JP3753420B2 - Stacking roof material fixing device and stacking roof material fixing method - Google Patents
[go: Go Back, main page]

JP3753420B2 - Stacking roof material fixing device and stacking roof material fixing method - Google Patents

Stacking roof material fixing device and stacking roof material fixing method Download PDF

Info

Publication number
JP3753420B2
JP3753420B2 JP2001324863A JP2001324863A JP3753420B2 JP 3753420 B2 JP3753420 B2 JP 3753420B2 JP 2001324863 A JP2001324863 A JP 2001324863A JP 2001324863 A JP2001324863 A JP 2001324863A JP 3753420 B2 JP3753420 B2 JP 3753420B2
Authority
JP
Japan
Prior art keywords
roofing material
hole
existing
fixture
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001324863A
Other languages
Japanese (ja)
Other versions
JP2003129614A (en
Inventor
進 山口
博文 遠藤
徹 杉山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
A&A Material Corp
Original Assignee
A&A Material Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by A&A Material Corp filed Critical A&A Material Corp
Priority to JP2001324863A priority Critical patent/JP3753420B2/en
Publication of JP2003129614A publication Critical patent/JP2003129614A/en
Application granted granted Critical
Publication of JP3753420B2 publication Critical patent/JP3753420B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、既存の屋根材に新規屋根材を重ね葺きするための重ね葺き用屋根材固定装置及び重ね葺き用屋根材固定方法に関するものである。
【0002】
【従来の技術】
図10に、既存の屋根材に新規屋根材を重ね葺きする場合の従来の態様を示す。既存の屋根材1は、既存の母屋2に既存のフックボルト3により固定されている。新規屋根材を重ね葺きする際には、まず、既存の屋根材1及び母屋2を貫通する留付け用ねじ4によって、新規の母屋5を屋根材1の上面に固定する。さらに、新規のフックボルト6を新規の母屋5に係止させることによって、重ね葺きする新規の屋根材7を新規の母屋5の上面に固定する。
【0003】
【発明が解決しようとする課題】
しかしながら、上述した従来の態様では、新規の母屋5を既存の屋根材1に固定するために用いる留付け用ねじ4が屋根材1及び既存の母屋2を貫通するため、既存の屋根材や母屋からスレート屑や金属屑が屋内に落下することがあった。また、留付け用ねじ4は、屋根材1及び母屋2を貫通する分、全長が長いため、真っ直ぐにねじ込みにくいなど作業性が良好ではなかった。
【0004】
そこで、このような問題に鑑み、本出願人は図11の(a)〜(d)に示されるような手法を創出した。すなわち、この手法に用いる重ね葺き用屋根材固定装置11は、第1取付金具12、第2取付金具13及び付け母屋14を備えるものであり、まず、図11の(a)に示されるように、既存の屋根材15を固定するフックボルト16に第1取付金具12を差し込んでスライドさせ、第1取付金具12が既存の屋根材15から離隔しないようにする。次に、第1取付金具12が屋根材15に対しスライドしないよう、図11の(b)に示されるように、第2取付金具13の穴17がフックボルト16の軸部を取り囲むように第1取付金具12上に第2取付金具13を載せる。さらに、図11の(c)に示されるように、付け母屋14を第1取付金具12及び第2取付金具13の立ち上り部に沿わせるように配置し、これら第1取付金具12、第2取付金具13及び付け母屋14をボルト・ナットにより仮留めする。そして、不陸などの調整を行った後、ボルト・ナットの本締めを行って、図11の(d)に示されるように、重ね葺き用屋根材固定装置11の組み立てを完了させる。その後、重ね葺き用屋根材固定装置11の付け母屋14部分に、新規な屋根材を重ね葺きする。かかる手法においては、既存の屋根材や母屋に対して新たな貫通部材を介在させずに重ね葺きを行えるため、屋内に屑を落下させることもなく、屋根材固定装置自体が既存の屋根材から外れることもない、という優れた利点があった。その一方で、組立・施工性に関しては、第1取付金具12、第2取付金具13及び付け母屋14の三種類の部材を順にセットしていき最後に相互締結を行う態様であるため、さらに簡易化を図れればより好適であった。
【0005】
従って、本発明は、上記に鑑みてなされたものであり、屋内に屑を落下させることなく、なお且つ、既存の屋根材から誤って外れることもなく、より施工が容易な重ね葺き用屋根材固定装置及び重ね葺き用屋根材固定方法を提供することを目的とする。
【0006】
【課題を解決するための手段】
上述の目的を達成するため、本発明は、既存の屋根材の上面に軸部が突出したボルトと、該軸部に差し込まれるナット及び座金とにより既存の母屋に固定された前記既存の屋根材の上に、新規の屋根材を重ね葺きするための、重ね葺き用屋根材固定装置であって、前記既存の屋根材上に水上水下方向に並べて配置され、前記新規の屋根材が固定される少なくとも二つの取付具と、正圧に対して前記新規の屋根材を支えるよう、対応する前記取付具に近接して配置される少なくとも一対のライトスペーサとを備え、前記取付具はそれぞれ、前記座金が貫通可能な第1孔及び該第1孔とつながり該座金が貫通不能且つ前記ボルトが貫通可能な第2孔を有し、水上水下方向に隣り合う一対の前記取付具は、前記第1孔及び前記第2孔の上下位置関係が相互に逆になるように配設される、ことを特徴とする。
また、前記既存及び新規の屋根材はそれぞれ波形に形成されており、前記ライトスペーサは波形に形成されたFRP製の部材であると好適である。
また、前記取付具は、施工治具の係合部が前記ボルトと係合した状態で該係合部及び該取付具の相互スライドを許容するスリットを備えていると好適である。
【0007】
同目的を達成するため、別の本発明は、既存の屋根材の上面に軸部が突出したボルトと、該軸部に差し込まれるナット及び座金とにより既存の母屋に固定された前記既存の屋根材の上に、新規の屋根材を重ね葺きするための、重ね葺き用屋根材固定方法であって、前記座金が貫通可能な第1孔及び該第1孔とつながり該座金が貫通不能且つ前記ボルトが貫通可能な第2孔を有する取付具を少なくとも一対用意し、前記一対の取付具を、前記第1孔及び前記第2孔の上下位置関係が相互に逆になるように前記既存の屋根材に水上水下方向に並べて配置し、各取付具において前記座金が前記第2孔の上方に位置する状態で、前記一対の取付具を前記新規の屋根材により一体的に連結するように該一対の取付具に該新規の屋根材を重ね葺きする、ことを特徴とする。
【0008】
【発明の実施の形態】
以下、この発明の実施の形態を添付図面に基づいて説明する。
実施の形態1.
図1〜図3に示されるように重ね葺き用屋根材固定装置21は、波形の既存の屋根材23の山部分に配置される複数の取付具25と、その近傍に配置される複数のライトスペーサ27とを備えている。
【0009】
取付具25は、金属により形成され、図4及び図5に示されるように、端面がほぼ台形に形成されている実質的に管状の部材である。より詳細には、取付具25は、底壁29、左右一対の側壁31,33及び上壁35から構成されている。底壁29は、波形の既存の屋根材の山部分に対応して中央が上方に盛り上がった湾曲形状を有している。底壁29の中央部には、貫通穴37が穿設されており、この貫通穴37は、後述する既存の屋根材のフックボルトに係合する座金部分が貫通可能な直径の丸穴である第1孔39と、その第1孔39とつながり、当該座金部分は貫通できずに上記フックボルトの軸部分がスライド可能な幅の長孔である第2孔41とを備えている。この第2孔41は、屋根材の水上水下方向に延びている。次に、左右一対の側壁31,33は、側壁29の対応する側端部から上方に立ち上がっており、上壁35の対応する側端部へとつながっている。左右一対の側壁31,33の間隔は、下部から上部にいくにつれて狭くなるように設定されている。また、上壁35は、重ね葺きされる波形の新規な屋根材の山部分に対応して中央が上方に盛り上がった湾曲形状を有している。なお、本実施の形態では、取付具25の実際の製作態様として、左右一対の側壁31,33及び上壁35が一体である端面ほぼU字状の部材を、側壁31,33の下端部において、底壁29に溶接して構成されているが、本発明は、この製作態様に限定されるものではない。
【0010】
ライトスペーサ27は、図1及び図3に示されるように、FRP製の波板であり、上方からかかる正圧に対して新規な屋根材43を支持するものである。より詳細には、ライトスペーサ27は、波形の新規な屋根材43の山部分の下方に位置する共にこの山部分から若干浮くような形状の凸部分45と、波形の既存の屋根材23の谷部分の上方に位置すると共にこの谷部分から若干浮くような形状の凹部分47とを有する。同時に、凸部分45及び凹部分47は、波形の新規な屋根材43に正圧が作用したときに、ライトスペーサ27が撓んで屋根材43の山部分及び屋根材23の谷部分に接触するような形状にもなっている。また、ライトスペーサ27が既存の屋根材23上に配置されたとき、凸部分45が取付具25よりも高くなるように形成されている。
【0011】
次に、以上のように構成された重ね葺き用屋根材固定装置21の施工態様について、主に図1〜図3、図6及び図7を参照しながら説明する。なお、図6及び図7はそれぞれ、図2のVI部及びVII部を側方からみた場合を示す。波形の既存の屋根材23は、その山部分の上面に軸部が突出するフックボルト49と、その軸部に係合するナット51及び座金53とによって、既存の母屋55に固定されている。かかる既存の屋根材23に対して、取付具25の第1孔39に座金53が貫通するように、取付具25を載せる。そして、フックボルト49の軸部が第2孔41内において第1孔39から離隔する方向に相対移動するように、取付具25を既存の屋根材23と座金53との間においてスライドさせる。このスライドは、フックボルト49の軸部が第2孔41のほぼ終端まで相対的に移動するまで行う。これにより、座金53が第2孔41の上方に位置するようになる。そして、第2孔41は上記のように座金53の貫通を許容しないため、取付具25は既存の屋根材23から離隔しないようになる。かかる態様で複数の取付具25をフックボルト49の座金53毎に取り付ける。
【0012】
また、各取付具25の近傍には、ライトスペーサ27が配置される。ライトスペーサ27は、各取付具25の第1孔39側に置かれる。このように複数の取付具25及び複数のライトスペーサ27を設置した後、波形の新規な屋根材43を載せて、ボルトや座金を含む締結手段57により屋根材43を取付具25の上壁35に留め付ける。なお、締結手段57は、図6に示されるように、上下に隣接する新規な屋根材43が重なる部分では、2枚の屋根材43の双方を貫通して上壁35にねじ込まれ、図7に示されるように、新規な屋根材43の中間部分では、その屋根材43のみを貫通して上壁35にねじ込まれる。
【0013】
このように、本実施の形態の重ね葺き用屋根材固定装置21では、2種類の部材をセットするだけで新規屋根材の重ね葺きができる。そのため、重ね葺き用屋根材固定装置21のセットが完了するまでの施工時間が大幅に短縮され、作業性が良好となった。また、部品点数の減少は、施工性を上げるだけでなく、重ね葺き用屋根材固定装置の重量低減にもつながり、既存建物への重量負担を軽減することができる。また、既存の屋根材23への重ね葺き用屋根材固定装置21の固定は、既存のフックボルト49のみを利用し屋根材23への穴あけを伴わないため、屋内に屑を落下させることもない。
【0014】
また、重ね葺き用屋根材固定装置21は2種類の部材で構成され、新規な屋根材43は取付具25に直接留め付けられるため、付け母屋や新規なフックボルトを省略することができる。したがって、施工作業の簡略化、屋根材固定装置の構成部品の簡素化を図ることができる。また、そのように付け母屋を省略しても、ライトスペーサ27が正圧に対して新規な屋根材43を支えるため、十分な強度も確保される。また、ライトスペーサをFRPにより形成したため、ライトスペーサ27は正圧に応じて撓み、既存及び新規の屋根材23,43の双方に馴染みやすくなっている。よって、好適に新規の屋根材43を支えることができる。さらに、ライトスペーサをFRPにより形成したことは、軽量化も促進でき、これによっても既存建物への重量負担を軽減することができる。
【0015】
さらに、ライトスペーサ27は単に既存の屋根材23に載せるだけでよいため、付け母屋のように作業性を考慮して最低限の高さが要求されることもないため、重ね葺き用屋根材固定装置21を低く構成することが可能であり、ひいては重ね葺きの仕上り高さも抑えることができる。このことはデザイン上、以下のような利点を確保することが可能である。すなわち、既存の建物は、当初から既存の屋根材の位置に屋根材があることを前提として設計されており、このため、既存の屋根材の上に新たに屋根材を葺いた場合、既存の屋根材と新規の屋根材との距離が大きくなることはデザイン上好ましくないことといえる。これに対し、本発明の重ね葺き用屋根材固定装置ならば、当該固定装置を低く構成することができるため既存の屋根材と新規の屋根材との距離を従来よりも小さくすることができるため、デザイン上、非常に好適である。また、重ね葺きを行った場合、既存の屋根材と新規の屋根材との間の空間は、断熱層としても機能することとなるが、既存の屋根材と新規の屋根材との距離が約3cm以上の態様では、断熱効果にあまり差が無くなってくるため、本実施の形態では、重ね葺き用屋根材固定装置を低く構成しながらも、当該距離を少なくとも3cm以上確保しておけばよい。これにより、デザイン上好適な高さの重ね葺きを行いながら、尚且つ、既存の屋根材と新規の屋根材との間に断熱層として有効に機能する適度な空間を確保することも可能となる。
【0016】
また、本実施の形態の重ね葺き用屋根材固定装置21においては、2種類の部材で構成されているにもかかわらず、以下に説明するように、既存の屋根材23からの脱落が防止されている。図2に、複数の取付具25が横方向に3列、上下方向(水上・水下方向)に2段、現れた部分を示す。図2に示されるように、同列において上下に並べて配置された一対の取付具25は、第1孔39及び第2孔41の上下位置関係が相互に逆になるように配置されている。すなわち、一段目に配置された複数の取付具25はいずれも、第1孔39が第2孔41よりも水下側に位置する向きに並べられ、逆に、二段目に配置された複数の取付具25はいずれも、第1孔39が第2孔41よりも水上側に位置する向きに並べられる。このような取付具25の配列態様により、各取付具25が既存の屋根材23に対して離脱することが防止されている。すなわち、一段目の取付具25は、既存の屋根材23から離脱させる場合、座金53を第1孔39上に位置させるよう取付具25を水上方向にスライドさせる必要がある。一方、二段目の取付具25は、既存の屋根材23から離脱させる場合、座金53を第1孔39上に位置させるよう取付具25を水下方向にスライドさせる必要がある。しかしながら、一段目の取付具25と二段目の取付具25とは、締結手段57及び新規な屋根材43を介して相互に一体的に連結されている。したがって、上記のように上下段の取付具25が互いに逆向きに取り付けられていることで、結果的に上下段の取付具25が互いに離脱方向のスライドを規制し合う関係になる。このため、各取付具25は既存の屋根材23に対してスライドが規制され、屋根材23から離脱することが防止される。
【0017】
実施の形態2.
次に、本発明の実施の形態2に係る重ね葺き用屋根材固定装置について、図8及び図9に基づいて説明する。本実施の形態に係る重ね葺き用屋根材固定装置は、上記実施の形態1において取付具にスリットを追加したものである。よって、当該スリット以外の取付具の構造やライトスペースの構造、さらに、設置態様などの他の構成は、実施の形態1と同様である。取付具59の左右一対の側壁61,63には、左右一対のスリット65,67が形成されている。スリット65,67は、後述する治具の係合部がフックボルト49の軸部と係合し、その状態で、係合部と取付具59とが相対スライドできるようにするためのものである。スリット65,67は、対応する側壁61,63の一端面61a,63aすなわち第1孔39が近接する側の端面において開放しており、その一端面61a,63aから他端面61b,63bに向けてほぼ水平に延びている。
【0018】
また、これらスリット65,67を備えた取付具59を、既存の屋根材23と既存のフックボルト49の座金53との間で容易にスライドさせるために、治具71を使用する。治具71は、図8に示されるように、ベース部73と、その一端に揺動自在に取り付けられたレバー75と、このレバー75の中間部に揺動自在に取り付けられたアーム77と、さらにベース73の一端側にセットされるあて板79とを備えている。アーム77は、左右一対のプレート77a,77bと、これらプレート77a,77bの両端を相互に連結する一対のロッド77c,77dとを備えている。左右一対のプレート77a,77bは、レバー75を挟み込むように配置され、ロッド77cは、レバー75を貫通し、一対のプレート77a,77bの後端を相互接続すると共に、同プレート77a,77bをレバー75に対して揺動自在に支持する。一方、ロッド77dは、一対のプレート77a,77bの前端を相互接続すると共に、既存のフックボルト49に対する係合部として機能し、取付具59に形成された一対のスリット65,67内をスライド可能な直径を備える。
【0019】
次に、このような治具71を使用して、取付具59を既存の屋根材23と座金53との間でスライドさせる動作について説明する。図9の(a)に示されるように、治具71のベース部73の一端側にあて板79を配置し、あて板79におけるベース部73との反対側に取付具59を当接させる。このとき、スリット65,67の開放方向が治具71と逆向きとなるように、取付具59をセットする。次に、既存のフックボルト49に係合する座金53が取付具59の第1孔39を貫通するように、取付具59を既存の屋根材23に載せると共に、治具71のアーム77のロッド77dを取付具59のスリット65,67内に入れる。このとき、フックボルト49があて板79とロッド77dとの間に挟まれるように、アーム77をフックボルト49の近傍に位置させる。
【0020】
以上のようなセットが完了したら、図9の(b)に示されるように、レバー75をベース部73に向けて倒す。これにより、フックボルト49は、治具71のあて板79に接近するような方向の力を受ける。しかし、フックボルト49は既存の屋根材23に固定され不動であるため、反作用力により治具71及びそれに当接する取付具59が、図中矢印の方向にスライドする。これにより、取付具59は既存の屋根材23と座金53との間でスライドし、座金53は取付具59の第2孔41の上方に位置するように相対的に移動する。このようにして、本実施の形態では、治具71により取付具59を容易にスライドさせ、取付具59を既存の屋根材23から離脱しないようにセットすることができる。また、その後の重ね葺き用屋根材固定装置の組立や、新規の屋根材の重ね葺きについては、上記実施の形態1の場合と同様である。このように、本実施の形態2では、上記実施の形態1と同様な利点を奏することができることに加え、取付具59のセットが容易に行える利点がある。
【0021】
【発明の効果】
以上説明したように、請求項1に記載の本発明の重ね葺き用屋根材固定装置によれば、取付具及びライトスペーサという2種類の部品から構成されることで施工が非常に容易であり、また、重ね葺き用屋根材固定装置の既存の屋根材への取り付けに際しては、既存の屋根材を貫通する固定具を用いないため、従来のように既存の屋根材の下方へ貫通に伴う屑を落下させることを回避することができる。また、既存の技術に比べ、部材数が少なく簡素であるので、重ね葺きにより既存の屋根材上に新たに加わる重量が少なくて済む。
請求項2に記載の重ね葺き用屋根材固定装置によれば、ライトスペーサがFRPから構成されているため、軽量化による既存建物への重量負担が軽減され、加えて、その柔軟性より既存及び新規の屋根材に馴染みやすくなっている。さらに、ライトスペーサが正圧に対し新規屋根材を支えることができるため、母屋を省略し、重ね葺き用屋根材固定装置の構成部品の種類数の減少にもつながる。
請求項3に記載の重ね葺き用屋根材固定装置によれば、施工治具と組み合わせることができ、更に施工が容易となる。
請求項4に記載の本発明の重ね葺き用屋根材固定方法によれば、上下に隣り合う一対の取付具を上下方向が相互に逆になるように配置することで、取付具の脱落を防止するだけの専用部品を使用せずに重ね葺きが行え、使用部品の種類を低減して施工を容易にすることができる。
【図面の簡単な説明】
【図1】 この発明の実施の形態1に係る重ね葺き用屋根材固定装置の斜視図である。
【図2】 この発明の実施の形態1に係る重ね葺き用屋根材固定装置の平面図である。
【図3】 この発明の実施の形態1に係る重ね葺き用屋根材固定装置の端面図である。
【図4】 この発明の実施の形態1に係る重ね葺き用屋根材固定装置の取付具に関する正面図である。
【図5】 この発明の実施の形態1に係る重ね葺き用屋根材固定装置の取付具に関する斜視図である。
【図6】 図2のVI部を側方からみた図である。
【図7】 図2のVII部を側方からみた図である。
【図8】 この発明の実施の形態2に係る重ね葺き用屋根材固定装置と、その施工に使用する治具とを示す斜視図である。
【図9】 この発明の実施の形態2に係る重ね葺き用屋根材固定装置の施工を示す図である。
【図10】 従来の重ね葺き用屋根材固定装置の側面図である。
【図11】 本出願人が創作した比較例としての重ね葺き手法を示す図である。
【符号の説明】
21…重ね葺き用屋根材固定装置、23…既存の屋根材、25,59…取付具、27…ライトスペーサ、39…第1孔、41…第2孔、43…新規の屋根材、49…フックボルト、51…ナット、53…座金、55…既存の母屋、65,67…スリット、71…施工治具、77d…係合部。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a stacking roof material fixing device and a stacking roof material fixing method for stacking a new roof material on an existing roof material.
[0002]
[Prior art]
FIG. 10 shows a conventional mode in the case where a new roof material is overlaid on an existing roof material. The existing roofing material 1 is fixed to the existing purlin 2 with existing hook bolts 3. When stacking a new roofing material, first, the new purlin 5 is fixed to the upper surface of the roofing material 1 with a fastening screw 4 penetrating the existing roofing material 1 and the main roof 2. Further, the new roof bolt 7 is fixed to the upper surface of the new purlin 5 by engaging the new hook bolt 6 with the new purlin 5.
[0003]
[Problems to be solved by the invention]
However, in the conventional mode described above, the fastening screws 4 used for fixing the new purlin 5 to the existing roofing material 1 penetrate the roofing material 1 and the existing purlining 2, so that the existing roofing material and purlin Slate and metal scraps could fall indoors. Further, since the fastening screw 4 has a long total length because it penetrates the roofing material 1 and the purlin 2, workability is not good, such as being difficult to screw straight.
[0004]
In view of such a problem, the present applicant has created a technique as shown in FIGS. That is, the roofing material fixing device 11 for the double roofing used in this method includes the first mounting bracket 12, the second mounting bracket 13, and the attached purlin 14, and first, as shown in FIG. The first mounting bracket 12 is inserted and slid into the hook bolt 16 that fixes the existing roofing material 15 so that the first mounting bracket 12 is not separated from the existing roofing material 15. Next, in order to prevent the first mounting bracket 12 from sliding relative to the roofing material 15, the second mounting bracket 13 has a hole 17 surrounding the shaft portion of the hook bolt 16 as shown in FIG. The second mounting bracket 13 is placed on the first mounting bracket 12. Further, as shown in FIG. 11 (c), the splint 14 is arranged along the rising portions of the first mounting bracket 12 and the second mounting bracket 13, and the first mounting bracket 12 and the second mounting bracket 12 are mounted. The bracket 13 and the attached purlin 14 are temporarily fixed with bolts and nuts. Then, after adjusting for unevenness, etc., the bolts and nuts are finally tightened, and as shown in FIG. Then, a new roofing material is piled on the splint 14 of the stacked roofing material fixing device 11. In such a method, the roof material fixing device itself can be removed from the existing roof material without dropping waste indoors because it can be stacked and rolled without interposing a new penetrating member on the existing roof material or main building. There was an excellent advantage that it would not come off. On the other hand, regarding assembly and workability, it is a mode in which the three types of members of the first mounting bracket 12, the second mounting bracket 13 and the splint 14 are set in order, and finally are mutually fastened, so that it is further simplified. It would have been more suitable if it could be achieved.
[0005]
Therefore, the present invention has been made in view of the above, and does not cause debris to fall indoors, and does not accidentally come off from existing roofing materials, and can be easily laid, and the roofing material can be used for laying. It is an object of the present invention to provide a fixing device and a method for fixing a roofing material for laying.
[0006]
[Means for Solving the Problems]
In order to achieve the above-described object, the present invention provides the above-described existing roofing material that is fixed to the existing main building by a bolt having a shaft protruding from the upper surface of the existing roofing material, and a nut and a washer inserted into the shaft. A roofing material fixing device for stacking a new roofing material, arranged on the existing roofing material in a water-and-water direction, and fixing the new roofing material At least two fixtures, and at least a pair of light spacers disposed proximate to the corresponding fixtures to support the new roofing material against positive pressure, each of the fixtures being A pair of fittings that have a first hole through which a washer can penetrate and a second hole that connects to the first hole and through which the washer cannot penetrate and through which the bolt can penetrate, Vertical position relationship between one hole and the second hole Are disposed to have opposite to each other, characterized in that.
In addition, it is preferable that the existing and new roof materials are each formed in a corrugated shape, and the light spacer is an FRP member formed in a corrugated shape.
In addition, it is preferable that the fixture includes a slit that allows the engaging portion and the fixture to slide relative to each other in a state where the engaging portion of the construction jig is engaged with the bolt.
[0007]
In order to achieve the same object, another aspect of the present invention provides the above-described existing roof fixed to an existing main building by a bolt whose shaft portion protrudes from an upper surface of an existing roof material, and a nut and a washer inserted into the shaft portion. A method for fixing a roofing material for laying roofing, in which a new roofing material is overlaid on a material, the first hole through which the washer can pass, the first hole connected to the first washer, and the washer not penetrating and At least a pair of fixtures having a second hole through which a bolt can pass is prepared, and the existing roof is arranged so that the vertical positional relationship between the first hole and the second hole is opposite to each other. In order to connect the pair of fixtures integrally with the new roofing material in a state where the washer is positioned above the second hole in each fixture. This new roofing material is piled on a pair of fixtures. The features.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the accompanying drawings.
Embodiment 1 FIG.
As shown in FIG. 1 to FIG. 3, the roofing material fixing device 21 for stacking is composed of a plurality of fixtures 25 that are arranged in the mountain portions of the corrugated existing roofing material 23 and a plurality of lights that are arranged in the vicinity thereof. And a spacer 27.
[0009]
The fixture 25 is a substantially tubular member made of metal and having an end surface formed in a substantially trapezoidal shape as shown in FIGS. 4 and 5. More specifically, the fixture 25 includes a bottom wall 29, a pair of left and right side walls 31, 33 and an upper wall 35. The bottom wall 29 has a curved shape in which the center rises upward corresponding to the peak portion of the existing corrugated roofing material. A through hole 37 is formed in the center of the bottom wall 29. The through hole 37 is a round hole having a diameter through which a washer portion that engages with a hook bolt of an existing roof material to be described later can pass. The first hole 39 is connected to the first hole 39 and includes a second hole 41 that is a long hole having a width that allows the shaft portion of the hook bolt to slide without allowing the washer portion to pass therethrough. This second hole 41 extends in the direction of the water surface of the roofing material. Next, the pair of left and right side walls 31, 33 rises upward from the corresponding side end of the side wall 29 and is connected to the corresponding side end of the upper wall 35. The distance between the pair of left and right side walls 31 and 33 is set so as to become narrower from the lower part to the upper part. Further, the upper wall 35 has a curved shape with the center rising upward corresponding to a mountain portion of a new corrugated roofing material to be rolled up. In the present embodiment, as an actual manufacturing mode of the fixture 25, an end face substantially U-shaped member in which the pair of left and right side walls 31, 33 and the upper wall 35 are integrated is formed at the lower end of the side walls 31, 33. However, the present invention is not limited to this production mode.
[0010]
As shown in FIGS. 1 and 3, the light spacer 27 is a corrugated plate made of FRP, and supports a new roof material 43 against the positive pressure from above. More specifically, the light spacer 27 includes a convex portion 45 which is located below the peak portion of the new corrugated roof material 43 and slightly floats from the peak portion, and a valley of the existing corrugated roof material 23. It has a concave portion 47 which is located above the portion and has a shape slightly floating from the valley portion. At the same time, the convex portion 45 and the concave portion 47 are so arranged that when the positive pressure is applied to the corrugated new roof material 43, the light spacer 27 is bent and contacts the mountain portion of the roof material 43 and the valley portion of the roof material 23. It is also a simple shape. Moreover, when the light spacer 27 is arrange | positioned on the existing roofing material 23, the convex part 45 is formed so that it may become higher than the fixture 25. FIG.
[0011]
Next, a construction aspect of the roofing material fixing device 21 for the double roofing configured as described above will be described mainly with reference to FIGS. 1 to 3, 6 and 7. 6 and 7 show the case where the VI part and the VII part of FIG. 2 are viewed from the side, respectively. The corrugated existing roofing material 23 is fixed to the existing main building 55 by a hook bolt 49 whose shaft portion protrudes from the upper surface of the mountain portion, and a nut 51 and a washer 53 that engage with the shaft portion. The fixture 25 is placed on the existing roof material 23 so that the washer 53 penetrates the first hole 39 of the fixture 25. Then, the fixture 25 is slid between the existing roof material 23 and the washer 53 so that the shaft portion of the hook bolt 49 moves relative to the first hole 39 in the second hole 41. This sliding is performed until the shaft portion of the hook bolt 49 relatively moves to almost the end of the second hole 41. As a result, the washer 53 is positioned above the second hole 41. Since the second hole 41 does not allow the washer 53 to penetrate as described above, the fixture 25 is not separated from the existing roof material 23. In this manner, the plurality of fixtures 25 are attached to each washer 53 of the hook bolt 49.
[0012]
A light spacer 27 is disposed in the vicinity of each fixture 25. The light spacer 27 is placed on the first hole 39 side of each fixture 25. After installing the plurality of fixtures 25 and the plurality of light spacers 27 in this way, a new roof material 43 having a corrugated shape is placed, and the roof material 43 is attached to the upper wall 35 of the fixture 25 by fastening means 57 including bolts and washers. Fasten to. As shown in FIG. 6, the fastening means 57 is screwed into the upper wall 35 through both of the two roof materials 43 at the portion where the new roof materials 43 adjacent to each other overlap. As shown in the figure, in the middle part of the new roofing material 43, only the roofing material 43 is penetrated and screwed into the upper wall 35.
[0013]
As described above, in the roofing material fixing device 21 for stacking roof according to the present embodiment, it is possible to stack a new roofing material only by setting two kinds of members. For this reason, the construction time until the setting of the roofing material fixing device 21 for overlapping thatched is completed is greatly shortened, and the workability is improved. Moreover, the reduction in the number of parts not only improves the workability, but also leads to a reduction in the weight of the roofing material fixing device for the double roofing, and can reduce the weight burden on the existing building. In addition, the fixing of the roofing material fixing device 21 for overlapping roofing to the existing roofing material 23 uses only the existing hook bolts 49 and does not involve drilling in the roofing material 23, so that no debris is dropped indoors. .
[0014]
Moreover, since the roofing material fixing device 21 for the double roofing is composed of two types of members and the new roofing material 43 is directly fastened to the fixture 25, it is possible to omit a splint and a new hook bolt. Therefore, the construction work can be simplified and the components of the roof material fixing device can be simplified. Moreover, even if the splint is omitted as described above, the light spacer 27 supports the new roof material 43 against the positive pressure, so that sufficient strength is ensured. In addition, since the light spacer is formed of FRP, the light spacer 27 bends according to the positive pressure, so that it is easy to become familiar with both the existing and new roof materials 23 and 43. Therefore, the new roof material 43 can be suitably supported. Furthermore, the fact that the light spacer is formed by FRP can also promote weight reduction, which can reduce the weight burden on the existing building.
[0015]
Furthermore, since the light spacers 27 need only be placed on the existing roofing material 23, a minimum height is not required in consideration of workability as in the case of a splint. The apparatus 21 can be configured to be low, and as a result, the finished height of the multiple firing can be suppressed. This can ensure the following advantages in terms of design. In other words, the existing building is designed on the premise that there is a roofing material at the position of the existing roofing material from the beginning. Therefore, if a new roofing material is spread on the existing roofing material, It can be said that an increase in the distance between the roofing material and the new roofing material is not preferable in terms of design. On the other hand, since the fixing device can be configured to be low if the roofing material fixing device for stacked roofs of the present invention is used, the distance between the existing roof material and the new roof material can be made smaller than before. It is very suitable in design. In addition, when layered, the space between the existing roof material and the new roof material will also function as a heat insulating layer, but the distance between the existing roof material and the new roof material is approximately In the embodiment of 3 cm or more, there is not much difference in the heat insulation effect. Therefore, in this embodiment, it is sufficient to secure the distance of at least 3 cm or more while configuring the low roofing material fixing device. As a result, it is possible to secure an appropriate space that effectively functions as a heat insulating layer between the existing roof material and the new roof material, while carrying out the stacking at a height suitable for the design. .
[0016]
Moreover, in the overlapping roofing material fixing device 21 of the present embodiment, although it is composed of two types of members, it is prevented from falling off from the existing roofing material 23 as described below. ing. FIG. 2 shows a portion in which a plurality of fixtures 25 appear in three rows in the horizontal direction and in two levels in the vertical direction (water and water). As shown in FIG. 2, the pair of fixtures 25 arranged vertically in the same row are arranged so that the vertical positional relationship between the first hole 39 and the second hole 41 is opposite to each other. That is, the plurality of fixtures 25 arranged in the first stage are all arranged in the direction in which the first hole 39 is located below the second hole 41, and conversely, the plurality of fixtures 25 arranged in the second stage. All of the fixtures 25 are arranged in a direction in which the first hole 39 is located on the water side of the second hole 41. Such an arrangement mode of the fixtures 25 prevents each fixture 25 from being detached from the existing roofing material 23. That is, when the first-stage fixture 25 is detached from the existing roof material 23, it is necessary to slide the fixture 25 in the water direction so that the washer 53 is positioned on the first hole 39. On the other hand, when the second-stage fixture 25 is detached from the existing roofing material 23, it is necessary to slide the fixture 25 in the downward direction so that the washer 53 is positioned on the first hole 39. However, the first-stage fixture 25 and the second-stage fixture 25 are integrally connected to each other via the fastening means 57 and the new roof material 43. Therefore, the upper and lower mounting fixtures 25 are attached in opposite directions as described above, and as a result, the upper and lower mounting fixtures 25 restrict the sliding in the separating direction. For this reason, sliding of each fixture 25 is restricted with respect to the existing roof material 23, and it is prevented from being detached from the roof material 23.
[0017]
Embodiment 2. FIG.
Next, a stacking roof material fixing device according to Embodiment 2 of the present invention will be described with reference to FIGS. 8 and 9. The overlapping roofing material fixing device according to the present embodiment is obtained by adding a slit to the fixture in the first embodiment. Therefore, the structure of the fixture other than the slit, the structure of the light space, and other configurations such as the installation mode are the same as those in the first embodiment. A pair of left and right slits 65 and 67 are formed in the pair of left and right side walls 61 and 63 of the fixture 59. The slits 65 and 67 are provided so that an engaging portion of a jig, which will be described later, engages with a shaft portion of the hook bolt 49, and the engaging portion and the fixture 59 can be relatively slid in this state. . The slits 65 and 67 are open at one end surfaces 61a and 63a of the corresponding side walls 61 and 63, that is, end surfaces on the side where the first holes 39 are close to each other, and from the one end surfaces 61a and 63a toward the other end surfaces 61b and 63b. It extends almost horizontally.
[0018]
A jig 71 is used to easily slide the fixture 59 having the slits 65 and 67 between the existing roofing material 23 and the washer 53 of the existing hook bolt 49. As shown in FIG. 8, the jig 71 includes a base portion 73, a lever 75 swingably attached to one end thereof, and an arm 77 swingably attached to an intermediate portion of the lever 75, Further, a base plate 79 set on one end side of the base 73 is provided. The arm 77 includes a pair of left and right plates 77a and 77b and a pair of rods 77c and 77d that connect both ends of the plates 77a and 77b to each other. The pair of left and right plates 77a and 77b are arranged so as to sandwich the lever 75. The rod 77c penetrates the lever 75 and interconnects the rear ends of the pair of plates 77a and 77b. 75 is swingably supported. On the other hand, the rod 77d interconnects the front ends of the pair of plates 77a and 77b, functions as an engaging portion for the existing hook bolt 49, and can slide in the pair of slits 65 and 67 formed in the fixture 59. With a large diameter.
[0019]
Next, the operation | movement which slides the fixture 59 between the existing roof material 23 and the washer 53 using such a jig | tool 71 is demonstrated. As shown in FIG. 9A, a contact plate 79 is disposed on one end side of the base portion 73 of the jig 71, and the fixture 59 is brought into contact with the opposite side of the contact plate 79 from the base portion 73. At this time, the fixture 59 is set so that the opening direction of the slits 65 and 67 is opposite to the jig 71. Next, the fixture 59 is placed on the existing roof material 23 so that the washer 53 that engages with the existing hook bolt 49 passes through the first hole 39 of the fixture 59, and the rod of the arm 77 of the jig 71. 77d is put into the slits 65 and 67 of the fixture 59. At this time, the arm 77 is positioned in the vicinity of the hook bolt 49 so that the hook bolt 49 is sandwiched between the contact plate 79 and the rod 77d.
[0020]
When the setting as described above is completed, the lever 75 is tilted toward the base portion 73 as shown in FIG. As a result, the hook bolt 49 receives a force in such a direction as to approach the contact plate 79 of the jig 71. However, since the hook bolt 49 is fixed to the existing roofing material 23 and does not move, the jig 71 and the fixture 59 abutting on the jig 71 slide in the direction of the arrow in the figure due to the reaction force. Thereby, the fixture 59 slides between the existing roof material 23 and the washer 53, and the washer 53 moves relatively so as to be positioned above the second hole 41 of the fixture 59. In this way, in the present embodiment, the fixture 59 can be easily slid by the jig 71, and the fixture 59 can be set so as not to be detached from the existing roof material 23. Further, the subsequent assembly of the roofing material fixing device for overlapping roofing and the overlapping roofing of the new roofing material are the same as in the case of the first embodiment. As described above, in the second embodiment, in addition to having the same advantages as those of the first embodiment, there is an advantage that the attachment tool 59 can be easily set.
[0021]
【The invention's effect】
As explained above, according to the roofing material fixing device for stacked roof of the present invention according to claim 1, construction is very easy by being composed of two types of parts, a fixture and a light spacer, In addition, when attaching the roofing material fixing device for the overlapping roofing to the existing roofing material, since there is no fixture that penetrates the existing roofing material, as in the conventional case, the debris accompanying the downward penetration of the existing roofing material is removed. It is possible to avoid dropping. In addition, since the number of members is simple compared to the existing technology, the weight newly added to the existing roofing material due to the overlapping is reduced.
According to the stacking roof material fixing device according to claim 2, since the light spacer is made of FRP, the weight burden on the existing building due to weight reduction is reduced. It is easy to become familiar with new roofing materials. Furthermore, since the light spacer can support the new roofing material against the positive pressure, the main building is omitted, and the number of types of components of the roofing material fixing device for the double roofing is reduced.
According to the roofing material fixing apparatus for laying roof according to claim 3, it can be combined with the construction jig, and the construction is further facilitated.
According to the method for fixing the roofing material for stacked roofs according to the fourth aspect of the present invention, it is possible to prevent the fixtures from falling off by arranging the pair of fixtures adjacent in the vertical direction so that the vertical directions are opposite to each other. It is possible to carry out layering without using dedicated parts, and to reduce the types of parts used and to facilitate construction.
[Brief description of the drawings]
FIG. 1 is a perspective view of a stacking roof material fixing device according to Embodiment 1 of the present invention.
FIG. 2 is a plan view of the roofing material fixing device for stacked roof according to Embodiment 1 of the present invention.
FIG. 3 is an end view of the roofing material fixing device for stacked roof according to Embodiment 1 of the present invention.
FIG. 4 is a front view relating to the fixture for the roofing material fixing apparatus for stacked roof according to Embodiment 1 of the present invention.
FIG. 5 is a perspective view relating to a fixture for a roofing material fixing apparatus for stacked roof according to Embodiment 1 of the present invention.
6 is a side view of the VI part of FIG. 2;
7 is a view of the VII portion of FIG. 2 as viewed from the side.
FIG. 8 is a perspective view showing a stacking roof material fixing device and a jig used for its construction according to Embodiment 2 of the present invention.
FIG. 9 is a diagram showing the construction of a stacking roof material fixing apparatus according to Embodiment 2 of the present invention.
FIG. 10 is a side view of a conventional stacking roof material fixing device.
FIG. 11 is a diagram showing a method of overlapping that is a comparative example created by the present applicant.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 21 ... Stacking roof material fixing device, 23 ... Existing roof material, 25, 59 ... Fixture, 27 ... Light spacer, 39 ... 1st hole, 41 ... 2nd hole, 43 ... New roof material, 49 ... Hook bolt, 51 ... nut, 53 ... washer, 55 ... existing purlin, 65, 67 ... slit, 71 ... construction jig, 77d ... engagement part.

Claims (4)

既存の屋根材の上面に軸部が突出したボルトと、該軸部に差し込まれるナット及び座金とにより既存の母屋に固定された前記既存の屋根材の上に、新規の屋根材を重ね葺きするための、重ね葺き用屋根材固定装置であって、
前記既存の屋根材上に水上水下方向に並べて配置され、前記新規の屋根材が固定される少なくとも二つの取付具と、
正圧に対して前記新規の屋根材を支えるよう、対応する前記取付具に近接して配置される少なくとも一対のライトスペーサとを備え、
前記取付具はそれぞれ、前記座金が貫通可能な第1孔及び該第1孔とつながり該座金が貫通不能且つ前記ボルトが貫通可能な第2孔を有し、
水上水下方向に隣り合う一対の前記取付具は、前記第1孔及び前記第2孔の上下位置関係が相互に逆になるように配設される、
ことを特徴とする重ね葺き用屋根材固定装置。
A new roofing material is overlaid on the existing roofing material fixed to the existing main building by bolts with protruding shafts on the upper surface of the existing roofing material, and nuts and washers inserted into the shafts. A roofing fixing device for roofing,
Arranged on the existing roofing material side by side in the water-down direction, and at least two fixtures to which the new roofing material is fixed;
Including at least a pair of light spacers disposed proximate to the corresponding fixture to support the new roofing material against positive pressure;
Each of the fixtures has a first hole through which the washer can penetrate and a second hole connected to the first hole through which the washer cannot penetrate and the bolt can penetrate.
The pair of fixtures adjacent to each other in the water / water direction are arranged so that the vertical positional relationship between the first hole and the second hole is opposite to each other.
A roofing material fixing device for stacked roofs characterized by that.
前記既存及び新規の屋根材はそれぞれ波形に形成されており、前記ライトスペーサは波形に形成されたFRP製の部材であることを特徴とする請求項1に記載の重ね葺き用屋根材固定装置。The existing roofing material and the new roofing material are each formed in a corrugated shape, and the light spacer is an FRP member formed in a corrugated shape. 前記取付具は、施工治具の係合部が前記ボルトと係合した状態で該係合部及び該取付具の相互スライドを許容するスリットを備えたことを特徴とする請求項1又は2に記載の重ね葺き用屋根材固定装置。The said fixture is provided with the slit which accept | permits mutual sliding of this engaging part and this fixture in the state which the engaging part of the construction jig engaged with the said bolt. The roofing material fixing device for stacked roofs according to the description. 既存の屋根材の上面に軸部が突出したボルトと、該軸部に差し込まれるナット及び座金とにより既存の母屋に固定された前記既存の屋根材の上に、新規の屋根材を重ね葺きするための、重ね葺き用屋根材固定方法であって、
前記座金が貫通可能な第1孔及び該第1孔とつながり該座金が貫通不能且つ前記ボルトが貫通可能な第2孔を有する取付具を少なくとも一対用意し、
前記一対の取付具を、前記第1孔及び前記第2孔の上下位置関係が相互に逆になるように前記既存の屋根材に水上水下方向に並べて配置し、
各取付具において前記座金が前記第2孔の上方に位置する状態で、前記一対の取付具を前記新規の屋根材により一体的に連結するように該一対の取付具に該新規の屋根材を重ね葺きする、
ことを特徴とする重ね葺き用屋根材固定方法。
A new roofing material is overlaid on the existing roofing material fixed to the existing main building by a bolt whose shaft portion protrudes from the upper surface of the existing roofing material, and a nut and a washer inserted into the shaft portion. A method for fixing roofing material for cascading roofing,
Preparing at least a pair of fittings having a first hole through which the washer can penetrate and a second hole connected to the first hole through which the washer cannot penetrate and the bolt can penetrate;
The pair of fixtures are arranged side by side on the existing roofing material so that the vertical positional relationship between the first hole and the second hole is opposite to each other,
In the state where the washer is positioned above the second hole in each fixture, the pair of fixtures is integrally connected to the pair of fixtures with the new roof material. Whispering,
A method for fixing a roofing material for stacked roofs, characterized in that.
JP2001324863A 2001-10-23 2001-10-23 Stacking roof material fixing device and stacking roof material fixing method Expired - Fee Related JP3753420B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001324863A JP3753420B2 (en) 2001-10-23 2001-10-23 Stacking roof material fixing device and stacking roof material fixing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001324863A JP3753420B2 (en) 2001-10-23 2001-10-23 Stacking roof material fixing device and stacking roof material fixing method

Publications (2)

Publication Number Publication Date
JP2003129614A JP2003129614A (en) 2003-05-08
JP3753420B2 true JP3753420B2 (en) 2006-03-08

Family

ID=19141521

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001324863A Expired - Fee Related JP3753420B2 (en) 2001-10-23 2001-10-23 Stacking roof material fixing device and stacking roof material fixing method

Country Status (1)

Country Link
JP (1) JP3753420B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009125658A (en) * 2007-11-22 2009-06-11 Asahi Sunac Corp Roof painting method, painting equipment and single pipe fixture
JP5227148B2 (en) * 2008-11-28 2013-07-03 日鉄住金鋼板株式会社 Installation tool and fixing member
JP5373878B2 (en) * 2011-10-24 2013-12-18 綿半鋼機株式会社 Roof repair method
JP6923948B2 (en) * 2019-02-01 2021-08-25 株式会社カナメ New roof mounting fixtures and new roof mounting structure
JP7219967B2 (en) * 2019-05-08 2023-02-09 株式会社カナメ Mounting structure of corrugated metal roofing material
JP7421285B2 (en) * 2019-08-16 2024-01-24 Jfe鋼板株式会社 How to repair a corrugated slate roof

Also Published As

Publication number Publication date
JP2003129614A (en) 2003-05-08

Similar Documents

Publication Publication Date Title
CN103875178B (en) The fixture construction of solar module
JP5202430B2 (en) Solar cell module fixing structure
CA2977049C (en) System for enhancing the thermal resistance of roofs and walls of buildings
WO2011078382A1 (en) Structure installation mount, support for structure installation, and solar power generation system
JP2012019060A (en) Solar cell panel attachment device
JP3753420B2 (en) Stacking roof material fixing device and stacking roof material fixing method
EP3319228A1 (en) An integrated solar panel to a tiled roof
JP4415830B2 (en) Function panel mounting structure
JPH10245952A (en) Mounting bracket for solar panel
JP5890662B2 (en) Roof construction
JP2004300668A (en) Roof renovation structure
JP3588214B2 (en) Roof mounting fixtures
JP5368749B2 (en) Rooftop greening equipment
JP4125334B2 (en) Solar cell module
WO2008041467A1 (en) Fixing structure of solar cell module
KR102701919B1 (en) Roof panel system capable of improving solidarity and solar power generation
JP6863726B2 (en) Roof panel installation method, roof panel and roof structure
JP2003286760A (en) Roof structure having solar panel and construction method
JP6714639B2 (en) Support member and support structure for external material
JP2012127079A (en) Auxiliary rafter fixing metal fitting and equipment fixing device
JP5294190B2 (en) External structure and construction method
JP4287439B2 (en) Stacking fixture and refurbishment structure using this fixture
JP4955948B2 (en) Construction method of roof accessory fixing bracket and roof accessory tile
JP3389167B2 (en) Roof repair structure and repair method
JP3122950U (en) Support and fixing structure on rooftop, flat roof, etc. and support device used therefor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040401

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051212

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091222

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101222

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101222

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111222

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121222

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121222

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131222

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees