JP3390719B2 - Concrete formwork construction method - Google Patents
Concrete formwork construction methodInfo
- Publication number
- JP3390719B2 JP3390719B2 JP2000043217A JP2000043217A JP3390719B2 JP 3390719 B2 JP3390719 B2 JP 3390719B2 JP 2000043217 A JP2000043217 A JP 2000043217A JP 2000043217 A JP2000043217 A JP 2000043217A JP 3390719 B2 JP3390719 B2 JP 3390719B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- metal
- metal foam
- foam
- anchor member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【発明の詳細な説明】
【0001】
【発明の属する技術分野】本発明は、コンクリート打設
工事に於いて初回のコンクリート打設後、引き続き第2
回目以降のコンクリート打設用コンクリート型枠を構成
する際の作業能率と安全性を高めたコンクリート型枠構
築工法に関するものである。
【0002】
【従来の技術】従来から例えば砂防ダム等の様なコンク
リート構造物を築造するには、図5に概略断面構造を示
すように、メタルフォーム1と呼称する部材を型枠支柱
2に沿って配列し、フックボルト6で固定してコンクリ
ート型枠11を構成する。そして前記メタルフォーム1
に固定部材3を取り付け、当該固定部材3のコンクリー
ト型枠11のコンクリート打設空間Sに面した側に一端
が基礎部分に取り付けられているアンカー部材4を取り
付け、当該コンクリート型枠11がコンクリート壁面を
形成するように所定位置に立設してコンクリート擁壁を
構築する。しかる後コンクリートを注入して硬化させ
る。コンクリート構造物が巨大な場合は一度に所定形状
に仕上げることは使用する資材の量の関係から困難であ
るので基礎C0に続いて第1段目C1(仮想線で表示)
を施工し、次いで、一定の養生期間が経過してから、第
1段目C1の上部に第2段目のコンクリート擁壁を構築
して第2段目を施工し、以下この工法を繰り返す(2段
目以降図示省略)。
【0003】アンカー部材4とメタルフォーム1及び型
枠支柱2との結合は、メタルフォーム1の面板に固定座
金3を取り付け、当該固定座金3のコンクリート打設空
間S側の部位にアンカー部材4を結合し、コンクリート
打設空間Sと反対側の部位に、メタルフォーム1と型枠
支柱2とに固定するためのフォームタイ7を螺合し、ナ
ット、座金により固定する。固定座金3と予め頭出しし
て埋め込まれているアンカー部材4とは伸縮可能のジョ
イント8で結合され、コンクリート型枠11の必要とさ
れる傾斜を維持する。
【0004】
【発明が解決しようとする課題】上述した従来工法で
は、次段以降の型枠を形成する場合に前段の硬化したコ
ンクリートから一旦型枠を外して解体し、しかる後次段
以降の型枠の最下段のコンクリート型枠11を前段のコ
ンクリート打設面と連続させて構築するので、次段のコ
ンクリート型枠11と前段のコンクリート打設面との間
に隙間が生じ、未硬化のコンクリートを注入した場合そ
の隙間に水やペーストが流入して各段の境界部の壁面の
仕上がり状態が悪いと言う欠点があった。又、次段以降
の型枠の構築に際して複数のメタルフォーム1を水平方
向に配列するための型枠のレベル出し及び通り出し作業
に多大の手数を要し、作業能率を低下させる一因となる
と共に、安全性にも解決すべき課題を抱えていた。
【0005】そこで、本発明は、上記従来例のコンクリ
ート型枠が有する、型枠構築のための作業量の多大性、
構築部材の構造並びに構築方法に起因する安全性や作業
能率の低下、区分して築造された打設面の外観不良等の
諸課題を解消する事を可能とするコンクリート型枠構築
工法を提供する事を目的とする。
【0006】
【課題を解決するための手段】上記目的を達成するため
の解決手段を実施例を示す図面と共通の符号を用いて説
明すると、本発明のコンクリート型枠構築工法は、コン
クリート打設空間Sに面して上下方向に複数段配設され
たメタルフォーム1と、その外側に立設され連結金具6
を介してこれらのメタルフォーム1を所定姿勢に維持さ
せる型枠支柱2と、コンクリート打設空間S側において
該メタルフォーム1とアンカー部材4との間に張設され
た緊張連結具3とを備えたコンクリート型枠構築工法で
あって、前記複数段配設されたメタルフォーム1の内、
少なくとも最上段のメタルフォーム1を前記緊張連結具
3を介してアンカー部材4と連結した状態で、空間S内
に未硬化コンクリートCを打設し、所定硬度に硬化させ
た後、前記最上段のメタルフォーム1を残して2段目以
降の複数のメタルフォーム1を前段の構築に使用した型
枠支柱2に連結したままの状態でコンクリート面から剥
離除去させ、この型枠支柱2と連結したままの最下段の
メタルフォーム1をコンクリート面に残したままの前記
最上段のメタルフォーム1を固定枠として次工程のメタ
ルフォーム1にセットするとともに所要アンカー部材4
と連結し、以下、順次前記工程を繰り返す工法である。
【0007】
【発明の実施の形態】本発明を実施するに当たっては、
メタルフォーム1、型枠支柱2(作業現場では本柱と呼
称)は通常の製品を使用し、複数段のメタルフォーム1
を型枠支柱2に連結金具6で結合してパネル状のコンク
リート型枠11を形成し、該コンクリート型枠11の最
上段のメタルフォーム1とアンカー部材4とを緊張連結
具3により結合する。この緊張連結具3は、コンクリー
ト打設空間S側とその反対側とに螺合により分割可能な
構造とした内連結具3aと、外連結具3bと、内連結具
3aとアンカー部材4とを結合するジョイント3c及び
外連結具3bと型枠支柱2とを結合するジョイント3d
とからなる。該緊張連結具3のコンクリート打設空間S
側にはジョイント3cを介してアンカー部材4を、又、
反対側にはフォームタイ3dの一端部を夫々結合し、当
該フォームタイ3dの他端部は型枠支柱2に座金とナッ
トで固定する。この状態でコンクリート打設を行うが、
次段のコンクリート打設に備えてターンバックル4aに
より伸縮可能なアンカー部材4を頭出しした状態で埋め
込んでおく。尚、9は型枠支柱2に固定されている足場
支持枠である。
【0008】コンクリートが硬化し、一定の養生期間を
経過した後、最上段のメタルフォーム1と型枠支柱2と
を結合している前記連結金具6をメタルフォーム1から
外し、又、緊張連結具3を介してアンカー部材4が結合
されている部位では、フォームタイ3dを外連結具3b
から外して、最上段のメタルフォーム1を残してパネル
状のコンクリート型枠11を分離する。最上段のメタル
フォーム1はアンカー部材4と緊張連結具3の内連結具
3aと外連結具3bとにより固定されているので打設し
たコンクリート面から離れる事なく残留し、分離された
コンクリート型枠11はチェーンブロック又はクレーン
で型枠全体を引き上げ、最下段であったメタルフォーム
1を最上段であったメタルフォーム1の上に続けて設置
し、将来コンクリートに埋設されるアンカー部材4と連
結する。最上段と最下段との適当な中間位置にあるメタ
ルフォーム1に緊張連結具3を設けて、該緊張連結具3
と頭出しした状態で埋め込まれているアンカー部材4と
を、連結穴が連続穿設されているジョイント3cで連結
し、連結穴の位置を変更し、又、アンカー部材4のター
ンバックル4aを調節してコンクリート型枠11の傾斜
を変えて所定の姿勢に保持させる。
【0009】上記工法によると、次段のコンクリート型
枠11の構築に際して、前段の構築に際して使用したコ
ンクリート型枠11をそのまま利用するので、再組立に
要する作業と時間とを格段に減少させる事ができる。場
合によっては最初の型枠組み立てを平面上で行う事がで
きるので、作業が容易であり、且つ安全である。次に、
次段のコンクリート型枠11を構築するとき、当初に最
上段であったメタルフォーム1を硬化したコンクリート
上に残して固定枠として次工程のコンクリート型枠11
を組み立てるので、新型枠の左右の水平度や連続性等を
配慮する必要がなく、通り出し作業が不要であるから設
置が極めて容易であり、従って両者相俟って施工経費を
大幅に低減させることが可能である。
【0010】又、2段目以降の築造に際して前段のコン
クリート型枠11の最上段であったメタルフォーム1は
そのまま取り外すこと無く打設ずみのコンクリート面に
残留するので、当該コンクリート面と固定枠となるメタ
ルフォーム1との間に一切隙間がなく、新たに構築され
たコンクリート型枠11の内側に未硬化のコンクリート
を注入した場合その隙間に水やペーストが流入する事が
ないので、各段の境界部の壁面の仕上がり状態は極めて
良好である。更に、分割された緊張連結具3の結合部の
ボルト部に嵌合されてフリーとなっている座金を採用す
る事で、緊張連結具3を取り外す時にナット部のみが緩
むので、座金によってメタルフォーム1を痛めることも
なく、ナット部の取り外しが容易である特徴を有する。
更に又、コンクリート型枠11を段階的にずらせて能率
よく施工するため、工事全体として使用部品を少なくし
得るという効果をも有する。
【0011】
【実施例】以下本発明の詳細を図に示した実施例に基き
説明する。図1は第1実施例の構造を説明する断面図、
図2は要部拡大断面図、図3,図4は順序に従って工法
の細部を説明する説明用の断面図である。
【0012】図1は2段目以降でコンクリートが未注入
な状態のコンクリート型枠11の構造を説明する断面図
で、同図に於て未注入のコンクリートCは一点鎖線で記
入されている。又、図2は要部拡大断面図であって図
1、図2の両図を参照して説明すると、コンクリート型
枠11は型枠支柱2に複数個のメタルフォーム1が配列
された状態で連結金具6で結合されてパネルを形成して
いる。メタルフォーム1は浅い箱のような形状をなし、
箱の底板に相当するコンクリート受け板1aの外周に幅
Wの補強枠1bが立上がり形成されている。図2に示す
ように、補強枠1bには穴1cが穿設され、型枠支柱2
に沿って配列させて隣接するメタルフォーム1の穴1c
に跨がって連結金具6の一端部の鉤状部を引っ掛け、他
端部を型枠支柱2に捩子止めして固定する。尚、9は足
場支持枠である。
【0013】コンクリート型枠11の最上段のメタルフ
ォーム1に、コンクリート打設空間S側とその反対側と
に夫々位置する内連結具3a,外連結具3bの2部分に
分割可能とした緊張連結具3をコンクリート受け板1a
を挟んで両者を螺合させて取り付け、該緊張連結具3の
コンクリート打設空間S側の内連結具3aにはコンクリ
ート打設後に埋没するアンカー部材4を、又、反対側の
外連結具3bにはフォームタイ3dの一端部を夫々結合
し、フォームタイ3dの他端部は型枠支柱2に固定す
る。
【0014】図3に於て、上記により構築されたコンク
リート型枠11のコンクリート打設空間Sに未硬化のコ
ンクリートを注入し、所定期間養生硬化させた後最上段
のメタルフォーム1(図3,図4の面上で太線で表示)
を残してコンクリート型枠11を分離し、当該分離した
コンクリート型枠11を2段目の型枠として、その最下
段のメタルフォーム1を前段階で最上段となっていたメ
タルフォーム1の上に続けて設置設し、該メタルフォー
ム1dを固定枠として次工程のメタルフォーム1を組み
立てるとともに所要アンカー部材4と連結する。それに
は図3に示すように、最上段のメタルフォーム1と型枠
支柱2とを結合している前記連結金具6をメタルフォー
ム1から外し、次に一端部で連結されているフォームタ
イ3dを外連結具3bから外すだけでメタルフォーム1
は緊張連結具3とアンカー部材4とでコンクリート面に
固定されたまま残留し、コンクリート型枠11から分離
することになる。次に図4に示すように分離したコンク
リート型枠11を2段目型枠として再構築することにな
る。この時外連結具3bをメタルフォーム1の補強枠1
bの上端縁から突出しないような寸法に設定することに
より、分離されたコンクリート型枠11を移動する際に
外連結具3bに引っ掛かって作業を阻害するような事態
を避けることができる。
【0015】以上本発明の代表的と思われる実施例につ
いて説明したが、本発明は必ずしもこれらの実施例構造
のみに限定されるものではなく、本発明にいう構成要件
を備え、本発明にいう目的を達成し、以下にいう効果を
有する範囲内において適宜改変して実施することができ
るものである。
【0016】
【発明の効果】以上の説明から既に明らかなように、本
発明によるコンクリート型枠構築工法は、次段のコンク
リート型枠の構築に際して、当初に最上段であったメタ
ルフォームを硬化したコンクリート上に残して二段目以
下の複数のメタルフォームを型枠支柱に連結したままの
状態でコンクリート面から離して上方に持ち上げ、この
型枠支柱と連結したままの最下段のメタルフォームを前
記コンクリート面に残したままのメタルフォームの上部
に載置させた状態として次工程のメタルフォームを組み
立てるので、次段の型枠の左右方向の水平度や連続性等
を配慮する必要がなく、通り出し作業が不要であるから
組み立てが極めて容易で極めて安全であり、組み立て時
間を省略することで施工経費を大幅に低減させることが
可能と言う効果を有する。
【0017】又、2段目以降の築造に際して前段のコン
クリート型枠の最上段であったメタルフォームは取り外
すこと無く前段のコンクリート面に残留してガイド作用
を有する固定枠となるので、当該コンクリート面と固定
枠メタルフォームとの間に一切隙間がなく、未硬化のコ
ンクリートを注入した場合、従来のように新たに構築さ
れたコンクリート型枠内面とコンクリート面との隙間に
水やペーストが流入しないので、各段の境界部の壁面の
仕上がり状態は極めて良好であると言う効果をも得る事
ができるに至ったのである。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to concrete
The present invention relates to a concrete formwork construction method that improves work efficiency and safety when constructing a concrete formwork for concrete placement after the first time. 2. Description of the Related Art Conventionally, in order to construct a concrete structure such as a sabo dam, for example, a member called a metal foam 1 is formed on a form support 2 as shown in FIG. The concrete form 11 is formed by arranging along the lines and fixing with the hook bolts 6. And the metal form 1
The anchor member 4 having one end attached to the base portion is attached to the side of the fixed member 3 facing the concrete placing space S of the concrete form 11, and the concrete form 11 is attached to the concrete wall surface. A concrete retaining wall is built upright at a predetermined position so as to form a concrete retaining wall. After that, concrete is poured and hardened. If the concrete structure is huge, it is difficult to finish it into a predetermined shape at once because of the amount of materials used, so the first stage C1 following the foundation C0 (displayed in phantom lines)
Then, after a certain curing period has elapsed, a second-stage concrete retaining wall is constructed above the first-stage C1, and the second-stage is constructed. Thereafter, this construction method is repeated ( The second and subsequent stages are not shown). The anchor member 4 is connected to the metal foam 1 and the form support 2 by attaching a fixed washer 3 to a face plate of the metal foam 1 and attaching the anchor member 4 to a portion of the fixed washer 3 on the concrete placing space S side. After joining, a form tie 7 for fixing to the metal form 1 and the formwork column 2 is screwed to a portion opposite to the concrete casting space S, and fixed with a nut and a washer. The fixed washer 3 and the anchor member 4 which has been previously caught and embedded are connected by a telescopic joint 8 so as to maintain the required inclination of the concrete form 11. [0004] In the above-mentioned conventional method, when forming a mold in the next and subsequent stages, the mold is temporarily removed from the hardened concrete in the previous stage and dismantled, and then the concrete in the next and subsequent stages is formed. Since the lowermost concrete form 11 of the form is connected to the previous concrete placing surface, the gap is formed between the next concrete form 11 and the previous concrete placing surface, and the uncured concrete form 11 is formed. When concrete is poured, there is a drawback that water or paste flows into the gap and the finished state of the wall surface at the boundary of each step is poor. Further, when constructing the molds at the next and subsequent stages, it takes a great deal of trouble to level and form the molds for arranging the plurality of metal forms 1 in the horizontal direction, which is one of the causes of lowering the work efficiency. At the same time, there were safety issues to be solved. [0005] Therefore, the present invention provides a large amount of work for constructing the formwork of the conventional concrete formwork,
Provided is a concrete formwork construction method capable of solving various problems such as a decrease in safety and work efficiency caused by a structure and a construction method of a construction member, and a poor appearance of a separately cast and cast surface. For the purpose. Means for achieving the above object will be described with reference to the drawings showing the embodiment and common reference numerals. The concrete formwork construction method of the present invention is a concrete casting method. A plurality of metal foams 1 vertically arranged facing the space S, and connecting metal fittings 6 erected outside the metal foams 1.
Form support 2 for maintaining these metal foams 1 in a predetermined posture via a buckle, and a tension connecting member 3 stretched between the metal foam 1 and the anchor member 4 on the concrete placing space S side. Concrete formwork construction method, wherein the metal form 1 arranged in a plurality of stages,
In a state where at least the uppermost metal foam 1 is connected to the anchor member 4 via the tension connector 3, uncured concrete C is poured into the space S and hardened to a predetermined hardness. A mold that uses multiple metal forms 1 in the second and subsequent stages for the previous stage , leaving the metal form 1
In the state where it is connected to the frame support 2, it is peeled off from the concrete surface and the lowermost stage connected to the form support 2 is removed .
It required anchoring member as well as set the metal foam 1 of the next step the <br/> metal foam 1 uppermost still leaving a metal foam 1 into the concrete surface as the fixed frame 4
Then, the above steps are sequentially repeated. DESCRIPTION OF THE PREFERRED EMBODIMENTS In carrying out the present invention,
For the metal form 1 and the form support 2 (referred to as the main pillar at the work site), a normal product is used.
Is connected to the form support 2 by the connection fitting 6 to form a panel-shaped concrete form 11, and the uppermost metal form 1 of the concrete form 11 and the anchor member 4 are connected by the tension connection 3. This tensioned connecting member 3 is composed of an inner connecting member 3a, an outer connecting member 3b, an inner connecting member 3a and an anchor member 4 which can be divided by screwing into the concrete placing space S side and the opposite side. The joint 3c to be connected and the joint 3d to connect the outer connecting member 3b and the form support 2
Consists of Concrete placing space S of the tension connector 3
On the side, an anchor member 4 is provided via a joint 3c,
One end of the foam tie 3d is connected to the opposite side, and the other end of the foam tie 3d is fixed to the form post 2 with a washer and a nut. Concrete is poured in this state,
In order to prepare for the next stage of concrete placement, the extendable anchor member 4 is embedded in a state where the head is caught by the turnbuckle 4a. Reference numeral 9 denotes a scaffold support frame fixed to the form support 2. After the concrete has hardened and a certain curing period has elapsed, the connecting metal fitting 6 connecting the uppermost metal foam 1 and the formwork column 2 is removed from the metal foam 1, and a tensioned connecting metal is used. 3, the foam tie 3 d is connected to the outer connector 3 b
Then, the panel-shaped concrete form 11 is separated while leaving the metal foam 1 at the top. Since the uppermost metal form 1 is fixed by the anchor member 4 and the inner connecting member 3a and the outer connecting member 3b of the tension connecting member 3, it remains without leaving the cast concrete surface and is separated from the concrete form. Reference numeral 11 denotes a chain block or a crane that pulls up the entire formwork, successively installs the lowermost metal form 1 on the uppermost metal form 1 and connects it to the anchor member 4 to be buried in concrete in the future. . A tension connector 3 is provided on the metal foam 1 at an appropriate intermediate position between the uppermost stage and the lowermost stage.
And the anchor member 4 embedded in the crawled state is connected by a joint 3c having a continuous connection hole, the position of the connection hole is changed, and the turnbuckle 4a of the anchor member 4 is adjusted. Then, the inclination of the concrete formwork 11 is changed to maintain the concrete form 11 in a predetermined posture. According to the above-mentioned construction method, when constructing the next concrete form 11, the concrete form 11 used in the previous construction is used as it is, so that the work and time required for reassembly can be reduced significantly. it can. In some cases, the initial mold assembly can be performed on a flat surface, so that the work is easy and safe. next,
When constructing the next-stage concrete form 11, the metal form 1 which was the uppermost step at the beginning is left on the hardened concrete to serve as a fixed form as the fixed form 11 in the next step.
Because it is assembled, there is no need to consider the horizontal level and continuity of the new frame, and it is extremely easy to install because it does not need to go through the work. It is possible. In the second and subsequent steps, the metal foam 1, which was the uppermost step of the concrete form 11 of the previous step, remains on the cast concrete surface without being removed. When there is no gap between the metal form 1 and the unhardened concrete is poured into the newly constructed concrete form 11, water and paste do not flow into the gap. The finished condition of the wall surface at the boundary is very good. Furthermore, by adopting a washer that is fitted to the bolt portion of the coupling portion of the divided tension coupling device 3 and is free, only the nut portion is loosened when the tension coupling device 3 is removed. It has a feature that the nut portion can be easily removed without damaging the nut.
Furthermore, since the concrete formwork 11 is displaced in a stepwise manner and is constructed efficiently, there is an effect that the number of parts used can be reduced in the whole construction. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The details of the present invention will be described below with reference to an embodiment shown in the drawings. FIG. 1 is a sectional view illustrating the structure of the first embodiment,
FIG. 2 is an enlarged cross-sectional view of a main part, and FIGS. 3 and 4 are cross-sectional views for explaining the details of the method according to the order. FIG. 1 is a cross-sectional view for explaining the structure of a concrete formwork 11 in a state where concrete has not been poured in the second and subsequent steps. In the same figure, unfilled concrete C is indicated by a one-dot chain line. FIG. 2 is an enlarged sectional view of a main part. Referring to FIGS. 1 and 2, the concrete form 11 is in a state where a plurality of metal forms 1 are arranged on the form support 2. The panel is formed by being connected by the connection fitting 6. Metal Form 1 is shaped like a shallow box,
A reinforcing frame 1b having a width W is formed upright on an outer periphery of a concrete receiving plate 1a corresponding to a bottom plate of a box. As shown in FIG. 2, a hole 1c is formed in the reinforcing frame 1b,
Holes 1c of the adjacent metal form 1 arranged along
And hook the hook-like portion at one end of the connection fitting 6, and fix the other end to the form support 2 by screwing. In addition, 9 is a scaffold support frame. A tension connection that can be divided into two parts, an inner connection tool 3a and an outer connection tool 3b, which are respectively located on the concrete casting space S side and on the opposite side, to the uppermost metal form 1 of the concrete formwork 11. Fixture 3 on concrete receiving plate 1a
The anchor member 4 to be buried after the concrete is cast is attached to the inner connecting tool 3a of the tension connecting tool 3 on the side of the concrete casting space S, and the outer connecting tool 3b is mounted on the opposite side. Is connected to one end of the form tie 3d, and the other end of the form tie 3d is fixed to the form post 2. In FIG. 3, uncured concrete is poured into the concrete casting space S of the concrete form 11 constructed as described above, and after curing for a predetermined period, the uppermost metal foam 1 (FIG. 3, FIG. 3). (Indicated by a bold line on the surface in Fig. 4)
And the concrete form 11 is separated, and the separated concrete form 11 is used as a second form, and the lowermost metal form 1 is placed on the metal form 1 which was the uppermost in the previous step. Subsequently, the metal foam 1d is used as a fixed frame to assemble the metal foam 1 in the next step, and is connected to the required anchor member 4. For this purpose, as shown in FIG. 3, the connecting metal fitting 6 connecting the uppermost metal form 1 and the form support 2 is removed from the metal form 1, and then the form tie 3d connected at one end is removed. Metal foam 1 simply by removing it from the external connector 3b
Will remain fixed to the concrete surface by the tension connector 3 and the anchor member 4 and will be separated from the concrete form 11. Next, as shown in FIG. 4, the separated concrete form 11 is rebuilt as a second-stage form. At this time, the outer connecting member 3b is connected to the reinforcing frame 1 of the metal foam 1.
By setting the dimensions so as not to protrude from the upper end edge of b, it is possible to avoid a situation in which the separated concrete form 11 is caught by the outer connecting tool 3b and hinders the work when moving. Although the embodiments which are considered to be representative of the present invention have been described above, the present invention is not necessarily limited to only the structures of these embodiments, but includes the structural requirements according to the present invention and refers to the present invention. The present invention can be implemented by appropriately modifying it within the range of achieving the object and having the following effects. As is apparent from the above description, the concrete form construction method according to the present invention hardens the metal foam that was initially the uppermost step when constructing the next concrete form. Leave on the concrete and raise the metal foam of the second stage or less away from the concrete surface while being connected to the form support, and lift the metal form of the lowermost stage connected to this form support. Since the metal foam for the next process is assembled with it placed on top of the metal foam that has been left on the concrete surface, there is no need to consider the horizontality and continuity etc. of the next formwork in the left and right direction. No assembly work is required, making assembly extremely easy and extremely safe. It has the effect of saying. In the second and subsequent steps, the metal foam, which was the uppermost step of the former concrete formwork, remains on the previous concrete surface without being removed and becomes a fixed frame having a guiding action. When there is no gap between the fixed form metal foam and uncured concrete, water and paste do not flow into the gap between the concrete surface inside the newly constructed concrete form and the concrete surface as in the past. In addition, it is possible to obtain the effect that the finished state of the wall surface at the boundary of each step is extremely good.
【図面の簡単な説明】
【図1】第1実施例の構造説明用の断面図。
【図2】同、要部拡大断面図。
【図3】同、メタルフォームとコンクリート型枠とを分
離する工程の説明図。
【図4】同、分離したコンクリート型枠の移設、再構築
説明図。
【図5】従来例の構造説明用の断面図。
【符号の説明】
1 メタルフォーム
2 型枠支柱
3 緊張連結具
4 アンカー部材
6 連結金具
9 足場支持枠
11 コンクリート型枠BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a sectional view for explaining the structure of a first embodiment. FIG. 2 is an enlarged sectional view of a main part of the same. FIG. 3 is an explanatory view of a step of separating a metal form and a concrete formwork. FIG. 4 is an explanatory view showing the relocation and rebuilding of the separated concrete formwork. FIG. 5 is a sectional view for explaining the structure of a conventional example. [Explanation of Signs] 1 Metal foam 2 Form support 3 Tension connection tool 4 Anchor member 6 Connection fitting 9 Scaffold support frame 11 Concrete form
Claims (1)
方向に複数段配設されたメタルフォーム(1)と、その外
側に立設され連結金具(6)を介してこれらのメタルフォ
ーム(1)を所定姿勢に維持させる型枠支柱(2)と、コンク
リート打設空間(S)側において該メタルフォーム(1)とア
ンカー部材(4)との間に張設された緊張連結具(3)とを備
えたコンクリート型枠構築工法であって、前記複数段配
設されたメタルフォーム(1)の内、少なくとも最上段の
メタルフォーム(1)を前記緊張連結具(3)を介してアンカ
ー部材(4)と連結した状態で、空間(S)内に未硬化コンク
リート(C)を打設し、所定硬度に硬化させた後、前記最
上段のメタルフォーム(1)を残して2段め以降の複数の
メタルフォーム(1)を前段の構築に使用した型枠支柱(2)
に連結したままの状態でコンクリート面から剥離除去さ
せ、この型枠支柱(2)と連結したままの最下段のメタル
フォーム(1)をコンクリート面に残したままの前記最上
段のメタルフォーム(1)を固定枠として次工程のメタル
フォーム(1)にセットするとともに所要アンカー部材(4)
と連結し、順次前記工程を繰り返すコンクリート型枠構
築工法。(57) [Claims] [Claim 1] A metal foam (1) arranged in a plurality of stages in the vertical direction facing a concrete casting space (S), and a connecting metal fitting ( 6), form supports (2) for maintaining the metal foam (1) in a predetermined posture, and the metal foam (1) and the anchor member ( 4) a concrete formwork construction method comprising a tension connector (3) stretched between the metal foam (1) , at least the uppermost metal foam of the plurality of metal foams (1) arranged With (1) connected to the anchor member (4) via the tension connector (3), the uncured concrete (C) is poured into the space (S) and hardened to a predetermined hardness, Form supports (2) using a plurality of second and subsequent metal forms (1) for the construction of the previous stage , leaving the uppermost metal foam (1 )
It was peeled off from the concrete surface in a state linked to the metal of the lowermost remains connected with the mold support column (2)
While the foam (1) is left on the concrete surface, the top metal foam (1) is set as a fixed frame on the metal foam (1) of the next process and the required anchor member (4)
A concrete formwork construction method that is connected to a concrete form and repeats the above steps sequentially.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000043217A JP3390719B2 (en) | 2000-02-21 | 2000-02-21 | Concrete formwork construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000043217A JP3390719B2 (en) | 2000-02-21 | 2000-02-21 | Concrete formwork construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001226944A JP2001226944A (en) | 2001-08-24 |
| JP3390719B2 true JP3390719B2 (en) | 2003-03-31 |
Family
ID=18566168
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000043217A Expired - Fee Related JP3390719B2 (en) | 2000-02-21 | 2000-02-21 | Concrete formwork construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3390719B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111042516A (en) * | 2019-12-24 | 2020-04-21 | 重庆新久融科技有限公司 | Creeping formwork hangs |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4961483B2 (en) * | 2010-02-10 | 2012-06-27 | 財団法人日本森林林業振興会 | Concrete formwork for concrete and concrete structure with this on the outer surface |
| CN108867568B (en) * | 2018-07-11 | 2020-05-19 | 中国葛洲坝集团第二工程有限公司 | Method for constructing water stopping vertical formwork of upper and lower reaches of arch dam by using hydraulic self-climbing cantilever formwork |
-
2000
- 2000-02-21 JP JP2000043217A patent/JP3390719B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111042516A (en) * | 2019-12-24 | 2020-04-21 | 重庆新久融科技有限公司 | Creeping formwork hangs |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001226944A (en) | 2001-08-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2346124C1 (en) | Method for manufacture of columns | |
| CN110616735A (en) | Template system for retaining wall and construction method of retaining wall | |
| JP3390719B2 (en) | Concrete formwork construction method | |
| CN117005680B (en) | Cast-in-situ bare concrete stand template and construction method thereof | |
| JP4026510B2 (en) | Rapid construction method for PCa structures | |
| AU2003240022B2 (en) | An erection unit for a building floor slab and the erection method thereof | |
| JP2001254495A (en) | Internal stairway for building, and building method therefor | |
| JP2002212966A (en) | Landscape protection wall creation method | |
| JP2001311247A (en) | Construction method for concrete structure | |
| JP5912194B1 (en) | Construction method of wooden building and basic member used in the construction method | |
| CN210766867U (en) | A template system for retaining wall | |
| CN112663943A (en) | Building structure wall construction method | |
| JP2001032241A (en) | Execution method for concrete structure and concrete placing mold | |
| JP2000352169A (en) | Inner stair for building, its construction method and assembly jig for erection therefor | |
| JP7851285B2 (en) | Building construction methods and buildings | |
| JP2000160834A (en) | Step-up construction of concrete caisson | |
| CN106013779A (en) | Positioning method for early-dismantling supporting system | |
| JP3114071B2 (en) | Embedded type leg anchoring method for steel columns | |
| CN214403606U (en) | Template supporting construction of T shape basis | |
| JP3287816B2 (en) | Building interior stairs | |
| CN224161101U (en) | A large-section stepped independent foundation formwork reinforcement device | |
| JPH09316900A (en) | Reverse construction method | |
| JP3665839B2 (en) | Construction method of buried formwork unit and dam body | |
| CN214034781U (en) | Adjustable template single-side supporting system | |
| JP3087196B2 (en) | How to build stairs |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |