JP3637166B2 - Segment perfect circle holding device - Google Patents
Segment perfect circle holding device Download PDFInfo
- Publication number
- JP3637166B2 JP3637166B2 JP29489596A JP29489596A JP3637166B2 JP 3637166 B2 JP3637166 B2 JP 3637166B2 JP 29489596 A JP29489596 A JP 29489596A JP 29489596 A JP29489596 A JP 29489596A JP 3637166 B2 JP3637166 B2 JP 3637166B2
- Authority
- JP
- Japan
- Prior art keywords
- pair
- tunnel
- segment
- perfect circle
- holding device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003028 elevating effect Effects 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 description 12
- 238000010276 construction Methods 0.000 description 9
- 238000003825 pressing Methods 0.000 description 8
- 238000009412 basement excavation Methods 0.000 description 4
- 230000014759 maintenance of location Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 239000004576 sand Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000002952 polymeric resin Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、トンネルの内壁面に組付けられた多数のセグメントに圧接してこのセグメントを真円状態に保持するセグメントの真円保持装置及びこのセグメントの真円保持装置が搭載されたトンネル掘削機に関する。
【0002】
【従来の技術】
図4に従来のセグメントの真円保持装置の概略を示す。
【0003】
図4に示すように、従来のセグメントの真円保持装置100は図示しない掘削機本体の後部に搭載されている。即ち、この掘削機本体の後部には梁101が固定されており、この梁101には左右一対のレール102(図4には一方のみ記載)が取付けられ、このレール102にフラット型車輪103によって支持台104が移動自在に支持されている。また、この支持台104はガイド部材105によって走行方向側方に所定量だけ移動することができる。この支持台104上には外筒106が固定され、この外筒106内には内筒107が軸方向移動自在に支持されており、この内筒107は外筒106に取付けられた昇降ジャッキ108によって昇降することができる。そして、この内筒107の上端部には連結ピン109によって支え梁110の下部が連結されている。この支え梁110は中間部が既設セグメントSの内周面とほほ同様に湾曲しており、上面部に既設セグメントSの内周面に圧接する圧接部材111が固定されている。
【0004】
従って、図示しないカッタヘッドを回転させながらシールドジャッキを伸縮してセグメントSへの押し付け反力によって掘削機本体が前進することで、前方の地盤を掘削してトンネルを形成し、その後、セグメントエレクタによってトンネルの内壁面にセグメントSをリング状に組付ける。このとき、セグメントの真円保持装置100は掘削機本体の前進に伴ってレール102上を車輪103が転動することで追従する。そして、所定の位置で昇降ジャッキ108を伸長して外筒106 に対して内筒107を上昇することで、内筒107 に固定された支え梁110を上昇し、既設セグメントSの内周面に圧接部材111を圧接して既設セグメントSの真円度を保持する。
【0005】
【発明が解決しようとする課題】
ところで、シールド掘削機によるトンネル掘削作業では、近年、急曲線施工のトンネル工事が増加の傾向にある。このような急曲線のトンネル掘削作業を行う場合、前述した従来のセグメントの真円保持装置100にあっては、トンネル掘削作業に追従してトンネルの内壁面に組付けられたセグメントを真円状態に保持することが困難であった。
【0006】
即ち、シールド掘削機によって急曲線のトンネルを掘削するとき、その急曲線に沿って掘削機本体が掘進することとなり、既設セグメントと一対のレール102上を走行する支持台104に支持された支え梁110(圧接部材111)との左右方向における位置がずれてしまう。この場合、従来は、支持台104をガイド部材105によって走行方向側方に所定量だけ移動することで対応していた。ところが、このような方法では、車輪103がレール102上を落下せずに走行できる範囲で支持台104をガイド部材105によって側方に移動させており、その移動量に限界があり、急曲線施工のトンネル工事に対応することができなかった。
【0007】
本発明はこのような問題を解決するものであって、急曲線施工のトンネル工事に対応可能としたセグメントの真円保持装置及びトンネル掘削機を提供することを目的とする。
【0008】
【課題を解決するための手段】
上述の目的を達成するための本発明のセグメントの真円保持装置は、トンネルの内壁面に組付けられた多数のセグメントに圧接して真円状態に保持するセグメントの真円保持装置において、前記トンネル内にその長手方向に沿って配設された左右一対のレールと、該左右一対のレールに沿ってそれぞれ移動自在に支持された左右一対の支持台と、該左右一対の支持台にそれぞれ装着された左右一対の昇降手段と、該左右一対の昇降手段によってそれぞれ昇降自在に支持された左右一対の支持ブラケットと、該左右一対の支持ブラケットに架設されて下部がそれぞれ該左右一対の支持ブラケットにスライド機構を介して前記トンネルの横方向に沿って所定量移動自在に支持されたセグメント支え梁と、を具えたことを特徴とするものである。
【0009】
従って、トンネルの内壁面にセグメントを組み付けるのに伴って、トンネル内に配設されたレールに沿って各支持台が走行し、所定の位置で昇降手段によって支持ブラケットを介してセグメント支え梁を移動して既設セグメントの内壁面に圧接することで、この既設セグメントが真円状態で保持されることとなり、トンネルが急曲線形状になると、各支持台に対してセグメント支え梁が支持ブラケットを介してスライド機構によりトンネルの横方向に沿って移動することで、急曲線となった既設セグメントの内壁面にセグメント支え梁を確実に圧接することができ、既設セグメントが真円状態で保持される。
【0010】
また、本発明のトンネル掘削機は、筒状をなす掘削機本体と、該掘削機本体の前部に回転自在に装着されたカッタヘッドと、該カッタヘッドを駆動回転するカッタヘッド駆動手段と、前記掘削機本体に設けられた推進手段と、前記掘削機本体の後部に装着されてトンネルの内部に搬入されたセグメントを該トンネルの内壁面に組み付けるセグメント組付手段と、トンネルの内壁面に組付けられた多数のセグメントに圧接して真円状態に保持するセグメントの真円保持装置とを具えたトンネル掘削機において、前記真円保持装置は、トンネル長手方向に沿って配設された左右一対のレールと、該左右一対のレールに沿ってそれぞれ移動自在に支持された左右一対の支持台と、該左右一対の支持台にそれぞれ装着された左右一対の昇降手段と、該左右一対の昇降手段によってそれぞれ昇降自在に支持された左右一対の支持ブラケットと、該左右一対の支持ブラケットに架設されて下部がそれぞれ該左右一対の支持ブラケットにスライド機構を介して前記トンネルの横方向に沿って所定量移動自在に支持されたセグメント支え梁と、を具えたことを特徴とするものである。
【0011】
従って、カッタヘッド駆動手段によってカッタヘッドを回転駆動しながら、推進手段によって掘削機本体を前進させることで、このカッタヘッドによって前方の地盤が掘削され、セグメント組付手段が外部から搬入されたセグメントをこのトンネルの内壁面に組み付けると共に、トンネル内に配設されたレールに沿って各支持台が走行し、所定の位置で昇降手段によって支持ブラケットを介してセグメント支え梁を移動して既設セグメントの内壁面に圧接することで、この既設セグメントが真円状態で保持されることとなり、カッタヘッドが急曲線のトンネルを掘削するときは、各支持台に対してセグメント支え梁が支持ブラケットを介してスライド機構によりトンネルの横方向に沿って移動することで、急曲線となった既設セグメントの内壁面にセグメント支え梁を確実に圧接することができ、既設セグメントが真円状態で保持される。
【0012】
【発明の実施の形態】
以下、図面に基づいて本発明の実施の形態を詳細に説明する。
【0013】
図1に本発明の一実施例に係るセグメントの真円保持装置の正面視、図2に本実施形態のセグメントの真円保持装置の側面視、図3にセグメントの真円保持装置が装着されたシールド掘削機の概略を示す。
【0014】
図3に示すように、本実施形態のシールド掘削機において、掘削機本体としての円筒形状をなすスキンプレート11の前部にはカッタヘッド12が回転自在に装着されており、このカッタヘッド12の前面には多数のカッタビット13が固定されている。そして、カッタヘッド12の後部にはリングギア14が固定される一方、スキンプレート11には油圧モータ15が取付けられ、この油圧モータ15の駆動ギア16がこのリングギア14に噛み合っている。従って、油圧モータ15を駆動して駆動ギア16を回転駆動すると、リングギア14を介してカッタヘッド12を回転することができる。
【0015】
また、スキンプレート11にはカッタヘッド12の後方に位置してバルクヘッド17が取付けられており、カッタヘッド12とこのバルクヘッド17との間にチャンバ室18が形成されている。そして、このチャンバ室18には一端がシールド掘削機の外部に延設された送泥管19及び排泥管20の他端が開口しており、排泥管20の開口部分の近傍には掘削土砂と泥水とを攪拌、混合するアジテータ21が設置されている。なお、カッタヘッド12の外周部にはコピーカッタ22が設けられており、スキンプレート11の前端部には機外に出るためのマンロック23が設けられ、スキンプレート11の外周部には薬液注入管24が設けられている。
【0016】
更に、スキンプレート11の後部外周辺には円周方向に複数のシールドジャッキ25が並設されており、このシールドジャッキ25がシールド掘削機の掘進方向後方に伸長して掘削したトンネル内周面に構築された既設のセグメントSに押し付けることで、その反力によりスキンプレート11、即ち、シールド掘削機全体を前進することができる。一方、スキンプレート11の後部中央部には縦梁26が形成され、この縦梁26には架台27が後方に延設されている。また、スキンプレート11の後部にはリングガータ28によってセグメントエレクタ29が支持されており、このセグメントエレクタ29はシールドジャッキ25によって前進したスキンプレート11と既設のセグメントSとの間の空所に新しいセグメントSを装着してトンネルを構築することができる。更に、シールドジャッキ25の後方にはセグメントの真円保持装置30が設けられている。
【0017】
このセグメントの真円保持装置30において、図1及び図2に示すように、スキンプレート11の後部に固定された架台27には左右一対のレール31が取付けられており、この各レール31にはそれぞれ鍔付の車輪32によって支持台33が移動自在に支持されている。この各支持台33上には外筒34がそれぞれ固定され、この外筒34内には内筒35が軸方向移動自在に支持されている。また、各外筒34の側部には昇降ジャッキ36が取付けられ、この昇降ジャッキ36の駆動ロッドの先端部が内筒35の上部に連結されており、この昇降ジャッキ36の伸縮駆動によって外筒34に対して内筒35が昇降することができる。
【0018】
この各内筒36の上端部には連結ピン37によって支持ブラケット38が連結されている。一方、既設セグメントSの内周面に沿って湾曲した支え梁39は中間の上面部に既設セグメントSの内周面に圧接する圧接部材40が固定されている。そして、この支え梁39の両端部にはフランジ部39aが一体に形成され、各フランジ部39aがスライド機構41によって各支持ブラケット38上をトンネルの横方向に沿って所定量移動自在に支持されている。即ち、支持ブラケット38上には高分子樹脂からなるスライド板42及びガイド板43が張着されると共に、前後一対のストッパ44が固定される一方、支え梁39のフランジ部39aがこのスライド板42に密着してストッパ44によって保持されている。従って、支え梁39は支持ブラケット38に対して前後方向(トンネルの長手方向)が移動不能に拘束される一方、左右方向(トンネルの径方向)を所定量移動可能に拘束されることとなる。
【0019】
従って、トンネルを掘削形成するには、図3に示すように、まず、油圧モータ15によりカッタヘッド12を回転させながら、複数のシールドジャッキ25を伸長し、既設のセグメントSへの押し付け反力によってスキンプレート11を前進させことで、カッタヘッド12の多数のカッタビット13が前方の地盤を掘削する。そして、カッタビット13によって掘削された土砂はチャンバ室18内に取り込まれ、送泥管19から給水されてアジテータ21により掘削土砂と送水とが攪拌、混合され、排泥管20により外部に排出される。次に、シールドジャッキ25の何れか一つを縮み方向に作動して既設のセグメントSとの間に空所を形成し、セグメントエレクタ29によってこの空所に新しいセグメントSを装着する。
【0020】
その後、真円保持装置30において、図1及び図2に示すように、スキンプレート11の前進に伴って車輪32がレール31上を転動することで支持台33が前進し、所定の停止位置で昇降ジャッキ36を伸長することによって外筒34に対して内筒35及び支持ブラケット38を上昇させる。すると、この支持ブラケット38にスライド機構41を介して支持された支え梁39が上昇し、圧接部材40が既設セグメントSの内周面に圧接することで、この既設セグメントSが真円状態で保持されることとなる。
【0021】
そして、カッタヘッド12によって掘削するトンネルが急曲線形状になると、既設セグメントSとレール31上を走行する支持台33に支持された支え梁39(圧接部材40)との左右方向における位置がずれてしまう。この場合、本実施形態にあっては、支え梁39をスライド機構41によって支持台33に対して左右方向に移動することで、既設セグメントSと支え梁39(圧接部材40)との左右方向における位置を適合することができ、急曲線となった既設セグメントSの内周面に支え梁39の圧接部材40を確実に圧接して既設セグメントSを真円状態に保持することができる。
【0022】
【発明の効果】
以上、実施形態において詳細に説明したように本発明のセグメントの真円保持装置によれば、左右一対の支持台をトンネル内に配設された左右一対のレール上を移動自在に支持し、この支持台に昇降手段によって支持ブラケットを昇降自在に支持し、この支持ブラケットにスライド機構を介してセグメント支え梁をトンネルの横方向に沿って所定量移動自在に支持したので、急曲線形状のトンネルの内壁面に組付けられた既設セグメントと支え梁の圧接部材との位置を容易に適合し、このセグメントSの内周面に圧接部材40を確実に圧接することで既設セグメントを真円状態に保持することができる。
【0023】
また、本発明のトンネル掘削機によれば、筒状をなす掘削機本体の前部に回転自在なカッタヘッドを装着してカッタヘッド駆動手段によって駆動回転可能とすると共に、掘削機本体を推進手段によって前進可能とし、支持台をトンネル内のレール上を移動自在に支持して昇降手段によって支持ブラケットを昇降自在に支持し、この支持ブラケットにスライド機構を介してセグメント支え梁をトンネルの横方向に沿って所定量移動自在に支持したので、急曲線形状のトンネルの内壁面に組付けられた既設セグメントと支え梁の圧接部材との位置を容易に適合してこのセグメントSの内周面に圧接部材40を確実に圧接することで既設セグメントを真円状態に保持することができ、トンネル工事の工期の短縮及び工事費用の削減を図ることができる。
【図面の簡単な説明】
【図1】 本発明の一実施例に係るセグメントの真円保持装置の正面図である。
【図2】 本実施形態のセグメントの真円保持装置の側面図である。
【図3】 セグメントの真円保持装置が装着されたシールド掘削機の概略図である。
【図4】 従来のセグメントの真円保持装置の概略図である。
【符号の説明】
11 スキンプレート(掘削機本体)
12 カッタヘッド
15 カッタ旋回モータ(カッタヘッド駆動手段)
25 シールドジャッキ(推進手段)
27 架台
29 セグメントエレクタ(セグメント組付手段)
30 真円保持装置
31 レール
32 車輪
33 支持台
34 外筒
35 内筒
36 昇降ジャッキ(昇降手段)
38 支持ブラケット
39 支え梁
40 圧接部材
41 スライド機構[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a segment perfect circle holding device that press-contacts a plurality of segments assembled on the inner wall surface of a tunnel and holds the segment in a perfect circle state, and a tunnel excavator equipped with the segment perfect circle retention device About.
[0002]
[Prior art]
FIG. 4 shows an outline of a conventional segment perfect circle holding device.
[0003]
As shown in FIG. 4, a conventional segment perfect circle holding device 100 is mounted on a rear portion of an excavator body (not shown). That is, a
[0004]
Therefore, the shield jack is expanded and contracted while rotating the cutter head (not shown), and the excavator main body moves forward by the pressing reaction force against the segment S, so that the ground is excavated to form a tunnel. The segment S is assembled in a ring shape on the inner wall surface of the tunnel . At this time, the segment perfect circle holding device 100 follows the
[0005]
[Problems to be solved by the invention]
By the way, in tunnel excavation work by shield excavator, tunnel construction of sharp curve construction has been increasing in recent years. In the case of such a sharply-curved tunnel excavation work, in the conventional segment perfect circle holding device 100 described above, the segment assembled on the inner wall surface of the tunnel following the tunnel excavation work is in a perfect circle state. It was difficult to hold on.
[0006]
That is, when a tunnel with a sharp curve is excavated by a shield excavator, the excavator body will dig along the sharp curve, and the supporting beam supported by the
[0007]
An object of the present invention is to solve such a problem, and an object of the present invention is to provide a perfect circle holding device for a segment and a tunnel excavator that can cope with tunnel construction of sharp curve construction.
[0008]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, the segment perfect circle retaining device of the present invention is a segment perfect circle retainer that presses against a number of segments assembled on the inner wall surface of the tunnel and holds the segment in a perfect circle state. A pair of left and right rails arranged along the longitudinal direction in the tunnel , a pair of left and right support bases movably supported along the pair of left and right rails, and a pair of left and right support bases, respectively. A pair of left and right lifting means, a pair of left and right support brackets supported by the pair of left and right lifting means , respectively, and a pair of left and right support brackets, and lower portions thereof are respectively connected to the pair of left and right support brackets. And a segment support beam supported by a predetermined amount of movement along a lateral direction of the tunnel via a slide mechanism.
[0009]
Therefore, as the assembly of the segments on the inner wall surface of the tunnel, each of the support platform is traveling along a rail disposed in the tunnel, the segments support beam via a support bracket by lifting means at a predetermined position movement Then, the existing segment is held in a perfect circle by being pressed against the inner wall surface of the existing segment. When the tunnel has a sharp curve shape, the segment support beam is attached to each support base via the support bracket. By moving along the lateral direction of the tunnel by the slide mechanism, the segment support beam can be reliably pressed against the inner wall surface of the existing segment which has become a sharp curve, and the existing segment is held in a perfect circle.
[0010]
The tunnel excavator of the present invention includes a tubular excavator main body, a cutter head rotatably attached to the front portion of the excavator main body, cutter head driving means for driving and rotating the cutter head, Propulsion means provided in the excavator body, segment assembling means for assembling the segment mounted on the rear part of the excavator body and carried into the tunnel to the inner wall surface of the tunnel, and assembled to the inner wall surface of the tunnel A tunnel excavator comprising a segment perfect circle holding device that presses against a number of attached segments and holds the segment in a perfect circle state, wherein the perfect circle retention device includes a pair of right and left disposed along the longitudinal direction of the tunnel. Rails, a pair of left and right support bases movably supported along the pair of left and right rails, a pair of left and right lifting means respectively mounted on the pair of left and right support bases, A pair of left and right support brackets which are vertically movably supported respectively by the pair of right and lifting means, the lateral direction of the tunnel through the slide mechanism bottom respectively are bridged left and right pair of support brackets to the left and right pair of support brackets And a segment support beam supported so as to be movable by a predetermined amount along the line.
[0011]
Therefore, the excavator body is advanced by the propelling means while the cutter head is driven to rotate by the cutter head driving means, so that the front ground is excavated by the cutter head, and the segment assembly means carries the segment carried in from the outside. In addition to assembling to the inner wall surface of this tunnel , each support base travels along the rails arranged in the tunnel , and the segment support beam is moved through the support bracket by the lifting means at a predetermined position, so that the inside of the existing segment By pressing against the wall, the existing segment is held in a perfect circle. When the cutter head excavates a sharply curved tunnel, the segment support beam slides through the support bracket to each support base. mechanism by by moving along the lateral direction of the tunnel, of the existing segment became steeper curve Can be reliably pressed against the segment support beam to the surface, existing segments are held in a perfect circle state.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0013]
FIG. 1 is a front view of a segment perfect circle holding device according to an embodiment of the present invention, FIG. 2 is a side view of a segment perfect circle retention device of this embodiment, and FIG. An outline of a shield excavator is shown.
[0014]
As shown in FIG. 3, in the shield excavator of the present embodiment, a cutter head 12 is rotatably mounted on the front portion of a cylindrical skin plate 11 as the excavator body. A number of
[0015]
A
[0016]
Further, a plurality of shield jacks 25 are arranged in the circumferential direction around the outer periphery of the rear portion of the skin plate 11, and the shield jacks 25 extend rearward in the advancing direction of the shield excavator on the inner peripheral surface of the tunnel excavated. By pressing against the established segment S, the skin plate 11, that is, the entire shield excavator can be advanced by the reaction force. On the other hand, a
[0017]
In the perfect
[0018]
A
[0019]
Therefore, in order to form a tunnel by excavation, as shown in FIG. 3, first, while the cutter head 12 is rotated by the
[0020]
Thereafter, in the perfect
[0021]
When the tunnel excavated by the cutter head 12 has a sharp curve shape, the positions of the existing segment S and the support beam 39 (pressure contact member 40) supported by the
[0022]
【The invention's effect】
As described above in detail in the embodiment, according to the segment perfect circle holding device of the present invention, the pair of left and right support bases are movably supported on the pair of left and right rails disposed in the tunnel . the support bracket vertically movably supported by the lifting means to the support, since the support freely predetermined amount of movement of the segment support beams along the transverse direction of the tunnel through the slide mechanism to the support bracket, the steep curve shape of the tunnel The position of the existing segment assembled on the inner wall surface and the pressure contact member of the support beam can be easily matched, and the existing segment can be held in a perfect circle by securely pressing the
[0023]
Further, according to the tunnel excavator of the present invention, a rotatable cutter head is attached to the front portion of the cylindrical excavator body so that the cutter excavator body can be driven and rotated by the cutter head driving means, and the excavator main body is propelled. The support bracket can be moved on the rail in the tunnel movably, and the support bracket can be lifted and lowered by the lifting means, and the segment support beam is placed in the lateral direction of the tunnel via a slide mechanism on the support bracket. Since a predetermined amount is supported along the inner wall surface of the sharply curved tunnel , the position of the existing segment assembled on the inner wall surface of the sharply curved tunnel and the pressure contact member of the support beam can be easily adapted to press contact with the inner peripheral surface of the segment S. the existing segment by reliably pressing the
[Brief description of the drawings]
FIG. 1 is a front view of a perfect circle holding device for a segment according to an embodiment of the present invention.
FIG. 2 is a side view of the segment perfect circle holding device of the present embodiment.
FIG. 3 is a schematic view of a shield excavator equipped with a segment perfect circle holding device;
FIG. 4 is a schematic view of a conventional segment perfect circle holding device.
[Explanation of symbols]
11 Skin plate (excavator body)
12
25 Shield jack (propulsion means)
27
30 perfect
38
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29489596A JP3637166B2 (en) | 1996-11-07 | 1996-11-07 | Segment perfect circle holding device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29489596A JP3637166B2 (en) | 1996-11-07 | 1996-11-07 | Segment perfect circle holding device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10140997A JPH10140997A (en) | 1998-05-26 |
| JP3637166B2 true JP3637166B2 (en) | 2005-04-13 |
Family
ID=17813646
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP29489596A Expired - Fee Related JP3637166B2 (en) | 1996-11-07 | 1996-11-07 | Segment perfect circle holding device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3637166B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110080113A (en) * | 2019-05-16 | 2019-08-02 | 中国一冶集团有限公司 | The installation production method of variable cross-section decorative aluminum plate skeleton |
| CN111485923A (en) * | 2018-12-05 | 2020-08-04 | 黄河科技学院 | Mobile tunnel segment support frame for underground construction |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119900576B (en) * | 2025-01-21 | 2025-10-28 | 中国铁建重工集团股份有限公司 | A crawler-type rock tunnel boring machine and its transfer method |
-
1996
- 1996-11-07 JP JP29489596A patent/JP3637166B2/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111485923A (en) * | 2018-12-05 | 2020-08-04 | 黄河科技学院 | Mobile tunnel segment support frame for underground construction |
| CN111485923B (en) * | 2018-12-05 | 2021-12-28 | 河南省诚建检验检测技术股份有限公司 | Movable tunnel segment support frame for underground construction |
| CN110080113A (en) * | 2019-05-16 | 2019-08-02 | 中国一冶集团有限公司 | The installation production method of variable cross-section decorative aluminum plate skeleton |
| CN110080113B (en) * | 2019-05-16 | 2021-01-19 | 中国一冶集团有限公司 | Method for mounting and manufacturing variable cross-section decorative aluminum plate framework |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10140997A (en) | 1998-05-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN215860187U (en) | Tunneling device of tunnel boring machine and tunnel boring machine | |
| JP3637166B2 (en) | Segment perfect circle holding device | |
| JP3611286B2 (en) | Electa device and tunnel excavator | |
| JP3631874B2 (en) | Segment perfect circle holding device | |
| CN108517906B (en) | Walking excavator, working method of walking excavator and transferring method | |
| JP2588458Y2 (en) | Segment installation equipment | |
| JP3611287B2 (en) | Electa device and tunnel excavator | |
| JP3468938B2 (en) | Tunnel excavator and excavation method | |
| JP3758737B2 (en) | Method for holding a perfect circle of a segment by a perfect circle holding device of a tunnel machine | |
| JP3752100B2 (en) | Tunnel excavator | |
| JPH09132999A (en) | Assembling construction method for segment covering and shield machine | |
| JP3891645B2 (en) | Embedded pipe dismantling method and equipment | |
| JP2001032700A (en) | Shape holding device | |
| JP4181508B2 (en) | Tow truck and tunnel excavator | |
| JP2850302B2 (en) | Segment erector device | |
| JP2000274197A (en) | Tunnel excavator | |
| JP3595523B2 (en) | Electa device | |
| JPH11336496A (en) | Equipment for holding roundness of segments | |
| JP2686487B2 (en) | Shield excavator | |
| JP5011245B2 (en) | Shield machine | |
| JP3229130B2 (en) | Segment feeder | |
| JPH063120B2 (en) | Shield tunnel lining method | |
| JP2008014044A (en) | Excavator body recovery device in tunnel excavator | |
| JP4330768B2 (en) | Segment assembly method for shield machine | |
| JP2832400B2 (en) | Assembly device for segment wall in tunnel machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040824 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040831 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040921 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20041026 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20041116 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20041214 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050107 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080114 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090114 Year of fee payment: 4 |
|
| LAPS | Cancellation because of no payment of annual fees |