JP3701936B2 - Formwork support structure - Google Patents
[go: Go Back, main page]

JP3701936B2 - Formwork support structure - Google Patents

Formwork support structure Download PDF

Info

Publication number
JP3701936B2
JP3701936B2 JP2002339107A JP2002339107A JP3701936B2 JP 3701936 B2 JP3701936 B2 JP 3701936B2 JP 2002339107 A JP2002339107 A JP 2002339107A JP 2002339107 A JP2002339107 A JP 2002339107A JP 3701936 B2 JP3701936 B2 JP 3701936B2
Authority
JP
Japan
Prior art keywords
mold
girder
supported
arm
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002339107A
Other languages
Japanese (ja)
Other versions
JP2004169500A (en
Inventor
忠良 石橋
正夫 横山
憲一 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2002339107A priority Critical patent/JP3701936B2/en
Publication of JP2004169500A publication Critical patent/JP2004169500A/en
Application granted granted Critical
Publication of JP3701936B2 publication Critical patent/JP3701936B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、例えば現に供用されている橋梁における橋桁など、振動を受ける部材をコンクリートで被覆する場合に用いられる型枠の支持構造及びコンクリートの施工方法に関する。
【0002】
【従来の技術】
従来の型枠の支持構造としては、例えば橋梁の主桁たる鋼部材をコンクリートで被覆するための型枠を支持する支保工であって、地面等によって支持されるものが開示されている(例えば、非特許文献1参照)。
【0003】
そして、この型枠の支持構造は、近年における建設工事の複雑化及び高度化や、周辺環境への影響に対する配慮の必要性の増大などに伴い、現に供用されている橋梁の橋桁たる主桁をコンクリートで被覆する場合にも用いられている。
【0004】
【非特許文献1】
土木学会編,「土木工学ハンドブックI」,第四版,技報堂出版,1993年11月20日,p.1246
【0005】
【発明が解決しようとする課題】
しかしながら、従来の型枠の支持構造では、コンクリートで被覆すべき主桁が交通振動等を受けることとなっているのに対して、その振動を受ける鋼部材をコンクリートで被覆するための型枠は地面等の不動点によって支持されていることから、鋼部材と型枠との振動差が大きくなってしまい、振動を受ける鋼部材とコンクリートとを一体化した複合構造が確実かつ十分に得られないという問題がある。
【0006】
そこで、本発明者等は、振動を受ける鋼部材をコンクリートで被覆するための型枠をその振動を受ける鋼部材からのみ支持することとした型枠の支持構造を開発した。すなわち、このような型枠の支持構造によれば、鋼部材と型枠との振動差が小さくなり、その結果、振動を受ける鋼部材とコンクリートとを一体化した複合構造が確実かつ十分に得られることが可能となっている。
【0007】
ところで、この型枠の支持構造は、上記したように、コンクリートで被覆すべき鋼部材が継続して交通振動を受ける工事に用いられるのが適合的である。
【0008】
ここで、そのような工事としては、例えば鉄道の仮設橋梁における振動する鋼部材である鋼桁をコンクリートで被覆することにより本設橋梁におけるコンクリート桁として使用しようとする工事や、道路の本設橋梁における振動する鋼部材である鋼桁をコンクリートで被覆することにより本設橋梁におけるコンクリート桁として使用しようとする工事がある。
【0009】
しかしながら、これらの工事においては、通常、列車や自動車など、現に供用されている交通を遮断することなく施工する必要があり、急速施工を要求されることとなっている。
したがって、従来の型枠の支持構造に対しては、急速施工の要求を十分に満たすことが望まれ低ている。
【0010】
そこで、本発明の課題は、急速施工の要求が十分に満たされるように、現場作業の簡素化及び迅速化を図ることができる型枠の支持構造を提供することにある。
【0011】
【課題を解決するための手段】
上記課題を解決するため、第一発明に係る型枠の支持構造は、現に供用されている橋梁において車両が走行することにより振動する部材をコンクリートで被覆するための型枠を支持する型枠の支持構造であって、部材から型枠側に張り出され、型枠を支持するための支持アームと、型枠から部材側に張り出され、部材によって支持されるための被支持アームとを備え、支持アームが、この支持アームから突出する凸部又は上側に開口する凹部を有しており、被支持アームが、下側に開口する凹部又は被支持アームから突出する凸部を有しており、型枠が、被支持アームの凹部又は凸部が支持アームの凸部又は凹部に嵌ることによって支持されていることを特徴としている。
【0012】
第一発明に係る型枠の支持構造によれば、被支持アームの凹部又は凸部が支持アームの凸部又は凹部に嵌ることによってのみ型枠が支持されていることから、現場作業者は被支持アームの凹部又は凸部を支持アームの凸部又は凹部に嵌め込むだけで型枠を振動する部材によってのみ支持できることとなり、これにより、現場作業の簡素化及び迅速化が図られることとなり、急速施工の要求が十分に満たされることとなる。
【0013】
このような技術的手段において、「型枠が被支持アームの凹部又は凸部が支持アームの凸部又は凹部に嵌ることによって支持されている」には、例えば被支持アームの凹部又は凸部の形状が支持アームの凸部又は凹部の形状に対応するために、単一の被支持アームの凹部又は凸部が単一の支持アームの凸部又は凹部に嵌るだけで係止されることとなる態様のみならず、単一の被支持アームの凹部又は凸部が単一の支持アームの凸部又は凹部に嵌っても係止されないが、これらが上下に一組として配置されるなどにより、一組の被支持アームの凹部又は凸部が一組の支持アームの凸部又は凹部に嵌るだけで係止されることとなる態様も含まれる。
【0014】
ここで、コンクリートが硬化するまでの間において、コンクリートの重量を有効利用することとして、部材と型枠との振動差をより小さくするという観点からすれば、支持アームの凹部は、斜め外上方向に開口していることが好ましく、被支持アームの凹部は、斜め外下方向に開口していることが好ましい。
【0017】
さらに、第発明に係る型枠の支持構造は、請求項1に記載の型枠の支持構造において、前記型枠が、埋め込み型枠であり、かつ、前記車両の走行方向に所定間隔で切り離され、切り離された位置で前記部材によってのみ支持される各型枠片からなる型枠で、各型枠片どうしの間に形成される目地のうち圧縮力を負担しない部分に対しては応力を伝達しない目地材が充填されており、圧縮力を負担すべき部分に対しては圧縮力を伝達するための目地材が充填されていることを特徴としている。
【0018】
発明に係る型枠の支持構造によれば、型枠が、埋め込み型枠であり、かつ、前記車両の走行方向に所定間隔で切り離され、切り離された位置で前記部材によってのみ支持される各型枠片からなる場合において、現場作業者は、各型枠片どうしの目地のうち圧縮力を負担しない目地と圧縮力を負担すべき目地とにそれぞれ適合する目地材を充填するだけでよく、コンクリートが硬化するまでの間、各型枠片どうしの間に応力を伝達させないための特別な作業や、コンクリートの硬化後、埋め込み型枠を構造物の一部として圧縮力を伝達させるための特別な作業が不要となり、作業量の低減を通じて、現場作業の簡素化及び迅速化が図られることとなり、急速施工の要求が十分に満たされることとなる。
【0019】
【発明の実施の形態】
以下、添付図面に基づいて本発明の実施の形態を詳細に説明する。
【0020】
なお、ここでは、鉄道の仮設橋梁における振動する部材である鋼桁がコンクリートで被覆されることにより本設橋梁におけるコンクリート桁として使用される場合について説明するが、これに限られるものではなく、例えば道路の本設橋梁における振動する部材である鋼桁がコンクリートで被覆されることにより本設橋梁におけるコンクリート桁として使用される場合などでも、以下の説明が妥当する。
【0021】
図1は本発明の一実施の形態に係る型枠の支持構造の全体構成を示す断面図、図3は同型枠の支持構造の部分構成を示す斜視図、図3は同型枠の支持構造の概略構成を示す斜視図である。
【0022】
本実施の形態において、型枠の支持構造は、図1に示すように、現に供用されている鉄道4の仮設橋梁における振動する部材である主桁1a及び枕木受桁1bからなる鋼部材1をコンクリート3(図3(c)参照、以下同じ)で被覆するための型枠2を支持する目的に用いられる。
【0023】
以下、主桁1a、枕木受桁1b、型枠2、型枠の支持構造についてさらに詳細に説明する。
【0024】
(1)主桁1a
仮設橋梁においては、図1に示すように、鉄道車両(図示外)がレール41上を走行することにより生じた振動エネルギーが、レール41から枕木42、枕木受桁1b及び桁受用ブラケット51を通じて主桁1aへと伝達される。
【0025】
すなわち、主桁1aは、振動する部材として構成されている。
【0026】
加えて、主桁1aのうち後記する補強桁12は、本設橋梁においては、コンクリート桁において圧縮力には強いが引張力には弱いコンクリート3の弱点を補う役割を果たすものとして構成されている。
【0027】
すなわち、主桁1aがコンクリート3で被覆されることにより、両者間の付着力により一体化した複合構造である本設橋梁におけるコンクリート桁が構築されることとなっている。
【0028】
具体的には、この主桁1aは、同図に示すように、ほぼI形鋼からなる工事桁11と、下側フランジの幅の方が上側フランジの幅よりも大きいI形鋼からなり、工事桁11の下側にボルト接合される補強桁12とからなるものとして構成されている。
【0029】
(2)枕木受桁1b
仮設橋梁においては、図1に示すように、鉄道車両がレール41上を走行することにより生じた振動エネルギーが、レール41から枕木42を通じて枕木受桁1bへと伝達される。
【0030】
すなわち、枕木受桁1bは、振動する部材として構成されている。
【0031】
加えて、枕木受桁1bは、本設橋梁においては、コンクリートスラブにおいて圧縮力には強いが引張力には弱いコンクリート3の弱点を補う役割を果たすものとして構成されている。
【0032】
すなわち、枕木受桁1bがコンクリート3で被覆されることにより、両者間の付着力により一体化した複合構造である本設橋梁におけるコンクリートスラブが構築されることとなっている。
【0033】
(3)型枠2
型枠2は、図1に示すように、主桁1a及び枕木受桁1bからなる鋼部材1をコンクリート3で被覆するために用いられるものであり、本設橋梁におけるコンクリート桁及びコンクリートスラブからなるコンクリート構造物の位置、形状及び寸法が正確に確保し得るよう配置されるものとして構成されている。
【0034】
すなわち、このような型枠2によれば、コンクリート3を打ち込むことにより、主桁1a及び枕木受桁1bからなる鋼部材1がコンクリート3で被覆されることとなり、これにより、所定の形状・寸法をもつ本設橋梁におけるコンクリート構造物がつくられることとなっている。
【0035】
ここで、型枠2は、コンクリート又はモルタルからなる板材である埋め込み型枠2であるものとして構成されている。
【0036】
すなわち、このような型枠2によれば、コンクリートが硬化した後で、埋め込み型枠2を主桁1aとコンクリートとが一体化した複合構造の一部として扱うことが可能となり、これにより、型枠2をばらす作業が不要となり、作業量の低減を通じて、作業量現場作業の簡素化及び迅速化を図ることが可能となっている。
【0037】
具体的には、型枠2は、同図に示すように、桁用型枠21と、スラブ用型枠22と、勾配型枠3とからなっている。そして、桁用型枠21は、主桁1aの上部に対応して配置される上段型枠21aと、主桁1aの下部に対応して配置される下段型枠21bとからなっている。
【0038】
ここで、桁用型枠21は、図3に示すように、異なる振動をする主桁1aの各部分別に切り離され、各部分によって支持される各型枠片2aと、各型枠片どうしの間に形成される目地に対して充填されている目地材24とからなっている。
【0039】
そして、目地材24は、圧縮力を負担しない目地に対して充填されている応力非伝達目地材24aと、圧縮力を負担すべき目地に対して充填されている応力伝達目地材24bとからなっている。
【0040】
応力非伝達目地材24aとしては、コンクリートが硬化するまでの間において異なる振動により生じる変位を吸収する目的で用いられるものであり、例えばゴムからなるものとして構成されている。一方、応力伝達目地材24bは、コンクリートが硬化した後において圧縮力を伝達する目的で用いられるものであり、例えばエポキシ樹脂からなるものとして構成されている。
【0041】
すなわち、このような桁用型枠21によれば、応力非伝達目地材24aを有しているので、コンクリートが硬化するまでの間において主桁1aが場所により異なる振動をする場合にあっても、振動による変位が自由に確保されることとなり、これにより、各型枠片2aどうしの間に応力が伝達されないこととなっている。一方、応力伝達目地材24bを有しているので、コンクリートが硬化した後において各型枠片2aどうしの間で圧縮力が伝達されることとなり、埋め込み型枠2が主桁1aとコンクリートとが一体化した複合構造の一部としての機能を発揮し得ることとなっている。
【0042】
一方、スラブ用型枠22は、図1に示すように、枕木受桁1bによって支持されるものとして構成されている。
【0043】
(4)型枠の支持構造
本実施の形態において、型枠の支持構造は、図1に示すように、主桁1a及び枕木受桁1bからなる鋼部材1をコンクリート3で被覆するための型枠2を支持する役割を果たすものとして構成されている。
【0044】
そして、この型枠の支持構造においては、型枠2は、鋼部材1によってのみ支持されるものとして構成されている。
【0045】
すなわち、一方では、桁用型枠21のうち上段型枠21aが、同図に示すように、工事桁11によってのみ固定状態に支持されている。また、下段型枠21bが、同図に示すように、補強桁12によってのみほぼ固定状態に支持されている。
【0046】
また、他方では、スラブ用型枠22が、同図に示すように、枕木受桁1bによってのみ固定状態に支持されている。
【0047】
すなわち、型枠2は、鋼部材1に対して移動及び回転において拘束があることとなり、これにより、鉄道車両の走行時に鋼部材1に伝達される振動エネルギーが型枠2にも伝達されることとなっている。
【0048】
具体的には、この型枠の支持構造は、上段型枠21aを工事桁11によってのみ支持するための工事桁用支持手段と、スラブ用型枠22を枕木受桁1bによってのみ支持するためのスラブ用支持手段と、下段型枠21bを補強桁12によってのみ支持するための補強桁用支持手段とを備えるものとして構成されている。
【0049】
工事桁用支持手段は、同図に示すように、工事桁11の上側フランジに設けられ、上段型枠21aを支持するための工事桁用支持アーム61と、上段型枠21aから工事桁11側に張り出され、工事桁11によって支持されるための工事桁用被支持アーム71と、工事桁11から上段型枠21a側に張り出され、上段型枠21aを支持するための補強桁用支持アーム62と、上段型枠21aから工事桁11側に張り出され、工事桁11によって支持されるための補強桁用被支持アーム72とからなっている。
【0050】
また、スラブ用支持手段は、枕木受桁1bの下側フランジに設けられ、スラブ用型枠22を支持するためのスラブ用支持アーム81と、スラブ用型枠22から枕木受桁1b側に張り出され、枕木受桁1bによって支持されるためのスラブ用被支持アーム91とからなっている。
【0051】
さらに、補強桁用支持手段は、補強桁12から下段型枠21b側に張り出され、下段型枠21bを支持するための補強桁用支持アーム62と、下段型枠21bから補強桁12側に張り出され、補強桁12によって支持されるための補強桁用被支持アーム72とからなっている。
【0052】
ここで、図1及び図2に示すように、一方では、補強桁用支持アーム62が、主桁1aの長さ方向に突出する棒状の凸部62aを有しており、他方では、補強桁用被支持アーム72が、下側に開口するU字形の凹部72aを有している。
【0053】
そして、この下段型枠21bの支持構造は、これらの図に示すように、補強桁用被支持アーム72のU字形の凹部72aが支持アームの棒状の凸部62aに嵌ることによって支持されているのである。
【0054】
つまり、このような下段型枠21bの支持構造によれば、現場作業者は被支持アームのU字形の凹部72aを支持アームの棒状の凸部62aに嵌め込むだけで下段型枠21bを補強桁12によってのみ支持できることとなっている。
【0055】
したがって、このような型枠の支持構造によれば、現場作業の簡素化及び迅速化を図ることがことが可能となっており、これにより、急速施工の要求を十分に満たすことが可能となっている。
【0056】
なお、単一の補強桁用被支持アーム72のU字形の凹部72aが単一の補強桁用支持アーム62の棒状の凸部62aに嵌っても、補強桁用被支持アーム72が補強桁用支持アーム62に係止されることはないが、これらのU字形の凹部72aや棒状の凸部62aが上下に一組として配されているので、一組の補強桁用被支持アーム72のU字形の凹部72aが一組の補強桁用支持アーム62の棒状の凸部62aに嵌るだけで、補強桁用被支持アーム72が補強桁用支持アーム62に係止されることとなっている。
【0057】
ところで、この下段型枠21bの支持構造における補強桁用被支持アーム72のU字形の凹部72aは、図2に示すように、斜め外下方向に開口している。
【0058】
つまり、この下段型枠21bの支持構造においては、同図に示すように、補強桁用被支持アーム72のU字形の凹部72aが下側に開口しており、下段型枠21bが補強桁12に対して上方向への移動が自由であり、水平方向及び下方向への移動並びに回転が拘束されているものとして構成されているが、このような形状のU字形の凹部72aによれば、コンクリートが硬化するまでの間においてコンクリートの重量が下段型枠21bに対して有効に加わることにより、補強桁12に対して下段型枠21bの移動及び回転がほぼ拘束されることとなり、その結果、補強桁12と下段型枠21bとの振動差をより小さくすることが可能となっている。
【0059】
ここで、この下段型枠21bの支持構造は、図1に示すように、主桁1aの下側フランジの側端部が、上側フランジの側端部より外側に張り出しており、桁用型枠21の下端部が、張り出した下側フランジの上面に接合している。
【0060】
つまり、このような下段型枠21bの支持構造によれば、コンクリートが硬化するまでの間において、主桁1aの下側フランジを底部に配置されるべき型枠2としても機能させることが可能となっている。
【0061】
したがって、このような型枠の支持構造によれば、型枠2量の低減を通じて、現場作業の簡素化及び迅速化を図ることがことが可能となっており、これにより、急速施工の要求を十分に満たすことが可能となっている。
【0062】
また、この型枠の支持構造は、図3に示すように、桁用型枠21が、異なる振動をする主桁1aの各部分によってのみほぼ固定状態に支持される各型枠片2aからなるものとして構成されている。
【0063】
そして、同図に示すように、各型枠片どうしの間に形成される目地のうち圧縮力を負担しない部分に対しては異なる振動により生じる変位を吸収するための応力非伝達目地材24aが充填されており、圧縮力を負担すべき部分に対しては圧縮力を伝達するための応力伝達目地材24bが充填されている。
【0064】
つまり、このような型枠の支持構造によれば、型枠2が、埋め込み型枠2であり、かつ、異なる振動をする前記部材の各部分別に切り離され、該各部分によってのみ支持される各型枠片2aからなる場合において、現場作業者は、各型枠片どうしの目地のうち圧縮力を負担しない目地と圧縮力を負担すべき目地とにそれぞれ適合する目地材24を充填するだけでよく、コンクリートが硬化するまでの間、異なる振動により各型枠片どうしの間に生じる変位を吸収させるための特別な作業や、コンクリートが硬化した後に、埋め込み型枠2を構造物の一部として圧縮力を伝達させるための特別な作業が不要となっている。
【0065】
したがって、このような型枠の支持構造によれば、作業量の低減を通じて、現場作業の簡素化及び迅速化を図ることがことが可能となっており、これにより、急速施工の要求を十分に満たすことが可能となっている。
【0066】
【発明の効果】
本発明に係る型枠の支持構造によれば、現場作業の簡素化及び迅速化が図られることとなり、急速施工の要求が十分に満たされることとなる。
【図面の簡単な説明】
【図1】本発明の一実施の形態に係る型枠の支持構造の全体構成を示す断面図である。
【図2】本発明の一実施の形態に係る型枠の支持構造の部分構成を示す斜視図である。
【図3】本発明の一実施の形態に係る型枠の支持構造の概略構成を示す斜視図である。
【符号の説明】
1 鋼部材
1a 主桁
1b 枕木受桁
2 型枠
2a 各型枠片
3 コンクリート
4 鉄道
11 工事桁
12 補強桁
21 桁用型枠
21a 上段型枠
21b 下段型枠
22 スラブ用型枠
23 勾配型枠
24 目地材
24a 応力非伝達目地材
24b 応力伝達目地材
41 レール
42 枕木
51 桁受用ブラケット
61 工事桁用支持アーム
62 補強桁用支持アーム
62a 棒状の凸部
71 工事桁用被支持アーム
72 補強桁用被支持アーム
72a U字形の凹部
81 スラブ用支持アーム
91 スラブ用被支持アーム
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a formwork support structure and a concrete construction method used when a member subjected to vibration, such as a bridge girder in a currently used bridge, is covered with concrete.
[0002]
[Prior art]
As a conventional support structure of a formwork, for example, a support for supporting a formwork for covering a steel member as a main girder of a bridge with concrete, which is supported by the ground or the like is disclosed (for example, Non-Patent Document 1).
[0003]
The support structure for this formwork has become the main girder of the bridge currently in use as the construction work has become more complex and sophisticated in recent years and the need to consider the impact on the surrounding environment has increased. It is also used when covering with concrete.
[0004]
[Non-Patent Document 1]
Civil Engineering Handbook I, 4th edition, Gihodo Publishing, November 20, 1993, p. 1246
[0005]
[Problems to be solved by the invention]
However, in the conventional support structure of the formwork, the main girder to be covered with concrete is subject to traffic vibration etc., whereas the formwork for covering the steel member receiving the vibration with concrete is Because it is supported by a fixed point such as the ground, the difference in vibration between the steel member and the formwork becomes large, and a composite structure in which the steel member and concrete that receive vibration are integrated cannot be obtained reliably and sufficiently. There is a problem.
[0006]
Accordingly, the present inventors have developed a formwork support structure in which a formwork for covering a steel member subject to vibration with concrete is supported only from the steel member subject to the vibration. That is, according to such a support structure of the formwork, the difference in vibration between the steel member and the formwork is reduced, and as a result, a composite structure in which the steel member subjected to vibration and the concrete are integrated is obtained reliably and sufficiently. It is possible to be
[0007]
By the way, as described above, this formwork support structure is suitable for use in construction in which steel members to be covered with concrete are continuously subjected to traffic vibration.
[0008]
Here, as such a construction, for example, a construction intended to be used as a concrete girder in a main bridge by covering a steel girder, which is a vibrating steel member in a temporary bridge of a railway, with concrete, or a permanent bridge on a road There is a construction to use as a concrete girder in a permanent bridge by covering a steel girder, which is a vibrating steel member, with concrete.
[0009]
However, in these constructions, it is usually necessary to construct without interrupting the traffic currently in service, such as trains and automobiles, and rapid construction is required.
Therefore, it is desired to sufficiently satisfy the requirement for rapid construction for the conventional support structure of the formwork.
[0010]
Then, the subject of this invention is providing the support structure of the formwork which can aim at the simplification and speeding-up of field work so that the request | requirement of rapid construction may fully be satisfy | filled.
[0011]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, a formwork support structure according to a first aspect of the present invention is a formwork that supports a formwork for covering a member that vibrates with concrete when a vehicle travels on a currently used bridge. A support structure that includes a support arm that projects from a member to the mold side and supports the mold frame, and a supported arm that projects from the mold to the member side and is supported by the member. The support arm has a convex portion protruding from the support arm or a concave portion opening upward, and the supported arm has a concave portion opening downward or a convex portion protruding from the supported arm. The mold is supported by fitting the concave or convex portion of the supported arm into the convex or concave portion of the supporting arm.
[0012]
According to the support structure for a mold according to the first aspect of the invention, since the mold is supported only by fitting the concave or convex portion of the supported arm into the convex or concave portion of the support arm, the field worker can By simply fitting the concave or convex portion of the support arm into the convex or concave portion of the support arm, the mold can be supported only by a member that vibrates, thereby simplifying and speeding up on-site work. The construction requirements will be fully met.
[0013]
In such a technical means, “the formwork is supported by fitting the concave portion or convex portion of the supported arm into the convex portion or concave portion of the supporting arm” means, for example, that of the concave portion or convex portion of the supported arm. Since the shape corresponds to the shape of the convex portion or the concave portion of the support arm, the concave portion or the convex portion of the single supported arm is locked only by fitting into the convex portion or the concave portion of the single support arm. Not only the mode but also the concave or convex part of the single supported arm is not locked even if it fits into the convex part or concave part of the single supporting arm. A mode in which the concave portions or the convex portions of the pair of supported arms are locked only by fitting into the convex portions or the concave portions of the pair of supporting arms is also included.
[0014]
Here, from the viewpoint of effectively reducing the difference in vibration between the member and the formwork as the effective use of the weight of the concrete until the concrete is hardened, the concave portion of the support arm is inclined outwardly upward. It is preferable that the recessed portion of the supported arm is opened obliquely outward and downward.
[0017]
Furthermore, the formwork support structure according to the second invention is the formwork support structure according to claim 1, wherein the formwork is an embedded formwork and is separated at a predetermined interval in the traveling direction of the vehicle. It is, Ri Ah in the mold consisting of the mold pieces to be supported only by the member at a position which is separated, for the portion not bear the compressive forces of the joint to be formed between the mold pieces to each other It is characterized in that a joint material that does not transmit stress is filled, and a joint material for transmitting the compressive force is filled in a portion that should bear the compressive force.
[0018]
According to the support structure for a formwork according to the second invention, the formwork is an embedded formwork, and is separated at a predetermined interval in the traveling direction of the vehicle , and is supported only by the member at the separated position. In the case of each formwork piece, the field worker only needs to fill joints that match the joints that do not bear the compressive force and joints that should bear the compressive force among the joints between the formwork pieces. In order to prevent the stress from being transmitted between each formwork piece until the concrete hardens, or to transmit the compressive force using the embedded formwork as part of the structure after the concrete is hardened. Special work is not required, and the work on site can be simplified and speeded up by reducing the amount of work, so that the demand for rapid construction is sufficiently satisfied.
[0019]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0020]
Here, a case where a steel girder, which is a vibrating member in a temporary bridge of a railway, is used as a concrete girder in a main bridge by being covered with concrete, but is not limited thereto. The following explanation is valid even when the steel girder, which is a vibrating member in the road's main bridge, is used as a concrete girder in the main bridge by being covered with concrete.
[0021]
FIG. 1 is a cross-sectional view showing the overall structure of a formwork support structure according to an embodiment of the present invention, FIG. 3 is a perspective view showing a partial structure of the formwork support structure, and FIG. It is a perspective view which shows schematic structure.
[0022]
In the present embodiment, as shown in FIG. 1, the formwork support structure includes a steel member 1 composed of a main girder 1a and a sleeper support girder 1b which are vibrating members in a temporary bridge of a railway 4 currently in service. It is used for the purpose of supporting the mold 2 for covering with concrete 3 (see FIG. 3C, the same applies hereinafter).
[0023]
Hereinafter, the main girder 1a, the sleeper receiving girder 1b, the mold 2 and the support structure of the mold will be described in more detail.
[0024]
(1) Main digit 1a
In the temporary bridge, as shown in FIG. 1, vibration energy generated when a railway vehicle (not shown) travels on the rail 41 is mainly transmitted from the rail 41 through the sleeper 42, the sleeper receiving beam 1 b and the beam receiving bracket 51. It is transmitted to the digit 1a.
[0025]
That is, the main beam 1a is configured as a vibrating member.
[0026]
In addition, the reinforcement girder 12, which will be described later, of the main girder 1a is configured to play a role of compensating for the weak point of the concrete 3 which is strong in compressive force but weak in tensile force in the concrete girder. .
[0027]
That is, when the main girder 1a is covered with the concrete 3, the concrete girder in the main bridge which is a composite structure integrated by the adhesive force between the two is constructed.
[0028]
Specifically, as shown in the figure, the main girder 1a is composed of a work girder 11 substantially made of I-shaped steel, and an I-shaped steel in which the width of the lower flange is larger than the width of the upper flange, The reinforcement girder 12 is configured to be bolted to the lower side of the work girder 11.
[0029]
(2) Sleeper girder 1b
In the temporary bridge, as shown in FIG. 1, vibration energy generated when the railway vehicle travels on the rail 41 is transmitted from the rail 41 through the sleeper 42 to the sleeper support beam 1 b.
[0030]
That is, the sleeper girder 1b is configured as a vibrating member.
[0031]
In addition, the sleeper girder 1b is configured to play a role of compensating for the weak point of the concrete 3 which is strong in compressive force but weak in tensile force in the concrete slab.
[0032]
That is, when the sleeper girder 1b is covered with the concrete 3, the concrete slab in the main bridge which is a composite structure integrated by the adhesive force between the two is constructed.
[0033]
(3) Form 2
As shown in FIG. 1, the formwork 2 is used for covering the steel member 1 composed of the main girder 1a and the sleeper girder 1b with concrete 3, and is composed of the concrete girder and concrete slab in the main bridge. It is configured to be arranged so that the position, shape and dimensions of the concrete structure can be ensured accurately.
[0034]
That is, according to such a mold 2, the concrete member 3 is driven to cover the steel member 1 composed of the main beam 1 a and the sleeper receiving beam 1 b with the concrete 3. A concrete structure in a permanent bridge with a toll is to be made.
[0035]
Here, the mold 2 is configured as an embedded mold 2 that is a plate material made of concrete or mortar.
[0036]
That is, according to such a mold 2, after the concrete is hardened, the embedded mold 2 can be handled as a part of a composite structure in which the main girder 1a and the concrete are integrated. The work of disassembling the frame 2 is not required, and the work amount can be simplified and speeded up by reducing the work amount.
[0037]
Specifically, the mold 2 is composed of a girder mold 21, a slab mold 22, and a gradient mold 3, as shown in FIG. The girder mold 21 is composed of an upper mold 21a arranged corresponding to the upper part of the main girder 1a and a lower mold 21b arranged corresponding to the lower part of the main girder 1a.
[0038]
Here, as shown in FIG. 3, the girder form 21 is separated for each part of the main girder 1a that vibrates differently, and each form piece 2a supported by each part, and each form piece It consists of joint material 24 filled with respect to the joint formed between.
[0039]
The joint material 24 includes a stress non-transmission joint material 24a filled in a joint that does not bear compressive force, and a stress transmission joint material 24b filled in a joint that should bear compressive force. ing.
[0040]
The stress non-transmitting joint material 24a is used for the purpose of absorbing displacement caused by different vibrations until the concrete is hardened, and is made of, for example, rubber. On the other hand, the stress transmission joint material 24b is used for the purpose of transmitting a compressive force after the concrete is hardened, and is configured of, for example, an epoxy resin.
[0041]
That is, according to such a girder form 21, since it has the stress non-transmitting joint material 24a, even when the main girder 1a vibrates differently depending on the location until the concrete is hardened. Thus, displacement due to vibration is ensured freely, so that stress is not transmitted between the mold frame pieces 2a. On the other hand, since the stress transmission joint material 24b is provided, the compressive force is transmitted between the mold frame pieces 2a after the concrete is hardened, and the embedded mold frame 2 is connected to the main girder 1a and the concrete. The function as a part of the integrated composite structure can be exhibited.
[0042]
On the other hand, the slab form 22 is configured to be supported by a sleeper girder 1b as shown in FIG.
[0043]
(4) Formwork support structure In the present embodiment, the formwork support structure is a mold for covering a steel member 1 comprising a main girder 1a and a sleeper girder 1b with concrete 3 as shown in FIG. It is configured to play a role of supporting the frame 2.
[0044]
In this formwork supporting structure, the formwork 2 is configured to be supported only by the steel member 1.
[0045]
That is, on the other hand, the upper mold 21a of the girder mold 21 is supported in a fixed state only by the construction girder 11 as shown in FIG. Further, as shown in the figure, the lower mold 21b is supported in a substantially fixed state only by the reinforcing beam 12.
[0046]
On the other hand, the slab form 22 is supported in a fixed state only by the sleeper girder 1b as shown in FIG.
[0047]
That is, the mold 2 is restricted in movement and rotation with respect to the steel member 1, whereby vibration energy transmitted to the steel member 1 during traveling of the railway vehicle is also transmitted to the mold 2. It has become.
[0048]
Specifically, the support structure for this formwork is a construction girder support means for supporting the upper mold form 21a only by the work girder 11 and a support structure for supporting the slab form 22 only by the sleeper girder 1b. The slab support means and the reinforcement girder support means for supporting the lower mold 21b only by the reinforcement girder 12 are provided.
[0049]
As shown in the figure, the work girder support means is provided on the upper flange of the work girder 11, and supports the work girder support arm 61 for supporting the upper mold 21a, and the upper girder 21a from the work girder 11 side. Supported by the work girder 11 and supported by the work girder 11 and a support for the reinforcing girder projecting from the work girder 11 toward the upper mold frame 21a and supporting the upper mould 21a The arm 62 includes a support arm 72 for a reinforcing beam that protrudes from the upper mold 21 a toward the construction beam 11 and is supported by the work beam 11.
[0050]
Further, the slab support means is provided on the lower flange of the sleeper support 1b, and supports the slab support arm 81 for supporting the slab form 22, and extends from the slab form 22 to the sleeper support 1b. And a slab supported arm 91 for being supported by the sleeper support 1b.
[0051]
Further, the reinforcing girder support means projects from the reinforcing girder 12 to the lower mold frame 21b side, supports a reinforcing girder support arm 62 for supporting the lower mould 21b, and extends from the lower mold frame 21b to the reinforcing girder 12 side. It consists of a reinforcing girder supported arm 72 that is extended and supported by the reinforcing girder 12.
[0052]
Here, as shown in FIGS. 1 and 2, on the one hand, the reinforcing girder support arm 62 has a rod-like convex part 62a protruding in the length direction of the main girder 1a, and on the other hand, the reinforcing girder The supported arm 72 has a U-shaped recess 72a that opens downward.
[0053]
The support structure of the lower mold 21b is supported by fitting the U-shaped concave portion 72a of the reinforcing girder supported arm 72 to the rod-shaped convex portion 62a of the supporting arm, as shown in these drawings. It is.
[0054]
In other words, according to such a support structure for the lower mold 21b, the field worker simply fits the U-shaped recess 72a of the supported arm into the rod-shaped protrusion 62a of the support arm, and attaches the lower mold 21b to the reinforcing girder. 12 can only be supported.
[0055]
Therefore, according to such a formwork support structure, it is possible to simplify and speed up on-site work, thereby sufficiently satisfying the requirement for rapid construction. ing.
[0056]
Even if the U-shaped recess 72a of the single support arm 72 for the reinforcing girder fits into the rod-shaped convex portion 62a of the single support arm 62 for the reinforcing girder, the supported arm 72 for the reinforcing girder is used for the reinforcing girder. The U-shaped concave portion 72a and the bar-shaped convex portion 62a are arranged as a set in the vertical direction, but are not locked to the support arm 62. The reinforced girder supported arm 72 is locked to the reinforcing girder support arm 62 simply by fitting the letter-shaped concave part 72 a into the rod-shaped convex part 62 a of the pair of reinforcing girder support arms 62.
[0057]
By the way, as shown in FIG. 2, the U-shaped concave portion 72a of the reinforcing girder supported arm 72 in the support structure of the lower mold 21b is opened obliquely outward and downward.
[0058]
In other words, in the support structure of the lower mold 21b, as shown in the figure, the U-shaped recess 72a of the reinforcing girder supported arm 72 is opened to the lower side, and the lower mold 21b is used as the reinforcing girder 12b. The U-shaped concave portion 72a having such a shape is configured such that the movement in the upward direction is free and the movement and rotation in the horizontal direction and the downward direction are restricted. Since the weight of the concrete is effectively applied to the lower mold 21b until the concrete is hardened, the movement and rotation of the lower mold 21b with respect to the reinforcing girder 12 are substantially restricted. As a result, The vibration difference between the reinforcing beam 12 and the lower mold 21b can be further reduced.
[0059]
Here, as shown in FIG. 1, the support structure of the lower mold 21b is such that the side end of the lower flange of the main girder 1a projects outward from the side end of the upper flange. The lower end of 21 is joined to the upper surface of the overhanging lower flange.
[0060]
That is, according to such a support structure of the lower mold 21b, the lower flange of the main girder 1a can function as the mold 2 to be arranged at the bottom until the concrete is hardened. It has become.
[0061]
Therefore, according to such a support structure of the formwork, it is possible to simplify and speed up the field work through the reduction of the amount of the formwork 2, thereby satisfying the demand for rapid construction. It is possible to fully satisfy.
[0062]
Further, as shown in FIG. 3, the support structure of the mold is composed of each mold piece 2a in which the girder mold 21 is supported in a substantially fixed state only by each part of the main girder 1a that vibrates differently. It is structured as a thing.
[0063]
And as shown in the same figure, the stress non-transmitting joint material 24a for absorbing the displacement caused by the different vibrations is applied to the joint formed between the mold pieces without bearing the compressive force. Filled portions are filled with a stress transmission joint material 24b for transmitting the compressive force to the portion that should bear the compressive force.
[0064]
That is, according to such a formwork support structure, the formwork 2 is the embedded formwork 2 and is separated for each part of the member that vibrates differently, and is supported only by the respective parts. In the case of the formwork piece 2a, the field worker simply fills joints 24 that do not bear compressive force and joints that should bear the compressive force among joints between the formwork pieces. Well, until the concrete hardens, special work to absorb the displacement generated between the mold pieces due to different vibrations, or after the concrete hardens, the embedded formwork 2 is used as a part of the structure. No special work is required to transmit the compressive force.
[0065]
Therefore, according to such a support structure of the formwork, it is possible to simplify and speed up on-site work through reducing the amount of work, thereby sufficiently satisfying the demand for rapid construction. It is possible to satisfy.
[0066]
【The invention's effect】
According to the support structure for a formwork according to the present invention, the on-site work can be simplified and speeded up, and the requirement for rapid construction is sufficiently satisfied.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing the overall structure of a mold frame support structure according to an embodiment of the present invention.
FIG. 2 is a perspective view showing a partial configuration of a support structure for a mold according to an embodiment of the present invention.
FIG. 3 is a perspective view showing a schematic configuration of a support structure for a mold according to an embodiment of the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Steel member 1a Main girder 1b Sleeper girder 2 Formwork 2a Each formwork piece 3 Concrete 4 Railway 11 Construction girder 12 Reinforcement girder 21 Girder form 21a Upper form 21b Lower form 22 Slab form 23 Gradient form 24 Joint material 24a Stress non-transmission joint material 24b Stress transmission joint material 41 Rail 42 Sleeper 51 Girder receiving bracket 61 Supporting girder support arm 62 Reinforcement girder support arm 62a Bar-shaped convex portion 71 Construction girder supported arm 72 Reinforcing girder Supported arm 72a U-shaped recess 81 Support arm for slab 91 Supported arm for slab

Claims (2)

現に供用されている橋梁において車両が走行することにより振動する部材をコンクリートで被覆するための型枠を支持する型枠の支持構造であって、
前記部材から前記型枠側に張り出され、該型枠を支持するための支持アームと、
前記型枠から前記部材側に張り出され、該部材によって支持されるための被支持アームとを備え、
前記支持アームが、この支持アームから突出する凸部又は上側に開口する凹部を有しており、
前記被支持アームが、下側に開口する凹部又は該被支持アームから突出する凸部を有しており、
前記型枠が、前記被支持アームの凹部又は凸部が前記支持アームの凸部又は凹部に嵌ることによって支持されていることを特徴とする型枠の支持構造。
A formwork support structure for supporting a formwork for covering a member that vibrates when a vehicle travels on a bridge currently in service with concrete,
A support arm that protrudes from the member to the mold side and supports the mold form;
A projecting arm extending from the mold to the member side, and a supported arm for being supported by the member;
The support arm has a convex part protruding from the support arm or a concave part opening upward,
The supported arm has a concave portion opening downward or a convex portion projecting from the supported arm;
A support structure for a mold frame, wherein the mold frame is supported by fitting a concave portion or a convex portion of the supported arm into a convex portion or a concave portion of the support arm.
前記型枠が、埋め込み型枠であり、かつ、前記車両の走行方向に所定間隔で切り離され、切り離された位置で前記部材によってのみ支持される各型枠片からなる型枠で
前記各型枠片どうしの間に形成される目地のうち圧縮力を負担しない部分に対しては応力を伝達しない目地材が充填されており、圧縮力を負担すべき部分に対しては圧縮力を伝達するための目地材が充填されていることを特徴とする請求項1に記載の型枠の支持構造。
The mold is a buried type frame, and said severed at predetermined intervals in the traveling direction of the vehicle, Ri Ah in the mold consisting of the mold pieces to be supported only by the member at a position disconnected,
Of the joints formed between the mold pieces, joints that do not transmit stress are filled in the joints that do not bear compressive force, and compressive forces are applied to the parts that should bear the compressive force. 2. The formwork support structure according to claim 1, wherein a joint material for transmitting the filler is filled.
JP2002339107A 2002-11-22 2002-11-22 Formwork support structure Expired - Fee Related JP3701936B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002339107A JP3701936B2 (en) 2002-11-22 2002-11-22 Formwork support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002339107A JP3701936B2 (en) 2002-11-22 2002-11-22 Formwork support structure

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2005168168A Division JP3814286B2 (en) 2005-06-08 2005-06-08 Formwork support structure

Publications (2)

Publication Number Publication Date
JP2004169500A JP2004169500A (en) 2004-06-17
JP3701936B2 true JP3701936B2 (en) 2005-10-05

Family

ID=32702135

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002339107A Expired - Fee Related JP3701936B2 (en) 2002-11-22 2002-11-22 Formwork support structure

Country Status (1)

Country Link
JP (1) JP3701936B2 (en)

Also Published As

Publication number Publication date
JP2004169500A (en) 2004-06-17

Similar Documents

Publication Publication Date Title
JP5266291B2 (en) Construction method of bridge deck and joint structure of precast deck
JP2007032057A (en) Expansion device for bridge joint and joint method for bridge
KR101762148B1 (en) Bridge using precast psc deck type girder and construction method therefor
JP6074378B2 (en) Expansion device replacement method and temporary lining plate structure
JP2008303538A (en) Precast floor slab joint structure
JP3818020B2 (en) Cross-section precast segment method
JP2010236260A (en) Construction method of track girder, box girder and box girder for straddle type monorail
KR20040086653A (en) bridge and construction process with integral pier-type mixed abutment
JP3814286B2 (en) Formwork support structure
JP3701936B2 (en) Formwork support structure
KR101038714B1 (en) Composite Girder Bridge with Tide Arch Shape Using Precast Slab and Its Construction Method
JP4162291B2 (en) Railway work girder cradle and rail work girder cradle construction method
JP2004324245A (en) Floating ladder sleeper, floating ladder track and laying method thereof
JP6670631B2 (en) Support structure for columnar structures
JPH0892923A (en) Guard fence
KR101043710B1 (en) How to form an angle portion on the Haro bridge and the Haro bridge
CN217298652U (en) Prestressed concrete combined box girder reinforcing structure
JP5041481B2 (en) Updating method and structure of existing bearing device
JP3759101B2 (en) Formwork support structure and concrete construction method
JP3788774B2 (en) Railroad track structure and railroad track construction method
KR101309005B1 (en) Rahmen bridge and constructing method thereof
JP2002081021A (en) Soundproof wall, and execution method thereof
KR101996601B1 (en) Mono-block for improving metrology and method of the same
JP2018172908A (en) Precast slab system and bridge structure
KR101145958B1 (en) Precast beam and construction method of prestressed rigid-frame bridge using the same

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050324

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050412

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050608

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050705

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050714

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090722

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090722

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100722

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100722

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110722

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120722

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130722

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees