Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3408857B2 - Sediment transport equipment - Google Patents
[go: Go Back, main page]

JP3408857B2 - Sediment transport equipment - Google Patents

Sediment transport equipment

Info

Publication number
JP3408857B2
JP3408857B2 JP2982394A JP2982394A JP3408857B2 JP 3408857 B2 JP3408857 B2 JP 3408857B2 JP 2982394 A JP2982394 A JP 2982394A JP 2982394 A JP2982394 A JP 2982394A JP 3408857 B2 JP3408857 B2 JP 3408857B2
Authority
JP
Japan
Prior art keywords
earth
sand
air
pipe
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2982394A
Other languages
Japanese (ja)
Other versions
JPH07238786A (en
Inventor
敏彦 塩入
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP2982394A priority Critical patent/JP3408857B2/en
Publication of JPH07238786A publication Critical patent/JPH07238786A/en
Application granted granted Critical
Publication of JP3408857B2 publication Critical patent/JP3408857B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】 【0001】 【産業上の利用分野】本発明は土砂搬送装置に係り、特
にシールド工法における切羽で発生する土砂を地上に搬
出するための装置に関する。 【0002】 【従来の技術】従来より、シールド工法における切羽で
発生する土砂を地上に搬出するための土砂搬送装置とし
ては、例えば図2に示すものがある。 【0003】これはシールド掘削機10から排出される
土砂11をバッテリー機関車12に積載して、立て坑1
3まで搬送した後、地上14に搬送するものである。立
て坑13の底部にはピストンポンプ15が設置されてお
り、このピストンポンプ15から地上14に至るパイプ
16が延出されている。 【0004】そして、前記ピストンポンプ15には土砂
11、あるいは土砂に必要に応じて水を加えたものが搬
入され、これらは上方に圧送される。地上では圧送され
た土砂が排出され、トラック17等に積載して運搬す
る。 【0005】 【発明が解決しようとする課題】しかし、前記した従来
のものにおいては、土砂11を立て坑13の高さ分だけ
上方に押し上げる必要があるが、その高さは専らピスト
ンポンプ15の能力に依存しており、高くなる程急激に
抵抗が増大する。これはパイプ16内の圧力が高まり土
砂11とパイプ16との抵抗が増大することに起因して
いる。 【0006】したがってある限界以上の高さの搬出は極
めて困難となる。また、土質によってはピストンポンプ
15で排出し難い場合がある。また、従来はバッテリー
機関車12の往復によって土砂11を搬送していたため
能率が悪く、さらにバッテリー機関車12の運行にはレ
ール18が不可欠なためその設置作業が必要となりコス
ト高となる。そして、バッテリー機関車12の運行にあ
たっては坑内に土砂が飛散し、坑内が汚れる原因ともな
る。 【0007】さらに、ピストンポンプ15は一般に大型
で高重量の装置であるが、これを狭い坑内に設置する必
要があることから、その設置や撤去作業が繁雑となるの
は勿論、坑内への資材の搬出入も困難となるため作業性
が著しく低下する虞れがある。 【0008】本発明は前記事項に鑑みてなされたもの
で、高低差が大きい場合でも円滑に土砂排出作業が可能
となるとともに、坑内に大型の土砂排出設備を設置する
必要がなく低コストで作業ができるようにした土砂搬送
装置を提供することを技術的課題とする。 【0009】 【課題を解決するための手段】本発明は前記技術的課題
を解決するために、シールド工法における切羽で発生す
る土砂を地上に搬出するための装置において以下のよう
な構成とした。 【0010】即ち、切羽側と地上側とを連結する搬送パ
イプ1と、この搬送パイプ1の排出側2に接続された吸
引ポンプ3と、前記搬送パイプ1の吸入側8に設けられ
た土砂搬入機4と、前記搬送パイプ1の中途に開口する
空気圧入口5と、前記空気圧入口5へ空気を圧送する空
気ポンプ6とを備えている。 【0011】そして、前記土砂搬入機4から搬送パイプ
1内へ圧送された土砂を前記空気圧入口5から吸引ポン
プ3へ至る空気流により搬送するように構成したことを
技術的手段とする。 【0012】さらに、前記土砂搬送機4と前記空気圧入
口5との間に余剰の空気を逃すための空気逃がし弁を
けている。また、前記空気圧入口5は搬送パイプ1の長
さに応じて複数箇所設けるのがよい。 【0013】なお、吸引ポンプ3の前段に空気と土砂と
を分別するセパレーターを設けるのが望ましい。 【0014】 【作用】土砂搬入機4から搬送パイプ1内へ土砂が圧送
されるとともに、空気ポンプ6から空気圧入口5へ空気
が圧送される。これと同時に吸引ポンプ3が作動する。
すると搬送パイプ1内に空気圧入口5から吸引ポンプ3
へ至る空気流が発生する。土砂はこの空気流によって上
方に移送され、地上に排出される。 【0015】このように、搬送パイプ16は加圧と吸引
とがなされることで内部の圧力が必要以上に高くなるこ
とはなく、また、土質によって搬送し難くなるというこ
ともない。さらに、土砂の搬送距離を長くしても従来の
ように抵抗が極端に増大することがないので、大出力の
ポンプを使用する必要もない。 【0016】なお、前記土砂搬入機4と前記空気圧入口
5との間に余剰の空気を逃がすための空気逃がし弁7
は、空気圧によって土砂が土砂搬入機4から逆流しない
ようにするためのものである。 【0017】また、土砂の連続搬送が可能となるため従
来のような土砂をピストン輸送する必要がなく土砂排出
能率が大きく向上する。さらにレールが不要となり坑内
が汚れることもない。 【0018】そして、ピストンポンプ等は必要としない
ので、その設置や撤去作業はなく工期の短縮をも図るこ
とができる。 【0019】 【実施例】本発明の実施例を図1に基づいて説明する。
この実施例はシールド掘削機10の後方から連続的に排
出される土砂を地上に搬出するための装置である。なお
シールド掘削機10が設置してある坑は横坑20であ
り、この水平坑20に連続した立坑21から土砂を排出
する。 【0020】前記横坑20と立坑21にはシールド掘削
機10の切羽側と地上側とを連結する搬送パイプ1が設
置されている。この搬送パイプ1の排出側2には吸引
(真空)ポンプ3が接続されている。この吸引ポンプ3
はモータ3aで駆動されるようになっており、吸引ポン
プ3と搬送パイプ1との間には土砂と空気とを分離する
セパレーター3bが介挿されている。 【0021】一方、前記搬送パイプ1の吸入側には土砂
搬入機4が設けられている。この土砂搬入機4は筒の内
部にスクリュー4aを回転できるように配置してなり、
筒の先端からスクリュー4aで土砂をかき込むようにな
っている。 【0022】前記搬送パイプ1の中途には空気圧入口5
が3カ所設けられており、この空気圧入口5には加圧空
気パイプ22が接続されている。この加圧空気パイプ2
2の先端には前記空気圧入口5へ空気を圧送する空気ポ
ンプ6が接続されている。この空気ポンプ6はモーター
6aで駆動される。 【0023】なお、前記空気圧入口5から吸引ポンプ3
寄りの搬送パイプ1にはバキュームゲージ5aが設けら
れているとともに、このバキュームゲージ5aに連動す
るスイッチ5bが設けられている。このスイッチ5bは
電磁ソレノイド5cを作動させ、この電磁ソレノイド5
cに連動するよう設けられた空気弁5dの空気流量を制
御するようになっている。この空気弁5dは空気圧入口
5と加圧空気パイプ22との間に介挿されており、空気
ポンプ6から前記搬送パイプ1の内部に流入する空気の
流量を制御するように構成されている。 【0024】なお、前記土砂搬入機4と前記空気圧入口
5との間には余剰の空気を逃がすための空気逃がし弁7
が設けてある。ここで、土砂を搬送するに際しては、ま
ず土砂搬入機4、空気ポンプ6を作動させる。すると搬
送パイプ1内に空気圧入口5から吸引ポンプ3へ至る空
気流が発生する。土砂はこの空気流によって上方に移送
され、地上に排出される。このとき、搬送パイプ1内の
圧力は常にバキュームゲージ5aにより監視されてい
る。 【0025】即ち、通常は空気圧入口5から1気圧の圧
力で空気が供給されているが、土砂の量が増大する等し
て搬送パイプ1内の真空度が増すと前記空気弁5dを開
き閉塞土砂を吹き飛ばす。一方、必要以上の空気が空気
圧入口5から流入しているときは前記空気弁5dを調整
して適量の空気だけが入るように作用する。 また、空
気逃がし弁7は、空気圧によって土砂が土砂搬入機4か
ら逆流しないよう、その流量は別途圧力計で制御されて
いる。 【0026】このように、搬送パイプ16は加圧と吸引
とがなされることで内部の圧力が必要以上に高くなるこ
とはなく、また、土質によって搬送し難くなるというこ
ともない。したがって、内部を流れる土砂は大きな抵抗
がなく円滑に移送される。 【0027】また、土砂の連続搬送が可能となるため従
来のような土砂をピストン輸送する必要がなく土砂排出
能率が大きく向上する。さらに従来必要であったバッテ
リー機関車が不要となるため坑内が汚れることもない。
そして、ピストンポンプ等は必要としないので、その
設置や撤去作業はなく工期の短縮をも図ることができ
る。特に小断面のトンネルにあっては十分な設置スペー
スがないため特に有効である。 【0028】 【発明の効果】本発明によれば、シールド工法で排出さ
れる土砂を搬送するに際し、搬送パイプを設けこの搬送
パイプ内を吸引及び加圧して土砂を搬送するように構成
したので、搬送パイプ内の圧力上昇が抑制され高低差が
大きくとも容易に搬送できる。また連続排出が可能とな
り作業能率が大幅に向上し、しかも坑内が汚れる虞れも
ない。 【0029】また坑内での設備が小型で済むため、低コ
ストでしかも工期の短縮をも図ることができる。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for transporting earth and sand, and more particularly to an apparatus for transporting earth and sand generated from a face in a shield method to the ground. 2. Description of the Related Art Conventionally, there is a sediment transporting apparatus for carrying out sediment generated at a face in a shield method to the ground, for example, as shown in FIG. [0003] In this method, earth and sand 11 discharged from a shield excavator 10 are loaded on a battery locomotive 12, and the shaft 1
3 and then to the ground 14. A piston pump 15 is provided at the bottom of the shaft 13, and a pipe 16 extending from the piston pump 15 to the ground 14 extends. [0004] The earth and sand 11 or the earth and sand to which water is added as required is carried into the piston pump 15, and these are pumped upward. On the ground, the pumped earth and sand is discharged, loaded on a truck 17 or the like, and transported. [0005] However, in the above-mentioned prior art, it is necessary to push the earth and sand 11 upward by the height of the vertical shaft 13, but the height of the earth It depends on the ability, and the higher the resistance, the more the resistance increases sharply. This is because the pressure in the pipe 16 increases and the resistance between the soil 11 and the pipe 16 increases. [0006] Therefore, it is extremely difficult to carry out above a certain height. In addition, it may be difficult to discharge with the piston pump 15 depending on the soil. Conventionally, the earth and sand 11 were transported by reciprocation of the battery locomotive 12, resulting in poor efficiency. In addition, since the rail 18 is indispensable for the operation of the battery locomotive 12, installation work is required and the cost increases. When the battery locomotive 12 is operated, the earth and sand scatter in the pit, which may cause the pit to become dirty. [0007] Furthermore, the piston pump 15 is generally a large and heavy device. However, since the piston pump 15 needs to be installed in a narrow mine, the installation and removal work is complicated, and the material for the mine is not limited. Also, it is difficult to carry in and out, so that workability may be significantly reduced. [0008] The present invention has been made in view of the above-mentioned problems, and enables smooth discharge of sediment even when the height difference is large. It is an object of the present invention to provide a soil and sand transport device capable of performing the above-mentioned steps. Means for Solving the Problems In order to solve the above-mentioned technical problems, the present invention has the following configuration in an apparatus for carrying out earth and sand generated from a face in a shield method to the ground. That is, a transport pipe 1 connecting the face side and the ground side, a suction pump 3 connected to a discharge side 2 of the transport pipe 1, and a sediment loading provided on a suction side 8 of the transport pipe 1. And a pneumatic inlet 5 opening in the middle of the transport pipe 1, and an air pump 6 for pumping air to the pneumatic inlet 5. The technical means is that the earth and sand sent from the earth and sand loading machine 4 into the conveying pipe 1 is conveyed by an air flow from the air pressure inlet 5 to the suction pump 3. Further, an air release valve for releasing excess air is provided between the earth and sand transporter 4 and the air pressure inlet 5.
I am. Further, it is preferable to provide a plurality of air pressure inlets 5 according to the length of the transport pipe 1. It is desirable to provide a separator for separating air and earth and sand at a stage preceding the suction pump 3. The earth and sand is pressure-fed from the earth and sand loading machine 4 into the transport pipe 1, and the air is also pressure-fed from the air pump 6 to the air pressure inlet 5. At the same time, the suction pump 3 operates.
Then, the suction pump 3 is inserted into the transport pipe 1 from the air pressure inlet 5.
An airflow is generated that leads to Sediment is transported upward by this air flow and discharged to the ground. As described above, since the transport pipe 16 is pressurized and suctioned, the internal pressure does not increase more than necessary, and the transport does not become difficult due to the soil. Further, even if the transport distance of the earth and sand is lengthened, the resistance does not increase extremely unlike the conventional case, so that it is not necessary to use a high-output pump. An air release valve 7 for releasing excess air between the earth and sand carry-in machine 4 and the air pressure inlet 5 is provided.
Is for preventing the earth and sand from flowing backward from the earth and sand carry-in machine 4 by air pressure. Further, since the earth and sand can be continuously conveyed, it is not necessary to transport the earth and sand as in the prior art, and the earth and sand discharge efficiency is greatly improved. Furthermore, rails are not required, and the mine is not contaminated. Since no piston pump or the like is required, there is no need to install or remove the piston pump, so that the construction period can be shortened. An embodiment of the present invention will be described with reference to FIG.
This embodiment is an apparatus for carrying earth and sand continuously discharged from the rear of a shield excavator 10 to the ground. The shaft where the shield excavator 10 is installed is a horizontal shaft 20, and the earth and sand is discharged from a shaft 21 continuous with the horizontal shaft 20. A transport pipe 1 for connecting the face side of the shield excavator 10 and the ground side is installed in the horizontal shaft 20 and the vertical shaft 21. A suction (vacuum) pump 3 is connected to the discharge side 2 of the transport pipe 1. This suction pump 3
Is driven by a motor 3a, and a separator 3b for separating earth and sand and air is interposed between the suction pump 3 and the transport pipe 1. On the other hand, on the suction side of the transport pipe 1, a sediment carrying-in machine 4 is provided. This earth and sand carry-in machine 4 is arranged inside the cylinder so that the screw 4a can be rotated,
Earth and sand are scraped in from the tip of the cylinder with the screw 4a. In the middle of the conveying pipe 1, an air pressure inlet 5 is provided.
Are provided at three locations, and a pressurized air pipe 22 is connected to the air pressure inlet 5. This pressurized air pipe 2
An air pump 6 for pumping air to the air pressure inlet 5 is connected to the tip of 2. The air pump 6 is driven by a motor 6a. It should be noted that the suction pump 3
The transport pipe 1 is provided with a vacuum gauge 5a and a switch 5b interlocked with the vacuum gauge 5a. The switch 5b activates the electromagnetic solenoid 5c, and the electromagnetic solenoid 5c
The air flow rate of the air valve 5d provided so as to be interlocked with c is controlled. The air valve 5 d is interposed between the air pressure inlet 5 and the pressurized air pipe 22, and is configured to control the flow rate of air flowing from the air pump 6 into the inside of the transport pipe 1. An air release valve 7 for releasing excess air is provided between the earth and sand carry-in machine 4 and the air pressure inlet 5.
Is provided. Here, when conveying the earth and sand, first, the earth and sand carry-in machine 4 and the air pump 6 are operated. Then, an air flow from the air pressure inlet 5 to the suction pump 3 is generated in the transport pipe 1. Sediment is transported upward by this air flow and discharged to the ground. At this time, the pressure in the transport pipe 1 is constantly monitored by the vacuum gauge 5a. That is, normally, air is supplied from the air pressure inlet 5 at a pressure of 1 atm. However, when the degree of vacuum in the transport pipe 1 increases due to an increase in the amount of earth and sand, the air valve 5d is opened and closed. Blow off earth and sand. On the other hand, when more air than necessary is flowing from the air pressure inlet 5, the air valve 5d is adjusted so that only an appropriate amount of air enters. The flow rate of the air release valve 7 is separately controlled by a pressure gauge so that the earth and sand do not flow backward from the earth and sand loading machine 4 due to the air pressure. As described above, since the transport pipe 16 is pressurized and suctioned, the internal pressure does not increase more than necessary, and the transport does not become difficult due to the soil. Therefore, the earth and sand flowing inside is smoothly transferred without a large resistance. Further, since the earth and sand can be continuously conveyed, it is not necessary to transport the earth and sand as in the prior art, thereby greatly improving the earth and sand discharge efficiency. Further, since the conventional battery locomotive is not required, the pit is not contaminated.
Since no piston pump or the like is required, there is no need to install or remove the piston pump, and it is possible to shorten the construction period. Particularly in a tunnel having a small cross section, it is particularly effective because there is not enough installation space. According to the present invention, when transporting the earth and sand discharged by the shield method, a transportation pipe is provided and the interior of the transportation pipe is suctioned and pressurized to transport the earth and sand. The rise in pressure in the transfer pipe is suppressed, and the transfer can be easily performed even if the height difference is large. In addition, continuous discharge becomes possible, and the work efficiency is greatly improved. Further, since the equipment in the mine can be reduced in size, the cost can be reduced and the construction period can be shortened.

【図面の簡単な説明】 【図1】本発明の一実施例を示す側面図である。 【図2】従来の土砂搬送装置を示す側面図である。 【符号の説明】 1・・搬送パイプ、 2・・排出側、 3・・吸引ポンプ、 4・・土砂搬入機、 5・・空気圧入口、 6・・空気ポンプ、 7・・空気逃がし弁、 8・・吸入側。[Brief description of the drawings] FIG. 1 is a side view showing an embodiment of the present invention. FIG. 2 is a side view showing a conventional earth and sand transport device. [Explanation of symbols] 1 .... conveying pipe, 2 ・ ・ Discharge side, 3. Suction pump, 4 ・ ・ Equipment for earth and sand, 5 ... Air pressure inlet, 6. Air pump, 7 ... Air release valve, 8. The suction side.

Claims (1)

(57)【特許請求の範囲】 【請求項1】 シールド工法における切羽で発生する土
砂を地上に搬出するための装置において、 切羽側と地上側とを連結する搬送パイプと、この搬送パ
イプの排出側に接続された吸引ポンプと、前記搬送パイ
プの吸入側に設けられた土砂搬入機と、前記搬送パイプ
の中途に開口する空気圧入口と、前記空気圧入口へ空気
を圧送する空気ポンプと、前記土砂搬入機と前記空気圧
入口との間に余剰の空気を逃すために設けられた空気逃
がし弁とを備え、前記土砂搬入機から搬送パイプ内へ圧
送された土砂を前記空気圧入口から吸引ポンプへ至る空
気流により搬送することを特徴とする土砂搬送装置。
(57) [Claims 1] In an apparatus for carrying out earth and sand generated on a face in a shield method, a transport pipe connecting a face side and a ground side, and discharging of the transport pipe Pump connected to the suction pipe, an earth and sand loading machine provided on the suction side of the transfer pipe, an air pressure inlet opening in the middle of the transfer pipe, an air pump for pumping air to the air pressure inlet, and the earth and sand Loading machine and the air pressure
An air vent provided to escape excess air between the inlet
An earth and sand transport device comprising a release valve and transporting the earth and sand fed from the earth and sand loading machine into a transport pipe by an air flow from the air pressure inlet to a suction pump.
JP2982394A 1994-02-28 1994-02-28 Sediment transport equipment Expired - Fee Related JP3408857B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2982394A JP3408857B2 (en) 1994-02-28 1994-02-28 Sediment transport equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2982394A JP3408857B2 (en) 1994-02-28 1994-02-28 Sediment transport equipment

Publications (2)

Publication Number Publication Date
JPH07238786A JPH07238786A (en) 1995-09-12
JP3408857B2 true JP3408857B2 (en) 2003-05-19

Family

ID=12286753

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2982394A Expired - Fee Related JP3408857B2 (en) 1994-02-28 1994-02-28 Sediment transport equipment

Country Status (1)

Country Link
JP (1) JP3408857B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107218045B (en) * 2017-07-03 2019-03-26 中车建设工程有限公司 The rapid constructing method of rocky stratum tunneling subway station entrance tunneling section

Also Published As

Publication number Publication date
JPH07238786A (en) 1995-09-12

Similar Documents

Publication Publication Date Title
RU2527867C2 (en) Method used in material pneumatic feed system and material pneumatic feed system
RU2549424C2 (en) Method and device of material pneumatic conveyance system
RU2099156C1 (en) Method of and system for washing of tank and extraction and processing of liquid remnants
TWI469906B (en) Method and apparatus in pneumatic material transport system
JP2011506233A (en) Method and apparatus for pneumatic material transfer system
JP2011506230A (en) Pneumatic material transfer system method and pneumatic material transfer system
JP2011506229A (en) Method and apparatus for pneumatic material transfer system
CA2466096A1 (en) Proppant recovery system
JP3408857B2 (en) Sediment transport equipment
JP2019501091A (en) Method, apparatus and system for treating waste
CN216642191U (en) Tunneling working face dust control and removal system of tunneling and anchoring all-in-one machine
CN207986107U (en) A kind of dregs elevator
CN113772427B (en) Combined vehicle-mounted pneumatic conveying device for bulk material conveying
US6213139B1 (en) Hybrid solids conveying system
JP4249084B2 (en) Excavation soil removal method of muddy water type shield method
KR102128720B1 (en) Floating ash drainage device for incinerators
JP4352615B2 (en) Earth and sand transport method and apparatus
JP2837602B2 (en) Sediment transport system for shield method
JP2005133472A (en) Excavated soil taking-out method applicable to caisson settling work, and device therefor
JPH06330899A (en) Pneumatic mud carrier
JPH11229429A (en) Transporting method and device for excavated soil
CN202687260U (en) Dust-conveying device for inclined chute pipe
KR100973356B1 (en) Integrated waste by-product collection device
JPH11152993A (en) Sand and soil conveying device for jacking device
JP2521210B2 (en) Excavation and sediment discharge transport device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080314

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20090314

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090314

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 7

Free format text: PAYMENT UNTIL: 20100314

LAPS Cancellation because of no payment of annual fees