JPH0718256B2 - Process and safety work monitoring system in construction work, dismantling and construction method - Google Patents
[go: Go Back, main page]

JPH0718256B2 - Process and safety work monitoring system in construction work, dismantling and construction method - Google Patents

Process and safety work monitoring system in construction work, dismantling and construction method

Info

Publication number
JPH0718256B2
JPH0718256B2 JP9936389A JP9936389A JPH0718256B2 JP H0718256 B2 JPH0718256 B2 JP H0718256B2 JP 9936389 A JP9936389 A JP 9936389A JP 9936389 A JP9936389 A JP 9936389A JP H0718256 B2 JPH0718256 B2 JP H0718256B2
Authority
JP
Japan
Prior art keywords
crane
construction
block
temporary
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP9936389A
Other languages
Japanese (ja)
Other versions
JPH02279873A (en
Inventor
四郎 小山
友和 小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP9936389A priority Critical patent/JPH0718256B2/en
Publication of JPH02279873A publication Critical patent/JPH02279873A/en
Publication of JPH0718256B2 publication Critical patent/JPH0718256B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Closed-Circuit Television Systems (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この出願の発明は、第一に地上乃至地下、並びに水上乃
至水中に於ける低層・高層又は超高層を成す構造物乃至
構築物(以下単に「構造物等」という。)の建設又は解
体工事における工程及び安全作業の監視システムに関
し、典型的には超大型石油プラントにおける超大型縦形
ベッセル乃至大口径配管等の建設又は解体工事(以下単
に「建設工事等」ともいう。)における工程及び安全作
業の監視システムに関し、第二に、前記構造物等の解体
及び建設のための工法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The invention of this application is, firstly, a structure or structure (below, simply referred to as “below” which is a low-rise / high-rise or super-high rise above or below ground and above or below water. "Systems, etc.") or the process of dismantling construction and the monitoring system for safe work, typically the construction or dismantling of super-large vertical vessels or large-diameter pipes in super-large oil plants (hereinafter simply "construction" Also referred to as "construction, etc."), and secondly, a construction method for dismantling and construction of the structures and the like.

〔発明の技術的背景〕[Technical background of the invention]

本邦においては、西暦1955年に始まる高度成長期の前葉
に、スケールメリットと臨海効果の双方を求めて、多数
の大形石油プラント類が、日本列島の臨海地帯各所に陸
続と、先を争って建設をされた。日本列島太平洋側沿岸
地帯をベルト状に埋めつくした世界に冠たる大臨海工業
地帯の誕生である。
In Japan, in the front of the high growth period beginning in 1955, many large petroleum plants are struggling for land sequel to various seaside areas of the Japanese archipelago in search of both economies of scale and seaside effects. Was built. This is the birth of a world-leading Great Seaside Industrial Zone, which is a belt-shaped area filled with the Pacific coast of the Japanese archipelago.

そしてそれから三分の一世紀が経過し、新たに1990年代
を展望しようとする今日、それ等の諸設備は、或は部分
的に或は全体的に、老朽化乃至旧式化を来たしていると
判断しなければならない。かくして、新なる解体と建設
の時代が到来する。
Now, one third of the century has passed, and nowadays, with the prospect of a new 1990s, it is said that these facilities have deteriorated or become obsolete, partly or wholly. You have to judge. Thus, a new era of demolition and construction has arrived.

然しながら、ここでの建設と解体は、机上で見る程に爾
く簡単ではない。
However, construction and demolition here is not as easy as it looks on a desk.

国土の狭隘な本邦においては、十分なる工場敷地の取得
が可能ではなかったがために、不十分なる敷地内に、高
層乃至超高層の構造物乃至構築物(例えば高さが60〜80
m,ときには100mにも垂んとする超高層縦形ベッセルやそ
れ等の間を相結合している大口径配管等)が、林立・錯
綜・相接近して、構築をされている。
In Japan, where the land is small, it was not possible to acquire sufficient factory premises, so high-rise or super-high-rise structures or structures (for example, 60 to 80
The ultra-high-rise vertical vessels, which sometimes hang down to 100 m, and sometimes large-diameter pipes that connect them, etc., are constructed in close proximity to each other.

典型的な製油所敷地には、十指に余る大規模な諸装置が
配置されているのであるが、例えばその内の流動接触分
解装置(FCC)一つを取って見ても、その核心部には超
高層の反応塔や再生塔や主蒸留塔が先ず屹立し、次いで
それ等を取り巻くように、脱ブタン塔やガソリン分留塔
や脱プロパン塔が林立し、続いてブチレン重合装置や各
種精製装置群や動力回収設備や排熱ボイラや脱硝設備や
電気集塵機やその他の諸装置が配備され、更には多数の
大口径配管等が、以上の諸設備の間を縫うようにして、
錯綜・配管をされている。
There are more than ten large-scale devices on a typical refinery site, but even if you take one of them, for example, a fluid catalytic cracking device (FCC), The ultra-high-rise reaction tower, regeneration tower, and main distillation tower stand up first, and then debutane towers, gasoline fractionation towers, and depropanizer towers surround them, followed by butylene polymerization equipment and various purification equipment. Equipment groups, power recovery equipment, exhaust heat boilers, denitration equipment, electric dust collectors, and other equipment are installed, and a large number of large-diameter pipes, etc. sew between the above equipment,
Has been complicated and plumbing.

このことだけでも前記の解体作業を極めて困難にしてい
るのであるが、そこへ持って来て、これ等の諸設備の稼
動は長期間にわたって停止をすることが許されないと言
う社会的、経済的事情が加わって、尚のこと事態を複雑
困難にしているのである。
This alone makes the dismantling work extremely difficult, but it is social and economic that it is not allowed to bring these facilities to a halt for a long period of time. The added circumstance makes it even more complicated and difficult.

本邦においては、(したがってまた諸外国において
も)、未だ曾てこのように複雑・困難な状況の下におけ
る超高層構造物等の解体工事と、それに続く再建設とを
体験したことがない。従って、どのような潜在的危険が
伏在しているかは、未だ明確にされてはいないのであ
る。
In Japan (and therefore also in other countries), I have never experienced the demolition work of super high-rise structures and the subsequent reconstruction under such complicated and difficult circumstances. Therefore, it is not yet clear what kind of potential danger lies.

周囲に充分な空間的余裕がある場合の低層構造物等の解
体工事においては、 a)該低層構造物をその場において倒伏させる b)倒伏の際には、該低層構造物等の付帯構造物を成し
ていたH型鋼をクッションとして利用する c)細断した後、撤去をする という工法が採られていたが、このような工法は、前述
の如く厳しい環境条件の下にある構造物等の解体工事に
適用することはできない。
In the dismantling work of low-rise structures, etc. when there is a sufficient space around them, a) collapse the low-rise structures on the spot b) In the case of a fall, incidental structures such as the low-rise structures Using the H-shaped steel that has been used as a cushion c) The method of removing after shredding was adopted, but such a method is a structure under severe environmental conditions as described above. Can not be applied to the dismantling work of.

となると、前述の如き環境にある超高層構造物等の解体
工事の設計施工に当たっては、上記の工法に代えて、先
ず下記の如き解体方法が考えられる。
Then, in designing and constructing the dismantling construction of the super high-rise structure in the environment as described above, first, the following disassembling method can be considered instead of the above construction method.

(解体方法1) 超高層構造物等の最上端部に溶接により多対の台付け
フックを固設させ、これ等の台付けフックに多数の台
付けワイヤーを引っ掛け、これ等のワイヤーに超大型
クレーンの巨大クレーンフックを引っ掛け、前記超高
層構造物等を懸吊するに足る張力を掛け、その最下部
を適宜の切断機(例えばアセチレンガス切断機やアーク
切断機)で切断し、切断された構造物の全体を前記ク
レーンで吊り上げ、これを水平に移動させた後、適所
に吊り降ろして横転させ、細断した後、廃棄をする。
しかしながら、かかる解体方法1を、一般に適用するこ
とは出来ない。
(Dismantling method 1) A large number of pairs of mounting hooks are fixed by welding to the uppermost end of a super high-rise structure, etc., and a large number of mounting wires are hooked on these mounting hooks. Hook the giant crane hook of the crane, apply sufficient tension to suspend the super high-rise structure, etc., cut the bottom part with an appropriate cutting machine (for example, acetylene gas cutting machine or arc cutting machine), and cut The entire structure is hoisted by the crane, horizontally moved, hoisted in a proper place, tumbled, shredded, and then discarded.
However, the disassembling method 1 cannot be generally applied.

前述の如き環境に置かれている超高層構造物等に対して
迄も、前述の解体方法1を適用するときは、〜の過
程において人命及び設備に罹る重大な事故を惹き起す虞
があるからである。そこには、工程における超高層
構造物等の切断作業の完了直後に発生するその横揺れ及
び回転現象、それによる台付けワイヤー乃至クレーン
ワイヤーの切断現象、続いての超高層構造物等の落下と
横転現象、同じく超大型クレーン自体の横転現象、
工程〜においてクレーンワイヤーによって懸吊され
ている被切断超高層構造物等の、強風等に起因する横揺
れ現象(横方向振動現象)、それによる台付けワイヤ
ー乃至クレーンワイヤーの切断現象、続いての超高層
構造物等の落下と横転現象、前記〜,の諸現象
に起因する他の稼動中の超高層構造物等への衝突、及び
それ等の部分的乃至全体的な破損乃至破壊、工程〜
におけるクレーンの操作ミスに起因する他の稼動中の
超高層構造物等への衝突、及びそれ等の部分的乃至全体
的な破損乃至破壊等等の潜在的危険要因が至る所に伏在
しているのであるが、一歩誤って、これらの潜在的危険
要因を顕在化させるときは、人命の損傷乃至死亡事故、
続いての引火、爆発、更には第2次引火爆発等等の不測
の大災害に迄発展する虞がある。
When the above-mentioned dismantling method 1 is applied even to a super high-rise structure or the like placed in the environment as described above, there is a risk of causing a serious accident affecting human life and equipment in the processes of to. Is. There are rolling and rotation phenomena that occur immediately after the completion of the cutting work of super high-rise structures, etc. in the process, the cutting phenomenon of the mounting wire or crane wire due to it, and the subsequent fall of super high-rise structures etc. Rollover phenomenon, also rollover phenomenon of the super-large crane itself,
Rolling phenomenon (lateral vibration phenomenon) caused by strong winds in super high-rise structures to be cut that are suspended by crane wires in the process Falling and roll-over phenomena of super high-rise structures, etc., collision with other operating super high-rise structures, etc. due to various phenomena of the above, and partial or total damage or destruction thereof, process-
Potential hazards such as collisions with other operating super high-rise structures, etc. due to operation errors of the crane in the above, and partial or total damage or destruction of them, etc. However, if one step is mistakenly made to reveal these potential risk factors, injury or death of human life,
There is a possibility that it may develop into an unforeseen catastrophe such as a subsequent ignition, explosion, or even a secondary ignition and explosion.

そこで次に、以下に述べる如き解体方法が考えられる。Therefore, next, a disassembling method as described below can be considered.

(解体方法2) 超高層構造物等の最上端部に溶接により多対の台付け
フックを固着させ、これ等の台付けフックに多数の台
付けワイヤーを掛け、これ等の台付けワイヤーに超大
型クレーンの巨大クレーンフックを引っ掛け、前記構
造物における予定切断面より上の部分の全重量を懸吊す
るに足る張力を掛け、その予定切断面を切断機(例え
ばアセチレンガス切断機)で切断し、切断された部分
を前記クレーンで吊り上げ、これを水平・垂直に移動
させた後、適所に吊り下ろし、細断した後、適宜廃棄
をする。以下同様にして、工程〜を反復する。
(Dismantling method 2) A number of pairs of mounting hooks are fixed by welding to the uppermost end of a super high-rise structure, etc., and a large number of mounting wires are hung on these mounting hooks. Hook the huge crane hook of a large crane, apply sufficient tension to suspend the entire weight of the part above the planned cutting surface in the structure, and cut the planned cutting surface with a cutting machine (for example, acetylene gas cutting machine) Then, the cut portion is lifted by the crane, moved horizontally and vertically, then hung in a suitable place, shredded, and appropriately discarded. In the same manner, steps to are repeated.

この方法は、前記解体方法1に較べて、多くの潜在的危
険要因を排除していることが、詳説する迄もなく、明ら
かである。
It is obvious, of course, that this method eliminates many potential risk factors compared to the dismantling method 1 described above.

ところで、解体の対極には、当然のことながら、再建設
あるいは新規の建設が存在する。
By the way, at the other end of demolition, of course, there is reconstruction or new construction.

解体に続く再建設、或は別途の新規建設に際しても、前
記解体工事と同様な潜在的危険要因が伏在していること
を否定出来ない。
It cannot be denied that the same potential risk factors as in the above-mentioned demolition work are also present when reconstructing following demolition or in new construction separately.

それゆえ、再建設或いは新規建設に際しても、上記の二
つの解体方法に対応して、分割処理の有無において共通
する、二つの建設方法が考えられる。
Therefore, even in the case of re-construction or new construction, two construction methods can be considered, corresponding to the above-mentioned two dismantling methods and common in the presence or absence of division processing.

これら二つの建設方法においては、単位工程の配列順序
及び単位工程の内容は、前記二つの解体方法におけるそ
れとは凡そ正反対となる。
In these two construction methods, the arrangement order of the unit processes and the contents of the unit processes are almost opposite to those in the two disassembling methods.

〔従来技術の問題点と発明の目的〕[Problems of prior art and object of invention]

上記のような建設工事等においては、設計施行管理監督
者や、労働基準監督署の監督官(以下単に「工事管理監
督者等」という。)は、労働災害の発生を極力防止する
ために、工事の全状況を細大漏らさず把握をしていなけ
ればならない。
In the above construction work, the design enforcement management supervisor and the supervisor of the Labor Standards Inspection Office (hereinafter simply referred to as "construction management supervisor, etc.") are required to prevent the occurrence of occupational accidents. It is necessary to grasp the whole construction situation without leaking details.

しかしながら、これらの工事管理監督者等は、鳶職のよ
うに高所乃至超高所での作業経験を積んでいる訳ではな
いので、地上60〜80m、時には100mにも達する作業ステ
ージに登って行くことができない。仮に登ることが出来
たとしても、監視対象である超高層構造物等のサイズが
巨大に過ぎるために、局所的状況の把握しか可能ではな
くなり、却って全状況の把握において齟齬を来すおそれ
が生じる。
However, since these construction management supervisors do not have the experience of working at high places or super high places like the Tobi job, they go up to the work stage of 60 to 80m, sometimes 100m above the ground. I can't. Even if you could climb, the size of the super-high-rise structures, etc. to be monitored is too large, so it is only possible to grasp the local situation, and there is a risk of discrepancies in grasping the entire situation. .

そのため、作業ステージにおける作業員にトランシーバ
ーを装備させ、このトランシーバーを介する作業員から
の音声報告に基づいて、且つ過去の事例との対比におい
て、全状況の把握に努め、把握した状況に基づいて、前
記トランシーバーを介して、作業員等に対し指令・指示
を与えるという方法がとられてきた。
Therefore, the worker on the work stage is equipped with a transceiver, based on the voice report from the worker via this transceiver, and in comparison with past cases, strive to grasp the whole situation, based on the grasped situation, A method has been adopted in which a command or instruction is given to a worker or the like via the transceiver.

然しながら、何時までもかかる方法にのみ頼っているこ
とは出来ない。中規模工事の場合においてすら既に隔靴
掻痒の感を免れ得なかったのであるから、況してや前述
の如き大規模工事においては、全うに通用する筈はない
からであら。
However, we can't rely solely on this method for hours. Even in the case of medium-scale construction, it was already possible to avoid the feeling of pruritus, so there is no way it can be used in the large-scale construction mentioned above.

これを要するに、本邦においてはこれまで、前述の如く
厳しい環境条件の下における大規模建設工事等の経験が
なく、したがってまたかかる場合の十全な監視システム
は存在していなかったのである。
In short, in Japan, as described above, there is no experience in large-scale construction work under severe environmental conditions as described above, and there is no adequate monitoring system for such cases.

遡っていえば、前述の如く厳しい諸条件の下における大
規模且つ未経験の工事を為さんとする設計施行管理監督
者等は、人命尊重と設備保護の責めを負っているが故
に、従来工法の単純延長を為すのではなく、工法の諸元
についての抜本的な見直しを為すという態度を採ること
が求められることと成る。量的変化は屡々質的変化を呼
び起こすことがあるからである。
Going back, as mentioned above, the design execution management supervisors who perform large-scale and inexperienced construction under severe conditions are liable for respect for human life and equipment protection. It is necessary to take the attitude of making a radical review of the specifications of the construction method, rather than making an extension. Quantitative changes often evoke qualitative changes.

かくして、工法自体についても、下記〜の如き問題
点が浮び上がってくる。
Thus, with respect to the construction method itself, the following problems (1) to (3) appear.

工法の諸元間の内的連関が明確化されておらず、従っ
てこれ等の諸元が有機的に組織化されていない。即ち工
法が体系化されていない。
The internal relations between construction method specifications are not clarified, and therefore these specifications are not organically organized. That is, the construction method is not systematized.

工法の諸元について、経験主義に基づく若干の誤解が
ある。例えば、台付けワイヤーについては、本数が多け
れば多い程作業が安全確実であるという考えがあり、実
際低層構造物等の懸吊時には2本以上の台付けワイヤー
が使用されているのであるが、この考えは、低層構造物
等での経験が不用意に一般化されたものであって、実
は、超高層構造物等の工事には妥当し得ないものなので
ある。(因に、この事は、この出願の発明者等によって
初めて明確にされたところである。) 従って、この出願の発明の目的は、上記の諸問題を一挙
に解決をすること、又、新規且つ確実なる監視システム
と、これと協働し得る新規且つ安全なる工法とを提供す
ることにある。
There are some misunderstandings about the specifications of the construction method based on empirical principles. For example, regarding the mounting wire, there is an idea that the more the number of mounting wires is, the safer and more reliable the work is. In fact, when suspending a low-rise structure or the like, two or more mounting wires are used. This idea was inadvertently generalized in experience with low-rise structures and, in fact, is not valid for construction of super-high-rise structures. (Incidentally, this has been clarified for the first time by the inventors of this application.) Therefore, the object of the invention of this application is to solve the above problems at once, and It is to provide a reliable monitoring system and a new and safe construction method capable of cooperating with it.

〔問題点を解決する手段乃至発明の原理〕[Means for Solving Problems or Principle of the Invention]

この発明の監視システムの第1の原理は、 第一に、解体又は建設をすべき構造物等の高さを遥かに
超える様な高さを有する超大形クレーン等を使用し、こ
のクレーンブームの先端部又は先端部近傍にm(m≧
2)個のテレビカメラの内の1個のテレビカメラを吊下
乃至取着をすることによって、場合によっては、これに
加えて更に1乃至複数個のテレビカメラを必要に応じて
クレーンブームの中間部の側面等にも相互に適宜の間隔
を置いて分散・取着をすることによって、即ちr(m−
1≧r≧1)個のテレビカメラをクレーンブーム上に配
設することによって、前記構造物等とこれを取り囲む人
的物的な諸対象から成る全体について大局的状況を鳥瞰
出来るようにするとともに、そのズーム機能により、前
記層構造物等の最上端部及びその近傍における局所的状
況をも細密に虫瞰出来るようにし、 第二に、被監視対象物を成す前記構造物等を取り囲む所
定の環状領域内に、前記構造物等と同程度の高さを有す
る仮設構築物を、前記構造物等を可及的に取り囲むよう
に仮設をし、前記所定の環状領域内に利用可能な既設の
構築物等が存在しない場合には前記仮設構築物単独で、
又利用可能な既設の構築物等が存在する場合にはその既
設構築物等と前記仮設構築物等との双方で、s(=m−
r)個(m≧2,m−1≧r≧1)のテレビカメラを、作
業ステージと作業平面の移動に伴って移動できるように
して支持し、これ等のカメラによって作業ステージ及び
作業平面内の局所的状況を細密に虫瞰出来るようにし、 第三に、前記各テレビカメラによって撮像された時々刻
々の各画像の各画像信号を、M画面マルチシステム用画
像信号合成装置(通信画像合成処理装置)で合成して、
各個のモニターテレビ(M画面マルチシステム用画像信
号受信装置)における表示画面の全体をM分割して成る
M個の部分画面上に同時並行的に映像表示出来るように
し、 以って、建設工事等の工事管理監督者等が、解体又は建
設をすべき超高層構造物等とこれを取り囲む人的物的な
諸対象からなる全体について、大局的な、又局所的な時
々刻々の変動過程を、可及的に細大漏らさず、鳥瞰図的
にも虫瞰図的にも自在に把握出来るようにし、 第四に、作業ステージ上の作業員及びクレーンオペレー
ター室のクレーンオペレーター(以下「作業員等」と言
う。)並びに工事管理監督者等がそれぞれトランシーバ
ーを装備するようにし、 以って、前記工事管理監督者等が、前記トランシーバを
介して前記各作業員等に対して、適時適切な指令指示を
与えることを可能にし、 第五に、録画装置を配設して、後日の調査研究や、万一
の事故発生の際の、原因の究明、責任の明確化のための
科学的且つ客観的なデータの提供をも可能にした ところにある。
The first principle of the monitoring system of the present invention is that, firstly, an ultra-large crane or the like having a height far exceeding the height of a structure or the like to be disassembled or constructed is used. M at the tip or near the tip (m ≧
2) By suspending or attaching one of the TV cameras, one or more TV cameras may be additionally attached to the middle of the crane boom, if necessary. By disperse / attach the side surfaces of the part at appropriate intervals with each other, that is, r (m-
By arranging 1 ≧ r ≧ 1) TV cameras on the crane boom, it is possible to provide a bird's-eye view of the overall structure including the structures and the human objects surrounding them. , Its zoom function makes it possible to closely observe the local situation at the uppermost end of the layered structure or the like and in the vicinity thereof, and secondly, a predetermined surrounding surrounding the structure or the like forming the monitored object. In the annular region, a temporary structure having the same height as the structure, etc. is temporarily installed so as to surround the structure etc. as much as possible, and an existing structure that can be used in the predetermined annular region. If there is no such thing, the temporary construction alone,
When there is an existing building that can be used, both s (= m-
r) (m ≧ 2, m−1 ≧ r ≧ 1) television cameras are supported so as to be movable as the work stage and the work plane move, and these cameras support the work stage and the work plane. The third aspect of the present invention is to enable a detailed bird's-eye view of the local situation of the image. Thirdly, the image signals of each image captured by each of the television cameras are converted into an image signal synthesizer for M-screen multi-system (communication image synthesis processing Device)
The display screen of each individual monitor television (image signal receiving device for M-screen multi-system) can be displayed simultaneously on M partial screens that are formed by dividing the entire display screen into M parts. The construction management supervisor, etc. of the whole, consisting of super-high-rise structures to be dismantled or constructed and the various human and physical objects surrounding them, will carry out a global or local momentary fluctuation process, It is possible to grasp the bird's-eye view and the insect-eye view freely without leaking as much as possible. Fourth, the worker on the work stage and the crane operator in the crane operator room (hereinafter referred to as “worker, etc.”) In addition, the construction management supervisor, etc. shall equip each with a transceiver, so that the construction management supervisor, etc. can timely and appropriately order the workers etc. via the transceiver. Fifth, by arranging a recording device, a scientific and objective method for investigating and researching later, investigating the cause, and clarifying the responsibility in the event of an accident should it occur. It is also possible to provide various data.

亦、この発明の監視システムの第2の原理は、 この発明の監視システムの第1の原理によって成る監視
システムに対して、更にk個(m≧k≧1)のテレビカ
メラを付加し、且つ これ等k個のテレビカメラは、各個に又は一括して、前
記M画面マルチシステム用画像合成装置(通信画像合成
処理装置)の入力側において、k個の高周波用切換スイ
ッチにより、前記m個のテレビカメラの内のk個のテレ
ビカメラの夫々又は全体と、切換えて使用出来るように
し、これによって、 或は,これ等k個のテレビカメラを、予定作業面内にお
いて、前記超高層構築物上に、前記s(=m−r)個の
テレビカメラと同様にして支持し、以って合計(m−r
+k)個のテレビカメラにより作業ステージ及び作業平
面内の局所的状況を更に一層細密に虫瞰できるようにし
たり、 或はこれ等k個のテレビカメラの内の任意の1個をクレ
ーンウインチ(巻上げ機)の内部又は外部の適所に配設
して、クレーンワイヤの巻込状態を監視出来るように
し、以ってクレーンワイヤの不正常なる巻込状態を発見
した時は、クレーンウインチの巻き戻し・巻き上げ操作
を繰り返すことにより不正常なる巻き込み状態を解消さ
せて、クレーンワイヤの断線事故を事前に回避をするこ
とが出来るようにしたり、 或はこれ等k個のテレビカメラの全部又は一部を上記以
外の要監視箇所に配設して、それ等の要監視箇所におけ
る時々刻々の状況変化を、直接又は録画装置を介して、
常時又は随時に監視をすることが出来るようにしたりし
た ところにある。
The second principle of the surveillance system of the present invention is the addition of k (m ≧ k ≧ 1) television cameras to the surveillance system according to the first principle of the surveillance system of the present invention, and These k TV cameras are individually or collectively provided on the input side of the M-screen multi-system image synthesizing device (communication image synthesizing processing device) by the k high-frequency changeover switches. The k television cameras of the television cameras can be switched and used with each or all of the k television cameras, or these k television cameras can be placed on the super high-rise structure in the planned work plane. , S (= m−r) TV cameras are supported in the same manner as described above, so that the total (m−r)
+ K) TV cameras can be used to provide a more detailed view of the local situation on the work stage and work plane, or any one of these k TV cameras can be used for crane winch (hoisting). (Equipment) inside or outside, so that the winding state of the crane wire can be monitored, and when an abnormal winding state of the crane wire is found, rewinding of the crane winch By repeating the hoisting operation, the abnormal winding state can be resolved to prevent the accident of the disconnection of the crane wire in advance, or all or part of these k television cameras can be Other monitoring points other than the above, to monitor the situational changes at those monitoring points directly or via a recording device.
It is in the place where it can be monitored constantly or at any time.

更に、この発明の監視システムの第3の原理は、この発
明の監視システムの第2の原理によって成る監視システ
ムに対して、更に第2の録画装置を付加し、前記k個の
テレビカメラが撮像した各画像の画像信号を、各個に、
又は合成した後一括して録画をし、随時モニターテレビ
上に再生をして、前記要監視箇所における状況変化をも
把握出来るようにした ところにある。
Further, the third principle of the surveillance system of the present invention is such that a second recording device is further added to the surveillance system according to the second principle of the surveillance system of the present invention, and the k television cameras capture images. The image signal of each image is
Alternatively, after the images are combined, they are collectively recorded and then reproduced on the monitor TV at any time so that the situation change at the above-mentioned monitoring points can be grasped.

この発明の監視システムの第4の原理は、作業面(切断
又は接続面)が垂直面を成している場合において、s
(=m−r)個のテレビカメラを該垂直面内に於いて可
及的に対称且つ等間隔配置となるように支持し、他は上
記第1〜第3の原理と同様にした ところにある。第4の原理は、例えば大口径配管乃至横
形ベッセルの解体又は建設の工事に適用される。
A fourth principle of the monitoring system of the present invention is that when the work surface (cutting or connecting surface) is a vertical surface, s
(= M−r) TV cameras are supported so as to be symmetrically and equidistantly arranged in the vertical plane, and otherwise the same as the first to third principles. is there. The fourth principle is applied to, for example, dismantling or construction of large-diameter pipes or horizontal vessels.

この発明の解体及び建設工法の原理は、 第一に、台付けワイヤーとしては大径のものを唯1本だ
け使用することとし、従って又台付けフックも各ブロッ
ク毎に唯1対だけ設けることとし、以って台付けワイヤ
ー切断事故の発生確率を、より細径の台付けワイヤーを
複数本使用した場合に較べて、低減をさせ、 第二に、予定切断線上の周壁部分の切断作業を2段階に
分け、第1段階においては、等間隔を成すs(s≧2)
個の弧状周壁部分(例えば予定切断線上30〜50cmに亙る
弧状部分)は残しておいて切断をせず、それ等s個の弧
状周壁部分の間の他のs個のより長大な弧状周壁部分を
スリット状に切断をし、第2の段階においては、先に残
しておいたs個の弧状周壁部分を、s人の作業員によっ
て同時に同一速度を以って一気呵成に切断をするように
し、以って切断完了時におけるバリの発生や、被切断ブ
ロックの横揺れや、回転等を減少させ、作業員の身体や
機材設備を安全にし、 第三に、各工程の内的連関を明確にし、それ等を時間軸
上に緻密に隙間なく、且つ可及的に併行関係を成すよう
に、配列をすることによって、作業時間を短縮するとと
もに、作業員の長時間作業(例えば4〜5時間/1段落)
に基づく疲労と注意力散漫化とに起因するクレーン操作
ミス等の事故発生確率を低減させた ところにある。
The principle of the dismantling and construction method of the present invention is that, firstly, only one large-diameter wire is used as the mounting wire, and therefore, only one pair of mounting hook is provided for each block. As a result, the probability of accidents in cutting the mounting wire is reduced compared to the case where multiple mounting wires with smaller diameters are used. It is divided into two stages, and in the first stage, s (s ≧ 2) with equal intervals is formed.
The arcuate peripheral wall parts (for example, the arcuate part extending over 30 to 50 cm on the planned cutting line) are left uncut, and the other s longer arcuate peripheral wall parts between the s arcuate peripheral wall parts. Is cut into a slit shape, and in the second step, the s number of arc-shaped peripheral wall portions left previously are cut simultaneously by the same number of workers by the same number of workers at the same speed, As a result, the occurrence of burrs at the completion of cutting, the rolling of the block to be cut, the rotation, etc. are reduced, the worker's body and equipment are safe, and thirdly, the internal relations of each process are clarified. By arranging them so as to form a parallel relationship as closely as possible with no gaps on the time axis, the working time can be shortened and the worker can work for a long time (for example, 4 to 5 hours). / 1 paragraph)
This is because the probability of accidents such as crane operation errors due to fatigue and distraction due to the accident has been reduced.

そして、この出願の発明は、地上と同様に、地下、更に
は、水上及び水中にも適用することが出来る。水中作
業、水中切断、水中溶接そして水中用テレビカメラが実
用化されているからである。
The invention of this application can be applied to underground as well as above ground, and above and below water. This is because underwater work, underwater cutting, underwater welding, and underwater television cameras have been put to practical use.

〔監視システムの実施例S1〕 第1図の実施例S1について説明をする。[S1 of Monitoring System] The S1 of FIG. 1 will be described.

同図において、1は、これから解体をすべき高層乃至超
高層構造物(典型的には石油プラントにおける超高層縦
形円筒状ベッセル)であって、その直径は6〜16m、そ
の高さは60〜80m、時には100mにも垂んとするものであ
る。
In the figure, 1 is a high-rise to ultra-high-rise structure (typically, an ultra-high-rise vertical cylindrical vessel in an oil plant) having a diameter of 6 to 16 m and a height of 60 to It has a length of 80m and sometimes 100m.

2は、高層乃至超高層構築物(俗にいう作業員足場)で
あって、高層乃至超高層構築物1と同程度の高さを必要
とする。
Reference numeral 2 denotes a high-rise building or a super-high-rise building (a so-called worker's scaffolding), which requires the same height as that of the high-rise building.

3は、作業用ステージ、すなわち作業員が作業をするた
めに乗る作業用ステージである。
Reference numeral 3 is a work stage, that is, a work stage on which a worker rides to perform work.

4は、上から数えて第1番目の、予定切断面1である。
以下順番に、i(i=2,3、…,p)番目の予定切断面i
が続く。
4 is the first planned cut surface 1 counted from the top.
In the following order, the i (i = 2,3, ..., p) th planned cutting plane i
Continues.

5は、唯1本の大径(10〜20cm、時には26cm)の台付け
ワイヤであって、両端には、溶接によって閉成されたル
ープ(図示しない)を有する。ループ閉成の工程は、詳
説をすれば、下記のとうりである。
Reference numeral 5 is a single large-diameter (10 to 20 cm, sometimes 26 cm) mounting wire, and has loops (not shown) closed by welding at both ends. The process of loop closure is as follows, in detail.

ワイヤー先端部の縒りを所定の長さに亙って解(ほ
ぐ)す、 適宜の道具(例えばシノ)を用いてワイヤー上の予定
の結節点から中央部側へ向け所定の長さに亙って縒りを
解(ほぐ)し、隣接する素線間に隙間を作り出す、 前記素線間の隙間に、先に解(ほぐ)しておいたワ
イヤー先端部の各素線を挟み込んで、所定の長さに亙っ
て、局所的には恰も2倍の素線数から成る複合縒り線状
態乃至編組状態を成しているかの如き、結合部を作り出
す、 前記結合部に置ける結節点及びその近傍を、溶接に
よって更に強固に結合をさせる、 結合を更に一層強化するために前記結合部の一部乃
至全部に亙って鉛を掛ける。
Unravel the twist of the wire tip over a specified length, and use an appropriate tool (for example, Shino) to move the knot on the wire toward the center side from the intended knot point and follow the specified length. Unravel the twist to create a gap between adjacent strands. Insert each strand of the wire tip previously unraveled in the gap between the strands. , Creating a joint part as if it is in a complex twisted wire state or braided state locally consisting of twice the number of strands over a predetermined length, a knot point that can be placed in the joint part And the vicinity thereof are further strongly bonded by welding, and lead is applied to a part or all of the bonding portion in order to further strengthen the bonding.

高層乃至超高層構造物1の上端には、予め溶接により、
1対の台付けフック(図示しない)が、固設されてい
る。1対の台付けフックの固設位置は、中心点に関して
正確に点対称関係をなしていなければならない。
By welding in advance to the upper end of the high-rise to super high-rise structure 1,
A pair of pedestal hooks (not shown) are fixed. The fixed positions of the pair of pedestal hooks must be in an exact point-symmetrical relationship with respect to the center point.

台付けワイヤ5の両端のループは、この台付けフックに
引っ掛けられている。
The loops at both ends of the mounting wire 5 are hooked on this mounting hook.

CBは、陸上用又は船舶用の超大型クレーンのクレーンブ
ームである。その高さは、後述する理由によって、被監
視対象物の高さを遥かに超えている様な高さでなければ
ならない。ここに使用すべき超大型クレーンとしては、
実際本邦に1〜2台しかないという様な巨大なクレーン
が予定される。7はこのクレーンに使用される大径(10
〜20cm、時にはそれ以上)のクレーンワイヤである。6
はこのクレーンワイヤの先端に結合されている巨大なク
レーンフックである。このクレーンフック6は、前記台
付けワイヤ5の中央部に引っ掛けられる。
CB is a crane boom of a super-large crane for land or ships. The height must be far higher than the height of the monitored object for the reason described later. As a super large crane to be used here,
In fact, there will be a huge crane, such as only one or two in Japan. 7 is the large diameter (10
~ 20 cm, sometimes more) crane wire. 6
Is a huge crane hook attached to the tip of this crane wire. The crane hook 6 is hooked on the central portion of the mounting wire 5.

c1はテレビカメラ(例えば超小型CCDテレビカメラ)で
あって、ケーブル8によって前記クレーンブームCBの先
端部に懸吊されている。このテレビカメラは、ケーブル
8によって(又は即して)給電をされる。レンズのある
鏡頭部(ヘリコイド)の方向は可変にされていなければ
ならない。
c 1 is a television camera (for example, an ultra-small CCD television camera), which is suspended by a cable 8 at the tip of the crane boom CB. The television camera is powered by (or in line with) the cable 8. The direction of the mirror head (helicoid) with the lens must be variable.

テレビカメラc1の所要高度は、超高層構造物及びそれを
取り囲む人的物的な諸対象から成る全体を、一挙・同時
に、且つ鳥瞰図的に把握をするために、超高層構造物等
の高度を遥かに超える様な高度でなければならない。
The required altitude of the TV camera c 1 is the altitude of the super high-rise structure, etc., in order to grasp the whole structure consisting of the super high-rise structure and various human objects surrounding it at once and simultaneously and in a bird's-eye view. It must be at an altitude that far exceeds.

又、テレビカメラc1の水平面内における配設位置は、以
下に定義をする画像切れ領域の外部の点を選択しなけれ
ばならない。
Further, the position of the television camera c 1 in the horizontal plane must be selected at a point outside the image cutout area defined below.

ここに、画像切れ領域とは、クレーンワイヤ7を中心点
(線)とし、半径を以下に述べる最小許容距離とする仮
想の円(円筒)の内部のことである。上記の最小許容距
離は、クレーンワイヤ7の径の大小、テレビカメラc1
視野の広狭、又被監視対象物のサイズの大小等々の関数
なのであるが、解りやすくするために誤解をおそれず端
的にいえば、第1図の如き超大型縦形円筒状ベッセル1
の場合にはおよそ1mである。テレビカメラc1の懸吊・配
設に当たり、画像切れという現象の認識ないし洞察なし
に、漫然とこれを為してしまうときは、鏡頭部(ヘリコ
イド)の方向が大径のクレーンワイヤー7側へ向けられ
た時など、そのクレーンワイヤーによってカメラレンズ
の視野が遮られ、画面の半分(クレーンワイヤー7の径
が10〜20cmの場合)乃至全部(同26cmの場合)が消えて
しまうことにも成り兼ねないばかりでなく、終にその原
因を探知することすら出来ないのである。(因みに、こ
こでのこの画像切れの現象は、この発明の発明者(出願
人)が初めて明確に解明をした現象である。) c2〜c4は、c1と同様なテレビカメラ(例えば超小型CCD
テレビカメラ)であって、第1図(b)に示す如く、可
及的に対称且つ等距離配置が可能でなければならない。
Here, the image cut-out area means the inside of an imaginary circle (cylinder) having the crane wire 7 as the center point (line) and the radius being the minimum allowable distance described below. The minimum allowable distance is a function of the diameter of the crane wire 7, the size of the field of view of the television camera c 1 , the size of the monitored object, etc. Speaking of which, as shown in Fig. 1, a super-large vertical cylindrical vessel 1
In the case of, it is about 1 m. When suspending and arranging the TV camera c 1 and aiming for it without knowing or insight of the phenomenon of image breakage, aim the mirror head (helicoid) toward the crane wire 7 side with a large diameter. When the crane wire is used, the field of view of the camera lens is blocked by the crane wire, and half of the screen (when the diameter of the crane wire 7 is 10 to 20 cm) or all of the screen (when the diameter is 26 cm) can disappear. Not only can it not be detected, but at the end it cannot even be detected. (Incidentally, this phenomenon of image breakage is a phenomenon that the inventor (applicant) of the present invention has clarified for the first time.) C 2 to c 4 are television cameras similar to c 1 (for example, Ultra small CCD
It must be a television camera) and as symmetrical and equidistant as possible, as shown in FIG. 1 (b).

ここに、対称配置とは、前記円筒状ベッセルの中心点
(線)をoとしたとき、 ∠c2oc3=∠c3oc4=∠c4oc2 を満足する様な配置関係をいい、 等距離配置とは、各個のテレビカメラc2,c3,c4と円筒
状ベッセルの壁面との距離(従って又これ等のテレビカ
メラと円筒状ベッセルの中心点との距離)が互いに同一
となるような配置関係をいう。
Here, the symmetrical arrangement means an arrangement relation that satisfies ∠c 2 oc 3 = ∠c 3 oc 4 = ∠c 4 oc 2 when the center point (line) of the cylindrical vessel is o. , Equidistant arrangement means that the distances between the individual television cameras c 2 , c 3 , c 4 and the wall surface of the cylindrical vessel (and hence the distance between these television cameras and the center point of the cylindrical vessel) are the same. It means an arrangement relationship such that

今、前記円筒状ベッセルに外接する三角形、又は前記円
筒状ベッセルを内含する三角形を考えて、それらの各頂
点にテレビカメラc2〜c4を配設するときは、前記円筒状
ベッセルの全周壁に亙って撮像をし、観察をすることが
できる。
Now, considering a triangle circumscribing the cylindrical vessel, or a triangle including the cylindrical vessel, and disposing the television cameras c 2 to c 4 at their respective vertices, all of the cylindrical vessel Images can be taken and observed over the peripheral wall.

しかして、これらのテレビカメラc2〜c4は、作業ステー
ジの移動に伴って、移動できるようにしておかなければ
ならない。
However, these TV cameras c 2 to c 4 must be able to move as the work stage moves.

テレビカメラc1〜c4の後段の適宜箇所には、手動乃至自
動のホワイトバランス装置(図示しない)や、手動乃至
自動の焦点調節装置(図示しない)や、手動乃至自動の
鏡筒方向遠隔制御装置が配置・接続されている。
A manual or automatic white balance device (not shown), a manual or automatic focus adjustment device (not shown), or a manual or automatic lens barrel direction remote control is provided at an appropriate position after the television cameras c 1 to c 4. The device is located and connected.

MTV1は、モニターテレビすなわちm画面マルチシステム
用画像信号受信装置であって、クレーンオペレーター室
に配設され、クレーンオペレーター(又は臨検の監督官
等)によって、被監視対象をモニタするために使用され
る。
The MTV 1 is a monitor television, that is, an image signal receiving device for an m-screen multi-system, which is installed in a crane operator room and is used by a crane operator (or an inspecting supervisor) to monitor an object to be monitored. It

MTV2は、同じくモニターテレビすなわちm画面マルチシ
ステム用画像信号受信装置であって、工事管理監督者室
に配設され、監督者等によって、被監視対象をモニタす
るために使用される。
The MTV2 is also a monitor television, that is, an image signal receiving device for an m-screen multi-system, and is installed in the construction management supervisor room, and is used by the supervisor or the like to monitor the monitored object.

モニターテレビMTV1及びMTV2の全画面を4分割して成る
第1の4半画面1(左上)には、第1のテレビカメラc1
から送信されて来た画像信号が表示され、 第2の4半画面2(右上)には、第2のテレビカメラc2
から送信されて来た画像信号がそのまま表示され、 第3の4半画面3(左下)には、第3のテレビカメラc3
から送信されて来た画像信号がそのまま表示され、 第4の4半画面4(右下)には、第4のテレビカメラc4
から送信されて来た画像信号がそのまま表示されるよう
に 構成されている。
The first TV camera c 1 is provided on the first quarter screen 1 (upper left) formed by dividing the full screen of the monitor TVs MTV 1 and MTV 2 into four.
The image signal transmitted from the second television camera c 2 is displayed on the second quarter screen 2 (upper right).
The image signal transmitted from is displayed as it is, and the third TV camera c 3 is displayed on the third quarter screen 3 (lower left).
The image signal transmitted from the fourth television camera c 4 is displayed on the fourth 4th half screen 4 (lower right).
The image signal transmitted from is displayed as it is.

MMは、m画面マルチシステム用画像信号合成装置(通信
画像合成処理装置)であって、m(m≧2)個のテレビ
カメラからの画像信号を処理して、一般のテレビ画面條
に、上記の如く、各画像を一挙同時併行的に映像表示出
来るような合成信号に変換するための装置である。(こ
の装置自体は、テレビの実況放送等から窺知される如
く、この出願前において公知である。) VRは、記録様ビデオすなわちビデオテープレコーダー等
の、長時間(大凡4〜5時間或はそれ以上の時間)に亙
って記録をとることができる録画装置である。この録画
装置は、クレーンオペレータ室又は工事監督者室の一方
又は双方に配置をされる。一方のみに配置をする場合に
は、万一の事故の際の原因究明のための客観的データを
確保するという観点からすればクレーンオペレータ室へ
の配置を優先するのが良策である。
The MM is an image signal synthesizing device (communication image synthesizing device) for m-screen multi-system, which processes image signals from m (m ≧ 2) TV cameras to obtain the above-mentioned general TV screen. As described above, it is a device for converting each image into a combined signal that can be simultaneously and concurrently displayed as an image. (This device itself is known before this application, as it is known from the live broadcasting of television etc.) VR is a record-like video, that is, a video tape recorder, for a long time (about 4 to 5 hours or More than that) is a recording device that can record over time. This recording device is placed in one or both of the crane operator room and the construction supervisor room. In the case of arranging in only one side, it is a good idea to give priority to the arrangement in the crane operator room from the viewpoint of securing objective data for investigating the cause in case of an accident.

そして、作業ステージ上の作業員、クレーオペレータ
ー、工事管理監督者等には、それぞれトランシーバーを
装備するものとする。
Workers on the work stage, clay operators, construction management supervisors, etc. shall be equipped with transceivers.

〔監視システムの実施例S2〕この発明の監視システムの
実施例S2は、前記実施例S1に於ける第2のモニターテレ
ビMTV2を省略して成る監視システムである。この監視シ
ステムの使用に際しては、工事管理監督者等は、クレー
ンオペレーター室に出掛けて行って、そこにあるモニタ
ーテレビMT2によって、安全作業の監視を為すことが出
来る。
Embodiment S2 of Monitoring System The embodiment S2 of the monitoring system of the present invention is a monitoring system in which the second monitor television MTV 2 in the embodiment S1 is omitted. When using this monitoring system, the construction management supervisor can go out to the crane operator room and monitor the safety work by the monitor TV MT 2 there.

〔工法の実施例P1及びP2、並び監視システムの実施例S1
の有効活用方法〕 第1図図示の如き,高層乃至超高層構造物1をp個の断
片に切断して、順次撤去をする場合において、この発明
の工法の実施例P1及びP2、並びにこの発明の監視システ
ムの実施例S1の有効活用方法について、詳細に説明をす
る。
[Examples P1 and P2 of the construction method, Example S1 of the alignment monitoring system
Effective use method of the invention] As shown in FIG. 1, when the high-rise to super-high-rise structure 1 is cut into p pieces and sequentially removed, embodiments P1 and P2 of the construction method of the present invention, and the present invention The effective use method of the embodiment S1 of the monitoring system will be described in detail.

(実は、前記第1の解体方法は、p=1の場合に相当
し、前記第2の解体方法はp≧2の場合に相当すること
に留意されたい。) 先ず、高層乃至超高層構造物1上に、p個の切断面を選
定する。
(Actually, it should be noted that the first dismantling method corresponds to the case of p = 1 and the second dismantling method corresponds to the case of p ≧ 2.) First, a high-rise to super-high-rise structure 1. Select p cut planes on 1.

いま、Z軸が高層乃至超高層構造物1の重心線(=垂直
中心線)と一致し、かつ原点がその下端面(=基礎上端
面)内に位置するようなxyz座標系を考え、且つ、h=H
/pとしたとき、選定をすべきp個の水平切断面は、上か
ら順に、z座標 (p−1)h,(p−2)h,‥‥‥,0 によって定まるp個の水平面、又は各その近傍のp個の
水平面であるとする。以下、これ等の切断面を、上から
順に、切断面1、切断面2、切断面3、・・・、切断面
pと言う。
Now, consider an xyz coordinate system in which the Z axis coincides with the center of gravity line (= vertical center line) of the high-rise or super high-rise structure 1, and the origin is located in the lower end surface (= upper upper end surface) of the structure, and , H = H
Assuming / p, the p horizontal cutting planes to be selected are, in order from the top, p horizontal planes determined by z coordinates (p-1) h, (p-2) h ,. Alternatively, it is assumed that there are p horizontal planes in the vicinity thereof. Hereinafter, these cut surfaces will be referred to as cut surface 1, cut surface 2, cut surface 3, ..., Cut surface p in order from the top.

そして、高層乃至超高層仮設構築物2の構築過程におい
て、作業ステージ3が、下から順に、各個の予定切断面
i(i=p,p−1,……,1)に接近した時点時点で、各個
の予定切断面iの直下の構造物周壁面に一対の台付けフ
ック(図示しない)を溶接により固設する。各一対の台
付けフックの固設位置は、重心線に関して正確に点対称
をなすように設定をしなければならない。(なお台付け
フックの固設作業は、場合によっては、後回しとし、各
個の切断・撤去作業の直後直後になすような設計をする
こともできる。) 仮設構築物2の構築が終った段階で、いよいよ高層乃至
超高層構造物1の切断・撤去の作業が始まる。その詳細
は、以下の通りである。
Then, in the process of constructing the high-rise to ultra-high-rise temporary structure 2, at the time when the work stage 3 approaches each of the planned cutting planes i (i = p, p−1, ..., 1) in order from the bottom, A pair of pedestal hooks (not shown) are fixed by welding on the peripheral wall surface of the structure immediately below each planned cut surface i. The fixed position of each pair of mounting hooks must be set so as to be exactly point-symmetric with respect to the center of gravity line. (In some cases, the mounting work of the pedestal hook may be postponed, and it may be designed to be performed immediately after the cutting / removing work of each individual.) When the construction of the temporary construction 2 is completed, Finally, the work of cutting / removing the high-rise or super high-rise structure 1 begins. The details are as follows.

大径の台付けワイヤー5の正確な中点に、超大型ク
レーンフック6を引っ掛けて、これを吊り上げ、高層乃
至超高層構造物1の最上端面直近上方に移動させた後、
停止をさせる。
After hooking the super-large crane hook 6 on the accurate midpoint of the large-diameter mounting wire 5 and lifting it, and moving it to the position immediately above the uppermost end face of the high-rise or super-high-rise structure 1,
Stop.

高層乃至超高層構造物1の最上端部周壁面に溶接に
より固設されている一対の台付けフックに、前記大径の
ワイヤー5の両先端部におけるワイヤーループを引っ掛
ける。
The wire loops at both ends of the large-diameter wire 5 are hooked on a pair of mounting hooks that are fixed to the peripheral wall surface of the uppermost end of the high-rise to super-high-rise structure 1 by welding.

前記大径の台付けワイヤー5に対しては、クレーン
ワイヤー7を介して、張力を掛ける。この張力は引き続
き保持をしておかなければならない。
Tension is applied to the large-diameter mounting wire 5 through the crane wire 7. This tension must continue to be maintained.

爾後、工事管理監督者等は、張力の大きさが前記構造物
における第1番目の予定切断面4より上の部分の全重量
を懸吊するに足る大きさであること、又、クレーンフッ
ク6とクレーンワイヤー7とが、正確に、高層乃至超高
層構造物1の重心線(=中心線)上に存在するか否かを
確認し続けなければならない。
After that, the construction management supervisor and the like must confirm that the magnitude of the tension is sufficient to suspend the entire weight of the portion of the structure above the first planned cut surface 4, and the crane hook 6 It is necessary to continue checking whether or not the crane wire 7 and the crane wire 7 are present accurately on the center of gravity (= center line) of the high-rise or super high-rise structure 1.

第1の予定切断面4を切断機(例えばアセチレンガ
ス切断機又はアーク切断機)で切断をする。切断作業は
2段階に分けて行なう。
The first planned cutting surface 4 is cut by a cutting machine (for example, an acetylene gas cutting machine or an arc cutting machine). The cutting work is done in two stages.

第1段階においては、3個のテレビカメラc2,c3,c4
各正面前方乃至正面前方寄りにおける適宜の長さ(例え
ば30〜50cm)の周壁部分は切断をせず、残余の周壁部分
のみ切断をする。切断作業は3箇所から開始をするが、
この段階では未だ、切断速度が同一であることを必要条
件とはしていない。
In the first step, the peripheral wall portion of the three television camera c 2, c 3, each of the front side on the front to appropriate length in the front side on the front side of the c 4 (e.g. 30 to 50 cm) is not cut, the remainder of the peripheral wall Cut only the part. The cutting work starts from three locations,
At this stage, the same cutting speed is not yet required.

第2段階では、3個のテレビカメラc2,c3,c4の正面前
方乃至正面前方寄りに切断せずに残しておいた3箇所の
周壁部分を、3人の作業者が同時に同一速度をもって、
一気呵成に切断をする。作業者は切断完了後直ちに身を
伏せなければならない。切断完了直後に発生するバリを
伴った被切断ブロックの横揺れ及び回転現象から身体を
守るためである。それでも、作業宜しきを得ない時に
は、鳶の命が危険に曝される。大きく横揺れする被切断
ブロックによって作業足場に押付けられたりするからで
ある。ことによると、足場自体を引っくり返してしまう
ような大事故に発展する虞なしとしない。
In the second stage, the three TV cameras c 2 , c 3 and c 4 are left in front of or in front of the front of the three TV cameras, and the three peripheral wall portions left uncut are simultaneously operated by three workers at the same speed. With
Make a quick cut. The operator must lie down immediately after completing the cutting. This is to protect the body from the rolling and rotation phenomena of the block to be cut accompanied by burrs that occur immediately after the cutting is completed. Still, when the work is not convenient, the life of the hawk is at risk. This is because the block to be cut that greatly sways is pressed against the work scaffold. Possibly, there is a risk that it will lead to a major accident that will overturn the scaffolding itself.

切断された部分を前記クレーンで吊り上げ、 これを水平・垂直に移動させた後、適所に吊り下ろ
す。
The cut part is lifted by the crane, moved horizontally and vertically, and then hung in a proper place.

細断をした後、廃棄をする。 After shredding, discard.

上記の解体工法P1に於いては、従来工法の如く複数本の
台付けワイヤーを使用することなく、唯1本の大径の台
付けワイヤーだけを使用することによって、従来工法に
伏在していた一つの断線事故要因を除去することに成功
を納めている。
In the dismantling method P1 described above, there is no need to use a plurality of mounting wires as in the conventional method, but only one large-diameter mounting wire is used. It has succeeded in eliminating one other cause of disconnection accidents.

従来常識によれば、複数本の台付けワイヤーを使用した
方が懸吊作業を安全且つ確実にしたのであるが、この発
明者等の研究によれば、この常識は誤りであった。
According to the conventional wisdom, it is safer and more reliable to suspend the work by using a plurality of pedestal wires, but according to the study by the inventors, this common wisdom was incorrect.

即ち、複数本の台付けワイヤーを使用する時は、クレー
ンフック上で台付けワイヤー同士が交差したり、重なり
合ったりする事態が出来し、下側となった台付けワイヤ
ーには張力と剪断力とが複雑に集中し、更にはノッチェ
フェクトも加わったりして、却って、切断事故を起こし
易くしていたのである。
That is, when using multiple mounting wires, it is possible that the mounting wires may intersect or overlap on the crane hook, and tension and shearing force may be applied to the lower mounting wire. However, due to the complex concentration and the addition of notch effects, it was rather easy to cause a cutting accident.

大規模なるが故に潜在的危険が随所に伏在しているこの
種解体工事の管理監督者等は、〜の工程において、
人命尊重と設備保護の観点から、無災害を目指して、次
のことを、念には念を入れて、確認するとともに、各作
業者に対して、適時適切な指令指示を発しなければなら
ない。
The management supervisor of this kind of dismantling work, which has potential dangers everywhere due to its large scale,
From the viewpoint of respect for human life and protection of equipment, aiming for no accident, it is necessary to carefully check the following matters and to give each worker timely and appropriate command instructions.

(イ)クレーンワイヤー7乃至台付けワイヤー5の張力
は適正か。クレーンウインチ(巻上げ機)内のクレーン
ワイヤーは、規則的且つ整列的に、又緻密に隙間なく、
巻き取られているか。
(B) Is the tension of the crane wire 7 or the pedestal wire 5 appropriate? The crane wire in the crane winch (hoisting machine) is regularly and regularly and closely and without gaps.
Have you been wound up?

(ロ)台付けフック、台付けワイヤー5、クレーンフッ
ク6は正しく係合されているか、又それ等の部材に異常
はないか。
(B) Are the pedestal hook, pedestal wire 5 and crane hook 6 properly engaged, and are there any abnormalities in their members?

(ハ)クレーンフック6及びクレーンワイヤー7は構造
物1の重心線上に正しく位置決めされているか。
(C) Are the crane hook 6 and the crane wire 7 correctly positioned on the center of gravity of the structure 1?

(ニ)の第1段階の切断作業は完璧に完了したか。す
なわち、切断面の形状は直線状か、バリが発生しにくい
形状は確保されているか。
Is the first stage cutting work of (d) completed completely? In other words, is the cut surface straight, or is a shape that does not easily generate burrs secured?

(ホ)の第2段階の切断作業は、同時に同一速度でな
されているか。又切断口周縁はバリが発生しないような
形状になされているか。
Is the cutting work of the second stage of (e) done at the same speed at the same time? Is the peripheral edge of the cutting opening shaped so as not to generate burrs?

(ヘ)作業者は切断作業完了後に迅速に身を伏せられる
様な態勢にあるか。
(F) Is the operator in a position to be able to lie down quickly after completing the cutting work?

(ト)環境に異常はないか。等々。(G) Is there any abnormality in the environment? And so on.

然るところ、工事管理監督者等による(イ)〜(ト)等
々の確認は、前述の理由によって、極めて困難であり、
事実上不可能であった。然しながら、この発明の実施例
S1による監視システムを採用するときは、工事管理監督
者等は、上記(イ)〜(ト)等々のことを極めて容易に
確認をすることが出来るようになり、これに基づいて作
業者等に対して、適時適切な指令指示を発することがで
きるようになるのである。
However, it is extremely difficult for construction management supervisors, etc. to confirm (a) to (g), etc.
It was virtually impossible. However, the embodiment of the present invention
When adopting the monitoring system by S1, the construction management supervisor can check the above (a) to (g) etc. very easily, and based on this, the worker etc. can be confirmed. On the other hand, it becomes possible to issue appropriate command instructions in a timely manner.

以上を以って、解体方法の実施例P1等についての説明を
終る。
This is the end of the description of the embodiment P1 and the like of the disassembling method.

次に、建設方法の実施例P2等について詳細に説明をす
る。
Next, Example P2 of the construction method will be described in detail.

建設方法の実施例P2は、単位工程の配列順序と、単位工
程の各内容において、解体方法の前記実施例P1とは大凡
正反対である。建設方法の実施例P2は、前記解体方法の
実施例P1における工程の配列順序と、単位工程の各内容
とを、いわば逆転をさせることによって成るものであ
る。
The example P2 of the construction method is roughly opposite to the example P1 of the disassembly method in the arrangement order of the unit steps and the respective contents of the unit steps. Example P2 of the construction method is configured by reversing the sequence order of the steps and the respective contents of the unit steps in Example P1 of the dismantling method.

すなわち、 超高層構造物を構成すべきp個(p≧1)のブロッ
クのそれぞれの上端に、溶接により一対の台付けフック
を固設する。
That is, a pair of pedestal hooks are fixed by welding to the upper ends of the p (p ≧ 1) blocks that form the super high-rise structure.

台付けワイヤーを吊り上げて、下から数えて第j番
目に配置をすべきブロックjの最上端の直近上位に移動
させた後、静止をさせる。
The pedestal wire is hoisted, moved from the bottom to the nearest upper position of the uppermost end of the block j to be arranged at the j-th position from the bottom, and then made stationary.

台付けワイヤーの両端部における一対のワイヤール
ープを、一対の台付けフックに引っ掛ける。
The pair of wire loops at both ends of the mounting wire are hooked on the pair of mounting hooks.

超大型クレーンにより第j番目のブロックjを吊り
上げて水平垂直に移動をさせ、既に配設をされている第
j−1番目のブロック(j−i)の上方に停止乃至静止
させた後、吊り下ろす。
The j-th block j is hoisted by a super-large crane to move horizontally and vertically, and is stopped or stopped above the already arranged j-1 th block (j-i) and then hoisted. Lower it.

ブロック(j−i)の上側フランジとブロックjの
下側フランジとを正確に合致させる。その際、両フラン
ジの輪郭同士はクレーンオペレーターによるクレーン操
作により合致させ、両フランジのボルト孔同士は、作業
ステージの上の作業員によるテコの操作により、上側の
ブロックjを所要角度回転させて合致をさせる。
Accurately match the upper flange of block (j-i) with the lower flange of block j. At that time, the contours of both flanges are matched by a crane operation by a crane operator, and the bolt holes of both flanges are matched by rotating the upper block j by a required angle by a lever operation by a worker on the work stage. Let

両フランジの合わせ目を溶接により完全に溶着をさ
せ、ボルトの頭部周縁とナットの周縁には、肉盛り溶接
をする。
The joints of both flanges are completely welded by welding, and build-up welding is performed on the head peripheral edge of the bolt and the peripheral edge of the nut.

(溶接の目的は、完璧なる気密・水密の状態を実現する
ことにある。針の孔程度の孔であってもそうした孔が何
処かに残っていたりすると、高圧の流体が猛烈な勢で噴
出をすることになる。) 工程〜を反復繰り返す。
(The purpose of welding is to achieve perfect air-tightness and water-tightness. Even if there is a hole about the size of a needle, if such a hole is left somewhere, high-pressure fluid is ejected with a violent force. The process is repeated.

この発明の実施例S1による監視システムが上述の建設工
事に対しても極めて有効であることは、前述の解体工事
に適用した場合との類否によって、明らかである。
The fact that the monitoring system according to the embodiment S1 of the present invention is extremely effective for the above-mentioned construction work is apparent from the similarities to the case where it is applied to the above-mentioned dismantling work.

〔監視システムの実施例S3〕 実施例S3の監視システムは、実施例S1の監視システムに
対して、第5番目のテレビカメラc5を付加し、これによ
ってクレーンウインチ(巻取機)(図示しない)の内部
におけるクレーンワイヤーの巻取状態が正常か否かをも
監視できるようにしたものである。
[Example S3 of Monitoring System] The monitoring system of Example S3 has a fifth television camera c 5 added to the monitoring system of Example S1, whereby a crane winch (winder) (not shown) is added. It is also possible to monitor whether or not the winding condition of the crane wire inside the () is normal.

クレーンウインチ(巻上げ機)内におけるクレーンワイ
ヤーの巻取状態は、どの巻き取り層をとってみても、常
に隙間なく、相隣れるワイヤー同士が相接するように、
緻密に整列をされていなければならない。不整列による
空隙がワイヤ間に存在するような巻取状態を放置すると
きは、急激なる荷重の増大時に、その巻取状態が崩壊
し、それに伴う衝撃によって、クレーンワイヤが断線す
る虞がある。
The winding state of the crane wire in the crane winch (hoisting machine) is such that no matter which winding layer is taken, there is always no gap between adjacent wires,
It must be closely aligned. When the winding state in which a gap due to misalignment exists between the wires is left, the winding state collapses when the load suddenly increases, and there is a risk that the crane wire will be broken due to the accompanying shock.

そこで、第5のテレビカメラc5によって、時々刻々の巻
取状態を監視をするか、一旦記録をしておいた画像を、
必要なときに、モニターテレビの四半画面の一つに、早
送りによって再生して、点検をすれば、断線事故を事前
に回避することができるのである。
Therefore, the fifth television camera c 5 monitors the winding state from moment to moment, or
When necessary, if one of the quarter screens of a monitor TV is played back by fast-forwarding and inspected, a disconnection accident can be avoided in advance.

実施例S3においては、4個のテレビカメラc1〜c4の内の
任意の1個と第5のテレビカメラc5とを、必要に応じて
切換えて使用するようにして、4画面表示のままにして
もよいし、4画面マルチシステム用画像信号合成装置MM
4に代えて、5画面マルチシステム用画像信号合成装置M
M5を使用するようにしてもよい。後者の場合には、第5
の画面を相対的に小さくすることも出来る。
In the embodiment S3, an arbitrary one of the four TV cameras c 1 to c 4 and the fifth TV camera c 5 are switched and used as necessary to provide a four-screen display. You can leave it as it is, or image signal synthesizer MM for 4-screen multi-system
Image signal synthesizer M for 5 screen multi-system instead of 4
It is also possible to use the M 5. In the latter case, the fifth
You can also make the screen relatively small.

〔監視システムの実施例S4〕 実施例S4の監視システムは、実施例S1の監視システムに
対して、更に3個のテレビカメラc22,c33,c44を付加
し、これらのテレビカメラc22,c33,c44,と前記のテ
レビカメラc2,c3,c4、とを切換えて使用することがで
きるようにしたものである。
Monitoring system in Example S4 Example S4 in monitoring systems], to the monitoring system of Example S1, and additionally the three television cameras c 22, c 33, c 44 , these television cameras c 22 , C 33 , c 44 , and the television cameras c 2 , c 3 , c 4 described above can be switched and used.

実施例S4のカメラ配置によれば、死角が減少し、又作業
員等によって視野を遮られる機会も減少するので、超高
層構造物等の全周壁に亙って、より正確な状況把握をす
ることができる。
According to the camera arrangement of Example S4, the blind spots are reduced and the chances that the field of view is blocked by the worker or the like are also reduced, so that the situation can be grasped more accurately over the entire peripheral wall of the super high-rise structure or the like. be able to.

〔発明の効果〕〔The invention's effect〕

前述したところから既に明らかなように、周囲に稼動中
の超高層構造物等が相隣接して多数個存在しており、且
つ又これ等を衝突事故等により損傷乃至破壊をさせる時
は、引火・爆発等の不測の大災害を招来する虞がある場
合において、各個の超高層構造物等の解体又は建設工事
を、安全且つ確実に遂行するための十全な監視システム
は未だ嘗て存在していなかったところである。
As is clear from the above description, there are many adjacent high-rise structures, etc. that are in operation in the vicinity, and when they are damaged or destroyed due to a collision accident, etc.・ There are still sufficient monitoring systems to safely and reliably carry out the dismantling or construction work of individual super high-rise structures when there is a risk of causing an unforeseen disaster such as an explosion. This is where it didn't exist.

それゆえ、この発明の細大の技術的意義は、かかる厳し
い環境の下に置かれている各個の超高層構造物等の解体
又は建設工事を、安全且つ確実に遂行するための十全な
監視システムを初めて提供したところにある。
Therefore, the enormous technical significance of the present invention is to provide sufficient supervision for safely and reliably carrying out dismantling or construction work of individual super high-rise structures and the like placed under such a severe environment. The system is being offered for the first time.

前述の如き極めて困難なる超高層構造物の解体又は建設
のための工事において、この発明による監視システムを
採用するときは、 工事管理監督者等は、解体又は建設をすべき超高層
構造物等の遥か上方に位置決めをされている1個のテレ
ビカメラを通して、該超高層構造物等とそれを取り囲む
人的物的な諸対象から成る環境全体との双方にに関わる
大局的状況を、部分に分けることなくそのまま、言わば
鳥瞰図的に把握をすることが出来るようになり、又 作業平面内における超高層仮設構築物(作業足場)
上の適所に位置決めをされている(m−1)個(m≧
2)のテレビカメラを通して、作業ステージ上及び作業
平面内における局所的状況を、部分に分割して細密に、
言わば虫瞰図的に把握をすることが出来るようになり、
そして又何よりも、 単一のモニタテレビの画面全体をm個に区画して成
るm個の部分画面を通して、前記m個のテレビカメラに
よって撮像されて成る時々刻々のm個の画像を、一挙・
同時・併行的に目視をすることができるようになり、こ
れによって、前記超高層構造物を中心とする被監視対象
の全体について、屡々分裂し相対立する大局的な状況と
局所的な状況とを、極僅かの目線転換によって、瞬時に
して細大漏らさず、鳥瞰図的にも虫瞰図的にも、自在に
把握をすることができるようになったので、 作業ステージ上の作業員やクレーンオペレータ等に
対して適時適切な指令指示を発することが出来るように
なり、かてて加えて、 時々刻々に変化するm個の画像を一つの録画装置に
録画しておいて、必要時にこれを単一のモニターテレビ
上に一挙・同時・併行的に再生をして、極僅かの目線転
換を為すだけで、大局的状況と局所的状況とを、瞬時に
して細大漏らさず、鳥瞰図的にも虫瞰図的にも自在に把
握をすることが出来るようになるので、更なる工程の改
善や、万一の事故発生時の原因究明のための、科学的・
客観的なデータを提供することができることにもなるの
である。更にいえば、 この発明による監視システムは、労働基準監督署の
監督官に対して、前述の意味における科学的な手段と多
面的なデータとを同時に提供をすることにもなり、延い
ては人命尊重と無災害を目指す労働監督行政に対して、
科学的且つ客観的な確呼たる基礎を提供することにもな
るものである。
When adopting the monitoring system according to the present invention in the construction for dismantling or construction of a super high-rise structure which is extremely difficult as described above, when the construction management supervisor, etc. Through a single television camera positioned far above, the global situation relating to both the super high-rise structure and the entire environment consisting of human and physical objects surrounding it is divided into parts. It becomes possible to grasp the bird's-eye view as it is, without any need, and the super high-rise temporary structure (work scaffold) in the work plane.
(M-1) pieces (m ≧
Through the TV camera of 2), the local situation on the work stage and in the work plane is divided into parts and detailed,
In other words, it became possible to grasp from a perspective view,
And above all, through the m sub-screens formed by partitioning the entire screen of a single monitor TV into m sub-screens, the m pictures at every moment, which are captured by the m TV cameras, are displayed at once.
It becomes possible to observe simultaneously and in parallel, which makes it possible to see the global situation and the local situation in which the whole of the monitored object centering on the super high-rise structure is often divided and stands up against each other. With a slight change in the eyes, it is now possible to grasp the bird's-eye view and insect's-eye view freely without giving large leaks instantly. It becomes possible to issue appropriate command instructions to operators etc. in a timely manner. In addition to this, m images that change moment by moment are recorded in one recording device, and this is recorded when necessary. By playing all at once, simultaneously, and in parallel on a single monitor TV, and making a very slight change in the line of sight, the global situation and the local situation can be instantly and in a detailed bird's-eye view without leaking. Freely grasp from a perspective view So it will be able to, improvements and of a further step, for the emergency investigate the cause of the accident occurrence, scientific and
It will also be possible to provide objective data. Furthermore, the monitoring system according to the present invention simultaneously provides the inspector of the Labor Standards Inspection Office with scientific means in the above-mentioned sense and multifaceted data, which in turn leads to human life. For labor inspection administration aiming for respect and no accident,
It also provides a scientifically and objectively established basis.

又、この発明による工法を採用する時は、更なる作業の
安全と工期の短縮化とを同時に達成することが出来るの
である。
Further, when the construction method according to the present invention is adopted, it is possible to simultaneously achieve further work safety and shortening of the construction period.

【図面の簡単な説明】[Brief description of drawings]

第1図は、この発明の実施例S1による監視システムを、
構造物等の解体工事に適用した場合における、該構造物
等と監視システムとを示す模式図であって、同図(a)
はこの発明の監視システムを構成する諸エレメント間の
空間的配置関係を示す模式図、同図(b)は3個のテレ
ビカメラc2、c3、c4の配設位置関係を示すための水平断
面図である。 第2図は、この発明による監視システムのサブシステム
を成すm画面マルチシステムを構成する主なエレメント
間の接続関係を示す模式図である。 1…高層乃至超高層構造物(例えば超大型縦形ベッセ
ル)、2…高層乃至超高層仮設構築物(例えば作業用足
場)、3…作業用ステージ、4…第1番目の切断面、5
…台付ワイヤー、CB…クレーンブーム、6…クレーンフ
ック、7…クレーンワイヤー、8…ケーブル、c1〜c4
超小型CCDテレビカメラ、MTV1〜MTV2…m画面マルチシ
ステム用画像信号受信装置、VR…録画装置(例えばビデ
オテープレコーダー)、MM…m画面マルチシステム用画
像信号合成装置。
FIG. 1 shows a monitoring system according to an embodiment S1 of the present invention,
It is a schematic diagram which shows this structure etc. and a monitoring system at the time of applying to the dismantling construction of a structure etc., Comprising: (a) of the same figure.
Is a schematic diagram showing a spatial arrangement relationship between various elements constituting the surveillance system of the present invention, and FIG. 7B is a schematic view showing the arrangement positional relationship of the three television cameras c 2 , c 3 , c 4 . It is a horizontal sectional view. FIG. 2 is a schematic diagram showing the connection relationship between the main elements constituting the m-screen multi-system which is a subsystem of the surveillance system according to the present invention. DESCRIPTION OF SYMBOLS 1 ... High-rise to ultra-high-rise structure (for example, super-large vertical vessel), 2 ... High-rise to ultra-high-rise temporary construction (for example, work scaffolding), 3 ... Work stage, 4 ... First cut surface, 5
… Wire with pedestal, CB… Crane boom, 6… Crane hook, 7… Crane wire, 8… Cable, c 1 to c 4
Ultra-compact CCD TV camera, MTV 1 to MTV 2 ... m screen multi-system image signal receiving device, VR ... recording device (eg video tape recorder), MM ... m screen multi system image signal synthesizing device.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】作業用ステージ(3)を有する仮設構築物
(2)と、m(m≧2)個のテレビカメラ(c1〜cm
と、1種又は2種以上から成る1個又は複数個のM画面
マルチシステム用画像信号合成装置(MM)と、n(n≧
1)個の画像信号受信装置(MTV1〜MTVn)とから成り、 前記仮設構築物(2)は、構造物乃至構築物等から成る
被監視対象物(1)を囲繞する所定幅の環状領域内にお
いて、前記被監視対象物(1)と同程度の高さを成し、
且つ前記被監視対象物(1)の周囲を可及的広範囲に亙
って取り囲むような形状を成して、構築をされており、 前記m個のテレビカメラ(c1〜cm)は、第1グループ
と、第2グループと、第3グループとにグループ分けさ
れ、第1グループはr(m−1≧r≧1)個のテレビカ
メラ(c1〜cr)から成り、第2グループはs(m−1≧
r≧1)個のテレビカメラ(cr+1〜cr+s)から成り、第
3グループは残余のt(m−r−s≧t≧0)個のテレ
ビカメラから成り、従って、整数値r、s、tは式r+
s+t=mによって規定されており、 前記第1グループのr個のテレビカメラ(c1〜cr)につ
いては、優先順位第1位のテレビカメラ(c1)が、被監
視対象物の高さを遥かに超える高さを有する大型乃至超
大型クレーン等のクレーンブーム(CB)の先端部又は先
端部近傍に、クレーンワイヤー(7)とは許容最小限以
上の間隔を保持して吊下乃至取着をされ、優先順位第2
位以下のテレビカメラがある時(r≧2である時)はそ
れ等が前記クレーンブーム(CB)の中間部の側面等に沿
って適宜分散・取着をされており、 前記第2グループのs個のテレビカメラ(ct+1〜cr+s
については、その全部が夫々、前記所定幅の環状領域内
に前記仮設構築物(2)の他に利用可能な既設構築物が
存在しない場合には、前記仮設構築物(2)の適宜箇所
に、前記環状領域内に前記仮設構築物(2)の他に利用
可能な既設構築物が存在する場合には、前記仮設構築物
(2)と上記既設構築物との双方に亙る適宜箇所に、作
業平面及び作業ステージの移動に伴って移動出来且つ作
業平面内において可及的に対称且つ等距離配置となるよ
うに、支持をされており、 前記第3グループのテレビカメラについては、優先順位
第1位以下のテレビカメラがある時(t≧1である時)
はそれ等のテレビカメラが上記第1グループの配設箇所
及び第2グループの配設箇所以外の要配設箇所(例えば
台付けフックと台付けワイヤーの正常・異常を監視する
為の仮設構築物(2)上の適所、クレーンブーム(CB)
の旋回動作を監視する為の前記環状領域外の既設構築物
等の適所、クレーンウインチにおけるクレーワイヤーの
巻込み状態を監視するためのクレーンウインチ内外の適
所、等々)に配設をされており、 前記n個の画像信号受信装置(MTV1〜MTVn)について
は、2個のグループにグループ分けされ、先ず優先順位
第1位のu(u≧2)個の画像信号受信装置(MTV1〜MT
Vu)から成る第1のグループが、クレーンオペレーター
室に配設をされ、次いで優先順位第2位の(n−u)個
の画像信号受信装置(MTVu+1〜MTVn)から成るグループ
がある時(n≧2且つn−u≧1である時)は、それ等
が工事管理監督者用に配設をされており、且つ 前記m個のテレビカメラ(c1〜cm)と、前記1種又は2
種以上から成る1個乃至複数個のM画面マルチシステム
用画像信号合成装置(MM)と、前記n個の画像信号受信
装置(MTV1〜MTVn)とは、無線又は有線伝送路を介して
適宜縦続接続をされている 建設工事等における工程及び安全作業監視システム。
1. A temporary structure (2) having a working stage (3) and m (m ≧ 2) TV cameras (c 1 to cm ).
And one or more image signal synthesizers (MM) for M-screen multi-system consisting of one or more, and n (n ≧
1) consists of a plurality of image signal receiving devices (MTV 1 to MTV n ), and the temporary building (2) is within an annular area of a predetermined width surrounding the monitored object (1) consisting of a structure or a building. At the same height as the monitored object (1),
Moreover, it is constructed to have a shape that surrounds the monitored object (1) in the widest possible range, and the m TV cameras (c 1 to cm ) are The first group, the second group, and the third group are divided into groups. The first group includes r (m-1 ≧ r ≧ 1) TV cameras (c 1 to cr ) and the second group. Is s (m-1 ≧
r ≧ 1) TV cameras ( cr + 1 to cr + s ), and the third group consists of the remaining t (m−r−s ≧ t ≧ 0) TV cameras. Numerical values r, s, and t are the expressions r +
s + t = m, and for the r TV cameras (c 1 to cr ) of the first group, the TV camera (c 1 ) having the first priority is the height of the monitored object. The crane wire (7) should be hung or picked up at or near the tip of a crane boom (CB) such as a large or ultra-large crane with a height far exceeding Dressed, second priority
When there are TV cameras below the rank (when r ≧ 2), they are appropriately dispersed / attached along the side surface of the middle part of the crane boom (CB), etc. s TV cameras (ct + 1- cr + s )
In the case where there is no existing building other than the temporary building (2) in the ring-shaped area of the predetermined width, the whole of the ring is provided at an appropriate location of the temporary building (2). When there is an existing building that can be used in addition to the temporary building (2) in the area, the work plane and the work stage are moved to appropriate positions on both the temporary building (2) and the existing building. Are supported so that they can be moved with each other and are arranged symmetrically and equidistantly in the work plane as much as possible. Regarding the TV cameras of the third group, the TV cameras with the first priority or lower are Sometime (when t ≧ 1)
Is a temporary construction for monitoring the normality / abnormality of the mounting hooks and the mounting wires of those television cameras other than the mounting locations of the first group and the second group. 2) The right place, crane boom (CB)
Suitable location such as an existing structure outside the annular area for monitoring the turning operation of the crane, suitable location inside and outside the crane winch for monitoring the winding state of the clay wire in the crane winch, etc.), The n image signal receiving devices (MTV 1 to MTV n ) are divided into two groups, and the u (u ≧ 2) image signal receiving devices (MTV 1 to MT) having the first priority are first grouped.
The first group consisting of V u ) is arranged in the crane operator room, and then the group consisting of (n−u) image signal receiving devices (MTV u + 1 to MTV n ) of second priority. (When n ≧ 2 and n−u ≧ 1), they are arranged for the construction management supervisor and the m TV cameras (c 1 to cm ) , The above 1 or 2
One or a plurality of M-screen multi-system image signal synthesizers (MM) of at least one kind and the n image signal receivers (MTV 1 to MTV n ) are connected via a wireless or wired transmission line. A process and safety work monitoring system for construction work, etc. that are connected in cascade as appropriate.
【請求項2】1個乃至複数個の録画装置(VR)を有して
おり、 前記各録画装置(VR)は、前記クレーンオペレーター室
乃至前記工事管理監督者用に配設をされており、且つ 前記各録画装置(VR)の各画像信号入力端子は、前記1
個乃至複数個のM画面マルチシステム用画像信号合成装
置(MM)における所望の画像信号出力端子乃至前記n個
の画像信号受信装置(MTV1〜MTVn)における所望の画像
信号入力端子に接続をされている 請求項1記載の建設工事等における工程及び安全作業監
視システム。
2. It has one or a plurality of recording devices (VR), and each said recording device (VR) is arranged for the crane operator room or the construction management supervisor. Also, each image signal input terminal of each recording device (VR) is
Connect to a desired image signal output terminal in the image signal synthesizer (MM) for M or more M screen multi-systems or a desired image signal input terminal in the n image signal receivers (MTV 1 to MTV n ). The process and safe work monitoring system in the construction work according to claim 1.
【請求項3】多数のトランシーバーを有しており、 前記多数のトランシーバーはそれぞれ、作業ステージに
おける各作業員、クレーンオペレーター室におけるクレ
ーンオペレーター、工事管理監督者等に装備されている 請求項1又は2記載の建設工事等における工程及び安全
作業監視システム。
3. A plurality of transceivers are provided, and each of the plurality of transceivers is equipped to each worker on a work stage, a crane operator in a crane operator room, a construction management supervisor, and the like. Process and safety work monitoring system in the described construction work.
【請求項4】解体をすべき構造物乃至構築物即ち被解体
対象物(1)の周囲に、作業用ステージ(3)を有する
仮設構築物(2)を、鉛直面内に於いて高さが前記被解
体対象物(1)と同程度と成るように、且つ各水平面内
に於いて可及的広範囲に亙って被解体対象物(1)を取
り囲むように、仮設をする仮設構築物の仮設工程と、 前記被解体対象物(1)に於ける予定被切断ブロックi
(i=1,2,…,p)の最上端部に、一対の台付けフック
を、それらの固設位置が前記予定被切断ブロックiの重
心線に対して正確に点対称を成すように、溶接により固
設をする台付けフックの台付け工程と、 予定被切断ブロックiの切断・撤去工程と から成り、 前記予定被切断ブロックiの切断・撤去工程は、 大径の台付けワイヤー(5)の正確な中点に、大型乃至
超大型クレーンの巨大クレーンフック(6)を引っ掛
け、これを吊り上げ、前記被解体対象物(1)の最上端
面直近上位に移動・停止をさせ、それ等の最上端部に溶
接により固設されている前記一対の台付けフックに、前
記大径の台付けワイヤー(5)の両先端部に形成したワ
イヤーループを引っ掛ける引っ掛け素工程と、 前記第引っ掛け素工程の後に実行される素工程であっ
て、前記大径の台付けワイヤー(5)に対して、クレー
ンワイヤー(7)を介して、所定の張力、即ちその大き
さが前記被解体対象物(1)に於ける予定被切断ブロッ
クiの全重量を懸吊するに足る大きさであり、その作用
線が正確に前記予定被切断ブロックiの重心線と一致す
るような張力を掛け続ける張力付与素工程と、 前記張力付与素工程と略併行して実行され、前記作業用
ステージ(3)に対応する予定切断面iに於いて前記被
解体対象物(1)を切断器で切断する素工程であって、
第1段階と第2段階とから成っており、第1段階に於い
ては、前記予定切断面iに於ける前記被解体対象物
(1)上の予定周回切断線i上に、互いに等間隔を成す
r(r≧2)個の点と、これ等の点を夫々中央部に含む
ような適宜の長さのr個の周壁部分とを選択して、これ
等の周壁部分は切断をせず、残余のr箇所の周壁部分の
みを略スリット状に切断をし、第2段階においては、先
に切断をせずに残しておいたr箇所の周壁部分を、r人
の作業者が同時に同一速度をもって完全に切断をするよ
うにして成る予定切断面iの切断素工程と、 前記切断素工程の後に実行される素工程であって、前記
切断素工程に於いて切断されて成る被切断ブロックiを
前記大型クレーン等で吊り上げ、これを適宜水平・垂直
に移動させた後、予め準備をしておいた空所に吊り下ろ
す被切断ブロックiの撤去素工程と から成り、 前記予定被切断ブロックiの最上端部に対する台付けフ
ックの台付け工程は、前記仮設構築物の仮設工程と併行
して、乃至は前記仮設構築物の仮設工程に直接後続し
て、乃至は前記予定被切断ブロックiの切断・撤去工程
に直接先行して、実行される 高層乃至超高層構造物の解体工法。
4. A temporary structure (2) having a working stage (3) around a structure or structure to be disassembled, that is, an object to be disassembled (1), the height of which is said in a vertical plane. Temporary process of temporarily constructing a temporary structure so that the object to be dismantled (1) is of the same degree and surrounds the object to be dismantled (1) in each horizontal plane as much as possible. And the planned cut block i in the object to be disassembled (1)
At the uppermost end of (i = 1,2, ..., p), a pair of mounting hooks are provided so that their fixed positions are exactly point-symmetric with respect to the center of gravity line of the block i to be cut. , A step of attaching a pedestal hook that is fixed by welding, and a step of cutting / removing the planned block to be cut i. The cutting / removing step of the block to be cut i includes a large-diameter mounting wire ( Hook a huge crane hook (6) of a large or super-large crane at the exact midpoint of 5), lift it, move it to a position immediately above the uppermost end face of the object to be disassembled (1), and stop it. Hooking step of hooking the wire loops formed at both ends of the large-diameter mounting wire (5) on the pair of mounting hooks fixedly welded to the uppermost end of the It is a basic process that is executed after the process , A predetermined tension with respect to the large-diameter mounting wire (5) via the crane wire (7), that is, the magnitude of the predetermined cutting block i in the object to be disassembled (1) A tensioning element step of continuing to apply tension such that the total weight is sufficiently suspended and the line of action of which exactly matches the center of gravity line of the planned block to be cut i; A raw process which is executed in parallel and cuts the object to be disassembled (1) with a cutter at a planned cutting surface i corresponding to the working stage (3),
It consists of a first step and a second step, and in the first step, on the planned circular cutting line i on the object to be disassembled (1) on the planned cutting surface i, equidistant from each other. , R (r ≧ 2) points and r peripheral wall portions having an appropriate length such that these points are included in the central portion, and these peripheral wall portions are cut. However, only the remaining peripheral wall portion of the r portion is cut into a substantially slit shape, and in the second step, the r peripheral wall portion that has been left without cutting is r A cutting element process of a planned cutting surface i, which is made so as to completely cut at the same speed, and a cutting step performed after the cutting element step, which is cut in the cutting element step. Hoist the block i with the large crane, move it horizontally and vertically as appropriate, and then prepare in advance. The removal step of the block to be cut i that is hung in the empty space, and the step of mounting the mounting hook for the uppermost end of the planned block to be cut i is performed in parallel with the temporary step of the temporary construction. Or a method for disassembling a high-rise or super-high-rise structure, which is performed directly following the temporary construction step of the temporary construction or directly preceding the cutting / removing step of the planned block to be cut i.
【請求項5】建設中の構造物乃至構築物の周囲に、作業
用ステージを有する仮設構築物を、鉛直面内に於いて高
さが前記構造物等と同程度と成るように、且つ各水平面
内に於いて可及的広範囲に亙って前記構造物等を取り囲
むように、仮設をする仮設構築物の仮設工程と、 前記構造物等を構成すべきp(p≧1)個のブロックj
(j=1,2,…,p)のそれぞれの最上端部に唯一対の台付
けフックを固設する、台付けフックの台付け工程と、 台付けワイヤーをクレーンで吊り上げて、両先端部に形
成したワイヤーループを所定箇所にあるブロックjの台
付けフックに引っ掛ける台付けワイヤーの引っ掛け工程
と、 前記ブロックjを所定箇所から吊り上げて水平・垂直に
移動させ、基礎乃至既設のブロックj−1の上に吊り下
ろして仮載置する、ブロックjの仮載置工程と、 仮載置された前記ブロックjの台付けワイヤーに対して
前記ブロックjを懸吊するに足る張力を掛け続ける張力
保持工程と、 前記張力保持工程に併行する工程であって、ブロックj
−1の上側のフランジとブロックjの下側のフランジと
の、各輪郭同士と各ボルト孔同士とを整合・合致させる
両ブロックの整合工程と、 前記両ブロックの各ボルト孔に各ボルトを挿通して、各
ナットで締着するボルト・ナットの締着工程と、 前記両フランジの合せ目を溶接によって完全に固着密閉
し、且つボルトの頭部の周辺とナットの周辺とに肉盛溶
接を施してボルト孔を完全に密閉する工程と、 前記ブロックjに対する台付けフックと台付けワイヤー
とを除去する工程と からなる構造物等の建設工法。
5. A temporary structure having a work stage is provided around a structure or a structure under construction so that the height of the structure is approximately the same as that of the structure or the like in the vertical plane. , A temporary construction process of a temporary structure for temporarily constructing the structure or the like so as to surround the structure or the like as far as possible, and p (p ≧ 1) blocks j to form the structure or the like.
(J = 1,2, ..., p) Each pair of mounting hooks is fixed to the top end of each, and the mounting process of the mounting hooks is performed. The step of hooking the mounting wire by hooking the wire loop formed on the mounting hook of the block j at a predetermined location, and lifting the block j from the predetermined location to move it horizontally / vertically to form a foundation or an existing block j-1. Temporary placing step of the block j, which is suspended and temporarily placed on the table, and tension holding for continuing to apply sufficient tension for suspending the block j to the mounting wire of the temporarily placed block j And a step which is performed in parallel with the tension holding step,
-1 aligning both contours and bolt holes of the upper flange of -1 and the lower flange of block j, and inserting each bolt into each bolt hole of both blocks. Then, the bolts and nuts are tightened with each nut, and the joints of both flanges are completely fixed and sealed by welding, and overlay welding is performed around the bolt head and the nut. A construction method for a structure or the like, which comprises a step of completely sealing the bolt hole by applying the step and a step of removing the mounting hook and the mounting wire for the block j.
JP9936389A 1989-04-19 1989-04-19 Process and safety work monitoring system in construction work, dismantling and construction method Expired - Fee Related JPH0718256B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9936389A JPH0718256B2 (en) 1989-04-19 1989-04-19 Process and safety work monitoring system in construction work, dismantling and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9936389A JPH0718256B2 (en) 1989-04-19 1989-04-19 Process and safety work monitoring system in construction work, dismantling and construction method

Publications (2)

Publication Number Publication Date
JPH02279873A JPH02279873A (en) 1990-11-15
JPH0718256B2 true JPH0718256B2 (en) 1995-03-01

Family

ID=14245487

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9936389A Expired - Fee Related JPH0718256B2 (en) 1989-04-19 1989-04-19 Process and safety work monitoring system in construction work, dismantling and construction method

Country Status (1)

Country Link
JP (1) JPH0718256B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3406882B2 (en) * 2000-02-17 2003-05-19 京成電鉄株式会社 Demolition of underwater structures
WO2025069928A1 (en) * 2023-09-29 2025-04-03 株式会社小松製作所 Water spray system, display device, and water spray machine control method

Also Published As

Publication number Publication date
JPH02279873A (en) 1990-11-15

Similar Documents

Publication Publication Date Title
US20070285222A1 (en) Safety Monitoring System
JP6312109B1 (en) Safety device for temporary scaffold
CN103470093A (en) Concrete chimney dismantling device and dismantling method
CA2878719A1 (en) A burner boom with a deluge system
CN109471398A (en) Supervision and interaction method of safety robot in electric power experiment operation site
JPH0718256B2 (en) Process and safety work monitoring system in construction work, dismantling and construction method
KR20170060711A (en) Drilling Tower Inspection Device using Drone
JP4659563B2 (en) Temporary scaffold device for dismantling and method for dismantling ultra-high structure using the device
JP2012127103A (en) Demolition method of cylindrical structure
JP6979780B2 (en) Reactor building demolition method and equipment
CN110077963B (en) Installation method of large tank
WO2016056906A1 (en) Scaffolding for storage tanks in the oil, gas and chemical industry.
KR20120054251A (en) Installation structure of scaffold
RO135345B1 (en) Communication system and control method for nuclear reactor equipments
CN109129710A (en) water jet pipe cutting method and pipe cutting system
JP2559257B2 (en) Construction method of construction materials
JP3050940B2 (en) Remote monitoring device
CN117145188A (en) An automatically adjustable high-altitude anti-sway working platform and its moving method
KR200479690Y1 (en) Crane for interal inspection and repairing of ship
CN209890196U (en) Lifting platform for boiler hearth maintenance
JP7452814B2 (en) Dismantling method and system for cylindrical structures
CN204270110U (en) Lifting monitors analysis and Control system
CN219156339U (en) Steel wire rope damage-preventing safety isolation protection device
CN104649160A (en) Monitoring system for maintenance and servicing of jib gantry crane
JP2003301615A (en) Tower-shaped structure dismantling apparatus and tower-shaped structure dismantling method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees