JP3710218B2 - Construction method of impermeable revetment at seaside plant - Google Patents
Construction method of impermeable revetment at seaside plant Download PDFInfo
- Publication number
- JP3710218B2 JP3710218B2 JP20055796A JP20055796A JP3710218B2 JP 3710218 B2 JP3710218 B2 JP 3710218B2 JP 20055796 A JP20055796 A JP 20055796A JP 20055796 A JP20055796 A JP 20055796A JP 3710218 B2 JP3710218 B2 JP 3710218B2
- Authority
- JP
- Japan
- Prior art keywords
- revetment
- impermeable
- plant
- water
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
- Processing Of Solid Wastes (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、臨海プラントが生じる管理型産業廃棄物を海中へ投棄するために、投棄される海域を遮水して区画する遮水護岸に関する。
【0002】
【従来の技術】
発電所、下水処理施設あるいは製錬所等の臨海プラントにおいて生じる石炭灰、下水汚泥焼却灰あるいは鉱滓等の粉状の管理型産業廃棄物を海域で最終処分する場合には、それらの産業廃棄物の有毒物が周辺の海水に溶出することを防止するために、最終処分場すなわち投棄せんとする海域を遮水護岸により区画する必要がある。そのような、遮水護岸を形成する遮水構造としては、例えば図5に示す構造が採用されている。
【0003】
図5において、遮水構造100は遮水板として機能する鋼矢板101と、複数のコンクリートブロック102aを山積みした防波堤102とからなる。
鋼矢板101は海底の不透明層まで打ち込み立設したものであり、これにより最終処分場内の海水を周辺海域から遮水することができる。
防波堤102は、少くとも鋼矢板101の外洋側に設置し、外洋からの波が鋼矢板101に与える衝撃を緩衝するものである。
係る構成から成る遮水構造を最終処分場を包囲するように連続して延設することにより遮水護岸が完成する。そして、臨海プラントから生じた管理型産業廃棄物は遮水護岸内に投棄され最終処分される。
【0004】
【発明が解決しようとする課題】
上述したとおり、海中に投棄された管理型産業廃棄物の有毒物が海水に溶出するのを防止するために、遮水護岸は前記廃棄物が発生するプラント稼働前に確立されている必要があり、例えば、火力発電所の場合、電源開発調整審議会の取決めにより約10年分の管理型産業廃棄物の投棄を許容する最終処分場の遮水護岸を予め施工する必要がある。
従って、プラント稼働による利益を得ることができないうちに多額の護岸建設費用を一時に必要として、これを補うために金融機関等から融資を受ければ、金利的な負担が大きいといった問題点があった。また、プラントから生じる管理型産業廃棄物の量を予想して最終処分場の広さを定めなければならないため、プラント稼働後において、時には最終処分場の広さが不足して拡大工事を余儀なくされ、時には広範に過ぎて護岸が無駄になる等の問題点があった。
【0005】
従って、本発明の目的は、遮水護岸の施工に必要とされる費用を臨海プラント稼働前において必要最小限とすることができ、また、臨海プラントから生じる管理型産業廃棄物の量に応じた最適な広さの最終処分場を形成し得る臨海プラントの遮水護岸の施工方法を提供することにある。
【0006】
【課題を解決するための手段】
本発明によれば、海底から海面を突出して立設した遮水板と、当該遮水板の少くとも外洋側に面して積設した護岸ブロックとからなる遮水構造物を臨海プラント周辺の所定海域に渡って延設して形成する臨海プラントの遮水護岸の施工方法において、(i)前記臨海プラントの稼働により生じた管理型産業廃棄物を含有した護岸ブロックを生成する工程と、(ii)前記遮水護岸の施工箇所に前記護岸ブロックを積設する工程と、(iii)前記護岸ブロックを積設した箇所の内側に前記遮水板を立設する工程と、(iv)前記工程(i)乃至(iii)を繰り返すことにより遮水構造を連続して構築し、遮水護岸を形成する工程とからなることを特徴とする臨海プラントの遮水護岸の施工方法が提供される。
【0007】
本発明の施工方法によれば、遮水護岸を施工するに際し、これを形成する護岸ブロックに臨海プラントから生じる管理型産業廃棄物を利用するため当該廃棄物を海中に投棄する必要が無いので、臨海プラントの稼働と平行して遮水護岸を施工することができると共に当該廃棄物の有効利用を図ることができる。
従って、臨海プラント稼働前に遮水護岸を確立する必要が無く、また、臨海プラント稼働により得た利益を遮水護岸の施工費用として利用できるので、稼働前に多額の遮水護岸建設費用を必要としない。また、稼働状況に応じた最終処分場の広さ等の施工変更も可能である。
【0008】
本発明において、前記護岸ブロックの生成方法としては、管理型産業廃棄物の有毒物が海中に溶出しないようにする必要があるため、例えば、特願平7−160906号に記載された方法を採用することが好ましい。
前記護岸ブロックに混入する管理型産業廃棄物としては、上述した石炭灰、下水汚泥焼却灰あるいは鉱滓等が適用できる。また、前記積設の便宜、及び強度向上の点から、前記護岸ブロックは、相互に嵌合する凹凸を有することが好ましい。 特に、波浪条件の厳しい海域では、最も外側の波浪を直接受けるブロックとして普通コンクリート、重量コンクリートや自然石を用いて、被覆するのが好ましい。 前記工程(ii)において、前記遮水板の立設は、必ずしも前記護岸ブロックの積設が終了した後でなくともよく、当該積設と平行して行なっても良い。前記遮水板としては、鋼矢板、鋼管矢板等を使用することができる。
また、本発明によれば、前記護岸ブロックを先に仮設置したスペーサの両側に積設し、その後当該スペーサを取り除いて、そこに遮水板を立設しても良い。係る工法を採用すれば、作業工程の簡略化を図ることができる。前記スペーサとしては、鋼製の枠等が使用できる。
【0009】
更にまた、本発明によれば、前記護岸ブロックの積設をGPS(汎地球測位システム)により位置決めして行なうこともできる。GPSとは人工衛星を利用した測量技術であり、陸上の定点に受信機を設置し、人工衛星からの測定対象及び当該受信機の距離を各々測定することにより、前記受信機から測定対象の距離を測定するものである。
【0010】
本発明においては、前記護岸ブロックの積設の位置決めを行なう装置にアンテナを設置し、前記GPSを利用して当該アンテナと前記受信機との距離を測定することにより、前記護岸ブロックの積設の位置決めを行なうことができる。
【0011】
係る方法によれば、従来行なわれていた潜水作業によるものと比較して、正確な積設を行なうことができると共に、人身事故等の防止を図ることができる。
【0012】
【発明の実施の形態】
以下、本発明の好適な実施の形態を添付図面に基づいて説明する。
図1は火力発電所1と、遮水護岸2と、これに区画された最終処分場2aとを示す臨海プラントの概要図である。また、図2は遮水護岸2を形成する遮水構造3を示す図1の線AAに沿う断面図であり、遮水構造3は、複数のブロック4aを積設したブロック堤4と、鋼矢板5とからなる。
ブロック4aは、火力発電所1の稼働により生じた石炭灰と、セメントと、海水とを混練した後に所定形状の型枠に打設し、当該石炭灰等の混練物の電気抵抗値が低下するまで当該型枠を振動させて製造したものである(詳細は特願平7−160906号に記載)。この製法によれば、硬化後において、ブロック4aから石炭灰が含有する有毒物が海中に溶出することが無い。
【0013】
次に、図3はブロック4aの外観図である。ブロック2aの両表面は4隅に凸部と、中心に十字状の凹部を備える。凹部の幅は凸部の幅の約2倍となっており、ブロック2aを積設する際に複数のブロック4aを互い違いに嵌合して積み上げることができる。このように互い違いに嵌合してブロック4aを積み上げることにより、ブロック堤4を構造的に安定化させることができる。なお、海象条件の厳しい場合には、ブロック堤4の表面に図示しない高重量コンクリートブロック等を別途敷設して護岸構造の安定化を図ることが好ましい。
【0014】
係る構成の遮水構造3の施工手順を施工途中のブロック提4の側面図である図4に基づいて説明する。
発電所1を稼働し、発生した石炭灰を利用して上述した方法によりブロック4aを生成する。すなわち、遮水護岸2の施工中は石炭灰は海中に投棄する必要が無く、全てブロック4aのために利用することができる。
次に、スペーサ8を海中に仮設置し、その両側にブロック4aをクレーン6により、搬送・積設する作業を行なう。積設にはその位置決めを正確かつ容易にするためにGPS(汎地球測位システム)を採用する。GPSは人工衛星5と、自動制御装置を有するクレーン6のブームに設置したアンテナ6aと、近郊の定点に設置した受信機7とにより構成される。係るGPSにおいては、人工衛星5からアンテナ6a、及び受信機7の位置をそれぞれ測定することができる。各々の位置から、アンテナ6aと受信機7との距離を割り出し、この距離に基づいてクレーン6の自動制御装置がブロック4aの積設位置を補正しながら、正確な積設を行なう。
【0015】
クレーン6は、施工の終えたブロック提4上を逐次移動し、ブロック堤4を延設する。そして、ブロック4aの積設が終了した箇所では、仮設置したスペーサ8を抜き出す作業を行ない、同時に遮水板として機能する鋼矢板5を当該箇所の海底の不透明層まで打設して、遮水護岸2の一部が完成する。
以下、この作業を発電所1が生じる石炭灰の量に応じて反復し、遮水護岸2を完成させる。遮水護岸が完成した後には、石炭灰は当該遮水護岸2内の海中に投棄し、最終処分することができる。
【0016】
【発明の効果】
以上述べたとおり、本発明によれば、遮水護岸を施工するに際し、これを形成する護岸ブロックに臨海プラントから生じる管理型産業廃棄物を利用するため当該廃棄物を海中に投棄する必要が無いので、臨海プラントの稼働と平行して遮水護岸を施工することができると共に当該廃棄物の有効利用を図ることができる。
従って、臨海プラント稼働前に遮水護岸を確立する必要が無く、また、臨海プラント稼働により得た利益を遮水護岸の施工費用として利用できるので、稼働前に多額の遮水護岸建設費用を必要としない。また、稼働状況に応じた最終処分場の広さ等の変更も可能である。
【図面の簡単な説明】
【図1】臨海プラントの概要図である。
【図2】遮水構造3の断面図である。
【図3】ブロック2aの外観図である。
【図4】施工途中のブロック堤4の側面図である。
【図5】従来の遮水構造100の断面図である。
【符号の説明】
1.火力発電所
2.遮水護岸
3.遮水構造
4.ブロック堤
4a.ブロック[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a water-impervious revetment for shielding and partitioning a dumped sea area in order to dump a managed industrial waste produced by a coastal plant into the sea.
[0002]
[Prior art]
When final disposal of powdered controlled industrial waste, such as coal ash, sewage sludge incineration ash, or slag, generated at a seaside plant such as a power plant, sewage treatment facility, or smelter, is the industrial waste In order to prevent toxic substances from leaching into the surrounding seawater, it is necessary to partition the final disposal site, that is, the sea area to be dumped, by impermeable revetment. As such a water-impervious structure that forms a water-impervious revetment, the structure shown in FIG.
[0003]
In FIG. 5, the water-
The
The
The impermeable revetment is completed by continuously extending the impermeable structure having such a structure so as to surround the final disposal site. The managed industrial waste generated from the coastal plant is dumped into the impermeable revetment for final disposal.
[0004]
[Problems to be solved by the invention]
As mentioned above, in order to prevent the toxic substances of managed industrial waste dumped in the sea from leaching into the seawater, the impermeable revetment needs to be established before the operation of the plant where the waste is generated. For example, in the case of a thermal power plant, it is necessary to construct a water-impounded revetment at the final disposal site that allows dumping of management-type industrial waste for about 10 years according to the agreement of the Power Development Coordination Council.
Therefore, there was a problem that a large amount of revetment construction costs were needed at one time before profits from the plant operation could not be obtained, and if the loan from financial institutions etc. was received to compensate for this, the burden of interest would be large. . In addition, the size of the final disposal site must be determined in anticipation of the amount of managed industrial waste generated from the plant. However, sometimes it was too wide and the revetment was wasted.
[0005]
Therefore, the object of the present invention is to minimize the cost required for the construction of the impermeable revetment before the operation of the coastal plant, and according to the amount of managed industrial waste generated from the coastal plant. The purpose is to provide a method for constructing a water-impounded revetment for a coastal plant that can form a final disposal site of an optimal size.
[0006]
[Means for Solving the Problems]
According to the present invention, a water-impervious structure comprising a water-impervious plate standing upright from the sea floor and at least a revetment block stacked facing the open ocean side of the water-impervious plate is disposed around the coastal plant. In the construction method of a seawater revetment of a coastal plant formed by extending over a predetermined sea area, (i) a step of generating a revetment block containing managed industrial waste generated by the operation of the coastal plant; ii) a step of stacking the revetment block at a construction location of the water-blocking revetment, (iii) a step of standing the water-shielding plate inside a location where the revetment block is stacked, and (iv) the step There is provided a method for constructing a seawater revetment in a coastal plant, comprising the steps of: (i) to (iii) being repeated to continuously construct a watertight structure and forming a water revetment.
[0007]
According to the construction method of the present invention, when constructing the impermeable revetment, it is not necessary to dump the waste into the sea in order to use the managed industrial waste generated from the coastal plant in the revetment block that forms the revetment, In parallel with the operation of the seaside plant, it is possible to construct a water-impervious revetment and to effectively use the waste.
Therefore, it is not necessary to establish a water-impervious revetment before the coastal plant is in operation, and the profits obtained from the operation of the coastal plant can be used as construction costs for the water-impervious revetment, requiring a large amount of water-impervious revetment construction cost before the operation. And not. In addition, it is possible to change the construction of the final disposal site according to the operating status.
[0008]
In the present invention, as a method of generating the revetment block, since it is necessary to prevent the toxic substances of managed industrial waste from being eluted into the sea, for example, the method described in Japanese Patent Application No. 7-160906 is adopted. It is preferable to do.
As the management-type industrial waste mixed in the revetment block, the above-described coal ash, sewage sludge incineration ash, or slag, etc. can be applied. Moreover, it is preferable that the said bank protection block has the unevenness | corrugation fitted mutually from the point of the convenience of the said loading, and the strength improvement. In particular, in a sea area with severe wave conditions, it is preferable to use ordinary concrete, heavy concrete, or natural stone as a block to directly receive the outermost waves. In the step (ii), the standing of the water shielding plate may not necessarily be after the stacking of the revetment block is completed, and may be performed in parallel with the stacking. A steel sheet pile, a steel pipe sheet pile, or the like can be used as the water shielding plate.
Moreover, according to this invention, the said revetment block may be piled up on both sides of the spacer temporarily installed previously, the said spacer may be removed after that, and a water shielding board may be stood | installed there. If such a construction method is employed, the work process can be simplified. A steel frame or the like can be used as the spacer.
[0009]
Furthermore, according to the present invention, the revetment block can be stacked and positioned by GPS (Global Positioning System). GPS is a surveying technology that uses an artificial satellite. A receiver is installed at a fixed point on land, and the distance from the receiver to the measuring object is measured by measuring the measuring object from the artificial satellite and the distance of the receiver. Is to measure.
[0010]
In the present invention, an antenna is installed in a device for positioning the revetment block, and the distance between the antenna and the receiver is measured by using the GPS. Positioning can be performed.
[0011]
According to such a method, it is possible to perform accurate loading as compared with a conventional diving operation, and to prevent personal injury and the like.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described with reference to the accompanying drawings.
FIG. 1 is a schematic diagram of a coastal plant showing a thermal power plant 1, a water-
The
[0013]
Next, FIG. 3 is an external view of the
[0014]
The construction procedure of the water-
The power plant 1 is operated, and the
Next, the spacer 8 is temporarily installed in the sea, and the work of carrying and stacking the
[0015]
The crane 6 sequentially moves on the block slab 4 for which construction has been completed, and extends the block dam 4. Then, at the location where the
Hereinafter, this operation is repeated according to the amount of coal ash produced by the power plant 1 to complete the
[0016]
【The invention's effect】
As described above, according to the present invention, when constructing the impermeable revetment, it is not necessary to dump the waste into the sea in order to use the managed industrial waste generated from the seaside plant in the revetment block that forms the revetment. Therefore, a water-impervious revetment can be constructed in parallel with the operation of the coastal plant, and the waste can be effectively used.
Therefore, there is no need to establish a water-impervious revetment before the coastal plant is in operation, and the profits gained from the operation of the coastal plant can be used as construction costs for the water-impervious revetment. And not. It is also possible to change the size of the final disposal site according to the operating status.
[Brief description of the drawings]
FIG. 1 is a schematic diagram of a coastal plant.
FIG. 2 is a cross-sectional view of a
FIG. 3 is an external view of a
FIG. 4 is a side view of the block bank 4 during construction.
5 is a cross-sectional view of a conventional
[Explanation of symbols]
1.
Claims (3)
(i)前記臨海プラントの稼働により生じた管理型産業廃棄物を含有した護岸ブロックを生成する工程と、
(ii)前記遮水護岸の施工箇所に前記護岸ブロックを積設する工程と、
(iii)前記護岸ブロックを積設した箇所の内側に前記遮水板を立設する工程と、
(iv)前記工程(i)乃至(iii)を繰り返すことにより遮水構造を連続して構築し、遮水護岸を形成する工程とからなることを特徴とする臨海プラントの遮水護岸の施工方法。A water-impervious structure consisting of a water-impervious plate standing upright from the bottom of the sea and a revetment block stacked at least on the open-sea side of the water-impervious plate extends over a predetermined area around the coastal plant. In the construction method of the impermeable revetment of the seaside plant
(I) generating a revetment block containing managed industrial waste generated by the operation of the seaside plant;
(Ii) a step of stacking the revetment block at a construction site of the impermeable revetment;
(Iii) a step of erecting the water shielding plate inside the place where the revetment block is stacked;
(Iv) Construction method of impermeable revetment for coastal plant, comprising the steps of constructing a impermeable structure continuously by repeating the steps (i) to (iii) and forming the impermeable revetment .
(ii)’前記遮水護岸の施工箇所にスペーサーを配置し、その両側に前記護岸ブロックを積設する工程と、
(iii)’前記スペーサーを取り除き、そこに遮水板を立設する工程と、からなることを特徴とする請求項1に記載の臨海プラントの遮水護岸の施工方法。Steps (ii) and (iii)
(Ii) 'placement of spacers at the construction site of the impermeable revetment, and stacking the revetment blocks on both sides thereof;
(Iii) 'The method for constructing a seawater revetment in a seaside plant according to claim 1, comprising the step of removing the spacer and standing a water shielding plate there.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20055796A JP3710218B2 (en) | 1996-07-30 | 1996-07-30 | Construction method of impermeable revetment at seaside plant |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20055796A JP3710218B2 (en) | 1996-07-30 | 1996-07-30 | Construction method of impermeable revetment at seaside plant |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1037159A JPH1037159A (en) | 1998-02-10 |
| JP3710218B2 true JP3710218B2 (en) | 2005-10-26 |
Family
ID=16426299
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP20055796A Expired - Fee Related JP3710218B2 (en) | 1996-07-30 | 1996-07-30 | Construction method of impermeable revetment at seaside plant |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3710218B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20040014126A (en) * | 2002-11-26 | 2004-02-14 | (주) 지. 알. 지 | Fly Ash Tetrafoot (TTP) Manufacturing Method |
| CN102304910B (en) * | 2011-06-23 | 2013-04-17 | 广东金东海集团有限公司 | Construction method of armor block in breakwater engineering |
| JP7491083B2 (en) * | 2020-06-23 | 2024-05-28 | 中国電力株式会社 | Ash disposal method |
| CN112934944B (en) * | 2021-01-28 | 2022-07-01 | 山西大学 | Method for using coal-based solid waste for repairing and treating coal gangue dump |
| CN114190129A (en) * | 2021-09-26 | 2022-03-18 | 山东双硕环境科技有限公司 | Movable impermeable ridge and construction method technical field |
-
1996
- 1996-07-30 JP JP20055796A patent/JP3710218B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH1037159A (en) | 1998-02-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3710218B2 (en) | Construction method of impermeable revetment at seaside plant | |
| JP4293435B2 (en) | Construction method of managed revetment | |
| JP5728206B2 (en) | Construction method of partition revetment | |
| CN208917765U (en) | A kind of river levee levee body landfill device suitable for river polluted bed mud | |
| JP5099709B2 (en) | Construction method of managed revetment | |
| JP2004162325A (en) | Impervious construction method for controlling revetment | |
| JP4523706B2 (en) | Floor excavation solidification replacement method | |
| JPH1037158A (en) | Construction method of impermeable seawall of seaside plant | |
| JP2639132B2 (en) | Final waste disposal site | |
| JP4606454B2 (en) | Construction method of managed revetment | |
| JP2546110B2 (en) | Levee structure using excavated sludge and its construction method | |
| JP3023410B1 (en) | A method for treating and disposing of waste by layering it underground. | |
| JP2004230371A (en) | Waste storage equipment and its installation method | |
| JP2006341172A (en) | Waste disposal site | |
| JPS56135631A (en) | Construction of rubble-mound foundation on sea bed | |
| JP2802815B2 (en) | Embankment structure | |
| JPS5934331A (en) | How to build a sewage treatment facility | |
| JPH0376371B2 (en) | ||
| JPH06116957A (en) | Construction method of underwater foundation in break-water, etc. | |
| JPH0278476A (en) | Method for creating waste disposing place | |
| JP4405414B2 (en) | Landfill treatment method | |
| JP2581602B2 (en) | Waste treatment method | |
| JP3579807B2 (en) | Method of reducing lateral pressure on underground structures in aerial landfill method | |
| JP2612669B2 (en) | Underground tank construction method and underground tank constructed thereby | |
| JPH02128006A (en) | Levee |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050428 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050719 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050809 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110819 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110819 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120819 Year of fee payment: 7 |
|
| LAPS | Cancellation because of no payment of annual fees |