JP3798367B2 - Construction method of arch structure, dome structure and construction method thereof - Google Patents
Construction method of arch structure, dome structure and construction method thereof Download PDFInfo
- Publication number
- JP3798367B2 JP3798367B2 JP2002325264A JP2002325264A JP3798367B2 JP 3798367 B2 JP3798367 B2 JP 3798367B2 JP 2002325264 A JP2002325264 A JP 2002325264A JP 2002325264 A JP2002325264 A JP 2002325264A JP 3798367 B2 JP3798367 B2 JP 3798367B2
- Authority
- JP
- Japan
- Prior art keywords
- frame
- arch
- blocks
- block
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title claims description 27
- 238000009434 installation Methods 0.000 claims description 7
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 4
- 241000868066 Myadestes myadestinus Species 0.000 claims description 2
- 239000002243 precursor Substances 0.000 claims 1
- 239000000463 material Substances 0.000 description 14
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 239000011347 resin Substances 0.000 description 4
- 229920005989 resin Polymers 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 239000004567 concrete Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】
【発明の属する技術分野】
本発明はアーチ構造物の構築方法、ドーム構造物およびその構築方法に関するものである。
【0002】
【従来の技術】
従来、アーチ構造物の構築方法、ドーム構造物およびその構築方法としては、特開平6−26101号公報の発明が開示されている。このドーム構造物は架設構台でドーム屋根またはアーチ架構を支持しながら構築し、この構築後に架設構台に設置したジャッキでドーム屋根を押し上げて架設構台から離した後に、この架設構台を撤去していた。
【0003】
【特許文献1】
特開平6−26101号公報(図10)
【0004】
【発明が解決しようとする課題】
しかし、上記の構築方法においては、図17に示すように、多数の架設構台33によって支持されたアーチ架構34のジャッキ35による押し上げ作業、およびジャッキダウンの作業を、他のジャッキ35とのバランスを取りながら一つ一つ行うため非常に困難な作業となって、多大の労力と時間とが必要になっていた。
【0005】
【課題を解決するための手段】
以上の課題を解決するためのアーチ構造物の構築方法は、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、この柱脚に、アーチ架構全体を複数のブロックに分割したアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成し、前記両柱脚間に設置した引張材を所定の力で緊張してアーチ架構をむくり上げて架設構台から離した後、該架設構台を撤去することを特徴とする。
またドーム構造物は、一方が開口した平面湾曲状の地上躯体と、該地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚に、アーチ架構全体を複数のブロックに分割したアーチ用組立部材を架設構台で支持しながら連続的に接合して組立形成したアーチ架構と、該アーチ架構と平面湾曲状の地上躯体とにわたって設置されたドーム屋根とからなり、前記アーチ架構の両柱脚間に設置された引張材が所定の力で緊張されてアーチ架構およびドーム屋根がむくり上げられて形成されたことを特徴とする。
またドーム構造物の構築方法は、一方が開口した平面湾曲状の地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、この柱脚に、アーチ架構全体を複数のブロックに分割したアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成するとともに、該アーチ架構と平面湾曲状の地上躯体とにわたってドーム屋根を架設構台で支持しながら設置した後、前記アーチ架構の両柱脚間に設置した引張材を所定の力で緊張してアーチ架構とドーム屋根とをむくり上げて架設構台から離すとともに、該架設構台を撤去することを特徴とする。
【0006】
【課題を解決するための手段】
以上の課題を解決するためのアーチ構造物の構築方法は、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成し、前記両柱脚間に設置した引張材を所定の力で緊張してアーチ架構をむくり上げて架設構台から離した後、該架設構台を撤去することを特徴とする。
またドーム構造物は、一方が開口した平面湾曲状の地上躯体と、該地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合して組立形成したアーチ架構と、該アーチ架構と平面湾曲状の地上躯体とにわたって設置されたドーム屋根とからなり、前記アーチ架構の両柱脚間に設置された引張材が所定の力で緊張されてアーチ架構およびドーム屋根がむくり上げられて形成されたことを特徴とする。
またドーム構造物の構築方法は、一方が開口した平面湾曲状の地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成するとともに、該アーチ架構と平面湾曲状の地上躯体とにわたってドーム屋根を架設構台で支持しながら設置した後、前記アーチ架構の両柱脚間に設置した引張材を所定の力で緊張してアーチ架構とドーム屋根とをむくり上げて架設構台から離すとともに、該架設構台を撤去することを特徴とする。
【0007】
引張材の緊張でローラー支承の柱脚が内側に横移動するとともに、他方の柱脚がピン支承を中心に回転することにより、アーチ架構がむくり上げられて架設構台から一気に離されるので、架設構台がジャッキを必要とせずに撤去でき、アーチ構造物の構築が簡単になる。
アーチ架構のむくり上がりにともなってドーム屋根全体がむくり上げられるので、アーチ架構およびドーム屋根の応力の低減と、構成部材数量の低減とを図ることができる。
アーチ架構のむくり上がりにともなってドーム屋根全体がむくり上げられて架設構台から一気に離されるので、架設構台の簡単な撤去、およびドーム構造物の構築の簡略化が図れる。
【0008】
【発明の実施の形態】
以下、本発明のアーチ構造物の構築方法、ドーム構造物およびその構築方法の実施の形態を図面に基づいて詳細に説明する。はじめにアーチ構造物の構築方法について説明し、次いでドーム構造物、そしてドーム構造物の構築方法について説明する。また各実施の形態において同じ構成は同じ符号を付して説明し、異なった構成にのみ異なった符号を付して説明する。
【0009】
アーチ構造物1は、図1に示すように、両柱脚2、3が基礎4に支持されたアーチ架構5が両柱脚2、3間の下部に設置された引張材6の緊張によりむくり上げられて構成されたものである。
【0010】
このアーチ架構5は、図2に示すような、アーチ用組立部材7が連続的に接続されて構成されたものであり、このアーチ用組立部材7はH形鋼からなるトラス材8が横方向に適宜間隔をもって接続されて構成されている。
【0011】
一方、引張材6は、図3に示すように、適宜間隔をもって連結材9で連結された2本のH形鋼がその中央部で適宜間隔をもって左右に分割され、これら左右に分割された分割材10がセンターホール型のジャッキ11で接続されて構成されている。したがって、この分割された分割材10をジャッキ11で引っ張って緊張すると、図4に示すように、ローラー支承の柱脚3が内側に横移動するとともに、他方の脚柱2がピン支承を中心に回転するので、アーチ架構5がむくり上げられた状態になり、この状態で両柱脚2、3が基礎4に支持されている。
【0012】
次に、このアーチ構造物1の構築方法について説明する。このアーチ架構5の建て方は、図1に示すように、アーチ架構5全体を9ブロックのアーチ用組立部材7に分割して、1ブロック、5ブロック、2、3、4、6、7、8、9ブロックの順に建て方を行うものとする。
【0013】
このような建て方順のもとで7つの架設構台(角ベント支保工)12を組立形成し、その頂部に、鉛直荷重をスムーズに流すための受け材13を設置する。そして、製作ヤードで地組した両柱脚用組立部材14を基礎4上に設置して、一方をピン支承に、他方をローラー支承にする。
【0014】
次に、上記の建て方順にしたがって、地組した各アーチ用組立部材7をクレーンで吊り上げて、架設構台12で支持しながら接続すると、一方の柱脚2がピン支承で、他方の柱脚3がローラー支承のアーチ架構5が組立形成される。
【0015】
次に、図4に示すように、アーチ架構の両柱脚2、3間の下部に上記の引張材6を設置し、これをジャッキ11で引っ張るとアーチ架構5がむくり上げられて架設構台12から離される。このようにアーチ架構5全体が架設構台12から離れたままになるので、各架設構台12の解体かつ撤去が簡単になる。
【0016】
図5は上記のアーチ架構5を用いたドーム構造物15であり、平面湾曲状、すなわち馬蹄形の地上躯体16の開口部17側に上記のアーチ架構5が構築され、このアーチ架構5と地上躯体16とにわたってドーム屋根18が設置されて構成されている。このドーム構造物15は、図6に示すように、引張材6の緊張によるアーチ架構5のむくり上げによってドーム屋根18が全体的にむくり上げられて構成され、このドーム屋根18の荷重および水平スラストを、アーチ架構5をむくり上げて引張材6で負担する構造になっている。なお、地上躯体は前記の馬蹄形に限らず、平面湾曲状であれば、平面円形または平面楕円形の一方に開口部を有した形状であってもよい。
【0017】
このドーム屋根18は、図7に示すように、グリット形式の屋根架構21と、これに被覆された樹脂膜22とから構成されている。またこの屋根架構21は、図8に示すように、経線方向(アーチ架構5と直交方向)に架設されたフィーレンデイールトラス梁19と、緯線方向(アーチ架構5に沿った方向)に架設されたメイントラス梁20とから構成され、これらの梁端部は地上躯体16に形成されたSRC造のテンションリング23に接続され、このテンションリング23で屋根荷重による鉛直力と水平力とを負担している。上記のメイントラス梁20は、垂直材20aに斜材20bが接合された山形構造になっており、この山の頂部で樹脂膜22を支持するようになっている。
【0018】
次に、このドーム構造物の構築方法について説明する。はじめに、図9に示すように、上面にテンションリング用鉄骨材24を備えた平面馬蹄形の地上躯体16と、アーチ架構5とを構築する。このアーチ架構5の構築方法は、引張材6を緊張してアーチ架構5をむくり上げるまでは、上記の方法と同じ方法で構築する。よって地上躯体16の開口部17側には、ピン支承の柱脚2とローラー支承の柱脚3との間に引張材6が設置されたアーチ架構5が構築されている。
【0019】
この屋根架構21の建て方は、図10に示すように、屋根架構21全体を31のブロックの屋根用組立部材25に分割して、1ブロックから順に建てるものであり、この建て方順に応じた架設構台(角ベント支保工)12と四角支柱26の設置個所の割り出しを行う。また前記屋根用組立部材25は、図11に示すように、フィーレンデイールトラス梁用のトラス材27と、メイントラス梁用のトラス材28とが交差して形成されている。
【0020】
次に、上記の建て方順にしたがって、図12の(1)に示すように、第1エリア29の第1ブロックにクレーンで吊り上げた屋根用組立部材25を架設構台12で支持させながら設置するとともに、その端部を地上躯体16のテンションリング用鉄骨材24に接続する。このような作業を順次繰り返すと、同図の(2)に示すように、第1エリア29の屋根用組立部材25の建て方が完了する。
【0021】
次に、図13〜15に示すように、上記と同じ作業を順次繰り返して残りの第2〜4のエリア30、31、32の屋根用組立部材25の建て方を行うと、図15の(2)に示すように、経線方向に架設されたフィーレンデイールトラス梁19と、緯線方向に架設されたメイントラス梁20とで構成されたグリット形式の屋根架構21が完成する。
【0022】
この屋根架構21が完成した後に、前記のテンションリング用鉄骨材24にコンクリートを打設してテンションリング23を完成させる(図示せず)。また、この屋根架構21の荷重によるアーチ架構5の変形および水平スラストによってローラー支承の柱脚3が僅かに横移動する。
【0023】
次に、アーチ架構5の両柱脚2、3間の下部に設置された引張材6をジャッキ11で引っ張ると、図16に示すように、アーチ架構5がむくれ上がって架設構台12から離されるとともに、これにともなって屋根架構21もむくれ上がって架設構台12から離される。
【0024】
そして、ローラー支承の柱脚3を鉄筋コンクリートで地上躯体16に固定すると、アーチ架構5および屋根架構21全体が架設構台12から離された状態になるので、各架設構台12の解体かつ撤去が簡単になる。そして、この屋根架構21に樹脂膜(図示せず)を設置するとともに、アーチ架構5にカーテンウオール(図示せず)を設置すると、図5に示すようなドーム構造物15が完成する。
【0025】
【発明の効果】
アーチ構造物およびドーム構造物の作業の簡略化が図れる。
【図面の簡単な説明】
【図1】アーチ構造物の正面図である。
【図2】アーチ用組立部材の斜視図である。
【図3】引張材を示し、(1)は正面図、(2)は(1)の要部の拡大図、(3)は(2)のA−A線断面図、(4)は平面図である。
【図4】引張材の緊張によりアーチ架構がむくり上がるのを示した概念図である。
【図5】ドーム構造物の斜視図である。
【図6】引張材の緊張によりアーチ架構と屋根架構とがむくり上がるのを示した概念図である。
【図7】ドーム構造物の分解斜視図である。
【図8】(1)はフィーレンデイールトラス梁の正面図、(2)はメイントラス梁の正面図である。
【図9】地上躯体の開口部側にアーチ架構を構築した斜視図である。
【図10】(1)は屋根架構の建て方図、(2)は架設構台の設置個所の割り出し図である。
【図11】(1)および(2)は屋根用組立材の平面図である。
【図12】第1のエリアの屋根用組立部材の建て方を示した図である。
【図13】第2のエリアの屋根用組立部材の建て方を示した図である。
【図14】第3のエリアの屋根用組立部材の建て方を示した図である。
【図15】第4のエリアの屋根用組立部材の建て方を示した図である。
【図16】アーチ架構と屋根架構とをむくり上げた断面図である。
【図17】従来のアーチ架構の構築方法を示した正面図である。
【符号の説明】
1 アーチ構造物
2、3 柱脚
4 基礎
5、34 アーチ架構
6 引張材
7 アーチ用組立部材
8 トラス材
9 連結材
10 分割材
11、35 ジャッキ
12、33 架設構台
13 受け材
14 両柱脚用組立部材
15 ドーム構造物
16 地上躯体
17 開口部
18 ドーム屋根
19 フィーレンデイールトラス梁
20 メイントラス梁
21 屋根架構
22 樹脂膜
23 テンションリング
24 テンションリング用鉄骨材
25 屋根用組立部材
26 四角支柱
27 フィーレンデイールトラス梁用のトラス材
28 メイントラス梁用のトラス材
29 第1のエリア
30 第2のエリア
31 第3のエリア
32 第4のエリア[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an arch structure construction method, a dome structure, and a construction method thereof.
[0002]
[Prior art]
Conventionally, as an arch structure construction method, a dome structure, and a construction method thereof, the invention of Japanese Patent Laid-Open No. Hei 6-261101 has been disclosed. This dome structure was constructed while supporting the dome roof or arch frame with the erection gantry, and after this construction, the dome roof was pushed up with the jack installed on the erection gantry and released from the erection gantry, and then the erection gantry was removed .
[0003]
[Patent Document 1]
JP-A-6-261101 (FIG. 10)
[0004]
[Problems to be solved by the invention]
However, in the construction method described above, as shown in FIG. 17, the work of pushing up and jacking down the
[0005]
[Means for Solving the Problems]
The construction method of the arch structure to solve the above-mentioned problems is to install a column base assembly member on the foundation, form a column base with one pin support and the other roller support, , an arch rack構全body by joining a plurality of the arch for assembling member divided into blocks continuously while supporting at erection gantry arch Frames assembled form, a tensile member installed between the both pedestal with a predetermined force It is characterized by removing the erection frame after tensioning the arch frame to lift it away from the erection frame.
In addition, the dome structure has a planar curved ground frame with one opening, and an assembly member for both column bases is installed on the foundation at the opening side of the ground frame, with one being a pin support and the other being a roller support. An arch frame formed by continuously joining an arch frame divided into a plurality of blocks while supporting the arch frame by a continuous gantry while being supported by a frame frame; The arch frame and the dome roof are formed by tensioning the tension member installed between the two column bases of the arch frame with a predetermined force. To do.
In addition, the dome structure is constructed by installing a column base assembly member on the foundation on the opening side of a plane-curved ground frame that is open on one side, one with pin support and the other with roller support. forming a leg, to the column base, with the arch rack構全body continuously joined while supporting the arch for assembling member divided into a plurality of blocks in erection gantry assembling form an arch Frames, the arch Frames and plane After installing the dome roof while supporting it on the curved ground frame with the gantry base, tension the tension material installed between the two column bases of the arch frame with a predetermined force to peel off the arch frame and the dome roof It is characterized in that it is lifted away from the erection gantry and the erection gantry is removed.
[0006]
[Means for Solving the Problems]
The method for constructing arch structure for solving the above problems, forming a pedestal that pin bearing one by installing a Ryohashiraashi for assembly member on a foundation, the other to the roller bearing, these pedestals The entire arch frame is divided into 9 blocks of arch assembly members, the top of the arch frame is the 9th block, and the first, second, third, 4 blocks, the fifth, sixth, seventh and eighth blocks from the column base side of the pin support to the ninth block are the first, fifth, second, third, fourth and sixth blocks. The arch assembly is formed by continuously joining the arch assembly members in the order of the seventh, eighth, and ninth blocks while being supported by the construction base, and the tension member installed between the column bases is subjected to a predetermined force. After tensioning up and lifting the arch frame away from the erection gantry, Characterized in that it removed by.
In addition, the dome structure has a planar curved ground frame with one opening, and an assembly member for both column bases is installed on the foundation at the opening side of the ground frame, with one being a pin support and the other being a roller support. The entire arch frame formed on these column bases is divided into 9 blocks of arch assembly members, and the top of the arch frame extends from the 9th block to the 9th block from the column base side of the roller support. Are the first, second, third, and fourth blocks, and the fifth, sixth, seventh, and eighth blocks from the column base side to the ninth block of the pin support, and the first, fifth, An arch frame formed by continuously joining the arch assembly members in the order of the second, third, fourth, sixth, seventh, eighth, and ninth blocks while being supported by the gantry frame, and the arch frame And a dome roof installed over a flat curved ground frame. Characterized in that the tension member disposed between the two pillars leg of the arch Frames are taut arch rack Kamao and dome roof with a predetermined force has been formed by raised Mukuri.
In addition, the dome structure is constructed by installing a column base assembly member on the foundation on the opening side of a plane-curved ground frame that is open on one side, one with pin support and the other with roller support. Legs are formed, and the entire arch frame formed on these column bases is divided into nine blocks of arch assembly members. The top of the arch frame is divided into the ninth block, from the column base side of the roller support to the ninth block. 1st, 2nd, 3rd, 4th block, 5th, 6th, 7th, 8th block from the column base side to the 9th block of the pin support, the 1st, 5th, 2nd on the said column base The arch frame is assembled by continuously joining the arch assembly members in the order of the third, fourth, sixth, seventh, eighth, and ninth blocks while being supported by the gantry frame. A dome roof is supported by a erection base over a flat curved ground frame. After installation, the tension member installed between the two column bases of the arch frame is tensioned with a predetermined force to lift the arch frame and the dome roof away from the frame and remove the frame. It is characterized by that.
[0007]
As the column base of the roller bearing moves laterally inward due to the tension of the tensile material, and the other column base rotates around the pin support, the arch frame is lifted up and separated from the installation base at a stretch. The gantry can be removed without the need for a jack, making it easier to build arch structures.
Since the entire dome roof is rolled up as the arch frame is rolled up, it is possible to reduce the stress of the arch frame and the dome roof and reduce the number of components.
As the arch frame is rolled up, the entire dome roof is lifted and separated from the installation frame at a stretch, so that the installation frame can be easily removed and the construction of the dome structure can be simplified.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EMBODIMENTS Embodiments of an arch structure construction method, a dome structure, and a construction method thereof according to the present invention will be described below in detail with reference to the drawings. First, the construction method of the arch structure will be described, and then the dome structure and the construction method of the dome structure will be described. In the embodiments, the same components are described with the same reference numerals, and only different components are described with different reference numerals.
[0009]
As shown in FIG. 1, the
[0010]
The
[0011]
On the other hand, as shown in FIG. 3, the
[0012]
Next, a method for constructing the
[0013]
Under such an order of construction, seven erection frames (corner bent support) 12 are assembled and formed, and a receiving
[0014]
Next, according to the order of construction described above, when each grounded
[0015]
Next, as shown in FIG. 4, the above-described
[0016]
FIG. 5 shows a
[0017]
As shown in FIG. 7, the
[0018]
Next, the construction method of this dome structure will be described. First, as shown in FIG. 9, a flat horseshoe-shaped
[0019]
As shown in FIG. 10, this
[0020]
Next, in accordance with the order of construction described above, as shown in FIG. 12 (1), the
[0021]
Next, as shown in FIGS. 13 to 15, when the
[0022]
After the
[0023]
Next, when the
[0024]
When the
[0025]
【The invention's effect】
The work of the arch structure and the dome structure can be simplified.
[Brief description of the drawings]
FIG. 1 is a front view of an arch structure.
FIG. 2 is a perspective view of an assembly member for an arch.
3 shows a tensile material, (1) is a front view, (2) is an enlarged view of the main part of (1), (3) is a cross-sectional view taken along line AA of (2), and (4) is a plan view. FIG.
FIG. 4 is a conceptual diagram showing that an arch frame is rolled up by tension of a tensile member.
FIG. 5 is a perspective view of a dome structure.
FIG. 6 is a conceptual diagram showing that an arch frame and a roof frame are rolled up by tension of a tensile member.
FIG. 7 is an exploded perspective view of the dome structure.
8A is a front view of a feeler rail truss beam, and FIG. 8B is a front view of a main truss beam.
FIG. 9 is a perspective view in which an arch frame is constructed on the opening side of the ground frame.
FIGS. 10A and 10B are diagrams showing how to construct a roof frame, and FIG. 10B is an index diagram of the installation location of the frame.
FIGS. 11A and 11B are plan views of the roofing assembly material. FIGS.
FIG. 12 is a view showing how to construct the roof assembly member in the first area.
FIG. 13 is a view showing how to construct the roof assembly member in the second area.
FIG. 14 is a view showing how to construct a roof assembly member in a third area.
FIG. 15 is a view showing how to assemble a roof assembly member in a fourth area.
FIG. 16 is a sectional view in which an arch frame and a roof frame are rolled up.
FIG. 17 is a front view showing a conventional method for constructing an arch frame.
[Explanation of symbols]
DESCRIPTION OF
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002325264A JP3798367B2 (en) | 2002-11-08 | 2002-11-08 | Construction method of arch structure, dome structure and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002325264A JP3798367B2 (en) | 2002-11-08 | 2002-11-08 | Construction method of arch structure, dome structure and construction method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004156388A JP2004156388A (en) | 2004-06-03 |
| JP3798367B2 true JP3798367B2 (en) | 2006-07-19 |
Family
ID=32804548
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002325264A Expired - Lifetime JP3798367B2 (en) | 2002-11-08 | 2002-11-08 | Construction method of arch structure, dome structure and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3798367B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104986663A (en) * | 2015-05-21 | 2015-10-21 | 中交一航局安装工程有限公司 | Lifting installation technology for steel structure arched door |
| CN109610335A (en) * | 2018-12-24 | 2019-04-12 | 中冶天工集团有限公司 | Temporary support for mounting box-separated box girder of steel arch bridge |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102425326B (en) * | 2011-09-14 | 2012-11-21 | 徐州中煤百甲重钢科技有限公司 | Installation construction process of bolt net rack cylindrical shell storage bin |
| CN103195165B (en) * | 2013-03-27 | 2014-12-10 | 中国三冶集团有限公司 | Spiral dome and processing method and processing platform thereof |
| JP6663639B2 (en) * | 2014-10-28 | 2020-03-13 | 株式会社竹中工務店 | Construction method of frame |
| JP6960082B2 (en) * | 2017-05-18 | 2021-11-05 | 株式会社大林組 | How to build a skeleton by spraying concrete |
| CN114165060A (en) * | 2021-10-30 | 2022-03-11 | 北京首钢建设集团有限公司 | Method for mounting ultra-large-breadth curved surface porous steel plate curtain wall |
| CN116556692B (en) * | 2023-07-11 | 2023-11-03 | 中铁建工集团有限公司 | Sliding construction method of triple span arch truss |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0788692B2 (en) * | 1987-03-16 | 1995-09-27 | 鹿島建設株式会社 | Large space building |
| JP3110876B2 (en) * | 1992-07-07 | 2000-11-20 | 株式会社竹中工務店 | Dome roof and construction method |
| JPH06200625A (en) * | 1992-12-29 | 1994-07-19 | Daiwa House Ind Co Ltd | Frame method of arch truss construction |
-
2002
- 2002-11-08 JP JP2002325264A patent/JP3798367B2/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104986663A (en) * | 2015-05-21 | 2015-10-21 | 中交一航局安装工程有限公司 | Lifting installation technology for steel structure arched door |
| CN109610335A (en) * | 2018-12-24 | 2019-04-12 | 中冶天工集团有限公司 | Temporary support for mounting box-separated box girder of steel arch bridge |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004156388A (en) | 2004-06-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3798367B2 (en) | Construction method of arch structure, dome structure and construction method thereof | |
| JP7548869B2 (en) | How to build structures | |
| JP4691431B2 (en) | Roof structure and construction method thereof | |
| CN210289133U (en) | Batter post template support system | |
| CN116657964B (en) | A comprehensive steel structure for the stands containing long-span arch trusses and its construction method | |
| CN118345858A (en) | A walking tower crane foundation on steps and construction method thereof | |
| JP3981469B2 (en) | Construction method of concrete structure | |
| JPH0633627B2 (en) | New construction method on existing facility | |
| JP6736226B2 (en) | Structure and construction method of the structure constructed on the tower-shaped building | |
| CN105971287A (en) | Vertical prestress construction method of reaction wall | |
| JP2021059908A (en) | Large-space structure and method for constructing the same | |
| JPH04161566A (en) | Constructing apparatus for large space building | |
| JPH09310512A (en) | Demolition method for temporary roof | |
| JP2000129785A (en) | Construction method of dome roof | |
| JPH0932120A (en) | Method of construction of structure | |
| JPH11256690A (en) | Constructing method of roof structure | |
| JPH10110500A (en) | Dome roof structure and construction method | |
| CN118704624B (en) | A large-slope large-span roof grid construction method and roof grid | |
| JP3357882B2 (en) | Composite structure of precast panel and steel truss | |
| JPH06185120A (en) | Construction method for upper structure of roof, etc. | |
| CN210033474U (en) | A kind of support device for roof arch lining of special-shaped tunnel | |
| JP3318717B2 (en) | Construction method of PC cable stayed bridge | |
| JP2532333B2 (en) | Curing tent | |
| JPS6393943A (en) | Construction of reinforcement bar dome | |
| JPH0489939A (en) | Large span truss erecting method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050909 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051205 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060130 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060227 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060301 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060329 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060419 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3798367 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090428 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100428 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100428 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110428 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140428 Year of fee payment: 8 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |