JP3533261B2 - Coupling tool - Google Patents
Coupling toolInfo
- Publication number
- JP3533261B2 JP3533261B2 JP12821295A JP12821295A JP3533261B2 JP 3533261 B2 JP3533261 B2 JP 3533261B2 JP 12821295 A JP12821295 A JP 12821295A JP 12821295 A JP12821295 A JP 12821295A JP 3533261 B2 JP3533261 B2 JP 3533261B2
- Authority
- JP
- Japan
- Prior art keywords
- shaft
- band
- locking projection
- portions
- projection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Clamps And Clips (AREA)
Description
【発明の詳細な説明】
【0001】
【産業上の利用分野】本発明は、建築・土木・水産など
の様々な分野で用いられるシート状物や板状物を連結す
ると共に、そのように連結したシート状物や板状物を支
柱などに連結するときに用いられる連結具に関する。
【0002】
【従来の技術】従来、建築現場の足場の周囲に設けられ
る危険防止用シ−トを連結する際に、横に隣接して配設
される2枚のシ−トを支柱に連結するときには、手作業
により、それぞれのシートに具備された鳩目金具に紐を
通したりその紐を支柱に巻き付けたりして結び付けると
いうことが行なわれていたが、この作業は、煩わしくて
作業性が悪いだけでなく、紐の結び目が自然に緩んだり
解けたりすることがあって連結信頼性にも欠ける。
【0003】そこで、紐を用いずに2枚のシートを連結
でき、しかも連結した2枚のシートを支柱に連結するこ
とのできる連結具が開発された。
【0004】この連結具の構成の一例を図5に示してあ
る。同図の連結具は、略円弧形状に保形された合成樹脂
製のバンド1がその長手方向の両端部に互いに係脱可能
な連結機構2を有し、一対の軸部3,4の相互間に亘る
連結部5の中央部から一体に上記バンド1が延び出てい
る。そして、それぞれの軸部3,4に掛止突起6,7が
設けられている。図6に示したように、掛止突起7は断
面視形状が略直角三角形をなし、その斜面71の一端部
がヒンジ部75により軸部4に連結されており、かつこ
のヒンジ部75の弾力性によって常時軸部7の側方に突
出する突出位置側に付勢されている。そして、掛止突起
7が突出位置に位置しているときには、掛止突起7に具
備された掛止面72が軸部4の軸線Cに垂直になる。ま
た、この掛止突起7はヒンジ75の弾力性に抗して軸部
4に形成された抜き孔41の中に退入して軸部4の軸心
C側に近づいた退入位置に位置することができるように
なっている。他の軸部3に設けられた掛止突起6につい
ても同様であり、61はその斜面、65はヒンジ部、6
2は掛止面、31は軸部3の抜き孔である。なお、軸部
3,4は後述する被連結部材としてのシートやプレート
に具備された孔部300に挿通可能である。以上説明し
た連結部5、軸部3,4、掛止突起6,7およびヒンジ
部65,75は合成樹脂で一体成形されている。
【0005】上記連結具を用いて2枚のシートS1とS
2との連結した場合には、図6のように、各シートS
1,S2の孔部300,300に軸部3,4がそれぞれ
差し込まれ、かつ掛止突起6,7の掛止面62,72が
シートS1,S2に対向して軸部3,4の孔部300,
300からの抜け出しを防ぐ。図6に示したように、軸
部4をシートS2の孔部300に差し込む場合、軸部4
の差し込み途中において軸部4の側方に突き出ていた掛
止突起7が孔部300の孔縁部301で押されてヒンジ
部75を支点として仮想線のように退入位置側に後退
し、そのように後退した掛止突起7が孔部300を通過
すると、その掛止突起7がヒンジ部75による付勢によ
って実線で示した突出位置に突き出し、掛止面72がシ
ートS2に対向して軸部4が孔部300から抜け出すこ
とを阻止する。なお、図6には軸部4を孔部300に差
し込むときの軸部4に対するシートS2の相対的な移動
方向を矢印Xで示してある。他の軸部3を孔部300に
差し込む場合も同様である。
【0006】また、このようにして連結した2枚のシー
トS1,S2を支柱Bに連結した場合には、図5のよう
に、支柱Bに巻き付けられたバンド1の連結機構2によ
ってそのバンド1の両端部が連結されることによってこ
のバンド1が支柱Bに固定されている。
【0007】
【発明が解決しようとする課題】図5や図6で説明した
連結具は、シートS1,S2を撤去するときにそれに先
立ってシートS1,S2から取り外される。シートS
1,S2からの連結具の取外しは、掛止突起6,7を手
の指で押して突出位置から退入位置側に変位させた状態
で、軸部3,4を孔部300から支柱B側へ抜き出す。
【0008】ところが、シートS1,S2を上記連結具
で連結してその連結具を支柱Bに固定したときには、掛
止突起6,7がシートS1,S2を挾んで支柱Bの反対
側に位置しているので、支柱Bが建築用足場支柱である
ような場合には、作業者は足場側から掛止突起6,7を
押して軸部3,4を孔部300から支柱B側へ抜き出す
といった作業を行うことができず、例え、そのような作
業を行えたとしても作業者がシートS1,S2の外側へ
手を出して行わねばならないので作業が煩わしくその作
業に危険を伴うときもある。
【0009】本発明は以上の事情に鑑みてなされたもの
で、図5や図6で説明した連結具の基本構成をそのまま
有するものでありながら、シートやプレートなどの被連
結部材を連結してそれを支柱などに固定することに用い
た当該連結具を取り外すときに、その取外しに必要な作
業をすべて支柱側から容易かつ安全に行うことのできる
連結具を提供することを目的とする。
【0010】
【課題を解決するための手段】本発明による連結具は、
相隣接する被連結部材のそれぞれに具備された孔部に挿
通可能な一対の軸部と、この一対の軸部の相互間に亘る
連結部と、この連結部から延び出て支柱などの固定部材
に巻き付けられるバンドと、上記一対の軸部のそれぞれ
に設けられる掛止突起と、この掛止突起の上記バンド側
とは反対側を上記軸部に連結しかつ上記掛止突起が上記
軸部の側方への突出位置とその突出位置から上記軸部の
軸心側に近づいた退入位置との間で弾性変位することを
許容すると共に上記掛止突起を上記突出位置側に常時付
勢するヒンジ部と、上記掛止突起から上記バンドに近づ
く方向に延び出されたアームの先端側に具備されかつそ
の押込動作によって上記ヒンジ部を支点として上記掛止
突起をその退入位置側へ変位させる押込操作部と、を備
えるものである。
【0011】
【作用】この構成の連結具において、一対の軸部を相隣
接する2つの被連結部材の孔部に各別に差し込んでいく
と、その差込み途中においては、軸部の側方に突き出て
いた掛止突起がヒンジ部を支点として退入位置側に後退
して上記孔部をくぐり抜けた後、その掛止突起がヒンジ
部による付勢によって突出位置に突き出し軸部が上記孔
部から抜け出すことを阻止する。これにより、2つの被
連結部材が一対の軸部とそれらの間に亘る連結部とによ
り連結される。このようにして2つの被連結部材を連結
した状態では、押込操作部が被連結部材の固定部材側に
位置するので、その固定部材側からその押込操作部を押
し込むことができる。そして、押込操作部をそのように
押し込むと、上記ヒンジ部を支点として上記掛止突起が
その退入位置側へ変位されるので、軸部を被連結部材の
孔部から抜き出して連結具を被連結部材から取り外すこ
とができるようになる。なお、バンドは支柱などの固定
部材に巻き付けて固定される。
【0012】
【実施例】図1に本発明の第1実施例による連結具Aを
示してある。この連結具Aにおいて、1は略円弧形状に
保形された合成樹脂製のバンドで、その長手方向の両端
部に互いに係脱可能な連結機構2を有している。この連
結機構2は、バンド1の一端部に具備された受体21
と、バンド1の他端部に具備され上記受体21に挿抜可
能な差込片25とを備えている。そして、受体21は内
外方向で互いに対向する2股状に形成された外側挾持片
22と内側挾持片23とを備え、外側挾持片2の内面側
に鋸歯状の係合爪群24を有している。また、差込片2
5は外面側に鋸歯状の係合爪群26を有している。2
7,28,29は摘みである。
【0013】上記連結機構2において、円弧形状に保形
されているバンド1を縮径させて受体21に差込片25
を差し込んだときには、受体21の外側挾持片22と内
側挾持片23とが具備する合成樹脂に特有の弾力性によ
って差込片25が挾み付けられて外側挾持片22の係合
爪群24と差込片25の係合爪群26とが噛合い、その
噛合いによって受体21と差込片25とが確実に連結さ
れるようになっている。
【0014】3,4はそれぞれ軸部、5はこれら一対の
軸部3,4の相互間に亘る連結部であり、連結部5の中
央部から一体に上記バンド1が延び出ている。一方の軸
部3に掛止突起6が、他方の軸部4に掛止突起7が設け
られている。図3に示したように、他方の軸部4に設け
られた掛止突起7は、断面視形状が略直角三角形をな
し、その斜面71の一端部がヒンジ部75により軸部4
に連結されており、かつこのヒンジ部75の弾力性によ
って図3に実線で示したように常時軸部4の側方に突出
する突出位置側に付勢されている。掛止突起7から上記
バンド1に近づく方向にアーム78が延び出され、この
アーム78の先端部に押込操作部79が設けられてい
る。この押込操作部79は上記掛止突起7よりも背高で
あり、その押込動作によって上記ヒンジ部75を支点と
して掛止突起7をその退入位置側へ変位させ得る。掛止
突起7とアーム78と押込操作部79とは、ヒンジ75
の弾力性に抗して軸部4に形成された抜き孔41の中に
退入できる。一方の軸部3に設けられた掛止突起6につ
いても同様であり、61はその斜面、65はヒンジ部、
68はアーム、69は押込操作部、31は軸部3の抜き
孔である。なお、軸部3,4は後述する被連結部材に具
備された鳩目金具の孔部300に挿通可能である。
【0015】以上説明したバンド1、連結部5、軸部
3,4、掛止突起6,7、ヒンジ部65,75、アーム
68,78および押込操作部69,79は合成樹脂で一
体成形されている。
【0016】次に、図2および図3を参照して被連結部
材としての2枚の建築用シートS1,S2を連結した上
記連結具Aを建築用足場支柱Bに固定する場合を説明す
る。なお、シートS1,S2には鳩目が取り付けられて
おり、その鳩目の孔部を符号300で示してある。
【0017】シートS1とS2との連結については、各
シートS1,S2に取り付けられた鳩目の孔部300,
300に軸部3,4がそれぞれ差し込まれ、かつ掛止突
起6,7がシートS1,S2に対向して軸部3,4の孔
部300,300から抜け出しを防いでいる。また、図
3のように、他方の軸部4においては、アーム78が孔
部300を貫通して押込操作部79がシートS2を挾ん
で掛止突起7の反対側、即ち支柱B側に位置する。図示
していないが、一方の軸部3についても同様である。こ
れにより、2枚のシートS1,S2が軸部3,4と連結
部5とにより互いに連結されている。なお、軸部3,4
を孔部300,300に差し込むときの掛止突起6の作
用については、図6で前述したところと同様であるの
で、ここではその説明を省略する。
【0018】また、バンド1が支柱Bに巻き付けられ、
かつ、連結機構2における受体21側の係合爪群24と
受体21に差し込まれた差込片25側の係合爪群26と
が互いに噛み合わされて連結され、これによりバンド1
が支柱Bに巻き付いた状態で固定されている。したがっ
て、支柱Bに2枚のシートS1,S2が連結される。
【0019】連結具AをシートS1,S2から取り外す
ときは、支柱B側の足場の上で作業者が手の指で図3に
矢印Pで示したように押込操作部69,79を押し込
む。このようにすると、同図に仮想線で示したように、
ヒンジ部65,75を支点として掛止突起61,71が
その退入位置側へ変位されるので、軸部3,4をシート
S1,S2の孔部300,300から抜き出して連結具
をシートS1,S2から取り外すことができる。
【0020】図4に本発明の第2実施例による連結具A
を示してある。この連結具Aにおいて、第1実施例のも
のと異なる点は、連結部5、軸部3,4、掛止突起6,
7、ヒンジ部65,75、アーム68,78および押込
操作部69,79が合成樹脂で一体成形されているのに
対し、バンド1だけが合成樹脂で別に成形されており、
これら2つの成形体が、ピン部材9によって相対回転自
在に連結されている点だけである。その他の点について
は同じ構成であるので、同一部分に同一符号を付して詳
細な構成説明は省略する。
【0021】この連結具Aによると、上記した第1実施
例と同様の作用が発揮される。そして、特にこの連結具
Aによると、支柱(不図示)が傾斜している場合であっ
ても、バンド1を連結部5に対して回転させてバンド1
の姿勢をその支柱の姿勢に合わせることができる利便が
ある。本発明の連結具において、バンド1としては図示
以外の構成を採用することが可能である。
【0022】
【発明の効果】本発明によれば、縁隣接する2つの被連
結部材の孔部に一対の軸部を各別に差し込むだけでそれ
らの連結部材を連結することができ、しかもバンドを固
定部材に巻き付けて固定することができる。しかも連結
後には一対の軸部のそれぞれに設けられている掛止突起
が被連結部材の離脱を阻止する機能を果たして連結信頼
性が高くなるという効果があるのみならず、被連結部材
から取り外す作業を固定部材側から容易かつ安全に行う
ことができるようになるという効果がある。
【0023】なお、本発明の連結具は実施例で説明した
用途のみならず、土木用養生シートなどの各種のシート
材やプレート材の連結にも用いることができる。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for connecting sheets and plates used in various fields such as construction, civil engineering, and fisheries. The present invention relates to a connector used when connecting a sheet or plate to a support or the like. 2. Description of the Related Art Conventionally, when connecting a danger prevention sheet provided around a scaffold at a building site, two sheets arranged adjacent to each other are connected to a column. At that time, it was performed by hand to pass a string through eyelet fittings provided on each sheet or wrap the string around a support column and tie it together, but this work is cumbersome and poor workability In addition, the knot of the string may loosen or loosen spontaneously, resulting in poor connection reliability. [0003] Therefore, there has been developed a connector capable of connecting two sheets without using a string, and connecting the connected two sheets to a column. [0004] Fig. 5 shows an example of the structure of this connecting tool. The connecting tool shown in the figure has a connecting mechanism 2 in which a synthetic resin band 1 kept in a substantially arc shape can be disengaged from each other at both longitudinal ends thereof. The band 1 extends integrally from a central portion of the connecting portion 5 extending therebetween. Each of the shaft portions 3 and 4 is provided with a locking projection 6 and 7. As shown in FIG. 6, the hooking projection 7 has a substantially right-angled triangular cross-sectional shape, and one end of a slope 71 thereof is connected to the shaft 4 by a hinge 75, and the elasticity of the hinge 75 It is always urged toward the protruding position side protruding to the side of the shaft portion 7 due to its nature. When the engaging projection 7 is located at the projecting position, the engaging surface 72 provided on the engaging projection 7 is perpendicular to the axis C of the shaft 4. The latching projection 7 retreats into the hole 41 formed in the shaft portion 4 against the elasticity of the hinge 75 and is located at a retracted position closer to the axis C side of the shaft portion 4. You can do it. The same applies to the latching projections 6 provided on the other shaft portions 3, 61 is a slope thereof, 65 is a hinge portion, 6
Reference numeral 2 denotes a hooking surface, and 31 denotes a hole for the shaft portion 3. The shafts 3 and 4 can be inserted into holes 300 provided in a sheet or plate as a member to be connected, which will be described later. The connecting portion 5, the shaft portions 3, 4, the locking protrusions 6, 7, and the hinge portions 65, 75 described above are integrally formed of synthetic resin. [0005] Two sheets S1 and S2
2, the sheet S is connected to each sheet S as shown in FIG.
The shafts 3 and 4 are inserted into the holes 300 and 300 of the shafts 1 and S2, respectively, and the locking surfaces 62 and 72 of the locking protrusions 6 and 7 face the sheets S1 and S2, respectively. Part 300,
Prevent escape from 300. As shown in FIG. 6, when the shaft 4 is inserted into the hole 300 of the sheet S2, the shaft 4
During the insertion, the locking projection 7 protruding to the side of the shaft portion 4 is pushed by the hole edge portion 301 of the hole portion 300 and retreats to the retreat position side as a virtual line with the hinge portion 75 as a fulcrum, When the locking projection 7 thus retracted passes through the hole 300, the locking projection 7 projects to the projecting position indicated by the solid line by the bias of the hinge 75, and the locking surface 72 faces the sheet S2. The shaft 4 is prevented from coming out of the hole 300. In FIG. 6, the arrow X indicates the relative movement direction of the sheet S2 with respect to the shaft 4 when the shaft 4 is inserted into the hole 300. The same applies to the case where another shaft 3 is inserted into the hole 300. When the two sheets S1 and S2 connected in this manner are connected to the support B, as shown in FIG. 5, the band 1 is wound by the connection mechanism 2 of the band 1 wound around the support B. Are connected to each other to fix the band 1 to the support B. [0007] The connecting member described with reference to Figs. 5 and 6 is detached from the sheets S1 and S2 prior to removing the sheets S1 and S2. Sheet S
To remove the connecting tool from S1 and S2, the shafts 3 and 4 are displaced from the hole 300 to the column B side by pushing the latching projections 6 and 7 with the fingers of the hand to displace them from the projecting position to the retreating position side. Extract to However, when the sheets S1 and S2 are connected to each other by the above-mentioned connecting tool and the connecting tool is fixed to the column B, the locking projections 6, 7 are located on the opposite side of the column B with the sheets S1 and S2 therebetween. In the case where the support B is a building scaffold support, the worker pushes the latching protrusions 6 and 7 from the scaffold side to pull out the shaft portions 3 and 4 from the hole 300 to the support B side. Cannot be performed, and even if such a work can be performed, the work must be performed by putting the hand out of the sheets S1 and S2, and the work is troublesome, and the work may be dangerous. The present invention has been made in view of the above circumstances, and has the same basic structure of the connecting member described with reference to FIGS. 5 and 6, but also connects members to be connected such as sheets and plates. It is an object of the present invention to provide a connecting tool that can easily and safely perform all operations necessary for removing the connecting tool used to fix it to a support or the like from the support side. [0010] The connecting device according to the present invention comprises:
And it can be inserted pair of shaft portions into the hole which is provided in each of the connecting members adjacent to each, and a connecting portion over the mutual of the pair of shaft portions, a fixing member such as a strut extending out from the connecting portion a band wrapped around the the locking projection provided on each of said pair of shaft portions, the band side of the locking projection
And opposite the projecting position and the retracted position closer toward the axis of the shaft portion from its projecting position of the connecting vital the engaging projection on the shaft portion to the side of the <br/> shank and provided in the hinge portion to constantly urge the engaging projection in the projecting position side and distal end side of the arms Desa extending in a direction approaching to the band from the locking projection with it allows to elastically displaced between And a pushing operation section for displacing the latching projection to the retreat position side with the hinge section as a fulcrum by the pushing operation. In the connecting device of this construction, when a pair of shaft portions are individually inserted into holes of two adjacent members to be connected, the plugs protrude to the side of the shaft portion during the insertion. After the latching projection retracts to the retreat position side with the hinge portion as a fulcrum and passes through the hole, the latching projection projects to the projecting position by the bias of the hinge portion, and the shaft portion comes out of the hole. To prevent that. Thereby, the two connected members are connected by the pair of shaft portions and the connecting portion extending therebetween. In the state where the two connected members are connected in this manner, the pushing operation portion is located on the fixed member side of the connected member, so that the pushing operation portion can be pushed from the fixed member side. Then, when the pushing operation portion is pushed in such a manner, the latching projection is displaced toward the retreat position side with the hinge portion as a fulcrum, so that the shaft portion is pulled out from the hole portion of the connected member to cover the connecting member. It can be removed from the connecting member. The band is fixed by winding it around a fixing member such as a column. FIG. 1 shows a connector A according to a first embodiment of the present invention. In this connection tool A, reference numeral 1 denotes a synthetic resin band which is maintained in a substantially arc shape, and has a connection mechanism 2 which can be disengaged from each other at both ends in the longitudinal direction. The coupling mechanism 2 is provided with a receiving member 21 provided at one end of the band 1.
And an insertion piece 25 provided at the other end of the band 1 so as to be insertable into and removable from the receiver 21. The receiving member 21 has an outer holding piece 22 and an inner holding piece 23 formed in a bifurcated shape facing each other in the inner and outer directions. A serrated engaging claw group 24 is provided on the inner surface side of the outer holding piece 2. are doing. Insert 2
5 has a serrated engagement claw group 26 on the outer surface side. 2
7, 28 and 29 are knobs. In the connecting mechanism 2, the band 1, which is maintained in an arc shape, is reduced in diameter and inserted into the receiving member 21.
Is inserted, the insertion piece 25 is held by the elasticity peculiar to the synthetic resin provided on the outer holding piece 22 and the inner holding piece 23 of the receiving body 21, and the engaging claws 24 of the outer holding piece 22 are held. And the engaging claw group 26 of the insertion piece 25 mesh with each other, and the meshing ensures that the receiver 21 and the insertion piece 25 are securely connected. Reference numerals 3 and 4 denote shaft portions, and reference numeral 5 denotes a connecting portion extending between the pair of shaft portions 3 and 4. The band 1 extends integrally from a central portion of the connecting portion 5. A hooking projection 6 is provided on one shaft 3, and a hooking projection 7 is provided on the other shaft 4. As shown in FIG. 3, the hooking projection 7 provided on the other shaft 4 has a substantially right-angled triangular cross-sectional shape, and one end of the slope 71 is hinged to the shaft 4.
The hinge portion 75 is always urged by the elasticity of the hinge portion 75 toward a protruding position side protruding to the side of the shaft portion 4 as shown by a solid line in FIG. An arm 78 extends from the hooking projection 7 in a direction approaching the band 1, and a pushing operation section 79 is provided at a distal end of the arm 78. The pushing operation portion 79 is taller than the hooking projection 7, and the pushing operation allows the hooking projection 7 to be displaced toward the retreat position side with the hinge portion 75 as a fulcrum. The latching projection 7, the arm 78, and the pushing operation section 79 are connected to a hinge 75
Of the shaft portion 4 against the elasticity of the shaft portion 4. The same applies to the latching projections 6 provided on one of the shaft portions 3, 61 is its slope, 65 is a hinge portion,
Reference numeral 68 denotes an arm, reference numeral 69 denotes a pushing operation unit, and reference numeral 31 denotes a hole of the shaft 3. Note that the shaft portions 3 and 4 can be inserted into a hole portion 300 of an eyelet metal fitting provided in a connected member described later. The band 1, the connecting portion 5, the shaft portions 3 and 4, the latching protrusions 6, 7, the hinge portions 65 and 75, the arms 68 and 78, and the pushing operation portions 69 and 79 described above are integrally formed of synthetic resin. ing. Next, with reference to FIGS. 2 and 3, a description will be given of a case in which the connecting member A, which connects two building sheets S1 and S2 as connected members, is fixed to a scaffolding column B for building. Eyelets are attached to the sheets S1 and S2, and holes of the eyelets are denoted by reference numeral 300. Regarding the connection between the sheets S1 and S2, the eyelet holes 300,
The shaft portions 3 and 4 are inserted into 300, respectively, and the locking projections 6 and 7 face the sheets S1 and S2 to prevent the shaft portions 3 and 4 from coming out of the holes 300 and 300. Further, as shown in FIG. 3, in the other shaft portion 4, the arm 78 penetrates the hole portion 300, and the pushing operation portion 79 is located on the opposite side of the locking projection 7 across the sheet S2, that is, on the support B side. I do. Although not shown, the same applies to one of the shaft portions 3. Thus, the two sheets S <b> 1 and S <b> 2 are connected to each other by the shaft portions 3 and 4 and the connecting portion 5. In addition, the shaft portions 3 and 4
The operation of the hooking projection 6 when inserting into the holes 300, 300 is the same as that described above with reference to FIG. 6, and the description thereof is omitted here. Further, the band 1 is wound around the support B,
In addition, the engaging claw group 24 on the receiving body 21 side of the connecting mechanism 2 and the engaging claw group 26 on the insertion piece 25 side inserted into the receiving body 21 are engaged with each other and connected to each other.
Are fixed around the support B. Therefore, the two sheets S1 and S2 are connected to the support B. When removing the connecting member A from the seats S1 and S2, the operator pushes the pushing operation portions 69 and 79 with the fingers of the hand as shown by the arrow P in FIG. By doing so, as indicated by a virtual line in FIG.
Since the latching projections 61 and 71 are displaced toward the retreat position side with the hinge portions 65 and 75 as fulcrums, the shaft portions 3 and 4 are pulled out from the holes 300 and 300 of the sheets S1 and S2, and the connecting member is connected to the sheet S1. , S2. FIG. 4 shows a connector A according to a second embodiment of the present invention.
Is shown. The connection tool A is different from that of the first embodiment in that the connection portion 5, the shaft portions 3, 4, the locking projections 6,
7, while the hinge portions 65 and 75, the arms 68 and 78, and the push-in operation portions 69 and 79 are integrally formed of synthetic resin, only the band 1 is separately formed of synthetic resin.
The only difference is that these two molded bodies are connected by a pin member 9 so as to be relatively rotatable. Otherwise, the configuration is the same, and therefore, the same portions are denoted by the same reference characters and detailed description of the configuration is omitted. According to the connecting member A, the same operation as that of the first embodiment is exhibited. In particular, according to the connecting device A, even when the support column (not shown) is inclined, the band 1 is rotated with respect to the connecting portion 5 so that the band 1 is rotated.
Can be adjusted to the posture of the column. In the connecting device of the present invention, it is possible to adopt a configuration other than that shown as the band 1. According to the present invention, the connecting members can be connected only by inserting a pair of shaft portions separately into the holes of the two connected members adjacent to the edge. It can be wrapped around the fixing member and fixed. In addition, after the connection, the locking projections provided on each of the pair of shaft portions not only have the effect of preventing the detachment of the connected member, but also have the effect of increasing the connection reliability, but also work of removing from the connected member. Can be easily and safely performed from the fixing member side. The connecting device of the present invention can be used not only for the applications described in the embodiments, but also for connecting various sheet materials and plate materials such as a curing sheet for civil engineering.
【図面の簡単な説明】
【図1】本発明の第1実施例による連結具の平面図であ
る。
【図2】第1実施例による連結具の使用状態を示す一部
破断平面図である。
【図3】図2のIII−III線に沿う拡大断面図であ
る。
【図4】本発明の第2実施例による連結具の平面図であ
る。
【図5】従来の連結具の使用状態を示す一部破断平面図
である。
【図6】図5のVI−VI線に沿う拡大断面図である。
【符号の説明】
A 連結具
B 支柱(固定部材)
S1,S2 シート(被連結部材)
1 バンド
3,4 軸部
5 連結部
6,7 掛止突起
65,75 ヒンジ部
68,78 アーム
69,79 押込操作部
300 孔部BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a plan view of a coupler according to a first embodiment of the present invention. FIG. 2 is a partially broken plan view showing a use state of the coupler according to the first embodiment. FIG. 3 is an enlarged sectional view taken along line III-III in FIG. FIG. 4 is a plan view of a connector according to a second embodiment of the present invention. FIG. 5 is a partially broken plan view showing a use state of a conventional connector. FIG. 6 is an enlarged sectional view taken along the line VI-VI of FIG. 5; [Description of Signs] A Connecting Tool B Supporting Column (Fixed Member) S1, S2 Sheet (Connected Member) 1 Band 3, 4 Shaft 5 Connecting Portion 6, 7 Hanging Projection 65, 75 Hinge Portion 68, 78 Arm 69, 79 Push-in operation part 300 hole
フロントページの続き (72)発明者 安原 一司 兵庫県宍粟郡安富町安志766 タイトン 株式会社兵庫工場内 (56)参考文献 実開 平6−76549(JP,U) 実開 平6−82297(JP,U) 実開 昭61−161354(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04G 21/32 Continuation of the front page (72) Inventor Kazushi Yasuhara 766 Yasutoshi, Yasutomi-cho, Shiso-gun, Hyogo Pref. (U, U) Real opening Sho 61-161354 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E04G 21/32
Claims (1)
された孔部に挿通可能な一対の軸部と、この一対の軸部
の相互間に亘る連結部と、この連結部から延び出て支柱
などの固定部材に巻き付けられるバンドと、上記一対の
軸部のそれぞれに設けられる掛止突起と、この掛止突起
の上記バンド側とは反対側を上記軸部に連結しかつ上記
掛止突起が上記軸部の側方への突出位置とその突出位置
から上記軸部の軸心側に近づいた退入位置との間で弾性
変位することを許容すると共に上記掛止突起を上記突出
位置側に常時付勢するヒンジ部と、上記掛止突起から上
記バンドに近づく方向に延び出されたアームの先端側に
具備されかつその押込動作によって上記ヒンジ部を支点
として上記掛止突起をその退入位置側へ変位させる押込
操作部と、を備えていることを特徴とする連結具。(57) a pair of shaft portions which can be inserted into the hole which is provided in each of the patent scope claimed is: 1. A phase adjacent the member to be connected, connecting portions across between each other the pair of shaft portions When the band is wound around the fixing member, such as a post extending out from the connecting portion, and a locking projection provided on each of said pair of shaft portions, the locking projection
Of the above band-side connecting vital above <br/> locking projection opposite to the shaft portion approaches toward the axis of the shaft portion from the protruding position and the protruding position to the side of the shaft portion a hinge portion of the locking projection to constantly urge the said projecting position side with allows to elastically displaced between the retracted position, the arms Desa extending in a direction approaching to the band from the locking projection A push operation unit provided on the distal end side and displacing the latching projection to the retreat position side with the hinge portion as a fulcrum by the pushing operation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12821295A JP3533261B2 (en) | 1995-05-26 | 1995-05-26 | Coupling tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12821295A JP3533261B2 (en) | 1995-05-26 | 1995-05-26 | Coupling tool |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08326327A JPH08326327A (en) | 1996-12-10 |
| JP3533261B2 true JP3533261B2 (en) | 2004-05-31 |
Family
ID=14979268
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP12821295A Expired - Fee Related JP3533261B2 (en) | 1995-05-26 | 1995-05-26 | Coupling tool |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3533261B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6053100B2 (en) * | 2012-03-27 | 2016-12-27 | 株式会社サンヨーケミカル | Protection sheet connector |
-
1995
- 1995-05-26 JP JP12821295A patent/JP3533261B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08326327A (en) | 1996-12-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2005337317A5 (en) | ||
| US6438801B1 (en) | Holderless clamping hose | |
| EP0655538B1 (en) | A length-adjustable support | |
| JP3533261B2 (en) | Coupling tool | |
| JP3620885B2 (en) | Fitting that connects the scaffold elements | |
| JP2585357Y2 (en) | Hose clip | |
| JP3863698B2 (en) | Hose clamp | |
| JP2833679B2 (en) | Hook device for lifting heavy objects | |
| US6056015A (en) | Protecting and identifying fittings | |
| JP3503986B2 (en) | Hose clamp | |
| ITTO960935A1 (en) | ELASTIC HOSE CLAMP | |
| JP2602869Y2 (en) | Clamp for wire harness | |
| JP2004116070A (en) | Pipe joint | |
| JP2571360Y2 (en) | Hose clip | |
| JPH0669581U (en) | Hose clip | |
| JP2932177B2 (en) | Band fastener | |
| JPH0512552Y2 (en) | ||
| JP2529490Y2 (en) | Pipe connector | |
| JP3014220B2 (en) | Protective net and sheet connecting device | |
| JPH0676549U (en) | Connector | |
| JPH0676550U (en) | Connector | |
| JPH11201119A (en) | Hose clip and rod-shaped release tool | |
| JPH10309025A (en) | Protective cover for cable | |
| JPH0314515Y2 (en) | ||
| WO2023286412A1 (en) | Sheet fixing tool and temporary structure sheet |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040109 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040210 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040308 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |