JP3455794B2 - Train operation management system - Google Patents
Train operation management systemInfo
- Publication number
- JP3455794B2 JP3455794B2 JP32218696A JP32218696A JP3455794B2 JP 3455794 B2 JP3455794 B2 JP 3455794B2 JP 32218696 A JP32218696 A JP 32218696A JP 32218696 A JP32218696 A JP 32218696A JP 3455794 B2 JP3455794 B2 JP 3455794B2
- Authority
- JP
- Japan
- Prior art keywords
- train
- track circuit
- track
- circuit
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、地上設備である軌
道回路装置から列車集中制御装置を介して伝達されるC
TC情報に基づいて列車の追跡・制御を行う列車運行管
理システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to C which is transmitted from a track circuit device which is a ground facility via a train centralized control device.
The present invention relates to a train operation management system that tracks and controls trains based on TC information.
【0002】[0002]
【従来の技術】従来、列車集中制御装置から伝達される
CTC情報を基に列車の運行を管理するシステムにおい
て、列車の在線情報として列車集中制御装置から軌道回
路の落下・扛上情報等のCTC情報を受信し、そのCT
C情報に基づいて列車の追跡・制御を行うことが行われ
ている。ところで、従来の列車の運行管理システムで
は、高速・高密度で運行されている列車に列車遅延等の
ダイヤの乱れが一旦生じると、そのダイヤの乱れを回復
することは非常に困難な状況にある。ダイヤの乱れが生
じる原因は種々あるが、その一つとして不合理なCTC
情報による列車の仮追跡がある。列車追跡・制御を行う
コンピュータは、不合理なCTC情報を取得すると、追
跡していた列車を仮追跡状態、具体的には追跡している
列車の列車番号を仮列車番号に置き換え、追跡処理を続
行する。しかし、仮追跡の列車番号ではダイヤに基づい
た進路制御が行えないため、仮追跡列車の列車番号を確
定しない限り、列車の遅延が発生することは避けられな
い。従って、指令員は、鉄道電話等を使って列車の在線
位置と列車番号を確認し、仮追跡番号を実際に走行する
列車の列車番号に修正し、確定することが行われてい
る。あるいは、地上設備に列車番号検知装置がある場合
は、仮追跡の列車が列車番号検知装置を通過することを
待って、指令員が列車を確定している。因に、列車集中
制御装置がこの不合理なCTC情報を伝達する要因は、
地上設備である軌道回路に供給する電源の給電システム
の故障(落雷等自然災害を含む。)による停電や、軌道
回路装置自体の故障(レール破損を含む。)等による連
続的な軌道回路の異常状態や、列車集中制御装置が軌道
回路装置から軌道回路情報を取得する際に取得タイミン
グのずれ、列車追跡・制御コンピュータへCTC情報を
伝送する際の伝送タイミングや伝送エラー等の一過性の
CTC情報によって発生する。また、連続したCTC情
報が正常に回復した際も、CTC情報が異常状態になる
前と回復後の列車の在線位置が必ずしも一致するわけで
はなく、CTC情報が正常に回復した場合においても、
列車追跡においてCTC情報の合理性判断によって仮追
跡状態に陥ることは避けがたい。2. Description of the Related Art Conventionally, in a system that manages train operation based on CTC information transmitted from a train centralized control device, CTCs such as drop / lift information of a track circuit from the train centralized control device are used as train presence information. Information received and its CT
Tracking and control of trains are performed based on C information. By the way, in the conventional train operation management system, once a train disorder, such as a train delay, is disturbed in a train operating at high speed and high density, it is very difficult to recover the disorder of the train schedule. . There are various causes for the disorder of the diamond, but one of them is irrational CTC.
There is provisional tracking of trains by information. When the computer that tracks and controls trains acquires irrational CTC information, it replaces the tracked train with the temporary train number, specifically the train number of the tracked train, and performs the tracking process. continue. However, since the route control based on the schedule cannot be performed with the train number of the provisionally tracked train, it is inevitable that train delay will occur unless the train number of the provisionally tracked train is fixed. Therefore, the ordering person confirms the in-rail position and the train number of the train by using a railway telephone or the like, corrects the temporary tracking number to the train number of the train actually traveling, and confirms it. Alternatively, if the ground equipment has a train number detecting device, the ordering person confirms the train after waiting for the temporarily tracked train to pass through the train number detecting device. The reason why the train centralized control device transmits this irrational CTC information is
Abnormality of the continuous track circuit due to power failure due to failure of the power supply system of the power supply to the track circuit which is the ground equipment (including natural disaster such as lightning strike) or failure of the track circuit device itself (including rail damage) Transient CTCs such as the status, the acquisition timing deviation when the train centralized control device acquires track circuit information from the track circuit device, the transmission timing and the transmission error when transmitting the CTC information to the train tracking / control computer Generated by information. Further, even when the continuous CTC information is normally restored, the in-rail position of the train before and after the CTC information is not in the abnormal state does not always match, and even when the CTC information is normally restored,
It is unavoidable to fall into the tentative tracking state by rationality judgment of CTC information in train tracking.
【0003】[0003]
【発明が解決しようとする課題】このように、従来の列
車の運行管理システムによる列車の追跡・制御では、不
合理なCTC情報が列車集中制御装置から列車追跡・制
御を行うコンピュータに伝達されたとき、列車の追跡が
仮追跡状態に陥り、そのため、列車の確定に際し、地上
設備の障害回復後、あるいは一過性のCTC情報の不正
情報が発生した場合など指令員の介在を含み、ある一定
以上の時間を要さないと、当該列車を確定できない、と
いう問題がある。As described above, in the conventional train tracking / control by the train operation management system, irrational CTC information is transmitted from the train centralized control device to the train tracking / control computer. At this time, the tracking of the train falls into a temporary tracking state, and therefore, when the train is fixed, after the failure recovery of the ground equipment, or when the temporary illegal information of the CTC information is generated, including the intervention of the ordering staff There is a problem that the train cannot be confirmed unless the above time is required.
【0004】本発明の課題は、列車の運行管理システム
における列車追跡処理において、不合理なCTC情報に
対して列車を仮追跡状態に陥らせないタフネス性を備
え、地上設備が故障状態から回復した際、速やかに且つ
自動的に列車在線位置と該当列車を確定することにあ
る。An object of the present invention is to provide a train tracking process in a train operation management system with toughness that does not cause a train to enter a temporary tracking state due to irrational CTC information, and to recover ground equipment from a failure state. At that time, it is to promptly and automatically determine the position of the train and the corresponding train.
【0005】[0005]
【課題を解決するための手段】上記課題を解決するため
に、追跡する列車の最後尾が在線する軌道回路(基準軌
道回路)を記憶する機能と、追跡する列車の進行する軌
道回路の在線リンクを作成し、該在線リンクを記憶する
機能と、基準軌道回路と該列車の列車長から軌道回路の
異常落下または異常扛上を判断する機能を備え、追跡す
る列車の基準軌道回路が扛上した場合、在線リンクに従
い順に軌道回路を照査し、落下状態である軌道回路を検
出したとき、列車の在線位置と在線列車を追跡列車とし
て特定し、異常落下または異常扛上した軌道回路を検出
したとき、該軌道回路を不正な軌道回路として認識す
る。また、地上設備に障害が発生し、全ての軌道回路が
落下状態となった場合、地上設備の故障回復時に、地上
設備故障前の基準軌道回路から在線リンクに従い順に軌
道回路を照査し、列車の最後尾が在線する軌道回路を検
出したとき、当該列車を地上設備故障前の追跡列車とし
て特定する。In order to solve the above-mentioned problems, a function of storing a track circuit (reference track circuit) in which the tail end of a train to be tracked is located, and a track link of a track circuit in which a train to be tracked progresses And the function of storing the on-rail link and the function of determining an abnormal drop or abnormal lift of the track circuit from the reference track circuit and the train length of the train, and the reference track circuit of the train to be traced has been lifted. In this case, when the track circuits are checked in order according to the track links and the track circuits that are in a falling state are detected, the track position of the train and the track trains are specified as tracking trains, and a track circuit that has abnormally dropped or is lifted is detected. , Recognize the track circuit as an illegal track circuit. In addition, if a failure occurs in the ground equipment and all track circuits are in a dropped state, when the ground equipment is recovered, the track circuits are sequentially checked from the reference track circuit before the ground equipment failure according to the on-rail links, and the train When the track circuit in which the tail end is located is detected, the train is specified as the track train before the ground equipment failure.
【0006】本発明は、基準軌道回路の情報、軌道回路
の在線リンクの情報に基づいて追跡する列車の在線位置
と在線列車を追跡列車として確定する。これは、列車集
中制御装置を介して伝達されるCTC情報の合理性を判
断することになり、追跡している列車の追跡状態が仮追
跡状態に陥ることを未然に防止することができ、当該列
車に対してダイヤ通りの進路制御が行え、結果として列
車の遅延発生と遅延波及を防止することができる。ま
た、地上設備の故障からの復旧の際も、故障発生直前に
落下していた基準軌道回路が故障回復後、列車の空走
(高速で走行している列車が停止するためには、相当な
距離を必要とする。)により当該の基準軌道回路が扛上
つまり列車が通り過ぎてしまった場合においても、自動
的に故障発生前の基準軌道回路から在線リンクに従い軌
道回路を順に照査し、落下している軌道回路を検出し
て、故障発生前に在線していた列車を速やかに且つ確実
に追跡し、列車を特定するため、列車の追跡状態が仮追
跡状態に陥ることなく、列車の追跡・制御を継続して実
行することができる。According to the present invention, the on-rail position and the on-rail train of the train to be traced are determined as the tracking train based on the information on the reference track circuit and the on-rail link information on the track circuit. This is to judge the rationality of the CTC information transmitted through the train centralized control device, and it is possible to prevent the tracking state of the train being tracked from falling into a provisional tracking state. It is possible to control the route according to the schedule for the train, and as a result, it is possible to prevent the occurrence of delay and delay spread of the train. In addition, even when recovering from a breakdown of ground equipment, after the failure of the reference track circuit that had dropped just before the occurrence of the failure, the train runs idle (a train running at high speed stops Even if the reference track circuit concerned goes up due to the fact that the distance is required.), That is, the train passes by, the track circuits are automatically checked from the reference track circuit before the failure occurred in accordance with the on-rail links, and the train falls. Tracking trains that existed before the failure occurred can be quickly and surely detected by identifying the track circuit that is running, and the trains can be identified. Control can continue to be executed.
【0007】[0007]
【発明の実施の形態】以下、本発明の実施形態を図面を
参照して説明する。図1は、本発明の一実施形態による
列車運行管理システムを示す。列車運行管理システム
は、列車追跡・制御コンピュータ2、計画ダイヤ作成装
置のダイヤ情報を格納するダイヤファイル3、在線軌道
回路情報ファイル4、進路名や信号機の現示状態、進路
の開通方向等を格納する信号機情報ファイル5、信号機
情報から進路方向を格納する進路リンク情報ファイル
6、列車の軌道回路照査対象となる軌道回路を記憶する
在線リンク軌道回路ファイル7及び指令卓(運転整理用
端末)8からなる。また、地上設備(現地)として、運
行されている列車がレール上を走行すると、地上設備で
ある軌道回路装置(図示せず)や列車番号検出装置(図
示せず)から発せられるCTC情報つまり信号機情報、
軌道回路落下・扛上情報、列車番号情報を認識すると共
に、列車追跡・制御コンピュータ2から伝送される信号
機制御情報を基に、信号機を制御する列車集中制御装置
1を設備する。列車追跡・制御コンピュータ2は、列車
集中制御装置1から伝送されるCTC情報を基に、在線
軌道回路情報ファイル4、信号機情報ファイル5を更
新、格納し、あわせて信号機情報から進路の開通方向を
認識するための進路リンク情報ファイル6を更新する。
さらに、在線軌道回路情報、信号機情報及び進路リンク
情報に基づいて当該列車の軌道回路照査対象となる軌道
回路を作成し、その情報を在線リンク軌道回路情報とし
て在線リンク軌道回路ファイル7を更新、格納する。ま
た、列車追跡・制御コンピュータ2は、これらの一連の
処理を行って指令員が列車の運行状況を把握し、監視す
るための端末である指令卓8に更新されたファイルの結
果を伝送する。指令卓8は、伝送された情報を表示する
機能の他、警報等の情報を表示、通知等出力する機能を
備える。在線軌道回路情報ファイル4は、図2に示すよ
うに、在線列車テーブル4−1と軌道回路追跡テーブル
4−2からなり、在線列車テーブル4−1は在線する列
車単位に、軌道回路追跡テーブル4−2は軌道回路単位
に存在する。在線列車テーブル4−1と軌道回路追跡テ
ーブル4−2は、軌道回路追跡テーブル4−2の在線列
車テーブルポインタのアドレス情報によりリンケージす
る。ここで、図3に(表1)在線列車テーブルの構成、
図4に(表2)軌道回路追跡テーブルの構成を示す。DETAILED DESCRIPTION OF THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a train operation management system according to an embodiment of the present invention. The train operation management system stores a train tracking / control computer 2, a diamond file 3 that stores timetable information of a planned timetable creation device, an on-track track circuit information file 4, a route name, a signal signal state, a route opening direction, etc. From the traffic signal information file 5, the track link information file 6 that stores the track direction from the traffic signal information, the on-track link track circuit file 7 that stores the track circuit that is the target of the track circuit inspection of the train, and the command console (operation control terminal) 8 Become. Further, as a ground facility (on-site), when a train running on the rail travels on a rail, CTC information, that is, a traffic signal issued from a track circuit device (not shown) or a train number detection device (not shown) which is a ground facility. information,
The train centralized control device 1 is installed for recognizing track circuit drop / lift information and train number information, and for controlling traffic signals based on traffic signal control information transmitted from the train tracking / control computer 2. The train tracking / control computer 2 updates and stores the on-track track circuit information file 4 and the traffic signal information file 5 based on the CTC information transmitted from the train centralized control device 1, and also determines the opening direction of the route from the traffic signal information. The route link information file 6 for recognition is updated.
Further, a track circuit to be a target of track circuit inspection of the train is created based on the track circuit information on track, signal information, and route link information, and the track link circuit file 7 is updated and stored as the track circuit track information based on the information. To do. Further, the train tracking / control computer 2 carries out a series of these processes to transmit the updated file result to the command console 8 which is a terminal for the commander to grasp and monitor the train operation status. The command console 8 has a function of displaying the transmitted information, and a function of displaying information such as an alarm and outputting a notification. As shown in FIG. 2, the on-rail track circuit information file 4 is composed of an on-rail train table 4-1 and a track circuit tracking table 4-2. The on-rail train table 4-1 is a track circuit tracking table 4 for each on-train train. -2 exists in each track circuit unit. The on-rail train table 4-1 and the track circuit tracking table 4-2 are linked by the address information of the on-rail train table pointer of the track circuit tracking table 4-2. Here, in FIG. 3 (Table 1), the configuration of the on-rail train table,
FIG. 4 (Table 2) shows the configuration of the track circuit tracking table.
【0008】次に、図5は、列車追跡の基となるCTC
情報、特に、軌道回路情報について軌道回路装置の仕組
みとCTC情報の関係を示す。図5(a)は、軌道回路
装置の仕組みであり、導電性であるレール21を電気回
路の一部に見立ててそのレール21に軌道回路用電源2
3からレール電気を流し、レール21を通じて列車検知
リレー22に電流を送り、列車検知リレー22の作用を
利用してリレースイッチ24を作動し、列車の在線を検
出する。ここで、列車検知リレー22は、電流が供給さ
れることによりリレーに磁界が発生し、その電磁力によ
りリレースイッチ24が誘導され、スイッチが入った状
態(以下、ON状態)となる。この状態を列車の在線し
ていない状態と位置づけ、これを軌道回路の扛上とい
う。すなわち、これが軌道回路扛上のCTC情報を表わ
す。また、列車25が軌道回路に進入すると、導電性で
ある列車の車輪26及び車軸27により両レール回路を
短絡させることとなる。レール回路が車軸27により短
絡されると、列車検知リレー28にレール電流が供給さ
れなくなり、列車検知リレー磁束がなくなり、リレース
イッチ29が開放状態(以下、OFF状態)となる。こ
の状態を列車の在線している状態と位置づけ、これを軌
道回路の落下という。すなわち、これが軌道回路落下の
CTC情報を表わす。列車追跡・制御コンピュータ2
は、このように作成されたCTC情報に基づいて列車を
追跡する。図5(b)は、軌道回路装置に故障が発生し
た場合を示し、軌道回路に電気を供給する給電システム
の故障の例である。軌道回路装置用電源30に供給する
電気が給電システムの故障(落雷を含む。)により供給
できなくなった場合、レール回路に電流が流れないた
め、列車検知リレー31の磁束がなくなり、結果として
リレースイッチ32がOFF状態となる。すなわち、列
車の在線を示す「軌道回路落下=OFF状態」を意味す
るCTC情報として列車集中制御装置1から列車追跡・
制御コンピュータ2に伝達される。図5(c)は、上記
(a)及び(b)の軌道回路状態とCTC表示情報の関
係をまとめた表である。CTC表示情報は、地上設備の
状態として、「列車なし」のとき「扛上」、「列車あ
り」または「設備故障(停電)」のとき「落下」とな
る。Next, FIG. 5 shows a CTC which is a basis for train tracking.
Regarding the information, particularly the track circuit information, the relationship between the mechanism of the track circuit device and the CTC information is shown. FIG. 5A shows a mechanism of the track circuit device, in which the conductive rail 21 is regarded as a part of an electric circuit and the track circuit power supply 2 is provided on the rail 21.
Rail electric current is supplied from 3 and a current is sent to the train detection relay 22 through the rail 21, and the action of the train detection relay 22 is used to operate the relay switch 24 to detect the presence of a train. Here, in the train detection relay 22, when a current is supplied, a magnetic field is generated in the relay, the relay switch 24 is induced by the electromagnetic force, and the switch is turned on (hereinafter, ON state). Positioning this state as the state where the train is not in line, this is called the uplift of the track circuit. That is, this represents the CTC information on the track circuit. Further, when the train 25 enters the track circuit, both rail circuits are short-circuited by the train wheels 26 and the axles 27 of the train which are conductive. When the rail circuit is short-circuited by the axle 27, the rail current is not supplied to the train detection relay 28, the train detection relay magnetic flux disappears, and the relay switch 29 is opened (hereinafter, OFF state). This state is regarded as the state where the train is in line, and this is called a track circuit drop. That is, this represents the CTC information of the track circuit drop. Train tracking / control computer 2
Tracks the train based on the CTC information created in this way. FIG. 5B shows a case where a failure occurs in the track circuit device, and is an example of a failure of the power supply system that supplies electricity to the track circuit. When the electricity supplied to the track circuit device power supply 30 cannot be supplied due to a failure of the power supply system (including lightning strike), no current flows in the rail circuit, so the magnetic flux of the train detection relay 31 disappears, resulting in a relay switch. 32 is turned off. That is, the train centralized control device 1 tracks the train as CTC information that means “track circuit drop = OFF state” indicating the presence of the train.
It is transmitted to the control computer 2. FIG. 5C is a table summarizing the relationship between the track circuit states and the CTC display information in (a) and (b) above. The CTC display information is "dropping" when "no train" and "falling" when "train exists" or "equipment failure (power failure)" as the state of ground equipment.
【0009】次に、図6〜図8を参照し、実際の列車の
レール上の走行と、列車追跡・制御コンピュータ2上の
軌道回路の関係について説明する。図6〜図8におい
て、列車追跡・制御コンピュータ2上の軌道回路の斜線
部は、列車の在線を示す軌道回路の落下状態、白抜きの
部分は、列車在線していないことを示す軌道回路の扛上
状態を表わす。ここで、追跡する列車の最後尾が在線す
る軌道回路を「基準軌道回路」、追跡する列車の進行す
る軌道回路の結びつきを「在線リンク」という。Next, with reference to FIGS. 6 to 8, the relationship between the actual traveling of the train on the rails and the track circuit on the train tracking / control computer 2 will be described. 6 to 8, the hatched portion of the track circuit on the train tracking / control computer 2 indicates the falling state of the track circuit indicating the presence of the train, and the white part indicates the track circuit indicating that the train is not present. Represents the uplifted state. Here, the track circuit in which the last part of the track to be tracked is located is called a "reference track circuit", and the connection of the track circuits in which the train to be tracked progresses is called a "track link".
【0010】図6は、実際の列車走行と列車追跡・制御
コンピュータ上の軌道回路情報の関係を示す。図6
(a)において、実際に列車の最後尾が軌道回路40に
在線するとき、列車追跡・制御コンピュータ2上は、軌
道回路40を基準軌道回路として認識し、そして、当該
列車の軌道回路照査リンケージである在線リンクとして
在線リンク46〜50を認識する。列車の走行に伴い、
図6(b)の状態へ移行する。列車の先頭車両が軌道回
路41に進入したため、軌道回路41は落下状態とな
る。さらに列車が進むと、図6(c)の状態になる。こ
の状態は列車の最後尾が在線していた軌道回路40から
列車が存在しなくなるため、軌道回路40が扛上する。
すなわち、基準軌道回路40が扛上することになる。基
準軌道回路40が扛上すると、列車追跡・制御コンピュ
ータ2は、基準軌道回路40に在線していた列車の在線
リンクしている軌道回路41、42、43、44、45
を基準軌道回路40から順に照査し、落下している軌道
回路を検出する。図6(c)のケースでは、基準軌道回
路40の扛上により、まず、軌道回路41の照査を行
い、その結果、軌道回路41が落下していることから、
軌道回路41を列車の最後尾が在線する基準軌道回路と
して認識し、基準軌道回路の情報を更新し、在線軌道回
路情報ファイル4に格納する。また、図6(c)の軌道
回路44は、軌道回路装置の故障等により列車追跡・制
御コンピュータ2上の列車の在線を示す軌道回路の落下
状態となった場合を表わす。列車追跡・制御コンピュー
タ2は、軌道回路44の落下状報を受けると、この落下
した軌道回路44に在線リンクしている列車の基準軌道
回路41や列車長、走行予測データ等をもとに、この軌
道回路44の落下情報の合理性を判断する。この場合、
合理性判断結果、不正な軌道回路の落下情報として認識
し、指令員に対して警報出力、表示通知等を行う。な
お、図6(c)において、列車が在線しているにも拘ら
ず、列車追跡・制御コンピュータ2が軌道回路41の扛
上状態を受けると、同様に不正な軌道回路の扛上情報と
して認識し、指令員に対して警報出力、表示通知等を行
う。FIG. 6 shows the relationship between actual train travel and track circuit information on the train tracking / control computer. Figure 6
In (a), when the last part of the train actually exists in the track circuit 40, the train tracking / control computer 2 recognizes the track circuit 40 as a reference track circuit, and the track circuit checking linkage of the train is used. The on-rail links 46 to 50 are recognized as certain on-rail links. As the train runs,
The state shifts to that shown in FIG. Since the head car of the train has entered the track circuit 41, the track circuit 41 is in a falling state. When the train progresses further, the state shown in FIG. In this state, the train no longer exists from the track circuit 40 on which the last part of the train was located, so the track circuit 40 moves up.
That is, the reference track circuit 40 is lifted. When the reference track circuit 40 is lifted, the train tracking / control computer 2 causes the track circuits 41, 42, 43, 44, 45 linked to the on-track lines of the trains on the reference track circuit 40.
Are sequentially checked from the reference track circuit 40 to detect a falling track circuit. In the case of FIG. 6 (c), the track circuit 41 is first checked by the elevation of the reference track circuit 40, and as a result, the track circuit 41 has dropped,
The track circuit 41 is recognized as the reference track circuit on which the last part of the train is located, the information of the reference track circuit is updated, and the updated track circuit information file 4 is stored. Further, the track circuit 44 of FIG. 6 (c) represents a case where the track circuit indicating the presence of the train on the train tracking / control computer 2 is dropped due to a failure of the track circuit device or the like. When the train tracking / control computer 2 receives the drop notification of the track circuit 44, the train tracking / control computer 2 uses the reference track circuit 41, the train length, the travel prediction data, and the like of the train that is linked to the track circuit 44 that has fallen on the track. The rationality of the drop information of the track circuit 44 is judged. in this case,
As a result of the rationality judgment, it recognizes it as illegal fall information of the track circuit, and issues an alarm output, display notification, etc. to the dispatcher. In addition, in FIG. 6C, when the train tracking / control computer 2 receives the lifted state of the track circuit 41 despite the presence of the train, it is similarly recognized as incorrect lifted information of the track circuit. Then, an alarm output and display notification are given to the ordering staff.
【0011】図7、図8は、進路開通方向と在線リンク
の関係を示す。図7(a)は、正常時における信号機5
1の現示名称と進路開通方向及び在線リンクの関係を表
わす。いま、列車68がA駅50に接近し、軌道回路5
9に在線したとき、列車追跡・制御コンピュータ2は、
ダイヤファイル3を基に当該列車68をA駅2番線に入
場させるべく、A駅の入場信号機51に対して「RD
1」(RD1:2番線への進路名称)の進路出力要求を
行う。この進路出力要求は列車集中制御装置1を介して
入場信号機51へ伝達され、入場信号機51は「RD
1」すなわちA駅2番線への進路を開通する。続いて、
この入場信号機51の進路開通状態が列車集中制御装置
1を介してCTC情報として列車追跡・制御コンピュー
タ2に伝達される。列車追跡・制御コンピュータ2は、
このCTC情報を取得すると、信号機名称、この場合
「RD1」から信号機情報ファイル5の該当信号機51
の現示名称を更新し、併せて信号機名称から進路リンク
情報ファイル6を検索し、当該列車の在線リンク軌道回
路を作成し、在線リンク軌道回路ファイル7に格納す
る。この状態を列車追跡・制御コンピュータ2の在線認
識として示すと、図7(a)となる。53〜57は列車
68の在線軌道回路照査軌道回路を示す在線リンクであ
り、信号機52の開通方向RD1側、すなわち、A駅2
番線へ在線リンク53〜57が設定される。7 and 8 show the relationship between the route opening direction and the on-rail link. FIG. 7A shows the traffic signal 5 in a normal state.
1 represents the relationship between the displayed name, the route opening direction, and the on-rail link. Now, the train 68 approaches the A station 50, and the track circuit 5
When you are on line 9, the train tracking / control computer 2
In order to allow the train 68 to enter the A station line 2 on the basis of the timetable file 3, the “RD
1 ”(RD1: route name to track 2) is requested. This route output request is transmitted to the admission signal 51 via the central train control device 1, and the admission signal 51 causes the “RD
1 ", that is, the route to A station line 2 is opened. continue,
The route opening state of the entrance signal 51 is transmitted to the train tracking / control computer 2 as CTC information via the train centralized control device 1. Train tracking / control computer 2
When this CTC information is acquired, the traffic signal name, in this case, "RD1", corresponds to the traffic signal 51 in the traffic signal information file 5.
Is updated, and the route link information file 6 is also searched from the traffic signal name to create the on-rail link track circuit of the train and store it in the on-rail link track circuit file 7. This state is shown in FIG. 7A when the train tracking / control computer 2 recognizes the train. Numerals 53 to 57 are on-rail links indicating on-rail track circuit inspection track circuits of the train 68, and are on the RD1 side of the traffic signal 52 in the opening direction, that is, A station 2
On-line links 53 to 57 are set to the numbered line.
【0012】図7(b)は、図7(a)において在線リ
ンクが確立した直後に、軌道回路に電気を供給する給電
システムに何らかの障害が発生し、軌道回路に電気が送
られなくなった状態を表わす。軌道回路に電気が供給さ
れなくなると、図5に示す通り、レール電流がなくな
り、列車検知リレー31の磁束がなくなり、リレースイ
ッチ32が開放されることから、結果として、列車追跡
・制御コンピュータ2は、CTC情報として列車の在線
と等価の軌道回路落下情報を取得することになる。その
ため、図7(b)に示す列車追跡・制御コンピュータ2
上の認識する軌道回路58〜67は全て落下状態とな
る。給電システムの障害は、走行している列車に対して
も電気の供給を絶つことから、列車は自走能力を失い、
緊急停止する。しかし、高速で走行中の列車は、停止す
るためにある程度の停止距離を必要とするため、給電シ
ステムの障害が発生したときに、列車が在線していた軌
道回路と給電システムの障害が回復した時に列車が在線
している軌道回路は必ずしも一致しない。列車が高速で
走行していればいるほど、また、駅構内付近を走行して
いると、障害回復後の軌道回路は殆ど一致することはな
い。図7(b)は、在線リンクが確立した直後の給電シ
ステムの障害発生であり、また、当該列車68が停止距
離を要したために、進路が開通されていたA駅2番線に
進入して停止した状態を示している。FIG. 7 (b) shows a state in which electricity is no longer sent to the track circuit due to some failure in the power supply system for supplying electricity to the track circuit immediately after the on-line link is established in FIG. 7 (a). Represents When electricity is not supplied to the track circuit, as shown in FIG. 5, the rail current disappears, the magnetic flux of the train detection relay 31 disappears, and the relay switch 32 is opened. As a result, the train tracking / control computer 2 , CTC information is obtained as track circuit drop information equivalent to the presence of a train. Therefore, the train tracking / control computer 2 shown in FIG.
All of the track circuits 58 to 67 recognized above are in a falling state. The failure of the power supply system cuts off the supply of electricity to the running train, so the train loses its self-propelled ability,
Make an emergency stop. However, trains running at high speed require a certain amount of stopping distance to stop, so when the failure of the power supply system occurred, the failure of the track circuit where the train was located and the power supply system recovered. Sometimes the track circuits on which trains are located do not necessarily match. The higher the train is running, and the closer it is to running inside the station yard, the track circuits after failure recovery will hardly match. FIG. 7B shows a failure of the power supply system immediately after the on-rail link is established, and the train 68 required a stop distance. Therefore, the train entered the A station line 2 where the route was opened and stopped. It shows the state of being done.
【0013】図8は、給電システムの障害が回復したと
きの列車追跡・制御コンピュータ2の動作を表わす。給
電システムが回復すると、軌道回路装置に電気が再び供
給される。電気が供給された軌道回路では、列車の在線
していない軌道回路は列車検知リレーに磁束を生じてリ
レースイッチがON状態になることにより、軌道回路扛
上状態になり、また、列車の在線している軌道回路では
列車検知リレーのリレースイッチがOFF状態のままで
軌道回路短絡状態を保ち、軌道回路落下状態になり、こ
の情報が列車集中制御装置1を介してCTC情報として
列車追跡・制御コンピュータ2に伝達される。列車追跡
・制御コンピュータ2は、受信したCTC情報により給
電システム障害発生前の基準軌道回路59が扛上してい
ることを検知すると、在線リンク53〜57に基づいて
軌道回路を照査する。まず、扛上した基準軌道回路59
の在線リンク先軌道回路である軌道回路60を照査す
る。軌道回路60は列車が存在しない状態、つまり軌道
回路の扛上状態となっているため、次の在線リンク先軌
道回路である軌道回路61を照査する。軌道回路61も
軌道回路60と同様に軌道回路扛上状態となっているた
め、さらに先の在線リンク軌道回路である軌道回路65
を照査する。軌道回路65は列車68の在線により軌道
回路状態が落下状態となっていることから、列車追跡・
制御コンピュータ2は軌道回路65に列車68の最後尾
が在線していると判断して、軌道回路65を基準軌道回
路として情報を更新し、在線軌道回路情報ファイル4に
格納する。このように、基準軌道回路が扛上することに
より、在線リンク軌道回路を基準軌道回路から順に照査
し、落下状態にある軌道回路を検出すると、その軌道回
路を新たな基準軌道回路と判断し、在線軌道回路情報フ
ァイル4を更新し、格納する。これにより、障害回復後
の列車の在線位置及び当該列車を速やかに且つ自動的に
確定することができる。FIG. 8 shows the operation of the train tracking / control computer 2 when the power supply system failure is recovered. When the power supply system is restored, the track circuit device is supplied with electricity again. In the track circuit to which electricity is supplied, the track circuit in which the train is not present generates magnetic flux in the train detection relay and the relay switch is turned on. In the track circuit, the relay switch of the train detection relay remains in the OFF state, the track circuit is short-circuited, and the track circuit drops, and this information is transferred to the train tracking / control computer as CTC information via the central train control device 1. 2 is transmitted. When the train tracking / control computer 2 detects from the received CTC information that the reference track circuit 59 before the failure of the power feeding system has risen, it checks the track circuit based on the on-rail links 53 to 57. First, the upgraded standard track circuit 59
The track circuit 60 which is the track circuit of the on-rail link destination is checked. Since the track circuit 60 is in a state in which no train exists, that is, the track circuit is in a raised state, the track circuit 61, which is the next on-rail link destination track circuit, is checked. Like the track circuit 60, the track circuit 61 is also in a state in which the track circuit is lifted, so that the track circuit 65, which is an on-track link track circuit, further ahead.
To check. Since the track circuit 65 is in the falling state due to the presence of the train 68, the track tracking
The control computer 2 determines that the tail end of the train 68 is in the track circuit 65, updates the information using the track circuit 65 as a reference track circuit, and stores it in the track circuit information file 4. In this way, when the reference track circuit is lifted, the on-track link track circuit is checked in order from the reference track circuit, and when the track circuit in the falling state is detected, the track circuit is determined as a new reference track circuit, The on-rail track circuit information file 4 is updated and stored. As a result, it is possible to promptly and automatically determine the in-rail position of the train after the failure recovery and the train concerned.
【0014】次に、図9〜図12を参照し、列車追跡・
制御コンピュータ2がCTC情報として軌道回路の落下
情報を取得した場合と、軌道回路の扛上情報を取得した
場合の処理フローについて説明する。図9及び図11
は、軌道回路が扛上している状態から落下状態へ変化し
たときの処理フローを示す。図9において、ステップ1
では、落下した軌道回路に対して在線リンクの有無を検
索し、不正な軌道回路の落下であるか否かを判定する。
ここでは、在線リンクのない軌道回路の落下は、列車の
走行に関係のない軌道回路の変化情報と判断し、ステッ
プ5の在線外処理によつて不正な軌道回路の落下として
警報出力、表示等を実行する。当該軌道回路に在線リン
クがある場合は、列車の軌道回路への進入による軌道回
路と考えられるため、ステップ2では、当該軌道回路の
変化が基準軌道回路からみて、有効な範囲の軌道回路変
化であるか否かの判定を行う。図11に、図9のステッ
プ2の有効軌道回路の判定処理の詳細処理フローを示
す。ステップ2−1において、落下した軌道回路に在線
リンクしている列車について、表2(図4)のNo.1
在線列車テーブルポインターを用いて該当する在線列車
テーブル4−1を検索し、表1(図3)のNo.1列車
番号を取り出し、ステップ2−2において、取り出した
列車番号を基に表1のNo.2基準軌道回路から当該列
車番号の最後尾が在線する軌道回路番号を取り出す。ス
テップ2−3では、取り出した基準軌道回路を基に在線
リンク軌道回路ファイル7から在線リンク軌道回路を取
り出す。続いて、ステップ2−4では、取り出した在線
リンク軌道回路の内、列車長、走行予測等から当該列車
の在線可能な軌道回路を在線リンク軌道回路ファイル7
から取り出す。次に、ステップ2−5において、落下し
た軌道回路が当該列車の在線可能な軌道回路に該当する
か否かを判定し、判定の結果、一致する場合は列車の軌
道回路への進入を決定し、不一致の場合は列車の進入以
外の軌道回路の落下と決定し、図9ステップ2へ戻る。
図9のステップ3において、ステップ2の結果を判定
し、落下した軌道回路が在線有効広範囲の場合は、ステ
ップ4において軌道回路在線処理を行い、在線軌道回路
情報ファイル4を更新し、格納する。落下した軌道回路
が在線有効広範囲外の場合は、ステップ5の軌道回路在
線処理において不正な軌道回路の変化発生として警報を
出力、表示等を実施する。Next, referring to FIG. 9 to FIG.
The processing flow when the control computer 2 acquires the drop information of the track circuit as the CTC information and when it acquires the uplift information of the track circuit will be described. 9 and 11
Shows a processing flow when the track circuit changes from a lifted state to a dropped state. In FIG. 9, step 1
Then, the dropped track circuit is searched for presence / absence of an on-rail link, and it is determined whether or not the track circuit has fallen illegally.
Here, it is judged that the drop of the track circuit without the on-rail link is the change information of the track circuit which is not related to the running of the train, and the out-of-rail process in step 5 outputs an alarm as an illegal drop of the track circuit, display, etc. To execute. If the track circuit has an on-rail link, it is considered that the track circuit is due to the train entering the track circuit. Therefore, in Step 2, the change in the track circuit is within the effective range of the track circuit from the reference track circuit. It is determined whether there is any. FIG. 11 shows a detailed processing flow of the effective track circuit determination processing in step 2 of FIG. In step 2-1, for the trains that are linked to the track circuits that have fallen, the No. of Table 2 (FIG. 4) is set. 1
The on-rail train table 4-1 is searched using the on-rail train table pointer, and No. 1 in Table 1 (FIG. 3) is searched. The train number of No. 1 in Table 1 is extracted based on the train number extracted in step 2-2. 2 From the reference track circuit, take out the track circuit number where the last part of the train number is located. In step 2-3, the on-rail link track circuit is extracted from the on-rail link track circuit file 7 based on the extracted reference track circuit. Then, in step 2-4, among the extracted on-rail link track circuits, the on-rail link track circuit file 7 is used to find the track circuits on which the train can be on-track, based on the train length, running prediction, and the like.
Take out from. Next, in step 2-5, it is determined whether or not the track circuit that has fallen corresponds to a track circuit in which the train can stay in the train. If they do not match, it is determined that the track circuit has fallen except for the entry of the train, and the process returns to step 2 in FIG.
In step 3 of FIG. 9, the result of step 2 is determined, and if the dropped track circuit is in the effective range of the on-rail circuit, the track circuit on-rail process is performed in step 4, and the on-rail circuit information file 4 is updated and stored. If the dropped track circuit is outside the effective range of the track, the warning signal is output and displayed as an incorrect track circuit change in the track circuit on-line process in step 5.
【0015】図10及び図12は、落下していた軌道回
路が扛上状態へ変化したときの処理フローを示す。図1
0において、落下していた軌道回路が扛上すると、ステ
ップ100では、扛上した軌道回路に該当する軌道回路
追跡テーブル4−2から表2のNo.5またはNo.6
リンク軌道回路情報を取り出し、扛上した軌道回路の在
線リンクの有無を検索する。検索の結果、在線リンクが
認められなかった場合は、列車の通過に伴う軌道回路の
扛上ではないと判断し、ステップ150において不正な
軌道回路の扛上の処理を実施する。在線リンクが認めら
れた場合、ステップ110において、表2のNo.1在
線列車テーブルポインターを用いて該当する在線列車テ
ーブル4−1を検索し、表1のNo.1列車番号を取り
出す。ステップ120では、表1のNo.2基準軌道回
路から当該列車番号の最後尾が在線する軌道回路番号を
取り出し、ステップ130において、扛上した軌道回路
番号と表1のNo.2基準軌道回路の軌道回路番号とを
比較する。比較の結果、扛上した軌道回路番号と基準軌
道回路番号が一致していれば、ステップ140におい
て、基準軌道回路更新処理を行う。また、不一致であれ
ば、基準軌道回路以外の軌道回路扛上であるとして、ス
テップ150において不正な軌道回路の扛上の処理を実
施する。不正落下した軌道回路の扛上であれば、ステッ
プ160で軌道回路の不正状態を解除する。FIG. 10 and FIG. 12 show a processing flow when the track circuit that has been dropped is changed to the lifted state. Figure 1
When the track circuit that has fallen is lifted at 0, in step 100, the track circuit tracking table 4-2 corresponding to the lifted track circuit No. 4 to No. 2 in Table 2. 5 or No. 6
The link track circuit information is taken out and the presence or absence of the on-track link of the upgraded track circuit is searched. As a result of the search, if the on-rail link is not recognized, it is determined that the track circuit is not lifted due to the passage of the train, and in step 150, an illegal track circuit lifting process is executed. If the on-line link is recognized, in step 110, No. 2 in Table 2 is selected. No. 1 in Table 1 is searched using the in-rail train table pointer 4-1. 1 Take out the train number. In step 120, No. 1 in Table 1 is selected. 2 From the reference track circuit, the track circuit number in which the last part of the train number is located is taken out, and in step 130, the track circuit number that was lifted and No. 1 in Table 1 are taken out. 2 Compare the track circuit number of the reference track circuit. As a result of the comparison, if the enhanced track circuit number and the reference track circuit number match, in step 140, the reference track circuit update process is performed. If they do not match, it is determined that the track circuit other than the reference track circuit has been expanded, and in step 150, the processing for increasing the incorrect track circuit is executed. If the track circuit has fallen illegally, the illegal state of the track circuit is released in step 160.
【0016】図12は、図10のステップ140の基準
軌道回路更新処理の詳細処理フローを示す。図12にお
いて、ステップ140−1では、在線リンク軌道回路番
号を取り出すため、軌道回路追跡テーブル4−2の表2
のNo.5またはNo.6リンク軌道回路情報を検索す
る。ステップ140−2では、ステップ140−1のリ
ンク軌道回路情報に基づいて在線リンク先軌道回路の在
線状態を検索する。リンク先軌道回路に該当する軌道回
路追跡テーブル4−2を取り出し、取り出したテーブル
内の表2のNo.3在線状態の情報を参照する。ステッ
プ140−3では、No.3在線状態が「落下」状態で
あれば、ステップ140−5の基準軌道回路の更新処理
を行う。No.3在線状態が「落下」状態でなければ、
ステップ140−4において次に照査する軌道回路を設
定し、ステップ140−2へ戻る。この処理はステップ
140−3において軌道回路の落下が検出されるまで繰
り返される。ステップ140−5において、在線列車テ
ーブル4−1の表1のNo.2基準軌道回路の情報を前
記のリンク先軌道回路番号に更新する。すなわち、落下
を検出した軌道回路を列車の最後尾が在線する軌道回路
すなわち基準軌道回路として判断し、基準軌道回路情報
を更新し、格納する。これにより、列車の在線軌道回路
及び列車番号を確定することができる。ステップ140
−6では、新たに基準軌道回路となった軌道回路から在
線可能な軌道回路の範囲を算出し、ステップ140−7
において、扛上した軌道回路の軌道回路追跡テーブル4
−2の表2のNo.5またはNo.6のリンク軌道回路
情報を更新し、扛上した軌道回路の在線リンクを切断す
る。これは、元の基準軌道回路の在線リンクを切断する
ことにより、常に列車の最後尾が在線する軌道回路から
進行方向への軌道回路照査を確実なものとし、併せて元
の基準軌道回路への後続列車の在線リンクを可能とする
ことになり、軌道回路照査範囲の細密化を保つことがで
きる。FIG. 12 shows a detailed processing flow of the reference trajectory circuit update processing of step 140 of FIG. In FIG. 12, in Step 140-1, the track circuit tracking table 4-2 of Table 2 is obtained in order to retrieve the on-track link track circuit number.
No. 5 or No. Search for 6-link track circuit information. In step 140-2, the on-rail state of the on-rail link destination track circuit is searched based on the link track circuit information of step 140-1. The track circuit tracking table 4-2 corresponding to the linked track circuit is taken out, and No. 2 in Table 2 in the taken out table is taken out. 3 Refer to the information on the status of existing lines. In step 140-3, No. If the 3-rail status is the "falling" status, the reference track circuit is updated in step 140-5. No. 3 If the line status is not "falling",
In step 140-4, the track circuit to be checked next is set, and the process returns to step 140-2. This process is repeated until a drop in the track circuit is detected in step 140-3. In step 140-5, No. 1 in Table 1 of the on-rail train table 4-1 is selected. 2 Update the reference track circuit information to the linked track circuit number. That is, the track circuit in which the fall is detected is determined as the track circuit in which the last part of the train is located, that is, the reference track circuit, and the reference track circuit information is updated and stored. As a result, the on-track track circuit and train number of the train can be determined. Step 140
At -6, the range of track circuits that can be present from the track circuit that has become the new reference track circuit is calculated, and step 140-7
Track circuit tracking table 4 of the track circuit
No. 2 in Table 2 in Table-2. 5 or No. The link track circuit information of 6 is updated, and the on-line link of the lifted track circuit is disconnected. This ensures that the track circuit is always checked in the traveling direction from the track circuit where the last part of the train is located by disconnecting the on-track link of the original reference track circuit. This enables on-track links for subsequent trains, and keeps the track circuit inspection range fine.
【0017】[0017]
【発明の効果】以上説明したように、本発明によれば、
列車運行管理システムの列車追跡・制御を司る機能にお
いて、列車集中制御装置を介して伝達されるCTC情報
の合理性を判断することにより、追跡している列車の追
跡状態が仮追跡状態に陥ることを未然に防止することが
できるため、当該列車に対してダイヤ通りの進路制御が
行え、結果として列車の遅延発生と遅延波及を防止する
ことができる。また、地上設備の故障からの復旧の際
も、地上設備側の復旧と同時に追跡していた列車の在線
位置を速やかに且つ自動的に確定することができるた
め、指令員による在線確認のための連絡作業が省かれ、
また、地上設備側の異常発生前と回復後の列車の在線位
置の不一致による列車の仮追跡状態に陥ることなく、列
車の追跡・制御を継続して実行することができ、列車遅
延の早急な回復を行うことができる。As described above, according to the present invention,
In the function that manages the train tracking / control of the train operation management system, the tracking state of the tracked train falls into the provisional tracking state by determining the rationality of the CTC information transmitted via the train centralized control device. Since it is possible to prevent the occurrence of trains, it is possible to perform route control according to the schedule for the train, and as a result, it is possible to prevent train delay occurrence and delay spread. In addition, even when the ground equipment is restored from a failure, it is possible to quickly and automatically determine the location of the train that was being tracked at the same time as the restoration of the ground equipment. The contact work was omitted,
In addition, train tracking and control can be continuously executed without falling into a temporary train tracking state due to the inconsistency of the in-rail position of the train before and after the occurrence of an abnormality on the ground equipment side. Can recover.
【図1】本発明の一実施形態による列車運行管理システ
ムの構成図FIG. 1 is a configuration diagram of a train operation management system according to an embodiment of the present invention.
【図2】本発明の在線軌道回路情報ファイルの構成図FIG. 2 is a configuration diagram of an on-rail track circuit information file of the present invention.
【図3】表1 在線列車テーブルの構成表図[Fig. 3] Table 1 Schematic diagram of on-rail train table
【図4】表2 軌道回路追跡テーブルの構成表図FIG. 4 is a table showing the configuration of a track circuit tracking table in Table 2.
【図5】軌道回路の仕組みとCTC情報との関係を示す
図FIG. 5 is a diagram showing a relationship between a track circuit mechanism and CTC information.
【図6】本発明による列車走行と列車追跡・制御コンピ
ュータ上の軌道回路情報の関係を示す図FIG. 6 is a diagram showing a relationship between train traveling and track circuit information on a train tracking / control computer according to the present invention.
【図7】本発明による進路開通方向と在線リンクの関係
を示す図FIG. 7 is a diagram showing a relationship between a route opening direction and an on-rail link according to the present invention.
【図8】本発明による進路開通方向と在線リンクの関係
を示す図FIG. 8 is a diagram showing a relationship between a route opening direction and an on-rail link according to the present invention.
【図9】本発明による軌道回路落下処理フロー図FIG. 9 is a flowchart of a track circuit dropping process according to the present invention.
【図10】本発明による軌道回路落下処理ステップ2の
詳細処理フロー図FIG. 10 is a detailed process flow chart of a track circuit dropping process step 2 according to the present invention.
【図11】本発明による軌道回路扛上処理フロー図FIG. 11 is a flowchart of a track circuit raising process according to the present invention.
【図12】本発明による軌道回路扛上処理ステップ14
0の詳細処理フロー図FIG. 12: Track circuit raising processing step 14 according to the present invention
Detailed processing flow chart of 0
1…列車集中制御装置 2…列車追跡・制御コン
ピュータ
3…ダイヤファイル 4…在線軌道回路情報フ
ァイル
5…信号機情報ファイル 6…進路リンク情報ファ
イル
7…在線リンク軌道回路ファイル
8…指令卓(運転整理用端末)
40〜45、58〜67…軌道回路
46〜50、53〜57…在線リンク
51…信号機1 ... Centralized control device 2 ... Train tracking / control computer 3 ... Diamond file 4 ... Track track circuit information file 5 ... Traffic signal information file 6 ... Track link information file 7 ... Track link track circuit file 8 ... Command console (for rescheduling) Terminals) 40-45, 58-67 ... Track circuits 46-50, 53-57 ... On-line link 51 ... Traffic light
Claims (4)
中制御装置を介して伝達されるCTC情報に基づいて列
車の追跡・制御を行う列車運行管理システムにおいて、
追跡する列車の最後尾が在線する軌道回路(基準軌道回
路)を記憶する機能と、追跡する列車の進行する軌道回
路の在線リンクを作成し、該在線リンクを記憶する機能
と、基準軌道回路と該列車の列車長から軌道回路の異常
落下または異常扛上を判断する機能を備え、追跡する列
車の基準軌道回路が扛上した場合、在線リンクに従い順
に軌道回路を照査し、落下状態である軌道回路を検出し
たとき、列車の在線位置と在線列車を追跡列車として特
定し、異常落下または異常扛上した軌道回路を検出した
とき、該軌道回路を不正な軌道回路として認識すること
を特徴とする列車運行管理システム。1. A train operation management system for tracking and controlling a train based on CTC information transmitted from a track circuit device which is a ground facility via a train centralized control device,
A function of storing a track circuit (reference track circuit) in which the last part of the track to be tracked is located, a function of creating an on-track link of the track circuit of the train to be tracked, and storing the track link, and a reference track circuit It has a function to judge abnormal drop or abnormal uplift of the track circuit from the train length of the train, and if the reference track circuit of the train to be tracked is uplifted, the track circuits are checked in sequence according to the on-rail links, and the track is in a falling state. When the circuit is detected, the on-rail position of the train and the on-rail train are specified as tracking trains, and when the abnormally dropped or abnormally elevated track circuit is detected, the track circuit is recognized as an illegal track circuit. Train operation management system.
尾が在線する軌道回路(基準軌道回路)が扛上したと
き、列車の通過と判断することを特徴とする列車運行管
理システム。2. The train operation management system according to claim 1, wherein when the track circuit (reference track circuit) in which the tail end of the tracked train is located is elevated, it is determined that the train has passed.
中制御装置を介して伝達されるCTC情報に基づいて列
車の追跡・制御を行う列車運行管理システムにおいて、
追跡する列車の最後尾が在線する軌道回路(基準軌道回
路)を記憶する機能と、追跡する列車の進行する軌道回
路の在線リンクを作成し、該在線リンクを記憶する機能
と、基準軌道回路から在線リンクの軌道回路を照査する
機能を備え、地上設備に障害が発生し、全ての軌道回路
が落下状態となった場合、地上設備の故障回復時に、地
上設備故障前の基準軌道回路から在線リンクに従い順に
軌道回路を照査し、列車の最後尾が在線する軌道回路を
検出したとき、当該列車を地上設備故障前の追跡列車と
して特定することを特徴とする列車運行管理システム。3. A train operation management system for tracking and controlling a train based on CTC information transmitted from a track circuit device which is a ground facility via a train centralized control device,
From the reference track circuit, the function to memorize the track circuit where the last part of the track to track (reference track circuit), the function to create the track link of the track circuit where the train to track progresses, and to store the track link With a function to check the track circuit of the on-rail link, if a failure occurs in the ground equipment and all of the track circuits fall, when the ground equipment fails and recovers, the reference track circuit before the ground equipment failure is linked A train operation management system characterized in that the track circuit is sequentially checked in accordance with the above, and when the track circuit in which the last part of the train is located is detected, the train is specified as a tracked train before the ground equipment failure.
する列車の進行する軌道回路の在線リンクは、追跡する
列車の最後尾が在線する軌道回路(基準軌道回路)情
報、当該列車の進路を構成する信号機の現状状態と進路
開通方向の情報及び当該列車の進行方向の情報をもとに
作成することを特徴とする列車運行管理システム。4. The on-track link of the track circuit on which the train to be tracked travels according to claim 1 or claim 3, wherein the track circuit (reference track circuit) information on which the tail end of the track to track is located and the course of the train. A train operation management system, which is created based on the current state of the traffic lights that constitute it, information on the route opening direction, and information on the traveling direction of the train.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32218696A JP3455794B2 (en) | 1996-11-19 | 1996-11-19 | Train operation management system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32218696A JP3455794B2 (en) | 1996-11-19 | 1996-11-19 | Train operation management system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10147242A JPH10147242A (en) | 1998-06-02 |
| JP3455794B2 true JP3455794B2 (en) | 2003-10-14 |
Family
ID=18140910
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP32218696A Expired - Fee Related JP3455794B2 (en) | 1996-11-19 | 1996-11-19 | Train operation management system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3455794B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102323813A (en) * | 2011-05-16 | 2012-01-18 | 北京和利时系统工程有限公司 | Simulation test system and method based on CTCS (China Train Control System) 2-level train control system |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5306083B2 (en) * | 2009-07-06 | 2013-10-02 | 三菱電機株式会社 | Automatic train control device and train control method |
| WO2012176234A1 (en) * | 2011-06-22 | 2012-12-27 | 株式会社 日立製作所 | Operation management system and alarm output system |
| JP5557215B2 (en) * | 2011-10-04 | 2014-07-23 | 株式会社京三製作所 | Train presence information distribution device |
| JP6468529B2 (en) * | 2014-09-19 | 2019-02-13 | 大同信号株式会社 | Track circuit state determination device |
| WO2018034001A1 (en) * | 2016-08-19 | 2018-02-22 | 三菱電機株式会社 | Wireless train control system and train position correction method |
| CN108327747B (en) * | 2018-01-17 | 2020-04-21 | 中铁第四勘察设计院集团有限公司 | Interface method for centralized system controlled by motor train section and signal system |
| WO2020012937A1 (en) * | 2018-07-11 | 2020-01-16 | 株式会社日立製作所 | Train control apparatus and train control method |
| CN108803584B (en) * | 2018-08-20 | 2022-03-15 | 赖明福 | Railway line condition simulation method and system |
| KR102095236B1 (en) * | 2018-11-07 | 2020-03-31 | 대아티아이 (주) | Train Number Management System |
| JP7193430B2 (en) * | 2019-08-23 | 2022-12-20 | 株式会社日立製作所 | Train operation control system |
-
1996
- 1996-11-19 JP JP32218696A patent/JP3455794B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102323813A (en) * | 2011-05-16 | 2012-01-18 | 北京和利时系统工程有限公司 | Simulation test system and method based on CTCS (China Train Control System) 2-level train control system |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10147242A (en) | 1998-06-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3455794B2 (en) | Train operation management system | |
| JP4454303B2 (en) | Signal security system | |
| CN216467864U (en) | Railway monitoring system | |
| CN113859331A (en) | A railway monitoring system and monitoring method thereof | |
| US20040049327A1 (en) | Radio based automatic train control system using universal code | |
| CN101786459B (en) | Train temporary speed-limiting method based on self-organizing network | |
| CN114715225B (en) | Unmanned system of maglev train | |
| JP3053802B1 (en) | Electronic interlocking device | |
| JP2010012932A (en) | Train monitoring system | |
| CN111923968B (en) | Safety protection method and system for level crossing | |
| CN210591934U (en) | Full-automatic locomotive protection separation system | |
| CN118790318A (en) | Train control method and system | |
| CN104309653B (en) | Crossings within section alert notice device and control method thereof | |
| JP4470166B2 (en) | Train operation management device | |
| JP2008239054A (en) | Train control system | |
| CN114715226B (en) | Control method of unmanned system | |
| Kornaszewski | Safe device solutions in railway traffic control systems | |
| JP2003002205A (en) | Garage management device | |
| KR20180038931A (en) | System and method for monitoring breakage railroad under atp level 3 | |
| AU2018201912B2 (en) | Method for controlling a level crossing and railway installation for implementing such method | |
| JP2002255032A (en) | Train detection management system and train entry / exit detection method | |
| CN121020254A (en) | Control methods, systems, electronic equipment and storage media for loading and unloading equipment in railway freight yards | |
| Wang et al. | Research on Recovery from Location Failure of a Fully Automatic Operation Train between Two Adjacent Stations | |
| KR102061676B1 (en) | Train control safety backup apparatus and method | |
| CN119142390A (en) | Train operation control system based on SIL4 level perception technology |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |