Operation control method and apparatus for vacuum packaging machine

Info

Publication number
JP3406153B2
JP3406153B2 JP17129296A JP17129296A JP3406153B2 JP 3406153 B2 JP3406153 B2 JP 3406153B2 JP 17129296 A JP17129296 A JP 17129296A JP 17129296 A JP17129296 A JP 17129296A JP 3406153 B2 JP3406153 B2 JP 3406153B2
Authority
JP
Japan
Prior art keywords
timer
vacuum
gas
turned
hold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP17129296A
Other languages
Japanese (ja)
Other versions
JPH1016916A (en
Inventor
享 石川
慎三 小塚
忠志 酒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hoshizaki Electric Co Ltd
Original Assignee
Hoshizaki Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hoshizaki Electric Co Ltd filed Critical Hoshizaki Electric Co Ltd
Priority to JP17129296A priority Critical patent/JP3406153B2/en
Publication of JPH1016916A publication Critical patent/JPH1016916A/en
Application granted granted Critical
Publication of JP3406153B2 publication Critical patent/JP3406153B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Vacuum Packaging (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、熱接着性の袋状部
材の中に食品等を入れ脱気してヒートシールすることに
より密封包装を行う真空包装機に関し、特にその運転の
制御方法及び装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a vacuum packaging machine for carrying out hermetic packaging by placing food or the like in a heat-adhesive bag-shaped member and degassing and heat-sealing, and particularly to a method of controlling its operation and It relates to the device.

【0002】[0002]

【従来の技術】食品等を熱接着性の袋状部材の中に入
れ、その袋状部材の内部を脱気・減圧してからヒートシ
ールすることにより密封するいわゆる真空包装機におい
て、真空包装は、一般に次のような工程で行われる。即
ち、適当な配管を介して真空ポンプに接続された減圧可
能なチャンバの中に、食品等の被包装物を入れた一辺開
口の袋状部材を入れる。その際、閉じるべき開口辺は、
ヒートシール可能な位置に置かれる。チャンバの蓋体を
閉じ、脱気工程と称する操作、即ち真空ポンプを作動さ
せてチャンバ内の気体を排出する操作を行う。次に、袋
状部材の内部と連通するチャンバ内の圧力が所定圧に達
したことを圧力センサで検知し、その後、シール工程と
称する操作、即ちヒートシール装置により、前述の袋状
部材の開口辺を閉じる操作が行われる。最後に、前記配
管に連絡した大気開放弁を開弁し、チャンバ内の圧力を
大気圧に戻し、蓋体を開き易いようにしてから、密封さ
れた袋状部材を取り出す。
2. Description of the Related Art In a so-called vacuum packaging machine in which food or the like is placed in a heat-adhesive bag-shaped member, the inside of the bag-shaped member is deaerated and depressurized, and then heat-sealed, the so-called vacuum packaging machine Generally, the following steps are performed. That is, a bag-shaped member having a one-side opening containing a product to be packaged, such as food, is placed in a chamber that can be depressurized and is connected to a vacuum pump via an appropriate pipe. At that time, the opening side to be closed is
It is placed in a heat sealable position. The lid of the chamber is closed, and an operation called a deaeration step, that is, an operation of activating the vacuum pump to discharge the gas in the chamber is performed. Next, the pressure sensor detects that the pressure in the chamber communicating with the inside of the bag-shaped member has reached a predetermined pressure, and thereafter, an operation called a sealing step, that is, a heat sealing device is used to open the bag-shaped member. The operation of closing the edge is performed. Finally, the atmosphere release valve connected to the pipe is opened to return the pressure in the chamber to atmospheric pressure so that the lid can be easily opened, and then the sealed bag-shaped member is taken out.

【0003】また、チャンバ及び袋状部材の内部を上述
のように脱気した後、不活性ガスのような気体を同チャ
ンバ内に、延いては袋状部材内に封入し(ガス封入工
程)、しかる後、袋状部材のヒートシールを行うガス封
入装置を備えた真空包装機も種々の形式のものが知られ
ている。
Further, after the inside of the chamber and the bag-shaped member is degassed as described above, a gas such as an inert gas is sealed in the same chamber and further in the bag-shaped member (gas filling step). After that, various types of vacuum packaging machines equipped with a gas sealing device for heat-sealing the bag-shaped member are known.

【0004】そして、前者の真空包装機においては、使
用者の様々なニーズに応えるために、真空包装の動作中
に、各工程の長さを任意に延長したり、各工程を途中で
中止したりできるように、各工程の実施に関連した諸機
器にスイッチ回路を接続したものが知られている。例え
ば、脱気時間延長スイッチと脱気中止スイッチとを設け
て、脱気工程の長さを変更したり、脱気工程を途中で中
止可能にしたものがある。
In the former vacuum packaging machine, in order to meet various needs of users, the length of each process can be arbitrarily extended or stopped during the vacuum packaging operation. It is known that a switch circuit is connected to various devices related to the execution of each process. For example, there is one in which a degassing time extension switch and a degassing stop switch are provided to change the length of the degassing process or to stop the degassing process midway.

【0005】更に、別の前者の形式に係る真空包装機に
は、保持もしくはホールドスイッチ、飛び越しもしくは
ジャンプスイッチと称する2種類のスイッチを設けて、
ホールドスイッチを作動した場合には、真空ポンプを制
御する真空タイマが作動しても、次の脱気工程に移らな
いようにしたり、ジャンプスイッチを作動した場合に
は、真空タイマが作動していなくても、次の脱気工程に
移行させてしまうものがある。
Further, another former type of vacuum packaging machine is provided with two kinds of switches called a holding or hold switch and a jump or jump switch,
When the hold switch is activated, even if the vacuum timer that controls the vacuum pump is activated, do not move to the next degassing process, or if the jump switch is activated, the vacuum timer is not activated. However, there is one that moves to the next degassing step.

【0006】[0006]

【発明が解決しようとする課題】しかし、従来の真空包
装機では、脱気工程を制御するために、上述のように2
個のスイッチを別々に採用していたため、これが、製造
コストの低減を阻害する要因となっており、また、各ス
イッチの操作部は、真空包装機の外部に露出する制御パ
ネルに設けられるが、スイッチの数が多いとコンパクト
化の弊害になるだけでなく誤操作を惹起し易くなるの
で、その改善が望まれていた。従って、本発明の目的
は、真空包装機における少なくとも2つの機能を1つの
スイッチで実行可能にするための制御方法及び装置を提
供することである。
However, in the conventional vacuum packaging machine, in order to control the degassing process, as described above,
Since each switch was adopted separately, this is a factor that hinders the reduction of manufacturing cost.Also, the operating part of each switch is provided on the control panel exposed to the outside of the vacuum packaging machine. If there are a large number of switches, not only is it an adverse effect on downsizing, but it is also easy to cause erroneous operation, so improvements have been desired. Accordingly, it is an object of the present invention to provide a control method and apparatus for enabling at least two functions in a vacuum packaging machine to be performed with a single switch.

【0007】[0007]

【課題を解決するための手段】上述の目的を達成するた
め、請求項1に記載の本発明による運転制御方法では、
本体と協働して真空チャンバを画成する開閉自在の蓋体
を有し、該蓋体を閉じて真空タイマにより制御される脱
気工程を開始し、前記真空タイマのタイムアップ時にシ
ールタイマにより制御されるシール工程を開始する真空
包装機の運転を制御するために1つのホールド・ジャン
プスイッチを用意し、前記脱気工程中にオンされた前記
ホールド・ジャンプスイッチが前記真空タイマのタイム
アップ前にオフされた場合には、前記真空タイマがタイ
ムアップしなくても前記脱気工程を中断して前記シール
工程に移行し、前記脱気工程中にオンされた前記ホール
ド・ジャンプスイッチが前記真空タイマのタイムアップ
時までにオフされない場合には、前記真空タイマがタイ
ムアップしても前記ホールド・ジャンプスイッチをオフ
するまで前記脱気工程を持続する
In order to achieve the above object, the operation control method according to the present invention as set forth in claim 1,
It has an openable and closable lid that cooperates with the main body to define a vacuum chamber, closes the lid to start a deaeration process controlled by a vacuum timer, and a seal timer is used when the vacuum timer times out. One hold / jump switch is provided to control the operation of the vacuum packaging machine to start the controlled sealing process, and the hold / jump switch is turned on during the degassing process.
Hold / jump switch is the time of the vacuum timer
If the vacuum timer is turned off before
The hole that was turned on during the degassing process after the degassing process was interrupted without moving
The jump jump switch increases the time of the vacuum timer
If the vacuum timer is not turned off by the time
Turn off the hold jump switch even if
The degassing step is continued until

【0008】また、請求項2に記載の本発明による運転
制御方法は、脱気工程の後にガス封入工程を行う真空包
装機に向けられている。この場合、本体と協働して真空
チャンバを画成する開閉自在の蓋体を有し、該蓋体を閉
じて真空タイマにより制御される脱気工程を開始し、前
記真空タイマのタイムアップ時にガスタイマにより制御
されるガス封入工程を開始し、前記ガスタイマのタイマ
アップ時にシールタイマにより制御されるシール工程を
開始する真空包装機の運転を制御するために1つのホー
ルド・ジャンプスイッチを用意し、前記脱気工程又は前
記ガス封入工程中にオンされた前記ホールド・ジャンプ
スイッチが前記真空タイマ又は前記ガスタイマのタイム
アップ前にオフされた場合には、前記真空タイマ又は前
記ガスタイマがタイムアップしなくても前記脱気工程又
は前記ガス封入工程を中断して次の工程に移行し、前記
脱気工程又は前記ガス封入工程中にオンされた前記ホー
ルド・ジャンプスイッチが前記真空タイマ又は前記ガス
タイマのタイムアップ時までにオフされない場合には、
前記真空タイマ又は前記ガスタイマがタイムアップして
も前記ホールド・ジャンプスイッチをオフするまで前記
脱気工程又は前記ガス封入工程を持続する
The operation control method according to the second aspect of the present invention is directed to a vacuum packaging machine that performs a gas filling step after a deaeration step. In this case, it has an openable / closable lid that cooperates with the main body to define a vacuum chamber, closes the lid to start a deaeration process controlled by a vacuum timer, and when the vacuum timer times out. One hold / jump switch is provided for controlling the operation of the vacuum packaging machine, which starts the gas charging step controlled by the gas timer and starts the sealing step controlled by the seal timer when the gas timer is up. The hold jump turned on during the degassing process or the gas charging process.
The switch is the time of the vacuum timer or the gas timer.
If turned off before up, the vacuum timer or before
Serial Gasutaima is interrupted the without time-up deaeration step or the gas enclosing step proceeds to the next step, the
The ho which is turned on during the degassing step or the gas charging step.
The jump switch is the vacuum timer or the gas.
If it is not turned off by the time of the timer,
The vacuum timer or the gas timer has timed out
Also until the hold jump switch is turned off
The deaeration process or the gas charging process is continued .

【0009】請求項3に記載の本発明による運転制御装
置では、本体と協働して真空チャンバを画成する開閉自
在の蓋体を有し、該蓋体を閉じて真空タイマにより制御
される脱気工程を開始し、前記真空タイマのタイムアッ
プ時にシールタイマにより制御されるシール工程を開始
する真空包装機の運転を制御するための装置であって、
前記真空タイマに電気的に接続される1つのホールド・
ジャンプスイッチと、前記脱気工程中にオンされた前記
ホールド・ジャンプスイッチが前記真空タイマのタイム
アップ前にオフされた場合に前記真空タイマがタイムア
ップしなくても前記脱気工程を中断して前記シール工程
に移行する手段と、前記脱気工程中にオンされた前記ホ
ールド・ジャンプスイッチが前記真空タイマのタイムア
ップ時までにオフされない場合に前記真空タイマがタイ
ムアップしても前記ホールド・ジャンプスイッチをオフ
するまで脱気工程を持続する手段とを備えている。
In the operation control device according to the present invention as defined in claim 3, there is provided an openable / closable lid which cooperates with the main body to define a vacuum chamber, and the lid is closed and controlled by a vacuum timer. A device for controlling the operation of a vacuum packaging machine, which starts a deaeration process and starts a sealing process controlled by a sealing timer when the vacuum timer times out,
One hold electrically connected to the vacuum timer
The jump switch and the switch that was turned on during the degassing process.
Hold / jump switch is the time of the vacuum timer
If the vacuum timer is turned off before it is turned off before
Means for interrupting the degassing process and shifting to the sealing process even if it is not installed, and the heater turned on during the degassing process.
The field jump switch is used for the vacuum timer.
If the vacuum timer does not turn off before
Turn off the hold jump switch even if
And a means for continuing the deaeration process .

【0010】また、請求項4に記載の本発明による運転
制御装置は、本体と協働して真空チャンバを画成する開
閉自在の蓋体を有し、該蓋体を閉じて真空タイマにより
制御される脱気工程を開始し、前記真空タイマのタイム
アップ時にガスタイマにより制御されるガス封入工程を
開始し、前記ガスタイマのタイマアップ時にシールタイ
マにより制御されるシール工程を開始する真空包装機の
運転を制御するための装置であって、前記真空タイマ及
び前記ガスタイマに電気的に関係した1つのホールド・
ジャンプスイッチと、前記脱気工程又は前記ガス封入工
程中にオンされた前記ホールド・ジャンプスイッチが前
記真空タイマ又は前記ガスタイマのタイムアップ前にオ
フされた場合に前記真空タイマ又は前記ガスタイマがタ
イムアップしなくても前記脱気工程又は前記ガス封入工
程を中断して次の工程に移行させる手段と、前記脱気工
程又は前記ガス封入工程中にオンされた前記ホールド・
ジャンプスイッチが前記真空タイマ又は前記ガスタイマ
のタイムアップ時までにオフされない場合に前記真空タ
イマ又は前記ガスタイマがタイムアップしても前記ホー
ルド・ジャンプスイッチをオフするまで前記脱気工程又
は前記ガス封入工程を持続する手段とを備えている。
Further, the operation control device according to the present invention according to claim 4 has an openable / closable lid body which cooperates with the main body to define a vacuum chamber, and the lid body is closed and controlled by a vacuum timer. The operation of the vacuum packaging machine that starts the degassing step, starts the gas filling step controlled by the gas timer when the vacuum timer times out, and starts the sealing step controlled by the seal timer when the gas timer times up. A holding device electrically connected to the vacuum timer and the gas timer.
The jump switch and the hold jump switch that was turned on during the degassing process or the gas charging process are in front of each other.
Note: Before the vacuum timer or the gas timer expires,
If the vacuum timer or the gas timer is
Means for shifting to the next step without Imuappu to interrupt the degassing step or the gas enclosing step, the degassing Engineering
Or the hold turned on during the gas charging step.
The jump switch is the vacuum timer or the gas timer.
If it is not turned off by the time of
Even if the timer or the gas timer times out, the ho
The degassing process or until the cold jump switch is turned off.
Means for maintaining the gas filling step .

【0011】[0011]

【発明の実施の形態】次に、添付図面を参照して本発明
の好適な実施の形態即ち実施形態について説明するが、
図中、同一符号は同一又は対応部分を示すものとする。
図1は、真空包装機に実施される本発明の運転制御装置
の一実施形態を示す回路図で、同図において、図示しな
い電源に直列に接続されているのは、符号ELBで示す
漏電遮断器であり、これに種々の並列回路が接続されて
いる。先ず、図面において左から、図示しない袋状部材
と真空チャンバを脱気するための真空ポンプVPが真空
ポンププロテクタOL及びパワリレーMSの常開接点M
S1を介して接続され(Cはコンデンサを表す)、次
に、密封包装の終了後に真空包装機の蓋体(図示せず)
を開き易くするため上記真空チャンバに大気を導入すべ
く大気開放バルブSV1が後述するリレーX1の常閉接
点X12を介して接続されている。変圧器TRはリレー
X4の常開接点X41を介して接続され、その二次側に
は、前述した袋状部材をヒートシールするためのシール
ヒータH1がある。
BEST MODE FOR CARRYING OUT THE INVENTION Preferred embodiments of the present invention will be described below with reference to the accompanying drawings.
In the drawings, the same reference numerals indicate the same or corresponding parts.
FIG. 1 is a circuit diagram showing an embodiment of an operation control device of the present invention which is implemented in a vacuum packaging machine. In FIG. 1, what is connected in series to a power source (not shown) is a leakage breaker indicated by a reference sign ELB. And various parallel circuits are connected to it. First, from the left in the drawing, the bag-shaped member (not shown) and the vacuum pump VP for degassing the vacuum chamber are the normally open contacts M of the vacuum pump protector OL and the power relay MS.
Connected via S1 (C represents a capacitor), and then the lid of the vacuum packaging machine (not shown) after the end of the hermetic packaging.
In order to facilitate the opening of the vacuum chamber, an atmosphere opening valve SV1 is connected via a normally closed contact X12 of a relay X1 to be described later in order to introduce the atmosphere into the vacuum chamber. The transformer TR is connected via the normally open contact X41 of the relay X4, and the seal heater H1 for heat-sealing the above-mentioned bag-shaped member is provided on the secondary side of the transformer TR.

【0012】更に、S1は上記蓋体の開閉に伴ってオン
・オフするリミットスイッチのような開閉スイッチであ
り、該開閉スイッチS1は、周知のように、蓋体の閉止
時には接点NOに接続され、開放時には接点NCに接続
されるようになっている。接点NOには、パワリレーモ
シクハマグネットスイッチMS及びリレーX1の並列体
が冷却タイマTM3の常閉接点TM31を介して接続さ
れている。該冷却タイマTM3は、ヒートシールを行っ
た後の図示しない熱線を冷却する時間を制御するための
タイマである。一方、冷却タイマTM3の常開接点TM
32にはケースヒータH2が接続されている。
Further, S1 is an opening / closing switch such as a limit switch which is turned on / off when the lid is opened / closed. As is well known, the opening / closing switch S1 is connected to a contact NO when the lid is closed. When opened, it is connected to the contact NC. To the contact NO, a parallel body of the power relay MOSHICHA magnet switch MS and the relay X1 is connected via the normally closed contact TM31 of the cooling timer TM3. The cooling timer TM3 is a timer for controlling the time for cooling the heat wire (not shown) after the heat sealing. On the other hand, the normally open contact TM of the cooling timer TM3
A case heater H2 is connected to 32.

【0013】ケースヒータH2及び常開接点TM32の
直列体に並列に接続されているのは、上述した真空ポン
プVPの図示しないパイプに設けられる真空バルブSV
2と、リレーX1の常開接点X13と、リレーX2の常
閉接点X24とからなる直列体であり、前述した開閉ス
イッチS1の接点NCは、この直列体に真空バルブSV
2と常開接点X13との間で接続されている。また、常
開接点X13と常閉接点X24との間から図示のように
一端が延びるラインに接続された直列体は、真空タイマ
TM1、ホールド・ジャンプスイッチS2の第1常開接
点S21及びリレーX3の常閉接点X32を含んでお
り、上記ラインの他端は、接点S21と真空タイマTM
1との間に接続されている。Lは真空ランプである。
A vacuum valve SV provided on a pipe (not shown) of the above-mentioned vacuum pump VP is connected in parallel to the series body of the case heater H2 and the normally open contact TM32.
2 and a normally open contact X13 of the relay X1 and a normally closed contact X24 of the relay X2, and the contact NC of the opening / closing switch S1 described above is connected to the vacuum valve SV.
2 and the normally open contact X13. The series body connected to the line whose one end extends from between the normally open contact X13 and the normally closed contact X24 as shown in the drawing is a vacuum timer TM1, a first normally open contact S21 of the hold / jump switch S2, and a relay X3. Normally closed contact X32, and the other end of the above line has a contact S21 and a vacuum timer TM.
It is connected between 1 and 1. L is a vacuum lamp.

【0014】上記ホールド・ジャンプスイッチS2は、
前述した接点S21に連動する第2常開接点S22と、
常閉接点S23とを更に含み、両接点に直列に、リレー
X3が接続されている。また、両接点S22、S23と
の間から延びるラインにリレーX2が接続され、このリ
レーX2にその常開接点X23と真空タイマTM1の常
開接点TM11の並列体が接続されている。かかるホー
ルド・ジャンプスイッチとしては、例えば、モーメンタ
リー動作をする2極双投式スイッチが好適であり、後述
するように、作業者が同スイッチを押している間は当該
工程を維持して延長が可能であり、押圧を解除すれば次
の工程へ移行させることができる。
The hold / jump switch S2 is
A second normally open contact S22 interlocking with the contact S21 described above,
A normally closed contact S23 is further included, and a relay X3 is connected in series with both contacts. A relay X2 is connected to a line extending between the contacts S22 and S23, and the relay X2 is connected to a parallel body of the normally open contact X23 and the normally open contact TM11 of the vacuum timer TM1. As such a hold / jump switch, for example, a two-pole double-throw switch that performs a momentary operation is suitable, and as will be described later, the process can be maintained and extended while the operator is pressing the switch. Yes, if the pressing is released, it is possible to move to the next step.

【0015】最後に、両接点S22、S23と並列に、
前述したリレーX3の常開接点X31が設けられると共
に、この接点X31に直列に、シールバルブSV3及び
リレーX2の常開接点X21の直列体と、シールタイマ
TM2を含むラインと、シールタイマTM2の常閉接点
TM21及びリレーX4の直列体と、シールタイマTM
2の常開接点TM22及び冷却タイマTM3の直列体と
が互いに並列の関係で接続されている。
Finally, in parallel with both contacts S22 and S23,
The normally open contact X31 of the relay X3 described above is provided, and a series body of the seal valve SV3 and the normally open contact X21 of the relay X2, a line including the seal timer TM2, and a normally open contact of the seal timer TM2 are provided in series with the contact X31. Closed contact TM21 and relay X4 in series, seal timer TM
The two normally open contacts TM22 and the serial body of the cooling timer TM3 are connected in parallel with each other.

【0016】以上のような構成を有する運転制御装置の
制御回路を有する真空包装機において、その動作を図1
に加え図2〜図3のタイミングチャートを参照して説明
する。先ず、通常運転の場合(図2)には、漏電遮断器
ELBはオンであり、ヒートシールすべき袋状部材を図
示しない真空チャンバに入れて、蓋体(図示せず)を閉
止すると、開閉スイッチS1がオンとなって接点NOに
接続され、パワリレー(マグネットスイッチ)MSがオ
ンとなり、その常開接点MS1が閉じて、真空ポンプV
Pが起動する。これと同時に、リレーX1が励磁され
て、その常閉接点X12が開いて大気開放バルブSV1
が閉じると共に、常開接点X13が閉成して真空バルブ
SV2が開き、真空引きを行う(脱気工程)。また、常
閉接点X24を介して真空タイマTM1がオンとなる。
The operation of the vacuum packaging machine having the control circuit of the operation control device having the above-described structure is shown in FIG.
In addition to this, description will be made with reference to the timing charts of FIGS. First, in the normal operation (FIG. 2), the earth leakage breaker ELB is on, the bag-like member to be heat-sealed is put in a vacuum chamber (not shown), and the lid (not shown) is closed to open and close. The switch S1 is turned on and connected to the contact NO, the power relay (magnet switch) MS is turned on, the normally open contact MS1 is closed, and the vacuum pump V
P starts. At the same time, the relay X1 is excited and its normally closed contact X12 is opened to open the atmosphere release valve SV1.
Is closed, the normally open contact X13 is closed, the vacuum valve SV2 is opened, and vacuuming is performed (deaeration process). Further, the vacuum timer TM1 is turned on via the normally closed contact X24.

【0017】十分に脱気を行うように設定された真空タ
イマTM1の設定時間がタイムアップすると、その接点
TM11が閉成して、リレーX2及びX3が励磁され、
それにより常閉接点X24が開成して真空バルブSV2
が閉じると共に、常開接点X21が閉成してシールバル
ブSV3が開く。また、励磁されたリレーX3の常開接
点X31が閉じることにより、常閉のタイマ接点TM2
1を介してリレーX4がオンとなり、その常開接点X4
1が閉じてシールヒータH1が通電され、袋状部材のヒ
ートシールが行われる(シール工程)。また、接点X3
1の閉成によりシールタイマTM2がオンとなる。
When the set time of the vacuum timer TM1 set to perform sufficient deaeration is up, the contact TM11 is closed and the relays X2 and X3 are excited,
As a result, the normally closed contact X24 is opened and the vacuum valve SV2
Is closed, the normally open contact X21 is closed and the seal valve SV3 is opened. In addition, the normally open contact X31 of the excited relay X3 is closed, so that the normally closed timer contact TM2 is closed.
Relay X4 is turned on via 1 and its normally open contact X4
1 is closed, the seal heater H1 is energized, and the bag-shaped member is heat-sealed (sealing step). Also, contact X3
With the closing of 1, the seal timer TM2 is turned on.

【0018】シールタイマTM2がタイムアップする
と、その常閉接点TM21が開成してリレーX4が消磁
され、シールヒータH1がオフとなり、シール工程が終
了する。同時に常開接点TM22の閉成により冷却タイ
マTM3がオンとなる。冷却タイマTM3の設定時間が
経過すると、その常閉接点TM31が開いてマグネット
スイッチMS及びリレーX1がオフとなり、真空ポンプ
VPは停止し、大気開放バルブSV1が開く。また、真
空ポンプに設置されたケースヒータH2に通電が始ま
る。
When the seal timer TM2 expires, its normally closed contact TM21 is opened, the relay X4 is demagnetized, the seal heater H1 is turned off, and the sealing process is completed. At the same time, the cooling timer TM3 is turned on by closing the normally open contact TM22. When the set time of the cooling timer TM3 has elapsed, the normally closed contact TM31 is opened, the magnet switch MS and the relay X1 are turned off, the vacuum pump VP is stopped, and the atmosphere opening valve SV1 is opened. Further, energization of the case heater H2 installed in the vacuum pump starts.

【0019】大気開放バルブSV1の開放により真空チ
ャンバ内が大気圧に戻った頃を見計らって蓋体を開く
と、開閉スイッチS1がオフとなって、接点NC側に接
続され、真空バルブSV2が開弁し、リレーX2、X
3、シールタイマTM2、冷却タイマTM3がオフとな
り、最初の待機状態に戻る。
When the lid is opened in anticipation of the time when the inside of the vacuum chamber has returned to atmospheric pressure due to the opening of the atmosphere opening valve SV1, the opening / closing switch S1 is turned off, the contact NC is connected, and the vacuum valve SV2 is opened. Valve, relay X2, X
3, the seal timer TM2, and the cooling timer TM3 are turned off, and the initial standby state is restored.

【0020】次に、ホールド・ジャンプスイッチS2の
使用による制御の仕方について説明する。図1及び図3
において、マグネットスイッチMS及びパワリレーX1
がオン即ち励磁され、パワリレーX2が消磁され、真空
タイマTM1が常閉接点X24を介して通電され、真空
ポンプVPが起動し、かつ真空バルブSV2が開放して
いる真空引きの脱気工程において、ホールド・ジャンプ
スイッチS2を押圧すると、その常開接点S22が閉じ
てリレーX2が励磁され、常閉接点X24が開成する
が、ホールド・ジャンプスイッチの他方の常開接点S2
1もオンとなって、真空バルブSV2は、いずれも閉成
しているリレー接点X13及びX32並びに常開接点S
21を介して開放状態に保持されるので、通電されてい
る真空タイマTM1がタイムアップしてその接点TM1
1が閉じ、リレーX2が励磁されても、真空バルブSV
2は、ホールド・ジャンプスイッチS2が押圧されてい
る限り、上記開放状態を続ける。即ち、真空タイマTM
1の動作は無効となり、同真空タイマTM1により制御
されずに、脱気工程をホールドする。
Next, a control method by using the hold / jump switch S2 will be described. 1 and 3
In, magnet switch MS and power relay X1
Is turned on, that is, the power relay X2 is deenergized, the vacuum timer TM1 is energized through the normally closed contact X24, the vacuum pump VP is activated, and the vacuum valve SV2 is opened. When the hold / jump switch S2 is pressed, its normally open contact S22 is closed and the relay X2 is excited, and the normally closed contact X24 is opened, but the other normally open contact S2 of the hold / jump switch is opened.
1 is also turned on, and the vacuum valve SV2 has relay contacts X13 and X32 and the normally open contact S that are all closed.
Since it is held in the open state via 21, the energized vacuum timer TM1 times out and its contact TM1
Even if 1 is closed and relay X2 is excited, vacuum valve SV
2 continues to be in the open state as long as the hold / jump switch S2 is pressed. That is, the vacuum timer TM
The operation of 1 is invalidated, and the deaeration process is held without being controlled by the vacuum timer TM1.

【0021】一方、真空タイマTM1のタイムアップ前
にホールド・ジャンプスイッチS2を押圧して直ぐ解除
した場合には、同スイッチS2の押圧により、接点S2
2を介してリレーX2が励磁され、その常開接点X23
が閉成してリレーX2が自己保持するため、スイッチS
2の押圧を解除すると、その接点S21だけでなくリレ
ーX2の常閉接点X24も開成し、真空バルブSV2は
オフになり、脱気工程は強制的に終了される。また、ス
イッチS2の押圧解除により、シール工程に移行する。
即ち、リレーX3が閉じた接点X23及びS23を介し
て励磁されてその接点X31が閉じ、シールバルブSV
3、シールタイマTM2、リレーX4及びシールヒータ
H1に通電される。
On the other hand, when the hold / jump switch S2 is pressed and immediately released before the vacuum timer TM1 times out, the contact S2 is pressed by pressing the switch S2.
Relay X2 is excited via 2 and its normally open contact X23
Is closed and relay X2 holds itself, so switch S
When the pressure of 2 is released, not only the contact S21 but also the normally closed contact X24 of the relay X2 is opened, the vacuum valve SV2 is turned off, and the deaeration process is forcibly ended. In addition, the release of the switch S2 causes a shift to the sealing step.
That is, the relay X3 is excited through the closed contacts X23 and S23 to close the contact X31, and the seal valve SV is closed.
3, the seal timer TM2, the relay X4 and the seal heater H1 are energized.

【0022】次に、真空ポンプVPにはオイルが封入さ
れているため、低温時等には、オイルの粘性増大によ
り、マグネットスイッチMSのスイッチMS1がオンに
なっても、起動されない場合がある。この場合に備え
て、真空ポンプVPのケース(図示せず)にケースヒー
タH2を取り付け、同ケースヒータに通電して真空ポン
プVP内のオイルを加温するのが好適である。即ち、脱
気工程において真空ポンプVPが起動されないと、過電
流防止用の周知のプロテクタOLが働いてオフとなり、
シール工程において前述したようにシールタイマTM2
に通電され、タイムアップすると、その接点TM22を
介して冷却タイマTM3に通電し、同タイマのタイムア
ップ時に接点TM32が閉成することにより、ケースヒ
ータH2をオンにする。
Next, since the vacuum pump VP is filled with oil, the magnet MS may not be activated even when the switch MS1 of the magnet switch MS is turned on due to an increase in the viscosity of the oil when the temperature is low. In this case, it is preferable to attach a case heater H2 to the case (not shown) of the vacuum pump VP and energize the case heater to heat the oil in the vacuum pump VP. That is, if the vacuum pump VP is not started in the deaeration process, the well-known protector OL for preventing overcurrent works to turn off,
As described above in the sealing process, the seal timer TM2
When the time is up, the cooling timer TM3 is energized through the contact TM22, and the contact TM32 is closed when the timer is up, thereby turning on the case heater H2.

【0023】真空ポンプVPの再起動は、使用者の判断
により蓋体を開けて、再び閉めることにより行う。その
時、オイル温度が十分に暖まっていれば、真空ポンプは
再起動することができる。逆に、オイル温度が上昇して
いなければ、再びケースヒータに通電され真空ポンプV
Pを暖める。
The vacuum pump VP is restarted by opening the lid and closing it again at the discretion of the user. At that time, if the oil temperature is sufficiently warm, the vacuum pump can be restarted. Conversely, if the oil temperature has not risen, the case heater is energized again and the vacuum pump V
Warm P.

【0024】本発明は上述の実施形態に限定されるもの
ではなく、その他様々な改変が可能である。例えば、図
4に示す改変実施形態に係る制御回路は、脱気工程の後
にガス封入工程が挿入されたもので、脱気及びガス封入
の各工程において、ホールド・ジャンプスイッチによる
制御を行うことができるように構成されている。制御回
路の基本的な構成は、細部を除いて図1に示したものと
ほぼ同様か又は当業者が図1に示したものについての説
明から容易に判断しうると考えられるため、説明を省略
しうるが、動作については以下に詳細に述べる。
The present invention is not limited to the above-mentioned embodiment, and various modifications can be made. For example, the control circuit according to the modified embodiment shown in FIG. 4 has a gas filling step inserted after the degassing step, and control by a hold / jump switch can be performed in each step of degassing and gas filling. It is configured to be able to. The basic configuration of the control circuit is almost the same as that shown in FIG. 1 except for the details, or it is considered that those skilled in the art can easily judge it from the description of what is shown in FIG. However, the operation will be described in detail below.

【0025】先ず、通常運転の場合(図4)には、漏電
遮断器ELBはオンであり、ヒートシールすべき袋状部
材を図示しない真空チャンバに入れて、蓋体(図示せ
ず)を閉止すると、開閉スイッチS1がオンとなって、
パワリレー(マグネットスイッチ)MSがオンとなり、
その接点MS1が閉じて、真空ポンプVPが起動する。
これと同時に、リレーX1が励磁されて、その常閉接点
X11が開いて大気開放バルブSV1が閉じると共に、
閉じている常閉接点X41を介して真空バルブSV2が
開き、真空引きを行う(脱気工程)。また、上記常閉接
点X41を介して真空タイマTM1がオンとなる。
First, in the normal operation (FIG. 4), the earth leakage breaker ELB is on, the bag-shaped member to be heat-sealed is put in a vacuum chamber (not shown), and the lid (not shown) is closed. Then, the open / close switch S1 is turned on,
Power relay (magnet switch) MS is turned on,
The contact MS1 is closed and the vacuum pump VP is activated.
At the same time, the relay X1 is excited, its normally-closed contact X11 opens, and the atmosphere release valve SV1 closes.
The vacuum valve SV2 is opened through the normally closed contact X41 that is closed, and vacuuming is performed (deaeration process). Further, the vacuum timer TM1 is turned on via the normally closed contact X41.

【0026】十分に脱気を行うように設定された真空タ
イマTM1の設定時間がタイムアップすると、その接点
TM11が閉成して、閉じているリレー接点X61、図
示のオン状態のガス切替スイッチSWの常閉接点、常軌
的に閉じているリレー接点X21を介してガスバルブG
Vが開くと共にガスタイマTM4に通電されて、図示し
ない真空チャンバ、延いては袋状部材へのガス封入工程
が周知のように開始される。また、閉じたタイマ接点T
M11を介してリレーX4が励磁され、その常閉接点X
41が開成して、真空バルブSV2が閉じる。同時に、
閉じたタイマ接点TM11とリレーX6の常閉接点X6
1を介してリレーX5も励磁される。尚、ガス切替スイ
ッチSWがオフ状態の場合には、図示の常閉接点が開
き、常開接点が閉じるため、ガスバルブGV及びガスタ
イマTM4はオンにならず、シールタイマTM2、リレ
ーX2及びX3がオンとなって、ガス封入工程をジャン
プして次のシール工程へ移行する。
When the set time of the vacuum timer TM1 set to perform sufficient degassing has timed up, the contact TM11 is closed, the relay contact X61 is closed, and the gas changeover switch SW is in the ON state shown in the figure. Of the gas valve G through the normally closed contact of the
When V is opened, the gas timer TM4 is energized to start a gas filling process in a vacuum chamber (not shown), and further in a bag-shaped member, as is well known. Also, the closed timer contact T
Relay X4 is excited via M11 and its normally closed contact X
41 is opened and the vacuum valve SV2 is closed. at the same time,
Closed timer contact TM11 and normally closed contact X6 of relay X6
Relay X5 is also excited via 1. When the gas changeover switch SW is in the off state, the illustrated normally closed contact opens and the normally open contact closes. Therefore, the gas valve GV and the gas timer TM4 do not turn on, and the seal timer TM2 and the relays X2 and X3 turn on. Then, the gas filling process is jumped to the next sealing process.

【0027】ガス切替スイッチSWのオン状態におい
て、ガスタイマTM4がタイムアップするとその接点T
M41が閉成してリレーX2が励磁されるため、その常
閉接点X21が開き、ガスバルブGVは閉じ、ガスタイ
マTM4への通電も停止し、ガス封入工程が終了する。
また、ガスタイマの接点TM41が開成するが、常開接
点X22が閉じて、リレーX2は励磁状態に保持され
る。そして、リレーX2の接点X22の閉成により、リ
レーX6の常閉接点X65を介してリレーX7が励磁さ
れシールバルブSV3が開き、同時に、シールタイマT
M2にも通電されると共に、その常閉接点TM21を介
してリレーX3が励磁され、その接点X31が閉じるこ
とにより、変圧器TRの二次側にあるシールヒータH1
が通電され、通常の手順で袋状部材のヒートシールが行
われる(シール工程)。また、リレーX7の常開接点X
72も閉じる。
When the gas timer TM4 times out in the ON state of the gas changeover switch SW, its contact T
Since M41 is closed and the relay X2 is excited, its normally-closed contact X21 is opened, the gas valve GV is closed, the energization of the gas timer TM4 is stopped, and the gas charging process is completed.
Further, the contact TM41 of the gas timer is opened, but the normally open contact X22 is closed, and the relay X2 is held in the excited state. When the contact X22 of the relay X2 is closed, the relay X7 is excited via the normally closed contact X65 of the relay X6 to open the seal valve SV3, and at the same time, the seal timer T
While energizing M2, the relay X3 is excited through the normally closed contact TM21, and the contact X31 is closed, so that the seal heater H1 on the secondary side of the transformer TR is closed.
Is energized, and the bag-shaped member is heat-sealed by a normal procedure (sealing step). Also, relay X7 normally open contact X
72 also closes.

【0028】シールタイマTM2がタイムアップする
と、その常閉接点TM21が開成してリレーX3が消磁
され、常開接点X31が開いてシールヒータH1がオフ
になる(シール工程終了)。しかし、常開接点X72が
閉じているため、シールバルブSV3は開弁状態を続け
る。また、常開接点TM22の閉成により冷却タイマT
M3がオンとなる。冷却タイマTM3の設定時間が経過
すると、その常閉接点TM31が開いてマグネットスイ
ッチMS及びリレーX1がオフとなり、真空ポンプVP
は停止し、大気開放バルブSV1が開く。
When the seal timer TM2 expires, its normally closed contact TM21 is opened, the relay X3 is demagnetized, the normally open contact X31 is opened, and the seal heater H1 is turned off (end of the sealing process). However, since the normally open contact X72 is closed, the seal valve SV3 continues to be open. Further, the cooling timer T is closed by closing the normally open contact TM22.
M3 turns on. When the set time of the cooling timer TM3 elapses, the normally closed contact TM31 opens, the magnet switch MS and the relay X1 turn off, and the vacuum pump VP.
Is stopped and the atmosphere opening valve SV1 is opened.

【0029】大気開放バルブSV1の開放により真空チ
ャンバ内が大気圧に戻った頃を見計らって蓋体を開く
と、開閉スイッチS1がオフとなって、リレーX2、X
4、X5、X7、シールタイマTM2、冷却タイマTM
3等がオフとなり、最初の待機状態に戻る。
When the lid is opened in anticipation of the time when the inside of the vacuum chamber has returned to atmospheric pressure by opening the atmosphere release valve SV1, the opening / closing switch S1 is turned off and the relays X2, X are provided.
4, X5, X7, seal timer TM2, cooling timer TM
The third grade is turned off, and it returns to the initial standby state.

【0030】次に、上述した改変実施形態について、ホ
ールド・ジャンプスイッチS2’の使用による制御の仕
方について説明する。この改変実施形態においては、真
空ポンプVP及びマグネットスイッチの接点MS1と並
列に、ホールド・ジャンプスイッチS2’及びリレーX
6の直列体が接続され、該リレーX6の種々の接点が以
下に述べるように開閉して、所期の目的を達成する。即
ち、図4において、図示しない蓋体が閉じて開閉スイッ
チS1がオンになり、マグネットスイッチMS及びパワ
リレーX1がオン即ち励磁され、真空タイマTM1が常
閉接点X41を介して通電されると共に真空ポンプVP
が起動し、かつ真空バルブSV2’が開放している真空
引きの脱気工程において、ホールド・ジャンプスイッチ
S2’を押圧すると、リレーX6が励磁され、常開接点
X62が閉じ、一方、常閉接点X61は開く。
Next, with respect to the modified embodiment described above, a control method by using the hold / jump switch S2 'will be described. In this modified embodiment, the hold / jump switch S2 ′ and the relay X are arranged in parallel with the contact MS1 of the vacuum pump VP and the magnet switch.
6 series bodies are connected and the various contacts of the relay X6 are opened and closed as described below to achieve the intended purpose. That is, in FIG. 4, the lid (not shown) is closed, the open / close switch S1 is turned on, the magnet switch MS and the power relay X1 are turned on or excited, the vacuum timer TM1 is energized via the normally closed contact X41, and the vacuum pump VP
When the hold / jump switch S2 ′ is pressed in the deaeration process of vacuuming in which the vacuum valve SV2 ′ is opened, the relay X6 is excited and the normally open contact X62 is closed, while the normally closed contact is closed. X61 opens.

【0031】そのため、ホールド・ジャンプスイッチS
2’を押圧状態のままにしておく限り、真空タイマTM
1がタイムアップしてタイマ接点TM11がオンにな
り、リレーX4が励磁してその常閉接点X41が開いて
も、リレーX5は励磁されずその常閉接点X51が閉成
しているため、真空バルブSV2は、閉じている常開接
点X62及び常閉接点X51を介して開弁状態にホール
ドされ、真空タイマTM1により制御されずに脱気工程
が保持される。
Therefore, the hold / jump switch S
Vacuum timer TM as long as 2'is left pressed
Even when the timer contact TM11 is turned on and the relay X4 is excited to open its normally closed contact X41, the relay X5 is not excited and its normally closed contact X51 is closed, so The valve SV2 is held in the open state via the normally open contact X62 and the normally closed contact X51 which are closed, and the deaeration process is held without being controlled by the vacuum timer TM1.

【0032】一方、真空タイマTM1のタイムアップす
る前にホールド・ジャンプスイッチS2’を押圧して直
ぐ解除した場合には、スイッチS2の押圧によりリレー
X6が励磁されその常開接点X63が閉じてリレーX4
が励磁され、常開接点X42が閉じて該リレーX4を励
磁状態に保持するので、スイッチS2’の押圧を解除し
て常開接点X62が開いた時にはリレーX4の常閉接点
X4も開いており、真空バルブSV2は、タイマTM1
に関係無く直ちにオフにされる。そして、閉成している
各種の接点X42、X61、オン状態のガス切替スイッ
チSWの常閉接点、X21等を介してガスバルブGV、
ガスタイマTM4等に通電され、ガス封入工程に入る。
勿論、ガス切替スイッチSWがオフ状態であれば、ガス
封入工程をジャンプして即ち飛び越えて前述したシール
工程に移行する。
On the other hand, if the hold / jump switch S2 'is pressed and released immediately before the vacuum timer TM1 times out, the relay X6 is excited and the normally open contact X63 is closed by the pressing of the switch S2. X4
Is excited and the normally open contact X42 is closed to keep the relay X4 in an excited state. Therefore, when the switch S2 'is released and the normally open contact X62 is opened, the normally closed contact X4 of the relay X4 is also open. , Vacuum valve SV2, timer TM1
It is turned off immediately regardless of. Then, the gas valve GV, through various closed contacts X42, X61, the normally closed contact of the gas changeover switch SW in the ON state, X21, etc.
The gas timer TM4 or the like is energized to start the gas charging process.
Of course, if the gas changeover switch SW is in the off state, the gas charging process is jumped, that is, jumped over, and the above-described sealing process is performed.

【0033】次に、この真空包装機がガス封入工程(ガ
スバルブGV及びガスタイマTM4が通電状態にあ
る。)にある場合にホールド・ジャンプスイッチS2’
を押圧操作した場合には、同スイッチS2’を押圧状態
に保持しておけば、ガスタイマTM4がタイムアップし
てその接点TM41が閉じリレーX2が励磁することに
よりその常閉接点X21が開いても、リレーX6の常開
接点X66、X71が閉じているために、ガスタイマT
M4に関係無くガスバルブGVは開弁状態に保持され、
ガス封入工程がホールドされる。
Next, when the vacuum packaging machine is in the gas filling step (the gas valve GV and the gas timer TM4 are in the energized state), the hold / jump switch S2 'is provided.
If the switch S2 'is held in the pressed state when is pressed, even if the normally closed contact X21 is opened by the gas timer TM4 being timed up and the contact TM41 being closed and the relay X2 being excited. , The normally open contacts X66 and X71 of the relay X6 are closed, the gas timer T
The gas valve GV is kept open regardless of M4,
The gas charging process is held.

【0034】また、ガスタイマTM4がタイムアップす
る前にホールド・ジャンプスイッチS2’を押圧して直
ぐ解除すれば、同スイッチS2’の押圧により常開接点
X64が閉じてリレーX2が励磁され、その常開接点X
22が閉じるため、同スイッチS2’の押圧を解除して
常閉接点X65が閉じると、リレーX7及びシールタイ
マTM2に通電すると共に、リレーX3がシールタイマ
の常閉接点TM21を介して励磁され、常閉接点X71
を開いて(常閉接点X21はリレーX2の励磁により閉
じている)、ガス封入工程が直ちに中断されシール工程
に移行する。
If the hold / jump switch S2 'is pressed and released immediately before the gas timer TM4 times out, the normally open contact X64 is closed and the relay X2 is excited by the pressing of the switch S2'. Open contact X
Since 22 is closed, when the switch S2 'is released and the normally closed contact X65 is closed, the relay X7 and the seal timer TM2 are energized, and the relay X3 is excited through the normally closed contact TM21 of the seal timer. Normally closed contact X71
Is opened (the normally closed contact X21 is closed by the excitation of the relay X2), the gas charging process is immediately interrupted, and the sealing process is started.

【0035】[0035]

【発明の効果】以上のように、本発明によれば1つのホ
ールド・ジャンプスイッチにより所望の操作を行うこと
ができるので、誤操作の可能性が大幅に低減し、信頼性
が向上すると共に、真空包装機のコンパクト化を実現し
て、製造コストも減少することができる。
As described above, according to the present invention, since a desired operation can be performed with one hold / jump switch, the possibility of erroneous operation is greatly reduced, the reliability is improved, and the vacuum is improved. The packaging machine can be made compact and the manufacturing cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の一実施形態による真空包装機の運転
制御装置の回路図である。
FIG. 1 is a circuit diagram of an operation control device for a vacuum packaging machine according to an embodiment of the present invention.

【図2】 図1の運転制御装置によるタイマ制御時の各
種機器の動作タイミングチャートである。
FIG. 2 is an operation timing chart of various devices at the time of timer control by the operation control device of FIG.

【図3】 図1の運転制御装置によるホールド・ジャン
プスイッチ制御時の各種機器の動作タイミングチャート
である。
FIG. 3 is an operation timing chart of various devices when the hold / jump switch is controlled by the operation control device of FIG.

【図4】 本発明の改変実施形態による真空包装機の運
転制御装置の回路図である。
FIG. 4 is a circuit diagram of an operation control device for a vacuum packaging machine according to a modified embodiment of the present invention.

【符号の説明】[Explanation of symbols]

VP…真空ポンプ、S1…開閉スイッチ、S2,S2’
…ホールド・ジャンプスイッチ、H1…シールヒータ、
SV1…大気開放バルブ、SV2…真空バルブ、SV3
…シールバルブ、X1〜X6…リレー、TM1…真空タ
イマ、TM2…シールタイマ、TM3…冷却タイマ。
VP ... Vacuum pump, S1 ... Open / close switch, S2, S2 '
... Hold / jump switch, H1 ... Seal heater,
SV1 ... Atmosphere release valve, SV2 ... Vacuum valve, SV3
... Seal valve, X1 to X6 ... Relay, TM1 ... Vacuum timer, TM2 ... Seal timer, TM3 ... Cooling timer.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−178324(JP,A) 特開 平5−170225(JP,A) 特開 平5−170226(JP,A) (58)調査した分野(Int.Cl.7,DB名) B65B 31/00 - 31/10 ─────────────────────────────────────────────────── --Continued from the front page (56) References JP-A-5-178324 (JP, A) JP-A-5-170225 (JP, A) JP-A-5-170226 (JP, A) (58) Field (Int.Cl. 7 , DB name) B65B 31/00-31/10

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 本体と協働して真空チャンバを画成する
開閉自在の蓋体を有し、該蓋体を閉じて真空タイマによ
り制御される脱気工程を開始し、前記真空タイマのタイ
ムアップ時にシールタイマにより制御されるシール工程
を開始する真空包装機の運転を制御するために1つのホ
ールド・ジャンプスイッチを用意し、 前記脱気工程中にオンされた前記ホールド・ジャンプス
イッチが前記真空タイマのタイムアップ前にオフされた
場合には、前記真空タイマがタイムアップしなくても
記脱気工程を中断して前記シール工程に移行し、前記脱気工程中にオンされた前記ホールド・ジャンプス
イッチが前記真空タイマのタイムアップ時までにオフさ
れない場合には、前記真空タイマがタイムアップしても
前記ホールド・ジャンプスイッチをオフするまで前記脱
気工程を持続する 真空包装機の運転制御方法。
1. An openable / closable lid body that cooperates with a main body to define a vacuum chamber, the lid body is closed to start a deaeration step controlled by a vacuum timer, and the time of the vacuum timer is set. One hold / jump switch is provided to control the operation of the vacuum packaging machine that starts the sealing process controlled by the sealing timer at the time of up, and the hold / jump switch turned on during the degassing process is prepared .
Switch was turned off before the vacuum timer timed out.
In this case, even if the vacuum timer has not timed up, the degassing step is interrupted, the process proceeds to the sealing step, and the hold jump switch turned on during the degassing step.
Switch is turned off by the time the vacuum timer times out.
If the vacuum timer expires,
Release the hold / jump switch until it is turned off.
A method for controlling the operation of a vacuum packaging machine that maintains the air process .
【請求項2】 本体と協働して真空チャンバを画成する
開閉自在の蓋体を有し、該蓋体を閉じて真空タイマによ
り制御される脱気工程を開始し、前記真空タイマのタイ
ムアップ時にガスタイマにより制御されるガス封入工程
を開始し、前記ガスタイマのタイマアップ時にシールタ
イマにより制御されるシール工程を開始する真空包装機
の運転を制御するために1つのホールド・ジャンプスイ
ッチを用意し、 前記脱気工程又は前記ガス封入工程中にオンされた前記
ホールド・ジャンプスイッチが前記真空タイマ又は前記
ガスタイマのタイムアップ前にオフされた場合には、前
記真空タイマ又は前記ガスタイマがタイムアップしなく
ても前記脱気工程又は前記ガス封入工程を中断して次の
工程に移行し、前記脱気工程又は前記ガス封入工程中にオンされた前記
ホールド・ジャンプスイッチが前記真空タイマ又は前記
ガスタイマのタイムアップ時までにオフされない場合に
は、前記真空タイマ又は前記ガスタイマがタイムアップ
しても前記ホールド・ジャンプスイッチをオフするまで
前記脱気工程又は前記ガス封入工程を持続する 真空包装
機の運転制御方法。
2. An openable / closable lid body that cooperates with a main body to define a vacuum chamber, the lid body is closed, and a deaeration process controlled by a vacuum timer is started. A hold / jump switch is provided to control the operation of the vacuum packaging machine that starts the gas charging process controlled by the gas timer when the gas timer is up and starts the sealing process controlled by the seal timer when the gas timer is up. , The gas turned on during the degassing step or the gas charging step
The hold / jump switch is the vacuum timer or the
If it is turned off before the gas timer times out,
The vacuum timer or the gas timer does not expire
Even if the degassing step or the gas charging step is interrupted, the process proceeds to the next step, and the deaeration step or the gas charging step is turned on.
The hold / jump switch is the vacuum timer or the
If it is not turned off by the time of the gas timer
The vacuum timer or the gas timer is up
Even until the hold jump switch is turned off
A method for controlling the operation of a vacuum packaging machine, which continues the degassing step or the gas charging step .
【請求項3】 本体と協働して真空チャンバを画成する
開閉自在の蓋体を有し、該蓋体を閉じて真空タイマによ
り制御される脱気工程を開始し、前記真空タイマのタイ
ムアップ時にシールタイマにより制御されるシール工程
を開始する真空包装機の運転を制御するための装置であ
って、 前記真空タイマに電気的に接続される1つのホールド・
ジャンプスイッチと、 前記脱気工程中にオンされた前記ホールド・ジャンプス
イッチが前記真空タイマのタイムアップ前にオフされた
場合に前記真空タイマがタイムアップしなくても前記脱
気工程を中断して前記シール工程に移行する手段と、前記脱気工程中にオンされた前記ホールド・ジャンプス
イッチが前記真空タイマのタイムアップ時までにオフさ
れない場合に前記真空タイマがタイムアップしても前記
ホールド・ジャンプスイッチをオフするまで脱気工程を
持続する 手段とを備えることを特徴とする真空包装機の
運転制御装置。
3. A vacuum chamber is provided with an openable / closable lid body that cooperates with a main body to define a vacuum chamber, and the lid body is closed to start a deaeration process controlled by a vacuum timer. A device for controlling the operation of a vacuum packaging machine, which starts a sealing process controlled by a sealing timer at the time of up, including one holding unit electrically connected to the vacuum timer.
A jump switch and the hold jumps turned on during the degassing process .
Switch was turned off before the vacuum timer timed out.
In this case, means for interrupting the deaeration process and shifting to the sealing process even if the vacuum timer has not timed out, and the hold jump switch turned on during the deaeration process.
Switch is turned off by the time the vacuum timer times out.
If the vacuum timer times out,
Degas process until hold / jump switch is turned off
An operation control device for a vacuum packaging machine, comprising: a sustaining means.
【請求項4】 本体と協働して真空チャンバを画成する
開閉自在の蓋体を有し、該蓋体を閉じて真空タイマによ
り制御される脱気工程を開始し、前記真空タイマのタイ
ムアップ時にガスタイマにより制御されるガス封入工程
を開始し、前記ガスタイマのタイマアップ時にシールタ
イマにより制御されるシール工程を開始する真空包装機
の運転を制御するための装置であって、 前記真空タイマ及び前記ガスタイマに電気的に関係した
1つのホールド・ジャンプスイッチと、 前記脱気工程又は前記ガス封入工程中にオンされた前記
ホールド・ジャンプスイッチが前記真空タイマ又は前記
ガスタイマのタイムアップ前にオフされた場合に前記真
空タイマ又は前記ガスタイマがタイムアップしなくても
前記脱気工程又は前記ガス封入工程を中断して次の工程
に移行させる手段と、前記脱気工程又は前記ガス封入工程中にオンされた前記
ホールド・ジャンプスイッチが前記真空タイマ又は前記
ガスタイマのタイムアップ時までにオフされない場合に
前記真空タイマ又は前記ガスタイマがタイムアップして
も前記ホールド・ジャンプスイッチをオフするまで前記
脱気工程又は前記ガス封入工程を持続する 手段とを備え
ることを特徴とする真空包装機の運転制御装置。
4. An openable / closable lid body that cooperates with a main body to define a vacuum chamber, the lid body is closed to start a deaeration step controlled by a vacuum timer, and the time of the vacuum timer is set. A device for controlling the operation of a vacuum packaging machine, which starts a gas charging process controlled by a gas timer at the time of up, and starts a sealing process controlled by a seal timer at the time of the time of the gas timer, comprising: One hold / jump switch electrically related to the gas timer, and the hold / jump switch turned on during the degassing step or the gas charging step.
The hold / jump switch is the vacuum timer or the
When the gas timer is turned off before the time is up, the above true
A means for interrupting the degassing step or the gas charging step to shift to the next step even if the empty timer or the gas timer does not time up , and turning on during the degassing step or the gas charging step. The said
The hold / jump switch is the vacuum timer or the
If it is not turned off by the time of the gas timer
The vacuum timer or the gas timer has timed out
Also until the hold jump switch is turned off
An operation control device for a vacuum packaging machine, comprising: a deaeration process or a means for continuing the gas charging process .
JP17129296A 1996-07-01 1996-07-01 Operation control method and apparatus for vacuum packaging machine Expired - Fee Related JP3406153B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17129296A JP3406153B2 (en) 1996-07-01 1996-07-01 Operation control method and apparatus for vacuum packaging machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17129296A JP3406153B2 (en) 1996-07-01 1996-07-01 Operation control method and apparatus for vacuum packaging machine

Publications (2)

Publication Number Publication Date
JPH1016916A JPH1016916A (en) 1998-01-20
JP3406153B2 true JP3406153B2 (en) 2003-05-12

Family

ID=15920608

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17129296A Expired - Fee Related JP3406153B2 (en) 1996-07-01 1996-07-01 Operation control method and apparatus for vacuum packaging machine

Country Status (1)

Country Link
JP (1) JP3406153B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7321918B2 (en) * 2019-12-18 2023-08-07 ホシザキ株式会社 vacuum packing machine

Also Published As

Publication number Publication date
JPH1016916A (en) 1998-01-20

Similar Documents

Publication Publication Date Title
CN216834441U (en) Vacuum sealer
JP3406153B2 (en) Operation control method and apparatus for vacuum packaging machine
JPH10236428A (en) Vacuum packaging device
JP3406172B2 (en) Vacuum packaging machine
JP3423888B2 (en) Open-phase / negative-phase operation prevention circuit for three-phase motor
JP2000142621A (en) Vacuum-packaging apparatus, and method for warming up vacuum pump in the apparatus
JP2959897B2 (en) Vacuum packaging equipment
JPH11137227A (en) Operation control device of vacuum cooling device
JP2784855B2 (en) Vacuum packaging equipment
JP2003095217A (en) Vacuum packaging apparatus
JP2741445B2 (en) Sealed packaging equipment
JP2691816B2 (en) Sealed packaging equipment
EP0328654B1 (en) Gas laser
JP2000079911A (en) Vacuum-packaging apparatus
JP2593156B2 (en) Gas laser device
JP2676288B2 (en) Vacuum packaging equipment
JP2000304278A (en) Cooking device
JPS6225071B2 (en)
JPH0430158Y2 (en)
JPS63125122A (en) Sealing packaging instrument
JPH10210797A (en) Power car operating device
JP2678613B2 (en) Excimer laser device
JP2000237287A (en) Method for airproofing steam sterilizer
JP3755286B2 (en) Relay drive device
JPH01308720A (en) Vacuum packing apparatus

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees