JP3511040B2 - Method for measuring compaction of fresh concrete and method for managing compaction - Google Patents
Method for measuring compaction of fresh concrete and method for managing compactionInfo
- Publication number
- JP3511040B2 JP3511040B2 JP09887794A JP9887794A JP3511040B2 JP 3511040 B2 JP3511040 B2 JP 3511040B2 JP 09887794 A JP09887794 A JP 09887794A JP 9887794 A JP9887794 A JP 9887794A JP 3511040 B2 JP3511040 B2 JP 3511040B2
- Authority
- JP
- Japan
- Prior art keywords
- compaction
- concrete
- fresh concrete
- degree
- elastic wave
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005056 compaction Methods 0.000 title claims description 89
- 238000000034 method Methods 0.000 title claims description 36
- 238000010276 construction Methods 0.000 claims description 18
- 238000000691 measurement method Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 description 27
- 239000004568 cement Substances 0.000 description 6
- 239000000470 constituent Substances 0.000 description 6
- 239000000463 material Substances 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 230000010354 integration Effects 0.000 description 5
- 238000001514 detection method Methods 0.000 description 4
- 238000007726 management method Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000006703 hydration reaction Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 230000005855 radiation Effects 0.000 description 3
- 230000029058 respiratory gaseous exchange Effects 0.000 description 3
- 238000005096 rolling process Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 239000012615 aggregate Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 1
- 244000046052 Phaseolus vulgaris Species 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000004898 kneading Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、スランプ0cmの硬練
りのフレッシュコンクリートの締固め度の測定方法、及
び締固め管理方法に関する。BACKGROUND OF THE INVENTION The present invention relates to a slump 0 cm hardening
Rino fresh concrete over preparative degree of compaction method of the measurement of, and a compaction management method.
【0002】[0002]
【従来の技術】打設後のフレッシュコンクリート又はフ
レッシュモルタル(以下、本明細書中において「フレッ
シュコンクリート等」という。)は、締め固めが不足す
ると、ジャンカや豆板が発生するため、様々な方法によ
って締固めが行われている。例えば、棒状バイブレータ
または型枠パネル取付け型バイブレーター等が一般的に
使用されており、ダム建設のRCD工法においては、特
に振動ローラーが使用されている。かように、様々な方
法によってフレッシュコンクリート等の締固めが行われ
るものの、締め固め作業中、どの程度まで締め固まって
いるか、リアルタイムで判らないために振動ローラーの
転圧回数や、棒状バイブレータまたは型枠パネル取付け
型バイブレーター等の振動時間が過不足することがあ
り、これによって、一定の締固め度が得られず、コンク
リートの品質が不均一になることがある。2. Description of the Related Art Fresh concrete or fresh mortar after pouring (hereinafter referred to as "fresh concrete, etc." in the present specification) causes junkers and bean boards when compaction is insufficient. It is being compacted. For example, a rod-shaped vibrator or a form-panel-mounted vibrator is generally used, and a vibrating roller is particularly used in the RCD method for dam construction. As described above, although compaction of fresh concrete etc. is performed by various methods, it is not possible to know in real time how much compaction is performed during compaction work, so the number of rolling pressure of the vibrating roller, the bar vibrator or the mold The vibration time of the vibrator attached to the frame panel or the like may be excessive or insufficient, which may result in inconsistent compaction degree and uneven quality of concrete.
【0003】締め固め作業中、フレッシュコンクリート
等が、どの程度まで締め固まっているかをリアルタイム
で知る方法としては、木槌で型枠の外側を打撃し、その
音によって判断する方法、フレッシュコンクリート等の
ブリージング水を目視する方法、更に、ダムのRCD工
法に用いられるRI法と称されている方法がある。この
RI法は、放射線発生端子を締固め後のフレッシュコン
クリート等に埋め込み、フレッシュコンクリート等の表
面に放射線測定部を設置し、そしてフレッシュコンクリ
ート等を透過する放射線量を測定して、締固め度を判定
する方法である。As a method of knowing in real time how much the fresh concrete or the like has been compacted during compaction work, a method of hitting the outside of the form with a mallet and judging by the sound, fresh concrete or the like is used. There is a method of visually observing breathing water, and a method called RI method used for dam RCD method. This RI method embeds the radiation generating terminal in compacted fresh concrete, etc., installs a radiation measuring section on the surface of the fresh concrete, etc., and measures the radiation amount passing through the fresh concrete etc. to determine the degree of compaction. This is the method of judgment.
【0004】[0004]
【発明が解決しようとする課題】しかしながら、前記木
槌で打撃する方法や、ブリージング水を目視する方法で
は、測定者の主観で締固め度を判断するため、一定の締
固め度が得られず、コンクリートの品質が不均一になる
という問題点がある。However, in the method of hitting with a mallet and the method of visually observing the breathing water, the compaction degree is judged subjectively by the measurer, so that a certain degree of compaction cannot be obtained. However, there is a problem that the quality of concrete becomes uneven.
【0005】また、ダムのRCD工法で用いるコンクリ
ートは、最初からスランプ0cmというように固く練り混
ぜられており、締め固めの際には、振動ローラーで転圧
されてさらに固く締め固められる。したがって、RI法
をダムのRCD工法に適用する場合、RCD用コンクリ
ート中に放射能発生端子を埋め込むのに非常な労力が必
要になる。そのため、振動ローラーでRCD用コンクリ
ートを転圧しながら、リアルタイムに締め固め度を測定
するのは難しく、締固め度の過不足のため、コンクリー
トの品質が不均一になり易いという問題点がある。Further, the concrete used in the RCD method for dams has been kneaded firmly from the beginning such that the slump is 0 cm, and at the time of compaction, it is further compacted by rolling with a vibrating roller. Therefore, when the RI method is applied to the dam RCD method, a great amount of labor is required to embed the radioactivity generation terminal in the RCD concrete. Therefore, it is difficult to measure the compaction degree in real time while rolling the RCD concrete with the vibrating roller, and there is a problem that the quality of the concrete is likely to be non-uniform because the compaction degree is excessive or insufficient.
【0006】本発明は前記問題点を解決せんとしたもの
であり、その目的は、フレッシュコンクリートの締固め
作業をしながらリアルタイムに、且つ客観的に締固め度
を判断することができる締固め度測定方法を提供するこ
とにある。[0006] The present invention has St. solve the above problems, tightening its object is capable of determining the real time, and objectively degree of compaction, while the compaction work of the fresh concrete over preparative It is to provide a method for measuring the degree of compaction.
【0007】また、本発明の別の目的は、所定の締固め
度まで締め固まったフレッシュコンクリートを得ること
ができるフレッシュコンクリートの締固め管理方法を提
供することにある。Further, another object of the present invention is to provide a compaction method for managing fresh concrete over bets can Rukoto give hardened fresh concrete over directors to a predetermined degree of compaction.
【0008】[0008]
【課題を解決するための手段】本発明は、前記目的に鑑
みてなされたものであり、その要旨は、スランプ0cm
の硬練りのフレッシュコンクリートの締固め度を測定す
る方法であって、予め、前記フレッシュコンクリートの
締固め度と、締固め作業中にフレッシュコンクリートか
ら発生する周波数20kHz以上の弾性波との関係を求
めておき、建設施工現場においてもフレッシュコンクリ
ートの締固め作業を行ないながら前記弾性波を測定し、
この建設施工現場において測定した弾性波と、予め求め
ておいた前記締固め度と弾性波との関係とから、フレッ
シュコンクリートの締固め度が判定されることを特徴と
するフレッシュコンクリートの締固め度測定方法にあ
る。The present invention has been made in view of the above objects, and its gist is a slump of 0 cm.
A method for measuring the compaction degree of fresh concrete of hard kneading , which comprises:
The degree of compaction and whether it is fresh concrete during compaction work.
To obtain the relationship with the elastic wave with a frequency of 20 kHz or more
In addition, even in the construction site, fresh concrete
Measure the elastic wave while performing the compaction work of the
Elastic wave measured at this construction site and
From the relationship between the compaction degree and the elastic wave, which was set aside,
Degree of compaction Gerhard concrete is determined in compaction method of measuring fresh concrete, characterized in Rukoto.
【0009】本発明の締固め度測定方法において、測定
対象となるフレッシュコンクリートとは、骨材、セメン
ト、水及び混和剤等のコンクリート構成材料が互いに十
分結合されておらず、まだ固まらない状態のコンクリー
トであれば良く、ミキサで練り混ぜられたばかりの状態
から、セメントの水和反応が進み、コンクリート構成材
料が一体となった硬化コンクリートに近い状態までのも
のを含む。 In the method for measuring the degree of compaction according to the present invention, the fresh concrete to be measured means that concrete constituent materials such as aggregate, cement, water and an admixture are not sufficiently bonded to each other and are not yet solidified. Any concrete can be used, including those that have just been mixed and kneaded in a mixer, to those that are close to hardened concrete in which the hydration reaction of cement has progressed and the concrete constituent materials are integrated .
【0010】本発明の締固め度測定方法において、前記
コンクリートが発生する弾性波とは、前記コンクリート
が締固められる時に、構成材料の骨材、セメント、水及
び混和剤等が相互に衝突や摩擦して発生したり、セメン
トの水和反応でコンクリート構成材料が一体となって硬
化する際に発生する、周波数20kHz以上の超音波領域
の音波のことをいう。この弾性波を測定する方法として
は、機械的振動を電気信号に変換する圧電素子を備え
る、「AEセンサー」と呼ばれるセンサーを使用すること
ができ、更に、この測定値を、演算処理装置を備えた解
析システムによって解析すれば、AE COUNT、AE 包落線
検波(事象、最大振幅、継続時間、立上り時間、及びエ
ネルギー)等の様々なAEパラメーターをリアルタイムに
求めることができて、締固め度を容易に判断することが
できる。[0010] In degree of compaction measurement method of the present invention, the <br/> The elastic wave concrete over preparative occurs, the concrete over preparative
When aggregates are compacted, the aggregates of the constituent materials, cement, water, admixture, etc. collide with each other and rub against each other, or when the concrete constituent materials harden together due to the hydration reaction of the cement. A sound wave in the ultrasonic range having a frequency of 20 kHz or higher. As a method of measuring this elastic wave, it is possible to use a sensor called a "AE sensor", which is provided with a piezoelectric element that converts mechanical vibration into an electric signal. By using the analysis system, various AE parameters such as AE COUNT, AE envelope detection (event, maximum amplitude, duration, rise time, and energy) can be obtained in real time, and the degree of compaction can be determined. It can be easily judged.
【0011】本発明の締固め度測定方法においては、ま
ず、型枠外面にAEセンサーを貼設するか、またはフレッ
シュコンクリートの表面に前記AEセンサーを配置する。
AEセンサーをフレッシュコンクリートの表面に配置する
場合には、コンクリートの表面に直接配設しても良く、
あるいは音波の伝導性が良好な部材、例えば鋼板等の金
属性の板をコンクリートの表面に配して、その金属板の
上にAEセンサーを配置しても良い。更に、ダムのRCD
工法では、振動ローラーと鋼板とを索条で連結し、この
鋼板の上にAEセンサーを配置しても良い。[0011] In the compaction degree measuring method of the present invention, first, either affixed to AE sensor in a mold outer surface, or placing the AE sensor on the front surface of the fresh concrete over and.
When placing the AE sensor on the front surface of the fresh concrete over preparative it may be disposed directly on the surface of the concrete over bets,
Alternatively waves conductive good member, for example, a metallic plate such as a steel plate by disposing the front surface of the concrete over preparative may be disposed AE sensor on the metal plate. Furthermore, the RCD of the dam
In the construction method, the vibrating roller and the steel plate may be connected by a cord, and the AE sensor may be arranged on the steel plate.
【0012】AEセンサーを配置したら、次にコンクリー
トを締め固めながら、弾性波を測定する。フレッシュコ
ンクリートは、締め固められるにしたがって、混練して
いる空気が抜けて、徐々に密実さを増していく。かよう
に密実さが増していくと、フレッシュコンクリートの中
は、高周波の弾性波が伝わりやすくなり、測定される弾
性波のAE COUNT、AE 包落線検波等の様々なAEパラメー
ター、すなわちAE特性も変化する。したがって、予め、
弾性波の卓越周波数、AE COUNT、AE 包落線検波等のAE
特性と、フレッシュコンクリートの締固め度との関係を
求めておくことによって、建設施工現場でフレッシュコ
ンクリートの締固め度をリアルタイムに判定することが
できる。After the AE sensor is arranged, the elastic wave is measured while compacting the concrete. Fresh co <br/> Nkuri over DOO according compacted tighten and deflated are kneaded, gradually increasing Mitsumi of. If Such densely real is go increases, <br/> in the fresh concrete over DOO is easier acoustic wave of a high frequency is transmitted, AE COUNT of the measured acoustic waves, various such AE envelope detection AE parameters, that is, AE characteristics also change. Therefore, in advance,
AE such as predominant frequency of elastic wave, AE COUNT, AE envelope detection
And characteristics can be determined by previously obtained relation between degree of compaction of fresh concrete over preparative, the degree of compaction of fresh co <br/> Nkuri over preparative construction construction site in real time.
【0013】また本発明の別の要旨は、スランプ0cm
の硬練りのフレッシュコンクリートの締固め管理方法で
あって、予め、前記フレッシュコンクリートの締固め度
と、締固め作業中にフレッシュコンクリートから発生す
る周波数20kHz以上の弾性波との関係を求め、該関
係からフレッシュコンクリートが締固められたときの前
記弾性波の周波数分布またはAE特性を求め、建設施工
現場においてもフレッシュコンクリートの締固め作業を
行ないながら前記弾性波を測定し、この建設施工現場に
おける弾性波が、予め求めておいた前記弾性波の周波数
分布またはAE特性に達するまで、前記フレッシュコン
クリートを繰返し締固めることを特徴とするフレッシュ
コンクリートの締固め管理方法にある。Another subject of the present invention is that the slump is 0 cm.
Is a method for controlling the compaction of freshly kneaded fresh concrete , wherein the compaction degree of the fresh concrete is set in advance.
And from the fresh concrete during compaction work
The relationship with elastic waves with a frequency of 20 kHz or more
Before when fresh concrete is compacted from the clerk
Construction of construction by obtaining frequency distribution or AE characteristics of elastic wave
Compacting fresh concrete on-site
Measure the elastic wave while doing it, and at this construction site
The elastic wave in the wave is the frequency of the elastic wave previously obtained.
A method for controlling compaction of fresh concrete is characterized in that the fresh concrete is repeatedly compacted until a distribution or an AE characteristic is reached.
【0014】本発明の締固め管理方法においては、前記
締固め度測定方法と同様な手段や、同様な手順により、
予め、フレッシュコンクリートが締固められたときの弾
性波の周波数分布またはAE特性を求めておき、施工現
場での締固め作業においても、この予め求められた弾性
波の周波数分布またはAE特性に達するまで、フレッシ
ュコンクリートを繰返し締固めることにより、充分に締
め固められた品質の高いコンクリート構造物の構築が可
能になる。In the compaction management method of the present invention, the same means and the same procedure as the method for measuring the degree of compaction described above are used.
Bullets when fresh concrete is previously compacted
Obtain the frequency distribution or AE characteristics of the sex wave, and
Even in compaction work in the field, this pre-determined elasticity is required.
Repeated compaction of fresh concrete until a wave frequency distribution or AE characteristic is reached allows the construction of a fully compacted and high quality concrete structure.
【0015】[0015]
【作用】本発明のフレッシュコンクリート締固め度測定
方法及び締固め管理方法では、前記フレッシュコンクリ
ートが締固められる時に、その構成材料である、骨材、
セメント、水及び混和剤等が相互に衝突や摩擦し、ま
た、セメントの水和反応でコンクリート構成材料が一体
となって硬化し、発生する弾性波を測定して締固め度を
判定する。In the fresh concrete compaction degree measuring method and compaction managing method of the present invention, the fresh concrete
When the shoe is compacted, its constituent material, aggregate,
Cement, water, admixture, etc. collide with each other and rub against each other, and the hydration reaction of cement causes the concrete constituent materials to harden together, and the elastic waves generated are measured to determine the degree of compaction.
【0016】[0016]
【実施例】以下に、本発明の実施例を添付図面に基づい
て詳細に説明する。Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
【0017】なお、以下に説明する実施例は、本発明の
フレッシュコンクリートの締固め度測定方法及び締固め
管理方法を、ダムのRCD工法に用いるフレッシュコン
クリートの締固め度測定に適用したものである。[0017] Incidentally, embodiments described below, which the fresh concrete over preparative compaction measurement methods and compaction management method of the present invention is applied to compaction measurement of fresh concrete used in the RCD method of dam Is.
【0018】[0018]
【実施例1】コンクリート単位体積当たりの単位水量
(以下、「W」にて表記する。)が89Kg/m3のRCD
用コンクリートの試料を作成し、この試料をVC試験機
によって締め固めながら、その際の弾性波をAEセンサー
(日本フィジカルアコースティック(株)製)によって
計測した。ここで、VC試験機とは、RCD用コンクリ
ートのコンシステンシーを計測するために開発されたも
のであって、RCD用コンクリートを詰めるための円筒
と、この円筒に振動を与える振動台とを備えるものであ
る。このVC試験機によって測定されるVC値は、円筒
にRCD用コンクリートを詰めた後、この円筒を振動台
に載置して振動を与え、RCD用コンクリートが締め固
まるまでの時間(秒数)により与えられる。締固め終了
は、RCD用コンクリートの表面にモルタルがブリージ
ングしたことによって判定するものである。[Example 1] RCD having a unit water amount per unit volume of concrete (hereinafter referred to as "W") of 89 kg / m3
A sample of concrete for use was prepared, and an elastic wave at that time was measured by an AE sensor (manufactured by Japan Physical Acoustics Co., Ltd.) while the sample was compacted by a VC tester. Here, the VC tester is developed for measuring the consistency of RCD concrete, and is provided with a cylinder for packing the RCD concrete and a vibrating table for vibrating the cylinder. Is. The VC value measured by this VC tester is determined by the time (in seconds) until the RCD concrete is compacted and solidified by placing the cylinder on the vibration table after filling the cylinder with the RCD concrete. Given. The completion of compaction is determined by the mortar breathing on the surface of the RCD concrete.
【0019】計測した結果を図1及び図2に示す。図1
はVC試験機の振動台を振動させて、締固めを開始して
から10秒間の周波数頻度を示しており、図2は締固め
を開始してから50秒から60秒の10秒間の周波数頻
度を示している。The measured results are shown in FIGS. 1 and 2. Figure 1
Shows the frequency frequency of 10 seconds after the compaction was started by vibrating the vibrating table of the VC tester, and FIG. 2 shows the frequency frequency of 10 seconds from 50 seconds to 60 seconds after the compaction was started. Is shown.
【0020】図1に示されているように締固め開始10
秒間は、ほとんどの弾性波が1MHz以下の範囲でしか
計測されていないが、図2に示すように、締固め後50
〜60秒の10秒間では、図1に比べると、1MHz以
上の弾性波も多く計測されている。このことから、フレ
ッシュコンクリートは締め固まるにしたがって、周波数
の高い弾性波をコンクリート表面に伝達しやすくなるこ
とがわかる。したがって、実際の建設作業現場におい
て、締め固め作業を行いながらAEセンサーにより弾性波
を計測し、更に、演算処理装置を備える解析システムに
よって、図1及び図2に示したように、その計測値の周
波数分布を求めれば、リアルタイムに締固め度を判断す
ることができる。Start compaction 10 as shown in FIG.
Most of the elastic waves are measured in the range of 1 MHz or less for a second, but as shown in FIG.
In 10 seconds of up to 60 seconds, as compared with FIG. 1, many elastic waves of 1 MHz or more are also measured. Therefore, fresh concrete over DOO in accordance solidifies tightened, high elasticity wave frequencies it can be seen that easily transmitted to the concrete surface. Therefore, at the actual construction work site, while performing the compaction work, the elastic wave is measured by the AE sensor, and further, by the analysis system equipped with the arithmetic processing device, as shown in FIG. 1 and FIG. If the frequency distribution is obtained, the compaction degree can be determined in real time.
【0021】[0021]
【実施例2】次に、W=84、89、91Kg/m3のRC
D用コンクリートの試料を作成し、この試料をVC試験
機によって締め固めながら、その際の弾性波をAEセンサ
ーによって計測すると共に、目視によってVC値も測定
した。Example 2 Next, RC of W = 84, 89, 91 kg / m3
A sample of concrete for D was prepared, and while the sample was compacted by a VC tester, the acoustic wave at that time was measured by an AE sensor, and the VC value was also visually measured.
【0022】図3(a)〜(d)は、W=84Kg/m3の
RCD用コンクリートの試料をVC試験機によって締め
固めながら、締固め開始から100秒経過までの弾性波
をAEセンサーによって計測した測定値であり、そのうち
図3(a)は、所定の閾値以上の弾性波の計測頻度、す
なわちAE COUNTを2秒間毎に示したものであり、図3
(b)は図3(a)の計測結果を計測時間で積分したも
のである。また、図3(c)は、AE ENERGY(AE エネル
ギー)を2秒間毎に示したものであり、図3(d)は図
3(c)の計測結果を計測時間で積分したものである。
この図3のグラフからAE COUNTが急増する締め固め時間
が91秒で、AE ENERGYが急増する締め固め時間は92
秒をであることがわかる。なお、この試料のVC値は9
0秒であった。3 (a) to 3 (d), an AE sensor measures elastic waves from the start of compaction to 100 seconds while compacting a sample of RCD concrete with W = 84 kg / m3 by a VC tester. 3 (a) shows the measurement frequency of elastic waves equal to or higher than a predetermined threshold value, that is, AE COUNT every 2 seconds.
FIG. 3B shows the measurement result of FIG. 3A integrated over the measurement time. Further, FIG. 3 (c) shows AE ENERGY (AE energy) every 2 seconds, and FIG. 3 (d) is an integration of the measurement results of FIG. 3 (c) over the measurement time.
From the graph in Fig. 3, the compaction time when the AE COUNT rapidly increases is 91 seconds and the compaction time when the AE ENERGY rapidly increases is 92.
You can see that the seconds are. The VC value of this sample is 9
It was 0 seconds.
【0023】図4(a)〜(d)はW=89Kg/m3のR
CD用コンクリートの試料を図3(a)〜(d)と同様
に実験した計測値であり、そのうち図4(a)は、AE C
OUNTを2秒間毎に示したものであり、図4(b)は図4
(a)の計測結果を計測時間で積分したものである。ま
た、図4(c)は、AE ENERGYを2秒間毎に示したもの
であり、図4(d)は図4(c)の計測結果を計測時間
で積分したものである。この図4のグラフからAE COUN
T、及びAE ENERGYが急増する締め固め時間が62秒であ
ることがわかる。なお、この試料のVC値は60秒であ
った。4 (a) to 4 (d) show R of W = 89 Kg / m3
It is the measured value which experimented the sample of the concrete for CD like FIG.3 (a)-(d), of which FIG.4 (a) is AE C.
OUNT is shown every 2 seconds, and FIG. 4 (b) is shown in FIG.
The measurement result of (a) is integrated over the measurement time. Further, FIG. 4 (c) shows AE ENERGY every 2 seconds, and FIG. 4 (d) shows the measurement result of FIG. 4 (c) integrated over the measurement time. From the graph of this Figure 4, AE COUN
It can be seen that the compaction time for T and AE ENERGY increases rapidly is 62 seconds. The VC value of this sample was 60 seconds.
【0024】更に、図5(a)〜(d)はW=91Kg/m
3のRCD用コンクリートの試料をVC試験機によって
締め固めながら、締固め開始から62秒経過までの弾性
波をAEセンサーによって計測した測定値であり、そのう
ち図5(a)は、AE COUNTを2秒間毎に示したものであ
り、図5(b)は図5(a)の計測結果を計測時間で積
分したものである。また、図5(c)は、AE ENERGYを
2秒間毎に示したものであり、図5(d)は図5(c)
の計測結果を計測時間で積分したものである。この図5
のグラフからAE COUNTが急増する締め固め時間が43
秒、AE ENERGYが急増する締め固め時間が42秒である
ことがわかる。なお、この試料のVC値は40秒であっ
た。Further, in FIGS. 5A to 5D, W = 91 kg / m
While compressing the RCD concrete sample of No. 3 with a VC tester, elastic waves from the start of compaction until 62 seconds have elapsed are measured values by the AE sensor, and FIG. 5 (a) shows AE COUNT of 2 FIG. 5B shows the measurement result of FIG. 5A integrated by the measurement time. Further, FIG. 5 (c) shows AE ENERGY every 2 seconds, and FIG. 5 (d) shows FIG. 5 (c).
It is the result of integration of the measurement result of 1. This Figure 5
The graph shows that the AE COUNT rapidly increases and the compaction time is 43
It can be seen that the compaction time at which the AE ENERGY increases rapidly is 42 seconds. The VC value of this sample was 40 seconds.
【0025】図6は、図3〜図5から得られた、それぞ
れの試料のAE COUNTが急増する締め固め時間、およびAE
ENERGYが急増する締め固め時間と、VC値との関係を
グラフにしたものである。FIG. 6 shows the compaction time and AE obtained from FIGS. 3 to 5 at which the AE COUNT of each sample rapidly increases.
This is a graph showing the relationship between the VC value and the compaction time when ENERGY rapidly increases.
【0026】図6から、同一試料において、AE COUNTが
急増する締め固め時間、およびAEENERGYが急増する締め
固め時間は、VC値とほとんど一致することがわかる。
したがって、実際の建設作業現場においても、締め固め
作業を行いながらAEセンサーにより弾性波を計測し、更
に、演算処理装置を備える解析システムによって、図3
〜図5に示したように、AE COUNTが急増する締め固め時
間、及びAE ENERGYが急増する締め固め時間を求めれ
ば、リアルタイムに締固め度を判断することができる。From FIG. 6, it can be seen that, in the same sample, the compaction time in which AE COUNT rapidly increases and the compaction time in which AE ENERGY rapidly increases almost coincide with the VC value.
Therefore, even at the actual construction work site, the elastic wave is measured by the AE sensor while performing the compaction work, and further, by the analysis system including the arithmetic processing device, as shown in FIG.
As shown in FIG. 5, if the compaction time in which AE COUNT rapidly increases and the compaction time in which AE ENERGY rapidly increases, the compaction degree can be determined in real time.
【0027】[0027]
【発明の効果】本発明のフレッシュコンクリートの締固
め度測定方法では、予め、フレッシュコンクリートの締
固め度と、締固め作業時にフレッシュコンクリートから
発生する弾性波の卓越周波数、AE COUNT、AE 包落線検
波等のAE特性との関係を求めておくことによって、締固
め作業時にフレッシュコンクリートの弾性波を測定し、
更に、この測定値を、演算処理装置を備えた解析システ
ムによって解析してAE特性を求めれば、建設施工現場で
フレッシュコンクリートの締固め度をリアルタイムに判
定することができる。The fresh concrete over preparative tightening solid <br/> Me measuring method of the present invention, in advance, a clamping <br/> compacted degree of fresh concrete over preparative, from fresh concrete over preparative during compaction operations
Dominant frequency of the acoustic wave that occurs, AE COUNT, by keeping obtained relation between AE characteristics such as AE envelope detection, to measure the elastic wave Fresh concrete over preparative during compaction operations,
Furthermore, this measurement, by obtaining the AE characteristics analyzed by the analysis system having an arithmetic processing device, it is possible to determine the degree of compaction of fresh concrete over preparative real-time construction construction site.
【0028】本発明の締固め管理方法においては、予
め、フレッシュコンクリートの締固め度と、締固め作業
中にフレッシュコンクリートから発生する周波数20k
Hz以上の弾性波との関係を求め、この関係からフレッ
シュコンクリートが締固められたときの弾性波の周波数
分布またはAE特性を求めておき、建設施工現場におい
てもフレッシュコンクリートの締固め作業を行ないなが
ら弾性波を測定し、この建設施工現場における弾性波
が、予め求めておいた弾性波の周波数分布またはAE特
性に達するまで、フレッシュコンクリートを繰返し締固
めることにより、充分に締め固められた品質の高いコン
クリート構造物の構築が可能になる。[0028] In compaction management method of the present invention, pre
Therefore, the compaction degree of fresh concrete and compaction work
Frequency generated from fresh concrete inside 20k
The relationship with elastic waves above Hz is obtained, and from this relationship
Frequency of elastic waves when compacted concrete
Find the distribution or AE characteristics and put it on the construction site.
Even if you do not compact the fresh concrete
Elastic wave is measured from the
Is the elastic wave frequency distribution or AE characteristic
Repeated compaction of fresh concrete until it reaches its properties allows the construction of a fully compacted and high quality concrete structure.
【図1】実施例1で測定した、締固め開始後10秒間の
弾性波の周波数頻度を示したグラフである。FIG. 1 is a graph showing the frequency frequency of elastic waves measured in Example 1 for 10 seconds after the start of compaction.
【図2】実施例1で測定した、締固め開始後50〜60
秒の10秒間の弾性波の周波数頻度を示したグラフであ
る。FIG. 2 is 50 to 60 after the start of compaction measured in Example 1.
It is a graph which showed the frequency frequency of the elastic wave for 10 seconds of a second.
【図3】(a)は、実施例2で測定した、W=84Kg/m
3のRCD用コンクリートの試料のAE COUNTを2秒間毎
に示したものであり、(b)は(a)の計測結果を計測
時間で積分したものであり、(c)は、AE ENERGYを2
秒間毎に示したものであり、(d)は(c)の計測結果
を計測時間で積分したものである。FIG. 3 (a) is W = 84 Kg / m measured in Example 2.
3 shows the AE COUNT of the RCD concrete sample of 3 every 2 seconds, (b) is the integration of the measurement results of (a) over the measurement time, and (c) is the AE ENERGY of 2
It is shown for each second, and (d) is obtained by integrating the measurement result of (c) with the measurement time.
【図4】(a)は、実施例2で測定した、W=89Kg/m
3のRCD用コンクリートの試料のAE COUNTを2秒間毎
に示したものであり、(b)は(a)の計測結果を計測
時間で積分したものであり、(c)は、AE ENERGYを2
秒間毎に示したものであり、(d)は(c)の計測結果
を計測時間で積分したものである。FIG. 4 (a) is W = 89 Kg / m measured in Example 2.
3 shows the AE COUNT of the RCD concrete sample of 3 every 2 seconds, (b) is the integration of the measurement results of (a) over the measurement time, and (c) is the AE ENERGY of 2
It is shown for each second, and (d) is obtained by integrating the measurement result of (c) with the measurement time.
【図5】(a)は、実施例2で測定した、W=91Kg/m
3のRCD用コンクリートの試料のAE COUNTを2秒間毎
に示したものであり、(b)は(a)の計測結果を計測
時間で積分したものであり、(c)は、AE ENERGYを2
秒間毎に示したものであり、(d)は(c)の計測結果
を計測時間で積分したものである。FIG. 5 (a) is W = 91 Kg / m measured in Example 2.
3 shows the AE COUNT of the RCD concrete sample of 3 every 2 seconds, (b) is the integration of the measurement results of (a) over the measurement time, and (c) is the AE ENERGY of 2
It is shown for each second, and (d) is obtained by integrating the measurement result of (c) with the measurement time.
【図6】実施例2の、それぞれの試料のAE COUNTが急増
する締め固め時間、およびAEENERGYが急増する締め固め
時間と、VC値との関係をグラフにしたものである。FIG. 6 is a graph showing the relationship between the VC value and the compaction time in which the AE COUNT of each sample sharply increases and the compaction time of AE ENERGY sharply increases in Example 2.
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭56−652(JP,A) 特開 平5−93715(JP,A) 実開 昭60−150261(JP,U) 特公 昭51−10604(JP,B1) (58)調査した分野(Int.Cl.7,DB名) E04G 21/06 G01N 29/02 ─────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-56-652 (JP, A) JP-A-5-93715 (JP, A) Actual development Sho-60-150261 (JP, U) JP-B-51- 10604 (JP, B1) (58) Fields investigated (Int.Cl. 7 , DB name) E04G 21/06 G01N 29/02
Claims (2)
ンクリートの締固め度を測定する方法であって、予め、
前記フレッシュコンクリートの締固め度と、締固め作業
中にフレッシュコンクリートから発生する周波数20k
Hz以上の弾性波との関係を求めておき、建設施工現場
においてもフレッシュコンクリートの締固め作業を行な
いながら前記弾性波を測定し、この建設施工現場におい
て測定した弾性波と、予め求めておいた前記締固め度と
弾性波との関係とから、フレッシュコンクリートの締固
め度が判定されることを特徴とするフレッシュコンクリ
ートの締固め度測定方法。1. A method for measuring the degree of compaction of fresh concrete with a slump of 0 cm, which comprises :
Compaction degree of the fresh concrete and compaction work
Frequency generated from fresh concrete inside 20k
The relationship with the elastic wave of Hz or more is sought, and the construction site
Even in this case, the compaction work of fresh concrete should be performed.
While measuring the elastic wave,
And the elastic wave measured by
Compaction of fresh concrete from the relationship with elastic waves
Compaction measurement method of fresh concrete, characterized in Rukoto because degree is determined.
ンクリートの締固め管理方法であって、予め、前記フレ
ッシュコンクリートの締固め度と、締固め作業中にフレ
ッシュコンクリートから発生する周波数20kHz以上
の弾性波との関係を求め、該関係からフレッシュコンク
リートが締固められたときの弾性波の周波数分布または
AE特性を求め、建設施工現場においてもフレッシュコ
ンクリートの締固め作業を行ないながら前記弾性波を測
定し、この建設施工現場における弾性波が、予め求めて
おいた前記弾性波の周波数分布またはAE特性に達する
まで、前記フレッシュコンクリートを繰返し締固めるこ
とを特徴とするフレッシュコンクリートの締固め管理方
法。2. A method for controlling compaction of fresh concrete with a slump of 0 cm , which comprises:
The degree of compaction of ash concrete and the
Frequency of 20 kHz or more generated from ash concrete
Of the elastic wave of the
Frequency distribution of elastic waves when the REIT is compacted or
Seeking AE characteristics, fresh co
The elastic wave is measured while compacting the cleats.
And obtain the elastic wave at this construction site in advance.
A method for managing compaction of fresh concrete, characterized in that the fresh concrete is repeatedly compacted until the frequency distribution or the AE characteristic of the elastic wave is reached.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP09887794A JP3511040B2 (en) | 1994-05-12 | 1994-05-12 | Method for measuring compaction of fresh concrete and method for managing compaction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP09887794A JP3511040B2 (en) | 1994-05-12 | 1994-05-12 | Method for measuring compaction of fresh concrete and method for managing compaction |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07305511A JPH07305511A (en) | 1995-11-21 |
| JP3511040B2 true JP3511040B2 (en) | 2004-03-29 |
Family
ID=14231401
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP09887794A Expired - Fee Related JP3511040B2 (en) | 1994-05-12 | 1994-05-12 | Method for measuring compaction of fresh concrete and method for managing compaction |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3511040B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT411361B (en) * | 2002-01-24 | 2003-12-29 | Pittel & Brausewetter Ges M B | Monitoring setting of road-surfacing concrete, determines compressive strength of test cubes to establish when use by traffic may be permitted |
| JP5114104B2 (en) * | 2006-07-21 | 2013-01-09 | 積水化学工業株式会社 | Inspection method for inspecting the curing state of fiber reinforced plastic materials with buried pipes |
| JP7097015B2 (en) * | 2018-02-22 | 2022-07-07 | 鹿島建設株式会社 | How to determine the degree of compaction of concrete |
| JP6616880B2 (en) * | 2018-12-03 | 2019-12-04 | 株式会社フジタ | Concrete vibration compaction detector |
| JP7833965B2 (en) * | 2022-05-25 | 2026-03-23 | りんかい日産建設株式会社 | Concrete compaction management device, concrete compaction management method, concrete compaction management program, and concrete compaction management system |
-
1994
- 1994-05-12 JP JP09887794A patent/JP3511040B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07305511A (en) | 1995-11-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Reinhardt et al. | Continuous monitoring of setting and hardening of mortar and concrete | |
| Van Den Abeele et al. | Active and passive monitoring of the early hydration process in concrete using linear and nonlinear acoustics | |
| Lootens et al. | Continuous strength measurements of cement pastes and concretes by the ultrasonic wave reflection method | |
| CN115977396A (en) | Intelligent vibrating equipment and method | |
| Park et al. | Evaluation of fire-damaged concrete: an experimental analysis based on destructive and nondestructive methods | |
| US4981626A (en) | Method of forming dense concrete surface layer | |
| JP3511040B2 (en) | Method for measuring compaction of fresh concrete and method for managing compaction | |
| Sharma et al. | Ultrasonic guided waves for monitoring the setting process of concretes with varying workabilities | |
| CN117782816A (en) | Asphalt mortar normal-temperature crack resistance test method | |
| Wang et al. | The effect of water-cement ratio on acousto-ultrasonic characteristics in mortar | |
| Berthelot et al. | Damage evaluation of concrete test specimens related to failure analysis | |
| WO2000016092A2 (en) | Energetic quantification method for composite materials | |
| JP3541091B2 (en) | Compaction degree measuring device and compaction degree measuring method | |
| JP4229277B2 (en) | Method for repairing concrete defects generated during construction of concrete structure and vibrator used for repairing the concrete defects | |
| JP2001337074A (en) | Device for determining compaction of fresh concrete | |
| Naji et al. | Versatility of piezoelectric ring actuator technique (P-RAT) for characterization of cement paste and mortar | |
| JP4716474B2 (en) | Pile construction method using granulated blast furnace slag | |
| JP2000028591A (en) | Method for measuring void between reinforcing plate material and grout material or the like | |
| Wang et al. | Experimental study of effects of water-cement ratio on the acoustic emission rate “a” values in concrete | |
| JPH0979924A (en) | Method of estimating compaction degree | |
| CN103154728B (en) | Device and method for the mass parameter and/or characteristic that describe inorganic bond system on the spot | |
| Gabrijel et al. | Monitoring of concrete hardening using acousto-ultrasonic method | |
| Ohdaira et al. | Presuming the strength of concrete cold joint by ultrasound | |
| RU2104518C1 (en) | Method of determination of structural stress coefficient | |
| Ervin et al. | Monitoring general corrosion of rebar embedded in mortar using high-frequency guided mechanical waves |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |