JP3584444B2 - Concrete formwork fixing member - Google Patents
[go: Go Back, main page]

JP3584444B2 - Concrete formwork fixing member - Google Patents

Concrete formwork fixing member Download PDF

Info

Publication number
JP3584444B2
JP3584444B2 JP2001103362A JP2001103362A JP3584444B2 JP 3584444 B2 JP3584444 B2 JP 3584444B2 JP 2001103362 A JP2001103362 A JP 2001103362A JP 2001103362 A JP2001103362 A JP 2001103362A JP 3584444 B2 JP3584444 B2 JP 3584444B2
Authority
JP
Japan
Prior art keywords
concrete
formwork
concrete formwork
bolt
fixing member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001103362A
Other languages
Japanese (ja)
Other versions
JP2002294669A (en
Inventor
善憲 北条
Original Assignee
株式会社 豊進
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 豊進 filed Critical 株式会社 豊進
Priority to JP2001103362A priority Critical patent/JP3584444B2/en
Publication of JP2002294669A publication Critical patent/JP2002294669A/en
Application granted granted Critical
Publication of JP3584444B2 publication Critical patent/JP3584444B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、コンクリート打設工事において使用されるコンクリート型枠のコンクリート受け板の外側に配置して、該コンクリート受け板の内側に配設されたアンカー部材と連結される内側金具と、コンクリート受け板を挟んで連結して用いられる型枠固定部材に関するものである。
【0002】
【従来の技術】
従来から例えば砂防ダム等の様なコンクリート構造物を築造するには、図5に主要部の断面構造を示すように、コンクリート型枠1を支柱5に沿って上下左右に配列し、重なり合った型枠1の補強枠1b,1bどうしを連結用フックボルト7等で固定するとともに、コンクリート型枠1のコンクリート打設空間S側に面して通常コーンと呼ばれている内側金具3を配置し、そのコンクリート打設空間S側にアンカー部材2またはアンカー部材2に接続した連結金具を取り付け、型枠1の外側において、型枠1と前記支柱5とをフォームタイロッド6で締め付け連結し、当該コンクリート型枠1がコンクリート打設面を形成するように所定位置に所定角度姿勢に立設してコンクリート受け面を構築する。
【0003】
しかる後、コンクリート打設空間Sにコンクリートを打設して、その硬化を待つ。築造しようとするコンクリート構造物が、一度のコンクリート型枠組み立て高さ以上の高さのものである場合は、第1段目のコンクリートC0を築造した後に、その上方に同様の作業を繰り返して第2段目、第3段目のコンクリート構造物を順次積み上げ築造する。
【0004】
この順次的積み上げ築造作業において、下位の打設コンクリートが所要硬さに硬化するのを待ってフォームタイロッド6を除去し、型枠支柱5をコンクリート型枠1から外し、上方に吊り上げてスライド移行させ、この支柱5に対して次の上部のコンクリート築造に必要なコンクリート型枠1を組み付けて前記と同様にコンクリート受け面を構築する本柱スライド工法がある。また、別の工法としては、下位の打設コンクリートを所定の養生期間そのままにしておいて充分に硬化させた後、コンクリート型枠1と支柱5とをそのまま上段に吊り上げて、所要姿勢に立設させて使用する大組スライド工法も行われている。
【0005】
【発明が解決しようとする課題】
以上の従来工法のうち、前者の本柱スライド工法では、打設コンクリートが型枠1を取り除いてもよい程度にまで硬化するのを待っていたのでは、次の上段の型枠の組付けが遅れ、その間作業者が待機しなければならず、作業効率が極めて悪くなる。そのため、打設コンクリートの形は硬化状となっても、より確実な硬化のための養生期間を必要とする時期に、フォームタイロッド6を緩めて、支柱5をコンクリート型枠1から外し、コンクリート型枠1はそのままにして、支柱5を上方に吊り上げて次の型枠組み付け作業を行うのであるが、この作業において、型枠1のコンクリート受け板1aとコンクリート側に位置する内側金具3とを圧接状態に締め付けていたフォームタイロッド6が除去されるため、該型枠1のコンクリート受け板1aと内側金具3との結合力が解放され、そのためコンクリート受け板1aと接していたコンクリート面との圧接力も解放されて離れ易くなり、以後のコンクリートの養生を完全には行うことができないという課題を有していた。
【0006】
また、後者の大組スライド工法では、コンクリート型枠1そのものをコンクリート面から取り外して、支柱5とともに吊り上げ上昇させる工法であるから、この型枠の取り外し時には、打設コンクリートの完全な養生を終えている必要があり、コンクリート打設後からこのコンクリート型枠取り外しまでの間に充分な時間を掛ける必要があり、この場合も作業効率悪化の要因を抱えた工法となっていた。
【0007】
そこで、本発明は、このような従来工法が抱えていたコンクリート擁壁築造工法が有していた課題を解決することが出来る工法、殊に、前者の本柱スライド工法において、顕著な硬化を発揮するコンクリート型枠固定部材を提供することを目的とする。
【0008】
【課題を解決するための手段】
上記目的を達成するために講じた本発明の解決手段を実施例を示す図面と共通の符号を用いて説明すると、本発明のコンクリート型枠固定部材は、コンクリート打設空間S側に位置して、一端側をアンカー部材2と連結する内側金具3におけるコンクリート型枠1側に向かって開口するボルト穴3aに対し、コンクリート型枠1の外側からコンクリート型枠1のコンクリート受け板1aに形成された穿孔1cを介して螺合連結するボルト部分4aと、コンクリート型枠1のコンクリート受け板1aの外面に接当する座金部材4cと、コンクリート型枠1と型枠支柱5とを締め付け連結するフォームタイロッド6の先端ボルト部分6bを螺合するボルト穴4bを備えたナット部材4とを一体的に備えている構成としたものである。
【0009】
【発明の実施の形態】
本発明を実施するに当たっては、前記座金部材4cを、ボルト部分4a上においてナット部材4側に偏した箇所で、相対回転自在で軸線方向移動阻止状態に連結されているものとして実施したり、前記ナット部材4を、その軸線方向長さと座金部材4cの厚さとの和の長さwが、コンクリート型枠1における補強枠1bの幅Wとほぼ等長かそれよりも短尺に形成されているものとして実施するのが好ましい。
【0010】
なぜなら、前者の場合は、使用に際して座金部材4cをナット部材4とは別部材として使用することなく、単一部材として使用することができ、使用が便利であることのみならず、座金部材4cを紛失する虞がない点で好ましく、後者の場合は、コンクリート型枠1と支柱5との組み立て時において、ナット部材4の一部がコンクリート型枠1の支柱5側に突出していて、組み立ての支障とならない点で好ましい。また、座金部材4cは、その平面形状が、正方形状のものに限らず、円形状のもの、楕円形のもの、六角や八角形のもの等適宜の形状のものとして実施することが出来る。
【0011】
【実施例】
以下本発明の詳細を図に示した実施例に基き説明する。図1は本発明の実施例の使用状態を説明する断面図、図2は同主要部を説明する分解斜視図、図3は固定部材を示す斜視図、図4は実施工法の説明図である。
【0012】
図1において、コンクリート型枠1のコンクリート受け面を形成するコンクリート受け板1aは、従来周知の鋼板製で、外形が長方形であって、その周囲と中間部分には、図1に示した幅Wの補強枠1bで補強されている。この補強枠1bにはフックボルト7の鉤状部を挿入したり、挟持クリップ金具の一端を挿入する穴1dが穿設され、前記コンクリート受け板1aにも内側金具3と、本発明に言う固定部材のボルト部分4aを貫通して連結する穿孔1cを穿設してある。
【0013】
内側金具3は、円錐台形で、合成樹脂製のものと鉄製のものとがあり、合成樹脂製のものでは、ボルト穴3aを形成する金属部分がインサートされている。この内側金具3は、通常、外側の端面をコンクリート型枠1の受け板1aに接当させて使用する。この外側のボルト穴3aと、アンカー部材2またはアンカー部材2に連結された連結金具2bが結合される内側のボルト穴3aとは、同芯状に形成されている。しかし、このボルト穴3aは一連の貫通ネジ孔の他、大小径を異にしてもよい。
【0014】
固定部材は、金属製で、ボルト穴4bを形成してある六角柱状のナット部材4と、該六角柱部分の一端面からボルト部分4aが突出されている。そして、その突出根元部分4dを少し小径としてあり、図1、図3に見られるように、この根元部分に正方形状とした座金部材4cを回転自在に嵌め込ませてある。また、前記ナット部材4の長さは、図1に示したように、座金部材4cの厚さを加えた長さ寸法wがコンクリート型枠1の補強枠1bの幅W内に位置するように、同補強枠1bの幅Wよりも小さくなる寸法に設定してある。即ち、W≧wの関係を満たすようにしてある。
【0015】
而して、この固定部材を使用するに当たっては、図1のように、ボルト部分4aを前記コンクリート型枠1の外側から、受け板1aに形成し穿孔1cを通してコンクリート打設空間S側に配置した前記内側金具3のボルト穴3aに螺合して締め付け、コンクリート受け板1aを挟んで内側金具3と連結する。前記内側金具3の反対側のボルト穴3aにアンカー部材2の先端のボルト部分4aを螺合して連結する。または、図4に見られるように、先端部分をアンカー部材2に連結した長さ調整ターンバックル2aをに対して連結した中間連結金具2bの上端のボルト部分を螺合して連結する。他方、コンクリート型枠1の外側において、コンクリート型枠1の外側に型枠支柱5を立てて支柱5の外側から前記ナット部材4のボルト穴4bにフォームタイロッド6の頭部ナット6aを回して先端ボルト部6bを螺合し、支柱5の外側において締め付けナット6cを締め付けて固定する。図4に示した符号9は足場固定枠である。
【0016】
このようにして組み立てた型枠によって形成したコンクリート打設空間Sに、所要量のコンクリートを打設し、しかる後に、コンクリートが硬化はしているが未養生状態の段階で、フォームタイロッド6を逆回転させてナット部材4のボルト穴4bとの締め付けを解除し、型枠支柱5とコンクリート型枠1との連結を解いて、次段のコンクリート型枠を構築するために、コンクリート型枠1をそのままにして、型枠支柱5だけを上方に吊り上げて、この支柱5に上段のコンクリート型枠1を組み付けて、コンクリート型枠1で囲まれた上段のコンクリート打設空間Sを形成する。
【0017】
この上段のコンクリート型枠構築中において、下段のコンクリートC0は、コンクリート型枠1のコンクリート受け板1aが内面金具3と固定部材との連結状態を保持したまま残されているので、充分な時間を掛けて完全な養生を行うことができ、完全なコンクリート築造物が得られる。
【0018】
以上本発明の代表的と思われる実施例について説明したが、本発明は必ずしもこの実施例構造のみに限定されるものではなく、前記のように、例えば座金の形状を円形や六角形等に変形させて実施することができ、本発明にいう構成要件を備え、本発明にいう目的を達成し、以下にいう効果を有する範囲内において適宜改変して実施することができるものである。
【0019】
【発明の効果】
以上の説明から既に明らかなように、本発明にいうところのコンクリート型枠固定部材は、コンクリート打設空間側に配置する内側金具とコンクリート型枠のコンクリート受け板を挟んで螺合させ、コンクリート型枠と型枠支柱とを固定するフォームタイロッドを、コンクリート型枠の外側において着脱結合される構造としたので、コンクリート打設後の早い段階において、コンクリート型枠だけをコンクリート打設状態のままで残して、型枠支柱を上方に吊り上げて、次段階のコンクリート型枠組み付け作業を行うことができ、無駄な待ち時間無く作業を順次的に行うことができ、それでいて、打設コンクリートを充分に完全に養生させることができ、品質の良い壁の築造を能率よく効果的に施工できるという顕著な効果を得ることができるに至ったのである。
【図面の簡単な説明】
【図1】使用状態の主要部を示す部分断面図。
【図2】主要部を説明する分解斜視図。
【図3】固定部材の全体を示す斜視図。
【図4】実施工法を説明する概略断面図。
【図5】従来工法を説明する概略断面図。
【符号の説明】
1 コンクリート型枠
1a コンクリート受け板
1b 補強枠
1c 穿孔
2 アンカー部材
3 内側金具
3a ボルト穴
3b ボルト部分
4 ナット部材
4a ボルト部分
4b ボルト穴
4c 座金部材
5 型枠支柱
6 フォームタイロッド
6b先端ボルト部分
S コンクリート打設空間
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a concrete receiving plate which is disposed outside a concrete receiving plate of a concrete form used in concrete placing work and is connected to an anchor member disposed inside the concrete receiving plate. The present invention relates to a form-fixing member that is used in a state where it is interposed therebetween.
[0002]
[Prior art]
Conventionally, in order to build a concrete structure such as a sabo dam, for example, as shown in FIG. 5, a cross-sectional structure of a main part, concrete forms 1 are arranged vertically and horizontally along a column 5 to form an overlapping mold. The reinforcing frames 1b, 1b of the frame 1 are fixed with the connecting hook bolts 7 and the like, and the inner metal fitting 3, which is usually called a cone, is arranged facing the concrete placing space S side of the concrete form 1; An anchor member 2 or a connection fitting connected to the anchor member 2 is attached to the concrete placing space S side, and the form 1 and the support 5 are tightened and connected by a foam tie rod 6 outside the form 1 to form the concrete mold. The concrete receiving surface is constructed by standing upright at a predetermined angle at a predetermined position so that the frame 1 forms a concrete placing surface.
[0003]
After that, concrete is poured into the concrete placing space S and the concrete is awaited. If the concrete structure to be built has a height equal to or higher than the height of one concrete formwork assembly, after constructing the first-stage concrete C0, the same operation is repeated above the concrete C0. The second and third stages of concrete structures are sequentially stacked and built.
[0004]
In this sequential stacking and building operation, the form tie rod 6 is removed after the lower cast concrete has hardened to the required hardness, the form support 5 is removed from the concrete form 1 and lifted upward to make a slide transition. There is a main pillar slide method of assembling the concrete form 1 required for the next upper concrete construction with the support pillar 5 and constructing a concrete receiving surface in the same manner as described above. Further, as another construction method, after the lower cast concrete is left as it is for a predetermined curing period and is sufficiently hardened, the concrete form 1 and the column 5 are lifted as they are on the upper tier, and are erected in a required posture. Daigumi slide method is also used.
[0005]
[Problems to be solved by the invention]
Of the above conventional methods, in the former main pillar slide method, if the cast concrete had to be hardened to such an extent that the formwork 1 could be removed, the next upper formwork was assembled. It is late and the worker has to wait during that time, and the working efficiency becomes extremely poor. Therefore, even if the shape of the cast concrete becomes hardened, the foam tie rod 6 is loosened and the support 5 is removed from the concrete form 1 at a time when a curing period for more reliable hardening is required, and the concrete mold is removed. While the frame 1 is left as it is, the column 5 is lifted upward to carry out the next formwork work. In this work, the concrete receiving plate 1a of the formwork 1 and the inner metal fitting 3 located on the concrete side are pressed into contact with each other. Since the foam tie rods 6 tightened to the state are removed, the bonding force between the concrete receiving plate 1a of the form 1 and the inner metal fitting 3 is released, and therefore, the pressing force of the concrete surface that has been in contact with the concrete receiving plate 1a is also reduced. There was a problem that it was released and became easy to separate, and it was not possible to completely cure concrete thereafter.
[0006]
Also, in the latter large assembly slide method, since the concrete form 1 itself is removed from the concrete surface and lifted up together with the columns 5, the complete curing of the cast concrete is completed when removing the form. Therefore, it is necessary to take sufficient time between the placement of the concrete and the removal of the concrete formwork. In this case, too, the construction method has a factor of deteriorating the work efficiency.
[0007]
Therefore, the present invention exerts remarkable hardening in the method capable of solving the problems of the concrete retaining wall construction method which the conventional method had, especially in the former main pillar slide method. It is an object of the present invention to provide a concrete form fixing member to be used.
[0008]
[Means for Solving the Problems]
Solution means of the present invention taken to achieve the above object will be described using the same reference numerals as in the drawings showing the embodiments. The concrete form fixing member of the present invention is located on the concrete placing space S side. For a bolt hole 3a opening toward the concrete form 1 side of the inner fitting 3 connecting one end side to the anchor member 2, a concrete receiving plate 1a of the concrete form 1 is formed from the outside of the concrete form 1. A bolt portion 4a that is screwed and connected through the perforation 1c, a washer member 4c that contacts the outer surface of the concrete receiving plate 1a of the concrete formwork 1, and a foam tie rod that tightens and connects the concrete formwork 1 and the formwork column 5 6 and a nut member 4 provided with a bolt hole 4b for screwing the tip bolt portion 6b.
[0009]
BEST MODE FOR CARRYING OUT THE INVENTION
In practicing the present invention, the washer member 4c may be embodied as being relatively rotatable and connected to the axial movement-preventing state on the bolt portion 4a at a position biased toward the nut member 4; The nut member 4 is formed such that the sum length w of the axial length thereof and the thickness of the washer member 4c is substantially equal to or shorter than the width W of the reinforcing frame 1b in the concrete formwork 1. It is preferable to carry out as follows.
[0010]
This is because, in the former case, the washer member 4c can be used as a single member without using the washer member 4c as a separate member from the nut member 4 in use. In the latter case, when the concrete form 1 and the support 5 are assembled, a part of the nut member 4 protrudes toward the support 5 of the concrete form 1, which hinders assembly. This is preferable because it does not result in the following. Further, the washer member 4c can be embodied in any suitable shape such as a circular shape, an elliptical shape, a hexagonal or octagonal shape, as well as a square shape in a plan view.
[0011]
【Example】
Hereinafter, details of the present invention will be described based on an embodiment shown in the drawings. FIG. 1 is a cross-sectional view illustrating a use state of an embodiment of the present invention, FIG. 2 is an exploded perspective view illustrating the main part, FIG. 3 is a perspective view illustrating a fixing member, and FIG. .
[0012]
In FIG. 1, a concrete receiving plate 1a forming the concrete receiving surface of the concrete form 1 is made of a conventionally known steel plate, has a rectangular outer shape, and has a width W shown in FIG. Reinforced frame 1b. The reinforcing frame 1b is provided with a hole 1d for inserting a hook-like portion of a hook bolt 7 or for inserting one end of a holding clip fitting. The concrete receiving plate 1a is also fixed to the inside fitting 3 according to the present invention. A perforation 1c is formed to penetrate and connect the bolt portion 4a of the member.
[0013]
The inner metal fitting 3 has a truncated cone shape and is made of synthetic resin or iron. In the case of synthetic resin, a metal part forming the bolt hole 3a is inserted. The inner metal fitting 3 is usually used with its outer end face in contact with the receiving plate 1a of the concrete formwork 1. The outer bolt hole 3a and the inner bolt hole 3a to which the anchor member 2 or the connection fitting 2b connected to the anchor member 2 is connected are formed concentrically. However, the bolt holes 3a may have different large and small diameters in addition to a series of through screw holes.
[0014]
The fixing member is made of metal and has a hexagonal column-shaped nut member 4 having a bolt hole 4b formed therein, and a bolt portion 4a protruding from one end surface of the hexagonal column portion. The protruding root portion 4d has a slightly smaller diameter, and a square washer member 4c is rotatably fitted into the root portion as shown in FIGS. Also, the length of the nut member 4 is such that the length dimension w to which the thickness of the washer member 4c is added is located within the width W of the reinforcing frame 1b of the concrete formwork 1 as shown in FIG. , The dimension is set to be smaller than the width W of the reinforcing frame 1b. That is, the relationship of W ≧ w is satisfied.
[0015]
In order to use this fixing member, as shown in FIG. 1, a bolt portion 4a was formed on the receiving plate 1a from outside the concrete form 1 and arranged on the side of the concrete placing space S through the perforation 1c. The inner metal fitting 3 is screwed into the bolt hole 3a of the inner metal fitting 3 and fastened, and connected to the inner metal fitting 3 with the concrete receiving plate 1a interposed therebetween. A bolt portion 4a at the tip of the anchor member 2 is screwed and connected to a bolt hole 3a on the opposite side of the inner metal fitting 3. Alternatively, as shown in FIG. 4, the bolt at the upper end of the intermediate connecting metal fitting 2 b connected to the length adjusting turnbuckle 2 a having the leading end connected to the anchor member 2 is screwed and connected. On the other hand, on the outside of the concrete form 1, the form support 5 is set up outside the concrete form 1, and the head nut 6 a of the foam tie rod 6 is turned from the outside of the support 5 to the bolt hole 4 b of the nut member 4. The bolt portion 6b is screwed, and a fastening nut 6c is fastened and fixed outside the support post 5. Reference numeral 9 shown in FIG. 4 is a scaffold fixing frame.
[0016]
A required amount of concrete is poured into the concrete placing space S formed by the formwork assembled in this way, and then the foam tie rod 6 is turned upside down at a stage where the concrete has hardened but is in an uncured state. The concrete form 1 is rotated to release the tightening of the nut member 4 with the bolt hole 4b, to release the connection between the form support 5 and the concrete form 1, and to construct the next concrete form. While keeping the form as it is, only the form support 5 is lifted upward, and the upper concrete form 1 is assembled to the support 5 to form an upper concrete placing space S surrounded by the concrete form 1.
[0017]
During the construction of the upper concrete form, the lower concrete C0 requires a sufficient amount of time because the concrete receiving plate 1a of the concrete form 1 is maintained while maintaining the connection between the inner metal fitting 3 and the fixing member. It can be applied to complete curing and a complete concrete structure can be obtained.
[0018]
Although the embodiment which is considered to be representative of the present invention has been described above, the present invention is not necessarily limited to the structure of this embodiment, and as described above, for example, the shape of the washer is changed to a circle or a hexagon. The present invention has the structural requirements of the present invention, achieves the object of the present invention, and can be appropriately modified and implemented within a range having the following effects.
[0019]
【The invention's effect】
As is clear from the above description, the concrete form fixing member according to the present invention is screwed into the concrete fitting plate and the inner metal fitting disposed on the side of the concrete casting space, and screwed into the concrete form. Since the foam tie rods that fix the frame and the form support are detachably connected to the outside of the concrete form, only the concrete form is left in the concrete poured state at an early stage after concrete placement. Then, the form support can be lifted up to perform the next stage concrete formwork work, and the work can be done sequentially without wasted waiting time, yet the casting concrete is completely and completely It can be cured and has the remarkable effect of efficiently and efficiently constructing high quality walls. Than it came to.
[Brief description of the drawings]
FIG. 1 is a partial sectional view showing a main part in a use state.
FIG. 2 is an exploded perspective view illustrating a main part.
FIG. 3 is a perspective view showing the entire fixing member.
FIG. 4 is a schematic cross-sectional view illustrating an implementation method.
FIG. 5 is a schematic sectional view illustrating a conventional method.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Concrete form 1a Concrete receiving plate 1b Reinforcement frame 1c Drilling 2 Anchor member 3 Inner fitting 3a Bolt hole 3b Bolt part 4 Nut member 4a Bolt part 4b Bolt hole 4c Washer member 5 Form post 6 Form tie rod 6b Tip bolt part S Concrete Casting space

Claims (3)

コンクリート打設空間(S)側に位置して、一端側をアンカー部材(2)と連結する内側金具(3)におけるコンクリート型枠(1)側に向かって開口するボルト穴(3a)に対し、コンクリート型枠(1)の外側からコンクリート型枠(1)のコンクリート受け板(1a)に形成された穿孔(1c)を介して螺合連結するボルト部分(4a)と、コンクリート型枠(1)のコンクリート受け板(1a)の外面に接当する座金部材(4c)と、コンクリート型枠(1)と型枠支柱(5)とを締め付け連結するフォームタイロッド(6)の先端ボルト部分(6b)を螺合するボルト穴(4b)を備えたナット部材(4)とを一体的に備えているコンクリート型枠固定部材。A bolt hole (3a) which is located on the concrete casting space (S) side and opens toward the concrete form (1) side of the inner metal fitting (3) connecting one end side to the anchor member (2). A bolt portion (4a) that is screw-connected from the outside of the concrete formwork (1) through a perforation (1c) formed in the concrete receiving plate (1a) of the concrete formwork (1), and the concrete formwork (1) A washer member (4c) contacting the outer surface of the concrete receiving plate (1a), and a bolt end (6b) of a foam tie rod (6) for fastening and connecting the concrete formwork (1) and the formwork column (5). A concrete formwork fixing member integrally provided with a nut member (4) having a bolt hole (4b) for screwing the same. 前記座金部材(4c)が、前記ボルト部分(4a)上においてナット部材(4)側に偏した箇所で相対回転自在で軸線方向移動阻止状態に連結されている請求項1に記載のコンクリート型枠固定部材。The concrete formwork according to claim 1, wherein the washer member (4c) is relatively rotatably connected to the bolt member (4a) at a position biased toward the nut member (4) so as to prevent movement in the axial direction. Fixing member. 前記ナット部材(4)の軸線方向長さと座金部材(4c)の厚さとの和の長さ(w)が、コンクリート型枠(1)における補強枠(1b)の幅(W)とほぼ等長かそれよりも短尺に形成されている請求項1または2に記載のコンクリート型枠固定部材。The sum length (w) of the axial length of the nut member (4) and the thickness of the washer member (4c) is substantially equal to the width (W) of the reinforcing frame (1b) in the concrete form (1). 3. The concrete formwork fixing member according to claim 1, wherein the member is formed to be shorter.
JP2001103362A 2001-04-02 2001-04-02 Concrete formwork fixing member Expired - Fee Related JP3584444B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001103362A JP3584444B2 (en) 2001-04-02 2001-04-02 Concrete formwork fixing member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001103362A JP3584444B2 (en) 2001-04-02 2001-04-02 Concrete formwork fixing member

Publications (2)

Publication Number Publication Date
JP2002294669A JP2002294669A (en) 2002-10-09
JP3584444B2 true JP3584444B2 (en) 2004-11-04

Family

ID=18956433

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001103362A Expired - Fee Related JP3584444B2 (en) 2001-04-02 2001-04-02 Concrete formwork fixing member

Country Status (1)

Country Link
JP (1) JP3584444B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7213136B2 (en) * 2019-05-09 2023-01-26 鹿島建設株式会社 Box girder construction method and construction system

Also Published As

Publication number Publication date
JP2002294669A (en) 2002-10-09

Similar Documents

Publication Publication Date Title
CN110337519B (en) Permanent concrete formwork and method of using such formwork to manufacture metal-concrete composite structures
JP3584444B2 (en) Concrete formwork fixing member
CN221346303U (en) Assembled cast-in-situ beam column node template fixed knot constructs
JPH0742369A (en) How to build a steel column
JP2002339496A (en) Slab construction method and ceiling construction method
KR101419606B1 (en) Apparatus for Assembling Beam and Column and Method for Assembling Beam and Column Using the Same
JPH07102668A (en) Thin walled precast concrete placing formwork wall plate size assembling method
JPH0673786A (en) Junction of precast concrete column
JP3070849B2 (en) Method of manufacturing outer shell PCa column member
CN222120738U (en) Non-dismantling template superposed hollow column structure
JP2001200518A (en) Retaining wall constructing method
JP3390719B2 (en) Concrete formwork construction method
CN221855973U (en) A straight anchor prefabricated hollow column structure
JP2595390Y2 (en) Post mounting aid
JPH0882095A (en) Form for sump pit
JP2516713Y2 (en) Reinforced concrete fence manufacturing equipment
JP2576940Y2 (en) PC steel material lowering device in pretensioning PC girder manufacturing equipment
JP3716390B2 (en) Assembling and dismantling method of wall with large plate formwork
JPH06129102A (en) Pillar form
KR930005579Y1 (en) Prefab dies
JP2611917B2 (en) Pillar formwork equipment
JPH10159109A (en) Anchor bolt-mounting device for steel framed reinforced concrete structure
JP2566851B2 (en) Precast concrete plate manufacturing method and formwork
JPH08333828A (en) Method for constructing concrete structure
CN118087785A (en) Non-dismantling template superposed hollow column structure and manufacturing process

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20031219

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20040304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040629

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040723

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees