JP3704658B2 - Construction equipment for concrete burying boxes - Google Patents
Construction equipment for concrete burying boxes Download PDFInfo
- Publication number
- JP3704658B2 JP3704658B2 JP2000374013A JP2000374013A JP3704658B2 JP 3704658 B2 JP3704658 B2 JP 3704658B2 JP 2000374013 A JP2000374013 A JP 2000374013A JP 2000374013 A JP2000374013 A JP 2000374013A JP 3704658 B2 JP3704658 B2 JP 3704658B2
- Authority
- JP
- Japan
- Prior art keywords
- box
- bonded
- construction tool
- concrete
- adhesive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、コンクリートからなる側壁にボックスを設置する工事に使用するボックスの架設具であって、詳しくは、コンクリートの側壁を形成する際の型枠にボックスを密着した状態で支持するための架設具に関する。
【0002】
【従来の技術】
特開昭60−152747号において、図10、11に示すように、手による折り曲げが可能で、かつ曲げられた状態で背面側から型枠に押圧できる突張り強度を有する支持棒を取付けたボックスを作成し、そして、このボックスの支持棒をコンクリート壁の支骨をなす支骨鉄筋に固定して、型枠をボックスに押圧して密着状態とする。その状態のままコンクリートを打設して、コンクリート壁内にボックスを埋設するというものが開示されている。
【0003】
この方法によれば、支持棒の曲げ具合を調整することによって、型枠の間隔に合わせてボックスを設置することができるという効果がある。
【0004】
かかる従来の架設具は、架設具に設けられた突片をボックス背面に予め形成された挿通孔に挿通し、これを折り曲げて固定している。しかし、このような方法では、ボックスと架設具の双方が取り付けに対応した構造を有していなければならないという欠点がある。例えば、前記挿通孔が設けられていないボックスには、突片を有する架設具を取り付けることはできないし、たとえ、挿通孔が施されていても、大きさ、位置等の構造が適応していなければ、取り付けることはできないこととなる。
【0005】
さらに、ボックスに結露防止のために断熱カバーを被せて使用する場合には、前記挿通孔が該カバーに覆われて使用することができないといった欠点をも有している。勿論、挿通孔に対応する孔を断熱カバーにも形成することは可能であるが、この場合には、断熱効果を著しく損なうことになり、完全に結露発生を防止することができないこととなる。
【0006】
【発明が解決しようとする課題】
そこで、本発明は以上のような問題を解決するためになされたものであり、解決すべき課題は、ボックスの取付構造の有無、形状に係わらず、支持棒を容易かつ確実に取り付けることができ、汎用性に優れる架設具を提供するとともに、断熱カバーが被せられているボックスであっても、断熱効果を妨げることなく、支持棒を取り付けることができる架設具を提供することにある。
【0007】
【課題を解決する手段】
以上のような問題点を解決するために本発明の請求項1に記載した発明が採った手段は、コンクリート壁面50に埋設されるボックス10を支骨鉄筋80に支持するための架設具100において、前記ボックス10を支持可能な突張り強度を有し、かつ手で折り曲げ自在な線状の支持棒30を保持するための保持部21と、ボックス10の外面に接着される接着面22とを有し、辺や角に配置されて該辺や該角を構成する側面及び裏面に2面以上にわたって接着される取付部材20と、該接着面22に設けられた接着層40と、を備えてなることを特徴とするコンクリート埋設用ボックスの架設具100、とするものである。
【0008】
これは、支持棒30をボックス10に取付けるために、まず、支持棒30を取り付けるための保持部21を取付部材20に設け、この取付部材20に接着層40を設けて、ボックス10に接着により貼りつけるという手段を採用している。このように接着という手段を採用することにより、ボックス10と取付部材20の互いの取付構造を問わずにボックス10に支持棒30を取り付けることができる。
さらに、架設具100をボックス10に接着する場合に、ボックス10の2面以上にわたって接着できるように接着面22を形成してある。これは、ボックス10を型枠70内に架設した場合に、ボックス10を2方向以上から支持できるようにして脱落の防止を図ったものである。2面以上にわたって支持するという手段を採用することにより、突片と比較すれば固定力が劣る接着という手段を採用してもズレたり、剥がれたりすることなく固定することができる。また、接着部分をボックス10の辺や角に設けることで、接着面22の面積を減らすことができる。従って、配線等の引き出し用の孔(ノック)を塞ぐことなく取り付けることができる。このようにして支持棒30を取り付けたボックス10は、従来と同様に、型枠70の間隔にあわせて支持棒30の曲げ具合を調整できるので、常にボックス10を型枠70に押圧した状態で設置することができる。
【0009】
さらに、請求項2に記載した発明が採った手段は、コンクリート壁面50に埋設されるボックス10を支骨鉄筋80に支持するために2以上からなる架設具100において、それぞれの架設具100は、ボックス10を支持可能な突張り強度を有し、かつ手で折り曲げ自在な線状の支持棒30を保持するための保持部21と、ボックス10の外面に接着される接着面22とを有し、辺や角に配置されて該辺や該角を構成する側面及び裏面に2面以上にわたって接着される取付部材20と、該接着面22に設けられた接着層40と、を備えてなり、
ボックス10の異なる部位に取り付けられてなることを特徴とするコンクリート埋設用ボックスの架設具100、とするものである。
これは、2以上の架設具をボックス10の異なる位置に取り付けて、ボックス10にかかる種々の方向からかかる力に対抗させたものである。例えば、図1に示すように、特にボックス10の対辺に取り付ければ、上下方向へは、互いの架設具によって抑えられているので、移動するのを防止することができる。
【0010】
さらに、本発明の請求項3に記載した発明が採った手段は、外面を覆う結露防止カバー60を有し、コンクリート壁面50に埋設されるボックス10を支持するための架設具100において、ボックス10を支持可能な突張り強度を有し、かつ手で折り曲げ自在な線状の支持棒30を保持するための保持部21と、結露防止カバー60の外面に接着させる接着面を有し、辺や角に配置されて該辺や該角を構成する側面又は裏面に2面以上にわたって接着される取付部材20と、前記接着面22に設けられた接着層40と、を備えてなることを特徴とするコンクリート埋設用ボックスの架設具100、とするものである。
これは、結露防止カバー60が被せられたボックス10に取り付ける架設具100にかかるものである。この請求項2記載の発明によれば、結露防止カバー60に孔を穿ったりすることなく、直接、貼り付けるだけで取り付けることができる。さらに、結露防止カバー60は、発泡スチロール等が用いられることが多いが、この発泡スチロールは、その作製方法から平面部が脆く、角部が比較的強く作製されることは周知である。そこで、ボックス10の1面に貼りつけるのみでは、発泡スチロール自体が破損するおそれがあるが、2面以上にわたった角部に設けることによって、その破損を防止することができる。また、2面以上にわたって接着することで、2方向から接着面22を支持するので、剥がれるのを防止することができる。これは、接着という手段は、剥がす方向には弱いが、ズレには比較的強いという特性を有している。そこで、2面以上にわたって接着すれば、取付部材20が剥がす場合、いずれかの面がズレる方向になるので、互いに剥がれるのを防止することになる。
【0011】
さらに、本発明の請求項4に記載した発明が採った手段は、外面を覆う結露防止カバー60を有し、コンクリート壁面50に埋設されるボックス10を支持するため2以上からなる架設具100において、ボックス10を支持可能な突張り強度を有し、かつ手で折り曲げ自在な線状の支持棒30を保持するための保持部21と、結露防止カバー60の外面に接着させる接着面を有し、辺や角に配置されて該辺や該角を構成する側面又は裏面に2面以上にわたって接着される取付部材20と、前記接着面22に設けられた接着層40と、を備えてなり、結露防止カバー60の異なる部位に取り付けられてなることを特徴とするコンクリート埋設用ボックスの架設具100、とするものである。
これは、請求項2に記載した発明を結露防止カバー60をついたボックス10に応用したものである。
【0012】
さらに、本発明の請求項5に記載した発明が採った手段は、支持棒30が保持部21に固定されてなることを特徴とする請求項1から4のいずれかに記載のコンクリート埋設用ボックスの架設具100、とするものである。これは、支持棒30を取付部材20に固定しておくことで、迅速かつ容易に支持棒30をボックス10に設けることができるようにするとともに、確実に固定することができるようにしたものである。
【0013】
さらに、本発明の請求項6に記載した発明が採った手段は、保持部21は、支持棒30が挿通自在な挿通孔23からなることを特徴とする請求項1から5のいずれかに記載のコンクリート埋設用ボックスの架設具100、とするものである。ボックス10の使用される場所や取り付ける支骨鉄筋80の配置等に応じて、支持棒30の太さや長さ等を調整できるようにしたものである。
【0014】
さらに、請求項7に記載した発明が採った手段は、取付部材20は、配線や配管を引き出すためボックス10に形成される孔に対応する部位に、切り欠きがボックスの側面に2つと裏面に2つ設けられてなることを特徴とする請求項1から6のいずれかに記載のコンクリート埋設用ボックスの架設具、とするものである。
これは、配線や配管を引き出す空間を確保したものである。本発明の取付部材20が、角に取り付けられているので、ボックス側面や背面に引き出し用の孔が形成されても、邪魔することなく切り欠きを設けるだけで可能となる。
【0015】
さらに、本発明の請求項8に記載した発明が採った手段は、接着層40は、加熱により溶融した後、硬化することにより接着可能なものからなることを特徴とする請求項1から6のいずれかに記載のコンクリート埋設用ボックスの架設具100、とするものである。これは、接着層40の材料としてホットメルトタイプのものを用いたものである。例えば、EVA(エチレンビニルアルコール)等を用いたものが考えられる。加熱により溶融させるだけで接着可能であるので、その場で接着層40を暖めるだけで接着することができ、非常に便利である。
【0016】
さらに、本発明の請求項9に記載した発明が採った手段は、外面の少なくとも一部を覆う結露防止カバー60を有し、コンクリート壁面50に埋設されるボックス10と、手で折り曲げ自在、かつボックス10を支持可能な突っ張り強度を有する線状の支持棒30と、該支持棒30を保持するための保持部21と結露防止カバー60の外面に接着させる接着面を有し、辺や角に配置されて該辺や該角を構成する側面又は裏面に2面以上にわたって接着される取付部材20とを備え、前記結露防止カバー60と接着面22とは接着されてなることを特徴とする架設具100を備えたボックス10、とするものである。これは、請求項2記載の架設具100を取り付けたボックス10に係るものである。
【0000】
さらに、本発明の請求項10に記載した発明が採った手段は、取付部材20の接着面は、ボックス10の対向する側面にそれぞれが接着され、かつ裏面にそれぞれ接着されてなることを特徴とする請求項9記載の架設具100を備えたボックス10とするものである。
【0017】
【発明の実施の形態】
以下に本発明の実施例について、図に沿って説明する。
(実施例1)
本発明に係る架設具100及び本架設具100によってコンクリート壁面50に埋設されるボックス10の実施例1が図1に示されている。本発明の架設具100は、線状の部材からなる支持棒30を保持する取付部材20と、該取付部材20に設けられた接着層40と、を備えている。ボックス10は、開口された箱状に形成されていて、この開口部11から種々の部品、例えば、電気配線用のユニット等を取り付けられる。このボックス10は、最終的に開口部11をコンクリート壁面50の表面に露出させて埋設されることになる(図6)。そのため、ボックス10からコンクリート壁面50内に配線等を取り出せるように複数の孔(ノック)を形成できるようにされている。具体的には、図2に示すように、ノックの周囲に切り欠き部12が形成され、この切り欠き部12に沿って切り取ることで容易にノックを設けることができるようにされている。
【0018】
支持棒30は、コンクリート壁面50の支骨をなす支骨鉄筋80間に架設してボックス10を支持するためのものである。ボックス10は、後述するように、コンクリート壁面50を作製する際の仕切となる型枠70に押しつけてコンクリートを打設することにより、ボックス10の開口部11をコンクリート壁面50に露出させるものである。そのため、支持棒30は、手で折り曲げて方向を自在に設定でき、かつ、曲げられた状態でボックス10を型枠70に押圧できる程度の突っ張り強度を有した線材で作成される必要がある。一方、このような条件を満たしているものであれば、断面が円形のもの、四角いもの、或いは扁平なもの等種々の断面のものを用いることができる。また、太さも特に限定するものではない。支骨をなす支骨鉄筋80への架設のしやすさ、曲げ方向の自在性という観点から断面円形のものが好ましく、折り曲げ強度や突っ張り強度の関係から、8番線前後の軟鋼線を用いるのが好ましい。実施例1においては、支持棒30は、手で自由に折り曲げることができ、かつ十分な突っ張り強度を有する孔径φ4のなまし鉄線で作製されている。
【0019】
取付部材20は、支持棒30を保持するとともに、支持棒30をボックス10に貼りつけるための仲介としての役目を果たすものである。実施例1の取付部材20は、断面がL字形状に形成され、2面の接着面22が形成されている。この接着面22は、ボックス10の裏面と側面とに接着される。また、図3に示すように接着面22は、ボックス10に貼りつけた場合に、ノックを塞がないようにその部分を逃がすように切り欠いてある。このように2面を接着することで、裏面と側面との2方向からボックス10を支持することができる。
【0020】
また、この取付部材20には、先述の支持棒30を取り付けることができるように保持部21が設けられている。保持部21は、長手方向に挿通孔23が設けられていて、この挿通孔23に支持棒30を挿通して固定することができる。この際に、支持棒30を挿通孔23に固定しておいてもよいし、単に挿通しておくだけでもよい。
【0021】
さらに、接着面22には、接着層40が設けられている。この接着層40は、例えば両面テープやホットメルト等が用いられるが、ボックス10や取付部材20の材質によって種々のものを適宜選択して用いることができる。実施例1においては、加熱により溶融した後、硬化することにより接着可能な約1mm程度の厚さのホットメルトにより接着層40が形成されている。ホットメルトは、その場で接着層40を暖めるだけで接着することができ、また、早乾性があるので、非常に便利である。
【0022】
次に、架設具100を取り付けたボックス10をコンクリート壁面50内に埋設する方法について説明する。まず、図4に示すように、ボックス10に取り付けられた線状の支持棒30を手で折り曲げてコンクリート壁面50内の支骨を形成するために巡らされた支骨鉄筋80に針金等で結束して架設する。このときに、型枠70にボックス10を押圧する位置にくるように、手で支持棒30を曲げて調節する。こうしてボックス10は、所定の埋設位置に設置される。
【0023】
そして、図5に示すように、ボックス10の開口部11に型枠70を押圧させて設置する。このとき、支持棒30の突っ張り強度によって矢印方向Aに取付部材20を押圧し、ボックス10は型枠70に密接した状態に保たれている。このように、水平方向に関しては、ボックス10は型枠70から矢印Bの方向に、取付部材20は支持棒30から矢印Aの方向に押圧されており、上下方向は、ボックス10の上下に取付られた架設具100によって、矢印C、Dの方向に押圧されて均衡を保っている。従って、接着層40はそれほどの接着力がなくても確実に固定することができる。
【0024】
次いで、図6に示すように、コンクリートを型枠70内に打設してコンクリート壁面50を形成する。こうしてボックス10はコンクリート壁面50内に開口部11を露出しつつ埋設されることになる。
【0025】
尚、上記埋設方法は、コンクリート壁面50内にボックス10を埋設する方法の一例であり、先に型枠70を立てかけた状態でこれにボックス10を密着させて埋設する方法においても、本発明にかかる架設具100の使用は可能である。この場合には、ボックス10を型枠70に接着させ、型枠70にボックス10の開口部11が密接するように支持棒30を手で折り曲げて支骨鉄筋80に架設すればよい。
【0026】
(実施例2)
次に実施例2について説明する。図7には、実施例2に係る架設具100が示されている。この実施例2における架設具100は、ボックス10を3方向から支持できるように、3方向の接着面22が3面設けられている。その他支持棒30や接着層40等は、実施例1と同様である。そして、3面の接着面22は、ボックス10の角に取り付けられ、3方向からボックス10を支持することになる。このときに架設具100をボックス10に取り付ける方法としては、図7に示したように、それぞれ別個に支持棒30を挿通しておいて、別個独立に支骨鉄筋80に取り付けてもよいし、図8に示したように、2つの架設具100を介するように支持棒30を保持させて取り付けてもよい。このようにして取り付けられたボックス10は、上下左右前後の全ての方向を支持することができるため、非常に堅固な固定を行うことができる。
【0027】
(実施例3)
図9に実施例3に係る架設具100が図示されている。これはボックス10に結露防止カバー60を被せたものに架設具100を取り付けたものである。架設具100は、実施例1のものと同様である。取付方法は、実施例1と同様の方法により、結露防止カバー60の外面から接着してある。
【0028】
【発明の効果】
以上のように、本発明による請求項1記載の架設具によれば、ボックスの取付構造を問うことなく、単に貼りつけるだけで、支持棒を架設具に取り付けることができる。従って、架設具を複数種類用意する必要がなく、本発明の架設具のみであらゆるボックスに対応することができる。また、2方向以上からボックスを支持することができるため、より確実に固定することができる。
そして、取り付けられたボックスは、線状の支持棒の曲げ具合を調整して、型枠の間隔に合わせてボックスを容易に設置することができるとともに、ボックスの開口を密着させる型枠に対して、ボックスを常に押圧した状態で設置することができる。従って、ボックスの位置決め及び型枠への押圧が簡単、確実に行え、作業の効率化を図ることができる。
【0029】
また、請求項2記載の架設具によれば、結露防止カバーによって被覆されたボックスであっても、結露防止カバーに孔を開けたりすることなく、直接貼り付けるだけで取り付けることができる。さらに、2面以上によって接着しているので、2方向以上からの支持により剥がれやズレを防止できる。
【0030】
また、請求項3記載の発明によれば、より確実に支持棒をボックスに固定することができるし、一方、請求項4記載の発明によれば、支持棒のみを自由に取り付け及び取り外しができるので、設置状態に応じて、任意の支持棒の太さ、長さや突っ張り強度を有するものを使用することができる。
【0031】
また、請求項5記載の架設具によれば、接着層にホットメルト型のものを使用することにより、現場で加熱するだけで容易に作業を行うことができるようになる。
【0032】
また、請求項6記載の架設具によれば、カバーに孔を形成することなく架設具が固定されているので、断熱効果損なうことなく、結露発生することがないボックスを提供することができる。
【0033】
【図面の簡単な説明】
【図1】 実施例1に係る架設具及びボックスを示す斜視図である。
【図2】 実施例1に係るボックスの切り欠き部の状態を示す断面図である。
【図3】 実施例1に係る架設具がボックスに取り付けられた状態を示す斜視図である。
【図4】 実施例1に係る架設具及びボックスを支骨鉄筋に取り付けた状態を示す斜視図である。
【図5】 実施例1に係る架設具が取り付けられたボックスを支骨鉄筋に取付けた後、型枠を設けた状態を示す側面図である。
【図6】 実施例1に係る架設具が取り付けられたボックスを型枠内に取り付けた後、コンクリートを打設した状態を示す側面図である
【図7】 実施例2に係る架設具及びボックスを示す斜視図である。
【図8】 実施例2に係る架設具及びボックスの別の取付状態を示す斜視図である。
【図9】 実施例3に係る架設具及びボックスの別の取付状態を示す斜視図である。
【図10】 従来の架設具及びボックスを示す斜視図である。
【図11】 従来の架設具をボックスに取り付けた状態を示す斜視図である。
【符号の説明】
10 ボックス
20 取付部材
30 支持棒
40 接着層
50 コンクリート壁面
60 結露防止カバー
70 型枠
100 架設具[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a box erection tool used in construction for installing a box on a side wall made of concrete, and more specifically, erection for supporting the box in close contact with a formwork when forming the side wall of concrete. Concerning ingredients.
[0002]
[Prior art]
In Japanese Patent Application Laid-Open No. 60-152747, as shown in FIGS. 10 and 11, a box is attached with a support bar that can be bent by hand and has a tensile strength that can be pressed against the formwork from the back side in the bent state. Then, the support rod of this box is fixed to the rebar that forms the support of the concrete wall, and the formwork is pressed against the box to bring it into close contact. It is disclosed that concrete is cast in that state and a box is embedded in the concrete wall.
[0003]
According to this method, there is an effect that the box can be installed according to the interval of the formwork by adjusting the bending state of the support bar.
[0004]
In such a conventional installation tool, a projecting piece provided on the installation tool is inserted into an insertion hole formed in advance on the back surface of the box, and this is bent and fixed. However, such a method has a drawback that both the box and the installation tool must have a structure corresponding to the attachment. For example, a mounting tool having a projecting piece cannot be attached to a box not provided with the insertion hole, and the structure of size, position, etc. must be adapted even if the insertion hole is provided. If it is, it cannot be attached.
[0005]
Further, when the box is covered with a heat insulating cover to prevent condensation, the insertion hole is covered with the cover and cannot be used. Of course, it is possible to form a hole corresponding to the insertion hole also in the heat insulating cover, but in this case, the heat insulating effect is remarkably impaired, and the occurrence of condensation cannot be prevented completely.
[0006]
[Problems to be solved by the invention]
Therefore, the present invention has been made to solve the above problems, and the problem to be solved is that the support rod can be easily and reliably attached regardless of the presence or absence of the box mounting structure and the shape. An object of the present invention is to provide a construction tool that can be attached to a support rod without hindering the heat insulation effect even in a box covered with a heat insulation cover, while providing a construction tool with excellent versatility.
[0007]
[Means for solving the problems]
In order to solve the above-mentioned problems, the means taken by the invention described in claim 1 of the present invention is the
[0008]
In order to attach the
Furthermore, when the
[0009]
Furthermore, the means taken by the invention as claimed in
The
In this case, two or more installation tools are attached to different positions of the
[0010]
Further, the means taken by the invention described in
This is applied to the
[0011]
Furthermore, the means taken by the invention described in claim 4 of the present invention has a dew condensation prevention cover 60 covering the outer surface, and in the
This is an application of the invention described in
[0012]
Further, according to the invention described in claim 5 of the present invention, the concrete burying box according to any one of claims 1 to 4, wherein the
[0013]
Furthermore, the means taken by the invention described in
[0014]
Further, the means taken by the invention described in claim 7 is that the mounting
This secures a space for drawing out wiring and piping. Since the
[0015]
Further, the means taken by the invention described in
[0016]
Furthermore, the means taken by the invention described in claim 9 of the present invention includes a dew condensation prevention cover 60 that covers at least a part of the outer surface, the
0000
Furthermore, the means taken by the invention described in
[0017]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
(Example 1)
FIG. 1 shows a first embodiment of a
[0018]
The
[0019]
The mounting
[0020]
Further, the
[0021]
Furthermore, an
[0022]
Next, a method for embedding the
[0023]
Then, as shown in FIG. 5, the
[0024]
Next, as shown in FIG. 6, concrete is cast into the
[0025]
The above burying method is an example of a method of burying the
[0026]
(Example 2)
Next, Example 2 will be described. FIG. 7 shows a
[0027]
(Example 3)
FIG. 9 shows a
[0028]
【The invention's effect】
As described above, according to the installation tool of the first aspect of the present invention, the support bar can be attached to the installation tool simply by attaching without questioning the attachment structure of the box. Therefore, it is not necessary to prepare a plurality of types of installation tools, and any box can be handled using only the installation tools of the present invention. Moreover, since a box can be supported from two or more directions, it can fix more reliably.
And the attached box can adjust the bending condition of the linear support rod, and can easily install the box according to the interval of the formwork, and also against the formwork that closely contacts the opening of the box It can be installed in a state where the box is always pressed. Therefore, the positioning of the box and the pressing to the mold can be performed easily and reliably, and the work efficiency can be improved.
[0029]
Moreover, according to the construction tool of
[0030]
According to the invention described in
[0031]
Further, according to the construction tool of the fifth aspect, by using a hot-melt type adhesive layer, the work can be easily performed only by heating on the spot.
[0032]
According to the construction tool of
[0033]
[Brief description of the drawings]
FIG. 1 is a perspective view showing a construction tool and a box according to Embodiment 1. FIG.
FIG. 2 is a cross-sectional view illustrating a state of a notch portion of the box according to the first embodiment.
FIG. 3 is a perspective view showing a state in which the construction tool according to the first embodiment is attached to the box.
FIG. 4 is a perspective view showing a state in which the installation tool and the box according to the first embodiment are attached to the rebar.
FIG. 5 is a side view showing a state in which a formwork is provided after a box to which a construction tool according to Example 1 is attached is attached to a rebar.
FIG. 6 is a side view showing a state in which concrete is placed after the box to which the construction tool according to the first embodiment is attached is installed in the formwork. FIG. 7 is the construction tool and the box according to the second embodiment. FIG.
FIG. 8 is a perspective view showing another attachment state of the installation tool and the box according to the second embodiment.
FIG. 9 is a perspective view showing another attachment state of the installation tool and the box according to the third embodiment.
FIG. 10 is a perspective view showing a conventional installation tool and box.
FIG. 11 is a perspective view showing a state in which a conventional installation tool is attached to a box.
[Explanation of symbols]
10
Claims (10)
前記ボックスを支持可能な突張り強度を有し、かつ手で折り曲げ自在な線状の支持棒を保持するための保持部と、ボックスの外面に接着される接着面とを有し、辺や角に配置されて該辺や該角を構成する側面及び裏面に2面以上にわたって接着される取付部材と、該接着面に設けられた接着層と、
を備えてなることを特徴とするコンクリート埋設用ボックスの架設具。In the installation tool for supporting the box embedded in the concrete wall to the rebar,
A holding portion for holding a linear support bar that has a tensile strength capable of supporting the box and is foldable by hand, and an adhesive surface that is bonded to the outer surface of the box. An attachment member that is disposed on the side surface and the back surface of the side and the corner and is bonded to two or more surfaces, and an adhesive layer provided on the adhesive surface;
A construction tool for a concrete burying box characterized by comprising:
それぞれの架設具は、ボックスを支持可能な突張り強度を有し、かつ手で折り曲げ自在な線状の支持棒を保持するための保持部と、ボックスの外面に接着される接着面とを有し、辺や角に配置されて該辺や該角を構成する側面及び裏面に2面以上にわたって接着される取付部材と、
該接着面に設けられた接着層と、を備えてなり、
ボックスの異なる部位に取り付けられてなることを特徴とするコンクリート埋設用ボックスの架設具。In order to support the box embedded in the concrete wall to the rebar, in the construction tool consisting of two or more, each construction tool has a tensile strength that can support the box and can be bent by hand. It has a holding part for holding the bar and an adhesive surface that is bonded to the outer surface of the box, and is disposed on the side or corner, and is bonded to two or more surfaces on the side and the rear surface that constitute the side or the corner. A mounting member ;
An adhesive layer provided on the adhesive surface,
A construction tool for a concrete burying box, which is attached to a different part of the box.
ボックスを支持可能な突張り強度を有し、かつ手で折り曲げ自在な線状の支持棒を保持するための保持部と、結露防止カバーの外面に接着させる接着面を有し、辺や角に配置されて該辺や該角を構成する側面又は裏面に2面以上にわたって接着される取付部材と、
前記接着面に設けられた接着層と、
を備えてなることを特徴とするコンクリート埋設用ボックスの架設具。In the construction tool for supporting the box embedded in the concrete wall, having a condensation prevention cover covering the outer surface,
Has a holding strength to hold a linear support bar that can be bent by hand and has a tensile strength that can support the box, and an adhesive surface that adheres to the outer surface of the anti-condensation cover. A mounting member that is disposed and bonded to two or more sides or back surfaces that constitute the sides and the corners ;
An adhesive layer provided on the adhesive surface;
A construction tool for a concrete burying box characterized by comprising:
ボックスを支持可能な突張り強度を有し、かつ手で折り曲げ自在な線状の支持棒を保持するための保持部と、結露防止カバーの外面に接着させる接着面を有し、辺や角に配置されて該辺や該角を構成する側面又は裏面に2面以上にわたって接着される取付部材と、
前記接着面に設けられた接着層と、を備えてなり、
結露防止カバーの異なる部位に取り付けられてなることを特徴とするコンクリート埋設用ボックスの架設具。In a construction tool comprising two or more in order to support a box embedded in a concrete wall surface, having a condensation prevention cover covering the outer surface,
Has a holding strength to hold a linear support bar that can be bent by hand and has a tensile strength that can support the box, and an adhesive surface that adheres to the outer surface of the anti-condensation cover. A mounting member that is disposed and bonded to two or more sides or back surfaces that constitute the sides and the corners ;
An adhesive layer provided on the adhesive surface,
A construction tool for a concrete burying box, which is attached to a different part of a dew condensation prevention cover.
手で折り曲げ自在、かつボックスを支持可能な突っ張り強度を有する線状の支持棒と、
該支持棒を保持するための保持部と、結露防止カバーの外面に接着させる接着面を有し、辺や角に配置されて該辺や該角を構成する側面又は裏面に2面以上にわたって接着される取付部材と、を備え、
前記結露防止カバーと接着面とは接着されてなることを特徴とする架設具を備えたボックス。A box with a dew condensation prevention cover covering the outer surface, embedded in the concrete wall;
A linear support bar that can be bent by hand and has a tensile strength capable of supporting the box;
It has a holding part for holding the support bar, and an adhesive surface to be bonded to the outer surface of the anti-condensation cover, and is disposed on the side or corner and bonded to two or more sides or the back surface constituting the side or the corner. An attachment member ,
A box provided with a construction tool, wherein the dew condensation prevention cover and an adhesive surface are bonded.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000374013A JP3704658B2 (en) | 2000-12-08 | 2000-12-08 | Construction equipment for concrete burying boxes |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000374013A JP3704658B2 (en) | 2000-12-08 | 2000-12-08 | Construction equipment for concrete burying boxes |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002174029A JP2002174029A (en) | 2002-06-21 |
| JP3704658B2 true JP3704658B2 (en) | 2005-10-12 |
Family
ID=18843291
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000374013A Expired - Fee Related JP3704658B2 (en) | 2000-12-08 | 2000-12-08 | Construction equipment for concrete burying boxes |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3704658B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5899020B2 (en) * | 2012-03-27 | 2016-04-06 | 河村電器産業株式会社 | Embedded box device |
-
2000
- 2000-12-08 JP JP2000374013A patent/JP3704658B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002174029A (en) | 2002-06-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| GB0122927D0 (en) | Assembly for mounting flexible sheet on structure | |
| AU6495999A (en) | Embeddable mounting device | |
| AU5322600A (en) | A heat sink clip for an electronic assembly | |
| SG87869A1 (en) | Cooling device with support members facing fin | |
| JP3704658B2 (en) | Construction equipment for concrete burying boxes | |
| FR2773598B1 (en) | PIVOTING MOUNTING CLUTCH DISC | |
| WO2007094689A1 (en) | Wall element and method for assembling building elements to form a wall element | |
| JP4921942B2 (en) | Waterproof sheet fixing structure | |
| JP2001200983A (en) | Pipe protection cover used for wall drawing bent portion of fluid pipe piping path, and piping method at the bent portion | |
| JPH1082114A (en) | Insulation fixture | |
| JP2002174028A (en) | Construction tools for concrete burying boxes | |
| JP3017312U (en) | Floor heating system | |
| JP2001193184A (en) | Heat insulator fixture and heat insulator mounting structure for building using it | |
| JPH10212794A (en) | Column base waterproof structure | |
| JP3999064B2 (en) | Wire harness mounting structure | |
| JP2010166762A (en) | Waterproof branching structure of vertically installed bus duct and method for assembling the same | |
| JPS6149608A (en) | Method of preventing dew on metal box buried in concrete wall and device therefor | |
| JP3127652U (en) | Snow melting panel heater for roof and roof structure | |
| JP3973950B2 (en) | Moisture-proof auxiliary material for wiring in moisture-proof layer, wiring structure and wiring method using the same | |
| JP3070799U (en) | Cable support for wiring | |
| JP2507775B2 (en) | Floor heating panel | |
| JPS6050140B2 (en) | How to install insulation | |
| JPH0438959B2 (en) | ||
| JPH0631684B2 (en) | How to install the insulation block | |
| JP2004300806A (en) | Ceiling support |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050310 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050419 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050609 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050711 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050714 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 3704658 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090805 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090805 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090805 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100805 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100805 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110805 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110805 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120805 Year of fee payment: 7 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120805 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120805 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120805 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130805 Year of fee payment: 8 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |