JP3665839B2 - Construction method of buried formwork unit and dam body - Google Patents
Construction method of buried formwork unit and dam body Download PDFInfo
- Publication number
- JP3665839B2 JP3665839B2 JP05629296A JP5629296A JP3665839B2 JP 3665839 B2 JP3665839 B2 JP 3665839B2 JP 05629296 A JP05629296 A JP 05629296A JP 5629296 A JP5629296 A JP 5629296A JP 3665839 B2 JP3665839 B2 JP 3665839B2
- Authority
- JP
- Japan
- Prior art keywords
- embedded
- support frame
- unit
- concrete
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【0001】
【産業上の利用分野】
本発明は、ダム堤体などの構築技術に関するものである。
【0002】
【発明が解決しようとする課題】
従来より、ダム堤体の構築に際しては、合板型枠やメタルフォームといったものが使用されてきた。
ところで、こうした型枠は機能面での問題は無いものの、無味な印象の強い、景観美に乏しい外観の構築物しか得られない。したがって、近年、とくに重要になりつつある要件、すなわち自然景観の中に構築されるダム堤体と環境との調和といった要件を満足することが難しかった。
【0003】
良好な景観を得るため、合板型枠やメタルフォーム等を用いて構築されたダム堤体の表面に、例えば天然石などの被覆材を貼付する方法が提案されている。
しかし、被覆材の貼付作業は、ダム堤体そのものの構築にも増して、多大な労力が必要であり、コストが著しくかさむ。その上、熟練労働者の減少や、若手労働力の不足といった問題から、実施は困難である。
【0004】
こうした事情に鑑みて、鋭意研究を推し進めていった結果、本発明者は、ダム堤体の構築に際し、脱型せずに堤体表面に残置される埋設型枠を使用し、この埋設型枠の表面に予め景観性を付与しておけば、被覆材を貼付する手間が省け、優れた景観美を有するダム堤体を容易に得られるであろうと考えるに至った。
ところで、ダム堤体の構築に際しては、上流・下流面などの傾斜面部分、あるいは越流面などの曲面部分の施工時に、その形状に応じて、さまざまな向きや角度で埋設型枠を支持することが必要となる。そして、平滑で、均一な勾配を有する傾斜面や、滑らかに連続する曲面を得るためには、鉛直面部分の施工に比べ、極めて正確な墨出と、高精度な埋設型枠の位置調整が不可欠である。
【0005】
しかし、墨出に掛かる手間は甚大であり、作業の省力化が図りにくい。また、合板型枠などに比べ、埋設型枠の重量は非常に大きく、このため位置調整が著しく困難である。
こうした点を考慮して、更なる研究を推し進めていった結果、埋設型枠に、ダム堤体の勾配に対応して構成された支持用枠体を取り付け、ユニット化すれば、上記課題を解決できることが判ってきた。
【0006】
すなわち、埋設型枠を支持用枠体同士の連結によって建て込むようにすれば、面倒な墨出や位置調整作業をほとんど省略でき、施工性を大幅に改善できるようになる。また、外部作業が不要で、外部足場を設ける必要もないため、作業の省力化、簡略化が図れる。更に、コンクリート打設に1段分先行して、埋設型枠の建て込みを行えば、予め建て込まれた埋設型枠が、その段におけるコンクリート打設の際に防護柵の役割を果たすので、安全性が大幅に向上する。
【0007】
しかし、実際には、こうした施工性や安全性に優れた工法にも、解決しなければならない新たな課題が存在することが判ってきた。
すなわち、埋設型枠が受けるコンクリートの側圧は、埋設型枠ユニット同士の連結部分に集中し、それらを離間させる方向に作用する。このため、ときには連結部分が損傷することもあり、これは、建て込まれた埋設型枠ユニット倒壊の原因ともなる。
【0008】
こうした事故を避けるためには、埋設型枠ユニット同士の連結を、必要以上に強固なものとしなければならない。つまり、一時的に必要となる大きな強度を得るために、コンクリートの硬化後にあっては、まったく無意味な処理を行わねばならない。それゆえに、埋設型枠ユニットを用いても、作業の省力化に寄与するところは小さい。
【0009】
こうした課題を解決するべく、更なる研究を推し進めていった結果、本発明者は、埋設型枠ユニットの構造を、支持用枠体の下端連結面が埋設型枠の下端よりも下方に存在するようなものとすればよいことを見出した。すなわち、支持用枠体を下方にずらし、埋設型枠に対して段違いに取り付けてなる埋設型枠ユニットを用いれば、ある段の埋設型枠ユニットよりも、1段下方に存在する埋設型枠ユニットの上端までコンクリートを打設した際、これら埋設型枠ユニット同士の連結部分はコンクリート中に埋没する。そして、コンクリートが硬化すれば、上側の支持用枠体は根固めされた状態となる。したがって、連結強度をそれほど大きくする必要はなく、連結処理を簡略化できる。
【0010】
本発明はこうした知見に基づいてなされたもので、その課題は、ダム堤体に景観美を付与でき、しかも作業の省力化、安全性の向上が図れるダム堤体の構築技術を提供することである。
【0011】
【課題を解決するための手段】
上記本発明の課題は、裏面側に連結治具が設けられた埋設型枠と、
前記連結治具を用いて前記埋設型枠に取り付けられた支持用枠体とを具備してなる埋設型枠ユニットであって、
前記支持用枠体は、鋼材をピン結合によって連結した平行リンク状のものであり、
前記支持用枠体の下端面を前記埋設型枠の下端よりも下方に存在させた
ことを特徴とする埋設型枠ユニットによって解決される。
また、裏面側に連結治具が設けられた埋設型枠と、
この埋設型枠と略等しい鉛直高さを有し、前記連結治具を用いて前記埋設型枠に取り付けられた支持用枠体とを具備してなる埋設型枠ユニットであって、
前記支持用枠体は、鋼材をピン結合によって連結した平行リンク状のものであり、
前記支持用枠体の下端面を前記埋設型枠の下端よりも下方に存在させた
ことを特徴とする埋設型枠ユニットによって解決される。
【0012】
また、裏面側に連結治具が設けられた埋設型枠と、
前記連結治具を用いて、前記埋設型枠に取り付けられた支持用枠体とを具備してなる埋設型枠ユニットであって、
前記支持用枠体は間隔調節機構を具備し、該間隔調節機構によって該支持用枠体の上端面とその上方に位置する支持用枠体の下端面との間隔が調節できるよう構成されてなり、
前記支持用枠体の下端面を前記埋設型枠の下端よりも下方に存在させた
ことを特徴とする埋設型枠ユニットによって解決される。
また、裏面側に連結治具が設けられた埋設型枠と、
この埋設型枠と略等しい鉛直高さを有し、前記連結治具を用いて前記埋設型枠に取り付けられた支持用枠体とを具備してなる埋設型枠ユニットであって、
前記支持用枠体は間隔調節機構を具備し、該間隔調節機構によって該支持用枠体の上端面とその上方に位置する支持用枠体の下端面との間隔が調節できるよう構成されてなり、
前記支持用枠体の下端面を前記埋設型枠の下端よりも下方に存在させた
ことを特徴とする埋設型枠ユニットによって解決される。
【0013】
また、上記本発明の課題は、埋設型枠と、鋼材をピン結合によって連結した平行リンク状の支持用枠体とからなる埋設型枠ユニットを基盤上に建て込む第1の工程と、
この第1の工程で建て込まれた埋設型枠ユニット上に、支持用枠体の下端連結面を埋設型枠の下端よりも下方に存在させた埋設型枠ユニットを建て込む第2の工程と、
前記第2の工程で建て込まれた埋設型枠ユニットの支持用枠体の下端連結面より上の位置と、支持用枠体の上端より下の位置との間の位置までコンクリートを打設する第3の工程と、
これまでに建て込まれた埋設型枠ユニットの上に、支持用枠体の下端連結面を埋設型枠の下端よりも下方に存在させた埋設型枠ユニットを建て込む第4の工程と、
この第4の工程で建て込まれた埋設型枠ユニットの支持用枠体の下端連結面より上の位置と、支持用枠体の上端より下の位置との間の位置までコンクリートを打設する第5の工程とを具備し、
前記第4の工程及び第5の工程を必要に応じて繰り返すことを特徴とするダム堤体の構築方法によって解決される。
また、埋設型枠と、間隔調節機構を具備し、該間隔調節機構によって支持用枠体の上端面とその上方に位置する支持用枠体の下端面との間隔が調節できるよう構成されてなる支持用枠体とからなる埋設型枠ユニットを基盤上に建て込む第1の工程と、
この第1の工程で建て込まれた埋設型枠ユニット上に、支持用枠体の下端連結面を埋設型枠の下端よりも下方に存在させた埋設型枠ユニットを建て込む第2の工程と、
前記第2の工程で建て込まれた埋設型枠ユニットの支持用枠体の下端連結面より上の位置と、支持用枠体の上端より下の位置との間の位置までコンクリートを打設する第3の工程と、
これまでに建て込まれた埋設型枠ユニットの上に、支持用枠体の下端連結面を埋設型枠の下端よりも下方に存在させた埋設型枠ユニットを建て込む第4の工程と、
この第4の工程で建て込まれた埋設型枠ユニットの支持用枠体の下端連結面より上の位置と、支持用枠体の上端より下の位置との間の位置までコンクリートを打設する第5の工程とを具備し、
前記第4の工程及び第5の工程を必要に応じて繰り返すことを特徴とするダム堤体の構築方法によって解決される。
【0014】
なお、この埋設型枠ユニットにおける埋設型枠は、上端面に凹条(又は凸条)が形成されてなり、かつ、下端面に凸条(又は凹条)が形成されてなることが好ましい。これによって、上下に連なる埋設型枠同士を、噛み合った状態で連結することができ、高い安定性が得られる。
また、支持用枠体は埋設型枠に対し、鋼材を介して取り付けられてなることが好ましい。これによって、埋設型枠面における全ての連結治具位置に、支持用枠体を取り付ける必要はなく、使用する支持用枠体の数を減ずることができる。そして、必ずしも連結治具を設けた位置に、支持用枠体を取り付ける必要は無く、所要の位置に支持用枠体の取り付けることができる。
【0015】
また、支持用枠体は埋設型枠に対し、蝶番を介して取り付けられてなることが好ましい。これによって、予め支持用枠体が埋設型枠に取り付けられていても、支持用枠体を倒すことができ、コンパクト化が図れる。よって、運搬作業に支障を来さない。現場では、倒された支持用枠体を立て起こして、固定するだけでよく、支持用枠体と埋設型枠とを現場でユニット化する場合に比べて、作業の簡略化が図れる。
【0016】
また、支持用枠体は、鋼材をピン結合によって連結した平行リンク状のものであることが好ましい。これによって必要に応じた傾斜度となるように、支持用枠体の形状をその都度、現場で調整することが可能となり、さまざまな勾配のダム堤体構築に対応できる。これは同時に、支持用枠体の製造コスト削減にもつながる。
【0017】
また、支持用枠体は間隔調節機構を具備し、この間隔調節機構によって、前記支持用枠体の上端面とその上方に位置する支持用枠体の下端面との間隔が調節できるよう構成してなることが好ましい。これによって支持用枠体の寸法誤差を吸収することができ、高精度な埋設型枠ユニットの建て込みが行える。逆に、間隔調節機構を積極的に利用すれば、支持用枠体には高い寸法精度が要求されない。したがって、熟練工でなくとも支持用枠体の製造が行える。
【0018】
なお、間隔調節機構としては、支持用枠体の上端面部において埋設型枠が存在する側の端部、及び前記支持用枠体の上端面部において埋設型枠が存在しない側の端部に、前記支持用枠体の上端面からの突出長さが可変であるよう螺着状態で設けた二つのネジ部材を具備してなるものを挙げることができる。
また、上記のダム堤体の構築方法において、基盤上には基礎フレームが設置され、この基礎フレーム上に最下段の埋設型枠ユニットが建て込まれることが好ましい。これによって、最下段の埋設型枠ユニットの高さ位置調整を基礎フレームを用いて行うことができ、施工性が向上する。
【0019】
また、埋設型枠ユニットは、支持用枠体が埋設型枠に予め取り付けられた状態で建て込まれることが好ましい。しかし、支持用枠体を、下段に位置する埋設型枠ユニットに連結した後、埋設型枠を吊り込み、この支持用枠体に固定するようにしてもよい。
そして、端面に段部が形成された埋設型枠を用いてなる埋設型枠ユニットを、同じく端面に段部が形成された埋設型枠を用いてなる埋設型枠ユニットの上方または左右に設置する際、埋設型枠間に弾性材料からなる止水部材を介在させることが好ましい。これによって、ダム堤体内部への水の侵入が起きにくくなり、鋼材の腐食を効果的に抑えることができる。特に、埋設型枠の上下左右端面に段部を形成しておき、止水部材を奥側(埋設型枠裏面側)に設けておけば、急激な水圧の変動があっても、止水部材に作用する力を緩和できる。したがって、止水部材に不具合が生じない。
【0020】
なお、上記埋設型枠を構成する材料は、特に限定されない。しいて例を挙げれば、普通コンクリート、高強度コンクリート、各種繊維補強コンクリート、樹脂含浸コンクリート、レジンコンクリート、膨張コンクリート等がその代表的なものである。ただし、軽量であることが望まれるため、できるだけ高強度なコンクリートから構成することが好ましい。
【0021】
【発明の実施の形態】
図1〜図13は、本発明の第1実施形態(ダム堤体の鉛直面部分の構築)に係るもので、図1は埋設型枠に溝形鋼を組み付けた状態を示す斜視図、図2は埋設型枠ユニットの斜視図、図3は2段目以上に建て込まれる埋設型枠ユニットの側面図、図4は1段目に建て込まれる埋設型枠ユニットの側面図、図5は基礎フレームを基礎コンクリート上に設置した状態を示す斜視図、図6は1段目の埋設型枠ユニットを建て込んだ状態を示す斜視図、図7は2段目の埋設型枠ユニットを建て込んだ状態を示す斜視図、図8は埋設型枠ユニット同士の連結部分を示す側面図、図9は1リフト目のコンクリートを打設した状態を示す斜視図、図10は1リフト目のコンクリートを打設した状態を示す側面図、図11は3段目の埋設型枠ユニットを建て込んだ状態を示す斜視図、図12は2リフト目のコンクリートを打設した状態を示す斜視図、図13は2リフト目のコンクリートを打設した状態を示す側面図である。
【0022】
各図中、1は高強度コンクリートから構成された埋設型枠であり、この埋設型枠1の表面側(図1などには表れていない側)は、自然環境と調和する景観性に優れた外観となっている。また、その裏面側には、上下2段に所定間隔で設けられた連結治具2を用いて、溝形鋼3が組み付けられている。
埋設型枠1の上端面には、上段に位置する埋設型枠の下端面に形成された凸条と噛み合う凹条4が、また、下端面には、下段に位置する埋設型枠の上端面に形成された凹条と噛み合う凸条5が形成されており、高い安定性が得られるようになっている。
【0023】
6は山形鋼を溶接などにより長方形状に組み立て、斜めに補強材を取り付けて構成された鋼製フレーム(支持用枠体)である。この鋼製フレーム6の水平辺部には、上下に位置する埋設型枠ユニットの鋼製フレームとの連結に用いられるボルト孔(図示せず)が形成されている。また、鋼製フレーム6の埋設型枠側垂直辺部には、溝形鋼3との連結に用いられるボルト孔(図示せず)が形成されている。鋼製フレーム6は、溝形鋼3を介して埋設型枠1に取り付けられ、埋設型枠ユニットAとなる。
【0024】
埋設型枠ユニットAを構成する埋設型枠1と鋼製フレーム6との鉛直高さ寸法はほぼ等しく、鋼製フレーム6の下端連結面が、埋設型枠1の下端よりも下方に存在するよう、図3に示すごとく、鋼製フレーム6を下方にずらして段違いに取り付けている。したがって、コンクリートを埋設型枠ユニットAの上端まで打設することで、その上段に位置する埋設型枠ユニットAの鋼製フレーム6は根固めされ、強固に固定された状態となる。
【0025】
なお、1段目に建て込まれる埋設型枠ユニットA’は、上記の2段目以降に建て込まれる埋設型枠ユニットAと基本的構造を同じくする。しかし、後述するように基礎フレームと連結させる必要から、鋼製フレーム6の下端連結面を埋設型枠1の下端よりも下方に存在させてはいない。すなわち、鋼製フレーム6としては、図4に示すごとく、埋設型枠1よりも高さ寸法の小さなものを用いている。
【0026】
次に、上記埋設型枠ユニットA(及び埋設型枠ユニットA’)を利用した、ダム堤体の構築方法について説明する。
この構築方法では、まず基盤上にコンクリートを打設し、平坦なコンクリート層(基礎コンクリート)7を形成する。そして、コンクリートが硬化する前に埋め込んでおいたアンカーボルト8によって挟まれる領域(図5では片側のアンカーボルトのみ示している)に、2本の溝形鋼を数本の山形鋼によって平行に連結してなる基礎フレーム9を載置する。この基礎フレーム9の上側水平辺部には、その上方に載置される埋設型枠ユニットA’の鋼製フレーム6との連結に用いられるボルト孔(図示せず)を形成しておく。
【0027】
基礎フレーム9の高さを合わせた後、これをアンカーボルト8に溶接する。なお、基礎フレーム9は、溝形鋼に代えて、山形鋼やH形鋼を用いて構成してもよい。
この作業と同時進行で、埋設型枠ユニットA’の組み立てが行われる。すなわち、工場から現場に搬入された埋設型枠1と鋼製フレーム6とを、溝形鋼3を介して、ボルト締めにより連結し、埋設型枠ユニットA’とする。ただし、鋼製フレーム6の取り付けまでを工場で行い、完成品として現場に搬入しても良い。また、工場で溝形鋼3のみを取り付けた埋設型枠1を、現場で鋼製フレーム6と連結してもよい。
【0028】
続いて、こうして得られた埋設型枠ユニットA’を、図6に示すごとく、基礎フレーム9の上に建て込み、この基礎フレーム9に対して、ボルト締めにより固定する。この作業を左右方向に繰り返し行い、1段目の埋設型枠ユニットA’の建て込みが完了する。
次に、1段目の埋設型枠ユニットA’の建て込み中に組み立てておいた2段目の埋設型枠ユニットAを、図7に示すごとく、1段目の埋設型枠ユニットA’の上に建て込む。なお、連結部分の構造は、図8に示すとおりで、埋設型枠ユニットA’と埋設型枠ユニットAとは、2枚の平ワッシャ10とスプリングワッシャ11を挟んで、ボルト12及びナット13によって締結されている。ただし、ボルトの径や間隔は、必要最小限の強度が得られる程度のものとしている。
【0029】
2段目の埋設型枠ユニットAの建て込みが完了した後、図9や図10に示すごとく、1リフト目のコンクリート14を1段目の埋設型枠ユニットA’の上端位置まで打設する。
打設されたコンクリート14が硬化し、2段目の埋設型枠ユニットAの鋼製フレーム6が根固めされたならば、3段目の埋設型枠ユニットAを、図11に示すごとく、2段目の埋設型枠ユニットA上に建て込み、両者をボルト締めによって連結する。そして、図12や図13に示すごとく、2リフト目のコンクリート15を、2段目の埋設型枠ユニットAの上端位置まで打設する。
【0030】
4段目以降の埋設型枠ユニットAの建て込み、及び3リフト目以降のコンクリート打設については、3段目の埋設型枠ユニットAの建て込み、及び2リフト目のコンクリート15の打設と全く同様であり、この作業を必要な回数だけ繰り返し、ダム堤体の鉛直面部分が得られる。
図14〜図23は、本発明の第2実施形態(ダム堤体の傾斜面部分の構築)に係るもので、図14は埋設型枠ユニットの斜視図、図15は2段目以上に建て込まれる埋設型枠ユニットの側面図、図16は1段目に建て込まれる埋設型枠ユニットの側面図、図17は1段目の埋設型枠ユニットを建て込んだ状態を示す斜視図、図18は2段目の埋設型枠ユニットを建て込んだ状態を示す斜視図、図19は1リフト目のコンクリートを打設した状態を示す斜視図、図20は1リフト目のコンクリートを打設した状態を示す側面図、図21は3段目の埋設型枠ユニットを建て込んだ状態を示す斜視図、図22は2リフト目のコンクリートを打設した状態を示す斜視図、図23は2リフト目のコンクリートを打設した状態を示す側面図である。
【0031】
図14〜図23中、21は高強度コンクリートからなる埋設型枠であり、この埋設型枠21の表面側は、自然環境と調和する外観となっている。また、その裏面側には上下2段に所定間隔で設けられた連結治具22を用いて、溝形鋼23が組み付けられている。
24は、山形鋼を溶接などにより平行四辺形状に組み立て、斜めに補強材を取り付けて構成された鋼製フレーム(支持用枠体)である。鋼製フレーム24の水平辺部には、上下に位置する鋼製フレームとの連結に用いられるボルト孔(図示せず)が形成されている。また、鋼製フレーム24の埋設型枠側斜辺部には、溝形鋼23との連結に用いられるボルト孔(図示せず)が形成されている。鋼製フレーム24は、溝形鋼23を介して埋設型枠21に取り付けられ、埋設型枠ユニットBとなる。
【0032】
埋設型枠ユニットBを構成する埋設型枠21と鋼製フレーム24との鉛直高さはほぼ等しく、鋼製フレーム24の下端連結面が、埋設型枠21の下端よりも下方に存在するよう、図15に示すごとく、鋼製フレーム24を下方にずらして段違いに取り付けている。したがって、コンクリートを埋設型枠ユニットの上端位置まで打設することで、その上段に位置する埋設型枠ユニットBの鋼製フレーム24は根固めされ、強固に固定された状態となる。
【0033】
なお、1段目に建て込まれる埋設型枠ユニットB’は、上記の2段目以降に建て込まれる埋設型枠ユニットBと基本的構造を同じくする。しかし、後述するように、基礎フレームと連結させる必要から、鋼製フレーム24の下端連結面を埋設型枠21の下端よりも下方に存在させてはいない。すなわち、鋼製フレーム24としては、図16に示すごとく、埋設型枠21よりも高さ寸法の小さなものを用いている。
【0034】
次に、上記埋設型枠ユニットB(及び埋設型枠ユニットB’)を利用した、ダム堤体の構築方法について説明する。
この第2実施形態の構築方法では、まず上記第1実施形態と同様に、基礎フレーム25を、アンカーボルト26が埋め込まれた基礎コンクリート27上に載置し、高さ調整を行う。そして、基礎フレーム25をアンカーボルト26に溶接する。
