JP3579704B2 - Underwater shield method and shield machine - Google Patents
[go: Go Back, main page]

JP3579704B2 - Underwater shield method and shield machine - Google Patents

Underwater shield method and shield machine Download PDF

Info

Publication number
JP3579704B2
JP3579704B2 JP31843399A JP31843399A JP3579704B2 JP 3579704 B2 JP3579704 B2 JP 3579704B2 JP 31843399 A JP31843399 A JP 31843399A JP 31843399 A JP31843399 A JP 31843399A JP 3579704 B2 JP3579704 B2 JP 3579704B2
Authority
JP
Japan
Prior art keywords
shield machine
shield
earth
sand
underwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP31843399A
Other languages
Japanese (ja)
Other versions
JP2001132385A (en
Inventor
正義 松木田
攻 高木
伸行 林
雅喜 高久
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP31843399A priority Critical patent/JP3579704B2/en
Publication of JP2001132385A publication Critical patent/JP2001132385A/en
Application granted granted Critical
Publication of JP3579704B2 publication Critical patent/JP3579704B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、水中シールド工法およびシールドマシンに関するものである。
【0002】
【発明が解決しようとする課題】
従来、水底トンネルの施工においては、沈埋工法、シールド工法などが用いられている。シールド工法による水底トンネルは、掘削土量が少なく、大規模な躯体製作ヤードを必要としない等の利点があるが、土被りが大きく、トンネルの計画高が深くなるという短所がある。そこで本発明は、水中シールド工法において土被りを減らし、かつシールドマシンの後方に構築したセグメントトンネルを効率良く埋め戻すことを課題とする。
【0003】
【課題を解決するための手段】
【0006】
上記課題を解決するための手段として本発明の手段として本発明は、後方にセグメントを組み立てながらシールドマシンを水中において推進させ、推進に際して取り除いたシールドマシンの切羽側の土砂をシールドマシン内に流入させ、シールドマシンのスキンプレートを貫通して内外に連通し、後方の既設セグメントまで到達する埋戻し管を介して後方の既設セグメントを埋め戻すことを特徴とした、水中シールド工法を提供する。
【0007】
また、上記に記載の水中シールド工法において、シールドマシン内に流入させた土砂の一部は後方既設セグメントの埋戻しに使用し、他の部分はシールドマシン内の排泥設備を介してトンネル後方より搬出することを特徴とした、水中シールド工法を提供する。
【0008】
そして、シールドマシンの切羽側の土砂の一部を水上からの掘削手段で取り除き、後方にセグメントを組み立てながらシールドマシンを水中において推進させ、推進に際して取り除いたシールドマシンの切羽側の土砂の他の部分をシールドマシン内に流入させ、シールドマシンのスキンプレートを貫通して内外に連通し後方の既設セグメントまで到達する埋戻し管を介して後方の既設セグメントを埋め戻すことを特徴とした、水中シールド工法を提供する。
【0009】
さらに、上記に記載の水中シールド工法に用いるシールドマシンにおいて、シールドマシンの切羽側の土砂をシールドマシン内に取り込む手段と、シールドマシンのスキンプレートを貫通して内外に連通し後方の既設セグメントまで到達しシールドマシン内に取り込んだ土砂を後方の既設セグメントの周囲まで搬送する埋戻し管とを有することを特徴とした、シールドマシンを提供する。
【0010】
また、上記に記載の水中シールド工法に用いるシールドマシンにおいて、シールドマシンの切羽側の土砂をシールドマシン内に取り込む手段と、シールドマシンのスキンプレートを貫通して内外に連通し後方の既設セグメントまで到達しシールドマシン内に取り込んだ土砂の一部を後方の既設セグメントの周囲まで搬送する埋戻し管と、取り込んだ土砂の他の部分をトンネル後方より搬出する排泥設備とを有することを特徴とした、シールドマシンを提供する。以下、図面を参照しながら、本発明の実施の形態について説明する。
【0011】
【発明の実施の形態1】
<イ>シールドマシンの構造
図1に示すように、本実施の形態1のシールドマシン100は、前面にカッタ装置を設けない構造である。円筒形や矩形のスキンプレートの前面に隔壁110を有し、その底部側に土砂取込口111が開設されている。また、必要に応じて土砂取込口111を受けるように外側に刃口112を突設する。なお、土砂の取り込みを容易にするためには、カッタ装置や攪拌装置を設ける場合もある。
【0012】
土砂取込口111の内部には、土砂取込装置120が装備され、トンネル後方の所定の排土場所まで到達する排泥管121の一端が連通している。なお、シールドマシン100内には、シールドジャッキ130やセグメント自動組立装置131のほか、排泥設備などのシールドトンネルの施工に必要な設備を配備している。
【0013】
<ロ>シールドマシンの推進
シールドマシン100の後方にセグメント200を組立ながら、シールドジャッキ130によりシールドマシン100を推進させる。このとき、土被りはゼロか非常に小さい状態で推進させる。シールドマシン100の切羽側の土砂は、水上の浚渫船300などの掘削手段によって掘削する。これによって、シールドマシン100の推進力を軽減させることができる。
【0014】
切羽側の土砂のうちシールドマシン100の底部付近の掘り残した土砂は、土砂取込口111から土砂取込装置120内に流入させ、排泥管121を介してトンネル後方より排出する。このように、浚渫船300による掘削と、シールドマシン100の推進力による土砂の取込によって、切羽側の土砂を取り除くことができるため、シールドマシン100の前面にカッタ装置を設ける必要が無い。なお、図示しないが、土砂取込口111の付近に、外側に向けてジェット式や機械式の土砂攪拌装置を設けておき、土砂の取込を容易にすることも考えられる。
【0015】
構築完了したトンネルの底部には、移動可能な作業台210を連続的に設置し、排泥管121等をその上に搭載することによってシールドマシン100の推進に追従できるようにする。また、埋戻し前のトンネルの浮上を防止するため、シールドマシン100の推進に追従して前進するウェイト台車220を設置する。
【0016】
<ハ>後方既設セグメントの埋戻し
浚渫船300により掘削した土砂は、水上の搬送手段を介して後方の既設セグメント200の周囲まで逐次搬送して、埋戻し土砂400とする。従って、シールドマシン100の推進に追従して、効率的に既設セグメント200の埋め戻しが可能となる。
【0017】
搬送手段の具体例としては、浚渫船300の後方にベルトコンベア台船310を連結し、これらの船上に、土砂を投入するホッパ320と、搬送するべルトコンベア330と、後方の既設セグメント200の周囲に土砂を投入する複数のトレミー管340とより構成したもの等が考えられる。なお、搬送手段の途上において、掘削土砂の流動化又は固化材の混合による土質の改良等を行うと良い。
【0018】
【発明の実施の形態2】
<イ>シールドマシンの構造
図2、3に示すように、本実施の形態2のシールドマシン500は、前面にカッタ装置を設けない構造である。スキンプレートの前面に隔壁510を有し、その底部側に土砂取込口511が開設されている。また、隔壁510の前方には、土砂取込口511を受けるように外側に刃口512を突設する。なお、土砂の取り込みを容易にするためには、カッタ装置や攪拌装置を設ける場合もある。
【0019】
土砂取込口511の内部には、土砂取込装置520が装備され、トンネル内に設置した土砂選別プラント530との間を土砂取込管521により連通されている。土砂選別プラント530は、取込んだ土砂のうち埋戻しに必要分を選別する機能を有し、不要分は排泥管531等の排泥設備を介して、トンネル後方の所定の排土場所に搬出される。
【0020】
必要分の土砂は、土砂改良プラント540等に送られ、そこで、流動化又は固化材の混合による土質の改良が行なわれる。また、土砂改良プラント540には埋戻し管550の一端が連通している。この埋戻し管550は、シールドマシン500のスキンプレートの例えば上面を貫通して、後方の既設セグメント600まで到達している。
【0021】
また、埋戻し管550は、埋戻しを均等に効率良く行えるように、セグメント600上で枝分かれしてかつ下方に伸びた複数の分岐管551を有している。このとき、埋戻し管を複数の独立した配管で構成する場合もある。さらに、シールドマシン500の推進に追従できるように、セグメント600上の埋戻し管550には、ローラーなどの移動装置552を設けておく。
【0022】
なお、シールドマシン500内には、シールドジャッキ560やセグメント自動組立装置561等のほか、シールドトンネルの施工に必要な設備を配備している。
【0023】
<ロ>シールドマシンの推進
シールドマシン500の後方にセグメント600を組立ながら、シールドジャッキ560によりシールドマシン500を推進させる。このとき、シールドマシン500の切羽側の土砂は、推進力によって土砂取込口511から土砂取込装置520内に取り込む。
【0024】
このように、シールドマシン500の推進力による土砂の取り込みによって、切羽側の土砂を取り除くことができるため、シールドマシン500の前面にカッタ装置を設ける必要が無い。なお、図示しないが、土砂取込口511の付近に、外側に向けてジェット式や機械式の土砂攪拌装置を設けておき、土砂の取込を容易にすることも考えられる。
【0025】
構築完了したトンネルの底部には、移動可能な作業台610を連続的に設置し、土砂選別プラント530、土砂改良プラント540、排泥管531をその上に搭載することによってシールドマシン500の推進に追従できるようにする。また、埋戻し前のトンネルの浮上を防止するため、シールドマシン500の推進に追従して前進するウェイト台車620を設置する。
【0026】
<ハ>後方既設セグメントの埋戻し
土砂取込装置520に取込んだ土砂は、土砂取込管521を介して土砂選別プラント530に送り、不要分は排泥管531を介してトンネル後方に逐次排土する。必要分は土砂改良プラント540で改良した後、埋戻し管550を介して後方の既設セグメント600の周囲まで逐次搬送し、埋戻し土砂700とする。従って、シールドマシン500の推進に追従して、効率的に既設セグメント600の埋め戻しが可能となる。
【0027】
【発明の実施の形態3】
実施の形態2のシールドマシン500を用いて推進する際に、切羽土砂の一部を、実施の形態1で用いたような浚渫船300により水上から掘削する場合もある。水上からの浚渫土量とシールドマシン500内への取り込み土量とをバランスさせ、掘削土砂の一部を浚渫土として水上経由で処分する。
【0028】
【発明の効果】
本発明は以上のように構成されるため、以下のような効果を得ることができる。
<イ>切羽側の土砂を、水上の搬送手段又はシールドマシン内の埋戻し管を介して、後方の既設セグメントの周囲に逐次搬送できる。従って、シールドマシンの推進に追従して、効率的に既設セグメントの埋め戻しが可能となる。
【0029】
<ロ>推進に追従して逐次埋戻しを行なうため、セグメントが水中に露出する期間が短くて済み、施工中のトンネルの安全性が向上する。
【0030】
<ハ>シールドマシンの前面にカッタ装置を設けない構造の場合、経済的であると共に、故障も少なくて済む。
【0031】
<ニ>土被りがゼロか非常に小さい状態でシールドマシンを掘進させるため、トンネルの計画高を浅くでき、トンネルの全長を短くすることができる。
【0032】
<ホ>切羽土砂の一部を水上から掘削して浚渫土として処分することによって、掘削土砂の処分コストを低減することができる場合がある。
【図面の簡単な説明】
【図1】本発明の実施の形態1の説明図
【図2】本発明の実施の形態2の説明図
【図3】本発明の実施の形態2の説明図
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an underwater shield method and a shield machine.
[0002]
[Problems to be solved by the invention]
Conventionally, in the construction of underwater tunnels, a submerging method, a shield method, and the like have been used. The submerged tunnel using the shield method has the advantages of a small amount of excavated soil and no need for a large-scale frame-building yard. However, it has disadvantages such as large earth covering and a large planned height of the tunnel. Therefore, an object of the present invention is to reduce the earth covering in the underwater shield construction method and efficiently backfill the segment tunnel constructed behind the shield machine.
[0003]
[Means for Solving the Problems]
[0006]
As a means of the present invention as a means for solving the above-mentioned problems, the present invention as a means of the present invention is to propel the shield machine underwater while assembling the segment at the rear, and let the earth and sand on the face side of the shield machine removed during propulsion flow into the shield machine. The present invention provides an underwater shield construction method characterized by penetrating a skin plate of a shield machine, communicating inside and outside, and backfilling the existing rear segment through a backfill pipe reaching the existing rear segment.
[0007]
Also, in the underwater shield method described above, part of the earth and sand that has flowed into the shield machine is used for backfilling the existing segment behind, and the other part is from the rear of the tunnel through the mud exhaust equipment inside the shield machine. To provide an underwater shield method characterized by carrying out.
[0008]
Then, part of the earth and sand on the face side of the shield machine is removed by means of excavation from above the water, and the shield machine is propelled underwater while assembling the segments at the rear. was flowing in the shield machine, communicates with the inside and outside through the skin plate of the shield machine, and wherein the backfill behind the existing segment through the pipe backfill reaching behind the existing segment, water shield Provide construction methods.
[0009]
Further, in the shield machine used in the underwater shield method described above , a means for taking in the earth and sand on the face side of the shield machine into the shield machine, and penetrating through the skin plate of the shield machine to the inside and outside, to the existing segment at the rear. and characterized in that it has a, a backfill tube for conveying to ambient behind the existing segments sediment captured in the shield machine reached, providing shielding machine.
[0010]
Also, in the shield machine used in the underwater shield method described above , a means for taking in the earth and sand on the face side of the shield machine into the shield machine, and penetrating through the skin plate of the shield machine to the inside and outside, to the existing segment at the rear. A backfill pipe for transporting a portion of the earth and sand that has arrived and taken into the shield machine to the periphery of the existing segment at the rear , and a mud discharging facility for carrying another portion of the earth and sand taken in from the rear of the tunnel. Provide a specially-designed shield machine. Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0011]
Embodiment 1 of the present invention
<A> Structure of Shield Machine As shown in FIG. 1, the shield machine 100 of the first embodiment has a structure in which a cutter device is not provided on the front surface. A partition wall 110 is provided on the front surface of a cylindrical or rectangular skin plate, and a sediment intake 111 is opened on the bottom side. In addition, a cutting port 112 is provided on the outside so as to receive the earth and sand intake port 111 as necessary. In addition, a cutter device or a stirring device may be provided in order to easily take in the earth and sand.
[0012]
Inside the sediment intake port 111, a sediment intake device 120 is provided, and one end of a mud discharge pipe 121 reaching a predetermined earth removal place behind the tunnel communicates therewith. In the shield machine 100, in addition to the shield jack 130 and the automatic segment assembling apparatus 131, equipment necessary for construction of the shield tunnel, such as a sludge drainage equipment, is provided.
[0013]
<B> Propulsion of the shield machine While assembling the segment 200 behind the shield machine 100, the shield machine 100 is propelled by the shield jack 130. At this time, the earth covering is propelled with zero or very small. The earth and sand on the face side of the shield machine 100 is excavated by excavation means such as a dredger 300 on the water. Thereby, the propulsive force of the shield machine 100 can be reduced.
[0014]
The earth and sand left uncut near the bottom of the shield machine 100 among the earth and sand on the face side is allowed to flow into the earth and sand intake device 120 from the earth and sand intake port 111, and is discharged from the rear of the tunnel through the exhaust pipe 121. As described above, the excavation by the dredger 300 and the inflow of earth and sand by the propulsive force of the shield machine 100 can remove the earth and sand on the face side, so that it is not necessary to provide a cutter device on the front surface of the shield machine 100. Although not shown, a jet-type or mechanical-type earth and sand stirring device may be provided in the vicinity of the earth and sand inlet 111 toward the outside to facilitate earth and sand intake.
[0015]
A movable worktable 210 is continuously installed at the bottom of the completed tunnel, and a mud pipe 121 or the like is mounted thereon so that the shield machine 100 can follow the propulsion. Also, in order to prevent the tunnel from floating before backfilling, a weight carriage 220 that moves forward following the propulsion of the shield machine 100 is installed.
[0016]
<C> Backfill existing segments Back excavated by dredging ship 300 Sediment excavated by dredging vessel 300 is sequentially transported to the periphery of existing existing segment 200 behind by water, and backfilled sediment 400 is obtained. Therefore, the existing segment 200 can be efficiently backfilled following the propulsion of the shield machine 100.
[0017]
As a specific example of the conveying means, a belt conveyor barge 310 is connected to the rear of the dredger 300, and on these ships, a hopper 320 for charging earth and sand, a belt conveyor 330 for conveying, and around the existing segment 200 in the rear. It is conceivable to use a plurality of tremie pipes 340 into which earth and sand are charged. In addition, it is preferable to improve the soil quality by fluidizing the excavated earth and sand or mixing the solidified material in the middle of the conveying means.
[0018]
Embodiment 2 of the present invention
<A> Structure of Shield Machine As shown in FIGS. 2 and 3, the shield machine 500 according to the second embodiment has a structure in which a cutter device is not provided on the front surface. A partition 510 is provided on the front surface of the skin plate, and a sediment intake 511 is opened on the bottom side. Further, in front of the partition wall 510, a blade port 512 is provided to protrude outward so as to receive the sediment intake port 511. In addition, a cutter device or a stirring device may be provided in order to easily take in the earth and sand.
[0019]
A sediment intake device 520 is provided inside the sediment intake port 511, and communicates with a sediment sorting plant 530 installed in a tunnel by a sediment intake pipe 521. The sediment sorting plant 530 has a function of selecting a necessary amount for backfilling of the sediment taken in, and the unnecessary portion is transferred to a predetermined discharging site behind the tunnel through a drainage facility such as a drainage pipe 531. It is carried out.
[0020]
The required amount of earth and sand is sent to an earth and sand improvement plant 540 or the like, where the soil quality is improved by fluidization or mixing of a solidifying material. In addition, one end of the backfill pipe 550 communicates with the earth and sand improvement plant 540. The backfill tube 550 penetrates, for example, the upper surface of the skin plate of the shield machine 500 and reaches the existing segment 600 at the rear.
[0021]
The backfill pipe 550 has a plurality of branch pipes 551 that are branched on the segment 600 and extend downward so that backfill can be performed uniformly and efficiently. At this time, the backfill pipe may be composed of a plurality of independent pipes. Further, a moving device 552 such as a roller is provided in the backfill tube 550 on the segment 600 so as to follow the propulsion of the shield machine 500.
[0022]
In the shield machine 500, in addition to the shield jack 560, the automatic segment assembling device 561, etc., equipment necessary for constructing the shield tunnel is provided.
[0023]
<B> Propulsion of the shield machine The shield machine 500 is propelled by the shield jack 560 while assembling the segment 600 behind the shield machine 500. At this time, the earth and sand on the face side of the shield machine 500 is taken into the earth and sand intake device 520 from the earth and sand intake port 511 by the propulsive force.
[0024]
As described above, since the sediment on the face side can be removed by taking in the earth and sand by the propulsive force of the shield machine 500, it is not necessary to provide a cutter device on the front surface of the shield machine 500. Although not shown, a jet-type or mechanical-type earth and sand stirring device may be provided in the vicinity of the earth and sand intake port 511 toward the outside to facilitate earth and sand intake.
[0025]
A movable workbench 610 is continuously installed at the bottom of the completed tunnel, and a sediment sorting plant 530, a sediment improvement plant 540, and a mud pipe 531 are mounted thereon to promote the shield machine 500. Be able to follow. In order to prevent the tunnel from floating before backfilling, a weight carriage 620 that moves forward following the propulsion of the shield machine 500 is installed.
[0026]
<C> The sediment taken into the back-filled sediment intake device 520 of the existing rear segment is sent to the sediment sorting plant 530 via the sediment intake pipe 521, and unnecessary parts are sequentially sent to the rear of the tunnel via the drainage pipe 531. Excavate. The necessary portion is improved in the earth and sand improvement plant 540, and is sequentially conveyed to the periphery of the existing segment 600 at the rear through the backfill pipe 550 to obtain the backfill soil 700. Therefore, the existing segment 600 can be efficiently backfilled following the propulsion of the shield machine 500.
[0027]
Third Embodiment of the Invention
When propelling using the shield machine 500 according to the second embodiment, a part of the face earth and sand may be excavated from the water by the dredger 300 as used in the first embodiment. The amount of dredged soil from the water and the amount of soil taken into the shield machine 500 are balanced, and part of the excavated soil is disposed of as dredged soil via the water.
[0028]
【The invention's effect】
Since the present invention is configured as described above, the following effects can be obtained.
<B> The face-side earth and sand can be successively conveyed around the existing segment at the rear through a conveying means on the water or a backfill pipe in the shield machine. Therefore, the existing segment can be efficiently backfilled following the propulsion of the shield machine.
[0029]
<B> Since backfilling is performed sequentially following the propulsion, the period during which the segments are exposed to the water can be shortened, and the safety of the tunnel during construction is improved.
[0030]
<C> In the case where the cutter device is not provided on the front surface of the shield machine, it is economical and requires less trouble.
[0031]
<D> Since the shield machine is excavated with zero or very small earth cover, the planned height of the tunnel can be reduced and the total length of the tunnel can be shortened.
[0032]
<E> In some cases, the disposal cost of excavated soil can be reduced by excavating part of the face earth and sand from the water and disposing it as dredged soil.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram of a first embodiment of the present invention; FIG. 2 is an explanatory diagram of a second embodiment of the present invention; FIG. 3 is an explanatory diagram of a second embodiment of the present invention;

Claims (5)

後方にセグメントを組み立てながらシールドマシンを水中において推進させ、Propelling the shield machine underwater while assembling segments behind,
推進に際して取り除いたシールドマシンの切羽側の土砂をシールドマシン内に流入させ、The earth and sand on the face side of the shield machine removed during propulsion flow into the shield machine,
シールドマシンのスキンプレートを貫通して内外に連通し、後方の既設セグメントまで到達する埋戻し管を介して後方の既設セグメントを埋め戻すことを特徴とした、水中シールド工法。An underwater shield method, characterized by penetrating the skin plate of the shield machine and communicating inside and outside, and backfilling the existing segment at the back via a backfill pipe reaching the existing segment at the rear.
請求項1に記載の水中シールド工法において、In the underwater shield method according to claim 1,
シールドマシン内に流入させた土砂の一部は後方既設セグメントの埋戻しに使用し、他の部分はシールドマシン内の排泥設備を介してトンネル後方より搬出することを特徴とした、水中シールド工法。Underwater shield method, in which part of the earth and sand that has flowed into the shield machine is used for backfilling the existing segment behind, and the other part is carried out from the back of the tunnel through the mud exhaust equipment inside the shield machine. .
シールドマシンの切羽側の土砂の一部を水上からの掘削手段で取り除き、後方にセグメントを組み立てながらシールドマシンを水中において推進させ、A part of the soil on the face side of the shield machine is removed by means of excavation from the water, and the shield machine is propelled underwater while assembling segments behind,
推進に際して取り除いたシールドマシンの切羽側の土砂の他の部分をシールドマシン内に流入させ、The other part of the earth and sand on the face side of the shield machine removed during propulsion flows into the shield machine,
シールドマシンのスキンプレートを貫通して内外に連通し、後方の既設セグメントまで到達する埋戻し管を介して後方の既設セグメントを埋め戻すことを特徴とした、水中シールド工法。An underwater shield method, characterized by penetrating the skin plate of the shield machine and communicating inside and outside, and backfilling the existing segment at the back via a backfill pipe reaching the existing segment at the rear.
請求項1に記載の水中シールド工法に用いるシールドマシンにおいて、A shield machine used in the underwater shield method according to claim 1,
シールドマシンの切羽側の土砂をシールドマシン内に取り込む手段と、Means for taking the earth and sand on the face side of the shield machine into the shield machine,
シールドマシンのスキンプレートを貫通して内外に連通し、後方の既設セグメントまで到達してシールドマシン内に取り込んだ土砂を後方の既設セグメントの周囲まで搬送する埋戻し管と、を有することを特徴とした、シールドマシン。A backfill pipe that penetrates through the skin plate of the shield machine and communicates inside and outside, reaches the existing segment at the rear, and conveys the earth and sand taken into the shield machine to the periphery of the existing segment at the back, and A shield machine.
請求項2に記載の水中シールド工法に用いるシールドマシンにおいて、A shield machine used in the underwater shield method according to claim 2,
シールドマシンの切羽側の土砂をシールドマシン内に取り込む手段と、Means for taking the earth and sand on the face side of the shield machine into the shield machine,
シールドマシンのスキンプレートを貫通して内外に連通し、後方の既設セグメントまで到達してシールドマシン内に取り込んだ土砂の一部を後方の既設セグメントの周囲まで搬送する埋戻し管と、A backfill pipe that penetrates through the skin plate of the shield machine and communicates inside and outside, reaches a rear existing segment, and conveys a part of the earth and sand taken into the shield machine around the rear existing segment,
取り込んだ土砂の他の部分をトンネル後方より搬出する排泥設備と、を有することを特徴とした、シールドマシン。A shield machine, comprising: a sludge discharging device for discharging another portion of the sediment taken in from behind the tunnel.
JP31843399A 1999-11-09 1999-11-09 Underwater shield method and shield machine Expired - Fee Related JP3579704B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31843399A JP3579704B2 (en) 1999-11-09 1999-11-09 Underwater shield method and shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31843399A JP3579704B2 (en) 1999-11-09 1999-11-09 Underwater shield method and shield machine

Publications (2)

Publication Number Publication Date
JP2001132385A JP2001132385A (en) 2001-05-15
JP3579704B2 true JP3579704B2 (en) 2004-10-20

Family

ID=18099106

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31843399A Expired - Fee Related JP3579704B2 (en) 1999-11-09 1999-11-09 Underwater shield method and shield machine

Country Status (1)

Country Link
JP (1) JP3579704B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4531298B2 (en) * 2001-06-26 2010-08-25 ジャパントンネルシステムズ株式会社 Underwater shield shield machine
JP4276441B2 (en) * 2003-01-08 2009-06-10 株式会社小松製作所 Backing material injection apparatus and back material injection method
JP6488175B2 (en) * 2015-04-08 2019-03-20 株式会社技研製作所 Earth disposal equipment
CN110318428B (en) * 2019-06-21 2024-11-05 中交第二航务工程局有限公司 Open-type shield machine suitable for prefabrication and assembly of shallow underwater tunnels
CN116296304B (en) * 2022-09-30 2025-09-02 盾构及掘进技术国家重点实验室 Segment floating test device with stable and accurate process

Also Published As

Publication number Publication date
JP2001132385A (en) 2001-05-15

Similar Documents

Publication Publication Date Title
EP2281091B1 (en) Improvements in and relating to underwater excavation apparatus
US4992000A (en) Underwater trenching system
JP3579704B2 (en) Underwater shield method and shield machine
CN111576517A (en) Integrated high-pressure anti-blocking suction excavation dredging equipment
RU2507431C2 (en) Production method of excavation and laying works at routing of underwater pipelines, and device for its implementation
JPH11117658A (en) Sea bottom excavating device and method
CN102124164A (en) Method for conveying large volumes of submerged soil to fill areas
CN104264732A (en) Dredging machine and dredger comprising same
JP3211875B2 (en) Effective use of rising soil by improving the ground over water
KR20100136027A (en) Dredgers using dredgers to transfer dredges
CN210369048U (en) Open type shield machine suitable for underwater shallow tunnel prefabrication assembly construction
JP3971241B2 (en) Method of laying pipe in submarine ground and excavation tip device used for pipe laying method
JP3053179B2 (en) Solidification and transfer processing method for earth and sand such as dredging
JP2683820B2 (en) Subsea tunnel construction method and construction equipment
US4903419A (en) Method of and apparatus for dredging sludge in high density
Huston Dredging fundamentals
JP3031506B2 (en) Shield method
CN111648425A (en) Construction process for sand mining in high-compactness high-impurity-content water area
JP3480699B2 (en) Land transfer method for sediment transfer such as dredging
JPS5513326A (en) Dredging method and dredge boat
JPS6073920A (en) Settled-mud dredger
JP2000238692A (en) Unloader-cum-spreader barge
JP2895595B2 (en) Landfill work boat
JPH03110295A (en) Method and apparatus for constructing tunnel under water
JPH1037674A (en) Discharge soil disposal device in small-diameter pipe jack method

Legal Events

Date Code Title Description
A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20031209

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040203

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040304

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20040420

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040608

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040622

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080730

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090730

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100730

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110730

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110730

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120730

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130730

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130730

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140730

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees