Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3445255B2 - Slope leveling machine and slope leveling method - Google Patents
[go: Go Back, main page]

JP3445255B2 - Slope leveling machine and slope leveling method - Google Patents

Slope leveling machine and slope leveling method

Info

Publication number
JP3445255B2
JP3445255B2 JP2001106440A JP2001106440A JP3445255B2 JP 3445255 B2 JP3445255 B2 JP 3445255B2 JP 2001106440 A JP2001106440 A JP 2001106440A JP 2001106440 A JP2001106440 A JP 2001106440A JP 3445255 B2 JP3445255 B2 JP 3445255B2
Authority
JP
Japan
Prior art keywords
slope
leveling
foundation
rubble
leveling member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001106440A
Other languages
Japanese (ja)
Other versions
JP2002294719A (en
Inventor
智徳 野田
Original Assignee
有限会社善徳丸建設
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 有限会社善徳丸建設 filed Critical 有限会社善徳丸建設
Priority to JP2001106440A priority Critical patent/JP3445255B2/en
Publication of JP2002294719A publication Critical patent/JP2002294719A/en
Application granted granted Critical
Publication of JP3445255B2 publication Critical patent/JP3445255B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、海上に敷設する
防波堤等の重量構造物を設置する捨石基礎の法面を突き
固める法面均し機、および法面均し方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a slope leveling machine for stamping the slope of a rubble foundation for installing heavy structures such as breakwaters laid on the sea, and a slope leveling method.

【0002】[0002]

【従来の技術】従来より、防波堤等の港湾構造物の基礎
に捨石基礎が用いられている。捨石基礎は、1個あた
り、その重さが数十〜数千kg、周囲長が1〜2mであ
る比較的大きな石材を海底に多数投入して、形成した断
面台形のマウントである。捨石基礎の上にはケーソン等
の重量構造物が設置される。前記ケーソン等の重量構造
物の設置安定性を確保するため、基礎工事において捨石
基礎の天端を均す作業が行われている。
2. Description of the Related Art Conventionally, rubble stone foundations have been used as foundations for port structures such as breakwaters. The rubble foundation is a mount with a trapezoidal cross section formed by inserting a large number of relatively large stone materials having a weight of several tens to several thousands kg and a perimeter of 1 to 2 m into the seabed. Heavy structures such as caisson will be installed on the rubble foundation. In order to secure the installation stability of the heavy structures such as the caisson, work for leveling the top end of the rubble foundation is performed in the foundation work.

【0003】以下に、捨石基礎の天端を均す従来の工法
である重錘式捨石均し工法について説明する。この工法
は、鋼製のアングルでトラス状に組まれ、数m四方の底
面を有する櫓の下端に鋼塊を取り付けた重錘で、捨石基
礎の天端を突き固める工法である。重錘の重量は、約5
0tである。具体的には、上記重錘の上端を起重機船の
起重機によって支持し、該起重機でこの重錘を天端から
数m上方に吊り上げ、そして吊り上げた重錘を天端に落
下させる。これを、捨石基礎の天端全体にわたって行
い、該天端全体を突き固めるとともに均していた。
Hereinafter, a weight type rubble leveling method, which is a conventional method for leveling the top of a rubble foundation, will be described. This method is a method in which the top end of the rubble stone foundation is tamped with a weight that is assembled in a truss shape with steel angles and has a steel ingot attached to the lower end of a turret having a bottom of several meters square. The weight weighs about 5
It is 0t. Specifically, the upper end of the weight is supported by a hoist of a hoist ship, the hoist lifts the weight several meters above the top, and the hoist is dropped to the top. This was done over the entire top of the rubble foundation, and the whole top was tamped and leveled.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、捨石基
礎の法面については該法面が傾斜面であったことから、
上述した重錘式捨石均し工法が利用できなかった。この
ため、捨石基礎の法面を均す作業は潜水士による手作業
で行われており、作業効率が悪いという問題があった。
また、作業を行なった潜水士の技術の差によって仕上が
りが均一にならないという問題があった。
However, since the slope of the rubble foundation was an inclined surface,
The above-mentioned weight type rubble leveling method could not be used. Therefore, the work to level the slope of the rubble foundation is performed manually by the diver, and there is a problem that the work efficiency is poor.
In addition, there was a problem that the finish was not uniform due to the difference in skills of the divers who worked.

【0005】さらに、海中での作業であることから潜水
士の安全性の確保が難しいという問題があった。特に、
最近では港湾工事自体の大型化にともなって、上記法面
を均す作業が水深の深い場所での大水深作業になってい
るため、潜水病に対する安全性の向上が要求される。
Further, there is a problem that it is difficult to secure the safety of the diver because the work is performed under the sea. In particular,
Recently, with the increase in the size of port construction itself, the work for leveling the slopes has become deep-water work in deep water places, and therefore improvement in safety against diving diseases is required.

【0006】この発明の目的は、捨石基礎の法面を均す
工程の作業効率を向上させるとともに、仕上がりを均一
にでき、さらには作業員の安全性の向上が図れる法面均
し機、および法面均し方法を提供することにある。
The object of the present invention is to improve the work efficiency of the step of leveling the slope of a rubble foundation, to make the finish uniform, and to improve the safety of workers, and To provide a slope leveling method.

【0007】[0007]

【課題を解決するための手段】この発明の法面均し機
は、上記課題を解決するために以下の構成を備えてい
る。
The slope leveling machine of the present invention has the following constitution in order to solve the above problems.

【0008】(1)石材を積み重ねた捨石基礎の天端に
載置する台座と、上記台座の側面に設けられた連結部に
連結され、上記捨石基礎の法面に沿って置かれる板状の
均し部材と、を備え、上記台座には、上記天端との当接
面に滑り止め部材が取り付けられており、 上記均し部材
は、上記台座に対して、上記捨石基礎の法面から持ち上
げる方向に回動自在に連結されている。
[0008] (1) and the base to be placed on the top end of the riprap foundation stacked stone, is <br/> connected to the connecting portion provided on a side surface of the pedestal, location along the slopes of the riprap foundation comprising a plate-like leveling member which Ru him, and on the pedestal is abutting surface to slip member is attached between the top end, the leveling member
Is raised from the slope of the rubble foundation above the pedestal.
It is rotatably connected in the pulling direction.

【0009】この発明では、捨石基礎の天端に載置され
た台座に回動自在に連結した板状の均し部材を起重機等
で吊り上げ、そして吊り上げた均し部材を法面に落下さ
せることにより、該法面を突き固めて均すことができ
る。
In this invention, a plate-shaped leveling member rotatably connected to a pedestal placed on the top of the rubble foundation is hoisted by a hoist, and the hoisted leveling member is dropped on the slope. Thus, the slope can be tamped and leveled.

【0010】このように、機械で捨石基礎の法面を均す
ことができるので、作業効率を向上させることができる
とともに、仕上がりを均一にできる。
As described above, since the slope of the rubble foundation can be leveled by the machine, the working efficiency can be improved and the finish can be made uniform.

【0011】また、潜水士による海中での法面の均し作
業をなくすことができるので、潜水士が潜水病の危険に
さらされることもなく、捨石基礎の基礎工事における安
全性を向上させることができる。
Further, since it is possible to eliminate the leveling work on the slope in the sea by the diver, the diver is not exposed to the risk of diving disease, and the safety in the foundation work of the rubble foundation is improved. You can

【0012】(2)上記均し部材には、複数の孔が形成
されている。
(2) A plurality of holes are formed in the leveling member.

【0013】この発明では、海中で均し部材を法面に落
下させるときに、複数の孔が水抜き孔として機能し、海
中における均し部材の落下速度の低下が抑えられる。
According to the present invention, when the leveling member is dropped on the slope in the sea, the plurality of holes function as drain holes, and the drop in the falling speed of the leveling member in the sea is suppressed.

【0014】(3)上記滑り止め部材は、上記天端との
当接面に設けられた複数の突起部である。
(3) The anti-slip member is a plurality of protrusions provided on the contact surface with the top end.

【0015】この発明では、台座に設けた突起部を天端
に突き刺すことで、均し部材を吊り上げ、そして落下さ
せる法面を均す工程において、該均し部材を連結した台
座の移動が防止できる。
According to the present invention, the protrusion provided on the pedestal is pierced at the top end to prevent the movement of the pedestal to which the leveling member is connected in the step of leveling the slope of the leveling member that is lifted and dropped. it can.

【0016】(4)上記均し部材は、別の均し部材を回
動自在に連結するための連結部が形成されている。
(4) The leveling member is formed with a connecting portion for rotatably connecting another leveling member.

【0017】この発明では、均し部材に別の均し部材を
連結し、連結した別の均し部材で法面を同様に均すこと
ができる。したがって、水深の深い場所に形成した捨石
基礎についても、台座に連結されている均し部材に別の
均し部材を連結することで、法面全体を均すことができ
る。
According to the present invention, another leveling member can be connected to the leveling member, and the slope can be leveled by the other leveling member. Therefore, even for a rubble foundation formed at a deep water location, the entire slope can be leveled by connecting another leveling member to the leveling member connected to the pedestal.

【0018】[0018]

【発明の実施の形態】図1(A)はこの発明の実施形態
にかかる法面均し機を構成する台座の正面図であり、図
1(B)は該台座の側面図である。また、図2(A)は
同法面均し機を構成する均し部材の上面図であり、図2
(B)は該均し部材の側面図である。
1A is a front view of a pedestal that constitutes a slope leveling machine according to an embodiment of the present invention, and FIG. 1B is a side view of the pedestal. Further, FIG. 2A is a top view of a leveling member which constitutes the slope leveling machine.
(B) is a side view of the leveling member.

【0019】台座1は、コンクリートを柱状に固めたも
のであり、その重さが約50tである。台座1は正面に
等間隔に均し部材10を連結するためのフック2を設け
ている。フック2は図1(B)において矢示する方向に
回動自在である。また、台座1の底面には等間隔にくし
3が設けられている。フック2が設けられている間隔
と、くし3が設けられている間隔とは、同じであっても
よいし、異なっていてもよい。
The pedestal 1 is made by solidifying concrete in a columnar shape, and has a weight of about 50t. The pedestal 1 has hooks 2 on the front surface for connecting the equalizing members 10 at equal intervals. The hook 2 is rotatable in a direction indicated by an arrow in FIG. Further, combs 3 are provided on the bottom surface of the pedestal 1 at equal intervals. The interval at which the hook 2 is provided and the interval at which the comb 3 is provided may be the same or different.

【0020】均し部材10は、鋼製で板状の部材であ
り、上記台座1に設けられているフック2に連結するた
めのリング11を備えている。リング11は、特定の片
(図2(A)では上辺)に沿って2つ設けている。リン
グ11の間隔と上記台座1に設けられているフック2の
間隔とは同じである。また、リング11が設けられてい
る片に対向する片には、2つのフック12が設けられて
いる。フック12の間隔はリング11と同じ間隔であ
る。フック12は図2(B)において矢示する方向に回
動自在である。このフック12は別の均し部材10を連
結するための構成である。また、均し部材10には孔1
3が多数形成されている。さらに、均し部材10にはク
レーンで吊り上げるときに使用するワイヤロープ(以
下、単にワイヤと言う。)を取り付けるための取付金具
14が設けられている。
The leveling member 10 is a plate-shaped member made of steel, and is provided with a ring 11 for connecting to the hook 2 provided on the pedestal 1. Two rings 11 are provided along a specific piece (upper side in FIG. 2A). The space between the rings 11 and the space between the hooks 2 provided on the pedestal 1 are the same. Further, two hooks 12 are provided on the piece opposite to the piece on which the ring 11 is provided. The distance between the hooks 12 is the same as that of the ring 11. The hook 12 is rotatable in the direction shown by the arrow in FIG. The hook 12 has a structure for connecting another leveling member 10. In addition, the leveling member 10 has a hole 1
Many 3 are formed. Further, the leveling member 10 is provided with a mounting bracket 14 for mounting a wire rope (hereinafter, simply referred to as a wire) used when hoisting with a crane.

【0021】以下、捨石基礎を海上に形成する基礎工事
について説明する。この中で、この実施形態の法面均し
機を使用して捨石基礎の法面を均す工程を説明する。
The foundation work for forming a rubble foundation on the sea will be described below. In this, a step of leveling the slope of the rubble foundation using the slope leveling machine of this embodiment will be described.

【0022】まず最初に、捨石基礎を海上に形成する。
捨石基礎は、周知のように1個あたり、その重さが数十
〜数千kg、周囲長が1〜2mである比較的大きな石材
を海底に多数投入して形成した断面台形のマウントであ
る(図3参照)。石材の投入には通常起重機船50が利
用される。
First, a rubble foundation is formed on the sea.
As is well known, the rubble stone foundation is a mount having a trapezoidal cross section formed by inserting a large number of relatively large stone materials having a weight of several tens to several thousands kg and a perimeter of 1 to 2 m into the seabed. (See Figure 3). A hoist ship 50 is usually used for loading stone materials.

【0023】なお、図3は、天端が海面よりも低く、全
体が海中に位置している捨石基礎21の例であり、捨石
基礎21の中央部については石材の図示を省略してい
る。最近では、港湾工事自体の大型化にともなって、水
深の深い場所に捨石基礎21を形成する傾向にあり、図
3に示すように捨石基礎21の全体が海中に位置する場
合が多い。
FIG. 3 shows an example of a rubble foundation 21 whose top is lower than the sea surface and is wholly located in the sea, and the stone material is omitted from the center of the rubble foundation 21. Recently, as the port construction itself becomes larger, the rubble foundation 21 tends to be formed in a place where the water depth is deep, and the entire rubble foundation 21 is often located in the sea as shown in FIG.

【0024】次に、海上に形成した捨石基礎21の天端
を突き固めて均す。この工程は、例えば公知の重錘式捨
石均し工法で行う。具体的には、図4に示すように、鋼
製のアングルでトラス状に組まれ、数m四方の底面を有
する櫓の下端に鋼塊を取り付けた重錘30の上端を起重
機船50の起重機によって支持し、起重機でこの重錘3
0を天端から数m上方に吊り上げ、そして吊り上げた重
錘30を天端に落下させる。これを、捨石基礎21の天
端全体にわたって行い、該天端を突き固めて均す。
Next, the top end of the rubble stone base 21 formed on the sea is tamped and leveled. This step is performed by, for example, a known weight type rubble leveling method. Specifically, as shown in FIG. 4, the hoist of the hoist ship 50 is the upper end of a weight 30 in which a steel ingot is attached to the lower end of a turret that is assembled in a truss shape with steel angles and has a bottom of several meters square. Supported by a hoist, this weight 3
0 is lifted a few meters above the top, and the suspended weight 30 is dropped to the top. This is performed over the entire top of the rubble foundation 21, and the top is tamped and leveled.

【0025】上記重錘式捨石均し工法で捨石基礎21の
天端全体を均すと、該捨石基礎21の法面を均す工程を
実行する。この工程において、この発明の実施形態であ
る法面均し機が利用される。まず、台座1を捨石基礎2
1の天端に載置する(図5参照)。図5は捨石基礎21
を形成する個々の石材の図示を省略した図である。台座
1は図5に示すように捨石基礎21における天端と法面
との境界近傍に載置される。設置された台座1は、くし
3が捨石基礎21の天端に突き刺さっており、天端上で
の移動を防止している。また、フック2は捨石基礎21
の法面側に位置している。
When the entire top end of the rubble foundation 21 is leveled by the above-mentioned weight type rubble leveling method, the step of leveling the slope of the rubble level 21 is executed. In this step, the slope leveling machine according to the embodiment of the present invention is used. First, pedestal 1 is rubble foundation 2
Place it on the top of No. 1 (see Fig. 5). Fig. 5 shows rubble foundation 21
It is the figure which abbreviate | omitted illustration of the individual stone materials which form. As shown in FIG. 5, the pedestal 1 is placed near the boundary between the top and the slope of the rubble foundation 21. The pedestal 1 installed has the comb 3 piercing the top end of the rubble foundation 21 to prevent movement on the top end. In addition, the hook 2 is a rubble foundation 21
It is located on the slope side of.

【0026】次に、捨石基礎21の天端に載置した台座
1に均し部材10を連結する(図6参照)。具体的に
は、均し部材10のリング11を台座1のフック2にか
ける。上述したように、フック2が回動自在であるの
で、連結された均し部材10の重みにより該フック2が
回動し、図6に示すように均し部材10が捨石基礎21
の法面に沿って置かれた状態になる。台座1は、上述し
たように捨石基礎21にくし3を突き刺しているので、
連結された均し部材10の重みにより、捨石基礎21の
天端から法面側に移動し、天端から滑り落ちることはな
い。
Next, the leveling member 10 is connected to the pedestal 1 placed on the top of the rubble foundation 21 (see FIG. 6). Specifically, the ring 11 of the leveling member 10 is hooked on the hook 2 of the pedestal 1. As described above, since the hook 2 is rotatable, the hook 2 is rotated by the weight of the leveling member 10 connected thereto, and the leveling member 10 is moved to the rubble foundation 21 as shown in FIG.
It will be placed along the slope of. Since the pedestal 1 pierces the rubble foundation 21 with the comb 3 as described above,
Due to the weight of the connected leveling members 10, the rubble foundation 21 does not move from the top end to the slope side and does not slide down from the top end.

【0027】そして、起重機船50のクレーンに均し部
材10を支持させて、該均し部材10を吊り上げられる
ようにする。具体的には、図7、および図8に示すよう
に均し部材10の取付金具14にワイヤ40を付け、こ
のワイヤ40をクレーンのフック41に支持させる。図
7は、均し部材を吊り上げた状態を示しており、図8
は、均し部材を落下させた状態を示している。なお、図
7、図8では、起重機船50の図示を省略している。
Then, the leveling member 10 is supported by the crane of the hoist ship 50 so that the leveling member 10 can be lifted. Specifically, as shown in FIG. 7 and FIG. 8, the wire 40 is attached to the fitting 14 of the leveling member 10, and the wire 40 is supported by the hook 41 of the crane. FIG. 7 shows a state in which the leveling member is lifted up.
Shows a state in which the leveling member is dropped. The hoist ship 50 is not shown in FIGS. 7 and 8.

【0028】捨石基礎21の法面の均し工程は、図7に
示すように起重機船50のクレーンで均し部材10を持
ち上げ、そして図8に示すように持ち上げた均し部材1
0を法面に落下させることで、捨石基礎21の法面を突
き固めて均す。また、均し部材10に設けた多数の孔1
3が水抜き孔として機能するので、海中における均し部
材10の落下速度の低下が抑えられる。したがって、落
下させた均し部材10によって法面に十分な大きさの力
が加えられる。これにより、法面を十分に突き固めて均
すことができる。
In the step of leveling the rubble foundation 21, the leveling member 10 is lifted by the crane of the hoist ship 50 as shown in FIG. 7, and the leveling member 1 is lifted as shown in FIG.
By dropping 0 on the slope, the slope of the rubble foundation 21 is tamped and leveled. In addition, a large number of holes 1 provided in the leveling member 10
Since 3 functions as a water drain hole, the drop of the falling speed of the leveling member 10 in the sea is suppressed. Therefore, a sufficient amount of force is applied to the slope by the leveling member 10 that has been dropped. Thereby, the slope can be sufficiently compacted and leveled.

【0029】また、台座1に対する均し部材10の連結
位置をずらすことで、捨石基礎21の法面全体を均すこ
とができる。さらに、反対側の法面についても同様の工
程で均すことができる。
Further, by shifting the connection position of the leveling member 10 with respect to the pedestal 1, the entire slope of the rubble foundation 21 can be leveled. Furthermore, the slope on the opposite side can be leveled in the same process.

【0030】このように、この実施形態の法面均し機に
より、従来潜水士による手作業で行っていた捨石基礎2
1の法面の均し工程の機械化が実現できる。これによ
り、捨石基礎21の法面を均す工程の作業効率を向上さ
せることができるとともに、仕上がりを均一にできる。
また、潜水士による海中での危険度の高い作業を無くす
ことができるので、潜水士が潜水病にかかることもな
く、本作業の安全性を向上させることができる。
As described above, the rubble stone foundation 2 which is conventionally manually operated by a diver by the slope leveling machine of this embodiment.
Mechanization of the step 1 leveling process can be realized. As a result, the work efficiency of the step of leveling the slope of the rubble foundation 21 can be improved and the finish can be made uniform.
Further, since highly dangerous work in the sea by the diver can be eliminated, the safety of this work can be improved without the diver having a diving disease.

【0031】さらに、図9に示すように捨石基礎21の
天端に重量構造物であるケーソン45が設置される。捨
石基礎21は天端および法面を十分に突き固めているの
で、ケーソン45の設置時におけるかたくずれを抑える
ことができる。
Further, as shown in FIG. 9, a caisson 45, which is a heavy structure, is installed at the top of the rubble foundation 21. Since the rubble foundation 21 is sufficiently tamped at the top and the slope, it is possible to suppress the collapse of the caisson 45 when it is installed.

【0032】また、法面が高さ方向に長くなると、1つ
の均し部材10では法面の高さ方向の一部しか均すこと
ができない場合が生じる。このような場合には、図10
に示すように台座1に連結されている均し部材10に別
の均し部材10を連結して法面全体を均す。
Further, if the slope becomes long in the height direction, there may be a case where one leveling member 10 can only part of the slope in the height direction. In such a case, FIG.
As shown in FIG. 5, another leveling member 10 is connected to the leveling member 10 connected to the pedestal 1 to level the entire slope.

【0033】具体的には、先ず台座1に連結されている
均し部材10で法面を均し、その後図10に示すよう
に、この均し部材10に別の均し部材10を連結し、こ
の別の均し部材10を、起重機船50のクレーンで吊り
上げ、落下させるという上述と同じ方法で法面を均す。
また、上記別の均し部材10にさらに別の均し部材10
を連結し、法面を均すことができる。
Specifically, first, the slope is leveled by the leveling member 10 connected to the pedestal 1, and then the leveling member 10 is connected to another leveling member 10 as shown in FIG. The slope of the other leveling member 10 is leveled by the same method as described above in which the crane of the hoist ship 50 lifts and drops the leveling member 10.
In addition, another leveling member 10 is added to the leveling member 10 described above.
Can be connected and the slope can be leveled.

【0034】このように、均し部材10に別の均し部材
10を連結し、この連結した別の均し部材10で法面を
均すことができるので、法面が長い捨石基礎21であっ
ても、該捨石基礎21の法面全体を突き固めて均すこと
ができるまた、台座1に連結されている均し部材10に
連結された別の均し部材10に対して、さらに別の均し
部材10を連結し、この均し部材10で法面を均すこと
もできる。
As described above, since another leveling member 10 can be connected to the leveling member 10 and the slope can be leveled by the connected leveling member 10, the rubble foundation 21 having a long slope can be used. Even if there is, the entire slope of the rubble foundation 21 can be compacted and leveled. Further, another leveling member 10 connected to the pedestal 1 can be further separated. It is also possible to connect the leveling members 10 and to level the slope with this leveling member 10.

【0035】さらに、均し部材10は鋼製で板状の部材
であるとしたが、内部を格子状に区切り、そこに鉄屑等
を詰めたものであってもよい。
Further, although the leveling member 10 is made of steel and has a plate shape, the leveling member 10 may be divided into a lattice shape and filled with iron scraps or the like.

【0036】なお、捨石基礎21全体が海中に形成され
た捨石基礎21の法面を均す作業を例にしてこの発明の
実施形態を説明したが、天端が海面よりも高い捨石基礎
21であっても、同様の作業工程で法面を突き固め、均
すことができる。
The embodiment of the present invention has been described by taking as an example the operation of leveling the slope of the rubble foundation 21 formed entirely in the sea. Even if there is, the slope can be tamped and leveled in the same working process.

【0037】[0037]

【発明の効果】以上のように、この発明によれば、従来
潜水士による手作業で行っていた捨石基礎の法面の均し
工程の機械化が実現できる。これにより、捨石基礎の法
面を均す工程の作業効率を向上させることができるとと
もに、仕上がりを均一にできる。また、潜水士による海
中での危険度の高い作業を無くすことができ、潜水士が
潜水病の危険にさらされることもなく、捨石基礎の基礎
工事における安全性を向上させることができる。
As described above, according to the present invention, it is possible to realize the mechanization of the leveling process of the slope of the rubble foundation, which has been performed manually by a diver. As a result, the work efficiency in the step of leveling the slope of the rubble foundation can be improved and the finish can be made uniform. Further, it is possible to eliminate highly dangerous work in the sea by the diver, and the diver is not exposed to the risk of diving disease, and the safety in the foundation work of the rubble foundation can be improved.

【0038】さらに、捨石基礎の法面を突き固めている
ので、ケーソン等の重量構造物の設置時における捨石基
礎のかたくずれが抑えられる。
Further, since the slope of the rubble stone foundation is tamped, it is possible to prevent the rubble stone foundation from being broken when installing a heavy structure such as a caisson.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施形態である法面均し機の台座を
示す図である。
FIG. 1 is a view showing a pedestal of a slope leveling machine according to an embodiment of the present invention.

【図2】この発明の実施形態である法面均し機の均し部
材を示す図である。
FIG. 2 is a view showing a leveling member of the slope leveling machine according to the embodiment of the present invention.

【図3】捨石基礎の形成を説明する図である。FIG. 3 is a diagram illustrating formation of a rubble foundation.

【図4】捨石基礎の天端ならしを説明する図である。[Fig. 4] Fig. 4 is a diagram for explaining the top leveling of a rubble foundation.

【図5】捨石基礎の天端に台座を設置した状態を説明す
る図である。
FIG. 5 is a diagram illustrating a state in which a pedestal is installed on the top of a rubble foundation.

【図6】捨石基礎の天端に設置した台座に均し部材を連
結した状態を説明する図である。
FIG. 6 is a diagram illustrating a state in which a leveling member is connected to a pedestal installed at the top of a rubble foundation.

【図7】この発明の実施形態である法面均し機による捨
石基礎の法面均しの工程を説明する図である。
FIG. 7 is a diagram illustrating a step of leveling a rubble foundation by a leveling machine according to an embodiment of the present invention.

【図8】この発明の実施形態である法面均し機による捨
石基礎の法面均しの工程を説明する図である。
FIG. 8 is a diagram illustrating a step of leveling a rubble foundation by a leveling machine which is an embodiment of the present invention.

【図9】この発明の実施形態である法面均し機による捨
石基礎の法面均しの工程を説明する図である。
FIG. 9 is a diagram illustrating a step of leveling a rubble foundation by a leveling machine according to an embodiment of the present invention.

【図10】この発明の実施形態である法面均し機による
捨石基礎の法面均しの工程を説明する図である。
FIG. 10 is a diagram illustrating a step of leveling a rubble foundation by a leveling machine which is an embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1−台座 2−フック 3−くし 10−均し部材 11−リング 12フック 13−孔 14−取付金具 21−捨石基礎 40−ワイヤ 45−ケーソン 1-pedestal 2-hook 3-comb 10-leveling member 11-ring 12 hooks 13-hole 14-Mounting bracket 21-Rubbish stone foundation 40-wire 45-Caison

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 石材を積み重ねた捨石基礎の天端に載置
する台座と、 上記台座の側面に設けられた連結部に連結され、上記捨
石基礎の法面に沿って置かれる板状の均し部材と、を備
え、 上記台座には、上記天端との当接面に滑り止め部材が取
り付けられており、 上記均し部材は、上記台座に対して、上記捨石基礎の法
面から持ち上げる方向に回動自在に連結されている法面
均し機。
1. A and the base for placing on the top end of the riprap foundation stacked stone, connected to the connecting portion provided on a side surface of said pedestal, said disposable
Comprising a plate-like leveling member which instructions are built along the slope of the stone foundation, and to the base is the contact surface to the slip preventing member is mounted between the top end, the leveling member is , The above-mentioned pedestal, the above-mentioned rubble foundation method
Slope that is connected so as to be rotatable in the direction of lifting from the surface
Leveling machine.
【請求項2】 上記均し部材には、複数の孔が形成され
ている請求項1に記載の法面均し機。
2. The slope leveling machine according to claim 1, wherein a plurality of holes are formed in the leveling member.
【請求項3】 上記滑り止め部材は、上記天端との当接
面に設けられた複数の突起部である請求項1または2に
記載の法面均し機。
3. The slope leveling machine according to claim 1, wherein the anti-slip member is a plurality of protrusions provided on a contact surface with the top end.
【請求項4】 上記均し部材は、別の均し部材を回動自
在に連結するための連結部が形成されている請求項1〜
3のいずれかに記載の法面均し機。
4. The leveling member is formed with a connecting portion for rotatably connecting another leveling member.
The slope leveling machine according to any one of 3 above.
【請求項5】 石材を積み重ねた捨石基礎の天端に台座
を載置し、 この台座の側面に設けられた連結部に、上記捨石基礎の
法面に沿って置かれる板状の均し部材を、上記捨石基礎
の法面から持ち上げる方向に回動自在に連結し、 この板状の均し部材を、上記台座に対して回動させて上
記捨石基礎の法面から持ち上げ、その後この板状の均し
部材を上記捨石基礎の法面に落下させることにより、こ
の法面を突き固めて均す 法面均し方法。
5. A pedestal is placed on the top end of a rubble foundation that is made by stacking stone materials, and the above-mentioned rubble foundation is attached to a connecting portion provided on a side surface of the pedestal .
A plate-shaped leveling member placed along the slope
Connected in a direction to lift from the slopes rotatably, above with the plate-like leveling member, is rotated relative to the base
Lift from the slope of the rubble stone foundation, and then smooth this plate
By dropping the member on the slope of the above-mentioned rubble foundation,
Slope leveling method to squeeze and level the slopes of .
【請求項6】 上記捨石基礎を海中に形成する請求項5
に記載の法面均し方法。
6. The rubble foundation is formed in the sea.
Slope leveling method described in.
JP2001106440A 2001-04-04 2001-04-04 Slope leveling machine and slope leveling method Expired - Lifetime JP3445255B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001106440A JP3445255B2 (en) 2001-04-04 2001-04-04 Slope leveling machine and slope leveling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001106440A JP3445255B2 (en) 2001-04-04 2001-04-04 Slope leveling machine and slope leveling method

Publications (2)

Publication Number Publication Date
JP2002294719A JP2002294719A (en) 2002-10-09
JP3445255B2 true JP3445255B2 (en) 2003-09-08

Family

ID=18958946

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001106440A Expired - Lifetime JP3445255B2 (en) 2001-04-04 2001-04-04 Slope leveling machine and slope leveling method

Country Status (1)

Country Link
JP (1) JP3445255B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3789443B2 (en) 2003-09-01 2006-06-21 Necエレクトロニクス株式会社 Resin-sealed semiconductor device
JP6615468B2 (en) * 2015-03-06 2019-12-04 東亜建設工業株式会社 Underwater ground leveling method and underwater ground leveling attachment
JP7345809B1 (en) 2022-08-08 2023-09-19 株式会社青山海事 Weight for leveling rubble stones

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000120068A (en) 1998-10-14 2000-04-25 Second District Port Constr Bureau Ministry Of Transport Underwater rubble leveling method and equipment

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000120068A (en) 1998-10-14 2000-04-25 Second District Port Constr Bureau Ministry Of Transport Underwater rubble leveling method and equipment

Also Published As

Publication number Publication date
JP2002294719A (en) 2002-10-09

Similar Documents

Publication Publication Date Title
JPS60242219A (en) Formation of offshore seabed mound
JP7345943B1 (en) Rubble mound leveling system and rubble mound leveling method
JPH04502655A (en) Method and device for installing piles for the construction of offshore platforms based on piles
CN109137751A (en) Based on pier dry method mounting process in the water for sitting bottom cofferdam water sealing structure
JP3445255B2 (en) Slope leveling machine and slope leveling method
JP3479974B2 (en) Building blocks, their construction methods and retaining walls
JP2759428B2 (en) Underwater steel pipe pile driving method and equipment
CN215367245U (en) Pile foundation construction tool
CN115679831A (en) Trestle bridge construction method using ship-assisted construction
JP7345809B1 (en) Weight for leveling rubble stones
JP5619659B2 (en) How to excavate the ground slope
CN118704471B (en) Quick installation method for soil retaining plate by utilizing excavator
CN219621813U (en) Auxiliary structure and hoisting accessory of open caisson back cover under water
JPH06970B2 (en) Breakwater and its construction method
CN215105262U (en) Pile forming structure of cast-in-situ bored pile
JPH0986862A (en) Shifting of precast concrete(pc) board, and installation method
JP3069684B2 (en) Concrete block
JPH0213098B2 (en)
CN205455354U (en) Assembled anchor system suitable for stereoplasm seabed
JPH07310321A (en) Mountain stop method
JPH0326734B2 (en)
JP4699320B2 (en) Construction method of pedestal concrete
JPH0617568B2 (en) Soil cover method for soft ground
JP6401530B2 (en) Revetment block installation method and installation jig
JPH06136942A (en) Expandable inner formwork

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
R150 Certificate of patent or registration of utility model

Ref document number: 3445255

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110627

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160627

Year of fee payment: 13

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term