【0035】
続いて、現場で、基礎フレーム25を設置している間に組み立てられた(又は予め工場で組み立てられた)1段目の埋設型枠ユニットB’を、図17に示すごとく、基礎フレーム25の上に建て込み、この基礎フレーム25に対して、ボルト締めにより固定する。そして、この作業を左右方向に繰り返し行って、1段目の埋設型枠ユニットB’の建て込みが完了する。
【0036】
次に、2段目の埋設型枠ユニットBを、図18に示すごとく、1段目の埋設型枠ユニットB’の上に建て込み、鋼製フレーム24同士をボルト締めによって連結する。この作業を左右方向に繰り返し行い、2段目の埋設型枠ユニットBの建て込みが完了する。
埋設型枠ユニットを2段に建て込んだ後、図19及び図20に示すごとく、1リフト目のコンクリート28を、1段目の埋設型枠ユニットB’の上端位置まで打設する。これによって、コンクリート28の硬化後には、2段目の埋設型枠ユニットBの鋼製フレーム24は、強固に根固めされた状態となる。
【0037】
続いて、3段目の埋設型枠ユニットBを、図21に示すごとく、2段目の埋設型枠ユニットBの上に建て込み、ボルト締めによって連結する。そして、図22や図23に示すごとく、2リフト目のコンクリート29を2段目の埋設型枠ユニットBの上端位置まで打設する。
以後、同様にして埋設型枠ユニットBの建て込み、及びコンクリートの打設を繰り返し行い、ダム堤体の傾斜面部分(法面部分)が得られる。
【0038】
図24〜図31は、本発明の第3実施形態(ダム堤体の曲面部分の構築)に係るもので、図24は1段目の埋設型枠ユニットを建て込んだ状態を示す側面図、図25は2段目の埋設型枠ユニットを建て込んだ状態を示す側面図、図26は1リフト目のコンクリートを打設した状態を示す側面図、図27は1リフト目のコンクリートを打設した状態を示す断面図、図28は3段目の埋設型枠ユニットを建て込んだ状態を示す側面図、図29は2リフト目のコンクリートを打設した状態を示す側面図、図30は2リフト目のコンクリートを打設した状態を示す断面図、図31は4段目の埋設型枠ユニットを建て込んだ状態を示す側面図である。
【0039】
図24〜図31中、Cは、裏面側に連結治具が設けられた埋設型枠に対して、さまざまな傾斜度を有する鋼製フレームを、溝形鋼を介して取り付けてなる埋設型枠ユニットである。
この埋設型枠ユニットCにあっても、上記第1及び第2実施形態で説明した埋設型枠ユニットと基本的構成は同じであるから、詳しくは図示していないが、埋設型枠と鋼製フレームとの鉛直高さはほぼ等しく、鋼製フレームの下端連結面が埋設型枠の下端よりも下方に存在するよう、鋼製フレームを下方にずらして段違いに取り付けている。
【0040】
なお、1段目の埋設型枠ユニットC’については、上記第1及び第2実施形態のものと同じ理由から、埋設型枠よりも鉛直高さ寸法の小さな鋼製フレームを用いている。
この第3実施例の構築方法においても、まず既存コンクリート41の上に基礎フレーム42を載置し、この基礎フレーム42を既存コンクリート41に埋め込まれたアンカーボルトに溶接する。
【0041】
続いて、1段目の埋設型枠ユニットC’を、図24に示すごとく、基礎フレーム42の上に建て込み、ボルト締めによって基礎フレーム42と連結する。
この作業を左右方向に繰り返し行い、1段目の埋設型枠ユニットC’の建て込みが完了する。
次に、2段目の埋設型枠ユニットCを、図25に示すごとく、第1段目の埋設型枠ユニットC’の上に建て込み、ボルト締めによって連結する。
【0042】
2段目の埋設型枠ユニットCの建て込みが完了した後、図26や図27に示すごとく、1リフト目のコンクリート43を、1段目の埋設型枠ユニットC’の上端位置まで打設する。これによって、打設されたコンクリートの硬化後には、埋設型枠ユニットCの鋼製フレームは、強固に根固めされた状態となる。
続いて、図28に示すごとく、3段目の埋設型枠ユニットCを、2段目の埋設型枠ユニットCの上に、両者を連ねた面が滑らかに連続するよう建て込み、ボルト締めによって連結する。
【0043】
1リフト目のコンクリート43が硬化した後、図29や図30に示すごとく、2リフト目のコンクリート44を打設する。
コンクリート44の硬化後、4段目(最上段)に位置する埋設型枠ユニットCを、図31に示すごとく、3段目の埋設型枠ユニットCの上に載置し、4段目の埋設型枠ユニットCの上端位置までコンクリートを打設する。こうして、ダム堤体の曲面部分(越流部分)が得られる。
【0044】
なお、曲面状の越流部分構築に用いられる埋設型枠ユニットは、第1及び第2実施形態のものと異なり、鋼製フレームの形状が各段ごとに異なっている。すなわち、上方に位置するものほど、その奥行き方向の寸法が大きくなっている。これは、上段のものほど設置勾配が小さく、埋設型枠ユニットの重心がダム堤体の奥行き方向に移っていくためである。
【0045】
また、4段目の埋設型枠ユニットCには、三角形状の鋼製フレームを用いている。これは、4段目の埋設型枠ユニットCの上には、新たな埋設型枠ユニットが設けられず、連結機能が不要だからである。
図32〜図36、本発明の第4実施形態に係るもので、図32は間隔調節可能な埋設型枠ユニットを建て込んだ状態を示す側面図、図33は鋼製フレームにボルトを螺着した状態を示す側面図、図34は埋設型枠ユニットを先に建て込まれたものの上に載置した状態を示す側面図、図35は埋設型枠ユニット同士の間隔調節が完了した状態を示す側面図、図36は埋設型枠間の目地部分の構造を示す断面図である。
【0046】
第4実施形態の埋設型枠ユニットは、間隔調節機構を備えたことを特徴とするものである。以下では、まず、この間隔調節機構について説明する。
図32〜図36中、45は埋設型枠であり、その上下左右端面には段部が設けられている。すなわち、上端面の奥側に凸部45aが形成され、下端面にはこの凸部45aと噛み合う凹部45bが形成されている。また、左右端面にも同様の凹凸が形成されている。
【0047】
下端面の凹部45b(及び左右端面のいずれか一方に形成された凹部)には、止水部材46が取り付けられている。この止水部材46は、ブチルゴムなどの弾性材料から構成されたものである。
47は埋設型枠45の裏面に上下2段に所定間隔で設けられた連結治具、48は鋼製フレームである。鋼製フレーム48は、溝形鋼49を介して埋設型枠45に取り付けられ、埋設型枠ユニットDとなる。
【0048】
鋼製フレーム48の上側水平辺部には、ボルト孔(図示せず)が形成されており、更にこのボルト孔に対応した位置には、ナット50a,50bが溶接されている。また、鋼製フレーム48の下側水平辺部には、ボルト孔(図示せず)のみが形成されている。
51a,51bは、現場でナット50a,50bに螺着させられるボルト、52a,52bも、同じく現場でボルト51a,51bに螺着させられるナットである。
【0049】
上記の間隔調節機構は、ナット50a,50bやボルト51a,51b、ナット52a,52bなどから構成される。すなわち、施工時に、ボルト51a,51bの上側水平辺部からの突出長さを変化させることで、ナット52a,52bの上に載る鋼製フレーム48の高さ(高さ方向における鋼製フレーム48同士の間隔)を調節できるようになっている。
【0050】
なお、本実施形態では、鋼製フレーム48同士の間に、間隔調節機構の一部を存在させている。そこで、鋼製フレーム48の鉛直高さを、埋設型枠45の鉛直高さよりも僅かに小さくし、これに対応している。
上記間隔調節機構を用いた埋設型枠ユニットDの建て込みは、次のようにして行われる。
【0051】
まず、ナット50a,50bが固着された埋設型枠ユニットDを、上記第1〜第3実施形態と同様にして建て込む。そして、ナット50a,50bにボルト51a,51bを螺着させ、鋼製フレーム48の上側水平辺部から突出させる。
更に、鋼製フレーム48の上側水平辺部から突出したボルト51a,51bの先端に、ナット52a,52bを螺着させる。この際、ボルト51a,51bの先端がナット52a,52bの頂面から突出しないようにする。
【0052】
続いて、ナット52a,52bの頂面高さを調節する。特に、ナット52aの頂面高さh1 は、最終状態における鋼製フレーム48同士の間隔に等しいものとする。ナット52bについては、図33に示すごとく、その頂面高さh2 をナット52aの頂面高さh1 よりも数cm程度大きくする。ナット52a,52bの頂面高さ調節を終えたら、ナット52a,52b上に、ワッシャ53a,53bを載置する。
【0053】
上記処理を同列に並ぶ全ての埋設型枠ユニットDについて行ったならば、この埋設型枠ユニットD上に、その上段に位置する埋設型枠ユニットDを吊り込み、載置する。この状態では、図34に示すごとく、上段の埋設型枠ユニットDはナット52bだけでなく、埋設型枠45とも接しており、安定支持されている。なお、ナット52aと上段の鋼製フレーム48との間には、意図的に僅かな間隙を形成したので、両者は接していない。
【0054】
次いで、上下鋼製フレーム48同士の間隔調節を行う。すなわち、ナット52aを工具で固定して、ボルト51aを回転させる。すると、その鋼製フレーム48同士の間隔は不変のまま、ボルト51aのみが上方に変位し、上段の鋼製フレーム48の下側水平辺部から突出する。突出したボルト51aには、ワッシャやスプリングワッシャ(図示せず)を介して、ナット54aを組み付ける。
【0055】
一方、奥側では、ボルト51bを固定して、ナット52bを回転させる。これによって、上段の埋設型枠ユニットDは徐々に降下してゆき、やがて上下の鋼製フレーム48の水平辺部同士は平行となる。この時点で、埋設型枠ユニットDを降下させるのをやめ、ナット52bを工具で固定して、ボルト51bを回転させる。すると、鋼製フレーム48同士の間隔は不変のまま、ボルト51bのみが上方に変位し、鋼製フレーム48の下側水平辺部から突出する。突出したボルト51bには、ボルト51aと同様、ワッシャやスプリングワッシャ(図示せず)を介して、ナット54bを組み付け、締め込む。また、ボルト51aに組み付けられたナット54aについても、これと同時に締め込みを行う。埋設型枠ユニットDの建て込み、および間隔調節が完了した状態は、図35に示すとおりである。
【0056】
この図35から判るように、最終的には、吊り込こまれた時点で当接していた上下の埋設型枠45同士は離間し、正規の間隔となる。
コンクリートを打設する前に、埋設型枠45間の目地部分には、裏面からシリコン系の止水材55が充填される。ただし、止水部材46を埋設型枠45間に設けているので、これによって止水材55の充填量が規制される。止水処理が完了した状態は、図36に示すとおりである。
【0057】
上述したように第4実施形態では、間隔調節機構を備えたので、鋼製フレーム48の寸法誤差を吸収することができ、埋設型枠ユニットDの高精度な建て込みが行える。逆に、間隔調節機構を活用すれば、鋼製フレーム48に高い寸法精度は要求されず、したがって製造作業を簡略化できる。
また、埋設型枠45に段部を設け、これを利用して止水処理を行うようにしたので、止水部材46が人目に触れることがなく、景観が良好である。また、紫外線に直接さらされることがないので、劣化も起きにくい。更に、止水材55を充填し、二重に止水処理を施したので、防水性に優れ、鋼製フレーム48の腐食が発生しない。
【0058】
なお、ナット50a,50bだけでなく、ボルト51a,51bについても予め鋼製フレーム48に、最終状態で固定しておくことができる。ただし、この場合には、現場に運搬する途中でボルト51a,51bが変形してしまう恐れがあり、また、取り扱いが困難になる。したがって、ボルト51a,51bは、できるだけ現場で取り付けるのが好ましい。
【0059】
上述したように、本発明によれば、環境との調和がとれた良好な景観のダム堤体が得られ、しかも墨出や位置調整といった面倒な作業がほとんど不要で、現場作業を大幅に省力化でき、工期短縮やコストの低減が図れる。また、埋設型枠ユニットを2段に建て込んだ状態で、その1段目までコンクリートを打設するようにしたので、この際、2段目のものが防護柵の役割を果たす。このため安全性が非常に高い。更に、全ての作業が構築物の内側にて行えるから、外部足場が不要で、これの設置や撤去に掛かる労力を軽減できる。
【0060】
そして、埋設型枠ユニットとして、鋼製フレームを下方にずらし、埋設型枠に対して段違いに取り付けた構造のものを用いているので、埋設型枠ユニット同士の連結が著しく簡略化される。すなわち、上下2段に埋設型枠ユニットを設置して、下方の埋設型枠ユニットの上端位置までコンクリートを打設すると、埋設型枠ユニット同士の連結部分はコンクリート中に埋没する。これによって、コンクリートの硬化後には、上方の埋設型枠ユニットの鋼製フレームは根固めされた状態となる。したがって、上下埋設型枠ユニット間の連結強度はそれほど大きなものである必要がなく、連結処理を簡略化できる。更に、埋設型枠ユニットの倒壊が抑止され、コンクリート打設時の安全性が高い。
上記第1〜第4実施形態における鋼製フレームは、山形鋼を溶接によって永久結合したものであったが、これ以外にも、例えば図37に示すごとく、山形鋼56をピン57によって連結した、平行リンク構造の鋼製フレームを用いることができる。
【0061】
こうした鋼製フレームを備えてなる埋設型枠ユニットでは、構築されるダム堤体の表面形状(勾配)に合わせて鋼製フレームが変形させられる。そして、補強材58を取り付けて、形状が決定される。
したがって、一つのもので、さまざまな勾配に対応でき、鋼製フレームを多種準備する必要が無いから、コストを大幅に削減できる。
【0062】
また、上記第1〜第4実施形態では、運搬性を考慮して、埋設型枠と鋼製フレームと別々に搬送し、現場でユニット化するようにした。しかし、埋設型枠と鋼製フレームとを予め連結しておくこともできる。その一例として、図38に示すごとく、埋設型枠59に固定された溝形鋼60に、蝶番61を介して鋼製フレーム62を取り付けてなる構造のものを挙げる。
【0063】
この埋設型枠ユニットは、図39に示すごとく、鋼製フレーム62が横倒した状態で現場に搬入され、そこで立て起こされる。そして、ボルト締めによって固定され、上記第1〜第4実施形態の埋設型枠ユニットと同様に使用される。
なお、複雑な形状のダム堤体、例えば上流側が鉛直面状であって、下流側が曲面状のダム堤体などについても、上記第1〜第4実施形態を適宜組み合わせることで得られる。
【0064】
【効果】
ダム堤体に景観美を付与でき、しかも作業の省力化、安全性向上に大きな効果がある。
【図面の簡単な説明】
【図1】埋設型枠に溝形鋼を組み付けた状態を示す斜視図
【図2】埋設型枠ユニット(第1実施例)の斜視図
【図3】2段目以上に建て込まれる埋設型枠ユニット(第1実施例)の側面図
【図4】1段目に建て込まれる埋設型枠ユニットの側面図
【図5】基礎フレームを基礎コンクリート上に設置した状態を示す斜視図
【図6】1段目の埋設型枠ユニットを建て込んだ状態を示す斜視図
【図7】2段目の埋設型枠ユニットを建て込んだ状態を示す斜視図
【図8】埋設型枠ユニット同士の連結部分を示す側面図
【図9】1リフト目のコンクリートを打設した状態を示す斜視図
【図10】1リフト目のコンクリートを打設した状態を示す側面図
【図11】3段目の埋設型枠ユニットを建て込んだ状態を示す斜視図
【図12】2リフト目のコンクリートを打設した状態を示す斜視図
【図13】2リフト目のコンクリートを打設した状態を示す側面図
【図14】埋設型枠ユニット(第2実施例)の斜視図
【図15】2段目以上に建て込まれる埋設型枠ユニット(第2実施例)の側面図
【図16】1段目に建て込まれる埋設型枠ユニットの側面図
【図17】1段目の埋設型枠ユニットを建て込んだ状態を示す斜視図
【図18】2段目の埋設型枠ユニットを建て込んだ状態を示す斜視図
【図19】1リフト目のコンクリートを打設した状態を示す斜視図
【図20】1リフト目のコンクリートを打設した状態を示す側面図
【図21】3段目の埋設型枠ユニットを建て込んだ状態を示す斜視図
【図22】2リフト目のコンクリートを打設した状態を示す斜視図
【図23】2リフト目のコンクリートを打設した状態を示す側面図
【図24】1段目の埋設型枠ユニットを建て込んだ状態を示す側面図
【図25】2段目の埋設型枠ユニットを建て込んだ状態を示す側面図
【図26】1リフト目のコンクリートを打設した状態を示す側面図
【図27】1リフト目のコンクリートを打設した状態を示す断面図
【図28】3段目の埋設型枠ユニットを建て込んだ状態を示す側面図
【図29】2リフト目のコンクリートを打設した状態を示す側面図
【図30】2リフト目のコンクリートを打設した状態を示す断面図
【図31】4段目の埋設型枠ユニットを建て込んだ状態を示す側面図
【図32】間隔調節可能な埋設型枠ユニットを建て込んだ状態を示す側面図
【図33】鋼製フレームにボルトを螺着した状態を示す側面図
【図34】埋設型枠ユニットを先に建て込まれたものの上に載置した状態を示す側面図
【図35】埋設型枠ユニット同士の間隔調節が完了した状態を示す側面図
【図36】埋設型枠間の目地部分の構造を示す断面図
【図37】埋設型枠ユニットの他実施形態の一部を示す側面図
【図38】埋設型枠ユニットの更に他の実施形態を示す平面図
【図39】図38の埋設型枠ユニットを変形させた状態を示す平面図
【符号の説明】
A 2段目以上に建て込まれる埋設型枠ユニット
A’ 1段目に建て込まれる埋設型枠ユニット
1 埋設型枠
2 連結治具
3 溝形鋼
4 凹条
5 凸条
6 鋼製フレーム(支持用枠体)
7 基礎コンクリート
8 アンカーボルト
9 基礎フレーム
14 1リフト目のコンクリート
15 2リフト目のコンクリート[0001]
[Industrial application fields]
The present invention relates to a construction technique for a dam dam body or the like.
[0002]
[Problems to be solved by the invention]
Conventionally, plywood formwork and metal foam have been used for the construction of dam bodies.
By the way, although such a formwork has no problem in terms of function, it is possible to obtain only a structure having a strong tasteless appearance and poor appearance. Therefore, it has been difficult to satisfy the requirements that have become particularly important in recent years, that is, the harmony between the dam body built in the natural landscape and the environment.
[0003]
In order to obtain a good landscape, a method has been proposed in which a covering material such as natural stone is attached to the surface of a dam dam body constructed using a plywood formwork or metal foam.
However, the work of applying the covering material requires much labor as compared with the construction of the dam body itself, and the cost is significantly increased. In addition, it is difficult to implement due to problems such as a decrease in skilled workers and a shortage of young labor.
[0004]
In view of these circumstances, as a result of eagerly pursuing research, the present inventor used an embedded formwork left on the surface of the dam body without demolding when constructing the dam body. If landscape was given to the surface in advance, it would be thought that it would save time and effort to apply a covering material, and would easily provide a dam body with excellent landscape beauty.
By the way, when constructing a dam dam body, the embedded formwork is supported at various orientations and angles depending on the shape of the sloped surface part such as the upstream / downstream surface or the curved surface part such as the overflow surface. It will be necessary. And, in order to obtain a smooth and even inclined surface or a smoothly continuous curved surface, compared to the construction of the vertical surface part, it is extremely accurate and the position adjustment of the embedded formwork is highly accurate. It is essential.
[0005]
However, it takes a lot of time and effort to save the work. In addition, the embedded mold is much heavier than the plywood mold and the like, so that the position adjustment is extremely difficult.
As a result of promoting further research in consideration of these points, the above problem can be solved by attaching a support frame constructed corresponding to the slope of the dam body to the buried formwork and unitizing it. I know I can do it.
[0006]
That is, if the embedded mold is built by connecting the supporting frames, troublesome inking and position adjustment work can be omitted, and the workability can be greatly improved. Further, since no external work is required and there is no need to provide an external scaffold, work can be saved and simplified. Furthermore, if the embedded formwork is erected one step ahead of the concrete placement, the pre-embedded formwork will serve as a protective fence during the concrete placement at that stage, Safety is greatly improved.
[0007]
However, in practice, it has been found that there are new problems that need to be solved even in such construction methods with excellent workability and safety.
That is, the side pressure of the concrete received by the embedded formwork concentrates on the connecting portion between the embedded formwork units and acts in a direction to separate them. For this reason, sometimes the connecting portion may be damaged, and this may cause collapse of the embedded formwork unit.
[0008]
In order to avoid such an accident, the connection between the embedded formwork units must be made stronger than necessary. In other words, in order to obtain a large strength that is temporarily required, a completely meaningless treatment must be performed after the concrete is hardened. Therefore, even if an embedded formwork unit is used, there is little contribution to labor saving.
[0009]
As a result of advancing further research to solve these problems, the present inventor has found that the structure of the embedded form unit has a lower end connecting surface of the support frame below the lower end of the embedded form. I found that it should be like this. That is, if an embedded form unit that is shifted downward and attached to the embedded form is used in an embedded form unit, the embedded form unit that is located one step lower than the embedded form unit of a certain stage is used. When the concrete is cast up to the upper end, the connecting portion between the embedded formwork units is buried in the concrete. And if concrete hardens | cures, the upper support frame will be in the state solidified. Therefore, it is not necessary to increase the connection strength so much and the connection process can be simplified.
[0010]
The present invention has been made on the basis of such knowledge, and the problem is to provide a construction technique for a dam dam body that can impart a beautiful scenery to the dam dam body, and can save labor and improve safety. is there.
[0011]
[Means for Solving the Problems]
The subject of the present invention is an embedded formwork provided with a connecting jig on the back surface side,
An embedded form unit comprising a supporting frame attached to the embedded form using the connecting jig,
The supporting frame is in the form of a parallel link in which steel materials are connected by pin coupling,
The lower end surface of the support frame was present below the lower end of the embedded formwork
This is solved by an embedded formwork unit.
Also, an embedded formwork provided with a connecting jig on the back side,
An embedded mold unit having a vertical height substantially equal to the embedded mold and comprising a support frame attached to the embedded mold using the connecting jig,
The supporting frame is in the form of a parallel link in which steel materials are connected by pin coupling,
The lower end surface of the support frame was present below the lower end of the embedded formwork
This is solved by an embedded formwork unit.
[0012]
Also, an embedded formwork provided with a connecting jig on the back side,
An embedded mold unit comprising a support frame attached to the embedded mold using the connecting jig,
The support frame includes an interval adjustment mechanism, and is configured such that the interval between the upper end surface of the support frame and the lower end surface of the support frame positioned above the support frame can be adjusted by the interval adjustment mechanism. ,
The lower end surface of the support frame was present below the lower end of the embedded formwork
This is solved by an embedded formwork unit.
Also, an embedded formwork provided with a connecting jig on the back side,
An embedded mold unit having a vertical height substantially equal to the embedded mold and comprising a support frame attached to the embedded mold using the connecting jig,
The support frame includes an interval adjustment mechanism, and is configured such that the interval between the upper end surface of the support frame and the lower end surface of the support frame positioned above the support frame can be adjusted by the interval adjustment mechanism. ,
The lower end surface of the support frame was present below the lower end of the embedded formwork
This is solved by an embedded formwork unit.
[0013]
Moreover, the subject of the present invention is an embedded formwork and, Parallel link-like steel connected by pin connectionA first step of building an embedded form unit comprising a support frame on a base;
A second step of building an embedded form unit in which the lower end connecting surface of the supporting frame is located below the lower end of the embedded form on the embedded form unit built in the first step; ,
Concrete is cast to a position between a position above the lower end connecting surface of the support frame of the embedded mold unit built in the second step and a position below the upper end of the support frame. A third step;
A fourth step of building an embedded formwork unit in which the lower end connection surface of the support frame is located below the lower end of the embedded formwork on the embedded formwork unit built so far;
Concrete is cast to a position between a position above the lower end connecting surface of the support frame of the embedded mold unit built in the fourth step and a position below the upper end of the support frame. A fifth step,
The fourth and fifth steps are repeated as necessary to solve the problem.
Further, the embedded mold frame and the interval adjusting mechanism are provided, and the interval adjusting mechanism is configured to adjust the interval between the upper end surface of the supporting frame and the lower end surface of the supporting frame located above the supporting frame. A first step of building an embedded form unit comprising a support frame on a base;
A second step of building an embedded form unit in which the lower end connecting surface of the supporting frame is located below the lower end of the embedded form on the embedded form unit built in the first step; ,
Concrete is cast to a position between a position above the lower end connecting surface of the support frame of the embedded mold unit built in the second step and a position below the upper end of the support frame. A third step;
A fourth step of building an embedded formwork unit in which the lower end connection surface of the support frame is located below the lower end of the embedded formwork on the embedded formwork unit built so far;
Concrete is cast to a position between a position above the lower end connecting surface of the support frame of the embedded mold unit built in the fourth step and a position below the upper end of the support frame. A fifth step,
The fourth and fifth steps are repeated as necessary to solve the problem.
[0014]
In addition, it is preferable that the embedded formwork in this embedded formwork unit is formed with a groove (or ridge) on the upper end surface and a protrusion (or groove) on the lower end surface. As a result, the embedded molds that are vertically connected can be connected in a meshed state, and high stability can be obtained.
Moreover, it is preferable that the support frame is attached to the embedded form via a steel material. Thereby, it is not necessary to attach the support frame to all the connecting jig positions on the embedded mold surface, and the number of support frames to be used can be reduced. And it is not always necessary to attach the support frame to the position where the connecting jig is provided, and the support frame can be attached to the required position.
[0015]
Moreover, it is preferable that the support frame is attached to the embedded form via a hinge. As a result, even if the support frame is attached to the embedded formwork in advance, the support frame can be brought down, and the size can be reduced. Therefore, it does not hinder the transportation work. At the site, it is only necessary to raise and fix the tilted support frame, and the work can be simplified compared to the case where the support frame and the embedded mold are unitized at the site.
[0016]
Moreover, it is preferable that the support frame is in the form of a parallel link in which steel materials are connected by pin coupling. As a result, the shape of the supporting frame can be adjusted at the site each time so that the inclination becomes as necessary, and it is possible to cope with construction of dam dam bodies with various slopes. This also leads to a reduction in the manufacturing cost of the support frame.
[0017]
In addition, the support frame includes an interval adjustment mechanism, and the interval adjustment mechanism is configured to adjust the interval between the upper end surface of the support frame and the lower end surface of the support frame located above the support frame. It is preferable that As a result, the dimensional error of the support frame can be absorbed, and a highly accurate embedded mold unit can be built. On the contrary, if the spacing adjustment mechanism is positively used, high dimensional accuracy is not required for the support frame. Therefore, the support frame can be manufactured without being a skilled worker.
[0018]
In addition, as an interval adjusting mechanism, the end on the side where the embedded mold is present in the upper end surface portion of the support frame, and the end on the side where the embedded mold is not present in the upper end surface of the support frame are There may be mentioned those provided with two screw members provided in a screwed state so that the protruding length from the upper end surface of the support frame is variable.
Moreover, in the construction method of the dam dam body described above, it is preferable that a foundation frame is installed on the base and the lowest buried form unit is built on the foundation frame. Thereby, the height position adjustment of the lowermost embedded mold unit can be performed using the basic frame, and the workability is improved.
[0019]
Moreover, it is preferable that the embedded mold unit is built in a state in which the supporting frame is attached to the embedded mold in advance. However, after the supporting frame is connected to the embedded form unit located in the lower stage, the embedded form may be suspended and fixed to the supporting frame.
Then, an embedded form unit using an embedded form having a step formed on the end surface is installed above or on the left and right of the embedded form unit using an embedded form having a step formed on the end face. At this time, it is preferable to interpose a water stop member made of an elastic material between the embedded molds. This makes it difficult for water to enter the inside of the dam dam body, and can effectively suppress corrosion of the steel material. In particular, if stepped parts are formed on the top, bottom, left, and right end faces of the embedded formwork, and the water stop member is provided on the back side (the back side of the embedded formwork), the water stop member even if there is a sudden fluctuation in water pressure. The force that acts on can be relaxed. Therefore, no problem occurs in the water stop member.
[0020]
In addition, the material which comprises the said embedded formwork is not specifically limited. Typical examples are ordinary concrete, high-strength concrete, various fiber reinforced concrete, resin-impregnated concrete, resin concrete, expanded concrete, and the like. However, since it is desired to be lightweight, it is preferable that the concrete is made as strong as possible.
[0021]
DETAILED DESCRIPTION OF THE INVENTION
1 to 13 relate to a first embodiment of the present invention (construction of a vertical surface portion of a dam dam body), and FIG. 1 is a perspective view illustrating a state in which channel steel is assembled to an embedded formwork. 2 is a perspective view of the embedded form unit, FIG. 3 is a side view of the embedded form unit built in the second stage or more, FIG. 4 is a side view of the embedded form unit built in the first stage, and FIG. FIG. 6 is a perspective view showing a state in which the foundation frame is installed on the foundation concrete, FIG. 6 is a perspective view showing a state in which the first stage embedded form unit is installed, and FIG. 7 is an example in which the second stage embedded form unit is installed. FIG. 8 is a side view showing a connecting portion between the embedded mold units, FIG. 9 is a perspective view showing a state where the first lift concrete is placed, and FIG. 10 is a diagram showing the first lift concrete. Side view showing the installed state, Fig. 11 shows the installation of the third-stage embedded formwork unit Perspective view showing a state I, Figure 12 is a perspective view showing a state in which Da設 two lift eyes of the concrete, FIG. 13 is a side view showing a state in which Da設 two lift eyes concrete.
[0022]
In each figure, 1 is an embedded form made of high-strength concrete, and the surface side (the side not shown in FIG. 1 etc.) of this embedded
On the upper end surface of the embedded
[0023]
[0024]
The vertical height dimensions of the embedded
[0025]
The embedded form unit A 'built in the first stage has the same basic structure as the embedded form unit A built in the second and subsequent stages. However, the lower end connection surface of the
[0026]
Next, a method for constructing a dam dam body using the embedded formwork unit A (and the embedded formwork unit A ′) will be described.
In this construction method, concrete is first placed on a base to form a flat concrete layer (foundation concrete) 7. Then, two groove steels are connected in parallel by several angle irons in a region sandwiched by
[0027]
After matching the height of the
Simultaneously with this operation, the embedded mold unit A 'is assembled. That is, the embedded
[0028]
Subsequently, as shown in FIG. 6, the embedded form unit A ′ thus obtained is built on the
Next, as shown in FIG. 7, the second-stage embedded form unit A ′ assembled during the installation of the first-stage embedded form unit A ′ is replaced with the first-stage embedded form unit A ′. Build on. The structure of the connecting portion is as shown in FIG. 8, and the embedded form unit A ′ and the embedded form unit A are sandwiched between two
[0029]
After the second stage embedded form unit A is completed, as shown in FIGS. 9 and 10, the
When the
[0030]
Regarding the laying of the embedded form unit A after the fourth stage and the concrete placing after the third lift, the placing of the third stage buried form unit A and the placing of the concrete 15 at the second lift It is exactly the same, and this work is repeated as many times as necessary to obtain the vertical surface portion of the dam body.
FIGS. 14 to 23 relate to the second embodiment of the present invention (construction of the inclined surface portion of the dam dam body), FIG. 14 is a perspective view of an embedded formwork unit, and FIG. FIG. 16 is a side view of the embedded formwork unit to be built in the first stage, and FIG. 17 is a perspective view showing a state in which the first stage of the formwork unit is built. 18 is a perspective view showing a state in which the second-stage embedded form unit is installed, FIG. 19 is a perspective view showing a state in which the first lift concrete is placed, and FIG. 20 is a diagram in which the first lift concrete is placed. FIG. 21 is a perspective view showing a state in which a third-stage embedded form unit has been built, FIG. 22 is a perspective view showing a state in which a second lift of concrete is placed, and FIG. It is a side view which shows the state which laid concrete of eyes.
[0031]
14 to 23,
[0032]
The vertical heights of the embedded
[0033]
The embedded form unit B ′ built in the first stage has the same basic structure as the embedded form unit B built in the second stage and thereafter. However, as will be described later, the lower end connection surface of the
[0034]
Next, a method for constructing a dam dam body using the embedded form unit B (and the embedded form unit B ′) will be described.
In the construction method of the second embodiment, first, as in the first embodiment, the
[0035]
Subsequently, as shown in FIG. 17, the first-stage embedded form unit B ′ assembled while installing the
[0036]
Next, as shown in FIG. 18, the second-stage embedded form unit B is built on the first-stage embedded form unit B ', and the steel frames 24 are connected to each other by bolting. This operation is repeated in the left-right direction to complete the installation of the second-stage embedded form unit B.
After the embedded formwork unit is built in two stages, as shown in FIGS. 19 and 20, the first-
[0037]
Subsequently, as shown in FIG. 21, the third-stage embedded form unit B is built on the second-stage embedded form unit B and connected by bolting. Then, as shown in FIGS. 22 and 23, the concrete 29 of the second lift is driven to the upper end position of the second-stage embedded form unit B.
Thereafter, the embedded form unit B and the concrete placement are repeated in the same manner to obtain an inclined surface portion (slope portion) of the dam dam body.
[0038]
FIGS. 24 to 31 relate to a third embodiment of the present invention (construction of a curved surface portion of a dam dam body), and FIG. 24 is a side view showing a state in which a first-stage embedded formwork unit is installed, 25 is a side view showing a state where the second-stage embedded form unit is installed, FIG. 26 is a side view showing a state where the first lift concrete is placed, and FIG. 27 is a view showing placing the first lift concrete. FIG. 28 is a side view showing a state where a third-stage embedded form unit is installed, FIG. 29 is a side view showing a state where concrete of the second lift is placed, and FIG. FIG. 31 is a side view showing a state in which a fourth-stage embedded form unit is installed. FIG.
[0039]
24 to 31, C is an embedded mold formed by attaching steel frames having various degrees of inclination to the embedded mold having a connecting jig provided on the back surface side through a grooved steel. Is a unit.
Even in this embedded form unit C, the basic configuration is the same as the embedded form unit described in the first and second embodiments. The vertical height of the steel frame is substantially equal, and the steel frame is shifted downward so that the lower end connecting surface of the steel frame is located below the lower end of the embedded mold.
[0040]
For the first-stage embedded form unit C ′, a steel frame having a smaller vertical height than the embedded form is used for the same reason as in the first and second embodiments.
Also in the construction method of the third embodiment, first, the
[0041]
Subsequently, as shown in FIG. 24, the first-stage embedded form unit C ′ is built on the
This operation is repeated in the left-right direction to complete the installation of the first-stage embedded form unit C ′.
Next, as shown in FIG. 25, the second-stage embedded form unit C is built on the first-stage embedded form unit C 'and connected by bolting.
[0042]
After the completion of the second-stage embedded form unit C, as shown in FIGS. 26 and 27, the
Subsequently, as shown in FIG. 28, the third-stage embedded form unit C is built on the second-stage embedded form unit C so that the surface where both are connected is smoothly continuous, and bolted. Link.
[0043]
After the
After the concrete 44 is hardened, the embedded form unit C located at the fourth level (the uppermost level) is placed on the third level embedded form unit C as shown in FIG. Concrete is cast to the upper end position of the formwork unit C. Thus, the curved surface portion (overflow portion) of the dam dam body is obtained.
[0044]
Note that the embedded formwork unit used for the construction of the curved overflow section differs from those of the first and second embodiments in that the shape of the steel frame is different for each stage. That is, the dimension in the depth direction is larger as the position is higher. This is because the upper one has a smaller installation gradient and the center of gravity of the embedded formwork unit moves in the depth direction of the dam dam body.
[0045]
The fourth-stage embedded form unit C uses a triangular steel frame. This is because a new embedded form unit is not provided on the fourth stage embedded form unit C, and a connecting function is not required.
32 to 36, according to a fourth embodiment of the present invention, FIG. 32 is a side view showing a state in which an embedded form unit with adjustable spacing is installed, and FIG. 33 is screwed bolts to a steel frame. FIG. 34 is a side view showing a state in which the embedded form unit is placed on what was previously built, and FIG. 35 shows a state in which the distance adjustment between the embedded form units has been completed. FIG. 36 is a sectional view showing the structure of the joint portion between the embedded molds.
[0046]
The embedded form unit of the fourth embodiment is characterized by including an interval adjusting mechanism. Below, this space | interval adjustment mechanism is demonstrated first.
32 to 36,
[0047]
A
[0048]
Bolt holes (not shown) are formed in the upper horizontal side portion of the
51a and 51b are bolts screwed to the nuts 50a and 50b at the site, and 52a and 52b are also nuts screwed to the
[0049]
The interval adjusting mechanism includes nuts 50a and 50b,
[0050]
In the present embodiment, a part of the interval adjusting mechanism is present between the steel frames 48. Therefore, the vertical height of the
The embedment mold unit D using the interval adjusting mechanism is built as follows.
[0051]
First, the embedded form unit D to which the nuts 50a and 50b are fixed is built in the same manner as in the first to third embodiments. Then,
Further, nuts 52 a and 52 b are screwed onto the tips of
[0052]
Subsequently, the heights of the top surfaces of the nuts 52a and 52b are adjusted. In particular, the height h of the top surface of the
[0053]
When the above processing is performed for all the embedded form unit D arranged in the same row, the embedded form unit D located in the upper stage is suspended and placed on the embedded form unit D. In this state, as shown in FIG. 34, the upper embedded form unit D is in contact with not only the nut 52b but also the embedded
[0054]
Next, the distance between the upper and lower steel frames 48 is adjusted. That is, the
[0055]
On the other hand, on the back side, the
[0056]
As can be seen from FIG. 35, the upper and lower embedded
Before placing concrete, the joint between the embedded
[0057]
As described above, in the fourth embodiment, since the distance adjusting mechanism is provided, the dimensional error of the
Moreover, since the embedding
[0058]
Note that not only the nuts 50a and 50b but also the
[0059]
As described above, according to the present invention, a dam body with a good landscape that is in harmony with the environment can be obtained, and troublesome work such as inking and position adjustment is almost unnecessary, and work on site is greatly saved. The construction period can be shortened and the cost can be reduced. In addition, in the state in which the embedded formwork unit is built in two stages, the concrete is placed up to the first stage, so that the second stage serves as a protective fence. For this reason, safety is very high. Furthermore, since all work can be performed inside the structure, no external scaffold is required, and the labor required for installation and removal of the work can be reduced.
[0060]
And since the thing of the structure which shifted the steel frame below as a buried formwork unit and was attached to the buried formwork in steps is used, the connection of buried formwork units is remarkably simplified. That is, when the embedded mold units are installed in the upper and lower two stages and the concrete is placed up to the upper end position of the lower embedded mold unit, the connecting portion between the embedded mold units is buried in the concrete. As a result, after the concrete is hardened, the steel frame of the upper embedded formwork unit is solidified. Therefore, the connection strength between the upper and lower embedded form units need not be so great, and the connection process can be simplified. Furthermore, the collapse of the buried formwork unit is suppressed, and the safety when placing concrete is high.
The steel frame in the first to fourth embodiments was a permanent connection of angle steel by welding, but besides this, for example, as shown in FIG. A steel frame with a parallel link structure can be used.
[0061]
In an embedded form unit comprising such a steel frame, the steel frame is deformed in accordance with the surface shape (gradient) of the dam dam body to be constructed. And the reinforcing
Therefore, it is possible to deal with various gradients with a single one, and it is not necessary to prepare various types of steel frames, so that the cost can be greatly reduced.
[0062]
Moreover, in the said 1st-4th embodiment, in consideration of transportability, it was conveyed separately with an embedding formwork and a steel frame, and was unitized on the spot. However, the embedded mold and the steel frame can be connected in advance. As an example, as shown in FIG. 38, a structure in which a
[0063]
As shown in FIG. 39, the embedded form unit is carried into the site with the
In addition, a dam dam body having a complicated shape, for example, a dam dam body whose upstream side is a vertical plane and whose downstream side is a curved surface can be obtained by appropriately combining the first to fourth embodiments.
[0064]
【effect】
The beauty of the dam can be given to the dam body, and it has great effects on labor saving and safety improvement.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a state in which channel steel is assembled to an embedded formwork.
FIG. 2 is a perspective view of an embedded form unit (first embodiment).
FIG. 3 is a side view of an embedded form unit (first embodiment) to be built in the second stage or higher.
FIG. 4 is a side view of an embedded formwork unit built in the first stage.
FIG. 5 is a perspective view showing a state in which the foundation frame is installed on the foundation concrete.
FIG. 6 is a perspective view showing a state in which the first-stage embedded form unit is installed.
FIG. 7 is a perspective view showing a state where a second-stage embedded form unit is installed.
FIG. 8 is a side view showing a connecting portion between embedded formwork units.
FIG. 9 is a perspective view showing a state in which concrete for the first lift is placed.
FIG. 10 is a side view showing a state in which concrete for the first lift is placed.
FIG. 11 is a perspective view showing a state where a third-stage embedded form unit is installed.
FIG. 12 is a perspective view showing a state in which concrete for the second lift is placed.
FIG. 13 is a side view showing a state in which concrete for the second lift is placed.
FIG. 14 is a perspective view of an embedded form unit (second embodiment).
FIG. 15 is a side view of an embedded formwork unit (second embodiment) to be built in the second stage or higher.
FIG. 16 is a side view of an embedded formwork unit built in the first stage.
FIG. 17 is a perspective view showing a state in which the first-stage embedded form unit is installed.
FIG. 18 is a perspective view showing a state in which the second-stage embedded form unit is installed.
FIG. 19 is a perspective view showing a state in which concrete for the first lift is placed.
FIG. 20 is a side view showing a state in which concrete for the first lift is placed.
FIG. 21 is a perspective view showing a state in which a third-stage embedded form unit is installed.
FIG. 22 is a perspective view showing a state in which concrete for the second lift is placed.
FIG. 23 is a side view showing a state in which concrete for the second lift is placed.
FIG. 24 is a side view showing a state in which the first-stage embedded form unit is installed.
FIG. 25 is a side view showing a state in which the second-stage embedded form unit is installed.
FIG. 26 is a side view showing a state in which concrete for the first lift is placed.
FIG. 27 is a cross-sectional view showing a state in which concrete for the first lift is placed.
FIG. 28 is a side view showing a state where a third-stage embedded form unit is installed.
FIG. 29 is a side view showing a state in which concrete for the second lift is placed.
FIG. 30 is a cross-sectional view showing a state in which concrete for the second lift is placed.
FIG. 31 is a side view showing a state in which a fourth-stage embedded form unit is installed.
FIG. 32 is a side view showing a state in which an embedded formwork unit capable of adjusting the interval is installed.
FIG. 33 is a side view showing a state in which a bolt is screwed to a steel frame.
FIG. 34 is a side view showing a state in which the embedded formwork unit is placed on the one previously built.
FIG. 35 is a side view showing a state in which the adjustment of the interval between the embedded mold units has been completed.
FIG. 36 is a cross-sectional view showing the structure of the joint portion between the embedded molds
FIG. 37 is a side view showing a part of another embodiment of an embedded formwork unit.
FIG. 38 is a plan view showing still another embodiment of an embedded form unit.
39 is a plan view showing a state where the embedded form unit of FIG. 38 is deformed.
[Explanation of symbols]
A Embedded formwork unit built in the second and higher levels
A 'Embedded formwork unit built in the first stage
1 buried formwork
2 Connecting jig
3 Channel steel
4 concave
5 ridges
6 Steel frame (supporting frame)
7 Foundation concrete
8 Anchor bolt
9 Basic frame
14 First lift concrete
15 Second lift concrete
Claims (4)
前記連結治具を用いて前記埋設型枠に取り付けられた支持用枠体とを具備してなる埋設型枠ユニットであって、
前記支持用枠体は、鋼材をピン結合によって連結した平行リンク状のものであり、
前記支持用枠体の下端面を前記埋設型枠の下端よりも下方に存在させた
ことを特徴とする埋設型枠ユニット。An embedded formwork provided with a connecting jig on the back side;
An embedded form unit comprising a supporting frame attached to the embedded form using the connecting jig,
The supporting frame is in the form of a parallel link in which steel materials are connected by pin coupling,
An embedded mold unit, wherein a lower end surface of the support frame is present below a lower end of the embedded mold.
前記連結治具を用いて、前記埋設型枠に取り付けられた支持用枠体とを具備してなる埋設型枠ユニットであって、
前記支持用枠体は間隔調節機構を具備し、該間隔調節機構によって該支持用枠体の上端面とその上方に位置する支持用枠体の下端面との間隔が調節できるよう構成されてなり、
前記支持用枠体の下端面を前記埋設型枠の下端よりも下方に存在させた
ことを特徴とする埋設型枠ユニット。 An embedded formwork provided with a connecting jig on the back side;
An embedded mold unit comprising a support frame attached to the embedded mold using the connecting jig,
The support frame includes an interval adjustment mechanism, and is configured such that the interval between the upper end surface of the support frame and the lower end surface of the support frame positioned above the support frame can be adjusted by the interval adjustment mechanism. ,
The embedded mold unit, wherein a lower end surface of the support frame is present below a lower end of the embedded mold.
この第1の工程で建て込まれた埋設型枠ユニット上に、支持用枠体の下端連結面を埋設型枠の下端よりも下方に存在させた埋設型枠ユニットを建て込む第2の工程と、
前記第2の工程で建て込まれた埋設型枠ユニットの支持用枠体の下端連結面より上の位置と、支持用枠体の上端より下の位置との間の位置までコンクリートを打設する第3の工程と、
これまでに建て込まれた埋設型枠ユニットの上に、支持用枠体の下端連結面を埋設型枠の下端よりも下方に存在させた埋設型枠ユニットを建て込む第4の工程と、
この第4の工程で建て込まれた埋設型枠ユニットの支持用枠体の下端連結面より上の位置と、支持用枠体の上端より下の位置との間の位置までコンクリートを打設する第5の工程とを具備し、
前記第4の工程及び第5の工程を必要に応じて繰り返すことを特徴とするダム堤体の構築方法。 A first step of building an embedded form unit comprising a buried form and a support frame in the form of a parallel link in which steel materials are connected by pin coupling on the base;
A second step of building an embedded form unit in which the lower end connecting surface of the supporting frame is located below the lower end of the embedded form on the embedded form unit built in the first step; ,
Concrete is cast to a position between a position above the lower end connecting surface of the support frame of the embedded mold unit built in the second step and a position below the upper end of the support frame. A third step;
A fourth step of building an embedded formwork unit in which the lower end connection surface of the support frame is located below the lower end of the embedded formwork on the embedded formwork unit built so far;
Concrete is cast to a position between a position above the lower end connecting surface of the support frame of the embedded mold unit built in the fourth step and a position below the upper end of the support frame. A fifth step,
A method for constructing a dam dam body, wherein the fourth step and the fifth step are repeated as necessary .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05629296A JP3665839B2 (en) | 1995-03-27 | 1996-03-13 | Construction method of buried formwork unit and dam body |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7-67439 | 1995-03-27 | ||
| JP6743995 | 1995-03-27 | ||
| JP05629296A JP3665839B2 (en) | 1995-03-27 | 1996-03-13 | Construction method of buried formwork unit and dam body |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08326039A JPH08326039A (en) | 1996-12-10 |
| JP3665839B2 true JP3665839B2 (en) | 2005-06-29 |
Family
ID=26397244
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP05629296A Expired - Fee Related JP3665839B2 (en) | 1995-03-27 | 1996-03-13 | Construction method of buried formwork unit and dam body |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3665839B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106012969A (en) * | 2016-05-13 | 2016-10-12 | 安徽名川活动坝科技有限公司 | Dam face structure |
-
1996
- 1996-03-13 JP JP05629296A patent/JP3665839B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08326039A (en) | 1996-12-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104088461B (en) | Y type cast-in-situ concrete columns template system and construction method thereof | |
| CN113638304B (en) | Concrete beam type bridge hidden cover beam structure system and construction method thereof | |
| JPH07247695A (en) | Construction method for high structure and construction device used therefor | |
| CN118911409A (en) | Integral structure of movable steel template and modeling template and construction method thereof | |
| KR100443809B1 (en) | Fabricated arch tunnel and construction method thereof | |
| JP3665839B2 (en) | Construction method of buried formwork unit and dam body | |
| JP2004017645A (en) | Form device for pre-cast concrete foundation block, pre-cast concrete foundation block, and foundation technique using pre-cast concrete foundation block | |
| KR0141463B1 (en) | Method of prefabricating stairway | |
| CN114351943A (en) | Shaped steel mould large-section stiff fair-faced concrete column structure and construction method | |
| CN210315967U (en) | Prefab installation structure | |
| JP2001254495A (en) | Internal stairway for building, and building method therefor | |
| JP2931761B2 (en) | Fixing device for outer wall material and laminating method for middle and high-rise buildings using the fixing device | |
| JP3137448B2 (en) | Construction method of concrete main tower | |
| CN224173750U (en) | Reinforcing steel bar positioning device for concrete upright post | |
| CN1942639A (en) | Equipment for the manufacture of upper anchors for steps | |
| JP3390719B2 (en) | Concrete formwork construction method | |
| JPH07317315A (en) | Self-rising type formwork construction method | |
| JP4067091B2 (en) | Residual perforated frame for formwork, concrete frame and concrete frame construction method | |
| JP3244102U (en) | Steel house foundation structure and anchor set used therein | |
| CN113944328A (en) | Cast-in-place construction process of column | |
| JP2843880B2 (en) | Wall construction method | |
| CN1079795A (en) | combined template and construction method thereof | |
| JP2000352169A (en) | Inner stair for building, its construction method and assembly jig for erection therefor | |
| JPH05239810A (en) | Constructing method for reinforced concrete arch bridge | |
| JP2006322154A (en) | Foundation construction method of building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20041012 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20041020 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20041220 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050316 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050316 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080415 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090415 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100415 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100415 Year of fee payment: 5 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100415 Year of fee payment: 5 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| LAPS | Cancellation because of no payment of annual fees |