Snow removing method and snowmelt vehicle in a short section on the road Download PDF

Info

Publication number
JP3639647B2
JP3639647B2 JP23774095A JP23774095A JP3639647B2 JP 3639647 B2 JP3639647 B2 JP 3639647B2 JP 23774095 A JP23774095 A JP 23774095A JP 23774095 A JP23774095 A JP 23774095A JP 3639647 B2 JP3639647 B2 JP 3639647B2
Authority
JP
Japan
Prior art keywords
snow
tank
stirring
hot water
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP23774095A
Other languages
Japanese (ja)
Other versions
JPH0959955A (en
Inventor
光男 熊田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsutai Co Ltd
Original Assignee
Tsutai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsutai Co Ltd filed Critical Tsutai Co Ltd
Priority to JP23774095A priority Critical patent/JP3639647B2/en
Publication of JPH0959955A publication Critical patent/JPH0959955A/en
Application granted granted Critical
Publication of JP3639647B2 publication Critical patent/JP3639647B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Cleaning Of Streets, Tracks, Or Beaches (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、道路での除雪作業をするに当たり道路の縁部に集積されている雪を短い作業区間において除去する方法及び雪の除去のために用いる融雪車に関する。
【0002】
【従来の技術】
道路特に高架となっていることの多い高速道路においては、例えば図9に示すように、除雪車による除雪作業によって走行車線31や追い越し車線32から除去された雪Sが一旦道路の縁部の路肩や路側帯33に集積される。この雪は道路の緊急車両通行帯(路側帯)を塞ぐ。従来はその邪魔な雪をトラック51に積み込んで運び去ることによって上記集積された雪Sの除去を行っている。例えば積み込み場所53にいるトラック51に上記の雪をタイヤショベル(ショベルローダ)34によって積み込む。トラック51が満載となるとそのトラック51は高速道路を通って、高速道路の外に設けられている雪の廃棄場所に向けて雪を運ぶ。一方、待機していた次のトラック52が雪の積み込み場所53に移動し、そのトラック52に対して再び雪Sの積み込みを行う。このような作業を次々と繰り返す。このようにして雪Sを除去することにより、道路における正常な交通を回復させることが出来る。又上記のような方法は、雪Sの集積されている場所に出向いていってそこの雪を除去できるので、どこの場所でも実施できる便利性がある。尚図9において55は作業区間54を明示する為に路上に設置した標識体である。
【0003】
【発明が解決しようとする課題】
しかし上記従来の方法では、全ての雪をトラックで運ばねばならぬ為、高額の運搬費用を要する問題点があった。又上記の雪を短い時間で除去する為にはその雪を次々と間断無くトラックに積み込んでは運ばねばならず、その為には図示の如く多数のトラック52を待機させておかねばならぬ。するとそのずらっと並んだ待機中のトラック52が走行車線31を長い区間54に渡って塞ぐことになり、交通の妨げになる問題点があった。
又市街地における上り、下り各一車線の幹線道路において、雪搬出用トラックが多数縦列して長い区間に渡り一車線を占有して作業すると、大変な交通渋滞を起こす問題点もある。
【0004】
本願発明の道路における雪の除去方法は上記従来技術の問題点を解決する為に提供するものである。
第1の目的は、路上の雪を除去して道路の正常な交通を回復できるようにすることである。
第2の目的は、どこの場所においても自由に雪の除去を行い得るようにすることである。
第3の目的は、運搬費用を要せずして上記雪の除去を行い得るようにすることである。
第4の目的は、交通妨害となる路上での作業(占有)区間を極力短くした状態で上記雪の除去が出来るようにすることである。
第5の目的は、上記雪の除去の為に用いるのに好適な融雪車を提供することである。
第6の目的は、上記雪を迅速に溶解させられるようにすることによって、上記交通の回復を迅速化できるようにすることである。
他の目的及び利点は図面及びそれに関連した以下の説明により容易に明らかになるであろう。
【0005】
【課題を解決するための手段】
本願発明における融雪車は、温水を貯留する為の槽を有すると共に、該槽の上側には上記温水中に雪を投入する為の投入口を備えており、更に槽内には上記槽内の温水を加熱する為の加熱手段を備え、更に上記槽内の温水中には槽内の温水を攪拌する為に回転軸の周囲に多数の攪拌羽根を備えさせた攪拌体を横設し、しかも、攪拌羽根は、回転軸の回転によって槽内の雪を回転軸の軸芯方向に並行する方向に移動させるように回転軸の回転方向に対して捻れた状態に形成してあり、
その上、攪拌羽根の捻れ方向は、攪拌体を回動させることによって攪拌体の中央部に入れられた雪を攪拌体の中央部から一方の側と他方の側に動かせるように、
攪拌体の中央部を境にして、捻れ方向をその一方側と他方側とで反対にしてある。
【0006】
また本願発明における路上における短い区間での雪の除去方法は、道路の縁部に沿って集積されている雪の近傍に、雪を融解させる為の融雪車を位置させ、その融雪車は、温水を貯留する為の槽を有すると共に、該槽の上側には上記温水中に雪を投入する為の投入口を備えており、更に槽内には上記槽内の温水を加熱する為の加熱手段を備え、更に上記槽内の温水中には槽内の温水を攪拌する為に回転軸の周囲に多数の攪拌羽根を備えさせた攪拌体を横設し、しかも、攪拌羽根は、回転軸の回転によって槽内の雪を回転軸の軸芯方向に並行する方向に移動させるように回転軸の回転方向に対して捻れた状態に形成してあり、
その上、攪拌羽根の捻れ方向は、攪拌体を回動させることによって攪拌体の中央部に入れられた雪を攪拌体の中央部から一方の側と他方の側に動かせるように、
攪拌体の中央部を境にして、捻れ方向をその一方側と他方側とで反対にしてあり、
上記集積されている雪を次々と上記融雪車における槽に入れて水に変えて道路外に放流させるものである。
【0007】
融雪車は移動可能なので、路上において雪の集積されている場所の近傍に向けて移動させてそこに位置させることが出来る。そしてその場所において、集積されている雪を上記融雪車により溶かして水にし道路外に放流することにより路上の雪が除去される。このことは嵩張る雪の運搬を不要とする。従って運搬費用を不要とする。又路上には上記の融雪車及び雪の投入の為の手段が必要であるのみで、運搬用の多数のトラックを路上に縦列させる場所を不要とするので、交通に対する妨害は少ない。
【0008】
【発明の実施の形態】
以下本願発明の実施の形態を示す図面について説明する。図1において、Yは雪を融解させる為の融雪車で、雪のある場所に赴いてそこで雪の除去を行う為に移動可能となっている。その移動を可能に構成した融雪車の一例として、トラックBとその荷台1に設置した融雪装置Aとから成る融雪車を示す。2は移動の為の車輪である。尚上記移動が可能な融雪車Yは、融雪装置Aにおける後述のフレームに上記移動の為の車輪2を取付け、牽引車で引くようにしたものであっても良い。
【0009】
次に上記融雪装置Aを詳細に示す図2乃至図5について説明する。該融雪装置Aは雪を投入して融解させる為の槽Cと、その融解に要する熱を槽内に供給する為の加熱手段Dと、上記槽C内での雪の融解を迅速に行わせるために上記槽C内において雪及び温水の攪拌を行う為の攪拌手段Eとを有する。上記槽Cは雪の融解の為に用いる温水を漏水無く保持する為のもので、水槽を例示する。容量は例えば3m程度である。該槽Cは符号4〜7で示す部材で構成しており、上部は雪の投入の為に開放されて投入口C'となっている。4は内部に保持する水の重さに耐えて槽の形態を保持させる為のフレーム、5は水を保持する空間を形成する為の板材で、例えば鉄板であり、フレーム4に固定している。6は槽内の温水の保温の為の断熱材、7は外張りを示す。8は槽内の水の排水口である。9は槽Cの側壁に設けられたオーバーフロー口の存在を示す。図示はしないが上記槽Cにはその他に吸水口が備わっている。
【0010】
次に上記加熱手段Dは上記槽C内の温水を加熱するようにしてあり、符号10〜16で示す部材から構成している。10は加熱用の熱を発生させる為のバーナーで、オイルバーナーを例示するがガスバーナーその他の発熱手段を用いても良い。該バーナー10としては例えば1時間当たり20〜50リットル炊きのものを2基用いている。11は燃焼筒で、内部は上記バーナー10の燃焼室となっており、周壁は燃焼により生じた高温の燃焼ガスから槽C内の水へ熱を伝える(上記燃焼ガスと槽C内の水との熱交換を行う)為の伝熱壁となっている。12,14は上記燃焼ガスを排出のために導くと共にその過程において燃焼ガスから槽C内の水へ熱伝達を行わせる為の伝熱パイプ、13は伝熱パイプ12,14相互の接続を行うと共に燃焼ガスから槽C内の水へ熱伝達を行わせる為の接続筒、15は複数の伝熱パイプ14からの燃焼ガスを集合させる為の集合筒、16は燃焼ガスの排出の為の排気筒を夫々示す。
【0011】
次に上記攪拌手段Eは上記槽C内において温水の攪拌、温水と雪との攪拌、及び雪の固まりの切り崩し等を行う為のもので、槽C内に備えた攪拌体18と、その駆動を行う為に槽C外に備えた駆動機構19とから構成している。攪拌体18は、図2、3、4、6から理解できるように軸芯が横向きの回転軸20の周囲に多数の攪拌羽根21を取付けたものを例示する。回転軸20は上記攪拌羽根21の取付の為に太径に形成した胴部20aとそれの支持の為にその両端(図2、図3において右端側は加熱手段Dの陰になっている)に連結した細径の被枢支部20bとから構成している。攪拌羽根21は図2に示す如く攪拌体18の回転方向に対して捻れた状態に取付けてある。又その捻れ方向は、攪拌体18の中央部18cを境にしてその一方側18aと他方側18bとで反対にしてある。尚22は上記攪拌体18を回動自在に支持する為の軸受で上記被枢支部20bを支えている。23は部材20bが槽Cを貫通する部分の漏水防止の為のシール部材を示す。次に駆動機構19は上記攪拌体18を回転駆動するための周知の構成のもので、ギヤードモータ25、スプロケット26,27、チェーン28から構成している。尚上記駆動機構19による攪拌体18の回動の速度は、例えば1分当り7回転程度から63回転程度である。尚29はバーナー10やギヤードモータ25の作動を制御する為の制御盤である。
【0012】
上記構成の融雪車Yを用いて行う道路における雪の除去について説明する。先ず槽Cに水を給水(例えば上記の大きさの装置の場合2m程度)し、トラックBを走行させて例えば図8の如き現地に赴く。この場合、雪を槽C内に投入する為の手段例えばタイヤショベル34も一緒に現地に赴かせると良い。尚現地まで走行する間において、加熱手段Dを作動させて上記槽C内の水を加熱しておくと良い。予め温水を槽C内に蓄えてから出発しても良いし、現地に到着してから加熱を行っても良い。加熱手段Dによる槽C内の水の加熱は次の通りである。バーナー10を燃焼させると、燃焼筒11内での燃焼によって高温の燃焼ガスが発生し、その燃焼ガスの熱は燃焼筒11の周壁を通してその周囲の水に伝わる。上記発生された燃焼ガスは次に伝熱パイプ12,接続筒13,伝熱パイプ14を順に通る。その過程においても燃焼ガスの熱はそれらの部材の周壁を通してその周囲の水に伝わる。上記のように燃焼ガスの熱が水に伝わることにより燃焼ガスの温度は次第に低下し、低温となった燃焼ガスが排ガスとして集合筒15を通って排気筒16から排出される。燃焼ガスが上記のように通る過程において槽C内の水は上記のようにして熱を受け取り、温度が次第に上昇し温水となる。尚上記水の加熱の場合、攪拌手段Eにおける駆動機構19によって攪拌体18を回動させることにより、槽C内の水を攪拌しても良い。
【0013】
次に現地においては、上記融雪車Yを、図8に示すように道路30の縁部に沿って集積されている雪Sの近傍に停車させる。そして融雪装置Aを用いて雪Sの除去を行う。尚図8において30は例えば高速道路の上り又は下りの一方の車線を示し、31は走行車線、32は追い越し車線、33は路側帯を夫々示す。雪Sの除去は次の通りである。融雪装置Aにおいては、加熱手段Dを作動させ、槽C内の水(この時には温水になっている)の加熱を行う。又攪拌手段Eを作動させ、攪拌体18を例えば図7の矢印36方向に回動させる。この状態において、集積されている雪Sを例えばタイヤショベル34により槽C内にその上方の投入口C'から投入する。投入は図7に符号35で示す範囲のように左右の伝熱パイプ14の間の空間をめがけて行うと良い。投入された雪Sは槽C内の温水Wから熱を受け、融解されて水となる。
【0014】
上記槽C内における雪Sの融解の場合、次の(1)〜(5)の作用によって雪Sの融解が迅速に行われる。(1)槽C内において雪Sの近傍37の温水Wは雪Sの融解の為に熱が使われて温度が下がる。しかし攪拌体18の回動により槽C内の温水Wが攪拌される為、上記の部分37には再び温度の高い温水が供給される。従って上記雪Sの融解が迅速に行われる。(2)槽C内の雪は温水Wの上に浮かんでいても、その雪は上記回動する攪拌体18による温水Wの動きによって温水Wと混ぜ合わされる。その結果、それらの雪の周囲には温度の高い温水Wが良く回り込み、雪の融解が迅速に行われる。(3)槽C内に投入され温水Wの上に浮かぶ雪Sは、回動する攪拌体18の多数の羽根21によって温水Wの中に次々と掻き込まれる。その結果、雪Sと温水Wとの攪拌が増進され、雪の融解が迅速に行われる。(4)槽C内に投入された雪Sが図6に符号38で示すように大きな塊であっても、その雪は回動する攪拌体18の多数の羽根21によって多数の小塊39に切り崩される。従ってそれら切り崩された小塊39の雪Sの相互の間に温水Wが入り込む。その結果、雪と温水との接触面積が大きくなり、雪Sの融解が迅速に行われる。(5)槽C内に投入される雪Sの量が多くてその雪Sが図6、図7に符号40で示すように山積みとなっていても、回動する攪拌体18の多数の羽根21によって上記山積み40となった雪Sはその下部から順に切り崩される。そしてその切り崩された雪が羽根21によって温水Wの中に掻き込まれる。その結果、雪の融解が迅速に行われる。
【0015】
上記槽C内における雪Sの融解によって槽C内の水量が増加した場合、余分な水はオーバーフロー口9からのオーバーフローによって排出する。排水口8からの排水によって行っても良い。排出された水は、道路30外に放流させる。例えば道路の縁部の端にある排水溝に流す。
【0016】
上記のような操作の継続により道路30の路上に集積された雪Sが無くなったならば融雪車Y及びタイヤショベル34を撤去することにより雪Sの除去作業が完了し、路側帯33が開放される。
【0017】
次に上記融雪車Yの雪の処理能力の一例を示せば、例えば1日当り200mである。従って例えば名古屋地区における名古屋高速での1日当りの除雪量が例えば1000mとすると、その全量を10トントラックに5mずつ積み込んで処理しようとすると延べ200台のトラックが必要となる。しかし上記融雪車Yによれば1台当りトラック40台分の雪を融解させて除去できるので、僅か5台の融雪車Yを投入するのみでよい。このことは運搬用の多数のトラックの通行による道路(雪の除去を行う場所から雪の廃棄を行う場所までの往復の高速道及び一般道)の混雑を無くすことが出来る大きな効果があり、又トラックによる運送費を不要に出来る上において大きな効果がある。
【0018】
次に、上記槽C内での攪拌体18の攪拌の場合、回転軸20の周囲に設けられた多数の攪拌羽根21は前述のように捻れさせてあるので、回転軸20の回転方向の如何によって、槽C内の雪Sは図6の回転軸20の軸芯方向に並行する矢印41a,41b方向の力を受けたり、反対に矢印42a,42b方向の力を受けたりする。従って駆動装置19による攪拌体18の回転方向を正逆変更できるようにして、槽C内の雪Sを上記矢印41a,41bの横方向に大きく動かしたり矢印42a,42bの横方向に大きく動かしたりし、それによって槽内の雪の融解を速めるようにしても良い。
【0019】
【発明の効果】
以上のように本願発明の方法にあっては、道路30の縁部に集積された雪Sを除去したい場合、融雪車Yの槽Cに雪Sを入れてそれを溶かし、水にして道路外に放流させることによって、上記雪Sを路上から除去でき、正常な交通を回復させられる効果がある。
しかも移動可能な融雪車Yは除去したい雪Sのあるどこの場所にも出向かせることが出来るので、どこでも上記雪Sの除去作業を行い得る簡便性がある。
更に上記雪Sの除去は、雪Sが集積されている現地において上記のように溶かし放流させることにより行うので、従来技術の如き雪の運搬を全く不要化出来る特長がある。このことは運搬費用を不要化出来る経済効果があり、又融雪車Yとそれにおける槽Cへ雪Sを入れるための手段のみがあれば良くて、多数の運搬用のトラックを路上において縦列待機させる為の区間を不要化出来るので、交通に対する妨害区間56も非常に短くできる効果がある。
更に本願発明の融雪車Yにあっては、雪Sを溶かす場合、雪Sを温水W中に入れて溶かすことが出来るので、迅速に雪Sを溶かすことが出来、上記現地での雪Sの除去の為に用いて極めて好適である。
しかも攪拌手段Eでの温水Wの攪拌により温度の高い温水Wが雪Sに接触する機会を増大させることが出来るので、雪Sの融解を迅速化できる特長がある。このことは路上の雪Sを次々と投入して溶かすことを可能に出来、その結果、路上からの雪Sの除去を短時間で完了させて正常な交通の回復を迅速化させることを可能に出来る効果がある。
【図面の簡単な説明】
【図1】 融雪車を示す側面図。
【図2】 融雪装置の平面図。
【図3】 図2のIII−III線位置において槽のみを切断して示す断面図。
【図4】 図2におけるIV−IV線位置の断面図。
【図5】 図2におけるV−V線位置の断面図。
【図6】 攪拌体の作用を説明する為の縦断面略示図。
【図7】 攪拌体の作用を説明する為の図2におけるVII−VII線位置の断面略示図。
【図8】 道路での雪の除去状況を示す平面図。
【図9】 従来方法による道路での雪の除去状況を示す平面図。
【符号の説明】
Y 融雪車
A 融雪装置
C 槽
D 加熱手段
E 攪拌手段
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for removing snow accumulated on an edge of a road in a short work section when performing snow removal work on a road, and a snow melting vehicle used for removing snow.
[0002]
[Prior art]
For example, as shown in FIG. 9, the snow S removed from the traveling lane 31 and the overtaking lane 32 by the snowplowing work is once removed from the shoulder of the road. And accumulated in the roadside belt 33. This snow blocks the emergency vehicle traffic zone (roadside zone) of the road. Conventionally, the accumulated snow S is removed by loading the disturbing snow on the truck 51 and carrying it away. For example, the above-described snow is loaded onto a truck 51 at a loading place 53 by a tire shovel (shovel loader) 34. When the truck 51 is fully loaded, the truck 51 passes through the highway and carries snow toward a snow disposal site provided outside the highway. On the other hand, the next truck 52 that has been waiting moves to the snow loading place 53 and loads the snow S again on the truck 52. Such work is repeated one after another. By removing the snow S in this way, normal traffic on the road can be recovered. Also, the method as described above has the convenience that it can be carried out anywhere because it can go to the place where the snow S is accumulated and remove the snow there. In FIG. 9, reference numeral 55 denotes a marker installed on the road in order to clearly indicate the work section 54.
[0003]
[Problems to be solved by the invention]
However, the conventional method described above has a problem in that it requires high transportation costs because all the snow must be carried by a truck. In order to remove the above-mentioned snow in a short time, it is necessary to carry the snow on the truck one after another without interruption, and for that purpose, a large number of trucks 52 must be kept waiting as shown in the figure. Then, the waiting trucks 52 lined up side by side block the traveling lane 31 over a long section 54, and there is a problem that hinders traffic.
Also, on the main roads of up and down lanes in urban areas, if there are many snow carrying trucks occupying one lane over a long section, there will be a problem of causing heavy traffic congestion.
[0004]
The method for removing snow on the road of the present invention is provided to solve the problems of the prior art.
The first purpose is to remove snow on the road so that normal traffic on the road can be restored.
The second purpose is to be able to remove snow freely anywhere.
The third object is to enable the removal of the snow without the need for transportation costs.
The fourth object is to make it possible to remove the snow in a state where the work (occupation) section on the road that causes traffic obstruction is shortened as much as possible.
A fifth object is to provide a snowmelt wheel suitable for use in removing the snow.
The sixth object is to make it possible to speed up the recovery of the traffic by allowing the snow to dissolve quickly.
Other objects and advantages will be readily apparent from the drawings and the following description associated therewith.
[0005]
[Means for Solving the Problems]
The snow melting wheel in the present invention has a tank for storing hot water, and has an inlet for pouring snow into the warm water above the tank, and further inside the tank, A heating means for heating the hot water is provided, and in the warm water in the tank, a stirring body provided with a large number of stirring blades around the rotating shaft is provided in order to stir the warm water in the tank. The stirring blade is formed in a state twisted with respect to the rotation direction of the rotation shaft so as to move the snow in the tank in a direction parallel to the axial direction of the rotation shaft by rotation of the rotation shaft,
In addition, the twisting direction of the stirring blade is such that the snow put in the central part of the stirring body can be moved from the central part of the stirring body to one side and the other side by rotating the stirring body.
The twist direction is reversed between the one side and the other side with the central part of the stirring body as a boundary.
[0006]
Further, according to the present invention, a method for removing snow in a short section on the road includes a snowmelt wheel for melting snow in the vicinity of the snow accumulated along the edge of the road. And a heating port for heating the hot water in the tank in the tank. Further, in the warm water in the tank, in order to stir the warm water in the tank, a stirring body provided with a large number of stirring blades around the rotating shaft is installed, and the stirring blade is provided on the rotating shaft. It is formed in a state twisted with respect to the rotation direction of the rotary shaft so as to move the snow in the tank in a direction parallel to the axial direction of the rotary shaft by rotation,
In addition, the twisting direction of the stirring blade is such that the snow put in the central part of the stirring body can be moved from the central part of the stirring body to one side and the other side by rotating the stirring body.
With the middle part of the stirrer as a boundary, the twist direction is opposite on one side and the other side,
The accumulated snow is successively put into a tank in the snow melting car, converted into water and discharged outside the road.
[0007]
Since the snowmelt vehicle is movable, it can be moved toward the vicinity of the place where the snow is accumulated on the road and positioned there. And the snow on the road is removed by melting the accumulated snow with the above-mentioned snow-melting wheel in that place, making it into water and discharging it outside the road. This eliminates the need for bulky snow transport. Therefore, transportation costs are unnecessary. Further, only the above-mentioned snow melting vehicle and means for putting snow are required on the road, and a place where a large number of trucks for transportation are arranged on the road is unnecessary, so that there is little interference with traffic.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, drawings showing embodiments of the present invention will be described. In FIG. 1, Y is a snow melting wheel for melting snow, and it can be moved to go to a snowy place and remove snow there. As an example of a snow melting vehicle configured to be able to move, a snow melting vehicle including a truck B and a snow melting device A installed on the loading platform 1 is shown. 2 is a wheel for movement. In addition, the snowmelt wheel Y that can be moved may be one in which a wheel 2 for the movement is attached to a frame to be described later in the snow melting device A and pulled by a towing vehicle.
[0009]
Next, FIGS. 2 to 5 showing the snow melting device A in detail will be described. The snow melting device A has a tank C for charging and melting snow, a heating means D for supplying heat required for the melting into the tank, and rapidly melting the snow in the tank C. Therefore, the tank C has stirring means E for stirring snow and hot water. The tank C is for holding warm water used for melting snow without leakage, and illustrates a water tank. The capacity is about 3 m 3, for example. The tank C is constituted by members indicated by reference numerals 4 to 7, and the upper part is opened for introducing snow and serves as an inlet C ′. 4 is a frame for withstanding the weight of the water held inside and holding the form of the tank, and 5 is a plate material for forming a space for holding water, for example, an iron plate, which is fixed to the frame 4. . 6 is a heat insulating material for keeping warm water in the tank, and 7 is an outer covering. 8 is a water outlet in the tank. 9 indicates the presence of an overflow port provided in the side wall of the tank C. Although not shown, the tank C is additionally provided with a water inlet.
[0010]
Next, the heating means D is configured to heat the hot water in the tank C, and is constituted by members indicated by reference numerals 10 to 16. Reference numeral 10 denotes a burner for generating heat for heating, and an oil burner is exemplified, but a gas burner or other heat generating means may be used. For example, two burners 10 cooked 20 to 50 liters per hour are used. 11 is a combustion cylinder, and the inside is a combustion chamber of the burner 10, and the peripheral wall transfers heat from the high-temperature combustion gas generated by combustion to the water in the tank C (the combustion gas and the water in the tank C). Heat transfer wall). The heat transfer pipes 12 and 14 guide the combustion gas for discharge and cause heat transfer from the combustion gas to the water in the tank C in the process, and 13 connects the heat transfer pipes 12 and 14 to each other. In addition, a connecting tube for transferring heat from the combustion gas to the water in the tank C, 15 is a collecting tube for collecting the combustion gas from the plurality of heat transfer pipes 14, and 16 is a discharge tube for discharging the combustion gas. Each cylinder is shown.
[0011]
Next, the agitating means E is for agitating hot water, agitating warm water and snow, breaking a lump of snow, etc. in the tank C. The agitator 18 provided in the tank C and its drive In order to carry out, it comprises the drive mechanism 19 provided outside the tank C. As can be understood from FIGS. 2, 3, 4, and 6, the agitator 18 is exemplified by a structure in which a large number of agitating blades 21 are attached around a rotating shaft 20 having a lateral axis. The rotary shaft 20 has a barrel 20a formed to have a large diameter for mounting the stirring blade 21 and both ends thereof for supporting it (the right end side in FIGS. 2 and 3 is behind the heating means D). It is comprised from the thin pivoted part 20b connected to. The stirring blade 21 is attached in a twisted state with respect to the rotation direction of the stirring member 18 as shown in FIG. Further, the twisting direction is reversed between the one side 18a and the other side 18b with the central portion 18c of the stirring member 18 as a boundary. Reference numeral 22 denotes a bearing for rotatably supporting the agitator 18 and supports the pivoted portion 20b. Reference numeral 23 denotes a seal member for preventing water leakage at a portion where the member 20b penetrates the tank C. Next, the drive mechanism 19 has a well-known configuration for rotationally driving the agitator 18, and includes a geared motor 25, sprockets 26 and 27, and a chain 28. The rotation speed of the stirring member 18 by the drive mechanism 19 is, for example, about 7 to 63 rotations per minute. Reference numeral 29 denotes a control panel for controlling the operation of the burner 10 and the geared motor 25.
[0012]
The snow removal on the road performed using the snow melting wheel Y having the above configuration will be described. First, water is supplied to the tank C (for example, about 2 m 3 in the case of the apparatus of the above size), and the truck B is run to go to the site as shown in FIG. In this case, a means for putting snow into the tank C, for example, a tire excavator 34, may be put together. In addition, it is good to operate the heating means D and to heat the water in the tank C while traveling to the site. The hot water may be stored in the tank C in advance and then may be started, or the heating may be performed after arrival at the site. The heating of the water in the tank C by the heating means D is as follows. When the burner 10 is burned, high-temperature combustion gas is generated by combustion in the combustion cylinder 11, and the heat of the combustion gas is transmitted to the surrounding water through the peripheral wall of the combustion cylinder 11. The generated combustion gas then passes through the heat transfer pipe 12, the connecting cylinder 13, and the heat transfer pipe 14 in this order. Even in this process, the heat of the combustion gas is transmitted to the surrounding water through the peripheral walls of these members. As described above, the heat of the combustion gas is transferred to the water, so that the temperature of the combustion gas gradually decreases, and the low-temperature combustion gas is discharged from the exhaust cylinder 16 through the collecting cylinder 15 as exhaust gas. In the process in which the combustion gas passes as described above, the water in the tank C receives heat as described above, and the temperature gradually rises to become hot water. In the case of heating the water, the water in the tank C may be agitated by rotating the agitator 18 by the drive mechanism 19 in the agitation means E.
[0013]
Next, at the site, the snowmelt vehicle Y is stopped near the snow S accumulated along the edge of the road 30 as shown in FIG. Then, the snow S is removed using the snow melting device A. In FIG. 8, reference numeral 30 denotes, for example, one of the lanes on the highway that is up or down, 31 denotes a traveling lane, 32 denotes an overtaking lane, and 33 denotes a roadside zone. The removal of snow S is as follows. In the snow melting apparatus A, the heating means D is operated to heat the water in the tank C (which is hot water at this time). Further, the stirring means E is operated, and the stirring body 18 is rotated, for example, in the direction of arrow 36 in FIG. In this state, the accumulated snow S is thrown into the tank C from, for example, the inlet C ′ above it by the tire excavator 34. The charging is preferably performed with the space between the left and right heat transfer pipes 14 as shown in the range indicated by reference numeral 35 in FIG. The introduced snow S receives heat from the hot water W in the tank C and is melted to become water.
[0014]
In the case of melting the snow S in the tank C, the snow S is rapidly melted by the following actions (1) to (5). (1) In the tank C, the hot water W in the vicinity 37 of the snow S is used to melt the snow S and the temperature is lowered. However, since the warm water W in the tank C is agitated by the rotation of the agitator 18, the hot water having a high temperature is supplied to the portion 37 again. Therefore, the snow S is melted quickly. (2) Even if the snow in the tank C floats on the warm water W, the snow is mixed with the warm water W by the movement of the warm water W by the rotating stirring body 18. As a result, the hot water W having a high temperature goes around the snow, and the snow is melted quickly. (3) The snow S that is thrown into the tank C and floats on the hot water W is swept into the hot water W one after another by the numerous blades 21 of the rotating stirring body 18. As a result, the stirring of the snow S and the hot water W is promoted, and the snow is melted quickly. (4) Even if the snow S introduced into the tank C is a large lump as indicated by reference numeral 38 in FIG. 6, the snow is turned into a large number of small lumps 39 by a large number of blades 21 of the rotating stirring body 18. Cut down. Accordingly, the hot water W enters between the pieces of snow S of the small blocks 39 that have been cut. As a result, the contact area between the snow and the hot water is increased, and the snow S is rapidly melted. (5) Even if the amount of snow S put into the tank C is large and the snow S is piled up as indicated by reference numeral 40 in FIGS. The snow S which becomes the pile 40 by 21 is cut down in order from the lower part. Then, the cut snow is scraped into the warm water W by the blades 21. As a result, the snow melts quickly.
[0015]
When the amount of water in the tank C increases due to the melting of the snow S in the tank C, excess water is discharged by overflow from the overflow port 9. You may carry out by the waste_water | drain from the drain port 8. FIG. The discharged water is discharged out of the road 30. For example, it flows in a drain at the edge of the road.
[0016]
If the snow S accumulated on the road 30 disappears due to the continuation of the above operation, the snow melting wheel Y and the tire excavator 34 are removed to complete the snow S removal work, and the roadside belt 33 is opened. The
[0017]
Next, an example of the snow processing capacity of the snow melting vehicle Y is 200 m 3 per day, for example. Therefore, for example, if the amount of snow removal per day at Nagoya High Speed in the Nagoya area is, for example, 1000 m 3 , a total of 200 trucks are required to load the entire amount on a 10-ton truck by 5 m 3 . However, according to the snow melting vehicle Y, snow for 40 trucks per vehicle can be melted and removed, so that only 5 snow melting vehicles Y need be introduced. This has the great effect of eliminating the congestion of roads (round-trip highways and general roads from the place where snow is removed to the place where snow is discarded) due to the passage of many trucks for transportation. This has a great effect on eliminating the need for trucking.
[0018]
Next, in the case of stirring the stirrer 18 in the tank C, a number of the stirring blades 21 provided around the rotating shaft 20 are twisted as described above. As a result, the snow S in the tank C receives a force in the directions of the arrows 41a and 41b parallel to the axial direction of the rotary shaft 20 in FIG. 6, or receives a force in the directions of the arrows 42a and 42b. Accordingly, the direction of rotation of the stirring member 18 by the drive device 19 can be changed forward and backward, and the snow S in the tank C is moved largely in the lateral direction of the arrows 41a and 41b or moved in the lateral direction of the arrows 42a and 42b. Then, the melting of the snow in the tank may be accelerated.
[0019]
【The invention's effect】
As described above, in the method of the present invention, when it is desired to remove the snow S accumulated on the edge of the road 30, the snow S is put in the tank C of the snowmelt wheel Y and melted to make water, which is outside the road. The snow S can be removed from the road and the normal traffic can be restored.
Moreover, since the movable snow melting wheel Y can be sent to any place where the snow S to be removed is present, there is a convenience that the work for removing the snow S can be performed anywhere.
Further, the removal of the snow S is performed by melting and discharging the snow S as described above at the site where the snow S is accumulated. This has the economic effect of eliminating the need for transportation costs, and it is sufficient if there is only a means for putting snow S into the snowmelt vehicle Y and the tank C in the snowmelt vehicle Y, and a large number of trucks for transportation are queued on the road. Therefore, there is an effect that the obstruction section 56 for traffic can be shortened very much.
Further, in the snow melting wheel Y of the present invention, when the snow S is melted, the snow S can be melted by putting it in the hot water W. Therefore, the snow S can be melted quickly, and the snow S in the field can be melted. It is very suitable for use for removal.
Moreover, since the hot water W having a high temperature can be increased in contact with the snow S by the stirring of the hot water W by the stirring means E, there is a feature that the melting of the snow S can be speeded up. This allows the snow S on the road to be introduced and melted one after another, and as a result, the removal of the snow S from the road can be completed in a short time, thereby speeding up normal traffic recovery. There is an effect that can be done.
[Brief description of the drawings]
FIG. 1 is a side view showing a snow melting vehicle.
FIG. 2 is a plan view of a snow melting device.
FIG. 3 is a cross-sectional view showing only a tank cut at the position of line III-III in FIG. 2;
4 is a sectional view taken along line IV-IV in FIG. 2;
5 is a cross-sectional view taken along the line VV in FIG.
FIG. 6 is a schematic vertical cross-sectional view for explaining the action of a stirring body.
7 is a schematic cross-sectional view taken along the line VII-VII in FIG. 2 for explaining the operation of the stirrer.
FIG. 8 is a plan view showing the snow removal status on the road.
FIG. 9 is a plan view showing a snow removal condition on a road according to a conventional method.
[Explanation of symbols]
Y Snow melting wheel A Snow melting device C Tank D Heating means E Stirring means

Claims (2)

温水を貯留する為の槽を有すると共に、該槽の上側には上記温水中に雪を投入する為の投入口を備えており、更に槽内には上記槽内の温水を加熱する為の加熱手段を備え更に上記槽内の温水中には槽内の温水を攪拌する為回転軸の周囲に多数の攪拌羽根を備えさせた攪拌体を横設し、しかも、攪拌羽根は、回転軸の回転によって槽内の雪を回転軸の軸芯方向に並行する方向に移動させるように回転軸の回転方向に対して捻れた状態に形成してあり、
その上、攪拌羽根捻れ方向は、攪拌体を回動させることによって攪拌体の中央部に入れられた雪を攪拌体の中央部から一方の側と他方の側に動かせるように、
攪拌体の中央部を境にして、捻れ方向をその一方側と他方側とで反対にしてあることを特徴とする融雪車。
And having a bath for storing the hot water, on the upper side of the cistern is provided with a inlet for introducing a snow into the warm water, and more tank heating for heating the hot water in the tank comprising means to further laterally disposed a stirring body which gave a number of stirring blades around the axis of rotation for the warm water in the tank for agitating the hot water in the tank, moreover, the stirring blade is rotary shaft It is formed in a state twisted with respect to the rotation direction of the rotary shaft so that the snow in the tank is moved in a direction parallel to the axial direction of the rotary shaft by the rotation of
In addition, the twisting direction of the stirring blade is such that the snow put in the central part of the stirring body can be moved from the central part of the stirring body to one side and the other side by rotating the stirring body .
And the central portion of the stirring body a boundary, snow melting wheel characterized tare Rukoto the opposite with its one side and the other side direction twist.
道路の縁部に沿って集積されている雪の近傍に、雪を融解させる為の融雪車を位置させ、その融雪車は、温水を貯留する為の槽を有すると共に、該槽の上側には上記温水中に雪を投入する為の投入口を備えており、更に槽内には上記槽内の温水を加熱する為の加熱手段を備え更に上記槽内の温水中には槽内の温水を攪拌する為回転軸の周囲に多数の攪拌羽根を備えさせた攪拌体を横設し、しかも、攪拌羽根は、回転軸の回転によって槽内の雪を回転軸の軸芯方向に並行する方向に移動させるように回転軸の回転方向に対して捻れた状態に形成してあり、
その上、攪拌羽根捻れ方向は、攪拌体を回動させることによって攪拌体の中央部に入れられた雪を攪拌体の中央部から一方の側と他方の側に動かせるように、
攪拌体の中央部を境にして、捻れ方向をその一方側と他方側とで反対にしてあり、
上記集積されている雪を次々と上記融雪車における槽に入れて水に変えて道路外に放流させることを特徴とする路上における短い区間での雪の除去方法。
In the vicinity of the snow accumulated along the edge of the road, a snow-melting wheel for melting snow is located, and the snow-melting wheel has a tank for storing hot water, and on the upper side of the tank The tank is provided with an inlet for pouring snow into the hot water, further provided with heating means for heating the hot water in the tank, and further in the hot water in the tank. was horizontally provided a stirring member which gave a number of stirring blades around the axis of rotation in order to agitate, moreover, the stirring blade is parallel snow in the tank in the axial direction of the rotary shaft by the rotation of the rotary shaft It is formed in a twisted state with respect to the rotation direction of the rotation shaft so as to move in the direction,
In addition, the twisting direction of the stirring blade is such that the snow put in the central part of the stirring body can be moved from the central part of the stirring body to one side and the other side by rotating the stirring body .
With the central part of the stirrer as the boundary, the twist direction is opposite on the one side and the other side ,
A method for removing snow in a short section on the road, characterized in that the accumulated snow is successively put into a tank in the snow melting car, converted into water and discharged outside the road.
JP23774095A 1995-08-22 1995-08-22 Snow removing method and snowmelt vehicle in a short section on the road Expired - Lifetime JP3639647B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23774095A JP3639647B2 (en) 1995-08-22 1995-08-22 Snow removing method and snowmelt vehicle in a short section on the road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23774095A JP3639647B2 (en) 1995-08-22 1995-08-22 Snow removing method and snowmelt vehicle in a short section on the road

Publications (2)

Publication Number Publication Date
JPH0959955A JPH0959955A (en) 1997-03-04
JP3639647B2 true JP3639647B2 (en) 2005-04-20

Family

ID=17019779

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23774095A Expired - Lifetime JP3639647B2 (en) 1995-08-22 1995-08-22 Snow removing method and snowmelt vehicle in a short section on the road

Country Status (1)

Country Link
JP (1) JP3639647B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4520518B2 (en) * 2008-05-13 2010-08-04 茂 八嶋 Snow melting machine
JP4918610B2 (en) * 2010-07-22 2012-04-18 有限会社アシスト Stirring snow melting device
JP6746836B1 (en) * 2019-10-08 2020-08-26 次郎 梶 Buried snow melting apparatus and snow melting method

Also Published As

Publication number Publication date
JPH0959955A (en) 1997-03-04

Similar Documents

Publication Publication Date Title
CN111455777B (en) Road milling asphalt waste recycling device
CN106436541B (en) A kind of express highway pavement detection automatic mending apparatus and method
JP3639647B2 (en) Snow removing method and snowmelt vehicle in a short section on the road
CA2035322C (en) Sensor controlled surface to sewer feeding system for ice and snow
JPH10237836A (en) Self-traveling direct-heat snow melting device
US2703704A (en) Combined pugmill and tail gate for truck bodies
CN102704381B (en) road finishing machine
US4288931A (en) Method and conveyor for snow removal
JP6395237B1 (en) Method for producing sabo soil cement
JPH11269812A (en) Asphalt regenerator and asphalt regenerating car with the regenerator
JPH11181729A (en) Snow-melting device mounted construction machine
JPH10152816A (en) Light and heat snow removing water tank truck
RU2204648C1 (en) Method of and device for removing of snow
JP2618190B2 (en) Snow melting equipment
SU949046A1 (en) Snow melter
CN222557395U (en) Pouring equipment for lifting curb
JPS6111288Y2 (en)
KR20000054123A (en) Regeneration method and regeneration device of waste ascon for asphalt base layer
US1334516A (en) Street or road snowplow
CN216379008U (en) Pitch heating melting device is used in town road construction
JPH07189223A (en) Snow melting equipment
CA1170215A (en) Concrete wash plant
JP2537747B2 (en) Snow melting car
US1894129A (en) Concrete delivery
CN121915645A (en) Drying mechanism of mine drying system

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040817

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041013

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050117

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080121

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090121

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100121

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100121

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110121

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120121

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120121

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130121

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140121

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term