Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4470166B2 - Train operation management device - Google Patents
[go: Go Back, main page]

JP4470166B2 - Train operation management device - Google Patents

Train operation management device Download PDF

Info

Publication number
JP4470166B2
JP4470166B2 JP2004247066A JP2004247066A JP4470166B2 JP 4470166 B2 JP4470166 B2 JP 4470166B2 JP 2004247066 A JP2004247066 A JP 2004247066A JP 2004247066 A JP2004247066 A JP 2004247066A JP 4470166 B2 JP4470166 B2 JP 4470166B2
Authority
JP
Japan
Prior art keywords
state
train
equipment
signal
failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004247066A
Other languages
Japanese (ja)
Other versions
JP2006062513A (en
Inventor
孝則 小池
直樹 三浦
英貴 大隅
直樹 三和
博之 油井
康則 小澤
克郎 駒嵜
崇 桑原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
East Japan Railway Co
Hitachi Industry and Control Solutions Co Ltd
Original Assignee
Hitachi Ltd
Hitachi Information and Control Solutions Ltd
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd, Hitachi Information and Control Solutions Ltd, East Japan Railway Co filed Critical Hitachi Ltd
Priority to JP2004247066A priority Critical patent/JP4470166B2/en
Publication of JP2006062513A publication Critical patent/JP2006062513A/en
Application granted granted Critical
Publication of JP4470166B2 publication Critical patent/JP4470166B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Description

本発明は、列車運行管理装置に係り、特に、駅の現場設備が故障した場合に、他の正常な現場設備を制御し、信号機の自動制御を継続するための手段に関する。   The present invention relates to a train operation management apparatus, and more particularly, to a means for controlling other normal on-site facilities and continuing automatic control of traffic lights when a station on-site facility breaks down.

列車運行管理装置は、制御対象の各駅に設置され、信号機を制御するために、日々の列車ダイヤの情報と軌道回路の落下・扛上状態から各列車の在線位置を特定する。各駅に接近した列車については、当該列車の列車番号と日々のダイヤ情報とから、自動制御すべき信号機を決定する。   The train operation management device is installed at each control target station, and specifies the position of each train on the basis of daily train schedule information and track circuit falling / floating states in order to control traffic lights. For a train approaching each station, a traffic signal to be automatically controlled is determined from the train number of the train and daily schedule information.

信号機の自動制御においては、列車運行管理装置は、連動条件すなわち各信号機固有の制御条件と、駅構内の現場設備の状態情報と、現場設備の情報および列車ダイヤの情報に基づく自動制御の可否判断の情報とにより、制御対象とする信号機が真に制御可能か否かを判断する。制御可能と判断した場合は、連動装置に対して制御指示を出力し、列車に対して走行を指示する。   In the automatic control of traffic lights, the train operation management device determines whether automatic control is possible based on the interlocking conditions, that is, the control conditions specific to each traffic light, the status information of the on-site equipment in the station, the information on the on-site equipment, and the information on the train schedule. Based on the information, it is determined whether or not the traffic signal to be controlled is truly controllable. When it is determined that control is possible, a control instruction is output to the interlocking device, and the train is instructed to travel.

列車運行管理装置が参照する現場設備の状態情報には、軌道回路の落下または扛上の状態,転てつ器の向き,信号機の点灯状態,信号機の制御に伴う現場設備の鎖錠状態などが含まれる。列車運行管理装置は、これら現場設備の情報をビットまたは数値として管理する。   The field equipment status information referred to by the train operation management device includes the track circuit falling or standing state, the direction of the switch, the lighting condition of the traffic light, and the locked state of the field equipment associated with the traffic signal control. included. The train operation management device manages the information on the field facilities as bits or numerical values.

現場設備が故障した場合または交換などで現場設備を使用不可の状態にした場合に備えて、現場設備の情報は、安全側の値を定常値として設定されている。例えば、軌道回路は、落下状態とし、信号機の現示すなわち信号機が指し示す進行または停止の指示は、停止状態にするなどである。したがって、現場設備の故障が発生すると、上記理由から、従来の列車運行管理装置では、信号機の自動制御が不可能となる。   In preparation for a case where the field equipment breaks down or the field equipment is made unusable due to replacement or the like, the information on the field equipment is set with a safe value as a steady value. For example, the track circuit is in a fall state, and the indication of the traffic signal, that is, the progress or stop command indicated by the traffic signal, is in the stop state. Therefore, when a failure of the on-site equipment occurs, the conventional train operation management device cannot automatically control the traffic lights for the above reason.

自動制御が不可能となる状況に対応する手段として、応急運転がある。応急運転は、現場設備の故障により列車運行管理装置が信号機を制御できなくなった場合に、駅員による手旗信号の表示または手信号代用信号機の操作により、列車を制御する代替手段である。   As a means for dealing with situations where automatic control is impossible, there is an emergency operation. Emergency operation is an alternative means of controlling a train by displaying a flag signal or operating a hand signal substitute signal by a station employee when the train operation management device becomes unable to control the signal due to a failure of a field facility.

転てつ器などが故障した場合に当該転てつ器を含む軌道回路区間を応急運転範囲として軌道回路区間予約テーブルに登録する方法が提案されている(例えば、特許文献1参照)。この登録により、連動装置は、故障した転てつ器の情報を無視でき、その他の関係する転てつ器の自動制御による転換を可能としている。   There has been proposed a method of registering the track circuit section including the switch as an emergency operation range in the track circuit section reservation table when a switch or the like breaks down (see, for example, Patent Document 1). By this registration, the interlocking device can ignore the information on the failed switch and can switch by other automatic control of the related switch.

また、軌道回路の故障状態を記憶し、その記憶情報に基づき、故障した現場設備の情報をマスクし、故障機器が正常であるときの連動処理をし、応急運転が可能な状態とする方法が提案されている(例えば、特許文献2参照)。   Also, there is a method for storing the failure state of the track circuit, masking the information on the failed field facility based on the stored information, performing the interlocking process when the failed device is normal, and making the emergency operation possible It has been proposed (see, for example, Patent Document 2).

特開平06−286613号公報 (第4〜6頁 図1〜図7)Japanese Patent Laid-Open No. 06-286613 (pages 4-6, FIGS. 1-7) 特開平10−181601号公報 (第3〜4頁 図1〜図3)Japanese Patent Laid-Open No. 10-181601 (pages 3 to 4 and FIGS. 1 to 3)

従来の列車運行管理装置では、手信号代用信号機は、自動制御の対象設備には含まれていない。このため、信号機,転てつ器,軌道回路などの現場設備の故障により手信号代用信号機を扱う場合は、駅員が各駅に進入する列車とそのとるべき進路とを逐一確認し、駅員の手動制御により扱わなければならない。この手動制御は、列車の円滑な走行の妨げとなり、列車ダイヤが乱れる原因となる。   In the conventional train operation management device, the hand signal substitute signal is not included in the automatic control target equipment. For this reason, when handling hand signal substitute traffic signals due to failure of on-site equipment such as traffic lights, switchboards, track circuits, etc., station staff checks each train entering each station and the course to be taken one by one, and manual control of station staff Must be handled by. This manual control hinders smooth running of the train and causes the train diagram to be disturbed.

また、列車運行管理装置は、列車の在線位置の変化を軌道回路を用いて検知し、列車の走行実績を取得する。軌道回路が故障した場合、故障した軌道回路の位置によっては列車の走行実績を正しく取得できない場合がある。この場合、列車は出発済みであるにもかかわらず、システム上は未出発とみなすため、実際の走行との差異が生じる。   In addition, the train operation management device detects a change in the train position using the track circuit, and acquires a train traveling result. When a track circuit breaks down, depending on the position of the track circuit that has failed, it may not be possible to correctly acquire the train running record. In this case, although the train has already departed, the system considers that the train has not departed, resulting in a difference from actual travel.

さらに、列車運行管理装置は、当該列車が駅を出発したとみなすことができないので、制御すべき列車の順序情報を更新できず、後続列車の走行が不可能な状態となる。   Furthermore, since the train operation management device cannot consider that the train has departed from the station, the train order information to be controlled cannot be updated, and the subsequent train cannot travel.

特許文献2の連動方法は、列車走行中に現場設備の故障が発生した場合、故障した軌道回路の状態情報を無視し、制御済み信号機による進路鎖錠を解除する。したがって、現場設備の故障後に進入する列車については、列車ダイヤの情報を参照して、駅に進入する列車の順序情報を作成できず、信号機の自動制御も不可能である。   In the interlocking method of Patent Document 2, when a failure of a field facility occurs during train traveling, the state information of the failed track circuit is ignored, and the route lock by the controlled traffic light is released. Therefore, for trains that enter after failure of the on-site equipment, it is impossible to create order information of trains that enter the station with reference to train diagram information, and automatic control of traffic lights is also impossible.

本発明の第1の目的は、駅の現場設備が故障した場合でも、応急運転への対応を自動制御により実現し、列車群を円滑に運行する手段を備えた列車運行管理装置を提供することである。   A first object of the present invention is to provide a train operation management device that is provided with means for smoothly operating a train group that realizes emergency response by automatic control even when station equipment on the station breaks down. It is.

本発明の第2の目的は、軌道回路が故障した場合であっても、列車の走行実績を取得し、列車運行管理装置による列車の自動制御を継続できる状態にする手段を備えた列車運行管理装置を提供することである。   A second object of the present invention is train operation management provided with means for obtaining train running results and allowing trains to be continuously controlled by the train operation management device even when the track circuit is broken. Is to provide a device.

本発明は、上記2つの目的を達成するために、連動装置を介して接続された駅の信号機,軌道回路,転てつ器などの現場設備の状態を記憶する設備状態管理データベースと、信号機状態管理データベースと、駅を走行する列車のダイヤ情報を管理するダイヤ情報データベースと、これらデータベースの情報に基づき前記現場設備に制御指示を出力し、現場設備の制御状態に基づき列車に走行指示を出力する演算処理手段とからなる列車運行管理装置において、設備状態管理データベースが、現場設備の故障状態を記憶する故障状態欄を備え、信号機状態管理データベースが、信号機に付随する手信号代用信号機の代用可否を記憶する手信号代用許可欄を備え、演算処理手段が、駅の現場設備の偶発故障または計画的な交換による使用不可能な状態が発生した場合に、使用可能な現場設備の情報および手信号代用信号機の代用可否の情報に基づき、手信号代用信号機を含む制御すべき現場設備を判定し、現場設備に対する制御指示および列車に対する走行指示を演算する列車運行管理装置を提案する。 In order to achieve the above two objects, the present invention provides an equipment state management database for storing the state of on-site equipment such as a traffic signal, a track circuit, and a switch in a station connected via an interlocking device, and a traffic light state. A management database, a schedule information database for managing schedule information of trains traveling in a station, and a control instruction is output to the field facility based on the information in the database, and a travel instruction is output to the train based on the control state of the field facility In the train operation management device comprising the arithmetic processing means, the equipment state management database has a failure state column for storing the failure state of the on-site equipment, and the traffic light state management database indicates whether or not the hand signal substitution signal associated with the traffic light can be substituted. It has a hand signal substitution permission column to memorize, and the processing means cannot be used due to accidental failure or planned replacement of the station site equipment. When the condition occurs, based on the information of the substitute permission information available field equipment and hand signals substitute signals, determines the scene equipment to be controlled, including a hand signal substitute signals, to the control instruction and the train for site facilities We propose a train operation management device that calculates travel instructions.

本発明は、また、それぞれの連動装置を介して接続された複数の駅の信号機,軌道回路,転てつ器などの現場設備の状態を記憶する設備状態管理データベースと、信号機状態管理データベースと、複数の駅を走行する列車のダイヤ情報を管理するダイヤ情報データベースと、これらデータベースの情報に基づき各駅の現場設備に制御指示を出力し、現場設備の制御状態に基づき列車に走行指示を出力する演算処理手段とからなる中央集中型列車運行管理装置において、設備状態管理データベースが、各駅の現場設備の故障状態を記憶する故障状態欄を備え、信号機状態管理データベースが、各駅の信号機に付随する手信号代用信号機の代用可否を記憶する手信号代用許可欄を備え、演算処理手段が、駅の現場設備の偶発故障または計画的な交換による使用不可能な状態が発生した場合に、使用可能な現場設備の情報および手信号代用信号機の代用可否の情報に基づき、手信号代用信号機を含む制御すべき現場設備を判定し、現場設備に対する制御指示および列車に対する走行指示を演算する中央集中型列車運行管理装置を提案する。
The present invention also includes an equipment state management database for storing the state of field equipment such as traffic lights, track circuits, and switchboards of a plurality of stations connected via respective interlocking devices, a traffic light state management database, A schedule information database that manages the schedule information of trains traveling at multiple stations, and a calculation instruction that outputs control instructions to the on-site equipment at each station based on the information in these databases, and outputs a travel instruction to the train based on the control status of the on-site equipment In the centralized train operation management device comprising processing means, the equipment state management database has a failure state column for storing the failure state of the on-site equipment at each station, and the traffic light state management database is a hand signal associated with the traffic signal at each station. A hand signal substitution permission column is provided for storing whether or not the substitution signal can be substituted. If the unusable condition occurs due to, based on the information of the substitute permission information available field equipment and hand signals substitute signals, determines the scene equipment to be controlled, including a hand signal substitute signals, for site facilities A centralized train operation management device that calculates control instructions and travel instructions for trains is proposed.

現場設備の故障状態および当該現場設備に対する制御指示の結果に基づき現場設備の故障状態を推定し設備状態管理データベースの故障状態欄を更新する故障状態自動検知手段を備えることができる。   A failure state automatic detecting means for estimating the failure state of the field facility based on the failure state of the field facility and the result of the control instruction for the field facility and updating the failure state column of the facility state management database can be provided.

演算処理手段は、駅の構内における旅客乗降位置,列車留置位置,その近傍の軌道回路が故障した場合に、隣接する軌道回路の状態に基づき列車の在線状況を推定する手段と、当該列車の在線位置の推定結果により列車の発車または到着の時刻を推定する手段とを含むことも可能である。   Arithmetic processing means includes means for estimating the presence of a train on the basis of the state of an adjacent track circuit when a passenger boarding / departing position on the station premises, a train detention position, or a nearby track circuit fails, and It is also possible to include means for estimating the departure or arrival time of the train based on the position estimation result.

本発明によれば、駅の信号機,軌道回路,転てつ器などの駅の現場設備の故障が発生した場合でも、応急運転を自動制御により実施するので、円滑な列車運行を継続できる。また、列車の走行実績についても、故障前の状態と同様に取得できる。   According to the present invention, even when a station equipment such as a traffic signal, a track circuit, and a switch in the station fails, emergency operation is performed by automatic control, so that smooth train operation can be continued. Also, the train performance can be acquired in the same manner as before the failure.

次に、図1〜図14を参照して、本発明による列車運行管理装置の実施形態を説明する。
≪実施形態1≫
図1は、本発明による列車運行管理装置の実施形態1の系統構成を示すブロック図である。列車運行管理装置1は、演算処理手段10と、設備状態を記憶する設備状態管理テーブル11と、信号機の手信号代用許可(手代許可)状態を記憶する信号機状態管理テーブル12と、日々の列車ダイヤを格納するダイヤ情報DB13とを含む。列車運行管理装置1の制御用端末2は、列車の在線状態を表示するとともに、駅員の列車運行管理装置1に対する入力手段となっている。
Next, with reference to FIGS. 1-14, embodiment of the train operation management apparatus by this invention is described.
Embodiment 1
FIG. 1 is a block diagram showing a system configuration of Embodiment 1 of a train operation management apparatus according to the present invention. The train operation management device 1 includes an arithmetic processing unit 10, an equipment state management table 11 that stores equipment states, a traffic light state management table 12 that stores hand signal substitution permission (hands money permission) states of traffic lights, and daily trains. And a diamond information DB 13 for storing diamonds. The control terminal 2 of the train operation management device 1 displays an on-line status of the train and serves as an input means for the train operation management device 1 of the station staff.

列車運行管理装置1と連動装置20とは、各駅に設置され、各駅の現場設備30を制御する。   The train operation management device 1 and the interlocking device 20 are installed at each station and control the field equipment 30 at each station.

各駅の現場設備30としては、信号機51,52、信号機51,52の故障時に使用する手信号代用信号機61,62、在線位置を検知するための軌道回路71〜75、転てつ器81,82がある。また、各駅には、旅客ホーム45,46がある。   As the field equipment 30 at each station, the traffic lights 51 and 52, the hand signal substitute traffic lights 61 and 62 used when the traffic lights 51 and 52 fail, the track circuits 71 to 75 for detecting the position of the line, and the switch 81 and 82 There is. Each station has passenger homes 45 and 46.

列車を制御する際に、列車運行管理装置1は、列車40の列車番号の情報とダイヤ情報DB13に格納されるダイヤ情報とをもとに、制御対象の信号機を決定する。例えば、列車40が列車ダイヤで旅客ホーム45に到着し出発する場合は、制御対象の信号機は、信号機51,52となる。   When the train is controlled, the train operation management device 1 determines a traffic signal to be controlled based on the train number information of the train 40 and the diagram information stored in the diagram information DB 13. For example, when the train 40 arrives at the passenger home 45 by a train diagram and departs, the traffic signals to be controlled are the traffic signals 51 and 52.

列車運行管理装置1は、これらの信号機51,52を制御するために、連動装置20に対して制御指示を出力する。連動装置20は、各駅の現場設備30のうち、制御対象の信号機51,52の制御可否をチェックする。具体的には、信号機51の場合は、使用する軌道回路71,72,73が落下状態でないことをチェックし、旅客ホーム45の列車ダイヤ上の使用順序、転てつ器81のある軌道回路71の列車ダイヤ上の使用順序などの自動制御に必要な条件をチェックする。   The train operation management device 1 outputs a control instruction to the interlocking device 20 in order to control these traffic lights 51 and 52. The interlocking device 20 checks whether or not the traffic signals 51 and 52 to be controlled are controllable among the on-site facilities 30 of each station. Specifically, in the case of the traffic light 51, it is checked that the track circuits 71, 72, 73 to be used are not in a fall state, the use sequence on the train diagram of the passenger home 45, the track circuit 71 with the switch 81. Check the conditions necessary for automatic control, such as the order of use on train schedules.

チェックOKである場合は、転てつ器81を旅客ホーム45の側に転換し、各々の現場設備の鎖錠を確認できた時点で、信号機51を進行の現示にする制御指示を連動装置20に対して出力する。これら設備状態の一連の状態については、設備状態管理テーブル11に周期的に記憶する。   If the check is OK, the switch 81 is switched to the passenger home 45 side, and when the lock on each field facility is confirmed, a control instruction to indicate the progress of the traffic light 51 is linked to the interlocking device. 20 is output. A series of these equipment states is periodically stored in the equipment state management table 11.

図2は、列車運行管理装置1が保有する設備状態管理テーブル11の構成の一例を示す図表である。設備状態管理テーブル11は、設備名称欄201、設備状態欄202、故障状態欄203からなる。設備状態欄202には、信号機の進行・停止,転てつ器の向き,軌道回路の落下・扛上などの各種状態を記憶する。故障状態欄203には、各設備が故障状態にあるときに、故障状態を記憶する。   FIG. 2 is a chart showing an example of the configuration of the equipment state management table 11 possessed by the train operation management device 1. The equipment state management table 11 includes an equipment name field 201, an equipment state field 202, and a failure state field 203. In the equipment state column 202, various states such as the progress / stop of the traffic light, the direction of the switch, the fall of the track circuit, and the hoisting are stored. The failure state column 203 stores a failure state when each facility is in a failure state.

図3は、列車運行管理装置1が保有する信号機状態管理テーブル12の構成の一例を示す図表である。信号機状態管理テーブル12は、設備名称欄211、手信号代用許可欄212からなる。手信号代用許可欄212には、各信号機が手信号代用許可の状態にある場合に、その旨を記憶する。   FIG. 3 is a chart showing an example of the configuration of the traffic light state management table 12 possessed by the train operation management device 1. The traffic light state management table 12 includes an equipment name column 211 and a hand signal substitution permission column 212. In the hand signal substitution permission column 212, when each traffic signal is in the hand signal substitution permission state, the fact is stored.

図1〜図3により、故障状態の登録方法を説明する。各駅の現場設備30の故障が発生した場合、その故障を次のように登録する。   A failure state registration method will be described with reference to FIGS. When a failure occurs in the field equipment 30 at each station, the failure is registered as follows.

第1に、信号機51が故障した場合、列車運行管理装置1が、連動装置20に対して制御指示を出したにもかかわらず、所定時間経過しても、信号機51の現示が停止のままであるとする。この場合、設備状態管理テーブル11に変化が生じないため、列車運行管理装置1は、信号機51に何らかの異常が発生したことを認識できる。   1stly, when the traffic signal 51 breaks down, even if the train operation management device 1 issues a control instruction to the interlocking device 20, even if a predetermined time elapses, the display of the traffic signal 51 remains stopped. Suppose that In this case, since no change occurs in the equipment state management table 11, the train operation management device 1 can recognize that some abnormality has occurred in the traffic light 51.

この場合、列車運行管理装置1は制御用端末2に対して、信号機51が異常である旨の警報を出力する。これを各駅の駅員が認識し、制御用端末2から、当該信号機が故障したことを列車運行管理装置1に入力する。この情報は、設備状態管理テーブル11の故障状態欄203に記憶される。そこで、列車運行管理装置1は、信号機51が故障状態になったものとみなす。   In this case, the train operation management device 1 outputs a warning to the control terminal 2 that the traffic light 51 is abnormal. The station staff at each station recognizes this, and inputs from the control terminal 2 to the train operation management device 1 that the signal has failed. This information is stored in the failure state column 203 of the equipment state management table 11. Therefore, the train operation management apparatus 1 considers that the traffic light 51 is in a failure state.

第2に、転てつ器81が故障した場合、その故障を次のように登録する。   Secondly, when the switch 81 fails, the failure is registered as follows.

列車運行管理装置1が、連動装置20に対して制御指示を出力した場合に、信号機51が使用する現場設備の範囲内に列車がいないにもかかわらず、所定時間経過しても、転てつ器81が転換できない状態が継続したとする。この場合、転てつ器81について設備状態管理テーブル11の設備状態欄202に記憶される情報が、本来変化すべきところ、当該情報に変化がないので、列車運行管理装置1は、転てつ器81に何らかの異常が発生したことを認識できる。   When the train operation management device 1 outputs a control instruction to the interlocking device 20, even if a predetermined time elapses even though there is no train within the range of the field equipment used by the traffic light 51, the train operation management device 1 falls. It is assumed that the state where the device 81 cannot be changed continues. In this case, the information stored in the equipment state column 202 of the equipment state management table 11 for the switch 81 is supposed to change, but the information does not change. It can be recognized that some abnormality has occurred in the device 81.

この場合、列車運行管理装置1は、制御用端末2に対して、転てつ器81が異常である旨の警報を出力する。これを各駅の駅員が認識し、制御用端末2から、当該転てつ器81が故障したことを列車運行管理装置1に入力する。この情報は、設備状態管理テーブル11の故障状態欄203に記憶される。そこで、列車運行管理装置1は、転てつ器81が故障状態になったものとみなす。   In this case, the train operation management device 1 outputs an alarm to the control terminal 2 that the switch 81 is abnormal. The station staff at each station recognizes this and inputs from the control terminal 2 to the train operation management device 1 that the switch 81 has failed. This information is stored in the failure state column 203 of the equipment state management table 11. Therefore, the train operation management apparatus 1 considers that the switch 81 is in a failure state.

第3に、軌道回路72が故障した場合、その故障を次のように登録する。列車40が軌道回路72,73の順に進入し、それから軌道回路73が扛上した後も、軌道回路72が落下したままの状態であるとする。または、軌道回路72に隣接する軌道回路71,73が扛上状態にもかかわらず、突然軌道回路72のみが落下したとする。いずれの場合も、当該軌道回路72だけが単独で軌道回路が落下していると考えられる。   Third, when the track circuit 72 fails, the failure is registered as follows. It is assumed that the track circuit 72 remains dropped after the train 40 enters the track circuits 72 and 73 in this order, and then the track circuit 73 climbs. Alternatively, it is assumed that only the track circuit 72 suddenly falls although the track circuits 71 and 73 adjacent to the track circuit 72 are in the upright state. In either case, it is considered that only the track circuit 72 is falling alone.

この場合には、列車運行管理装置1は、制御用端末2に対して、軌道回路72が不正に落下した旨の警報を出力する。駅員が、当該警報の出力を確認し、または制御用端末2の目視により、軌道回路72が故障であると認識した場合には、制御用端末2から、当該軌道回路72が故障したことを列車運行管理装置1に入力する。この情報は、設備状態管理テーブル11の故障状態欄203に記憶される。そこで、列車運行管理装置1は、軌道回路72が故障状態になったものとみなす。   In this case, the train operation management apparatus 1 outputs an alarm to the control terminal 2 that the track circuit 72 has been dropped illegally. When the station staff confirms the output of the alarm or visually recognizes the track circuit 72 from the control terminal 2, the train terminal confirms that the track circuit 72 has failed from the control terminal 2. Input to the operation management device 1. This information is stored in the failure state column 203 of the equipment state management table 11. Therefore, the train operation management apparatus 1 considers that the track circuit 72 is in a failure state.

次に信号機が故障状態となった場合または転てつ器や軌道回路が故障状態になったことにより、当該現場設備を使用する信号機を制御できなくなった場合に、制御すべき信号機を手信号代用信号機に変更し、自動制御を継続する方法を説明する。   Next, if the traffic light becomes faulty, or if it becomes impossible to control the traffic light that uses the on-site equipment due to the failure of a switch or track circuit, the signal to be controlled is replaced with a hand signal. A method for changing to a traffic light and continuing automatic control will be described.

例として、信号機51が制御不可能な状態となった場合を説明する。信号機51に付随する手信号代用信号機61の制御を許可する場合は、制御用端末2から列車運行管理装置1に、手信号代用信号機61の手信号代用許可の情報を入力する。この情報は、信号機状態管理テーブル12の手信号代用許可欄212に記憶される。列車運行管理装置1は、信号機51の替わりに手信号代用信号機61を制御すべき信号機として認識する。   As an example, a case where the traffic light 51 becomes uncontrollable will be described. When permitting control of the hand signal substitute signal device 61 associated with the signal device 51, information on the hand signal substitute permission of the hand signal substitute signal device 61 is input from the control terminal 2 to the train operation management device 1. This information is stored in the hand signal substitution permission column 212 of the traffic light state management table 12. The train operation management device 1 recognizes the hand signal substitute signal device 61 as a signal device to be controlled instead of the signal device 51.

図4は、手信号代用信号機による応急運転の処理手順を示すフローチャートである。応急運転の処理手順は、図4のA−0からA−8までの各ステップからなる。   FIG. 4 is a flowchart showing a processing procedure of emergency operation by a hand signal substitute signal. The emergency operation processing procedure includes steps A-0 to A-8 in FIG.

応急運転の自動制御論理は、手信号代用信号機について自動制御に必要な条件をチェックし、当該条件が成立した場合に、設備状態管理テーブル11の故障状態欄203に故障情報が入力されているものを除いて、当該手信号代用信号機が使用する設備の鎖錠を確認できた時点で、手信号代用信号機を制御する。既に故障状態にある設備については、当該設備の設備状態欄202をチェックしない。   The emergency control automatic control logic checks the conditions necessary for automatic control of the hand signal substitute traffic signal, and when the conditions are satisfied, the failure information is entered in the failure state column 203 of the equipment state management table 11 The hand signal substitute signal is controlled when the lock of the equipment used by the hand signal substitute signal is confirmed. For equipment that is already in a failure state, the equipment state column 202 of the equipment is not checked.

まず、ステップA−0で、駅に接近した列車40の列車番号情報と列車運行管理装置1が管理するダイヤ情報DB13に格納されるダイヤ情報とから、制御対象とする信号機を決定する。   First, at step A-0, a traffic signal to be controlled is determined from the train number information of the train 40 approaching the station and the diagram information stored in the diagram information DB 13 managed by the train operation management device 1.

ステップA−1では、制御対象信号機に手信号代用許可が設定されているかをチェックする。例えば、信号機51について、信号機状態管理テーブル12の手信号代用許可欄212に手信号代用許可の情報が設定されている場合は、この処理により、ステップA−2に進む。信号機状態管理テーブル12の手信号代用許可欄212に手信号代用許可の情報がない場合は、ステップA−11に進み、信号機51を制御対象の信号機とし、ステップA−12で通常の信号機制御を実施する。   In step A-1, it is checked whether the hand signal substitution permission is set for the control target traffic light. For example, if the hand signal substitution permission information is set for the traffic light 51 in the hand signal substitution permission column 212 of the traffic light state management table 12, the process proceeds to step A-2. If there is no hand signal substitution permission information in the hand signal substitution permission column 212 of the traffic signal state management table 12, the process proceeds to Step A-11, where the traffic light 51 is set as the signal to be controlled, and normal signal control is performed in Step A-12. carry out.

ステップA−2では、ステップA−1により制御対象信号機に手信号代用許可されていることを確認した場合、制御対象の信号機を手信号代用信号機とする。   In step A-2, when it is confirmed in step A-1 that the hand signal substitution is permitted for the control target signal device, the control target signal device is set as the hand signal substitute signal device.

ステップA−3では、故障状態転てつ器をチェックする。この処理は、手信号代用信号機61が使用する設備に故障状態の転てつ器が含まれる場合に、その転てつ器の開通方向が列車40の走行する方向と一致するかをチェックする。   In Step A-3, the failure state switch is checked. In this processing, when the equipment used by the hand signal substitute signal 61 includes a faulty switch, whether or not the opening direction of the switch matches the traveling direction of the train 40 is checked.

図5は、図4の手信号代用信号機による応急運転のうちで、故障状態転てつ器チェックA−3の詳細な処理手順を示すフローチャートである。   FIG. 5 is a flowchart showing a detailed processing procedure of the fault state switch checker A-3 in the emergency operation by the hand signal substitute traffic signal of FIG.

図5の故障状態転てつ器チェックA−3は、A3−0〜A3−6の各ステップからなる。手信号代用信号機61が使用する転てつ器81には、設備状態管理テーブル11の故障状態欄203に故障情報が設定されているとする。   The fault state switch check A-3 in FIG. 5 includes steps A3-0 to A3-6. It is assumed that failure information is set in the failure state column 203 of the equipment state management table 11 for the switch 81 used by the hand signal substitute signal device 61.

ステップA3−0は、故障状態転てつ器チェックA−3の処理の開始を示す。   Step A3-0 indicates the start of processing of the fault state switch check A-3.

ステップA3−1では、故障状態にある転てつ器が、手信号代用信号機61が使用する設備に含まれるかをチェックする。故障状態の転てつ器が含まれない場合は、ステップA−6に進む。   In Step A 3-1, it is checked whether the switch in the fault state is included in the equipment used by the hand signal substitute traffic light 61. If no fault switch is included, the process proceeds to step A-6.

ステップA3−2では、故障状態にある転てつ器の向きをチェックする。通常は駅員が当該転てつ器の向きを手動転換し、故障状態にある転てつ器81を制御する。転てつ器81の故障状態欄203は、故障状態であるため、ステップA−5においては、当該転てつ器の状態は考慮していない。そのため、転てつ器81の向きが現在どちらの方向に開通しているかは、列車運行管理装置1には判別がつかない。   In step A3-2, the direction of the switch in the fault state is checked. Usually, the station staff manually changes the direction of the switch and controls the switch 81 in a broken state. Since the failure state column 203 of the switch 81 is a failure state, the state of the switch is not considered in Step A-5. Therefore, the train operation management device 1 cannot determine which direction the switch 81 is currently open.

そこで、ステップA3−2では、故障した転てつ器81について、設備状態管理テーブル11の設備状態欄202を参照し、この202の欄に記載された転てつ器81の開通方向が、列車40による開通方向と一致しているかをチェックする。開通方向が一致する場合は、ステップA3−6に移動し、異なる場合は、ステップA3−3に移動する。   Therefore, in step A3-2, with reference to the equipment state column 202 of the equipment state management table 11 for the failed switch 81, the opening direction of the switch 81 described in the column 202 is the train Check if it matches the opening direction by 40. If the opening directions match, the process moves to step A3-6, and if different, the process moves to step A3-3.

ステップA3−3では、故障状態にある転てつ器81の開通方向を確認する問いかけを制御用端末2に対して出力する。このとき、駅員は現場設備の実際の転てつ器81の開通方向を確認し、問いかけに対して制御用端末2から承認(YES)か拒否(NO)かのいずれかを応答する。   In step A3-3, an inquiry for confirming the opening direction of the switch 81 in the fault state is output to the control terminal 2. At this time, the station staff confirms the actual opening direction of the switch 81 of the field equipment, and responds to the inquiry with either approval (YES) or rejection (NO) from the control terminal 2.

ステップA3−4では、当該問いかけに対する応答を確認する。問いかけの応答が承認である場合は、ステップA3−5に進む。問いかけの応答が拒否である場合は、ステップA3−10に進み、故障状態軌道回路チェックA−3は、条件不成立とする。   In step A3-4, a response to the inquiry is confirmed. If the inquiry response is approval, the process proceeds to step A3-5. If the inquiry response is rejected, the process proceeds to step A3-10, and the failure state track circuit check A-3 is not satisfied.

ステップA3−5では、転てつ器81について列車40の走行方向に転換した状態を確認できたので、当該転てつ器81について設備状態管理テーブル11における設備状態欄202を更新する。   In step A3-5, since the state where the switch 81 is changed to the traveling direction of the train 40 can be confirmed, the equipment state column 202 in the equipment state management table 11 is updated for the switch 81.

ステップA3−6では、故障状態転てつ器チェックA−3は、条件成立とする。   In step A3-6, the failure state switch check A-3 is satisfied.

以上の故障状態転てつ器チェックA−3の結果をステップA−4で判定する。条件不成立の場合には、ステップA−14に進み、手信号代用信号機61の制御を所定時間保留した後、再度ステップA−3に戻る。   The result of the above fault state switch check A-3 is determined in step A-4. If the condition is not satisfied, the process proceeds to step A-14, and the control of the hand signal substitute traffic light 61 is suspended for a predetermined time, and then the process returns to step A-3 again.

ステップA−5では、設備状態管理テーブル11に故障状態欄203に故障情報が入力されている設備を除いて、手信号代用信号機61が使用する設備の鎖錠状態を確認し、すべて鎖錠できたかをチェックする。ここで、一部の設備でも鎖錠できていない場合は、ステップA−15に進み、手信号代用信号機61の制御を所定時間保留した後、再度ステップA−5に戻る。   In step A-5, the lock status of the equipment used by the hand signal substitute signal 61 is confirmed except for the equipment whose fault information is entered in the fault status column 203 in the equipment status management table 11, and all the locks can be locked. Check if Here, if even some of the facilities are not locked, the process proceeds to step A-15, where the control of the hand signal substitute traffic light 61 is suspended for a predetermined time, and then the process returns to step A-5 again.

図6は、図4の手信号代用信号機による応急運転のうちで、故障状態軌道回路チェックA−6の詳細な処理手順を示すフローチャートである。   FIG. 6 is a flowchart showing a detailed processing procedure of the fault state track circuit check A-6 in the emergency operation by the hand signal substitute traffic signal of FIG.

ステップA−6では、故障状態軌道回路をチェックする。この処理は、手信号代用信号機61が使用する設備に故障状態の軌道回路が含まれる場合に、当該手信号代用信号機61を制御するためにチェックする処理手順である。   In step A-6, the fault state track circuit is checked. This process is a processing procedure to check to control the hand signal substitute signal 61 when the equipment used by the hand signal substitute signal 61 includes a track circuit in a failure state.

図6に示す故障状態軌道回路チェックA−6は、A6−0〜A6−4の各ステップからなる。ここでは、手信号代用信号機61が使用する軌道回路72には、設備状態管理テーブル11の故障状態欄203に故障情報が設定されているとする。   The fault state track circuit check A-6 shown in FIG. 6 includes steps A6-0 to A6-4. Here, it is assumed that failure information is set in the failure state column 203 of the equipment state management table 11 in the track circuit 72 used by the hand signal substitute traffic light 61.

ステップA6−0は、故障状態軌道回路チェックA−6の処理の開始を示す。   Step A6-0 indicates the start of the processing of the fault state track circuit check A-6.

ステップA6−1では、手信号代用信号機61が使用する設備に、故障状態にある軌道回路が含まれるかをチェックする。故障状態の軌道回路が含まれない場合は、ステップA6−4に進む。   In step A6-1, it is checked whether or not the equipment used by the hand signal substitute traffic light 61 includes a track circuit in a fault state. If no fault track circuit is included, the process proceeds to step A6-4.

ステップA6−2では、手信号代用信号機61の制御可否の問いかけを制御用端末2に出力する。故障状態にある軌道回路72について、その落下状態が、列車40が在線することによるものか、軌道回路故障によるものか、いずれであるかを駅員が確認する余地を確保するためである。   In step A6-2, an inquiry as to whether or not the hand signal substitute signal 61 can be controlled is output to the control terminal 2. This is to ensure that the station staff can confirm whether the track circuit 72 in the failure state is due to the train 40 being on track or due to a track circuit failure.

ステップA6−3では、当該問いかけに対する応答を確認する。問いかけの応答が承認である場合は、ステップA6−4に進む。問いかけの応答が拒否である場合は、ステップA6−10に進み、故障状態軌道回路チェックA−6は条件不成立とする。   In step A6-3, a response to the inquiry is confirmed. If the response to the inquiry is approval, the process proceeds to step A6-4. If the inquiry response is rejected, the process proceeds to step A6-10, and the failure state track circuit check A-6 is not satisfied.

ステップA6−4では、故障状態軌道回路チェックA−6は、条件成立とする。   In step A6-4, the failure state track circuit check A-6 is satisfied.

以上の故障状態軌道回路チェックA−6の結果をステップA−7で判定する。条件不成立の場合には、ステップA−17に進み、手信号代用信号機61の制御を所定時間保留した後、再度ステップA−6に戻る。   The result of the above fault state track circuit check A-6 is determined in step A-7. If the condition is not satisfied, the process proceeds to step A-17, where the control of the hand signal substitute signal 61 is suspended for a predetermined time, and then the process returns to step A-6 again.

ステップA−8では、手信号代用信号機61を制御する。   In Step A-8, the hand signal substitute traffic light 61 is controlled.

図4に示す一連の処理のうち、ステップA−3,A−4,A−14が属する処理群A1−1、ステップA−5,A−15が属する処理群A1−2、ステップA−6,A−7,A−17が属する処理群A1−3の各処理群については、その順序を入れ替えた場合でも、図4に示すステップA−8と同等の処理結果が得られる。   Of the series of processing shown in FIG. 4, processing group A1-1 to which steps A-3, A-4, and A-14 belong, processing group A1-2 to which steps A-5 and A-15 belong, and step A-6 , A-7, and the processing group A1-3 to which A-17 belongs, even when the order is changed, a processing result equivalent to step A-8 shown in FIG. 4 is obtained.

現場設備30の各々の設備の故障状態が回復した場合は、制御用端末2から列車運行管理装置1に対して、各設備単位で故障状態からの回復情報または手信号代用許可の解除情報を入力する。この入力により、設備状態管理テーブル11における故障状態欄203または信号機状態管理テーブルにおける手信号代用許可欄212の情報をクリアし、故障状態の回復または手信号代用許可の解除とみなす。   When the failure state of each facility of the on-site facility 30 is recovered, the recovery information from the failure state or the release information of hand signal substitution permission is input to the train operation management device 1 from the control terminal 2 To do. By this input, the information in the failure state column 203 in the equipment state management table 11 or the hand signal substitution permission column 212 in the traffic light state management table is cleared, and it is considered that the failure state is recovered or the hand signal substitution permission is released.

続いて、軌道回路が故障した場合における列車の追跡方法についての実施形態を説明する。   Subsequently, an embodiment of a method for tracking a train when a track circuit fails will be described.

列車運行管理装置1が保有する設備状態管理テーブル11において、軌道回路71〜75の設備状態欄202に記載される各設備の現在情報は、列車40の在線位置を示す。軌道回路が故障した場合、列車運行管理装置1は、列車40の正確な在線位置を把握できず、列車40の走行実績(到着時刻および出発時刻)を取得できないことは、既に説明した。   In the equipment state management table 11 possessed by the train operation management device 1, the current information of each equipment described in the equipment state column 202 of the track circuits 71 to 75 indicates the current line position of the train 40. As described above, when the track circuit breaks down, the train operation management device 1 cannot grasp the exact position of the train 40 and cannot acquire the traveling results (arrival time and departure time) of the train 40.

図7は、旅客ホーム45に相当する位置の軌道回路73の進入側の軌道回路72が故障し軌道回路72が落下状態となった場合の列車40の到着時刻の取得方法を説明する図である。   FIG. 7 is a diagram for explaining a method for obtaining the arrival time of the train 40 when the track circuit 72 on the entry side of the track circuit 73 at a position corresponding to the passenger home 45 fails and the track circuit 72 falls. .

通常状態においては、列車40について軌道回路72および73が落下状態にあるときに、進入側の軌道回路72が落下状態から扛上状態に変化したことを到着とみなす。このときの列車40のタイムチャート300を示すと、軌道回路72の状態変化は点線301に示す通りとなる。   In the normal state, when the track circuits 72 and 73 are in the fall state for the train 40, it is considered that the entry side track circuit 72 has changed from the fall state to the uphill state. When the time chart 300 of the train 40 at this time is shown, the state change of the track circuit 72 is as shown by the dotted line 301.

図7のタイムチャート300における2点鎖線302ように進入側の軌道回路72が故障により落下状態のままである場合は、列車が旅客ホームの軌道回路73に収容しても、旅客ホーム45の軌道回路73と進入側の軌道回路72とが連続して落下した状態のままであり、軌道回路73への列車40の収容を正確には検知できない。そこで、次のような方法で列車40の在線位置を推定し、到着時刻を取得する。   When the approach-side track circuit 72 remains in a falling state due to a failure as indicated by a two-dot chain line 302 in the time chart 300 of FIG. 7, even if the train is accommodated in the track circuit 73 of the passenger home, the track of the passenger home 45 The circuit 73 and the approach-side track circuit 72 remain in a continuously falling state, and the accommodation of the train 40 in the track circuit 73 cannot be accurately detected. Therefore, the on-line position of the train 40 is estimated by the following method, and the arrival time is acquired.

前に説明したように、列車運行管理装置1は、設備状態管理テーブル11の軌道回路の設備に対する設備状態欄202を周期的にチェックし、各列車の在線状況をチェックする。列車が進入側の軌道回路72から旅客ホームの軌道回路73に進入した際、進入側軌道回路72が故障状態の場合は、設備状態管理テーブル11において、軌道回路73の設備状態欄202に落下の情報が記憶されたことを確認する。列車運行管理装置1が設備状態管理テーブル11を確認する時刻304で、設備状態管理テーブルを再度確認し、状態に変化がなければ、列車40が旅客ホーム45に到着したと判断して、列車40の到着時刻を取得する。   As explained before, the train operation management device 1 periodically checks the equipment state column 202 for the equipment of the track circuit in the equipment state management table 11 and checks the status of each train. When the train enters the track circuit 73 of the passenger home from the approach side track circuit 72, if the approach side track circuit 72 is in a failure state, the train state falls into the facility state column 202 of the track circuit 73 in the facility state management table 11. Confirm that the information has been stored. At time 304 when the train operation management device 1 checks the equipment state management table 11, the equipment state management table is checked again. If the state does not change, it is determined that the train 40 has arrived at the passenger home 45, and the train 40 Get the arrival time.

図8は、旅客ホーム45に相当する位置の軌道回路73の進出側の軌道回路74が故障した場合における出発時刻の取得方法を説明する図である。   FIG. 8 is a diagram for explaining a method of acquiring a departure time when the advancing track circuit 74 of the track circuit 73 at a position corresponding to the passenger home 45 fails.

通常状態においては、列車40について軌道回路73が落下状態にあるとき、進出側の軌道回路74が扛上状態から落下状態に変化したことを出発とみなす。このときの列車40のタイムチャート310を示すと、軌道回路74の状態変化は、点線311に示す通りとなる。   In the normal state, when the track circuit 73 is in the fall state for the train 40, it is considered that the departure side track circuit 74 has changed from the suspended state to the fall state. When the time chart 310 of the train 40 at this time is shown, the state change of the track circuit 74 is as shown by the dotted line 311.

しかし、2点鎖線312のように進出側の軌道回路74が故障により落下状態のままである場合は、列車が進出側の軌道回路74に進入しても、軌道回路74が扛上から落下に変化したことを検知できない。このため、次のような方法で列車40の在線位置を推定し、出発時刻の情報を取得する。   However, when the advancing track circuit 74 remains in a fall state due to a failure as indicated by a two-dot chain line 312, even if the train enters the advancing track circuit 74, the track circuit 74 falls from the roof. Unable to detect changes. For this reason, the location position of the train 40 is estimated by the following method, and the information of departure time is acquired.

列車40は、進出側軌道回路74に進入しても設備状態管理テーブル11の設備状態欄202は変化しない。しかし、進出側軌道回路74に収容した段階で、旅客ホームの軌道回路73は扛上する。ここで設備状態管理テーブル11のうち軌道回路73の設備状態欄202は落下から扛上に変化する。このタイミングで列車40が出発した判断し、出発時刻を取得する。
≪実施形態2≫
図9は、本発明による列車運行管理装置の実施形態2の系統構成を示すブロック図である。
Even if the train 40 enters the advancing track circuit 74, the equipment state column 202 of the equipment state management table 11 does not change. However, at the stage of being accommodated in the advancing side track circuit 74, the track circuit 73 of the passenger home is hoisted. Here, the equipment state column 202 of the track circuit 73 in the equipment state management table 11 changes from falling to rising. It is determined that the train 40 has departed at this timing, and the departure time is acquired.
<< Embodiment 2 >>
FIG. 9: is a block diagram which shows the system | strain structure of Embodiment 2 of the train operation management apparatus by this invention.

列車運行管理装置101は、中央集中型の列車運行管理装置である。この列車運行管理装置101は、駅31から33までを管理し、各駅の現場設備との間では連動情報伝送回線25を介して制御を指示する。   The train operation management device 101 is a centralized train operation management device. The train operation management apparatus 101 manages stations 31 to 33 and instructs control via the link information transmission line 25 with the on-site equipment at each station.

列車運行管理装置101には、演算処理手段110と、駅31から33までの各駅の設備状態を記憶する設備状態管理テーブル111と、信号機の手信号代用許可(手代許可)状態を記憶する信号機状態管理テーブル112と、駅31から33までの各駅の列車ダイヤを格納するダイヤ情報DB113とを含む。   In the train operation management device 101, an arithmetic processing means 110, an equipment state management table 111 for storing the equipment states of each station from the stations 31 to 33, and a traffic signal for storing a hand signal substitute permission (hand charge permission) state of the traffic light. It includes a state management table 112 and a diagram information DB 113 that stores train diagrams of the stations 31 to 33.

図10は、中央集中型列車運行管理装置101が保有する設備状態管理テーブル111の構成の一例を示す図表であり、図11は、中央集中型列車運行管理装置101が保有する信号機状態管理テーブル112の構成の一例を示す図表である。   FIG. 10 is a chart showing an example of the configuration of the equipment state management table 111 held by the centralized train operation management apparatus 101. FIG. 11 shows the traffic light state management table 112 held by the centralized train operation management apparatus 101. It is a chart which shows an example of the structure of.

設備状態管理テーブル111は、駅名称欄200を含んでおり、信号機状態管理テーブル112は、駅名称欄210を含んでいるので、複数の駅の現場設備の情報を管理できる。   Since the equipment state management table 111 includes the station name column 200 and the traffic light state management table 112 includes the station name column 210, it is possible to manage on-site facility information of a plurality of stations.

駅31から33までの各駅の現場設備の故障状態については、駅員が制御用端末2から当該故障状態にある設備の故障情報を列車運行管理装置101に入力し、設備状態管理テーブル111の故障状態欄203に故障状態を記憶させると、列車運行管理装置101は、当該設備の故障状態を認識できる。   As for the failure state of the on-site facilities at the stations 31 to 33, the station staff inputs the failure information of the facility in the failure state from the control terminal 2 to the train operation management device 101, and the failure state of the facility state management table 111 When the failure state is stored in the column 203, the train operation management apparatus 101 can recognize the failure state of the equipment.

応急運転時の手信号代用信号機の制御方法については、図4のフローチャートを用いて説明した図1の列車運行管理装置1の例と同様である。   About the control method of the hand signal substitute traffic signal at the time of emergency operation, it is the same as that of the example of the train operation management apparatus 1 of FIG. 1 demonstrated using the flowchart of FIG.

また、軌道回路故障時の到着時刻および出発時刻の取得方法についても、図7および図8を用いて説明した図1の列車運行管理装置1の例と同様である。
≪実施形態3≫
図12は、本発明による列車運行管理装置の実施形態3の系統構成を示すブロック図である。
Moreover, the acquisition method of the arrival time and departure time at the time of a track circuit failure is also the same as that of the example of the train operation management apparatus 1 of FIG. 1 demonstrated using FIG. 7 and FIG.
<< Embodiment 3 >>
FIG. 12: is a block diagram which shows the system | strain structure of Embodiment 3 of the train operation management apparatus by this invention.

図12の列車運行管理装置102は、故障状態自動検知手段18を保有する。   The train operation management apparatus 102 in FIG. 12 has a failure state automatic detection means 18.

列車運行管理装置1は、現場設備の異常が発生した場合に、制御用端末2に警報を出力し、故障の疑いのある設備が当該駅に存在する旨の注意を駅員に喚起する。   The train operation management device 1 outputs a warning to the control terminal 2 when an abnormality occurs in the field facility, and alerts the station staff that a facility suspected of being present exists at the station.

この列車運行管理装置1では、駅員が、故障状態にある設備が各駅の現場設備30のいずれであるかをを確認し、制御用端末2で故障状態にある設備を選択し、列車運行管理装置1に故障状態を入力しなければならない。   In this train operation management apparatus 1, the station staff confirms which of the on-site facilities 30 at each station is the equipment in the failure state, selects the equipment in the failure state with the control terminal 2, and the train operation management apparatus. 1 must enter the fault condition.

これに対して、列車運行管理装置102では、故障の疑いがある設備を故障状態自動検知手段18が自動検知して、いずれの設備に故障の疑いがあるかを明確にする。この結果、故障の疑いのある設備の駅員による確認作業を効率化するとともに、故障状態でない設備について誤って故障状態を入力するなどの誤りを防止できる。   On the other hand, in the train operation management apparatus 102, the failure state automatic detection means 18 automatically detects facilities suspected of failure, and clarifies which facilities are suspected of failure. As a result, it is possible to improve the efficiency of the confirmation work by the station staff of the equipment that is suspected of failure, and it is possible to prevent errors such as erroneously inputting the failure state for facilities that are not in failure state.

図13は、故障状態自動検知手段18の処理手順を示すフローチャートである。   FIG. 13 is a flowchart showing a processing procedure of the failure state automatic detection means 18.

信号機や転てつ器について故障状態の自動認識方法について述べる。以下の説明で、故障の疑いがある設備とは、列車運行管理装置102が連動装置20に対して制御指示を出力した信号機について、当該信号機が使用する現場設備のうち故障状態の設定がないにもかかわらず、設備状態管理テーブル11の設備情報欄202の変化を検知できない信号機や転てつ器を意味する。   A method for automatically recognizing failure states of traffic lights and switchboards is described. In the following description, a facility that is suspected of failure is that there is no failure state setting among the on-site facilities used by the traffic signal for the traffic signal that the train operation management device 102 outputs a control instruction to the interlocking device 20. Nevertheless, it means a traffic light or a switch that cannot detect a change in the equipment information column 202 of the equipment state management table 11.

ステップB−0は、図4のステップA−0と同様であり、駅に接近した列車40の列車番号情報と列車運行管理装置102が管理するダイヤ情報DB13に格納されるダイヤ情報とから、制御対象とする信号機を決定する。   Step B-0 is the same as Step A-0 in FIG. 4, and is controlled from the train number information of the train 40 approaching the station and the diagram information stored in the diagram information DB 13 managed by the train operation management device 102. Determine the target traffic light.

ステップB−1では、故障の疑いがある設備の有無を確認する。   In step B-1, the presence or absence of equipment suspected of failure is confirmed.

ステップB−2では、故障の疑いがある設備について、真に故障状態にある設備であるか否かを制御用端末2に問いかけとして出力し、駅員の確認を促す。   In step B-2, the equipment suspected of failure is output as an inquiry to the control terminal 2 as to whether or not the equipment is truly in a trouble state, and prompts the station staff to confirm.

ステップB−3では、問いかけに対する応答を確認する。応答結果が故障である場合は、ステップB−4に進む。正常である場合は、ステップB−5に進む。   In Step B-3, a response to the inquiry is confirmed. If the response result is failure, the process proceeds to step B-4. If it is normal, the process proceeds to Step B-5.

ステップB−4では、当該故障の疑いのある設備について、設備状態管理テーブル11の故障状態欄203に故障情報を記憶する。   In step B-4, the failure information is stored in the failure state column 203 of the facility state management table 11 for the facility suspected of the failure.

ステップB−5では、故障状態の認識処理を終了する。   In step B-5, the failure state recognition process is terminated.

軌道回路73について故障状態の自動認識方法について説明する。軌道回路71〜75がすべて扛上状態であったところから、軌道回路73のみが突然落下した場合のように、特定の軌道回路が落下したときに、両隣接の軌道回路が扛上状態である場合は、当該落下した軌道回路は故障状態であると推定される。このとき、図13のステップB−0〜B−5に準じて、当該落下軌道回路について故障状態の問いかけを出力し、応答結果が承認である場合は、当該落下軌道回路の設備状態管理テーブル11の故障状態欄203に故障情報を記憶する。   A method for automatically recognizing the failure state of the track circuit 73 will be described. When all of the track circuits 71 to 75 are in the lifted state, when a specific track circuit is dropped, such as when only the track circuit 73 is suddenly dropped, both adjacent track circuits are in the lifted state. In this case, the dropped track circuit is estimated to be in a failure state. At this time, according to Steps B-0 to B-5 in FIG. 13, a failure state inquiry is output for the drop track circuit, and if the response result is approval, the equipment state management table 11 of the drop track circuit The failure information is stored in the failure state column 203 of FIG.

図14は、旅客ホーム45に相当する位置の軌道回路73が故障し軌道回路73が落下状態となった状態を示す図である。   FIG. 14 is a diagram illustrating a state in which the track circuit 73 at a position corresponding to the passenger home 45 has failed and the track circuit 73 has fallen.

軌道回路の故障状態の自動認識方法の別の実施例としては、列車の移動に伴うものがある。列車40は、軌道軌道回路71〜75を順に使用する。   As another example of the automatic recognition method of the track circuit failure state, there is one accompanying the movement of the train. The train 40 uses the track circuit 71 to 75 in order.

軌道回路73および74について着目すると、軌道回路73の落下状態において軌道回路74が落下し、その後、軌道回路74が落下状態である状態で軌道回路73が扛上するはずである。   Paying attention to the track circuits 73 and 74, the track circuit 74 should fall in the fall state of the track circuit 73, and then the track circuit 73 should rise in a state where the track circuit 74 is in the fall state.

これに対して、軌道回路73の落下状態において軌道回路74が扛上状態から落下状態に変化し、再び軌道回路74が扛上した場合は、列車40に列車の併合や分割の運用がない限り、列車40が退行して軌道回路73に再度収容したか、軌道回路73が故障し列車40の移動により軌道回路74が扛上したかのいずれかである。   On the other hand, when the track circuit 74 changes from the hoisting state to the falling state in the fall state of the track circuit 73 and the track circuit 74 rises again, unless the train 40 is operated to merge or divide the train. Either the train 40 retreats and is accommodated again in the track circuit 73, or the track circuit 73 breaks down and the track circuit 74 rises due to the movement of the train 40.

そこで、分割や併合の運用モードを持たない列車について、上記軌道回路変化が生じた場合に、故障状態の問いかけを出力し、駅員の判断を求める方法が自動認識方法の実施例として考えられる。
≪実施形態4≫
図1の実施形態1の列車運行管理装置1に故障状態自動検知手段18を設置して図12の実施形態3としたように、図9の実施形態1の中央集中型列車運行管理装置101に故障状態自動検知手段18を設置すると、ここでは図示していないが、故障状態自動検出手段を備えた中央集中型列車運行管理装置103を実現できることは、明らかであろう。
Therefore, a method of outputting a question about a failure state and obtaining a judgment of a station staff when a change in the track circuit occurs for a train having no operation mode of division or merging is considered as an example of the automatic recognition method.
<< Embodiment 4 >>
As shown in Embodiment 3 of FIG. 12 by installing the failure state automatic detection means 18 in the train operation management apparatus 1 of Embodiment 1 of FIG. 1, the centralized train operation management apparatus 101 of Embodiment 1 of FIG. If the failure state automatic detection means 18 is installed, it will be apparent that the centralized train operation management apparatus 103 provided with the failure state automatic detection means can be realized, although not shown here.

これらの実施例によれば、駅の信号機,軌道回路,転てつ器などの駅の現場設備の故障が発生した場合に、手信号代用信号機への切替をシステム内部で実施でき、手信号代用信号機を自動制御できる。また、列車の走行実績を継続して取得でき、走行実績の欠落を防止できる。したがって、応急運転時であっても、列車運行を円滑に継続できる。   According to these embodiments, in the event of failure of station equipment such as station traffic lights, track circuits, and switchboards, switching to hand signal substitute signals can be performed within the system, and hand signal substitutes are possible. The traffic light can be automatically controlled. In addition, it is possible to continuously acquire the train travel record and prevent the lack of travel record. Therefore, train operation can be continued smoothly even during emergency operation.

本発明による列車運行管理装置の実施形態1の系統構成を示すブロック図である。It is a block diagram which shows the system | strain structure of Embodiment 1 of the train operation management apparatus by this invention. 列車運行管理装置1が保有する設備状態管理テーブル11の構成の一例を示す図表である。It is a chart which shows an example of composition of equipment state management table 11 which train operation management device 1 holds. 列車運行管理装置1が保有する信号機状態管理テーブル12の構成の一例を示す図表である。It is a chart which shows an example of the composition of traffic light state management table 12 which train operation management device 1 holds. 手信号代用信号機による応急運転の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of emergency operation by a hand signal substitute signal. 図4の手信号代用信号機による応急運転のうちで、故障状態転てつ器チェックA−3の詳細な処理手順を示すフローチャートである。It is a flowchart which shows the detailed process sequence of failure state switch check A-3 in the emergency operation by the hand signal substitute traffic signal of FIG. 図4の手信号代用信号機による応急運転のうちで、故障状態軌道回路チェックA−6の詳細な処理手順を示すフローチャートである。It is a flowchart which shows the detailed process sequence of failure state track circuit check A-6 in the emergency operation by the hand signal substitute traffic signal of FIG. 旅客ホーム45に相当する位置の軌道回路73の進入側の軌道回路72が故障し軌道回路72が落下状態となった場合の列車40の到着時刻の取得方法を説明する図である。It is a figure explaining the acquisition method of the arrival time of the train 40 when the track circuit 72 of the approach side of the track circuit 73 of the position corresponded to the passenger home 45 fails and the track circuit 72 will be in the fall state. 旅客ホーム45に相当する位置の軌道回路73の進出側の軌道回路74が故障した場合における出発時刻の取得方法を説明する図である。It is a figure explaining the acquisition method of the departure time when the advancing side track circuit 74 of the track circuit 73 of the position corresponding to the passenger home 45 fails. 本発明による列車運行管理装置の実施形態2の系統構成を示すブロック図である。It is a block diagram which shows the system | strain structure of Embodiment 2 of the train operation management apparatus by this invention. 中央集中型列車運行管理装置101が保有する設備状態管理テーブル111の構成の一例を示す図表である。It is a graph which shows an example of a structure of the equipment state management table 111 which the centralized train operation management apparatus 101 has. 中央集中型列車運行管理装置101が保有する信号機状態管理テーブル112の構成の一例を示す図表である。It is a graph which shows an example of a structure of the traffic light state management table 112 which the centralized train operation management apparatus 101 has. 本発明による列車運行管理装置の実施形態3の系統構成を示すブロック図である。It is a block diagram which shows the system | strain structure of Embodiment 3 of the train operation management apparatus by this invention. 故障状態自動検知手段18の処理手順を示すフローチャートである。4 is a flowchart showing a processing procedure of a failure state automatic detection means 18; 旅客ホーム45に相当する位置の軌道回路73が故障し軌道回路73が落下状態となった状態を示す図である。It is a figure which shows the state where the track circuit 73 of the position corresponded to the passenger home 45 failed and the track circuit 73 fell.

符号の説明Explanation of symbols

1 列車運行管理装置
2 制御用端末
10 演算処理手段
11 設備状態管理テーブル
12 信号機状態管理テーブル
13 ダイヤ情報DB
18 故障状態自動検知手段
20〜23 連動装置
25 連動情報伝送回線
30 各駅の現場設備
31〜33 中央集中型列車運行管理装置101の制御対象駅
40 列車
45,46 旅客ホーム
51,52 信号機
61,62 手信号代用信号機
71〜75 軌道回路
81,82 転てつ器
101 中央集中型列車運行管理装置
102 故障状態自動検知手段を備えた列車運行管理装置
103 故障状態自動検出手段を備えた中央集中型列車運行管理装置
110 中央集中型列車運行管理装置101の演算処理手段
111 中央集中型列車運行管理装置101の設備状態管理テーブル
12 中央集中型列車運行管理装置101の信号機状態管理テーブル
13 中央集中型列車運行管理装置101のダイヤ情報DB
200 設備状態管理テーブル111の駅名称欄
201 設備状態管理テーブル11または111の設備名称欄
202 設備状態管理テーブル11または111の設備状態欄
203 設備状態管理テーブル11または111の故障状態欄
210 信号機状態管理テーブル112の駅名称欄
211 信号機状態管理テーブル12または112の設備名称欄
212 信号機状態管理テーブル12または112の手信号代用許可欄
300 列車40の到着時のタイムチャート
301 軌道回路72の通常時の設備状態変化
302 軌道回路72の故障時の状態
303 軌道回路73の設備状態変化
304 軌道回路73落下時期の次の設備状態管理テーブル11の参照時刻
310 列車40の出発時のタイムチャート
311 軌道回路74の通常時の設備状態変化
312 軌道回路74の故障時の状態
313 軌道回路73の設備状態変化
DESCRIPTION OF SYMBOLS 1 Train operation management apparatus 2 Control terminal 10 Arithmetic processing means 11 Equipment state management table 12 Traffic light state management table 13 Diagram information DB
18 Failure state automatic detection means 20-23 Interlocking device 25 Interlocking information transmission line 30 On-site facilities 31-33 at each station Controlled station 40 of centralized train operation management device 101 Train 45, 46 Passenger home 51, 52 Traffic lights 61, 62 Hand signal substitute signals 71-75 Track circuits 81, 82 Switchboard 101 Centralized train operation management device 102 Train operation management device 103 with failure state automatic detection means Centralized train with failure state automatic detection means Operation Management Device 110 Arithmetic Processing Unit 111 of Centralized Train Operation Management Device 101 Equipment State Management Table 12 of Centralized Train Operation Management Device 101 Signal State Management Table 13 of Centralized Train Operation Management Device 101 Centralized Train Operation Diagram information DB of management device 101
200 Station name column 201 of the equipment state management table 111 Equipment name column 202 of the equipment state management table 11 or 111 Equipment state column 203 of the equipment state management table 11 or 111 Fault state column 210 of the equipment state management table 11 or 111 Signal state management Station name column 211 of the table 112 Equipment name column 212 of the traffic signal state management table 12 or 112 Hand signal substitution permission column 300 of the traffic signal state management table 12 or 112 Time chart 301 when the train 40 arrives 301 Normal equipment of the track circuit 72 State change 302 State at the time of failure of the track circuit 72 Facility state change 304 of the track circuit 73 Reference time 310 of the facility state management table 11 next to the track circuit 73 fall time Time chart 311 at the time of departure of the train 40 311 of the track circuit 74 Normal equipment state change 31 Equipment state change of the state 313 the track circuit 73 at the time of failure of the track circuit 74

Claims (4)

連動装置を介して接続された駅の信号機,軌道回路,転てつ器などの現場設備の状態を記憶する設備状態管理データベースと、信号機状態管理データベースと、駅を走行する列車のダイヤ情報を管理するダイヤ情報データベースと、これらデータベースの情報に基づき前記現場設備に制御指示を出力し、前記現場設備の制御状態に基づき前記列車に走行指示を出力する演算処理手段とからなる列車運行管理装置において、
前記設備状態管理データベースが、前記現場設備の故障状態を記憶する故障状態欄を備え、
前記信号機状態管理データベースが、前記信号機に付随する手信号代用信号機の代用可否を記憶する手信号代用許可欄を備え、
前記演算処理手段が、駅の現場設備の偶発故障または計画的な交換による使用不可能な状態が発生した場合に、使用可能な前記現場設備の情報および前記手信号代用信号機の代用可否の情報に基づき前記手信号代用信号機を含む制御すべき現場設備を判定し、前記現場設備に対する制御指示および前記列車に対する走行指示を演算することを特徴とする列車運行管理装置。
Manages equipment status management database that stores the status of on-site equipment such as traffic lights, track circuits, and switchboards connected via an interlocking device, traffic light status management database, and schedule information of trains that run through the station In the train operation management device comprising a diagram information database to be output, a calculation instruction to output a control instruction to the on-site equipment based on information in these databases, and to output a travel instruction to the train based on a control state of the on-site equipment ,
The facility state management database includes a failure state column for storing a failure state of the field facility,
The traffic signal state management database includes a hand signal substitution permission column for storing whether or not substitution of a hand signal substitution signal associated with the traffic signal is possible,
When the arithmetic processing means has an unusable state due to an accidental failure or planned replacement of the on-site equipment at the station, information on the usable on-site equipment and information on whether or not the hand signal substitution signal can be substituted The train operation management apparatus characterized by determining the field equipment which should be controlled including the said hand signal substitute signal based on this, and calculating the control instruction | indication with respect to the said field equipment, and the driving | running | working instruction | indication with respect to the said train.
それぞれの連動装置を介して接続された複数の駅の信号機,軌道回路,転てつ器などの現場設備の状態を記憶する設備状態管理データベースと、信号機状態管理データベースと、前記複数の駅を走行する列車のダイヤ情報を管理するダイヤ情報データベースと、これらデータベースの情報に基づき各駅の現場設備に制御指示を出力し、前記現場設備の制御状態に基づき前記列車に走行指示を出力する演算処理手段とからなる中央集中型列車運行管理装置において、
前記設備状態管理データベースが、各駅の前記現場設備の故障状態を記憶する故障状態欄を備え、
前記信号機状態管理データベースが、各駅の前記信号機に付随する手信号代用信号機の代用可否を記憶する手信号代用許可欄を備え、
前記演算処理手段が、駅の現場設備の偶発故障または計画的な交換による使用不可能な状態が発生した場合に、使用可能な前記現場設備の情報および前記手信号代用信号機の代用可否の情報に基づき前記手信号代用信号機を含む制御すべき現場設備を判定し、前記現場設備に対する制御指示および前記列車に対する走行指示を演算することを特徴とする中央集中型列車運行管理装置。
A facility state management database for storing the state of field equipment such as traffic lights, track circuits, and switchboards connected to each other via each interlocking device, a traffic light state management database, and traveling through the plurality of stations A schedule information database for managing the schedule information of trains to be operated, and a calculation processing means for outputting a control instruction to the on-site equipment at each station based on the information of these databases, and outputting a travel instruction to the train based on a control state of the on-site equipment ; In the centralized train operation management system consisting of
The facility state management database includes a failure state column for storing a failure state of the field facility at each station,
The traffic light state management database includes a hand signal substitution permission column for storing whether or not substitution of a hand signal substitution signal associated with the traffic signal at each station is performed,
When the arithmetic processing means has an unusable state due to an accidental failure or planned replacement of the on-site equipment at the station, information on the usable on-site equipment and information on whether or not the hand signal substitution signal can be substituted A centralized train operation management device characterized by determining a field facility to be controlled including the hand signal substitute signal based on the control signal and calculating a control instruction for the field facility and a traveling instruction for the train.
請求項1または2に記載の列車運行管理装置において、
前記現場設備の故障状態および当該現場設備に対する制御指示の結果に基づき前記現場設備の故障状態を推定し前記設備状態管理データベースの前記故障状態欄を更新する故障状態自動検知手段を備えたことを特徴とする列車運行管理装置。
In the train operation management device according to claim 1 or 2,
A failure state automatic detection means for estimating the failure state of the field facility based on the failure state of the field facility and the result of the control instruction for the field facility and updating the failure state column of the facility state management database Train operation management device.
請求項1ないし3のいずれか一項に記載の列車運行管理装置において、
前記演算処理手段が、駅の構内における旅客乗降位置,列車留置位置,その近傍の軌道回路が故障した場合に、隣接する軌道回路の状態に基づき列車の在線状況を推定する手段と、当該列車の在線位置の推定結果により列車の発車または到着の時刻を推定する手段とを含むことを特徴する列車運行管理装置。
In the train operation management device according to any one of claims 1 to 3,
The arithmetic processing means, when a passenger boarding / departing position in a station premises, a train detention position, and a track circuit in the vicinity of the station, a means for estimating a current status of the train based on a state of an adjacent track circuit, And a means for estimating the departure or arrival time of the train based on the estimated position position.
JP2004247066A 2004-08-26 2004-08-26 Train operation management device Expired - Fee Related JP4470166B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004247066A JP4470166B2 (en) 2004-08-26 2004-08-26 Train operation management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004247066A JP4470166B2 (en) 2004-08-26 2004-08-26 Train operation management device

Publications (2)

Publication Number Publication Date
JP2006062513A JP2006062513A (en) 2006-03-09
JP4470166B2 true JP4470166B2 (en) 2010-06-02

Family

ID=36109366

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004247066A Expired - Fee Related JP4470166B2 (en) 2004-08-26 2004-08-26 Train operation management device

Country Status (1)

Country Link
JP (1) JP4470166B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102862589A (en) * 2012-10-19 2013-01-09 上海工程技术大学 Method and device for processing emergency dispatching command data for urban rail transit

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4987419B2 (en) * 2006-10-19 2012-07-25 東日本旅客鉄道株式会社 Train control network system, station intermediate small terminal device and station intermediate control device
WO2020012937A1 (en) * 2018-07-11 2020-01-16 株式会社日立製作所 Train control apparatus and train control method
CN112583876A (en) * 2019-09-30 2021-03-30 比亚迪股份有限公司 Station management method, station management device, electronic equipment and storage medium
JP7349384B2 (en) * 2020-02-13 2023-09-22 東日本旅客鉄道株式会社 central device
CN111402106A (en) * 2020-03-16 2020-07-10 北京锦鸿希电信息技术股份有限公司 Device management method, device, system and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102862589A (en) * 2012-10-19 2013-01-09 上海工程技术大学 Method and device for processing emergency dispatching command data for urban rail transit
CN102862589B (en) * 2012-10-19 2015-04-01 上海工程技术大学 Method and device for processing emergency dispatching command data for urban rail transit

Also Published As

Publication number Publication date
JP2006062513A (en) 2006-03-09

Similar Documents

Publication Publication Date Title
US10618536B2 (en) Method and system for managing specific events related to the movements of a guided vehicle
KR100288950B1 (en) System and Method for monitoring signal equipment difficulty in train
US20250376199A1 (en) Train operation intelligent dispatching system and method
JP6041847B2 (en) Integrated interlocking device and integrated interlocking system
US20190193766A1 (en) Reinitialization method of a zone controller and associated automatic train control system
KR101023533B1 (en) Real-time remote recovery system of high speed railway agency and its control method
CN105480262B (en) Linkage control system and method for full automatic driving
KR102058940B1 (en) Safety System for Worker in Railway Tunnel
JP4470166B2 (en) Train operation management device
CN115467601A (en) A vehicle base warehouse door control system and method in a fully automatic operation line
CN115689154B (en) Urban rail transit scheduling auxiliary decision-making system based on dynamic passenger flow
KR102008924B1 (en) Safety System for Track Crossing Worker
JP3455794B2 (en) Train operation management system
CN117565941A (en) A fully automatic train monitoring system, method, equipment and storage medium
KR100954289B1 (en) How to detect and display train number movement information on train intensive control display
JP2011045207A (en) On-board information-intensive advanced safety train control system
CN118238868B (en) A railway train operation safety monitoring auxiliary system and use method
JP5889062B2 (en) Wireless train control system
KR101989378B1 (en) Inspection method using track circuit safety check device
CN116853317B (en) Automatic fault red light band identification method based on CTC system
CN113984004B (en) Linear settlement deformation monitoring system for roadbed engineering
KR100963508B1 (en) Track diagram and line station display unit for train
Kornaszewski Safe device solutions in railway traffic control systems
JP7349384B2 (en) central device
CN121375902A (en) A system and method for monitoring the consistency between the interior and exterior of a turnout

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061019

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091027

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100126

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100218

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130312

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4470166

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130312

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140312

Year of fee payment: 4

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees