vessel and a jet pump installed inside the reactor pressure vessel are combined to increase the power density. A so-called jet pump system is employed. Hereinafter, a jet pump of a boiling water reactor employing the jet pump system will be described. A conventional example will be described with reference to FIGS. FIG. 8 is a longitudinal sectional view showing a schematic configuration of the BWR. A coolant 2 and a reactor core 3 are accommodated in the reactor pressure vessel 1. The reactor core 3 includes a plurality of fuel assemblies and control rods (not shown), and is accommodated in a reactor core shroud 10. [0004] The coolant 2 flows through the core 3 upward.
At that time, the temperature is raised by the nuclear reaction heat of the reactor core 3 and a two-phase flow of water and steam is established. Coolant 2 in two-phase flow
Flows into the steam separator 4 installed above the reactor core 3, where it is separated into water and steam. Of these, the steam is introduced into a steam dryer 5 installed above the steam separator 4, and becomes dry steam. [0005] The dried steam is transferred to a steam turbine (not shown) via a main steam pipe 6 connected to the reactor pressure vessel 1 and is used for power generation. On the other hand, the separated water flows through the downcomer section 7 between the reactor core 3 and the reactor pressure vessel 1 and flows down below the reactor core 3. A control rod guide tube 8 is provided below the core 3.
The control rod is inserted into and pulled out of the reactor core 3 through the control rod guide tube 8. A control rod drive mechanism 9 is provided below the control rod guide tube 8, and the control rod drive mechanism 9 controls the insertion and withdrawal of the control rod into and from the reactor core 3. A plurality of jet pumps 11 are installed in the downcomer section 7 at equal intervals in the circumferential direction. On the other hand, a recirculation pump (not shown) is provided outside the reactor pressure vessel 1, and a recirculation system is provided by the recirculation pump, the jet pump 11, and the recirculation piping arranged between them. It is configured. Then, driving water is supplied to the jet pump 11 by the recirculation pump, and the coolant 2 is forcibly circulated into the core by the action of the jet pump 11. The jet pump 11 has a riser pipe 12 as shown in FIG. Riser tube
Numeral 12 is fixed to the reactor pressure vessel 1, and introduces the coolant 2 supplied from the recirculation inlet nozzle 13 of the recirculation pump into the reactor. A pair of elbows 15 (15A, 15B) is connected to the upper part of the riser tube 12 via a transition piece 14. A pair of inlet throats 17 (17A, 17B) are connected to the pair of elbows 15A, 15B via a pair of mixing nozzles 16 (16A, 16B). A diffuser 18 (18A, 18B) is connected to the pair of inlet throats 17A, 17B, respectively. Then, the coolant 2 is injected by the mixing nozzles 16A and 16b, and at that time, the reactor water is entrained from the surroundings,
The injected coolant 2 and the entrapped water are mixed in the inlet throats 17A and 17B. Thereafter, the hydrostatic head is restored by the diffusers 18A and 18B. By the way, in the above configuration, fluid vibration is generated by the flow at the time of cooling sent from the recirculation pump. To cope with this fluid vibration, the riser pipe 12 has its lower end welded to the recirculation inlet nozzle 13 as described above, and its upper end is fixed to the reactor pressure vessel 1 via the riser brace 20. The inlet throats 17A and 17B are
As described above, the upper end is mechanically connected to the transition piece 14 via the mixing nozzles 16A and 16B and the bend, and the lower end is inserted at the upper end of the diffusers 18A and 18B. As described above, both the riser tube 12 and the inlet throats 17A and 17B are configured to sufficiently cope with the fluid vibration. Next, the configuration above the mixing nozzles 16A and 16B will be described. A pair of ears 21 are formed on both sides of the transition piece 14, respectively.
Project upward, and a groove 22 is formed inside the upper end thereof. The groove 22 has a pair of jet pump beams having a rectangular cross section that increases toward the center in the longitudinal direction.
23 is fixed by fitting both ends to the groove 22. At the center of the jet pump beam 23, a screw hole (not shown) is formed in the vertical direction, and a head bolt 28 is screwed into this screw hole. A hexagonal head is formed at the upper end of the head bolt 28, and a semi-round head is formed at the lower end. On the other hand, a pedestal (not shown) having a horizontal upper end surface is formed in each of the elbows 15A and 15B, and a counterbore (not shown) is formed in this pedestal.
The semi-round head of the head bolt 28 is fitted into the counterbore through a spherical washer. Since the inlet throats 17A and 17B are not fixed to the reactor pressure vessel 1, the inflow water pressure of the driving water supplied through the riser pipe 12 acts on the upper ends and the elbows 15A and 15B. . Elbows 15A, 15
A diffuser from a nozzle (not shown) connected to the other end of B
The reaction force such as the jet pressure of the driving water jetted toward the inside of 18A and 18B acts upward. A head bolt 28 is screwed to the jet pump beam 23 to counter this load. Since the ear 21 is fixed at a fixed position, when the head bolt 28 is screwed in, the head 21 is moved above the jet pump beam 23, and both ends of the head bolt 28 contact the upper wall surface of the groove 22. It will be in contact. This causes an upward load. Conversely, a downward load is applied to the upper ends of the elbows 15A and 15B via the head bolts 28, and the magnitude thereof is determined in relation to the upward load due to the reaction force of the driving water or the like. You. A keeper (not shown) is detachably fitted to the hexagonal head of the head bolt 28. The keeper is fixed by spot welding on a support plate (not shown). The support plate has a rectangular shape and is fixed to the upper surface of the jet pump beam 23 by two bolts. The inlet throats 17A and 17B are attached to a riser blanket 25 fixed to the riser tube 12. Further, the diffusers 18A and 18B are fixed to a shroud support 26 welded to the reactor pressure vessel 1. [0018] The jet pump 11 is used under a severe condition to circulate the coolant, as compared with other devices.
For this reason, a large load acts on each member, and particularly severe stress acts on the riser brace 20 that supports the riser tube 12 in the middle. The riser brace 20 is a riser tube.
In addition to suppressing the fluid vibration generated during operation of the reactor 12, the thermal expansion difference between the reactor pressure vessel 1 made of carbon steel and the riser pipe 12 made of austenitic stainless steel is absorbed. Therefore, during the operation of the reactor, the reactor is in a deformed state while absorbing the difference in thermal expansion. In order to control the output of a nuclear power plant, it is important to measure the flow rate of the jet pump during normal operation. For this reason, measurement pipes 19 are provided above and below the diffusers 18A and 18B. The static pressure difference between the upper and lower portions of the diffuser 18 during operation is measured, and the jet pump flow rate is calculated based on the measured value and a calibration value measured before using the plant. The measurement pipe 19 is welded to a static pressure hole at the upper and lower portions of the diffuser and is welded and supported by a support 24 fixed to the diffuser 18. Further, as shown in FIGS. 10 (a) and 10 (b), a jet pump is provided. It is arranged in a complicated state at the lower part of 11, and is connected to a pipe outside the furnace via a jet pump measurement nozzle 27. The jet pump measuring nozzles 27 are provided at two target positions in the reactor pressure vessel 1. The jet pump 11 having such a configuration is used under severe conditions compared to other devices due to the flow at the time of cooling sent from the recirculation pump. For this reason, a large load acts on each member, and in particular, the measuring pipe 19 receives the influence of the fluid vibration of the diffuser 18 directly or through the support 24, so that severe stress is applied. It is fully expected that a break will occur. If the measurement pipe 19 breaks, it will hinder the power control of the reactor, and must be repaired. Here, the measurement pipe is an annular space between the reactor pressure vessel 1 and the shroud 10 as is apparent from FIG.
The riser pipe 12 and the inlet throat 17 are disposed above the instrumentation pipe 19, and the jet pump components such as the riser brace 20, the mixing nozzle 16, and the elbow 15 are disposed above the instrumentation pipe 19. . In the above configuration, for example, when a crack or break occurs in the measurement pipe 19 or the welded portion of the jet pump system due to any cause,
The repair work must be performed remotely from directly above the core, which is a high radiation control area, and it is extremely difficult to access the piping. As a means for repairing such a damaged measuring pipe 19, welding may be performed. However, since repair work is generally performed underwater, a large-scale repair device is required and a long-term repair apparatus is required. There is a problem of construction. In addition, if these works are left unchecked, the jet pump may crack further and the jet pump that controls the power of the reactor will be in such a state. It is also considered that it may have an adverse effect on objects, and there is an undesirable problem. SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to provide a piping clamp device for measuring pipes in a nuclear reactor capable of reducing stress caused by fluid vibration generated at a weld between a support at the lowermost part of a jet pump diffuser and a measuring pipe. To provide. According to the present invention, a diffuser of a jet pump provided in a reactor pressure vessel of a boiling water reactor and a support for fixing a measurement pipe by welding are provided. In a piping clamp device for measurement in a nuclear reactor for reducing stress due to fluid vibration generated at a weld between a support and a pipe for measurement, a substantially semicircular arm abutting on the outside of the diffuser, and one end of this arm or A body provided at both ends, a fixing wedge provided on the body via a tightening bolt, one end of which is inserted into the fixing wedge, and the other end of which abuts against the outer surface of the measuring pipe to be fixed. And a pressing wedge connected via a pin to the body.
Loose stop to stop the tightening bolt from coming loose
A bolt is provided . DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A first embodiment of a piping clamp device for measurement in a nuclear reactor according to the present invention will be described with reference to FIGS. 1 to 4. FIG. 1 is a top view showing the clamp device according to the first embodiment, FIG. 2 is a side view showing a part of FIG. 1 in a longitudinal section, FIG. FIG. 3 is a side view showing an enlarged partial longitudinal sectional view of a part b of FIG.
In the figure, the same parts as those in FIGS. 8 to 10 are denoted by the same reference numerals. 1 to 4, reference numeral 30 denotes a semicircular arm. A body 31 is provided at one end of the arm 30, and a projection 32 is provided on the inner surface and a hanging ear 33 is provided on the upper surface at the other end. Have been. A protrusion 32 is also provided at the center of the inner surface of the arm 30. These projections 32 abut against the outer surface of the diffuser 18. The hanging ears 33 are located substantially at the center of the arm 30 and the body 31.
It is also provided on the upper surface of. As shown in FIG. 3, a fixing wedge hole 35 for inserting a fixing wedge 34, a screw hole 38 for screwing a screw portion 37 of a tightening bolt 36, and an upper shaft of the tightening bolt 36 are formed in the body 31.
An upper shaft hole 40 into which the locking bolt 39 is inserted, a screw hole 43 into which the screw portion 42 of the locking bolt 41 is screwed, and a large-diameter hole 45 into which a return member 44 of the locking bolt 41 is inserted are formed. A protrusion member 46 for preventing slipping is provided between the upper shaft 39 of the tightening bolt 36 and the screw portion 37, and a washer 48 is attached to the upper end of the tightening bolt 36 by tightening a nut 47 on the body 31. It is interposed between the end face. The washer 48 is bent downward by the lowering of the bending member 49 having the slope formed on the locking bolt 41, and the bent portion 50 suppresses the rotation of the tightening bolt 36, and the lifting member 44 raises the returning member 44. The folded portion 50 of the washer 48 is folded back to the opposite side. Reference numeral 51 denotes a stopper, which prevents the surface 52 from coming off due to contact when the locking bolt 41 is loosened, that is, when the locking bolt 41 is raised. A large V-shaped groove is provided at the tip of the fixing wedge 34.
A pressing wedge 54 is inserted into the large V-shaped groove 53 and connected by a pin 55. The pressing wedge 54 has an elongated hole 56 into which the pin 55 is inserted.
55 is slidable. A pin insertion hole 57 is also formed in the fixing wedge 34. A measuring pipe is provided at the tip of the pressing wedge 54.
A small V-shaped groove 58 is provided which is pressed against and in contact with 19.
The body 31 is provided with a finger-like support 59 that contacts the upper surface of the support 24. The support 59 is a member that applies the load of the entire clamp device to the upper surface of the support 24 that fixes the diffuser 18 and the measurement pipe 19 by welding. Since the fixing wedge 34 and the pressing wedge 54 are rotatable about the pin 55, the measurement pipe
It has a structure that closely contacts the 19 slopes. Hanging ears 33
Is used to move the diffuser 18 to a predetermined position. Next, the operation of the piping clamp apparatus for measurement in a nuclear reactor having the above configuration will be described with reference to FIGS. FIG. 5 is a configuration diagram showing a suspended state when the measuring pipe clamp device of the present embodiment is disposed in a reactor pressure vessel. As shown in FIG. 5, a cylindrical core shroud 10 is installed in the reactor pressure vessel 1, and in the core shroud 10, an upper grid plate 60 supporting the upper end of a fuel assembly (not shown) is provided. And a core support plate 61 that supports the lower portion of the fuel assembly via a fuel support (not shown). A fuel exchanger 62 is disposed above the reactor pressure vessel 1. A pole 64 is suspended from the fuel exchanger 62 via a pole handling mechanism 63. That is, the pole handling mechanism 63 is provided with a hoist 65 provided in the fuel exchanger 62.
And a wire 66 wound around the hoist 65. A pole 64 is connected to the wire 66 via a pole connection portion 67. The pole 64 has a configuration in which, for example, a plurality of poles having a fixed length are connected via a pole joint.
The lower end of the pole 64 is connected to the piping clamp device 68 for measuring in the reactor (hereinafter referred to as a clamp device) shown in FIGS. With the clamp device 68 incorporated in the jet pump diffuser 18 and the measurement pipe 19, two projections 32 provided on the inner surface of the semicircular shape 30 open on one side are formed on the surface of the diffuser 18. Contact. At the end of the arm 30, a fixing wedge 34 moves up and down by the rotation of the tightening bolt 36 and moves in the circumferential direction of the diffuser 18. The whole is fixed in contact with the diffuser 18 by contact. A pressing wedge 54 is incorporated in the fixing wedge 34 and is rotatable about a pin 55 so as to closely engage with the inclination of the instrumentation pipe 19. Next, when the jet pump measuring pipe 19 is fixedly held by using the clamp device according to the present embodiment, the following procedure is performed. First, after the reactor shuts down,
Remove the upper lid of the reactor pressure vessel 1. Thereafter, the steam dryer and shroud head are moved to the equipment storage pool and work is performed thereafter. In this case, as shown in FIG. 5, the clamp device 68 is suspended by the hoist 65 of the refueling machine 62 and is temporarily installed at a predetermined position of the jet pump diffuser 18. In this state, a pole 64 having a nut runner 69 incorporated at the lower end is hung by the wire 66 of the auxiliary hoist 65, and is seated on the head ear 33 of the elbow and turned to tighten the tightening bolt.
Rotate 36 heads. By rotating the tightening bolt 36, the fixing wedge 34 moves down, the pressing wedge 54 moves in the circumferential direction, and presses the measuring pipe 19 to diffuser.
It is fixed integrally with 18. Next, the washer 48, which has been fastened and fixed to the tightening bolt 36 with the nut 47, is loosened, and the locking bolt 41 is connected to the nut runner 69.
Rotate and lower with
The washer 48 is provided by a tapered bending member 49 provided on the
Can be bent. If the washer 48 is to be restored to the original state, the loosening bolt 41 is rotated in the reverse direction by the nut runner 69, and the washer 48 is flattened by the disc-shaped projection-like return member 44 provided below the loosening bolt 41. Then, the tightening bolt 36 can be rotated. According to such an embodiment, stress caused by fluid vibration generated in a weld between the support at the lowermost part of the jet pump diffuser installed in the reactor pressure vessel 1 and the measuring pipe 19 is reduced, and the operation rate of the plant is improved. Can be planned. In the above-described embodiment, an example has been described in which the fixing wedge 34 and the pressing wedge 54 are provided on the body 31 at one end of the arm 30. However, when a plurality of measurement pipes 19 are simultaneously fixed, A body 31 is provided at both ends of the arm 30 and a fixing wedge 34 and a pressing wedge are provided on the body 31 in the same manner as described above.
54 can also be provided. Next, a second embodiment of the clamp device according to the present invention will be described with reference to FIGS. 7 (a) and 7 (b). FIG. 7A is a top view of the present embodiment, and FIG. 7B is an elevation view of FIG. 7A viewed from the lower body side. In FIG. 7, the same reference numerals are given to the same portions or portions having similar functions in FIGS. For convenience of description, the upper end of the arm 30 will be referred to as an upper part and the lower end of the figure will be referred to as a lower part. The present embodiment differs from the first embodiment in that bodies 31a and 31b having members for pressing the measurement pipe 19 are provided at both ends of the semicircular arm 30, and the upper body 31 is provided.
A is provided with a pressing wedge 54 which makes surface contact with the measurement pipe 19, and a vertically movable holding block 74 which comes into contact with the lower body 31b by pressing the diffuser 18 is provided. That is, a wedge support 70 for supporting the pressing wedge 54 and a claw 71 mounted on the support 24 are attached to the upper body 31a of the arm 30 by bolts 72 and 73. The pawl 71 serves as a support for supporting the load of the clamp device including the arm 30 and other members. On the other hand, the lower body 31b of the arm has a support portion 74a of an arcuate holding block 74 having two projections 32 on its inner surface.
Are provided on the fixing wedge 34 movably by fitting. The fixing wedge 34 has, for example, a configuration as shown in FIGS. 1 to 4 described above, and is attached to the lower body 31b. When the tightening bolt 36 provided on the lower body 31a is tightened and rotated, the wedge 34 moves forward. When it is loosened, it retreats. A locking bolt 41 is provided adjacent to the tightening bolt 36. Reference numerals 75 and 76 are holes for lifting the clamp device. The second embodiment is different from the first embodiment in that the position where the instrumentation pipe 19 is fixed can be set in the opposite direction to the pressing wedge 54.
Hold the measurement pipe 19 with the pressing wedge 54 and tighten the
By rotating 36, the holding block 74 moves forward and comes into contact with the diffuser 18, and the measurement pipe 19 is pressed against the support 24 by the contact between the two points of the projection 32 of the holding block 74 and the pressing wedge 54 to fix the whole. be able to. The pin 55 is incorporated in the assembly of the pressing wedge 54 and the wedge support 70 so that the surface of the measuring pipe 19 can be brought into surface contact, and the fixing of the measuring pipe 19 is uniform. This has the advantage that it can be strongly fixed in any aspect and the fixing effect is increased. In the above embodiment, the washer 48 can be integrally formed with the tightening bolt 36. According to the present invention, the fluid vibration generated in the weld between the support at the lowermost part of the diffuser of the jet pump and the measuring pipe can be reliably and remotely controlled in water with the jet pump installed. It can be prevented in a short time. Also, by providing a pressing wedge at one end of the semicircular arm in surface contact with the measurement pipe, providing a holding block at the other end of the arm, and contacting the projections in the holding block with the diffuser to fix the whole In addition, the measurement pipe can be firmly fixed. Therefore, it is possible to greatly reduce the radiation exposure of the workers, to confirm the soundness of the reactor, and to operate the reactor safely, which greatly contributes to the improvement of the operation rate of the nuclear power plant. it can.
【図面の簡単な説明】
【図1】本発明に係る原子炉内計測用配管クランプ装置
の第1の実施の形態を示す上面図。
【図2】図1における一部縦断面で示す側面図。
【図3】図1におけるa部を拡大して示す上面図。
【図4】図2におけるb部を拡大して一部縦断面で示す
側面図。
【図5】本発明に係る原子炉内計測用配管クランプ装置
を原子炉内での使用状態を説明するための概略図。
【図6】図5におけるC部を拡大して一部断面で示す側
面図。
【図7】(a)は本発明に係る原子炉内計測用配管クラ
ンプ装置の第2の実施の形態を説明するための上面図、
(b)は(a)における保持ブロックとアーム組立体を
示す立面図。
【図8】沸騰水型原子炉内を一部断面で示す側面図。
【図9】従来の原子炉内計測用配管クランプ装置を説明
するためのジェットポンプ近傍を拡大して一部縦断面で
示す斜視図。
【図10】(a)は図8における原子炉圧力容器内のジ
ェットポンプに計測用配管が取付けられた状態を示す展
開図、(b)は(a)の原子炉圧力容器内での配列状態
を部分的に示す横断面図。
【符号の説明】
1…原子炉圧力容器、2…冷却材、3…炉心、4…気水
分離器、5…蒸気乾燥器、6…主蒸気管、7…ダウンカ
マ部、8…制御棒案内管、9…制御棒駆動機構、10…炉
心シュラウド、11…ジェットポンプ、12…ライザー管、
13…再循環入口ノズル、14…トランジションピース、15
(15A,15B)…エルボ、16(16A,16B)…混合ノズ
ル、17(17A,17B)…インレットスロート、18(18
A,18B)…ディフューザ、19…計測用配管、20…ライ
ザーブレース、21…耳部、22…溝部、23…ジェットポン
プビーム、24…サポート、25…ライザーブランケット、
26…シュラウドサポート、27…ジェットポンプ計測用ノ
ズル、28…ヘッドボルト、29…環状空間、30…半円状ア
ーム、31…ボディ、32…突起、33…吊り耳、34…固定用
くさび、35…固定用くさび穴、36…締付ボルト、37…ね
じ部、38…ねじ穴、39…上部軸、40…上部軸穴、41…ゆ
るみ止めボルト、42…ねじ部、43…ねじ穴、44…もどし
部材、45…大径穴、46…突起部材、47…ナット、48…座
金、49…折り曲げ部材、50…折り曲げ部、51…ストッ
パ、52…面、53…大形V字状溝、54…押付け用くさび、
55…ピン、56…長穴、57…ピン挿入用穴、58…小形V字
状溝、59…支工、60…上部格子板、61…炉心支持板、62
…燃料交換機、63…ポール取扱い機構、64…ポール、65
…ホイスト、66…ワイヤ、67…ポール接続部、68…原子
炉内計測用配管装置、69…ナットランナ、70…くさびサ
ポート、71…爪、72,73…ボルト、74…保持ブロック、
75,76…クランプ装置吊上げ用穴。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a top view showing a first embodiment of a piping clamp device for measurement in a nuclear reactor according to the present invention. FIG. 2 is a side view showing a partial longitudinal section in FIG. 1; FIG. 3 is an enlarged top view showing a part a in FIG. 1; FIG. 4 is an enlarged side view of a portion b in FIG. FIG. 5 is a schematic diagram for explaining a usage state of the piping clamp device for measurement in a nuclear reactor according to the present invention in a nuclear reactor. FIG. 6 is an enlarged side view of a part C in FIG. FIG. 7A is a top view for explaining a second embodiment of a piping clamp device for measurement in a nuclear reactor according to the present invention,
(B) is an elevation view which shows the holding block and arm assembly in (a). FIG. 8 is a side view showing a partial cross section of the inside of the boiling water reactor. FIG. 9 is an enlarged perspective view of a vicinity of a jet pump for explaining a conventional piping clamp device for measurement in a nuclear reactor, and showing a partial vertical cross section. 10A is a developed view showing a state in which a measuring pipe is attached to a jet pump in the reactor pressure vessel in FIG. 8, and FIG. 10B is an arrangement state in the reactor pressure vessel of FIG. FIG. [Description of Signs] 1 ... reactor pressure vessel, 2 ... coolant, 3 ... core, 4 ... steam separator, 5 ... steam dryer, 6 ... main steam pipe, 7 ... downcomer section, 8 ... control rod guide Pipe, 9: control rod drive mechanism, 10: core shroud, 11: jet pump, 12: riser pipe,
13 ... Recirculation inlet nozzle, 14 ... Transition piece, 15
(15A, 15B) Elbow, 16 (16A, 16B) Mixing nozzle, 17 (17A, 17B) Inlet throat, 18 (18
A, 18B) ... diffuser, 19 ... measurement piping, 20 ... riser brace, 21 ... ear, 22 ... groove, 23 ... jet pump beam, 24 ... support, 25 ... riser blanket,
26 ... shroud support, 27 ... jet pump measurement nozzle, 28 ... head bolt, 29 ... annular space, 30 ... semicircular arm, 31 ... body, 32 ... protrusion, 33 ... hanging ear, 34 ... fixing wedge, 35 ... Wedge hole for fixing, 36 ... Tightening bolt, 37 ... Screw part, 38 ... Screw hole, 39 ... Upper shaft, 40 ... Upper shaft hole, 41 ... Screw-proof bolt, 42 ... Screw part, 43 ... Screw hole, 44 ... Returning member, 45 ... Large diameter hole, 46 ... Protrusion member, 47 ... Nut, 48 ... Washer, 49 ... Bending member, 50 ... Bending part, 51 ... Stopper, 52 ... Surface, 53 ... Large V-shaped groove, 54… Wedge for pressing,
55 ... Pin, 56 ... Elongated hole, 57 ... Pin insertion hole, 58 ... Small V-shaped groove, 59 ... Support, 60 ... Upper lattice plate, 61 ... Core support plate, 62
… Refueling machine, 63… pole handling mechanism, 64… pole, 65
... Hoist, 66 ... Wire, 67 ... Pole connection part, 68 ... Piping device for measurement in reactor, 69 ... Nutrunner, 70 ... Wedge support, 71 ... Claw, 72, 73 ... Bolt, 74 ... Holding block,
75, 76 ... holes for lifting the clamp device.
Claims (1)
けられたジェットポンプのディフューザと計測用配管を
溶接により固定するサポートを有し、このサポートと前
記計測用配管の溶接部に生じる流体振動による応力を低
減するための原子炉内計測用配管クランプ装置におい
て、前記ディフューザの外側に当接する半円状アーム
と、このアームの一端部または両端部に設けられたボデ
ィと、このボディに締付けボルトを介して設けられた固
定用くさびと、この固定用くさびに一端が嵌入され他端
が前記計測用配管の外面に当接し前記固定用くさびにピ
ンを介して連結する押付け用くさびとを具備し、前記ボ
ディには前記締付けボルトに隣接して前記締付けボルト
のゆるみを止めるゆるみ止めボルトが設けられたことを
特徴とする原子炉内計測用配管クランプ装置。(1) Claims 1. A diffuser of a jet pump provided in a reactor pressure vessel of a boiling water reactor and a support for fixing a measurement pipe by welding. in reactor measuring pipe clamping device for reducing the stress caused by the fluid vibration generated in the welded portion of the measurement pipe, and semicircular arm you contact the outside of the diffuser, one end or both ends of the arm Body, a fixing wedge provided on the body via a tightening bolt, one end of which is fitted into the fixing wedge, and the other end of which abuts against the outer surface of the measurement pipe to contact the fixing wedge. comprising a wedge for pressing linked via a pin, said ball
D is adjacent to the tightening bolt
A piping clamp device for measurement in a nuclear reactor, wherein a locking bolt for stopping loosening is provided .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24933195A JP3372145B2 (en) | 1995-09-27 | 1995-09-27 | Pipe clamp device for measurement in reactor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24933195A JP3372145B2 (en) | 1995-09-27 | 1995-09-27 | Pipe clamp device for measurement in reactor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0990085A JPH0990085A (en) | 1997-04-04 |
| JP3372145B2 true JP3372145B2 (en) | 2003-01-27 |
Family
ID=17191428
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP24933195A Expired - Lifetime JP3372145B2 (en) | 1995-09-27 | 1995-09-27 | Pipe clamp device for measurement in reactor |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3372145B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6052425A (en) * | 1998-12-21 | 2000-04-18 | General Electric Company | Jet pump auxiliary wedge |
| US8608121B2 (en) * | 2007-07-06 | 2013-12-17 | Kabushiki Kaisha Toshiba | Device and method for fixing a reactor metering pipe |
| JP5564355B2 (en) * | 2010-08-06 | 2014-07-30 | 日立Geニュークリア・エナジー株式会社 | Clamp device installation device and installation method for jet pump measurement piping |
| KR101250807B1 (en) * | 2011-12-05 | 2013-04-04 | 한국수력원자력 주식회사 | Setting method and device of measurement instrument for comprehensive vibration assessment of reactor vessel internals |
| JP6192033B2 (en) * | 2013-04-11 | 2017-09-06 | 日立Geニュークリア・エナジー株式会社 | Pipe pump clamping device |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4675149A (en) | 1986-01-31 | 1987-06-23 | General Electric Company | Jet pump beam holder/positioner tool |
-
1995
- 1995-09-27 JP JP24933195A patent/JP3372145B2/en not_active Expired - Lifetime
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4675149A (en) | 1986-01-31 | 1987-06-23 | General Electric Company | Jet pump beam holder/positioner tool |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0990085A (en) | 1997-04-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8608121B2 (en) | Device and method for fixing a reactor metering pipe | |
| US7185798B2 (en) | Apparatus and method for mechanically reinforcing the welds between riser pipes and riser braces in boiling water reactors | |
| JP3372145B2 (en) | Pipe clamp device for measurement in reactor | |
| JP2010286485A (en) | Riser brace clamp for jet pump | |
| US9718151B2 (en) | Reactor measurement-pipe maintenance clamp apparatus | |
| JP5897156B2 (en) | Water jet peening apparatus and water jet peening construction method | |
| JP5479067B2 (en) | In-furnace structure and welding method thereof | |
| JP3128174B2 (en) | Segmented instrumentation tube | |
| JP2009008676A (en) | Device and method for repairing water riser pipe elbow weld of boiling-water nuclear reactor | |
| JP3514931B2 (en) | Jet pump clamp device and its handling device | |
| JP4108878B2 (en) | Jet pump riser brace reinforcement device | |
| JP3425262B2 (en) | Jet pump sealing device and jet pump inspection and repair method using the same | |
| JP4080641B2 (en) | Reactor pump seal device | |
| JP4351812B2 (en) | Reactor pump seal device | |
| JP2002040186A (en) | Reactor piping inspection system | |
| US5600688A (en) | Tool for installing hardware for radially supporting vertical restraint tie rod | |
| JPH0638114B2 (en) | Replacement riser brace structure | |
| JP2994084B2 (en) | Riser tube holding device | |
| JP2000162362A (en) | Jet pump sealing device | |
| JP4469520B2 (en) | Reactor piping seal device, its handling tool, and reactor piping seal method | |
| JP2000035495A (en) | Equipment for installation in piping | |
| JP4393011B2 (en) | Replacement method of core spray system equipment | |
| JP3071311B2 (en) | How to repair riser brace | |
| JPH0820546B2 (en) | In-reactor inspection device | |
| JP3425217B2 (en) | Sealing device for repairing pressure vessel penetration housing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071122 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081122 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091122 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101122 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101122 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111122 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121122 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131122 Year of fee payment: 11 |
|
| EXPY | Cancellation because of completion of term |