Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3406882B2 - Demolition of underwater structures - Google Patents
[go: Go Back, main page]

JP3406882B2 - Demolition of underwater structures - Google Patents

Demolition of underwater structures

Info

Publication number
JP3406882B2
JP3406882B2 JP2000040247A JP2000040247A JP3406882B2 JP 3406882 B2 JP3406882 B2 JP 3406882B2 JP 2000040247 A JP2000040247 A JP 2000040247A JP 2000040247 A JP2000040247 A JP 2000040247A JP 3406882 B2 JP3406882 B2 JP 3406882B2
Authority
JP
Japan
Prior art keywords
footing
work
underwater structure
crushing
discharge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000040247A
Other languages
Japanese (ja)
Other versions
JP2001226986A (en
Inventor
君俊 松下
慶典 岡澤
澄男 大河
卓 内山
勤 藤沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Okumura Corp
Original Assignee
Hitachi Construction Machinery Co Ltd
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd, Okumura Corp filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2000040247A priority Critical patent/JP3406882B2/en
Publication of JP2001226986A publication Critical patent/JP2001226986A/en
Application granted granted Critical
Publication of JP3406882B2 publication Critical patent/JP3406882B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Shovels (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、フーチングなどの
水中構造物を解体する水中構造物の解体工法に関する。
TECHNICAL FIELD The present invention relates to an underwater structure dismantling method for dismantling an underwater structure such as footing.

【0002】[0002]

【従来の技術】例えば、河川等に架設された橋梁を取り
壊して新たに橋梁を架設する場合には、フーチング等の
水中構造物の撤去作業が必要となる。この場合、フーチ
ングの撤去作業を適切に行うためには、破砕装置とフー
チングの位置関係、およびフーチングの形状変化を把握
しながら作業を行うことが望ましい。ところが、水中に
おける作業状況を直接目視することは困難であるため、
破砕装置を移動する際に装置がフーチングに接触してス
ムーズに移動ができなくなったり、破砕済みの箇所に再
度移動してしまうおそれがあり、作業効率が悪化する。
2. Description of the Related Art For example, when a bridge laid in a river or the like is demolished and a new bridge is laid, it is necessary to remove underwater structures such as footings. In this case, in order to properly remove the footing, it is desirable to perform the operation while grasping the positional relationship between the crushing device and the footing and the shape change of the footing. However, it is difficult to directly see the work situation underwater, so
When the crushing device is moved, the device may come into contact with the footing and may not be able to move smoothly, or the crushing device may move to a crushed location again, resulting in deterioration of work efficiency.

【発明が解決しようとする課題】[Problems to be Solved by the Invention]

【0003】このような問題を解決するため、例えば、
水中カメラを用いてフーチングの表面を間接的に監視し
ながら作業を行ったり、超音波検知機を用いて破砕直後
のフーチング形状を検出することが考えられる。しかし
ながら、破砕時や破砕直後においては、破砕粉(くず)
の散乱により水が濁っているため、水中カメラでの監視
は困難であり、また、超音波検知機を用いる場合には検
知器からの超音波は破砕くずに反射してしまうため、フ
ーチング形状の検出も困難である。その結果、破砕時、
または破砕直後にフーチングの形状変化などを正確に把
握することができず、水中での作業を効率よく行うこと
はできない。
In order to solve such a problem, for example,
It is conceivable to work while indirectly monitoring the surface of the footing using an underwater camera, or to detect the footing shape immediately after crushing using an ultrasonic detector. However, crushed powder (waste) at the time of crushing or immediately after crushing
It is difficult to monitor with an underwater camera because the water is turbid due to the scattering of water, and when an ultrasonic detector is used, the ultrasonic waves from the detector are reflected by the crushed debris. It is also difficult to detect. As a result, when crushing,
Alternatively, the shape change of the footing cannot be accurately grasped immediately after crushing, and the work in water cannot be performed efficiently.

【0004】また、別の方法として、予め登録された破
砕パターンに従って破砕装置を自動移動させてフーチン
グを破砕することも考えられる。しかしながら、この方
法では破砕装置の移動パターンを変更した方が作業効率
の点から好ましい場合であっても、オペレータの意思に
よって破砕装置を自由に移動することができず、作業の
自由度が制約される。また、破砕装置の制御が複雑にな
り、コストが上昇する。
As another method, it is conceivable to automatically move the crushing device according to a crushing pattern registered in advance to crush the footing. However, in this method, even if it is preferable to change the movement pattern of the crushing device from the viewpoint of work efficiency, the crushing device cannot be freely moved by the intention of the operator, and the degree of freedom of work is restricted. It Further, the control of the crushing device becomes complicated, and the cost increases.

【0005】本発明の目的は、フーチング等の水中構造
物の破砕作業などを容易に行うための水中構造物の解体
工法を提供することにある。
An object of the present invention is to provide a method of dismantling an underwater structure for easily crushing an underwater structure such as footing.

【0006】[0006]

【課題を解決するための手段】一実施の形態を示す図面
1〜4参照して説明する。 (1) 請求項1の発明は、作業機本体YSに取り付け
られたアーム4〜6とアーム先端に取り付けられた作業
用アタッチメント7を地上での操作により駆動して水中
構造物13を解体する水中構造物の解体工法であり、そ
の解体工法が、水中構造物13に対する作業用アタッチ
メント7の位置を検出する工程と、少なくとも水中構造
物13と作業用アタッチメント7を表示装置42に模式
的に表示する工程と、表示装置上で作業用アタッチメン
ト7が水中構造物13に当接するように、作業用アタッ
チメント7を移動する工程と、作業用アタッチメント7
を駆動して水中構造物の所定箇所を破砕する工程と、作
業用アタッチメント7による水中構造物13の所定箇所
の破砕を検出する工程と、この破砕の検出に応じて表示
装置上の水中構造物13の表示形態を破砕後の形態に変
更する工程と、水中構造物13の破砕片を排出装置70
で排出する工程とを含むことにより上述した目的は達成
される。 (2) 請求項2の発明は、解体工法が、作業機本体Y
Sを移動する工程を含み、その作業機本体YSの移動量
に基づいて作業用アタッチメント7の位置を検出するも
のである。 (3) 請求項3の発明は、解体工法が、破砕後の水中
構造物13の形状を超音波計測装置71により計測する
工程を含み、その計測結果に基づいて水中構造物13の
破砕後の表示形態を変更するものである。 (4) 請求項4の発明は、さらに、解体工法が、破砕
後の表示形態に対応した情報を破砕出来高管理装置35
Aに出力し、破砕作業の出来高を管理する工程を含むも
のである。 (5) 請求項5の発明は、解体工法が、水中構造物1
3に対する排出装置70の位置を検出する工程と、排出
装置70を表示装置42に表示する工程と、表示装置上
で排出装置70が破砕済みの領域に位置するように排出
装置70を移動する工程と、排出装置70による破砕片
の排出動作を検出する工程と、破砕後に変更された表示
形態を排出装置70の排出動作の検出に基づいて排出後
の表示形態に変更する工程とを含むものである。 (6) 請求項6の発明は、さらに、解体工法が、排出
後の表示形態に対応した情報を排出出来高管理装置35
Bに出力し、排出作業の出来高を管理する工程を含むも
のである。
An embodiment will be described with reference to FIGS. (1) In the invention of claim 1, the underwater structure in which the underwater structure 13 is disassembled by driving the arms 4 to 6 attached to the working machine body YS and the work attachment 7 attached to the tip of the arm by an operation on the ground. It is a method of dismantling a structure, and the dismantling method schematically displays the step of detecting the position of the work attachment 7 with respect to the underwater structure 13, and at least the underwater structure 13 and the work attachment 7 on the display device 42. Steps, steps for moving the work attachment 7 so that the work attachment 7 contacts the underwater structure 13 on the display device, and the work attachment 7
Driving the vehicle to crush a predetermined location of the underwater structure, detecting the crushing of the predetermined location of the underwater structure 13 by the work attachment 7, and responding to the detection of the crushing to the underwater structure on the display device. A process of changing the display form of 13 to a form after crushing, and a device 70 for discharging the crushed pieces of the underwater structure 13.
The above-mentioned object is achieved by including the step of discharging at. (2) In the invention of claim 2, the dismantling method is the work machine body Y.
The step of moving S is performed, and the position of the work attachment 7 is detected based on the moving amount of the working machine body YS. (3) In the invention of claim 3, the demolition method includes a step of measuring the shape of the underwater structure 13 after crushing with the ultrasonic measuring device 71, and based on the measurement result, The display form is changed. (4) In the invention of claim 4, the dismantling method further crushes information corresponding to the display form after crushing, and the crushing performance management device 35
It includes the process of outputting to A and managing the output of crushing work. (5) In the invention of claim 5, the demolition method is the underwater structure 1
3, the step of detecting the position of the discharging device 70 with respect to 3, the step of displaying the discharging device 70 on the display device 42, and the step of moving the discharging device 70 so that the discharging device 70 is located in the crushed area on the display device. And a step of detecting the discharge operation of the crushed pieces by the discharge device 70, and a step of changing the display form changed after the crushing to the display form after discharge based on the detection of the discharge operation of the discharge device 70. (6) In the invention of claim 6, the dismantling method further discharges information corresponding to the display form after discharging, and the discharge amount management device 35.
It includes the process of outputting to B and managing the amount of discharge work.

【0007】なお、本発明の構成を説明する上記課題を
解決するための手段の項では、本発明を分かり易くする
ために発明の実施の形態の図を用いたが、これにより本
発明が実施の形態に限定されるものではない。
In the section of the means for solving the above-mentioned problems for explaining the structure of the present invention, the drawings of the embodiments of the invention are used for the purpose of making the present invention easy to understand. It is not limited to this form.

【0008】[0008]

【発明の実施の形態】以下、図面を参照して本発明の実
施の形態について説明する。本実施の形態では水中構造
物の解体工法として、フーチングの撤去作業の工法を例
に説明する。図1は、フーチングの撤去作業を行うショ
ベル系作業車両YSの側面図である。図1(a)に示す
ように、作業車両YSは走行体1と、走行体1上に旋回
可能に搭載された旋回体2と、旋回体2の車両前部に取
り付けられた作業装置3とを有する。破砕用の作業装置
3は、旋回体2に回動可能に軸支された長尺ブーム4
と、ブーム4の先端に回動可能に軸支されたアーム5
と、アーム5に沿ってスライド可能に取り付けられたス
ライドアーム6と、スライドアーム6の先端に回動可能
に軸支されたブレーカ7とを有している。ブレーカ先端
部のノミ7aは運転席からのスイッチ操作によって高周
波で振動し、これによって、フーチングが破砕される。
ブーム4はブームシリンダ8の伸縮によって回動し、ア
ーム5はアームシリンダ9の伸縮によって回動する。ス
ライドアーム6はスライドシリンダ10の伸縮によって
スライドし、ブレーカ7はバケットシリンダ11の伸縮
によって回動する。これらシリンダ8〜11は運転席か
らのレバー操作によって駆動される。シリンダ8〜11
の伸縮による作業装置3の作業範囲は図示のとおりであ
る。なお、破砕物を排出する作業においてはスライドア
ーム6の先端には図1(b)に示すようなクラムシェル
バケット70(以下、バケットと呼ぶ)が取り付けられ
る。バケット70はバケットシリンダ11の伸縮によっ
て開閉する。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. In the present embodiment, a method for removing footing will be described as an example of a method for dismantling an underwater structure. FIG. 1 is a side view of a shovel work vehicle YS that performs a footing removal operation. As shown in FIG. 1A, a work vehicle YS includes a traveling body 1, a revolving structure 2 rotatably mounted on the traveling structure 1, and a work device 3 attached to a vehicle front portion of the revolving structure 2. Have. The crushing work device 3 includes a long boom 4 rotatably supported by the revolving structure 2.
And an arm 5 pivotally supported on the tip of the boom 4.
And a slide arm 6 slidably mounted along the arm 5, and a breaker 7 rotatably supported at the tip of the slide arm 6. The chisel 7a at the tip of the breaker vibrates at a high frequency due to the switch operation from the driver's seat, and the footing is broken by this.
The boom 4 is rotated by expansion and contraction of the boom cylinder 8, and the arm 5 is rotated by expansion and contraction of the arm cylinder 9. The slide arm 6 slides as the slide cylinder 10 expands and contracts, and the breaker 7 rotates as the bucket cylinder 11 expands and contracts. These cylinders 8 to 11 are driven by lever operation from the driver's seat. Cylinder 8-11
The working range of the working device 3 due to expansion and contraction is as illustrated. In the operation of discharging the crushed material, a clamshell bucket 70 (hereinafter referred to as a bucket) as shown in FIG. 1B is attached to the tip of the slide arm 6. The bucket 70 is opened and closed by the expansion and contraction of the bucket cylinder 11.

【0009】図2は、フーチング撤去作業時の状態を示
す側面図であり、図3はその平面図である。図2、3に
示すように、河川の底に打設された基礎杭12の上方に
は略台形断面を有するフーチング13が設けられてい
る。フーチング13の上部には旧橋脚15が立設されて
いたが、フーチング撤去作業を行う前に何らかの方法で
取り壊される。フーチング撤去作業を行う場合には、フ
ーチング13の周囲に架台14が仮設され、架台14の
上部に鋼板16が敷設される。鋼板16の上には作業車
両YSが走行可能に載置され、その状態で作業装置3が
駆動されて、主に鋼板16より前側のフーチング13が
撤去される。なお、作業車両YSは軽量であり、架台1
4も比較的、簡易な構成でよい。
FIG. 2 is a side view showing a state during footing removal work, and FIG. 3 is a plan view thereof. As shown in FIGS. 2 and 3, a footing 13 having a substantially trapezoidal cross section is provided above the foundation pile 12 cast at the bottom of the river. The old bridge pier 15 was erected on the upper part of the footing 13, but it will be demolished by some method before the footing removal work. When the footing removal work is performed, the pedestal 14 is temporarily installed around the footing 13, and the steel plate 16 is laid on the pedestal 14. The work vehicle YS is movably mounted on the steel plate 16, and the work device 3 is driven in this state to mainly remove the footing 13 on the front side of the steel plate 16. In addition, the work vehicle YS is lightweight, and the pedestal 1
4 may also have a relatively simple configuration.

【0010】本実施の形態では、フーチング13とブレ
ーカ7をモニターなどの表示装置42に表示させながら
作業を行う。その表示装置のブロック図を図4に示す。
図1〜3で図示は省略するが、旋回体2には車両本体の
傾斜角を検出する傾斜センサ21が設けられ、ブーム4
の基端部には旋回体2に対するブーム4の角度を検出す
るブーム角度センサ22が設けられている。アームシリ
ンダ9,スライドシリンダ10,バケットシリンダ11に
はシリンダ9,10,11の各ストローク量を検出するア
ームストロークセンサ23,スライドストロークセンサ
24,バケットストロークセンサ25がそれぞれ設けら
れ、ブレーカ7にはノミ7aに作用する負荷を検出する
圧力センサ26が設けられている。また、旋回体2には
演算装置40、中継ボックス41、表示装置42、電源
43などが搭載されている。
In the present embodiment, the work is performed while displaying the footing 13 and the breaker 7 on the display device 42 such as a monitor. A block diagram of the display device is shown in FIG.
Although not shown in FIGS. 1 to 3, the revolving structure 2 is provided with an inclination sensor 21 for detecting the inclination angle of the vehicle body, and the boom 4
A boom angle sensor 22 that detects the angle of the boom 4 with respect to the revolving structure 2 is provided at the base end of the. The arm cylinder 9, the slide cylinder 10, and the bucket cylinder 11 are provided with an arm stroke sensor 23, a slide stroke sensor 24, and a bucket stroke sensor 25 that detect the stroke amounts of the cylinders 9, 10, and 11, respectively, and the breaker 7 has a chisel. A pressure sensor 26 for detecting the load acting on 7a is provided. Further, the revolving structure 2 is equipped with a computing device 40, a relay box 41, a display device 42, a power supply 43, and the like.

【0011】作業車両YSとともに移動するブーム4の
基端部の位置は自動追尾式トータルステーションによっ
て計測される。以下、図3を参照して自動追尾式トータ
ルステーションについて説明する。図3に示すように、
旋回体2の右後部および左中央部にはそれぞれ異なった
周波数の赤外線を発光する投光装置29A,29Bが装
着されている。投光装置29A,29Bから発光された
赤外線は所定位置X1,X2に配置された測量機30A,3
0Bでそれぞれ受光され、測量機30A,30Bにおい
て投光装置29A,29Bまでの距離や水平角度、垂直
角度が測定される。これらの距離データは送信機31
A,31Bから旋回体2に設けられた受信機32に送信
され、受信機32に接続された演算装置40により基準
点(例えば位置X1)からのブーム基端部の位置が算出
される。基準点X1からのフーチング13の位置(形
状)は設計データ(後述するフーチングデータ)として
予め把握されており、これによって、フーチング13に
対するブーム基端部の位置が把握される。
The position of the base end of the boom 4 which moves with the work vehicle YS is measured by an automatic tracking type total station. Hereinafter, the automatic tracking type total station will be described with reference to FIG. As shown in FIG.
Projectors 29A and 29B for emitting infrared rays having different frequencies are mounted on the right rear portion and the left central portion of the revolving unit 2. The infrared rays emitted from the light projecting devices 29A and 29B are measured by the surveying instruments 30A and 3A arranged at predetermined positions X1 and X2.
The light is received at 0B, and the distance, horizontal angle, and vertical angle to the light projecting devices 29A, 29B are measured by the surveying instruments 30A, 30B. These distance data are transmitted by the transmitter 31
It is transmitted from A and 31B to the receiver 32 provided on the revolving structure 2, and the position of the boom base end portion from the reference point (for example, the position X1) is calculated by the arithmetic unit 40 connected to the receiver 32. The position (shape) of the footing 13 from the reference point X1 is known in advance as design data (footing data described below), and the position of the boom base end portion with respect to the footing 13 is thus known.

【0012】図4に示すように、演算装置40には中継
ボックス41を経由して本体傾斜センサ21と、ブーム
角度センサ22と、アームストロークセンサ23と、ス
ライドストロークセンサ24と、バケットストロークセ
ンサ25と、圧力センサ26と、電源43とがそれぞれ
接続されるとともに、中継ボックス41を介さずに、前
述した受信機32の他に表示装置42とキーボード47
と送信機33とがそれぞれ接続されている。受信機32
は中継ボックス41の電源端子にも接続されている。送
信機33は作業に関する情報などを基地局の受信機34
に送信する。受信機34には作業データを処理する出来
高管理装置35が接続され、作業に関する情報、例えば
作業の出来高に関するデータが出来高ファイルとして出
来高管理装置35のメモリに記憶される。なお、出来高
管理装置35は破砕作業用の破砕出来高管理装置35A
と排出作業用の排出出来高管理装置35Bに分けられ
る。
As shown in FIG. 4, in the arithmetic unit 40, a body inclination sensor 21, a boom angle sensor 22, an arm stroke sensor 23, a slide stroke sensor 24, and a bucket stroke sensor 25 are passed through a relay box 41. The pressure sensor 26 and the power source 43 are connected to each other, and the display device 42 and the keyboard 47 are provided in addition to the receiver 32 described above without the relay box 41.
And the transmitter 33 are connected to each other. Receiver 32
Is also connected to the power supply terminal of the relay box 41. The transmitter 33 transmits information regarding work to the receiver 34 of the base station.
Send to. A performance management device 35 for processing work data is connected to the receiver 34, and information regarding work, for example, data concerning work performance, is stored in the memory of the performance management device 35 as a performance file. The volume management device 35 is a crushing volume management device 35A for crushing work.
And a discharge volume management device 35B for discharge work.

【0013】演算装置40は、CPUなどの演算部44
と、データを一時記憶するRAM45と、ディスク形式
のフラッシュメモリ46からのデータを読み込むインタ
ーフェイス46Aとを有している。フラッシュメモリ4
6はフーチング13の形状データであるフーチングデー
タを演算装置40の電源オフ時にもそのまま記憶する。
なお、フラッシュメモリ46は破砕作業用のフラッシュ
メモリ46Bと排出作業用のフラッシュメモリ46Cの
2種類用意される。演算部44ではセンサ21〜25や
キーボード47からの入力信号に基づいて所定の処理を
実行し、表示装置42に画像信号を出力するとともに、
作業に関する情報を送信機33から受信機34に送信す
る。
The arithmetic unit 40 includes an arithmetic unit 44 such as a CPU.
A RAM 45 for temporarily storing data, and an interface 46A for reading data from a disk-type flash memory 46. Flash memory 4
Reference numeral 6 stores footing data, which is shape data of the footing 13, as it is even when the power of the arithmetic unit 40 is turned off.
Two types of flash memory 46 are prepared: a flash memory 46B for crushing work and a flash memory 46C for discharging work. The calculation unit 44 executes predetermined processing based on the input signals from the sensors 21 to 25 and the keyboard 47, outputs an image signal to the display device 42, and
Information regarding work is transmitted from the transmitter 33 to the receiver 34.

【0014】ここで、フラッシュメモリ46に記憶され
るフーチングデータについて説明する。図5に示すよう
に、フーチング形状は所定容積の3次元ブロック(例え
ば長さ20cmの立方形)の積み重ね(点線)によって表
される。フーチングデータはCSV形式で記憶され、こ
のフーチングデータによってフーチング13のXY平面
への投影図に相当するようなスプレッドシートS(表計
算用アプリケーションソフトウェアのデータフォーマッ
ト)を作成する。スプレッドシートSにはフーチング1
3のXY平面の各ブロックに対応してセルが設けられ、
セルの配置はブロックの配置に一致する。フラッシュメ
モリ46には所定ブロック(例えばB11)に対応するセ
ルa11の基準点X1からの位置(x座標,y座標)が記憶
されている。各セルの間隔はブロックの一辺の長さ(2
0cm)に相当し、したがって、前述したようにセルa11
の座標が与えられることで、基準点X1からのフーチン
グ13の平面形状がスプレッドシートによって把握され
る。各セルの数値は積み重ねられたブロックの高さ(z
座標)を表し、フーチング撤去作業によりフーチング上
面の一部が破砕されるとシート上の数値が更新され、更
新後のデータがフラッシュメモリ46に記憶される。な
お、1つのブロックの大きさは、1回のブレーカ7の押
し付け作業により破砕される容積を予め検証して決定さ
れる。
The footing data stored in the flash memory 46 will be described. As shown in FIG. 5, the footing shape is represented by a stack (dotted line) of a three-dimensional block (for example, a cube having a length of 20 cm) having a predetermined volume. The footing data is stored in CSV format, and a spreadsheet S (data format of spreadsheet application software) corresponding to a projection view of the footing 13 on the XY plane is created by the footing data. Footing 1 for spreadsheet S
A cell is provided corresponding to each block on the XY plane of 3,
The cell layout matches the block layout. The flash memory 46 stores the position (x coordinate, y coordinate) of the cell a11 corresponding to a predetermined block (for example, B11) from the reference point X1. The interval between cells is the length of one side of the block (2
0 cm), and thus cell a11 as described above.
By giving the coordinates of, the planar shape of the footing 13 from the reference point X1 is grasped by the spreadsheet. The number in each cell is the height of the stacked blocks (z
Coordinates), and when a part of the upper surface of the footing is crushed by the footing removing work, the numerical value on the sheet is updated, and the updated data is stored in the flash memory 46. The size of one block is determined by previously verifying the volume that is crushed by one pressing operation of the breaker 7.

【0015】演算部44では例えば以下のような処理が
実行される。 (1)作業装置3の位置算出 センサ21〜25からの検出値によりブーム基端部を基
準にしたノミ7aまたはバケット70の位置を算出す
る。そして、前述した自動追尾式トータルステーション
によって求められたフーチング13に対するブーム4の
基端部の位置を受信機32を介して読み込み、これによ
って、フーチング13に対するノミ7aまたはバケット
70の位置を算出する。
The calculation unit 44 executes the following processing, for example. (1) The position of the chisel 7a or the bucket 70 based on the boom base end is calculated based on the detection values from the position calculation sensors 21 to 25 of the work device 3. Then, the position of the base end portion of the boom 4 with respect to the footing 13 obtained by the automatic tracking type total station described above is read through the receiver 32, and the position of the chisel 7a or the bucket 70 with respect to the footing 13 is calculated by this.

【0016】(2)フーチング13の破砕の判定 フラッシュメモリ46Bからフーチングデータを読み込
んで、フーチング13のブロックの上面に与えられてい
る高さを算出する。そして、その高さと上述したように
算出されるノミ7aの高さデータとを比較する。ノミ7
aの高さがフーチングブロックの高さより1ブロック分
(本実施の形態では20cm)低くなると、フーチングの
1ブロックが破砕完了したと判定し、フーチングデー
タ、すなわちスプレッドシート上の数値を1ブロック低
い値に更新し、フラッシュメモリ46Bに書き込む。
(2) Determination of crushing of the footing 13 The footing data is read from the flash memory 46B and the height given to the upper surface of the block of the footing 13 is calculated. Then, the height is compared with the height data of the chisel 7a calculated as described above. Chisel 7
When the height of a is lower than the height of the footing block by one block (20 cm in the present embodiment), it is determined that one block of the footing has been crushed, and the footing data, that is, the numerical value on the spreadsheet is one block lower. To the flash memory 46B.

【0017】(3)破砕物の排出の判定 フラッシュメモリ46Cに破砕開始前のフーチングデー
タを予め書き込んでおき、そのフーチングデータをフラ
ッシュメモリ46Cから読み込むとともに、破砕終了後
のフーチングデータをフラッシュメモリ46Bから読み
込む。これら2種類のフーチングデータにより、破砕開
始前のフーチング13のブロックの上面の高さと破砕終
了後のフーチング13のブロックの上面の高さをそれぞ
れ算出する。その両者の差が破砕済みのフーチング13
のブロックの領域(図12参照)を表す。そして、バケ
ット70の位置データに基づいて、バケット70が掘削
済みのフーチング13のブロックの領域に移動し、かつ
バケット70が開閉動作したか否かを判定する。これに
より、バケット70の周囲の破砕くず、厳密には、バケ
ット開閉時におけるバケット先端部の移動軌跡の内側の
破砕くずがバケット内に取り込まれたと判定し、フーチ
ングデータを更新して、フラッシュメモリ46Cに書き
込む。
(3) Judgment of discharge of crushed material Footing data before crushing start is written in the flash memory 46C in advance, the footing data is read from the flash memory 46C, and footing data after crushing is completed from the flash memory 46B. Read. Based on these two types of footing data, the height of the upper surface of the block of the footing 13 before the start of crushing and the height of the upper surface of the block of the footing 13 after the end of crushing are calculated. The difference between the two is footing 13
Represents the area of the block (see FIG. 12). Then, based on the position data of the bucket 70, it is determined whether or not the bucket 70 has moved to the area of the block of the footing 13 that has already been excavated, and the bucket 70 has performed the opening / closing operation. As a result, it is determined that the crushed scraps around the bucket 70, strictly speaking, the crushed scraps inside the movement trajectory of the bucket tip portion when the bucket is opened and closed are taken into the bucket, the footing data is updated, and the flash memory 46C is updated. Write in.

【0018】このように算出された作業装置3の位置デ
ータ、およびフーチングデータに基づいて演算部44で
は画像信号を生成し、表示装置42に出力する。この信
号出力により、例えば図6〜8に示すように、表示装置
42には作業装置3の位置とフーチング13の形状が模
式的に表示される。オペレータは、表示装置42の表示
を目視しながらフーチング撤去作業を実行する。
Based on the position data of the working device 3 and the footing data calculated in this way, the arithmetic section 44 generates an image signal and outputs it to the display device 42. By this signal output, the position of the work device 3 and the shape of the footing 13 are schematically displayed on the display device 42, for example, as shown in FIGS. The operator executes the footing removal work while visually observing the display on the display device 42.

【0019】次に、フーチング撤去作業の施工手順につ
いて具体的に説明する。 (1)段取り作業 フーチング撤去作業にあたっては、まず、図2、3に示
すように、スライドアーム6の先端に作業用アタッチメ
ントとしてブレーカ7を取り付け、フーチング上方の鋼
板16の上に作業車両YSを移動する。そして、破砕作
業用のフラッシュメモリ46Bを演算装置40に挿入
し、電源をオンする。この電源オンにより表示装置42
には初期画面が表示される。初期画面では、撤去作業の
対象であるフーチング13を特定するために現場名とフ
ーチング番号を入力する。なお、現場名とフーチング番
号は予め数値化されており、テンキー操作によってオペ
レータは現場名とフーチング番号を入力する。これによ
り、フーチングデータがフラッシュメモリ46BからR
AM45に読み込まれる。
Next, the construction procedure of the footing removing work will be specifically described. (1) Setup Work In removing the footing, first, as shown in FIGS. 2 and 3, the breaker 7 is attached to the tip of the slide arm 6 as a work attachment, and the work vehicle YS is moved onto the steel plate 16 above the footing. To do. Then, the flash memory 46B for crushing work is inserted into the arithmetic unit 40, and the power is turned on. When the power is turned on, the display device 42
Displays the initial screen. On the initial screen, the site name and footing number are input to identify the footing 13 that is the target of the removal work. The site name and footing number are digitized in advance, and the operator inputs the site name and footing number by operating the ten keys. As a result, the footing data is read from the flash memory 46B to the R
It is read into AM45.

【0020】次いで、デジタル式センサであるストロー
クセンサ23〜25の初期値リセット作業を行う。これ
は、図1の位置Aに示すように、レバー操作によってア
ームシリンダ9を最大伸長させ、スライドシリンダ10
を最大縮退させ、バケットシリンダ11を最大伸長させ
た状態で、例えばキーボード47の「リセット」キーを
操作することにより行われる。これにより、センサ出力
がゼロリセットされる。
Next, the initial values of the stroke sensors 23 to 25, which are digital sensors, are reset. As shown in the position A of FIG.
With the bucket cylinder 11 maximally extended and the bucket cylinder 11 maximally expanded, for example, by operating the “reset” key of the keyboard 47. As a result, the sensor output is reset to zero.

【0021】続いて、例えばキーボード47の「破砕開
始」キーを操作すると、図6〜8に示すように、フーチ
ングデータに基づいてフーチング13が表示装置42に
ブロック表示されるとともに、センサ21〜25,受信
機32からの信号に基づいてブレーカ7および作業車両
YSが表示される。「開始」キーの操作直後において
は、表示装置42には図6に示すような縮小側面図が表
示される。ここで表示される側面図は作業装置3の真下
の鉛直方向縦断面図(図7のVI-VI線断面図)である。
表示装置42には、ノミ7aの先端の作業半径(先端作
業半径)と深度(先端深度)がデジタル表示される。な
お、先端作業半径が所定値以上になると、不図示の警報
装置が作動して、作業半径が大きくなるような作業装置
3の駆動が禁止され、これによって、フーチング以外の
障害物との接触が防止される。
Then, for example, when the "crushing start" key of the keyboard 47 is operated, as shown in FIGS. 6 to 8, the footing 13 is block-displayed on the display device 42 based on the footing data and the sensors 21 to 25. Then, the breaker 7 and the work vehicle YS are displayed based on the signal from the receiver 32. Immediately after the operation of the "start" key, the display device 42 displays a reduced side view as shown in FIG. The side view displayed here is a vertical cross-sectional view (a cross-sectional view taken along line VI-VI in FIG. 7) in the vertical direction directly below the working device 3.
The working radius of the tip of the chisel 7a (tip working radius) and the depth (tip depth) are digitally displayed on the display device 42. When the tip working radius becomes equal to or larger than a predetermined value, an alarm device (not shown) is activated to prohibit the driving of the working device 3 such that the working radius becomes large, whereby contact with an obstacle other than the footing is prevented. To be prevented.

【0022】図6の状態から例えばキーボード47の
「平面」キーを操作すると画像表示が変更され、図7に
示すような縮小平面図が表示される。その状態から例え
ば「拡大」キーを操作すると画像表示が再度変更され、
図8に示すような拡大平面図が表示される。平面図にお
いては、フーチング各部の高さの差異が画面上で明らか
となるように、フーチング上面のブロックの高さに応じ
てブロックごとに色分け表示(明暗表示)される。な
お、図6の側面図においても、図7,8と同様に色分け
表示してもよい。
When the "plane" key of the keyboard 47 is operated from the state of FIG. 6, the image display is changed and a reduced plan view as shown in FIG. 7 is displayed. If you operate the "Enlarge" key from that state, the image display will be changed again,
An enlarged plan view as shown in FIG. 8 is displayed. In the plan view, the blocks are color-coded (bright and dark) according to the height of the blocks on the top surface of the footing so that the difference in height between the footing parts can be clearly seen on the screen. Note that the side view of FIG. 6 may also be displayed in different colors as in FIGS.

【0023】次いで、表示画面上におけるノミ7aの位
置とフーチング13の位置を調整する。この場合、ま
ず、表示画面上でノミ7aの先端をフーチング13の隅
部に位置するようにレバー操作により作業装置3を駆動
し、ノミ7aの先端をフーチング13の表面に押圧させ
る。ここで、隅部とは、例えば図5の点Aに示すように
少なくとも3本の稜線が交差する場所であり、これによ
り、表示画面上の一点(x,y,z)が定まり、(x,y,
z)方向の調整が一度に可能となる。なお、表示画面上
で例えば(x,z)方向だけ調整する場合には、ノミ7
aの先端をy軸に平行な直線L上に移動すればよい。ま
た、表示画面上でz方向だけ調整する場合には、ノミの
先端をxy平面に平行な平面F上に移動すればよい。
Next, the position of the chisel 7a and the position of the footing 13 on the display screen are adjusted. In this case, first, the working device 3 is driven by the lever operation so that the tip of the chisel 7a is located at the corner of the footing 13 on the display screen, and the tip of the chisel 7a is pressed against the surface of the footing 13. Here, the corner is a place where at least three ridges intersect as shown by a point A in FIG. 5, for example, so that a point (x, y, z) on the display screen is determined, and (x , y,
Adjustment in the z) direction is possible at once. When adjusting only the (x, z) direction on the display screen, the chisel 7
It suffices to move the tip of a on a straight line L parallel to the y-axis. Further, in the case of adjusting only the z direction on the display screen, the tip of the chisel may be moved to the plane F parallel to the xy plane.

【0024】このようなレバー操作によるノミ7aの先
端とフーチング13との接触は、圧力センサ26によっ
て検出される。すなわち、ノミ7aはフーチング13に
当接するとそこから反力を受け、圧力センサ26の検出
値が増加するので、その検出値をオペレータは不図示の
計器盤によってモニターし、ノミ7aとフーチング13
との接触を判断する。このとき、表示装置42上に表示
されるノミ7aの先端の位置と実際の位置とがずれてい
る場合には、すなわち、ノミ7aをフーチング13の表
面に当接させたにも拘わらず画面上では当接していな場
合には、ノミ7aの先端の位置を画面上で調整する。こ
れは、「→」,「←」,「↑」,「↓」などの矢印キーの
操作により、作業車両全体の画像をフーチング13に対
してシフトさせることで行われる。このような画像調整
は、レバー操作によりノミ7aの先端の位置を動かしな
がら、数回にわたって繰り返し行われる。
The contact between the tip of the chisel 7a and the footing 13 due to the lever operation is detected by the pressure sensor 26. That is, when the fleas 7a come into contact with the footing 13, the fleas 7a receive a reaction force from them, and the detection value of the pressure sensor 26 increases. Therefore, the operator monitors the detection value by a not-shown instrument panel and the fleas 7a and the footing 13
Determine contact with. At this time, when the position of the tip of the chisel 7a displayed on the display device 42 is deviated from the actual position, that is, on the screen even though the chisel 7a is brought into contact with the surface of the footing 13. Then, if they are not in contact with each other, the position of the tip of the chisel 7a is adjusted on the screen. This is performed by shifting the image of the entire work vehicle with respect to the footing 13 by operating arrow keys such as “→”, “←”, “↑”, “↓”. Such image adjustment is repeated several times while moving the position of the tip of the chisel 7a by operating the lever.

【0025】(2)破砕作業 以上の手順の後、表示装置42を見ながらレバー操作に
よって作業装置3を駆動し、ノミ7aの先端を破砕すべ
きフーチング13のブロックの表面中央部に垂直にセッ
トするとともに、圧力センサ26からの検出値をモニタ
ーする。例えば、図9に示すように、フーチング13の
表面に凸凹があり、フーチング13の実表面と仮想表面
(ブロックの表面)が一致しない場合(点線)には圧力
センサ26の検出値が0または微小となる。この場合、
オペレータは圧力センサ26の検出値が増加するまで、
シリンダ10の駆動によって垂直姿勢を保ったままノミ
7aをさらに下方にずらし、フーチング13の表面に接
触させる(実線)。次いで、スイッチ操作によってノミ
7aを駆動し、破砕作業を開始する。これによって、非
接触状態でノミ7aが駆動されることはなく、いわゆる
空打ちが防止される。
(2) Crushing work After the above procedure, the working device 3 is driven by operating the lever while watching the display device 42, and the tip of the chisel 7a is set vertically to the center of the surface of the block of the footing 13 to be crushed. In addition, the detection value from the pressure sensor 26 is monitored. For example, as shown in FIG. 9, when the surface of the footing 13 has irregularities and the real surface of the footing 13 and the virtual surface (block surface) do not match (dotted line), the detection value of the pressure sensor 26 is 0 or very small. Becomes in this case,
Until the operator increases the value detected by the pressure sensor 26,
By driving the cylinder 10, the chisel 7a is further moved downward while keeping the vertical posture and brought into contact with the surface of the footing 13 (solid line). Then, the fleas 7a are driven by the switch operation to start the crushing work. As a result, the chisel 7a is not driven in the non-contact state, and so-called blank driving is prevented.

【0026】破砕作業時には作業装置3はフーチング1
3から反力を受けて作業車両YSが傾斜するが、傾斜セ
ンサ21によりブーム基端部の位置は補正されるので、
常にノミ7aの正確な位置が算出され、表示装置42に
表示される。ノミ7aの先端がブロックの上面に与えら
れた高さより所定長さ(20cm)だけ下方に移動する
と、演算部44はフーチング13の1ブロックが破砕さ
れたと判定し、スプレッドシート上のフーチングデータ
が更新され、フラッシュメモリ46Bに書き込まれる。
これによって、表示装置42に表示される画像は図1
0,11に示すように変更される。また、同時に作業処
理データが受信機34に送信され、破砕出来高管理装置
35Aの出来高ファイルに破砕作業の出来高が記録され
る。出来高ファイルは、例えば1ブロックを1単位とす
るもので、ブレーカ7が1つのブロックを破砕するたび
に破砕ブロック数を積算して記録するようなファイルで
ある。
During the crushing work, the working device 3 is the footing 1
Although the work vehicle YS is tilted by receiving a reaction force from No. 3, since the position of the boom base end is corrected by the tilt sensor 21,
The exact position of the chisel 7a is always calculated and displayed on the display device 42. When the tip of the chisel 7a moves downward by a predetermined length (20 cm) from the height given to the upper surface of the block, the arithmetic unit 44 determines that one block of the footing 13 has been crushed, and the footing data on the spreadsheet is updated. And is written in the flash memory 46B.
As a result, the image displayed on the display device 42 is shown in FIG.
It is changed as shown in 0 and 11. At the same time, the work processing data is transmitted to the receiver 34, and the crushing work output is recorded in the output file of the crushing output management device 35A. The volume file is, for example, one block as one unit, and is a file in which the number of crushed blocks is integrated and recorded each time the breaker 7 crushes one block.

【0027】図10(a),図11(a)はデータ更新
前の側面図、平面図の画像表示を、図10(b),図1
1(b)はデータ更新後の側面図、平面図の画像表示を
それぞれ示す。図10において、所定ブロック(例えば
B1)の破砕作業を行っているときに前述したようにフ
ーチングデータが更新されると、図10(a)→(b)
に示すように、所定ブロックB1に対応する表示が消去
される。また、図11において、所定ブロックB1のフ
ーチングデータが更新されると、図11(a)→(b)
に示すように、所定ブロックB1に対応する表示が1ブ
ロック低輝度の色(斜線)に変更される。これにより、
オペレータはフーチング撤去作業の進行状況を容易に認
識することができる。フーチング13の1ブロックの破
砕が完了すると、レバー操作によってノミ7aの先端を
別のブロックに移動し、同様な作業を繰り返す。
FIGS. 10 (a) and 11 (a) show the image display of the side view and the plan view before the data update, and FIGS.
1 (b) shows the image display of the side view and the plan view after updating the data, respectively. In FIG. 10, when the footing data is updated as described above while the crushing operation of a predetermined block (for example, B1) is being performed, FIG. 10 (a) → (b)
As shown in, the display corresponding to the predetermined block B1 is erased. Further, in FIG. 11, when the footing data of the predetermined block B1 is updated, FIG. 11 (a) → (b)
As shown in, the display corresponding to the predetermined block B1 is changed to one block low-brightness color (diagonal line). This allows
The operator can easily recognize the progress of the footing removal work. When the crushing of one block of the footing 13 is completed, the tip of the chisel 7a is moved to another block by the lever operation, and the same operation is repeated.

【0028】休憩や昼食等で破砕作業を一時中断する場
合には例えばキーボード47の「中断」キーを操作す
る。これによって、画像表示に関する演算部44での処
理が一時終了する。その後、作業を再開する場合には例
えばキーボード47の「再開」キーを操作する。これに
より画像表示に関する演算部44での処理が再開され
る。中断時に作業車両YSまたは作業装置3を動かして
しまった場合には、「再開」キーの操作後、初期値リセ
ット作業からやり直す。
When the crushing work is to be suspended for a break or lunch, for example, the "interrupt" key of the keyboard 47 is operated. As a result, the processing in the calculation unit 44 relating to image display is temporarily ended. After that, when resuming the work, for example, the "restart" key of the keyboard 47 is operated. As a result, the processing relating to image display in the calculation unit 44 is restarted. When the work vehicle YS or the work device 3 is moved at the time of interruption, after the operation of the "restart" key, the initial value resetting work is started again.

【0029】破砕作業が終了すると、例えばキーボード
47の「破砕終了」キーを操作する。これによって、演
算部44での処理が終了する。その後、演算装置40の
電源をオフし、フラッシュメモリ46Bを抜き取る。フ
ラッシュメモリ46BにはCSV形式のデータが保存さ
れており、パソコンなどによりデータを整理することが
できる。これにより、作業後のフーチング形状が詳細に
解析され、破砕作業の進行状況を評価できる。また、破
砕作業の進行状況は破砕出来高管理装置35Aの出来高
ファイルにも出力されており、この出来高ファイルによ
って作業日報などが作成される。
When the crushing work is completed, the "crushing end" key of the keyboard 47 is operated, for example. This completes the processing in the arithmetic unit 44. After that, the power of the arithmetic unit 40 is turned off and the flash memory 46B is removed. The flash memory 46B stores CSV format data, which can be organized by a personal computer or the like. As a result, the footing shape after the work is analyzed in detail, and the progress of the crushing work can be evaluated. The progress status of the crushing work is also output to the output file of the crushing output management device 35A, and a daily work report is created by this output file.

【0030】(3)排出作業 上述した破砕作業が終了するとフーチングの破砕くずを
排出する作業が行われる。排出作業を行う場合にはスラ
イドアーム6の先端に作業用アタッチメントとしてバケ
ット70を取り付け、フーチング上方の鋼板16の上に
作業車両YSを移動し、演算装置40の電源をオンす
る。次いで、演算装置40に破砕終了時のフーチングデ
ータが記憶されたフラッシュメモリ46Bを挿入し、フ
ーチング番号を入力する。これにより、破砕終了後のフ
ーチングデータがRAM45に読み込まれる。続いて、
フラッシュメモリ46Bを抜き取って演算装置40に破
砕開始前のフーチングデータが記憶されたフラッシュメ
モリ46Cを挿入し、同じくフーチング番号を入力し
て、破砕開始前のフーチングデータをRAM45に読み
込む。その後、前述したのと同様にストロークセンサ2
3〜25の初期値リセット作業を行う。
(3) Discharging work When the above-mentioned crushing work is completed, a work for discharging crushed chips of footing is performed. When performing the discharging work, the bucket 70 is attached to the tip of the slide arm 6 as a work attachment, the work vehicle YS is moved onto the steel plate 16 above the footing, and the power of the arithmetic unit 40 is turned on. Next, the flash memory 46B in which the footing data at the end of crushing is stored is inserted into the arithmetic unit 40, and the footing number is input. As a result, the footing data after the crushing is read into the RAM 45. continue,
The flash memory 46B is taken out, the flash memory 46C in which the footing data before the start of crushing is stored is inserted into the arithmetic unit 40, the footing number is also input, and the footing data before the start of crushing is read into the RAM 45. After that, the stroke sensor 2 is used as described above.
Perform the initial value resetting work of 3 to 25.

【0031】排出作業を開始する場合には、例えばキー
ボード47の「排出開始」キーを操作する。このキー操
作により、RAM45に記憶されたフーチングデータに
基づいて、演算部44は表示装置42に画像信号を出力
し、図12に示すように、破砕くずの領域が表示装置4
2にブロック表示される。すなわち、破砕開始前のフー
チングデータによってフーチング13のブロックの最上
面の高さが規定され、破砕終了後のフーチングデータに
よって最下面の高さが規定されて表示装置42に表示さ
れる。なお、破砕開始前のフーチングデータは排出作業
により破砕くずが除去されることによって随時更新され
るが、破砕終了後のフーチングデータは更新されない。
次いで、破砕作業時の場合と同様に、圧力センサ26の
検出値をモニターしながら表示画面上でバケット70の
先端をフーチング13の隅部に押圧させ、画面上のフー
チング13とバケット70の位置を調整する。
To start the discharging operation, for example, the "discharge start" key of the keyboard 47 is operated. By this key operation, the arithmetic unit 44 outputs an image signal to the display device 42 based on the footing data stored in the RAM 45, and as shown in FIG.
Blocked in 2. That is, the height of the uppermost surface of the block of the footing 13 is defined by the footing data before the start of crushing, and the height of the lowermost surface is defined by the footing data after the completion of crushing and displayed on the display device 42. The footing data before the start of crushing is updated whenever the crushed chips are removed by the discharging work, but the footing data after the crushing is not updated.
Then, as in the case of the crushing work, the tip of the bucket 70 is pressed against the corner of the footing 13 on the display screen while monitoring the detection value of the pressure sensor 26, and the positions of the footing 13 and the bucket 70 on the screen are adjusted. adjust.

【0032】続いて、図12(a)に示すように、バケ
ット70を開放して画面上のバケット70の位置をレバ
ー操作によってブロック上面の直上方に移動し、その場
所でシリンダ11の駆動によりバケット70を閉じてバ
ケット内に破砕くずを取り込む。このとき、演算部44
ではバケットの閉動作を検出して破砕くずの除去を判定
し、破砕くずの除去部に対応するスプレッドシート上の
フーチングデータが更新され、フラッシュメモリ46C
に書き込まれる。その結果、表示装置42に表示される
画像は図12(b)に示すように変更され、バケット7
0の閉動作に対応するブロックの表示が消去される。ま
た、同時に作業処理データが受信機34に送信され、排
出出来高管理装置35Bの出来高ファイルに排出作業の
出来高が記録される。バケット内に取り込まれた破砕く
ずはブーム4,アーム5,6の駆動によって地上に引き上
げられ、所定の場所に排出される。以降、ブロックのす
べてが消去されるまで、同様な作業が繰り返される。
Then, as shown in FIG. 12A, the bucket 70 is opened, and the position of the bucket 70 on the screen is moved to a position just above the block upper surface by the lever operation, and the cylinder 11 is driven at that position. The bucket 70 is closed and the debris is taken into the bucket. At this time, the calculation unit 44
Then, the closing operation of the bucket is detected to determine the removal of the crushed debris, the footing data on the spreadsheet corresponding to the crushed debris removal unit is updated, and the flash memory 46C is updated.
Written in. As a result, the image displayed on the display device 42 is changed as shown in FIG.
The display of the block corresponding to the closing operation of 0 is erased. At the same time, the work processing data is transmitted to the receiver 34, and the output amount of the discharging work is recorded in the output amount file of the discharge amount management device 35B. The crushed debris taken into the bucket is raised to the ground by driving the boom 4, the arms 5 and 6, and discharged to a predetermined place. After that, the same operation is repeated until all the blocks are erased.

【0033】排出作業が終了すると、例えばキーボード
47の「排出終了」キーを操作する。これによって、演
算部44での処理が終了する。その後、演算装置40の
電源をオフし、フラッシュメモリ46Cを抜き取り、フ
ラッシュメモリ46Cに記録されたデータをパソコンな
どで整理して排出作業の進行状況を評価する。また、排
出作業の進行状況は排出出来高管理装置35Bの出来高
ファイルにも出力されており、この出来高ファイルによ
って作業日報などが作成される。
When the discharging work is completed, for example, the "discharging end" key of the keyboard 47 is operated. This completes the processing in the arithmetic unit 44. After that, the power of the arithmetic unit 40 is turned off, the flash memory 46C is pulled out, the data recorded in the flash memory 46C is sorted by a personal computer or the like, and the progress of the discharging work is evaluated. In addition, the progress status of the discharge work is also output to the output volume file of the discharge volume management device 35B, and the daily work report and the like are created by this output volume file.

【0034】作業終了後のフーチング形状は超音波計測
装置でフーチング表面を2次元的に走査することにより
最終的に確認される。超音波計測装置は超音波照射用の
ソナー、計測データを処理するデータ処理装置、計測結
果を画像表示するモニターなどにより構成される。図1
3は超音波計測装置による測定の方法を示す図である。
図13に示すように、架台14にはフーチング中央部の
上方を通るレール72が支持され、レール72に沿って
超音波計測装置71のソナー71aが所定ピッチで移動
する。ソナー71aは進行方向と垂直方向(紙面垂直方
向)に走査可能であり、ソナー71aの所定ピッチの移
動ごとに、フーチング表面を走査する。これによって、
1本のレール72によりフーチング13の全形状を計測
する。なお、図13のAに示すように、ソナー71aを
所定の位置に固定し、その位置で全方向に回動させるこ
とにより、フーチング表面を走査してフーチング形状を
計測してもよい。
The footing shape after the work is finally confirmed by two-dimensionally scanning the footing surface with an ultrasonic measuring device. The ultrasonic measurement device is composed of a sonar for ultrasonic irradiation, a data processing device for processing measurement data, a monitor for displaying an image of the measurement result, and the like. Figure 1
3 is a diagram showing a method of measurement by the ultrasonic measuring device.
As shown in FIG. 13, the gantry 14 supports a rail 72 that passes above the center of the footing, and the sonar 71a of the ultrasonic measurement device 71 moves along the rail 72 at a predetermined pitch. The sonar 71a can scan in a direction perpendicular to the traveling direction (direction perpendicular to the paper surface), and scans the footing surface every time the sonar 71a moves by a predetermined pitch. by this,
The entire shape of the footing 13 is measured by one rail 72. Alternatively, as shown in FIG. 13A, the sonar 71a may be fixed at a predetermined position and rotated in all directions at that position to scan the footing surface and measure the footing shape.

【0035】このようなソナー71aによる計測の結
果、例えば図14(a)に示すように、フーチング13
の実測形状とフーチング13のブロックの形状(高さ)
が異なる場合には、フーチングデータを再構築し、図1
4(b)に示すように、フーチング13の実測形状にブ
ロックの高さを一致させる。また、図15(a)に示す
ようにフーチング13の表面に凸凹が発生し、ブロック
の中央部が凹んでいる場合には、図15(b)に示すよ
うに、フーチングデータの再構築によりフーチング13
のブロックを半ブロックずらして配置する。なお、一回
の作業による破砕領域と単位ブロックの大きさとが大き
く異なる場合には、フーチングデータを再構築して、破
砕領域に合うように単位ブロックの大きさを変更すれば
よい。以上の作業の後、鋼板16の直下方部のフーチン
グ13を撤去する場合には、作業車両YSを後方に移動
してフーチング上方の鋼板13を取り除き、一連の作業
を繰り返す。
As a result of the measurement by the sonar 71a, for example, as shown in FIG.
Measured shape of footing and block shape of footing 13 (height)
If the values are different, rebuild the footing data and
As shown in FIG. 4B, the height of the block is made to match the actually measured shape of the footing 13. In addition, when unevenness occurs on the surface of the footing 13 as shown in FIG. 15A and the central portion of the block is concave, as shown in FIG. Thirteen
The blocks of are shifted by half a block. If the size of the unit block and the size of the unit block are greatly different from each other in one operation, the footing data may be reconstructed and the size of the unit block may be changed so as to match the size of the unit area. When the footing 13 immediately below the steel plate 16 is to be removed after the above work, the work vehicle YS is moved backward to remove the steel plate 13 above the footing, and a series of work is repeated.

【0036】このように本実施の形態によると、フーチ
ング13の形状を表示装置42に表示するとともに、ブ
レーカ7およびバケット70の位置を検出してリアルタ
イムで表示装置42に表示するようにしたので、水中で
の作業状況をオペレータは認識することができる。ま
た、ブレーカ7によりフーチング13の表面が破砕され
ると、その破砕箇所に対応する表示を変更するようにし
たので、水中カメラや超音波検知機などでは目視が困難
な作業中のフーチング13の形状変化を容易に把握する
ことができ、作業性が向上する。さらに、レバー操作に
よってブレーカ7を自由に移動できるので、作業の自由
度が高められる。
As described above, according to the present embodiment, the shape of the footing 13 is displayed on the display device 42, and the positions of the breaker 7 and the bucket 70 are detected and displayed on the display device 42 in real time. The operator can recognize the work situation in water. Further, when the surface of the footing 13 is crushed by the breaker 7, the display corresponding to the crushed portion is changed. Therefore, the shape of the footing 13 during work that is difficult to see with an underwater camera or an ultrasonic detector. Changes can be easily grasped and workability is improved. Further, since the breaker 7 can be freely moved by operating the lever, the degree of freedom of work can be increased.

【0037】また、バケット70により破砕くずが排出
されると、破砕くずの位置に対応する表示装置42の表
示を変更するようにしたので、排出作業の状況も容易に
把握することができ、フーチングの解体作業を容易に行
える。さらに、作業の進行状況を出来高管理装置35の
出来高ファイルに出力するようにしたので、この出来高
ファイルによって作業日報などが作成され、出来高管理
が容易となる。さらにまた、超音波計測装置71によっ
て作業後のフーチング形状を計測するようにしたので、
フーチング表面形状(例えば表面の凹凸など)が正確に
把握され、その表面形状に合わせてフーチングブロック
を再構築することにより、最適な作業が行われる。
Further, when the crushed chips are discharged by the bucket 70, the display of the display device 42 corresponding to the position of the crushed chips is changed, so that the status of the discharging work can be easily grasped and the footing can be performed. The dismantling work can be done easily. Further, since the progress status of the work is output to the output file of the output management device 35, the daily work report is created by this output file, and the output management becomes easy. Furthermore, since the footing shape after the work is measured by the ultrasonic measuring device 71,
Optimal work is performed by accurately grasping the footing surface shape (for example, surface irregularities) and rebuilding the footing block according to the surface shape.

【0038】なお、上記実施の形態は、フーチング撤去
作業に適用したが、他の水中構造物を解体する作業に適
用してもよい。また、上記実施の形態では、作業車両と
してショベル系作業車両YSを用い、作業装置としてブ
レーカ7およびバケット70を用いてフーチング13を
解体するようにしたが、他の作業車両や作業装置を用い
てもよい。さらに、上記実施の形態では、破砕作業と解
体作業を同一の作業車両YSで行うようにしたが、破砕
作業と解体作業を別々の作業車両、すなわち、破砕専用
機、解体専用機により行うようにしてもよい。さらにま
た、上記実施の形態の図6〜8などの画像表示は一例で
あって、フーチング形状と作業装置3の位置が把握され
るなら、いかなる表示形態のものであってもよい。
Although the above embodiment is applied to the footing removing work, it may be applied to the work of disassembling another underwater structure. Further, in the above embodiment, the shovel-type work vehicle YS is used as the work vehicle, and the footing 13 is disassembled by using the breaker 7 and the bucket 70 as the work device, but other work vehicles or work devices are used. Good. Further, in the above-described embodiment, the crushing work and the dismantling work are performed by the same work vehicle YS, but the crushing work and the dismantling work are performed by different work vehicles, that is, the crushing dedicated machine and the dismantling dedicated machine. May be. Furthermore, the image displays of FIGS. 6 to 8 in the above embodiment are examples, and any display form may be used as long as the footing shape and the position of the work device 3 can be grasped.

【0039】以上の実施の形態と請求項との対応におい
て、フーチング13が水中構造物を、ブレーカ7が作業
用アタッチメントを、バケット70が排出装置をそれぞ
れ構成する。
In the correspondence between the above embodiment and the claims, the footing 13 constitutes an underwater structure, the breaker 7 constitutes a work attachment, and the bucket 70 constitutes a discharge device.

【0040】[0040]

【発明の効果】以上詳細に説明したように、本発明によ
れば、水中構造物に対する作業用アタッチメントの位置
を検出して表示装置に模式的に表示するとともに、作業
用アタッチメントによる水中構造物の破砕を検出し、こ
の破砕の検出に応じて水中構造物の表示形態を変更する
ようにしたので、作業用アタッチメントの位置だけでな
く水中構造物の形状変化をも把握することができ、水中
構造物の解体作業が容易に行える。とくに、請求項2の
発明によれば、作業機本体の移動量に基づいて作業用ア
タッチメントの位置を検出するようにしたので、作業車
両の位置を移動させて広範囲にわたる作業を行うことも
できる。また、請求項3の発明によれば、超音波計測装
置による計測結果に基づいて破砕後の水中構造物の表示
形態を変更するようにしたので、水中構造物の表面形状
に合わせた正確な表示が可能となる。さらに、請求項
4、6の発明によれば、作業後の表示形態に対応した情
報を破砕または排出出来高管理装置に出力して作業の出
来高を管理するようにしのたで、作業日報などが即座に
作成され、出来高管理が容易となる。さらにまた、請求
項5の発明によれば、排出装置による破砕片の排出動作
を検出し、破砕後に変更された表示形態を排出動作の検
出に基づいて排出後の表示形態に変更するようにしたの
で、破砕後の水中構造物を排出する作業も容易に行え
る。
As described above in detail, according to the present invention, the position of the work attachment with respect to the underwater structure is detected and schematically displayed on the display device, and the underwater structure by the work attachment is also displayed. Since the crushing is detected and the display form of the underwater structure is changed according to the detection of the crushing, not only the position of the work attachment but also the shape change of the underwater structure can be grasped. You can easily dismantle objects. In particular, according to the second aspect of the invention, the position of the work attachment is detected based on the movement amount of the work machine main body, so that the work vehicle can be moved to perform a wide range of work. Further, according to the invention of claim 3, the display form of the underwater structure after crushing is changed based on the measurement result by the ultrasonic measurement device, so that the accurate display according to the surface shape of the underwater structure is performed. Is possible. Further, according to the inventions of claims 4 and 6, since the information corresponding to the display form after the work is outputted to the crushing or discharging work amount management device to manage the work amount of the work, the daily work report or the like is immediately issued. It will be created in a simple way, and it will be easy to manage the output. Further, according to the invention of claim 5, the discharging operation of the crushed pieces by the discharging device is detected, and the display form changed after the crushing is changed to the display form after discharging based on the detection of the discharging operation. Therefore, the work of discharging the underwater structure after crushing can be easily performed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明が適用されるショベル系作業車両の側面
図。
FIG. 1 is a side view of a shovel work vehicle to which the present invention is applied.

【図2】フーチング撤去作業状態を示す図。FIG. 2 is a diagram showing a footing removing work state.

【図3】旋回体の位置検出装置の構成を示す図。FIG. 3 is a diagram showing a configuration of a position detection device for a revolving structure.

【図4】本実施の形態に係わるフーチング撤去作業の進
行状況表示装置のブロック図。
FIG. 4 is a block diagram of a progress status display device for footing removal work according to the present embodiment.

【図5】フーチング形状とフーチングデータの対応関係
を模式的に示す図。
FIG. 5 is a diagram schematically showing a correspondence relationship between footing shapes and footing data.

【図6】本実施の形態に係わるフーチング撤去作業の進
行状況表示装置を構成する表示装置に表示される一例を
示すフーチングおよび作業装置の縮小側面図。
FIG. 6 is a reduced side view of the footing and the working device showing an example displayed on the display device that constitutes the progress status display device for the footing removing work according to the present embodiment.

【図7】本実施の形態に係わるフーチング撤去作業の進
行状況表示装置を構成する表示装置に表示される一例を
示すフーチングおよび作業装置の縮小平面図。
FIG. 7 is a reduced plan view of a footing and a work device showing an example displayed on a display device that constitutes a progress status display device for the footing removal work according to the present embodiment.

【図8】本実施の形態に係わるフーチング撤去作業の進
行状況表示装置を構成する表示装置に表示される一例を
示すフーチングおよび作業装置の拡大平面図。
FIG. 8 is an enlarged plan view of the footing and the working device showing an example displayed on the display device that constitutes the progress status display device for the footing removal work according to the present embodiment.

【図9】フーチングの実表面と仮想表面の比較の一例を
示す図。
FIG. 9 is a diagram showing an example of comparison between a real surface and a virtual surface of footing.

【図10】破砕作業において、表示装置に表示されるフ
ーチングの画像の変化の一例を示す側面図。
FIG. 10 is a side view showing an example of changes in footing images displayed on the display device during crushing work.

【図11】破砕作業において、表示装置に表示されるフ
ーチングの画像の変化の他の例を示す平面図。
FIG. 11 is a plan view showing another example of changes in the footing image displayed on the display device in the crushing work.

【図12】排出作業において、表示装置に表示されるフ
ーチングの画像の変化の一例を示す平面図。
FIG. 12 is a plan view showing an example of changes in footing images displayed on a display device during a discharging operation.

【図13】超音波計測装置によるフーチング形状の測定
方法を示す図。
FIG. 13 is a diagram showing a method for measuring a footing shape by an ultrasonic measuring device.

【図14】フーチングのブロックを再構築する一例を示
す図。
FIG. 14 is a diagram showing an example of reconstructing a footing block.

【図15】フーチングのブロックを再構築する他の例を
示す図。
FIG. 15 is a diagram showing another example of reconstructing a footing block.

【符号の説明】[Explanation of symbols]

2 旋回体 3 作業装置 4 長尺ブーム 5 アーム 6 スライドアーム 7 ブレーカ 7a ノミ 13 フーチング 21 傾斜センサ 22 ブーム角度
センサ 23 アームストロークセンサ 24 スライドス
トロークセンサ 25 バケットストロークセンサ 29A,29B 投
光装置 30A,30B 測量機 31A,31B 送
信機 32 受信機 35 出来高管理
装置 40 演算装置 42 表示装置 46 フラッシュメモリ 70 クラムシェ
ルバケット
2 Revolving structure 3 Working device 4 Long boom 5 Arm 6 Sliding arm 7 Breaker 7a chisel 13 Footing 21 Inclination sensor 22 Boom angle sensor 23 Arm stroke sensor 24 Sliding stroke sensor 25 Bucket stroke sensor 29A, 29B Light projecting device 30A, 30B Surveying Machine 31A, 31B Transmitter 32 Receiver 35 Performance management device 40 Computing device 42 Display device 46 Flash memory 70 Clamshell bucket

───────────────────────────────────────────────────── フロントページの続き (72)発明者 岡澤 慶典 東京都墨田区押上一丁目10番3号 京成 電鉄株式会社内 (72)発明者 大河 澄男 大阪市阿倍野区松崎町2丁目2番2号 株式会社奥村組内 (72)発明者 内山 卓 大阪市阿倍野区松崎町2丁目2番2号 株式会社奥村組内 (72)発明者 藤沢 勤 東京都千代田区大手町二丁目6番2号 日立建機株式会社内 (56)参考文献 特開 平9−273869(JP,A) 特開 平2−279873(JP,A) 特開 平7−150775(JP,A) 特開 平11−302711(JP,A) 特開 平6−317090(JP,A) 特開 平10−311022(JP,A) 特開2000−8363(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02D 27/32 E02F 3/36 E02D 3/00 E04G 23/08 E02F 9/26 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Yoshinori Okazawa Inventor Yoshinori Okazawa 1-10-3 Oshiage, Sumida-ku, Tokyo Inside Keisei Electric Railway Co., Ltd. (72) Sumio Okawa 2-2-2 Matsuzaki-cho, Abeno-ku, Osaka Okumura Corporation (72) Inventor Taku Uchiyama 2-2, Matsuzaki-cho, Abeno-ku, Osaka City Okumura Corporation (72) Inventor Tsutomu Fujisawa 2--6, Otemachi, Chiyoda-ku, Tokyo Hitachi Construction Machinery Co., Ltd. In-house (56) Reference JP-A-9-273869 (JP, A) JP-A-2-279873 (JP, A) JP-A-7-150775 (JP, A) JP-A-11-302711 (JP, A) ) JP-A-6-317090 (JP, A) JP-A-10-311022 (JP, A) JP-A-2000-8363 (JP, A) (58) Fields investigated (Int.Cl. 7 , DB name) E02D 27/32 E02F 3/36 E02D 3/00 E04G 23/08 E02F 9/26

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 作業機本体に取り付けられたアームとア
ーム先端に取り付けられた作業用アタッチメントを地上
での操作により駆動して水中構造物を解体する水中構造
物の解体工法であって、 前記水中構造物に対する前記作業用アタッチメントの位
置を検出する工程と、 少なくとも前記水中構造物と前記作業用アタッチメント
を表示装置に模式的に表示する工程と、 前記表示装置上で前記作業用アタッチメントが前記水中
構造物に当接するように、前記作業用アタッチメントを
移動する工程と、 前記作業用アタッチメントを駆動して前記水中構造物の
所定箇所を破砕する工程と、 前記作業用アタッチメントによる前記水中構造物の所定
箇所の破砕を検出する工程と、 この破砕の検出に応じて前記表示装置上の前記水中構造
物の表示形態を破砕後の形態に変更する工程と、 前記水中構造物の破砕片を排出装置で排出する工程とを
含むことを特徴とする水中構造物の解体工法。
1. A method for dismantling an underwater structure, in which an arm attached to a work machine main body and a work attachment attached to an arm tip are driven by an operation on the ground to dismantle an underwater structure. A step of detecting the position of the work attachment with respect to a structure, a step of schematically displaying at least the underwater structure and the work attachment on a display device, and the work attachment on the display device being the underwater structure A step of moving the work attachment so as to contact an object; a step of driving the work attachment to crush a predetermined portion of the underwater structure; and a predetermined location of the underwater structure by the work attachment. Detecting the crushing of the underwater structure, and crushing the display form of the underwater structure on the display device according to the detection of the crushing. A method for disassembling an underwater structure, comprising: a step of changing to a crushed form; and a step of discharging the crushed pieces of the underwater structure with a discharge device.
【請求項2】 請求項1に記載の水中構造物の解体工法
において、 前記作業機本体を移動する工程を含み、 その作業機本体の移動量に基づいて前記作業用アタッチ
メントの位置を検出することを特徴とする水中構造物の
解体工法。
2. The method for disassembling an underwater structure according to claim 1, further comprising the step of moving the working machine body, wherein the position of the working attachment is detected based on a moving amount of the working machine body. The method for dismantling underwater structures characterized by.
【請求項3】 請求項1または2に記載の水中構造物の
解体工法において、 破砕後の前記水中構造物の形状を超音波計測装置により
計測する工程を含み、その計測結果に基づいて前記水中
構造物の破砕後の表示形態を変更することを特徴とする
水中構造物の解体工法。
3. The method for disassembling an underwater structure according to claim 1 or 2, comprising a step of measuring the shape of the underwater structure after crushing with an ultrasonic measuring device, and based on the measurement result, the underwater structure. A method for dismantling an underwater structure, characterized by changing the display form after the structure is crushed.
【請求項4】 請求項1〜3のいずれか1項に記載の水
中構造物の解体工法において、 さらに、前記破砕後の表示形態に対応した情報を破砕出
来高管理装置に出力し、破砕作業の出来高を管理する工
程を含むことを特徴とする水中構造物の解体工法。
4. The method for disassembling an underwater structure according to any one of claims 1 to 3, further comprising outputting information corresponding to the display form after the crushing to a crushing performance management device for crushing work. A method for dismantling an underwater structure, which includes a process of managing the volume.
【請求項5】 請求項1〜4のいずれか1項に記載の水
中構造物の解体工法において、 前記水中構造物に対する前記排出装置の位置を検出する
工程と、 前記排出装置を前記表示装置に表示する工程と、 前記表示装置上で前記排出装置が破砕済みの領域に位置
するように前記排出装置を移動する工程と、 前記排出装置による破砕片の排出動作を検出する工程
と、 破砕後に変更された表示形態を前記排出装置の排出動作
の検出に基づいて排出後の表示形態に変更する工程とを
含むことを特徴とする水中構造物の解体工法。
5. The method for disassembling an underwater structure according to any one of claims 1 to 4, wherein a step of detecting a position of the discharge device with respect to the underwater structure, the discharge device being used as the display device. A step of displaying, a step of moving the discharging device so that the discharging device is located in a crushed area on the display device, a step of detecting a discharging operation of crushed pieces by the discharging device, and a change after crushing And a step of changing the displayed display form to a display form after discharge based on the detection of the discharge operation of the discharge device.
【請求項6】 請求項5に記載の水中構造物の解体工法
において、 さらに、前記排出後の表示形態に対応した情報を排出出
来高管理装置に出力し、排出作業の出来高を管理する工
程を含むことを特徴とする水中構造物の解体工法。
6. The method for disassembling an underwater structure according to claim 5, further comprising the step of outputting information corresponding to the display form after the discharge to a discharge volume management device and managing the volume of the discharge work. A method for dismantling underwater structures, which is characterized by the following.
JP2000040247A 2000-02-17 2000-02-17 Demolition of underwater structures Expired - Lifetime JP3406882B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000040247A JP3406882B2 (en) 2000-02-17 2000-02-17 Demolition of underwater structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000040247A JP3406882B2 (en) 2000-02-17 2000-02-17 Demolition of underwater structures

Publications (2)

Publication Number Publication Date
JP2001226986A JP2001226986A (en) 2001-08-24
JP3406882B2 true JP3406882B2 (en) 2003-05-19

Family

ID=18563664

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000040247A Expired - Lifetime JP3406882B2 (en) 2000-02-17 2000-02-17 Demolition of underwater structures

Country Status (1)

Country Link
JP (1) JP3406882B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6794193B2 (en) * 2016-09-02 2020-12-02 株式会社小松製作所 Image display system for work machines
CN115288071A (en) * 2022-08-08 2022-11-04 重庆交通大学 An underwater rock breaking visualization device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718256B2 (en) * 1989-04-19 1995-03-01 四郎 小山 Process and safety work monitoring system in construction work, dismantling and construction method
JP2844040B2 (en) * 1993-05-07 1999-01-06 東急建設株式会社 3D display device
JP2504935B2 (en) * 1993-12-01 1996-06-05 アジア海洋作業株式会社 Method and device for cutting underwater structure by diamond wire saw
JPH09273869A (en) * 1996-04-08 1997-10-21 Nippon Steel Corp Molten metal gutter refractory repair device and refractory repair method
JP3362833B2 (en) * 1997-05-09 2003-01-07 鹿島建設株式会社 Compaction management system using GPS
JPH11302711A (en) * 1998-04-23 1999-11-02 Sumitomo Metal Ind Ltd Blast furnace inner wall repair equipment
JP2000008363A (en) * 1998-06-23 2000-01-11 Ohbayashi Corp Banking rolling control system

Also Published As

Publication number Publication date
JP2001226986A (en) 2001-08-24

Similar Documents

Publication Publication Date Title
CN100545359C (en) Construction target instructing device
CN114207220B (en) Motion teaching system
EP0811728B1 (en) Method for controlling an excavator
CN105765134B (en) The display methods of construction information display device and construction information
KR102126772B1 (en) Working machine
JP6200121B2 (en) Work machine periphery monitoring device
JP6216097B2 (en) Work machine periphery monitoring device
US9043098B2 (en) Display system of excavating machine and excavating machine
KR100452101B1 (en) Target excavation surface setting device for excavation machine, recording medium therefor and display unit
EP1541772A1 (en) Excavation teaching apparatus for construction machine
KR20000064826A (en) A slope excavation control device of a hydraulic excavator, a target slope setting device, and a slope excavation forming method
JP2004107926A (en) Digging work teaching device for construction machine
JP3406882B2 (en) Demolition of underwater structures
JP2004107925A (en) Digging work teaching device for construction machine
JP2002294763A (en) Work machine position detection device and display device
JP6409146B1 (en) Ground agitator management system
JP3406883B2 (en) Work progress display device and work machine equipped therewith
JP2022001836A (en) Calibration device and calibration method
JP4447734B2 (en) System and method for estimating the volume of material entrained in a bucket of a drilling machine
JP2020122371A (en) Work machine
JP2020076278A (en) Scaffold design device and scaffold design method
JP2874859B2 (en) Drilling support method for pneumatic caisson excavator
CN116181335B (en) A tunneling machine and tunneling method
US12516508B2 (en) System, method, and non-transitory computer-readable storage medium for work machine guidance
US20250003199A1 (en) Work system

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
R150 Certificate of patent or registration of utility model

Ref document number: 3406882

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090307

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100307

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100307

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110307

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110307

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120307

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150307

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term