JP3742938B2 - Rebar unit assembly equipment - Google Patents
[go: Go Back, main page]

JP3742938B2 - Rebar unit assembly equipment - Google Patents

Rebar unit assembly equipment Download PDF

Info

Publication number
JP3742938B2
JP3742938B2 JP21951697A JP21951697A JP3742938B2 JP 3742938 B2 JP3742938 B2 JP 3742938B2 JP 21951697 A JP21951697 A JP 21951697A JP 21951697 A JP21951697 A JP 21951697A JP 3742938 B2 JP3742938 B2 JP 3742938B2
Authority
JP
Japan
Prior art keywords
reinforcing bar
main reinforcing
main
bar
clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP21951697A
Other languages
Japanese (ja)
Other versions
JPH1157917A (en
Inventor
保夫 梶岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP21951697A priority Critical patent/JP3742938B2/en
Publication of JPH1157917A publication Critical patent/JPH1157917A/en
Application granted granted Critical
Publication of JP3742938B2 publication Critical patent/JP3742938B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Wire Processing (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、複数本の主鉄筋を平行に所定ピッチで平面的に配設し保持してなる鉄筋ユニットの組立に用いる組立装置に関する。
【0002】
【従来の技術】
従来、主鉄筋を平行に所定ピッチで平面的に配設し保持した構造の鉄筋ユニット(一方向メッシュ)を組み立てる場合、例えば主鉄筋を横筋とし、段取り筋(副鉄筋)を縦筋としてメッシュ状に配筋し、主鉄筋と段取り筋の交差部を、溶接あるいはなまし鉄線で連結することで製作している。
【0003】
【発明が解決しようとする課題】
しかし、従来のように溶接やなまし鉄線で鉄筋の交差部を連結する場合、作業が非常に面倒であり、施工能率が悪く、コスト高である上、溶接時の熱による強度低下や位置ずれ等の品質上の問題を生じる可能性があった。
【0004】
本発明は、上記事情を考慮し、作業が簡単にできて施工能率のアップとコストダウンを図れると共に、品質の向上が図れる鉄筋ユニットの組立装置を提供することを目的とする。
【0007】
【課題を解決するための手段】
請求項の発明の組立装置は、複数本の主鉄筋を平行に所定ピッチで平面的に配設し保持してなる鉄筋ユニットの組立装置において、主鉄筋を平行に所定ピッチで平面的に載置し保持し得る配筋架台と、主鉄筋と直交する向きで配設された鉄筋クリップ付きの副鉄筋を、その長手方向に押し移動することで各鉄筋クリップを主鉄筋に嵌め込ませる押し込み機構とを備えていることを特徴とする。
【0008】
請求項の発明の組立装置は、請求項において、前記押し込み機構が、副鉄筋の長手方向に沿うように配設された押し込み棒と、押し込み棒をその長手方向に押し移動する駆動装置とから構成され、前記押し込み棒に、各鉄筋クリップを直接押圧して主鉄筋に嵌め込ませるクリップ押圧部が設けられていることを特徴とする。
【0009】
請求項の発明の組立装置は、請求項またはにおいて、前記配筋架台に、主鉄筋を所定ピッチで保持する受け溝を有した主鉄筋受台と、昇降機構により昇降させられることで主鉄筋を受け溝に落とし込む主鉄筋受桟とが設けられていることを特徴とする。
【0010】
【発明の実施の形態】
以下、本発明の実施形態を図面に基づいて説明する。
まず、図1を用いて鉄筋ユニットTの組立方法について説明する。ここで製作しようとする鉄筋ユニットTは、複数本の主鉄筋1を平行に所定ピッチで平面的に配設し、それら主鉄筋1を、主鉄筋1と直交する方向に配した段取り筋(副鉄筋)2で保持することにより、一体のユニットとなしたものである。
【0011】
このユニットTを製作するに当たっては、最初に段取り筋2に前記所定ピッチで鉄筋クリップ3を取り付けておく。鉄筋クリップ3は、図2に連結した状態を示すように、主鉄筋1と段取り筋2の交差部に配されることで主鉄筋1と段取り筋2を連結するものであり、一枚の鋼板を折り曲げることで形成されている。この鉄筋クリップ3は、両鉄筋1、2間に挟まれる平板状の基板4を有しており、基板4の一方の面側に段取り筋2を嵌める第1鉄筋嵌合部5を有し、他方の面側に主鉄筋2を嵌める第2鉄筋嵌合部6を有している。両嵌合部5、6は互いに直交する方向に延びている。また、両嵌合部5、6の内周面には、両鉄筋1、2のふし部(凸部:図示略)と係合することで鉄筋の軸線方向の位置ずれを防止する突起7、8が間隔をおいて2個ずつ設けられている。
【0012】
段取り筋2に鉄筋クリップ3を取り付ける場合は、第1鉄筋嵌合部5を段取り筋2の外周に嵌め込むことで装着する。次に、鉄筋クリップ3を装着した複数本の段取り筋2を間隔をおいて平行に平面的に配設する。そして、各段取り筋2に装着されて段取り筋2と直交する方向に一列に並んだ鉄筋クリップ3の各列の位置を、各列の主鉄筋1の位置に対して位置合わせし、各列の鉄筋クリップ3の第2鉄筋嵌合部6に主鉄筋1を嵌め込むことで、主鉄筋1を段取り筋2と鉄筋クリップ3を介して平面的に保持し、これにより鉄筋ユニットTを得る。
【0013】
次に、この組立方法を実施するための組立装置について図3以降を参照しながら説明する。図3は組立装置10の一部を上側から見た斜視図、図4は図3のIV矢視方向から見た正面図、図5は図4のV矢視断面図、図6は図4のVI矢視断面図である。
【0014】
組立装置10の配筋架台11上には、図3、図4に示すように、主鉄筋1を所定ピッチで保持する受け溝15を有した主鉄筋受台12と、昇降機構(エアシリンダあるいは油圧シリンダ等)16により昇降させられることで主鉄筋1を受け溝15に落とし込む主鉄筋受桟13とが設けられている。主鉄筋受台12と主鉄筋受桟13は、交互に適当な間隔で複数個ずつ配設されている。主鉄筋受台12は、断面U字形の鋼材で構成されており、その上端縁に所定ピッチで受け溝15が形成されている。主鉄筋受桟13は、図5に示すように、ある軌跡で昇降するようにリンク機構17で支持されており、上昇状態で主鉄筋を受桟13上で転がして受桟13の上端縁のV溝部14にセットしておくと、受桟13を下降させることにより主鉄筋1を主鉄筋受台12の受け溝15に落とし込むことができるようになっている。
【0015】
主鉄筋受台12を構成するU字状断面の鋼材には、主鉄筋1と直交する向きでセットされる段取り筋2をその長手方向に押し移動することで、段取り筋2に予め装着されている鉄筋クリップ3を、主鉄筋1の外周に嵌め込ませる押し込み機構19が設けられている。押し込み機構19は、段取り筋2の長手方向に沿うように配設された押し込み棒20と、図6に示すように、この押し込み棒20をその長手方向に押し移動する駆動装置(エアシリンダあるいは油圧シリンダ等)22とから構成されている。そして、押し込み棒20の上面に、各鉄筋クリップ3を直接押圧して主鉄筋1の外周に嵌め込ませるためのクリップ押圧リブ21が設けられている。なお、図3に示すように、主鉄筋受台12を構成するU字状断面の鋼材内には、段取り筋2の受け溝部25を有するブラケット26が設けられている。
【0016】
次に上記組立装置を用いて鉄筋ユニットを組立てる場合の手順を主に図3を参照しながら説明する。
まず、主鉄筋受桟13を上昇させた状態で、その上に主鉄筋1を転がして、V溝部14に主鉄筋1をセットする。次に、主鉄筋受桟13を下げ、主鉄筋受台12の受け溝15に主鉄筋1を落とし込む。これにより、主鉄筋1は所定ピッチで保持される。
【0017】
次いで、予め所定ピッチで鉄筋クリップ3を取り付けてある段取り筋2を、主鉄筋受台12を構成する鋼材上に配置し、ブラケット26の受け溝部25に嵌める。この際、鉄筋クリップ3の第2鉄筋嵌合部6の入口が、主鉄筋1に対して押し込み側に位置するようにセットする。こうすることで、鉄筋クリップ3が一列に並ぶんで主鉄筋1の上に載る。
【0018】
次いで、全部の押し込み機構19の駆動装置22を一斉に操作して、段取り筋2を押し込み方向にスライドさせる。そうすると、各鉄筋クリップ3の第2鉄筋嵌合部6が主鉄筋1の外周に嵌まり込み、それにより、主鉄筋1を段取り筋2で保持した構造の鉄筋ユニットT(図1参照)が完成する。完成後は揚重機を用いて組立装置10から鉄筋ユニットTを外せばよい。
【0019】
【発明の効果】
以上説明したように、本発明の組立装置によれば、予め副鉄筋に鉄筋クリップを取り付けておき、副鉄筋と主鉄筋とを直交する関係で配置した上で、鉄筋クリップを主鉄筋に嵌め込めむことで鉄筋ユニットを完成させる組立方法を行うことができるので、溶接やなまし鉄線を用いて連結するのに比べて、作業が簡単にできて、施工能率のアップとコストダウンを図れる。また、鉄筋クリップで主鉄筋と副鉄筋を連結するので、強度劣化や位置ずれの心配がなく、品質の向上が図れる。
【0020】
また、本発明の組立装置によれば、配筋架台上に主鉄筋を副鉄筋を直交する関係で配置し、押し込み装置を操作するだけで、副鉄筋に予め取り付けておいた鉄筋クリップを用いて、主鉄筋と副鉄筋を連結することができるので、上記の組立方法を簡単に実施することができる。特に、鉄筋クリップを直接クリップ押圧部で押す場合は、小さい力で確実に鉄筋クリップを主鉄筋に嵌め込むことができる。また、昇降機構によって受桟上に載せた主鉄筋を主鉄筋受台上の受け溝に落とし込むようにした場合は、主鉄筋のセットが一層容易にできるようになる。
【図面の簡単な説明】
【図1】 本発明の実施形態に用いる鉄筋ユニットの斜視図である。
【図2】 本発明の実施形態で用いる鉄筋クリップの使用状態を示す斜視図である。
【図3】 本発明の実施形態の組立装置の一部斜視図である。
【図4】 図3のIV矢視方向から見た正面図である。
【図5】 図4のV矢視断面図である。
【図6】 図4のVI矢視断面図である。
【符号の説明】
T 鉄筋ユニット
1 主鉄筋
2 段取り筋(副鉄筋)
3 鉄筋クリップ
5 第1鉄筋嵌合部
6 第2鉄筋嵌合部
10 組立装置
11 配筋架台
12 主鉄筋受台
13 主鉄筋受桟
15 受け溝
16 昇降機構
19 押し込み機構
20 押し込み棒
21 クリップ押圧リブ
22 駆動装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an assembly apparatus for use in assembling rebar unit formed by dimensionally arranged to hold a plurality of main reinforcing bars in parallel with a predetermined pitch.
[0002]
[Prior art]
Conventionally, when assembling a reinforcing bar unit (one-way mesh) with a structure in which main reinforcing bars are arranged and held in parallel at a predetermined pitch, for example, the main reinforcing bars are horizontal bars and the set-up bars (secondary reinforcing bars) are vertical bars. It is manufactured by connecting the intersections of the main reinforcing bars and the set-up bars with welding or annealed iron wires.
[0003]
[Problems to be solved by the invention]
However, when connecting the intersections of reinforcing bars with welding and annealed iron wires as in the past, the work is very troublesome, the construction efficiency is poor, the cost is high, and the strength is reduced and the position is shifted due to heat during welding. This may cause quality problems.
[0004]
In view of the above circumstances, an object of the present invention is to provide an apparatus for assembling a reinforcing bar unit, which can simplify the work, increase the work efficiency and reduce the cost, and improve the quality.
[0007]
[Means for Solving the Problems]
The assembly apparatus according to the first aspect of the present invention is an assembly apparatus for a reinforcing bar unit in which a plurality of main reinforcing bars are arranged and held in parallel at a predetermined pitch in a plane, and the main reinforcing bars are mounted in a plane at a predetermined pitch in parallel. A reinforcing bar that can be placed and held, and a push-in mechanism that fits each reinforcing bar clip into the main reinforcing bar by pushing and moving a secondary reinforcing bar with a reinforcing bar clip arranged in a direction perpendicular to the main reinforcing bar in the longitudinal direction It is characterized by having.
[0008]
An assembly apparatus according to a second aspect of the present invention is the assembly apparatus according to the first aspect , wherein the push-in mechanism is arranged so that the push-in mechanism extends along the longitudinal direction of the secondary reinforcing bar, and the drive device that pushes and moves the push-in bar in the longitudinal direction. The push rod is provided with a clip pressing part that directly presses each reinforcing bar clip to be fitted into the main reinforcing bar.
[0009]
The assembling apparatus of the invention of claim 3 is the assembly apparatus according to claim 1 or 2 , wherein the reinforcing bar cradle is moved up and down by a lifting mechanism by a main reinforcing bar cradle having a receiving groove for holding the main reinforcing bar at a predetermined pitch. A main reinforcing bar receiving bar that receives the main reinforcing bar into the groove is provided.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
First, the assembly method of the reinforcing bar unit T will be described with reference to FIG. The reinforcing bar unit T to be manufactured here has a plurality of main reinforcing bars 1 arranged in a plane at a predetermined pitch in parallel, and the main reinforcing bars 1 are arranged in a direction perpendicular to the main reinforcing bars 1 (sub-reinforcement). Reinforcement) 2 holds the unit as an integral unit.
[0011]
In manufacturing the unit T, first, the reinforcing bar clips 3 are attached to the set-up bars 2 at the predetermined pitch. As shown in FIG. 2, the reinforcing bar clip 3 is arranged at the intersection of the main reinforcing bar 1 and the set-up bar 2 to connect the main reinforcing bar 1 and the set-up bar 2. It is formed by bending. This reinforcing bar clip 3 has a flat board 4 sandwiched between both reinforcing bars 1 and 2, and has a first reinforcing bar fitting portion 5 that fits the setup bar 2 on one surface side of the board 4, It has the 2nd reinforcement fitting part 6 which fits the main reinforcement 2 in the other surface side. Both fitting portions 5 and 6 extend in directions orthogonal to each other. Further, on the inner peripheral surfaces of the fitting portions 5 and 6, the protrusions 7 that prevent displacement of the reinforcing bars in the axial direction by engaging with the hook portions (convex portions: not shown) of both the reinforcing bars 1 and 2. 8 is provided two by two at intervals.
[0012]
When the reinforcing bar clip 3 is attached to the setup bar 2, the first reinforcing bar fitting part 5 is attached by being fitted to the outer periphery of the setup bar 2. Next, a plurality of set-up bars 2 to which the reinforcing bar clips 3 are attached are arranged in parallel and in a plane on an interval. And the position of each row | line | column of the reinforcing bar clip 3 with which it attached to each setup reinforcement 2 and was located in a line in the direction orthogonal to the setup reinforcement 2 is aligned with the position of the main reinforcement 1 of each row | line | column, By inserting the main reinforcing bar 1 into the second reinforcing bar fitting portion 6 of the reinforcing bar clip 3, the main reinforcing bar 1 is held in a plane via the set-up bars 2 and the reinforcing bar clip 3, thereby obtaining the reinforcing bar unit T.
[0013]
Next, an assembling apparatus for carrying out this assembling method will be described with reference to FIG. 3 is a perspective view of a part of the assembling apparatus 10 as seen from above, FIG. 4 is a front view as seen from the direction of arrow IV in FIG. 3, FIG. 5 is a sectional view as seen from arrow V in FIG. It is VI arrow sectional drawing.
[0014]
As shown in FIG. 3 and FIG. 4, on the reinforcing bar 11 of the assembling apparatus 10, as shown in FIG. 3 and FIG. 4, a main reinforcing bar base 12 having receiving grooves 15 for holding the main reinforcing bar 1 at a predetermined pitch, A main reinforcing bar receiving bar 13 is provided that is moved up and down by a hydraulic cylinder 16) and dropped into the groove 15 by receiving the main reinforcing bar 1. A plurality of main reinforcing bar receiving bases 12 and main reinforcing bar receiving bars 13 are alternately arranged at appropriate intervals. The main reinforcing bar receiving base 12 is made of a steel material having a U-shaped cross section, and receiving grooves 15 are formed at a predetermined pitch at the upper end edge thereof. As shown in FIG. 5, the main reinforcing bar receiving bar 13 is supported by a link mechanism 17 so as to move up and down along a certain trajectory, and the main reinforcing bar is rolled on the receiving bar 13 in the raised state, and the V groove portion 14 at the upper edge of the receiving bar 13. The main reinforcing bar 1 can be dropped into the receiving groove 15 of the main reinforcing bar receiving base 12 by lowering the receiving bar 13.
[0015]
The steel material having a U-shaped cross section constituting the main reinforcing bar receiving base 12 is pre-mounted on the setting bar 2 by pushing and moving the setting bar 2 set in the direction perpendicular to the main reinforcing bar 1 in the longitudinal direction. A push-in mechanism 19 is provided for fitting the reinforcing bar clip 3 on the outer periphery of the main reinforcing bar 1. The pushing mechanism 19 includes a pushing bar 20 disposed along the longitudinal direction of the set-up bar 2, and a driving device (air cylinder or hydraulic pressure) that pushes and moves the pushing bar 20 in the longitudinal direction as shown in FIG. Cylinder) 22). And the clip press rib 21 for pressing each rebar clip 3 directly and making it fit in the outer periphery of the main rebar 1 is provided in the upper surface of the pushing rod 20. FIG. As shown in FIG. 3, a bracket 26 having a receiving groove portion 25 of the set-up bar 2 is provided in a steel material having a U-shaped cross section constituting the main reinforcing bar base 12.
[0016]
Next, a procedure for assembling a reinforcing bar unit using the above assembling apparatus will be described mainly with reference to FIG.
First, in a state where the main reinforcing bar receiving bar 13 is raised, the main reinforcing bar 1 is rolled on the main reinforcing bar 1 and the main reinforcing bar 1 is set in the V groove portion 14. Next, the main reinforcing bar receiving bar 13 is lowered, and the main reinforcing bar 1 is dropped into the receiving groove 15 of the main reinforcing bar receiving base 12. Thereby, the main rebar 1 is held at a predetermined pitch.
[0017]
Next, the set-up bars 2 to which the reinforcing bar clips 3 are attached in advance at a predetermined pitch are arranged on the steel material constituting the main reinforcing bar receiving base 12 and are fitted into the receiving groove portions 25 of the bracket 26. Under the present circumstances, it sets so that the entrance of the 2nd reinforcing bar fitting part 6 of the reinforcing bar clip 3 may be located in the pushing side with respect to the main reinforcing bar 1. By doing so, the reinforcing bar clips 3 are arranged in a line and placed on the main reinforcing bar 1.
[0018]
Next, the drive devices 22 of all the pushing mechanisms 19 are operated at the same time to slide the setup bars 2 in the pushing direction. Then, the second reinforcing bar fitting portion 6 of each reinforcing bar clip 3 is fitted into the outer periphery of the main reinforcing bar 1, thereby completing the reinforcing bar unit T (see FIG. 1) having a structure in which the main reinforcing bar 1 is held by the setup bar 2. To do. After completion, the reinforcing bar unit T may be removed from the assembling apparatus 10 using a lifting machine.
[0019]
【The invention's effect】
As described above, according to the assembling apparatus of the present invention, the reinforcing bar clip is attached to the secondary reinforcing bar in advance, and the secondary reinforcing bar and the main reinforcing bar are arranged in an orthogonal relationship, and then the reinforcing bar clip is fitted into the main reinforcing bar. As a result, an assembly method for completing the reinforcing bar unit can be performed, so that the work can be performed more easily and the construction efficiency can be increased and the cost can be reduced as compared with the case of connecting using welding or annealed iron wire. In addition, since the main reinforcing bar and the secondary reinforcing bar are connected by the reinforcing bar clip, there is no fear of strength deterioration and displacement, and the quality can be improved.
[0020]
Further, according to the assembling apparatus of the present invention, the main reinforcing bars are arranged on the reinforcing bar in a relationship orthogonal to the auxiliary reinforcing bars, and the reinforcing bar clip previously attached to the auxiliary reinforcing bars is used only by operating the pushing device. Since the main reinforcing bar and the secondary reinforcing bar can be connected, the above assembling method can be easily implemented. In particular, when the reinforcing bar clip is directly pressed by the clip pressing portion, the reinforcing bar clip can be securely fitted into the main reinforcing bar with a small force. Further, when the main reinforcing bar placed on the receiving bar is dropped into the receiving groove on the main reinforcing bar receiving base by the lifting mechanism, the main reinforcing bar can be set more easily.
[Brief description of the drawings]
FIG. 1 is a perspective view of a reinforcing bar unit used in an embodiment of the present invention.
FIG. 2 is a perspective view showing a usage state of a reinforcing bar clip used in the embodiment of the present invention.
FIG. 3 is a partial perspective view of the assembling apparatus according to the embodiment of the present invention.
4 is a front view seen from the direction of arrow IV in FIG.
5 is a cross-sectional view taken along the arrow V in FIG. 4;
6 is a cross-sectional view taken along arrow VI in FIG. 4;
[Explanation of symbols]
T Reinforcing bar unit 1 Main reinforcing bar 2 Set-up bar (secondary bar)
DESCRIPTION OF SYMBOLS 3 Reinforcing bar clip 5 1st reinforcing bar fitting part 6 2nd reinforcing bar fitting part 10 Assembly apparatus 11 Reinforcement stand 12 Main reinforcing bar receiving base 13 Main reinforcing bar receiving bar 15 Receiving groove 16 Elevating mechanism 19 Pushing mechanism 20 Pushing bar 21 Clip pressing rib 22 Drive device

Claims (3)

複数本の主鉄筋を平行に所定ピッチで平面的に配設し保持してなる鉄筋ユニットの組立装置において、主鉄筋を平行に所定ピッチで平面的に載置し保持し得る配筋架台と、主鉄筋と直交する向きで配設された鉄筋クリップ付きの副鉄筋を、その長手方向に押し移動することで各鉄筋クリップを主鉄筋に嵌め込ませる押し込み機構とを備えていることを特徴とする鉄筋ユニットの組立装置。  In a reinforcing bar unit assembling apparatus in which a plurality of main reinforcing bars are arranged and held in parallel at a predetermined pitch in a plane, a reinforcing bar that can be placed and held in a plane at a predetermined pitch in parallel with the main reinforcing bars; Reinforcing bar comprising a push-in mechanism for fitting each reinforcing bar clip into the main reinforcing bar by pushing and moving the secondary reinforcing bar with reinforcing bar clip arranged in a direction orthogonal to the main reinforcing bar in its longitudinal direction Unit assembly equipment. 前記押し込み機構が、副鉄筋の長手方向に沿うように配設された押し込み棒と、押し込み棒をその長手方向に押し移動する駆動装置とから構成され、前記押し込み棒に、各鉄筋クリップを直接押圧して主鉄筋に嵌め込ませるクリップ押圧部が設けられていることを特徴とする請求項記載の鉄筋ユニットの組立装置。The pushing mechanism is composed of a pushing rod arranged along the longitudinal direction of the secondary reinforcing bar, and a drive device that pushes and moves the pushing rod in the longitudinal direction, and directly presses each reinforcing bar clip to the pushing rod. assembly device rebar unit according to claim 1, wherein it is characterized in that the clip pressing portion to fit into the main reinforcing bars and is provided. 前記配筋架台に、主鉄筋を所定ピッチで保持する受け溝を有した主鉄筋受台と、昇降機構により昇降させられることで主鉄筋を受け溝に落とし込む主鉄筋受桟とが設けられていることを特徴とする請求項または記載の鉄筋ユニットの組立装置。The reinforcing bar mount is provided with a main reinforcing bar receiving base having a receiving groove for holding the main reinforcing bar at a predetermined pitch, and a main reinforcing bar receiving bar for receiving the main reinforcing bar into the receiving groove by being raised and lowered by an elevating mechanism. 3. An apparatus for assembling a reinforcing bar unit according to claim 1 or 2 .
JP21951697A 1997-08-14 1997-08-14 Rebar unit assembly equipment Expired - Fee Related JP3742938B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21951697A JP3742938B2 (en) 1997-08-14 1997-08-14 Rebar unit assembly equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21951697A JP3742938B2 (en) 1997-08-14 1997-08-14 Rebar unit assembly equipment

Publications (2)

Publication Number Publication Date
JPH1157917A JPH1157917A (en) 1999-03-02
JP3742938B2 true JP3742938B2 (en) 2006-02-08

Family

ID=16736700

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21951697A Expired - Fee Related JP3742938B2 (en) 1997-08-14 1997-08-14 Rebar unit assembly equipment

Country Status (1)

Country Link
JP (1) JP3742938B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK176331B1 (en) * 2002-07-23 2007-08-13 Stema Engineering As Method and machine for making the concrete reinforcement roller net
KR100557349B1 (en) * 2003-10-08 2006-03-06 유재순 Manufacturing method and apparatus for wire mesh
CN107605164A (en) * 2017-11-03 2018-01-19 张昌荣 Guardrail reinforcing bar helps dress all-in-one
CN112122761B (en) * 2020-09-30 2023-11-17 上海市机械施工集团有限公司 Reinforcing steel bar compacting structure and compacting method
CN116290577B (en) * 2022-12-08 2024-07-16 中铁二十三局集团有限公司 Insulation connection equipment for steel reinforcement frame

Also Published As

Publication number Publication date
JPH1157917A (en) 1999-03-02

Similar Documents

Publication Publication Date Title
JP3742938B2 (en) Rebar unit assembly equipment
KR101188366B1 (en) Method and machines for bending a shear steel reinforcing bar
CN120133867B (en) A cap beam reinforcement skeleton welding device
JP3410819B2 (en) Grating, assembling method and assembling apparatus
JPH09206954A (en) Method for manufacturing corrugated reinforcing mat
KR101053355B1 (en) Rotor Coil Brazing Tool for Air Cooling Generator
CN215614661U (en) Steel band bending mechanism for fuel cell binding
JPH086319B2 (en) How to press in the pile
CN117283203B (en) Full-automatic robot welding device for manufacturing coke oven column
JP2004230464A (en) Method for manufacturing grating
CN115284007B (en) Net basket hydraulic forming welding machine
CN214114516U (en) Spool convenient to fixed bonding tool
JP4507038B2 (en) Lift-up mechanism and construction method
CN214516876U (en) Rectangular steel pipe surface depression correcting device
JP3215849B2 (en) Clamps for pile press-in and pull-out machines
CN213195267U (en) A bending machine that is convenient to replace the upper die
CN116511807B (en) Clamp tool for latch hook reinforcing plate assembly
JPH0415375Y2 (en)
JP3080086U (en) Structural steel
JPS6232653Y2 (en)
JPH06143045A (en) Fin member press-in device
KR101904288B1 (en) System support apparatus of movable and working method thereof
CN119140676A (en) Superplastic forming equipment and process for aluminum alloy material
JPH0218190B2 (en)
JPH0772419B2 (en) Clamping mechanism of pile press-fitting / extracting machine for steel pipe pile

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050120

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050621

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050803

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051018

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051101

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081125

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111125

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees