JP3605456B2 - H-beam joining method - Google Patents
H-beam joining method Download PDFInfo
- Publication number
- JP3605456B2 JP3605456B2 JP27663395A JP27663395A JP3605456B2 JP 3605456 B2 JP3605456 B2 JP 3605456B2 JP 27663395 A JP27663395 A JP 27663395A JP 27663395 A JP27663395 A JP 27663395A JP 3605456 B2 JP3605456 B2 JP 3605456B2
- Authority
- JP
- Japan
- Prior art keywords
- joining
- frequency
- web
- steel
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pressure Welding/Diffusion-Bonding (AREA)
- General Induction Heating (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は地下鉄工事、山留め仮設工事などの工事現場での、H形鋼の2本継ぎに適したH形鋼の接合方法に関する。
【0002】
【従来の技術】
地下鉄工事、山留め仮設工事などの工事現場では、周知の通り、H形鋼を順番に継ぎ足しながら埋設する工事が盛んに行われている。このような工事現場でのH形鋼の2本継ぎは、これまでアーク溶接またはボルトによるメカニカル継手により行われてきた。
【0003】
【発明が解決しようとする課題】
しかしながら、アーク溶接では施工に時間がかかる。施工に時間がかかっても、山留め仮設工事のように露天で工事を行う場合は、長尺のH形鋼を使用でき、継手箇所を少なくできるので、特に大きな問題は生じない。ところが、地下鉄工事のように限られた高さの空間で工事を行う場合は、H形鋼の長さが著しく制限され、これに比例して継手箇所が多くなる。そうなるとアーク溶接の施工時間の長さが問題になり、H形鋼埋設工事の大半が溶接施工で占められるようになる。したがって、地下鉄工事でのH形鋼の埋設施工能率は極めて低い。
【0004】
また、アーク溶接によるH形鋼の現場継ぎでは、品質確保が難しく、品質のばらつきも大きな問題になっている。
【0005】
一方、ボルトによるメカニカル継手は、打ち込みのときに当て板やボルトの頭などが周辺の土を引きずり込むので、埋設工事には不適とされている。
【0006】
本発明の目的は工事現場のような悪い環境でも、H形鋼を非常に短時間で、且つ安定した品質で冶金的に2本継ぎすることができるH形鋼の接合方法を提供することにある。
【0007】
【課題を解決するための手段】
本発明者らは以前より低融点のインサート材を用いた管材、条材の液相拡散接合法の研究を続けている。この接合方法は、低融点のインサート材を挟んで被接合材を突き合わせ、その突き合わせ部を加圧し、且つインサート材の融点以上被接合材の融点未満の温度に高周波誘導加熱するものであり、アーク溶接とは比較にならない短時間で、しかも安定した品質で接合を行うことができる。ここで加圧は、初期圧を加えた状態で加熱を開始し、加熱中に強制加圧を行うのが一般的である。
【0008】
この接合方法は、鋼管や鉄筋の現場継ぎに適用されて大きな実績をあげているが、H形鋼に対してはその適用が全く試みられていない。
【0009】
本発明のH形鋼の接合方法は、低融点のインサート材を挟んでH形鋼を突き合わせ、その突き合わせ部を加圧すると共に、前記インサート材の融点以上H形鋼の融点未満の温度に高周波誘導加熱することにより、工事現場のような悪い環境でも、H形鋼を非常に短時間で、且つ安定した品質で冶金的に2本継ぎするものである。
【0010】
本発明者らは又、低融点のインサート材を用いた液相拡散接合法をH形鋼の接合に適用するにあたっての問題点およびその解決法について調査研究を行った。その結果、次の事実が判明した。
【0011】
第1に、H形鋼は鋼管や鉄筋と異なり、フランジとウエブという肉厚の異なる部分を持つため、突き合わせ部の高周波誘導加熱が難しい。例えば300Hと称されるH形鋼は300H×300B×10t(ウエブ厚)×15t(フランジ厚)であり、400Hは400H×400B×13t(ウエブ厚)×21t(フランジ厚)である。このようなH形鋼を、鋼管や鉄筋の接合で得た経験に基づいて接合しようとしても、突き合わせ部が十分に加熱されないのである。
【0012】
これについては、突き合わせ部の高周波誘導加熱に用いる周波数を、H形鋼のウエブで両面側の電流が打ち消し合うことがなく且つ各電流がウエブ表面に集中することがない周波数とするのが有効であり、具体的には前記周波数が
80/t≦f≦300/t
f:周波数(kHz)
t:H形鋼のウエブ厚(mm)
を満足するようにするのが望ましい。
【0013】
第2に、突き合わせ部の高周波誘導加熱に用いる加熱コイルとしては、図1に示すように、H形鋼1の突き合わせ部をその外面に沿って包囲するH形の環状コイル2が必要になるが、突き合わせ部は加圧によるアプセットを受けるためにふくれを生じ、そのふくれはウエブとフランジが組み合わされたH形鋼特有の形状の影響を受けて不均一なものになる。そのため、加熱コイルを突き合わせ部に接近させると接触が起こり、突き合わせ部から遠ざけると加熱不足や不均一加熱が生じる。
【0014】
これに対しては加熱コイルを、コイル内の突き合わせ部が加圧によるふくれを生じた状態で突き合わせ部までの距離が各部で略均等となるように外側へ湾曲した異形コイルとするのが有効である。また、その距離は
t/2≦x≦2t
x:距離(mm)
t:ウエブ厚(mm)
の範囲内となるようにするのが望ましい。
【0015】
次に、本発明のH形鋼の接合方法に使用される接合装置について説明する。
【0016】
本発明のH形鋼の接合方法に使用される接合装置は、接合すべき2本のH形鋼を突き合わせるべく2本のH形鋼の各端部をそれぞれ把持し、それぞれが接離方向に強制駆動される一対のクランプと、一対のクランプの間にあって2本のH形鋼の突き合わせ部を包囲するようにH形の環状体に形成された高周波加熱コイルとを具備する。
【0017】
H形鋼の埋設工事の場合、埋設を終えたH形鋼の上端部に一方のクランプを装着すると共に、そのH形鋼の上方に保持したH形鋼の下端部に他方のクランプを装着し、2本のH形鋼の端面間にインサート材を挟んだ状態で、一対のクランプを接近する方向に強制駆動することにより、突き合わされた2本のH形鋼が加圧される。そして加圧中に一対のクランプ間の加熱コイルにより突き合わせ部を高周波誘導加熱することにより、2本のH形鋼が非常に短時間で、且つ安定した品質で冶金的接合される。
【0018】
本発明者らはこのような接合装置を用いた場合の問題点およびその解決法についての調査研究も行った。その結果、次の事実が判明した。
【0019】
第1に、2本のH形鋼を突き合わせるとき、両者を長手方向に直角な面内で正確に位置合わせする必要がある。これについては、各クランプに、H形鋼の一方のフランジを押圧して他方のフランジを基準面に押し付ける第1のクランプシリンダと、H形鋼のウエブの一方の面を押圧して他方の面を基準面に押し付ける第2のクランプシリンダとを設けるのが有効である。
【0020】
第2に、H形鋼は同サイズと言えどもフランジとウエブの角度等に差があり、同一形状とは言えない。そのため、クランプ内でフランジおよびウエブをそれぞれの基準面に押し付けても、2本のH形鋼を完全に突き合わすことができない場合がある。これに対しては、各クランプに、H形鋼のウエブの両側において一対のフランジの各裏面を押圧して各表面を基準面に押し付ける修正シリンダを設けるのが有効である。
【0021】
第3に、突き合わせ部の加熱においては、突き合わせ部と加熱コイルをH形鋼の長手方向において正確に位置合わせする必要がある。これについては、一方のクランプ上に高周波誘導加熱コイルを取付け、そのクランプをH形鋼の端部に装着するときにH形鋼の端面に当接してその端面を基準として高周波誘導加熱コイルのH形鋼長手方向における高さ設定を行う可動式のストッパを他方のクランプに取付けるのが有効である。
【0022】
【発明の実施の形態】
以下に本発明の実施の形態を接合方法について説明する。
【0023】
本発明の接合方法では、まず、低融点のインサート材を挟んで2本のH形鋼を突き合わせる。
【0024】
インサート材としては、重量比でB1〜5%、Cr20%以下、Si10%以下、P12%以下のうちのBを必須とする1種または2種以上を含み、残部がNiおよび不可避不純物からなるNi基合金が望ましい。
【0025】
Bは有効な融点降下元素である。1%未満では融点降下元素としての働きが不足し、融点が高くなる。5%を超えると拡散に長時間を要し、脆い金属間化合物が形成される。
【0026】
Crは接合部の耐食性確保に寄与するが、20%を超えると融点が高くなると共に、接合部の濡れ性を悪化させる。
【0027】
Si,Pも融点降下元素であるが、Siについては10%を超え、Pについては12%を超えると、拡散が遅れ、接合界面に脆化層を形成するようになる。
【0028】
融点降下元素は、インサート材の融点が1000℃前後となるように総量を調整するのが望ましい。
【0029】
インサート材をNi基としたのは、母材との濡れ性が良好で、接合端面の粗さなどの許容範囲を拡大することができるからである。
【0030】
突き合わせが完了すると、その突き合わせ部を加圧し加熱する。
【0031】
加圧は、加熱開始前に初期圧を加え、この状態で加熱を行い、加熱中は強制加圧を行わないパターンが望ましい。初期圧を加えた状態で加熱を開始すると、突き合わせ部の軟化に伴いアプセットが進む。本発明の接合方法では、鉄筋等と異なり、加熱開始前に付加した初期圧のみによって、加熱中の軟化により徐々にアプセットを加え、特に外力を加えずにアプセットを進行させる方法が望ましい。それは、鉄筋のような大きなふくれを必要とせず、また、小さなふくれでも十分に接合を行うことができるからである。
【0032】
初期圧としては0.8〜4.0kgf/mm2 が望ましい。初期圧が不足すると接合端面が十分に密着せず、接合不良が生じる。過剰な初期圧は、ハード上の問題もさることながら、接合部の座屈変形等を発生させる原因になる。
【0033】
初期圧の開始と並行して、フロントシールドガスによる突き合わせ部のシールドを開始するのがよい。
【0034】
加熱は、短時間で高温に加熱できる高周波誘導加熱とする。加熱コイルは、後述する異形コイルを用いるのが良い。加熱温度は、液相拡散接合の性質から、インサート材の融点以上、H形鋼の融点以下とし、1200〜1250℃が望ましい。その理由は後述する。
【0035】
加熱では、加熱温度および加熱コイルと共に周波数が重要である。H形鋼では、フランジとウエブの間に肉厚差があるので、板厚の薄いウエブを加熱するのに適した比較的高い周波数を選択する必要がある。板厚の厚いフランジに適した比較的低い周波数では、ウエブで誘導電流の浸透深さが深くなり過ぎて両面側の電流が互いに打ち消し合い、温度が十分に上がらない。
【0036】
望ましい周波数f(kHz)は、ウエブの厚みt(mm)に応じ、80/t〜300/tである。周波数が低すぎると、ウエブで上述した電流の相殺現象がおこり、高すぎると逆に浸漬深さが不足して両面側の電流が表面に集中し肉厚方向中央部が加熱不足となる。
【0037】
加熱により突き合わせ部が軟化すると、上述した初期圧によりアプセットが生じる。H形鋼の現場継ぎでは、接合端面の仕上げ程度、面粗度、GAP等の端面精度について十分なものを期待できない。そのため、端面精度が多少悪くても安定した継手性能を得るために、アプセットは必要である。アプセット量としては300H,400H,500Hの場合で2〜7mmが望ましい。アプセット量が不足すると、継手性能がばらつく。過剰になると接合部のふくれが大きくなる。このふくれは図1に示したように場所によっては全く生じない。ふくれが大きくなることはふくれの不均一が増大することを意味し、加熱コイルと内側の材料とのクリアランスの変動を大きくして、適正な温度の確保を困難にする。従って、ふくれを一定以上に大きくすることは良くない。適正なアプセット量が得られるように、加熱時間が設定される。
【0038】
突き合わせ部が軟化すると、前述した初期圧も低下する。加圧力を加圧センサーで監視することにより、温度やアプセット量が適正であるか否かを判断できる。また、この圧力が初期圧の80〜50%に達したときにシールドガスの供給を停止することにより、シールドガスを節約できる。80%に達していない状態では、接合端面の密着が完全に終わっていないので、シールドガスを止めるとインサート材が酸化して継手性能にばらつきが発生する。また、インサート材が融点に達していない場合もあり、これが理由で継手性能が低下するおそれもある。50%より小さくなった後もシールドガスの供給を続けることはガスの無駄使いになる。
【0039】
次に、本発明の方法に使用される加熱コイルについて詳述する。望ましい加熱コイルを図2に示す。また、その加熱コイルを使用した加熱ヘッドを図3に示す。
【0040】
加熱ヘッドは、加熱コイル10の下にガスジャケット20を重ねた構成になっている。いずれも、H形鋼を包囲するH形の環状体である。
【0041】
加熱コイル10は銅製の角管からなる1ターンコイルであり、ウエブを中心としてその両側に分離する2分割構造になっている。両側のコイル片10A,10Bは、両端のヘッド11A,11Bを圧接することにより電気的に接続され、且つヘッド11A,11B等を介して供給排出される冷却水により独立に冷却される。一方のコイル片10Aは、一方のフランジの一端に対応する部分で分断され、分断部から延出する一対のリード12,12により高周波電源と接続される。接合の際、この加熱コイル10は、H形鋼の突き合わせ部を包囲するようにセットされる。
【0042】
加熱コイル10の形状は、H形鋼の断面に対応した完全なH形ではなく、突き合わせ部が所定のアプセット量まで加圧・加熱されてふくれを生じたときに、その突き合わせ部までの距離が各部にほぼ均等になるように、ウエブに対向する部分およびフランジの両側部分に対向する部分が外側へ湾曲した形状になっている。
【0043】
ガスジャケット20は、加熱コイル10と同様に2分割構造になっており、各3本のガス供給管21から下室22にシールドガスが供給される。下室22に供給されたシールドガスは、上室23を経て上方に吹き出され、上方の加熱コイル10の内側に位置する突き合わせ部をガスシールドする。
【0044】
加熱コイル10とガスジャケット20は、上下方向に隙間をあけて配置され、図示されない連結具によりスペーサーを介して連結されている。また、これらは外側から図示されないカバーにより覆われている。
【0045】
300HのH形鋼をアプセット量7mmで加熱加圧したときの突き合わせ部のふくれ量を図4に示す。
【0046】
加熱コイル10の形状は、変形前の突き合わせ部の表面までの距離(クリアランス)で表わすと、標準クリアランスに、図4に示すようなふくれ量を加えたものになる。
【0047】
加熱コイル10を用いると、突き合わせ部がふくれた状態で突き合わせ部までの距離が各部で略均等になり、突き合わせ部を均一に加熱できる。このときの突き合わせ部までの距離が前述した標準クリアランスである。つまり、加熱コイル10は、突き合わせ部がふくれたときに各部のクリアランスを標準クリアランスに管理することができる。
【0048】
ふくれを生じたとの突き合わせ部から加熱コイル10までの距離x(mm)、すなわち標準クリアランスの望ましい値は、ウエブの厚みt(mm)によって表わされ、t/2〜2tである。標準クリアラスが小さ過ぎると、突き合わせ部が加熱コイル10に接近するため、接合後の加熱コイル10の取り外しが困難となり、逆に大き過ぎると、加熱効率が低下し、所定時間内での適正加熱が困難となる。
【0049】
次に、本発明の方法に使用される接合装置について説明する。
【0050】
図7は本発明の方法に使用される接合装置の1例についてその外観を示す斜視図、図8〜図12は同接合装置の内部構造を模式的に示し、図8は正面図、図9は右側面図、図10は左側面図、図11は平面図、図12は横断平面図である。また、図13および図14は同接合装置の動作を示す模式図である。
【0051】
本接合装置は、図7〜図12に示されるように、間隔をあけて連結された一対のクランプ30,30と、クランプ30,30間に配設された加熱ヘッド40とを具備する。通常この接合装置は垂直に埋設されたH形鋼1の上に別のH形鋼1を継ぎ足すのに使用されるので、クランプ30,30を区別する必要があるときは、図で上方のクランプ30を上クランプと称し、図で下方のクランプ30を下クランプと称する。
【0052】
下クランプ30の両側部は上方に延出し、その延出部間に上クランプ30を昇降自在に支持する。これ以外については、クランプ30,30は基本的に同じ構造であって、後部において接離自在に連結され、左右一対のメインシリンダ31,31により接近方向および離反方向にそれぞれ強制駆動される。
【0053】
個々のクランプ30は、H形鋼1の一対のフランジが両側を向く姿勢でH形鋼1の端部に装着されてその端部を把持する。H形鋼1へのクランプ30の装着を容易にするため、クランプ30の前部には片開き式の扉32が設けられている。扉32は水平なシリンダ32a(図11)により開閉駆動され、垂直なシリンダ32b(図8)により閉止状態にロックされる。また、H形鋼1を把持するために、クランプ30には2種類のクランプシリンダ33,34(図9,11,12)が設けられている。
【0054】
一方のクランプシリンダ33は、扉32の内部に上下2段に水平配置され、クランプ30内のH形鋼1のウエブを前方から後方へ押圧して、このウエブをクランプ30内の垂直な基準面35に押し付ける。他方のクランプシリンダ34は、クランプ30の一方の側部に上下2段に水平配置されている。そしてクランプシリンダ34,34はクランプ30内のH形鋼1の一方のフランジをヘッド37を介して他方のフランジ側へ押圧して他方のフランジをクランプ30内の垂直な基準面36に押し付ける。ヘッド37の正面は基準面36に正対していて、後述する修正作業のときに基準面として使用される。
【0055】
クランプ30内には又、4つの修正シリンダ38(図10,11,12)が設けられている。4つの修正シリンダ38は、前側と後側に2段ずつ水平配置され、いずれも側方を向いている。そして、これらの修正シリンダ38は、クランプ30内のH形鋼1のウエブの両側において両方のフランジの裏面を同期して押圧する。
【0056】
上クランプ30の下側には、傾動式のストッパ39(図10)が設けられている。ストッパ39は上端部を中心にしてシリンダ39aにより前後に傾動され、後傾位置では上クランプ30が上側のH形鋼1の端部に装着されたとき、その端部と干渉しないようになっている。また、前傾位置では下クランプ30が下側のH形鋼1の上端部に装着されたとき、そのH形鋼1のウエブ上端面にストッパ39の下端が当接し、そのウエブ上端面を基準にしてクランプ30,30の上下方向の位置決めを行う。
【0057】
クランプ30,30間に配設された加熱ヘッド40は、下クランプ30の上に支持されている。加熱ヘッド40は前述した加熱コイルを内蔵しており、この加熱コイルを含めて前後に2分割されている。前側のヘッドユニット41は扉32の上に設置されていて、シリンダ41aの作動により前後進する。後側のヘッドユニット42は後方のトランス50と直結され、シリンダ42aの作動によりトランス50と共に前後進する。
【0058】
加熱ヘッド40内の加熱コイルは、下クランプ30からの高さが一定であり、前述したストッパ39により下側のH形鋼1のウエブ上端面を基準にしてクランプ30,30の上下方向の位置決めが行われたときに、そのウエブ上端面と同じ高さとなる。
【0059】
次に、本接合装置の使用方法について、図13および図14を参照して説明する。
【0060】
下側のH形鋼1が地面に垂直に打ち込まれると、図13(a)(b)に示されるように、下クランプ30の扉32を開け、H形鋼1の上端部を下クランプ30内に嵌合した後、扉32を閉める。
【0061】
これにより、図14(a)に示されるように、下クランプ30内をH形鋼1の上端部が貫通する。このとき、加熱ヘッド40は前後に開放している。また、ストッパ39は前傾位置にあり、その下端はH形鋼1のウエブ上端面に当接している。これにより、そのウエブ上端面を基準としてクランプ30,30の上下方向の位置決めが行われ、加熱ヘッド4内の加熱コイルはウエブ上端面と同じ高さになる。
【0062】
クランプ30,30の上下方向の位置決めが終わると、下クランプ30において次の一連の動作が行われる。
【0063】
図13(c)を用いて説明すると、まず、下クランプ30内の一方のクランプシリンダ34により、H形鋼1の一方のフランジをヘッド37を介して軽く押し、他方のフランジを基準面36に当てる。引き続き、他方のクランプシリンダ33により、H形鋼1のウエブの一方の面を軽く押し、他方の面を基準面35に当てる。そして、クランプシリンダ33,34を同時に作動させてH形鋼のウエブおよびフランジを基準面35,36に強く押し付ける。これにより、下クランプ30がH形鋼1の上端部に結合されると共に、その上端部がクランプ30内で位置決めされる。
【0064】
下クランプ30内のH形鋼1の水平面内における位置決めが終了すると、下クランプ30内の修正シリンダ38を同期して作動させる。これにより、H形鋼1の両方のフランジが基準面35およびヘッド37の正面に押し付けられ、H形鋼1の端部形状が修正された状態になる。
【0065】
こうして下側のH形鋼1の上端部に下クランプ30が装着されると、上クランプ30を少し押し上げ、ストッパ39を後傾位置に戻した後、上クランプ30を元の位置まで下げる。
【0066】
次いで、図14(b)に示されるように、下側のH形鋼1の上に上側のH形鋼1を載せ、上側のH形鋼1の下端部に対して、上記と全く同様にして上クランプ30の装着を行う。これにより、上クランプ30内のH形鋼1も水平面内において位置決めされ、且つその端部形状が修正される。従って、上下のH形鋼1,1がずれなく突き合わされる。また、突き合わせ部は加熱ヘッド40内の加熱コイルと同じ高さになる。
【0067】
H形鋼1,1の突き合わせが終わると、一旦上クランプ30を上げ、H形鋼1,1の端面間にインサート材を挿入し、再び上クランプ30を下げる。そして、図14(c)に示すように、加熱ヘッド40を閉じ、加熱ヘッド40内の加熱コイルにより突き合わせ部を高周波誘導加熱すると共に、メインシリンダ31,31によりクランプ30,30を引き寄せることにより突き合わせ部を加圧する。
【0068】
上下のH形鋼1,1はずれなく突き合わされているので、健全に接合される。また、突き合わせ部は加熱コイルと同じ高さにセットされているので、所定時間内に接合を終えることができる。
【0069】
【実施例】
以下に本発明の方法の実施例を示し、比較例と対比することにより、本発明の方法の効果を明らかにする。
【0070】
JIS A5526 SHK400に規定される300H(ウエブ厚10mm,フランジ厚15mm)を突き合わせ、その突き合わせ部を高周波誘導加熱した。7mmのアプセット量を加えたときの突き合わせ部の変形を示したのが図4である。そして、この変形を見込んで設計した加熱コイルが、図2に示したものである。図2中の数字は変形前の突き合わせ部までの距離、すなわち設計クリアランス(mm)である。標準クリアランスは12mmとした。
【0071】
図2のコイルを用いて突き合わせ部の加熱したときの周波数と温度との関係を調査した。温度は熱電対により測定した。測定位置を図5に示す。フランジとウエブが交差するNo. 3およびNo. 10は加熱中に周波数の影響を殆ど受けないと考えられる位置である。一方、ウエブ中央のNo. 7はその影響が最も大きいと考えられる位置である。調査結果を表1および図6に示す。また、No. 3位置とNo. 7位置の温度差を表2に示す。
【0072】
【表1】
【0073】
【表2】
【0074】
加熱温度が1150℃未満ではインサート材の拡散不足が生じ、1300℃超では変形大と材質劣化が生じるので、1150〜1300℃を目標加熱温度とし、1200〜1250℃を最適加熱温度範囲とした。
【0075】
周波数が2kHzではいずれの箇所も温度が1200℃に達しない。そのなかで周波数の影響を受けにくいと考えられるNo. 3位置およびNo. 10位置では、最も温度が高くなっている。反対に、周波数の影響を受けやすいと考えられるNo. 7位置では、最も低温となっている。周波数が6kHzの場合も同様の傾向である。
【0076】
しかし、周波数が13kHzになると、No. 3位置とNo. 7位置の温度が逆転し、その温度差も10℃と小さく、いずれも1200〜1250℃の最適温度範囲内に収まっている。
【0077】
周波数が40kHzでは、周波数が高くなることによる表皮効果によって温度が下がり、板厚が薄いウエブ中央のNo. 7位置で温度が最も高くなる。
【0078】
これらの結果は以下に示す計算式によっても裏付けられる。
【0079】
平板を能率的に加熱するための最低許容周波数は
f≧158・ρ/μt2 (H2 )
f:周波数(Hz)
ρ:固有抵抗(μΩcm)
μ:比透磁率
t:被加熱厚さ(cm)
となる。ここで
P=5.03〔ρ/(μ×f)〕1/2
P:電流浸透深さ(cm)
であり、t/P≒2.5のときに吸収電力は最大となるから、10t,13t,15tに最適の周波数は表3のようになる。
【0080】
【表3】
【0081】
H形鋼では浸透深さの影響を受けやすいウエブに合わせて周波数を設定する必要があり、80/t〜300/tの範囲が望ましい。具体的には、300Hを対象としたときは、ウエブの板厚は10mmであり、周波数としては20kHzが最適であり、15〜25kHzが特に望ましい範囲である。400Hを対象としたときは、ウエブの板厚が13mmであるので、周波数としては15kHzが最適であり、10〜20kHzが特に望ましい範囲となる。500Hを対象としたときは、ウエブの板厚が15mmであるので、周波数としては8.7kHzが最適となり、5〜15kHzが特に望ましい範囲となる。
【0082】
以上の検討結果を踏まえ、図2の加熱コイルを使用し、20kHzの周波数で300Hを実際に接合した。接合時間は10分(一定)である。
【0083】
インサート材の種類を種々変更したときの結果を表4に示す。接合条件は初期圧3.0kgf/mm2 加熱温度1200℃、アプセット量6.0mmとした。また、シールドガスは加圧力が2.4kgf/mm2 に低下した時点で供給を停止した。表4中の母材破断に至ったI7のインサート材を使用し、接合条件を種々変更したときの結果を表5に示す。
【0084】
表4および表5から分かるように、本発明の方法によりH形鋼が2本継ぎされる。実際の施工では母材破断が求められることを考慮すると、インサート材の成分組成としてはB1〜5%、Cr20%以下(0を含む)、S:10%以下(0を含む)、P12%以下(0を含む)が適当である。また、初期圧としては0.8〜4.0kgf/mm2 、シールドガスの供給を停止する時期としては初期圧の80〜50%到達時、アプセット量としては2〜7mm以上がそれぞれ適当である。ちなみに300Hの接合にアーク溶接を用いると30分以上の時間がかかる。
【0085】
【表4】
【0086】
【表5】
【0087】
次に、実際の接合における周波数の影響および加熱コイルの標準クリアランスの影響を調査した。
【0088】
H形鋼は上記接合と同じ300Hを用いた。インサート材は表6のものを用いた。共通接合条件は加熱温度が1250℃、保持時間が300秒、アプセット量が6mm、接合雰囲気が窒素ガスである。接合後のウエブ接合部およびフランジ接合部からJIS Z3121の1号試験片を採取し、継手引張性能を評価した。周波数およびクリアランスを表7に示し、調査結果を表8に示す。表8より周波数は80/t〜300/t、クリアランスはt/2〜2tの望ましいことがわかる。
【0089】
【表6】
【0090】
【表7】
【0091】
【表8】
【0092】
【発明の効果】
本発明のH形鋼の接合方法は、各部で肉厚が異なるH形鋼を短時間で且つ安定した品質で冶金的に2本継ぎすることができる。従って、地下鉄工事でのH形鋼埋設のように短尺のH形鋼を次々と継ぎ足しながら埋め込んで行く工事に適用して、工期短縮、工事費低減等に大きな効果を発揮する。
【図面の簡単な説明】
【図1】H形鋼の拡散接合でのふくれの問題を示す模式図である。
【図2】本発明のH形鋼の接合方法に使用される加熱コイルの1例を示す平面図である。
【図3】同加熱コイルを用いた加熱ヘッドの1例を示す平面図である。
【図4】H形鋼の接合部のふくれ量を示す模式図である。
【図5】温度測定位置を示す模式図である。
【図6】H形鋼の高周波誘導加熱での周波数と加熱温度との関係を示すグラフである。
【図7】本発明のH形鋼の接合方法に使用される接合装置の1例についてその外観を示す斜視図である。
【図8】同接合装置の内部構造を模式的に示す正面図である。
【図9】同接合装置の内部構造を模式的に示す右側面図である。
【図10】同接合装置の内部構造を模式的に示す左側面図である。
【図11】同接合装置の内部構造を模式的に示す平面図である。
【図12】同接合装置の内部構造を模式的に示す横断平面図である。
【図13】同接合装置の動作を示す模式平面図である。
【図14】同接合装置の動作を示す模式側面図である。[0001]
TECHNICAL FIELD OF THE INVENTION
INDUSTRIAL APPLICABILITY The present invention relates to an H-shape steel suitable for a double splicing of an H-shape in a construction site such as a subway construction and a temporary retaining work.Joining methodAbout.
[0002]
[Prior art]
2. Description of the Related Art As is well known, construction work such as subway construction and temporary retaining work for burial is being actively carried out for burying H-shaped steel pieces while sequentially adding them. The double splicing of the H-section steel at such a construction site has hitherto been performed by arc welding or mechanical joints using bolts.
[0003]
[Problems to be solved by the invention]
However, arc welding takes a long time to perform. Even if it takes a long time to perform the construction, if the construction is to be carried out on the open side, as in the case of temporary retaining work, since a long H-section steel can be used and the number of joints can be reduced, there is no particular problem. However, when construction is performed in a space with a limited height such as in subway construction, the length of the H-section steel is significantly limited, and the number of joints increases in proportion to this. In that case, the length of the arc welding time becomes a problem, and most of the H-section steel burial work is occupied by the welding work. Accordingly, the efficiency of burying H-section steel in subway construction is extremely low.
[0004]
In addition, in the field joining of H-section steel by arc welding, it is difficult to ensure the quality, and the variation in quality is also a major problem.
[0005]
On the other hand, mechanical joints using bolts are unsuitable for burial work because the pad and the heads of the bolts drag the surrounding soil at the time of driving.
[0006]
SUMMARY OF THE INVENTION An object of the present invention is to provide an H-shaped steel capable of metallurgically joining two H-shaped steels in a very short time and with stable quality even in a bad environment such as a construction site.Joining methodIs to provide.
[0007]
[Means for Solving the Problems]
The present inventors have been studying a liquid phase diffusion bonding method for pipes and strips using a low melting point insert material. In this joining method, materials to be joined are butted with a low melting point insert material interposed therebetween, the butted portion is pressurized, and high-frequency induction heating is performed to a temperature equal to or higher than the melting point of the insert material and lower than the melting point of the material to be joined. Joining can be performed in a short time that is incomparable to welding and with stable quality. Here, as for pressurization, it is general that heating is started in a state where an initial pressure is applied, and forcible pressurization is performed during heating.
[0008]
Although this joining method has been applied to on-site joining of steel pipes and rebars and has achieved great results, no attempt has been made to apply it to H-section steel.
[0009]
The joining method of the H-section steel according to the present invention is characterized in that the H-section steel is butted with a low-melting point insert material interposed therebetween, the butt portion is pressurized, and high-frequency induction is performed at a temperature not lower than the melting point of the insert material and lower than the melting point of the H-section steel. By heating, even in a bad environment such as a construction site, two H-sections are metallurgically spliced in a very short time and with stable quality.
[0010]
The present inventors also conducted research on the problems in applying the liquid-phase diffusion bonding method using a low-melting-point insert material to the joining of H-section steels and the solution thereof. As a result, the following facts became clear.
[0011]
First, unlike a steel pipe or a reinforcing bar, an H-section steel has a flange and a web having different thicknesses, so that it is difficult to perform high-frequency induction heating of a butt portion. For example, an H-section steel called 300H is 300H x 300B x 10t (web thickness) x 15t (flange thickness), and 400H is 400H x 400B x 13t (web thickness) x 21t (flange thickness). Even if such an H-section steel is to be joined based on experience gained in joining steel pipes and steel bars, the butted portion is not sufficiently heated.
[0012]
In this regard, it is effective to set the frequency used for high-frequency induction heating of the butted portion to a frequency at which currents on both sides of the H-section steel web do not cancel each other and each current does not concentrate on the web surface. Yes, specifically, the frequency is
80 / t ≦ f ≦ 300 / t
f: frequency (kHz)
t: Web thickness of H-section steel (mm)
It is desirable to satisfy the following.
[0013]
Second, as a heating coil used for high-frequency induction heating of the butted portion, as shown in FIG. 1, an H-shaped
[0014]
In order to solve this problem, it is effective to use a heating coil with a deformed coil that curves outward so that the distance to the butting portion is almost equal in each portion in a state where the butting portion in the coil has blistered due to pressure. is there. The distance is
t / 2 ≦ x ≦ 2t
x: distance (mm)
t: Web thickness (mm)
Is desirably within the range.
[0015]
Next, the H-section steel of the present inventionJoining equipment used for joining methodWill be described.
[0016]
Of the present inventionUsed for joining H-beamsThe joining device grasps each end of the two H-shaped steels in order to abut the two H-shaped steels to be joined, and a pair of clamps, each of which is forcibly driven in a contact / separation direction, and a pair of clamps And a high-frequency heating coil formed in an H-shaped annular body so as to surround the butted portion of the two H-shaped steels.
[0017]
In the case of burying H-section steel, one clamp is attached to the upper end of the H-section steel that has been buried, and the other clamp is attached to the lower end of the H-section steel held above the H-section steel. By forcibly driving the pair of clamps in the approaching direction with the insert material being sandwiched between the end faces of the two H-beams, the butted two H-beams are pressed. Then, the high-frequency induction heating of the butted portion by the heating coil between the pair of clamps during pressurization allows the two H-shaped steels to be metallurgically joined in a very short time and with stable quality.
[0018]
The present inventors have also conducted research and investigation on problems when using such a bonding apparatus and methods for solving the problems. As a result, the following facts became clear.
[0019]
First, when butting two H-beams, it is necessary to accurately align them in a plane perpendicular to the longitudinal direction. In this regard, each clamp has a first clamp cylinder that presses one flange of an H-section steel and presses the other flange against a reference surface, and a first clamp cylinder that presses one side of an H-section web and presses the other side. It is effective to provide a second clamp cylinder that presses the second clamp cylinder against the reference surface.
[0020]
Second, even though the H-section steels have the same size, there is a difference in the angle between the flange and the web, and the H-shaped steels cannot be said to have the same shape. Therefore, even if the flange and the web are pressed against the respective reference surfaces in the clamp, the two H-shaped steels may not be able to completely abut each other. In order to cope with this, it is effective to provide a correction cylinder for pressing each back surface of a pair of flanges on both sides of the H-section steel web and pressing each front surface to a reference surface.
[0021]
Third, in heating the butted portion, it is necessary to accurately align the butted portion and the heating coil in the longitudinal direction of the H-beam. In this regard, a high-frequency induction heating coil is mounted on one of the clamps, and when the clamp is attached to the end of the H-shaped steel, the high-frequency induction heating coil is brought into contact with the end surface of the H-shaped steel and the end surface thereof is used as a reference.H-section height in the longitudinal directionIt is effective to attach a movable stopper for setting to the other clamp.
[0022]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with respect to a bonding method.
[0023]
In the joining method of the present invention, first, two H-section steels are butted with a low melting point insert material interposed therebetween.
[0024]
As the insert material, one or more of B1 to 5%, Cr20% or less, Si10% or less, P12% or less in which B is indispensable is included, and the balance is Ni composed of Ni and unavoidable impurities. A base alloy is preferred.
[0025]
B is an effective melting point lowering element. If it is less than 1%, the function as a melting point lowering element is insufficient, and the melting point becomes high. If it exceeds 5%, it takes a long time for diffusion, and a brittle intermetallic compound is formed.
[0026]
Cr contributes to ensuring the corrosion resistance of the joint, but if it exceeds 20%, the melting point increases and the wettability of the joint deteriorates.
[0027]
Si and P are also melting point depressing elements. However, if Si exceeds 10% and P exceeds 12%, diffusion is delayed and an embrittlement layer is formed at the joint interface.
[0028]
It is desirable to adjust the total amount of the melting point lowering element so that the melting point of the insert material is around 1000 ° C.
[0029]
The reason why the insert material is Ni-based is that the wettability with the base material is good, and the allowable range such as the roughness of the joint end face can be expanded.
[0030]
When the butting is completed, the butting portion is pressurized and heated.
[0031]
As for the pressurization, a pattern is preferably applied in which an initial pressure is applied before the start of heating, heating is performed in this state, and no forced pressurization is performed during heating. When heating is started with the initial pressure applied, the upset proceeds with the softening of the butted portion. In the joining method of the present invention, unlike the rebar or the like, it is desirable to use a method in which the upset is gradually applied by softening during heating only by the initial pressure applied before the start of heating, and in particular, the upset is advanced without applying external force. This is because a large bulge such as a reinforcing bar is not required, and a small bulge can be sufficiently joined.
[0032]
0.8 to 4.0 kgf / mm as initial pressure2Is desirable. If the initial pressure is insufficient, the bonding end faces do not adhere sufficiently, resulting in poor bonding. Excessive initial pressure causes not only hardware problems but also buckling deformation of the joint.
[0033]
It is preferable to start shielding the butted portion with the front shield gas in parallel with the start of the initial pressure.
[0034]
The heating is high-frequency induction heating that can be heated to a high temperature in a short time. As the heating coil, it is preferable to use a modified coil described later. The heating temperature is set to be equal to or higher than the melting point of the insert material and equal to or lower than the melting point of the H-section steel from the property of liquid phase diffusion bonding, and is desirably 1200 to 1250 ° C. The reason will be described later.
[0035]
In heating, frequency is important along with heating temperature and heating coil. In an H-beam, there is a difference in wall thickness between the flange and the web, so it is necessary to select a relatively high frequency suitable for heating a thin web. At a relatively low frequency suitable for thick flanges, the penetration depth of the induced current in the web becomes so deep that the currents on both sides cancel each other out and the temperature does not rise sufficiently.
[0036]
A desirable frequency f (kHz) is 80 / t to 300 / t depending on the thickness t (mm) of the web. If the frequency is too low, the above-described current canceling phenomenon occurs on the web, and if it is too high, the immersion depth is insufficient, and the current on both sides is concentrated on the surface, and the central part in the thickness direction is insufficiently heated.
[0037]
When the butted portion is softened by heating, upset occurs due to the initial pressure described above. In the field joint of H-section steel, it is not possible to expect sufficient end face accuracy such as the degree of finish, surface roughness and GAP of the joint end face. Therefore, an upset is required to obtain stable joint performance even if the end face accuracy is somewhat poor. The upset amount is preferably 2 to 7 mm for 300H, 400H, and 500H. If the upset amount is insufficient, the joint performance will vary. If it is excessive, the bulge of the joint becomes large. This blister does not occur at all in some places as shown in FIG. An increase in blister means an increase in nonuniformity of the blister, and a variation in clearance between the heating coil and the inner material is increased to make it difficult to secure an appropriate temperature. Therefore, it is not good to make the blister larger than a certain value. The heating time is set so that an appropriate upset amount is obtained.
[0038]
When the butted portion is softened, the above-described initial pressure also decreases. By monitoring the pressing force with the pressure sensor, it is possible to determine whether the temperature and the upset amount are appropriate. By stopping the supply of the shielding gas when the pressure reaches 80 to 50% of the initial pressure, the shielding gas can be saved. In a state where the ratio does not reach 80%, the adhesion of the joint end surfaces is not completely completed. Therefore, when the shielding gas is stopped, the insert material is oxidized and the joint performance varies. Further, the insert material may not reach the melting point in some cases, which may cause a decrease in joint performance. Continuing to supply the shielding gas even after it becomes smaller than 50% is a waste of gas.
[0039]
Next, the heating coil used in the method of the present invention will be described in detail. A preferred heating coil is shown in FIG. FIG. 3 shows a heating head using the heating coil.
[0040]
The heating head has a configuration in which a
[0041]
The
[0042]
The shape of the
[0043]
The
[0044]
The
[0045]
FIG. 4 shows the amount of bulge at the butted portion when an H-section steel of 300H was heated and pressed at an upset amount of 7 mm.
[0046]
When the shape of the
[0047]
When the
[0048]
The distance x (mm) from the butt portion where blistering has occurred to the
[0049]
next,Used in the method of the present inventionAbout joining equipmentexplain.
[0050]
FIG. 7 shows the present invention.Used in the wayFIG. 8 to FIG. 12 are perspective views showing the appearance of one example of the joining apparatus, and FIGS. 8 to 12 schematically show the internal structure of the joining apparatus.Is9 is a right side view, FIG. 10 is a left side view, FIG. 11 is a plan view, and FIG. 12 is a cross-sectional plan view. FIGS. 13 and 14 are schematic views showing the operation of the joining apparatus.
[0051]
As shown in FIGS. 7 to 12, the joining apparatus includes a pair of
[0052]
Both sides of the
[0053]
Each of the
[0054]
One of the
[0055]
Also provided within
[0056]
A tilting stopper 39 (FIG. 10) is provided below the
[0057]
The
[0058]
The heating coil in the
[0059]
Next, a method of using the present bonding apparatus will be described with reference to FIGS.
[0060]
When the lower H-shaped
[0061]
Thereby, as shown in FIG. 14A, the upper end of the H-shaped
[0062]
After the vertical positioning of the
[0063]
13C, first, one flange of the H-
[0064]
When the positioning of the H-
[0065]
When the
[0066]
Next, as shown in FIG. 14 (b), the upper H-
[0067]
After the butting of the H-
[0068]
Since the upper and lower H-section steels 1, 1 are butted against each other, they are soundly joined. Further, since the butted portion is set at the same height as the heating coil, the joining can be completed within a predetermined time.
[0069]
【Example】
Examples of the method of the present invention will be shown below, and the effects of the method of the present invention will be clarified by comparison with comparative examples.
[0070]
300H (web thickness: 10 mm, flange thickness: 15 mm) specified in JIS A5526 SHK400 were butted, and the butt portion was subjected to high frequency induction heating. FIG. 4 shows the deformation of the butted portion when an upset amount of 7 mm is added. The heating coil designed in consideration of this deformation is shown in FIG. The numbers in FIG. 2 are the distance to the butted portion before deformation, that is, the design clearance (mm). The standard clearance was 12 mm.
[0071]
The relationship between the frequency and the temperature when the butted portion was heated using the coil of FIG. 2 was investigated. Temperature was measured with a thermocouple. The measurement position is shown in FIG. No. where the flange and web intersect. 3 and No. 3
[0072]
[Table 1]
[0073]
[Table 2]
[0074]
If the heating temperature is lower than 1150 ° C, insufficient diffusion of the insert material occurs, and if it exceeds 1300 ° C, large deformation and material deterioration occur. Therefore, the target heating temperature was set at 1150 to 1300 ° C, and the optimal heating temperature range was set at 1200 to 1250 ° C.
[0075]
When the frequency is 2 kHz, the temperature does not reach 1200 ° C. at any point. Among them, No. 1 is considered to be hardly affected by frequency. No. 3 and No. 3 At the 10 position, the temperature is highest. Conversely, No. 1 is considered to be easily affected by frequency. At position 7, the temperature is the lowest. The same tendency is observed when the frequency is 6 kHz.
[0076]
However, when the frequency becomes 13 kHz, No. No. 3 and No. The temperatures at the seven positions are reversed, and the temperature difference is as small as 10 ° C, and all are within the optimal temperature range of 1200 to 1250 ° C.
[0077]
When the frequency is 40 kHz, the temperature decreases due to the skin effect caused by the increase in the frequency, and No. 2 in the center of the web having a small thickness is obtained. The temperature is highest at seven positions.
[0078]
These results are supported by the following calculation formula.
[0079]
The minimum allowable frequency for heating a flat plate efficiently is
f ≧ 158 · ρ / μt2(H2)
f: frequency (Hz)
ρ: Specific resistance (μΩcm)
μ: relative permeability
t: Heated thickness (cm)
It becomes. here
P = 5.03 [ρ / (μ × f)]1/2
P: Current penetration depth (cm)
Since the absorbed power becomes maximum when t / P ≒ 2.5, the optimal frequencies for 10t, 13t, and 15t are as shown in Table 3.
[0080]
[Table 3]
[0081]
In the case of the H-section steel, it is necessary to set the frequency in accordance with the web which is susceptible to the penetration depth, and a range of 80 / t to 300 / t is desirable. Specifically, when targeting 300H, the thickness of the web is 10 mm, and the optimal frequency is 20 kHz, and 15 to 25 kHz is a particularly desirable range. When 400H is targeted, the thickness of the web is 13 mm, so that the frequency is optimally 15 kHz, and 10 to 20 kHz is a particularly desirable range. When 500H is targeted, the web thickness is 15 mm, so that the frequency is optimally 8.7 kHz, and 5 to 15 kHz is a particularly desirable range.
[0082]
Based on the above examination results, 300H was actually joined at a frequency of 20 kHz using the heating coil of FIG. The joining time is 10 minutes (constant).
[0083]
Table 4 shows the results when various types of insert materials were changed. The joining condition is 3.0 kgf / mm of initial pressure.2The heating temperature was 1200 ° C. and the upset amount was 6.0 mm. The pressure of the shielding gas is 2.4 kgf / mm.2The supply was stopped at the time of the drop. Table 5 shows the results of various changes in the joining conditions using the insert material of I7 which resulted in the base material breakage in Table 4.
[0084]
As can be seen from Tables 4 and 5, two H-sections are spliced by the method of the present invention. Considering that base material fracture is required in actual construction, the composition of the insert material is B1-5%,
[0085]
[Table 4]
[0086]
[Table 5]
[0087]
Next, the influence of the frequency and the effect of the standard clearance of the heating coil on the actual joining were investigated.
[0088]
The same 300H as the above-mentioned joining was used for the H-section steel. The insert material shown in Table 6 was used. The common bonding conditions are a heating temperature of 1250 ° C., a holding time of 300 seconds, an upset amount of 6 mm, and a bonding atmosphere of nitrogen gas. A JIS Z 3121 No. 1 test piece was sampled from the joined web and the joined flange to evaluate the joint tensile performance. Table 7 shows the frequency and clearance, and Table 8 shows the inspection results. From Table 8, it can be seen that the frequency is desirably 80 / t to 300 / t and the clearance is desirably t / 2 to 2t.
[0089]
[Table 6]
[0090]
[Table 7]
[0091]
[Table 8]
[0092]
【The invention's effect】
The H-section steel of the present inventionJoining methodCan metallurgically splice two H-section steels having different thicknesses in each part in a short time and with stable quality. Therefore, the present invention is applied to a construction in which short H-shaped steels are buried while being added one after another, such as the burial of H-shaped steels in subway construction, and has a great effect in shortening the construction period, reducing construction costs, and the like.
[Brief description of the drawings]
FIG. 1 is a schematic view showing a problem of blistering in diffusion bonding of an H-section steel.
FIG. 2 of the present invention.Used for joining H-beamsIt is a top view showing an example of a heating coil.
FIG. 3Same heating coilFIG. 3 is a plan view showing an example of a heating head using the hologram.
FIG. 4 is a schematic diagram showing the amount of bulge at the joint of an H-section steel.
FIG. 5 is a schematic diagram showing a temperature measurement position.
FIG. 6 is a graph showing a relationship between frequency and heating temperature in high frequency induction heating of an H-section steel.
FIG. 7 of the present invention.Used for joining H-beamsIt is a perspective view which shows the external appearance about an example of a joining device.
FIG. 8 is a front view schematically showing the internal structure of the joining device.
FIG. 9 is a right side view schematically showing the internal structure of the joining device.
FIG. 10 is a left side view schematically showing the internal structure of the joining device.
FIG. 11 is a plan view schematically showing the internal structure of the joining device.
FIG. 12 is a cross-sectional plan view schematically showing the internal structure of the joining device.
FIG. 13 is a schematic plan view showing the operation of the joining device.
FIG. 14 is a schematic side view showing the operation of the joining device.
Claims (4)
80/t≦f≦300/t
f:周波数(kHz)
t:H形鋼のウエブ厚(mm)
を満足することを特徴とするH形鋼の接合方法。Butt H-beams across the insert material of low melting point, the butted portion with pressurized, and the high-frequency induction heating to a temperature below the melting point of the melting point or more H-beam of the insert material, H-shaped liquid phase diffusion bonding In the steel joining method, the frequency used for high-frequency induction heating of the butted portion is a frequency at which currents on both sides of the H-section steel web do not cancel out and each current does not concentrate on the web surface. ,
80 / t ≦ f ≦ 300 / t
f: frequency (kHz)
t: Web thickness of H-section steel (mm)
A method for joining H-shaped steel, characterized by satisfying the following.
t/2≦x≦2t
x:距離(mm)
t:ウエブ厚(mm)
の範囲内であることを特徴とする請求項2又は3に記載のH形鋼の接合方法。The distance from the butted portion of the blister to the heating coil is t / 2 ≦ x ≦ 2t
x: distance (mm)
t: Web thickness (mm)
The method for joining H-shaped steels according to claim 2 or 3 , wherein:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27663395A JP3605456B2 (en) | 1994-10-14 | 1995-09-29 | H-beam joining method |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27575194 | 1994-10-14 | ||
| JP6-275751 | 1994-10-14 | ||
| JP27663395A JP3605456B2 (en) | 1994-10-14 | 1995-09-29 | H-beam joining method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08206852A JPH08206852A (en) | 1996-08-13 |
| JP3605456B2 true JP3605456B2 (en) | 2004-12-22 |
Family
ID=26551603
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP27663395A Expired - Fee Related JP3605456B2 (en) | 1994-10-14 | 1995-09-29 | H-beam joining method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3605456B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4505491B2 (en) | 2007-11-05 | 2010-07-21 | 新日本製鐵株式会社 | Apparatus and method for heating welded portion of steel pipe |
| JP2012040584A (en) * | 2010-08-17 | 2012-03-01 | Osaka Univ | Method for bonding ferrous material |
| JP6425226B2 (en) * | 2014-11-28 | 2018-11-21 | 株式会社日立プラントコンストラクション | Brace cutting machine and brace cutting vehicle |
| JP7637944B2 (en) * | 2021-09-01 | 2025-03-03 | トヨタ自動車株式会社 | Joining Method |
-
1995
- 1995-09-29 JP JP27663395A patent/JP3605456B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08206852A (en) | 1996-08-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109848522B (en) | Ultrasonic-assisted GTAW pulsating arc welding method for duplex stainless steel sheet | |
| JP3605456B2 (en) | H-beam joining method | |
| JP2001105158A (en) | Induction heating coil for railroad rail diffusion bonding and railroad rail diffusion bonding method using the same | |
| JP2001269785A (en) | Tailored blank coil and method and apparatus for manufacturing the same | |
| JPH10296461A (en) | Ultrasonic vibration welding method | |
| US4079224A (en) | Method for preventing brittle fracture of steel pipe structures | |
| JP3079995B2 (en) | Diffusion bonding method of metal material | |
| JP7541648B2 (en) | Steel strip joining method and steel strip joining device | |
| JPS59179279A (en) | Spot welding method | |
| JPH08174249A (en) | Manufacturing method of welded steel pipe | |
| JP7853635B1 (en) | Spot welded joints | |
| JPH0275478A (en) | Method for joining bar materials | |
| JP2852315B2 (en) | Method of manufacturing hot large-diameter rectangular steel pipe in which material of corner R does not deteriorate | |
| JP2864338B2 (en) | Flash welding method for high strength steel | |
| JP3447891B2 (en) | How to join the end of the strip to a flat surface | |
| JP4176590B2 (en) | Closed loop type shear reinforcement | |
| JP3090030B2 (en) | Liquid phase diffusion bonding method | |
| CN114029706B (en) | A method to improve the composite qualification rate of high-strength and extra-thick steel plates produced by vacuum lamination rolling | |
| EP4578585A1 (en) | Resistance spot welding method and welded joint manufacturing method | |
| JP3274335B2 (en) | Backing material for steel bar welding | |
| JPH0679783B2 (en) | Method and apparatus for butt resistance welding of thin plates | |
| JP3465079B2 (en) | Joining method | |
| JPH0350634B2 (en) | ||
| JP2579096B2 (en) | Welding method to improve fatigue strength of rail joint | |
| JPH0825038B2 (en) | Method of joining strips |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040430 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040518 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20040519 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040519 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040720 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20040806 |
|
| TRDD | Decision of grant or rejection written | ||
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20040806 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040928 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20041004 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071008 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081008 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081008 Year of fee payment: 4 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081008 Year of fee payment: 4 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081008 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091008 Year of fee payment: 5 |
|
| LAPS | Cancellation because of no payment of annual fees |