JP3471182B2 - 電力系統の電圧低下現象検出方法 - Google Patents
電力系統の電圧低下現象検出方法Info
- Publication number
- JP3471182B2 JP3471182B2 JP32807896A JP32807896A JP3471182B2 JP 3471182 B2 JP3471182 B2 JP 3471182B2 JP 32807896 A JP32807896 A JP 32807896A JP 32807896 A JP32807896 A JP 32807896A JP 3471182 B2 JP3471182 B2 JP 3471182B2
- Authority
- JP
- Japan
- Prior art keywords
- voltage
- integration
- time
- voltage drop
- relay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Protection Circuit Devices (AREA)
- Control Of Voltage And Current In General (AREA)
- Control Of Electrical Variables (AREA)
- Measurement Of Current Or Voltage (AREA)
Description
電圧検出器の無い配電用変電所等において、変圧器のタ
ップを切り換える電圧調整継電器の動作状況から電力系
統の電圧低下現象を検出する方法に関する。
ている。この系統の電圧安定度を維持するためには、図
6(b)の「4」→「8」に示すような電圧低下現象を
捉えて調相設備や変圧器のタップの適切な制御を行う必
要がある。
側電圧をPT(計器用変圧器)やPD(電圧検出器)で
検出した電圧を取り込んで行っている。
圧器一次側にPTやPDが設置されていない場合があ
る。このような変電所では変圧器二次側の電圧しか取り
込めないが、変圧器二次側電圧は図6(c)に示すよう
に、電圧調整継電器4によって一定に維持されているの
で、二次側電圧のみでは変圧器一次側の電圧低下現象を
判定することができない。
てなされたものであり、その目的とするところは、変圧
器一次側にPTやPDが設置されていなくても一次側電
圧低下および系統電圧低下現象を確実に検出できる電力
系統の電圧低下現象検出方法を提供することにある。
圧器と電圧調整継電器を有し、電力系統の電圧低下時に
変圧器のタップを切り替えて二次電圧を調整するものに
おいて、前記電圧調整継電器の積分動作の開始からタッ
プ上げ指令までの時間を計測し、N回連続して所定時間
以下となったことを判定して変圧器一次側電圧の低下状
況を検出するようにしたものである。
置の構成を示す。同図において、31はバンク変圧器の
タップ切り替え中信号66及び電圧調整継電器90Ry
(以下90リレーという)の積分中信号90RINTが入
力し90リレーの上げ側積分動作の開始からタップ上げ
指令までの時間を計測する時間計測回路、T66はタップ
切り替え信号(積分中信号)66を引き延ばすオフディ
レータイマ、OR3は信号90RINTとタイマーT66の
信号を通す論理和回路、32は回路OR3に接続された
積分動作連続判定回路、33はこの回路32の出力信号
を反転して時間計測回路31をリセットするインバー
タ、35〜37は時間計測回路31のN個(整定によ
る)の計測時間をそれぞれ比較し、所定条件を満たした
場合に出力する時間判定部、AND1は積分動作連続判
定回路32からの出力信号があることを条件に時間判定
部35の信号を出力する論理積回路、AND2は積分動
作連続判定回路32からの出力信号があることを条件に
時間判定部36および37からの信号を出力する論理積
回路、OR4は回路AND1,AND2の信号を検出出
力として通す論理和回路である。
所の受電電圧が継続して低下した場合、バンクの90リ
レーは短時間の内に連続してタップ上げ信号を出力す
る。上記装置(図1)はこの90リレーの動きにより系
統電圧低下現象を検出するものである。
である。
積分中信号引き延ばしタイマT66の整定により図2のよ
うに決定される。同図より検出目標X、90リレー整定
Sk、積分満了時間Tmの関係は(1)式となる。
間Toffでも連続積分条件を成立させるため、積分中信
号引き延ばしタイマT66で補間する必要がある。これの
整定は(3)式となる。
1に示す。
る。
間整定Sk=大の場合を示したものである。
上げでも不感帯の中に少ししか入らないので、短時間の
内に次の積分が開始されるので、T66の値は小さくて良
い。また、電圧低下の傾きが一定の場合は、1回目の積
分時間と2回目の積分時間は同じ長さとなる。
間整定Sk=小の場合を示したものである。
上げで不感帯の中に大きく入るので、次の積分が開始ま
での時間が長いのでT66の値は大きくする必要がある。
また、電圧低下の傾きが一定の場合は、1回目の積分時
間と2回目の積分時間は同じ長さとなる。
な電圧低下の場合を示したものである。
上げで不感帯の中に入らずに、連続した積分となるので
T66の値は0で良い。この場合、電圧低下の傾きが一定
でも、1回目の積分時間より2回目、3回目の積分時間
は短くなる。
替え中信号などを図1の装置に入力される。同図の時間
計測回路31は、タップ切り替え中信号66と90リレ
ーの積分中信号90RINTから、今回の積分時間Tn,前
回の積分時間Tn-1,2回前の積分時間Tn-2を計測す
る。
時、今回の積分時間Tnと前回積分時間Tn-1を比較して
Tn≦Tn-1の時出力する。時間判定部36はN=3の
時、今回積分時Tnと2回前の積分時間Tn-2を比較して
Tn≦Tn-2の時出力する。また時間判定部37はN=3
の時、前回積分時間Tn-1と2回前の積分時間Tn-2を比
較してTn-1≦Tn-2の時出力する。
上げ後一旦不感帯の中に二次電圧V2が入り、90リレ
ーの積分動作が復帰し、90RINT信号がなくなる。タ
イマT 66はこの場合タップ切り替え中信号を遅らせて積
分動作連続判定回路32の連続積分判定を維持させる。
作連続判定出力及び電圧低下検出出力の概要を示下もの
である。
起因する電圧のステップ低下の発生による連続したタッ
プ上げ動作が想定されるが、この場合は、図5に示すよ
うに積分中信号の計測時間が拡大方向に有ることを検出
して誤動作を防止することができる。
で、次に記載する効果を奏する。
系統の電圧低下を検出することができるため、一次側に
PT,PDなどを設ける必要がなくなる。
したタップ上げ動作が想定されるが、これについては積
分時間が拡大方向に有るため誤検出することがない。
図。
Claims (2)
- 【請求項1】 タップ切替変圧器と電圧調整継電器を有
し、電力系統の電圧低下時に変圧器のタップを切り換え
て二次電圧を調整するものにおいて、前記電圧調整継電
器の積分動作の開始からタップ上げ指令までの時間を計
測し、N回連続して所定時間以下となったことを判定し
て変圧器一次側電圧の低下状況を検出することを特徴と
する電力系統の電圧低下現象検出方法。 - 【請求項2】 前記判定は、電圧調整継電器が積分動作
中であることを条件に今回の積分時間が前回の積分時間
より小の時判定信号出力することを特徴とする請求項1
記載の電力系統の電圧低下現象検出方法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32807896A JP3471182B2 (ja) | 1996-12-09 | 1996-12-09 | 電力系統の電圧低下現象検出方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32807896A JP3471182B2 (ja) | 1996-12-09 | 1996-12-09 | 電力系統の電圧低下現象検出方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10170557A JPH10170557A (ja) | 1998-06-26 |
| JP3471182B2 true JP3471182B2 (ja) | 2003-11-25 |
Family
ID=18206273
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP32807896A Expired - Fee Related JP3471182B2 (ja) | 1996-12-09 | 1996-12-09 | 電力系統の電圧低下現象検出方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3471182B2 (ja) |
-
1996
- 1996-12-09 JP JP32807896A patent/JP3471182B2/ja not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10170557A (ja) | 1998-06-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6950764B2 (en) | Arrangements to detect and respond to disturbances in electrical power systems | |
| JPS61240814A (ja) | 遮断器のデジタル固体引外し装置 | |
| JPS61240817A (ja) | 遮断器のデジタル固体引外し装置 | |
| US6757626B2 (en) | Trip unit and circuit breaker to prevent nuissance tripping | |
| US4821137A (en) | Positive sequence distance relay for AC power transmission line protection | |
| CN87105399A (zh) | 自监视数字式固体电路跳闸释放装置 | |
| JP3471182B2 (ja) | 電力系統の電圧低下現象検出方法 | |
| JP3502516B2 (ja) | 変圧器の一次電圧検出方法とその装置 | |
| JPH05341863A (ja) | 力率自動調整装置 | |
| JP3009069B2 (ja) | 地絡事故検出装置 | |
| JP2535938B2 (ja) | 力率自動調整装置 | |
| JP2611267B2 (ja) | 力率自動調整制御装置 | |
| JP3128584B2 (ja) | 地絡回線検出方法と地絡回線遮断方法 | |
| JPH0479718A (ja) | 間欠地絡検出方法 | |
| JP2504780B2 (ja) | 力率自動調整制御装置 | |
| JPH05256891A (ja) | 地絡事故方向検出回路 | |
| JPH01280811A (ja) | 力率自動調整制御装置 | |
| JP2001025153A (ja) | 漏電警報装置 | |
| JP2621212B2 (ja) | 力率自動調整装置 | |
| JPH07106017B2 (ja) | 直流回路事故検出装置 | |
| JP2734305B2 (ja) | ルート断事故検出装置 | |
| JPH0667743A (ja) | 力率自動調整装置 | |
| SU1026192A1 (ru) | Устройство дл испытани токовых защит | |
| JP2001033495A (ja) | 電力系統の最大電流計測装置 | |
| JPH08251810A (ja) | 半導体開閉器 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080912 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080912 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090912 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090912 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100912 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110912 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120912 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120912 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130912 Year of fee payment: 10 |
|
| LAPS | Cancellation because of no payment of annual fees |