Construction method of arch structure, dome structure and construction method thereof Download PDF

Info

Publication number
JP3798367B2
JP3798367B2 JP2002325264A JP2002325264A JP3798367B2 JP 3798367 B2 JP3798367 B2 JP 3798367B2 JP 2002325264 A JP2002325264 A JP 2002325264A JP 2002325264 A JP2002325264 A JP 2002325264A JP 3798367 B2 JP3798367 B2 JP 3798367B2
Authority
JP
Japan
Prior art keywords
frame
arch
blocks
block
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002325264A
Other languages
Japanese (ja)
Other versions
JP2004156388A (en
Inventor
秀仁 渡邉
豊人 荒井
幸宏 渡部
英利 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2002325264A priority Critical patent/JP3798367B2/en
Publication of JP2004156388A publication Critical patent/JP2004156388A/en
Application granted granted Critical
Publication of JP3798367B2 publication Critical patent/JP3798367B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はアーチ構造物の構築方法、ドーム構造物およびその構築方法に関するものである。
【0002】
【従来の技術】
従来、アーチ構造物の構築方法、ドーム構造物およびその構築方法としては、特開平6−26101号公報の発明が開示されている。このドーム構造物は架設構台でドーム屋根またはアーチ架構を支持しながら構築し、この構築後に架設構台に設置したジャッキでドーム屋根を押し上げて架設構台から離した後に、この架設構台を撤去していた。
【0003】
【特許文献1】
特開平6−26101号公報(図10)
【0004】
【発明が解決しようとする課題】
しかし、上記の構築方法においては、図17に示すように、多数の架設構台33によって支持されたアーチ架構34のジャッキ35による押し上げ作業、およびジャッキダウンの作業を、他のジャッキ35とのバランスを取りながら一つ一つ行うため非常に困難な作業となって、多大の労力と時間とが必要になっていた。
【0005】
【課題を解決するための手段】
以上の課題を解決するためのアーチ構造物の構築方法は、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、この柱脚に、アーチ架構全体を複数のブロックに分割したアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成し、前記両柱脚間に設置した引張材を所定の力で緊張してアーチ架構をむくり上げて架設構台から離した後、該架設構台を撤去することを特徴とする。
またドーム構造物は、一方が開口した平面湾曲状の地上躯体と、該地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚に、アーチ架構全体を複数のブロックに分割したアーチ用組立部材を架設構台で支持しながら連続的に接合して組立形成したアーチ架構と、該アーチ架構と平面湾曲状の地上躯体とにわたって設置されたドーム屋根とからなり、前記アーチ架構の両柱脚間に設置された引張材が所定の力で緊張されてアーチ架構およびドーム屋根がむくり上げられて形成されたことを特徴とする。
またドーム構造物の構築方法は、一方が開口した平面湾曲状の地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、この柱脚に、アーチ架構全体を複数のブロックに分割したアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成するとともに、アーチ架構と平面湾曲状の地上躯体とにわたってドーム屋根を架設構台で支持しながら設置した後、前記アーチ架構の両柱脚間に設置した引張材を所定の力で緊張してアーチ架構とドーム屋根とをむくり上げて架設構台から離すとともに、該架設構台を撤去することを特徴とする。
【0006】
【課題を解決するための手段】
以上の課題を解決するためのアーチ構造物の構築方法は、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成し、前記両柱脚間に設置した引張材を所定の力で緊張してアーチ架構をむくり上げて架設構台から離した後、該架設構台を撤去することを特徴とする。
またドーム構造物は、一方が開口した平面湾曲状の地上躯体と、該地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合して組立形成したアーチ架構と、該アーチ架構と平面湾曲状の地上躯体とにわたって設置されたドーム屋根とからなり、前記アーチ架構の両柱脚間に設置された引張材が所定の力で緊張されてアーチ架構およびドーム屋根がむくり上げられて形成されたことを特徴とする。
またドーム構造物の構築方法は、一方が開口した平面湾曲状の地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成するとともに、該アーチ架構と平面湾曲状の地上躯体とにわたってドーム屋根を架設構台で支持しながら設置した後、前記アーチ架構の両柱脚間に設置した引張材を所定の力で緊張してアーチ架構とドーム屋根とをむくり上げて架設構台から離すとともに、該架設構台を撤去することを特徴とする。
【0007】
引張材の緊張でローラー支承の柱脚が内側に横移動するとともに、他方の柱脚がピン支承を中心に回転することにより、アーチ架構がむくり上げられて架設構台から一気に離されるので、架設構台がジャッキを必要とせずに撤去でき、アーチ構造物の構築が簡単になる。
アーチ架構のむくり上がりにともなってドーム屋根全体がむくり上げられるので、アーチ架構およびドーム屋根の応力の低減と、構成部材数量の低減とを図ることができる。
アーチ架構のむくり上がりにともなってドーム屋根全体がむくり上げられて架設構台から一気に離されるので、架設構台の簡単な撤去、およびドーム構造物の構築の簡略化が図れる。
【0008】
【発明の実施の形態】
以下、本発明のアーチ構造物の構築方法、ドーム構造物およびその構築方法の実施の形態を図面に基づいて詳細に説明する。はじめにアーチ構造物の構築方法について説明し、次いでドーム構造物、そしてドーム構造物の構築方法について説明する。また各実施の形態において同じ構成は同じ符号を付して説明し、異なった構成にのみ異なった符号を付して説明する。
【0009】
アーチ構造物1は、図1に示すように、両柱脚2、3が基礎4に支持されたアーチ架構5が両柱脚2、3間の下部に設置された引張材6の緊張によりむくり上げられて構成されたものである。
【0010】
このアーチ架構5は、図2に示すような、アーチ用組立部材7が連続的に接続されて構成されたものであり、このアーチ用組立部材7はH形鋼からなるトラス材8が横方向に適宜間隔をもって接続されて構成されている。
【0011】
一方、引張材6は、図3に示すように、適宜間隔をもって連結材9で連結された2本のH形鋼がその中央部で適宜間隔をもって左右に分割され、これら左右に分割された分割材10がセンターホール型のジャッキ11で接続されて構成されている。したがって、この分割された分割材10をジャッキ11で引っ張って緊張すると、図4に示すように、ローラー支承の柱脚3が内側に横移動するとともに、他方の脚柱2がピン支承を中心に回転するので、アーチ架構5がむくり上げられた状態になり、この状態で両柱脚2、3が基礎4に支持されている。
【0012】
次に、このアーチ構造物1の構築方法について説明する。このアーチ架構5の建て方は、図1に示すように、アーチ架構5全体を9ブロックのアーチ用組立部材7に分割して、1ブロック、5ブロック、2、3、4、6、7、8、9ブロックの順に建て方を行うものとする。
【0013】
このような建て方順のもとで7つの架設構台(角ベント支保工)12を組立形成し、その頂部に、鉛直荷重をスムーズに流すための受け材13を設置する。そして、製作ヤードで地組した両柱脚用組立部材14を基礎4上に設置して、一方をピン支承に、他方をローラー支承にする。
【0014】
次に、上記の建て方順にしたがって、地組した各アーチ用組立部材7をクレーンで吊り上げて、架設構台12で支持しながら接続すると、一方の柱脚2がピン支承で、他方の柱脚3がローラー支承のアーチ架構5が組立形成される。
【0015】
次に、図4に示すように、アーチ架構の両柱脚2、3間の下部に上記の引張材6を設置し、これをジャッキ11で引っ張るとアーチ架構5がむくり上げられて架設構台12から離される。このようにアーチ架構5全体が架設構台12から離れたままになるので、各架設構台12の解体かつ撤去が簡単になる。
【0016】
図5は上記のアーチ架構5を用いたドーム構造物15であり、平面湾曲状、すなわち馬蹄形の地上躯体16の開口部17側に上記のアーチ架構5が構築され、このアーチ架構5と地上躯体16とにわたってドーム屋根18が設置されて構成されている。このドーム構造物15は、図6に示すように、引張材6の緊張によるアーチ架構5のむくり上げによってドーム屋根18が全体的にむくり上げられて構成され、このドーム屋根18の荷重および水平スラストを、アーチ架構5をむくり上げて引張材6で負担する構造になっている。なお、地上躯体は前記の馬蹄形に限らず、平面湾曲状であれば、平面円形または平面楕円形の一方に開口部を有した形状であってもよい。
【0017】
このドーム屋根18は、図7に示すように、グリット形式の屋根架構21と、これに被覆された樹脂膜22とから構成されている。またこの屋根架構21は、図8に示すように、経線方向(アーチ架構5と直交方向)に架設されたフィーレンデイールトラス梁19と、緯線方向(アーチ架構5に沿った方向)に架設されたメイントラス梁20とから構成され、これらの梁端部は地上躯体16に形成されたSRC造のテンションリング23に接続され、このテンションリング23で屋根荷重による鉛直力と水平力とを負担している。上記のメイントラス梁20は、垂直材20aに斜材20bが接合された山形構造になっており、この山の頂部で樹脂膜22を支持するようになっている。
【0018】
次に、このドーム構造物の構築方法について説明する。はじめに、図9に示すように、上面にテンションリング用鉄骨材24を備えた平面馬蹄形の地上躯体16と、アーチ架構5とを構築する。このアーチ架構5の構築方法は、引張材6を緊張してアーチ架構5をむくり上げるまでは、上記の方法と同じ方法で構築する。よって地上躯体16の開口部17側には、ピン支承の柱脚2とローラー支承の柱脚3との間に引張材6が設置されたアーチ架構5が構築されている。
【0019】
この屋根架構21の建て方は、図10に示すように、屋根架構21全体を31のブロックの屋根用組立部材25に分割して、1ブロックから順に建てるものであり、この建て方順に応じた架設構台(角ベント支保工)12と四角支柱26の設置個所の割り出しを行う。また前記屋根用組立部材25は、図11に示すように、フィーレンデイールトラス梁用のトラス材27と、メイントラス梁用のトラス材28とが交差して形成されている。
【0020】
次に、上記の建て方順にしたがって、図12の(1)に示すように、第1エリア29の第1ブロックにクレーンで吊り上げた屋根用組立部材25を架設構台12で支持させながら設置するとともに、その端部を地上躯体16のテンションリング用鉄骨材24に接続する。このような作業を順次繰り返すと、同図の(2)に示すように、第1エリア29の屋根用組立部材25の建て方が完了する。
【0021】
次に、図13〜15に示すように、上記と同じ作業を順次繰り返して残りの第2〜4のエリア30、31、32の屋根用組立部材25の建て方を行うと、図15の(2)に示すように、経線方向に架設されたフィーレンデイールトラス梁19と、緯線方向に架設されたメイントラス梁20とで構成されたグリット形式の屋根架構21が完成する。
【0022】
この屋根架構21が完成した後に、前記のテンションリング用鉄骨材24にコンクリートを打設してテンションリング23を完成させる(図示せず)。また、この屋根架構21の荷重によるアーチ架構5の変形および水平スラストによってローラー支承の柱脚3が僅かに横移動する。
【0023】
次に、アーチ架構5の両柱脚2、3間の下部に設置された引張材6をジャッキ11で引っ張ると、図16に示すように、アーチ架構5がむくれ上がって架設構台12から離されるとともに、これにともなって屋根架構21もむくれ上がって架設構台12から離される。
【0024】
そして、ローラー支承の柱脚3を鉄筋コンクリートで地上躯体16に固定すると、アーチ架構5および屋根架構21全体が架設構台12から離された状態になるので、各架設構台12の解体かつ撤去が簡単になる。そして、この屋根架構21に樹脂膜(図示せず)を設置するとともに、アーチ架構5にカーテンウオール(図示せず)を設置すると、図5に示すようなドーム構造物15が完成する。
【0025】
【発明の効果】
アーチ構造物およびドーム構造物の作業の簡略化が図れる。
【図面の簡単な説明】
【図1】アーチ構造物の正面図である。
【図2】アーチ用組立部材の斜視図である。
【図3】引張材を示し、(1)は正面図、(2)は(1)の要部の拡大図、(3)は(2)のA−A線断面図、(4)は平面図である。
【図4】引張材の緊張によりアーチ架構がむくり上がるのを示した概念図である。
【図5】ドーム構造物の斜視図である。
【図6】引張材の緊張によりアーチ架構と屋根架構とがむくり上がるのを示した概念図である。
【図7】ドーム構造物の分解斜視図である。
【図8】(1)はフィーレンデイールトラス梁の正面図、(2)はメイントラス梁の正面図である。
【図9】地上躯体の開口部側にアーチ架構を構築した斜視図である。
【図10】(1)は屋根架構の建て方図、(2)は架設構台の設置個所の割り出し図である。
【図11】(1)および(2)は屋根用組立材の平面図である。
【図12】第1のエリアの屋根用組立部材の建て方を示した図である。
【図13】第2のエリアの屋根用組立部材の建て方を示した図である。
【図14】第3のエリアの屋根用組立部材の建て方を示した図である。
【図15】第4のエリアの屋根用組立部材の建て方を示した図である。
【図16】アーチ架構と屋根架構とをむくり上げた断面図である。
【図17】従来のアーチ架構の構築方法を示した正面図である。
【符号の説明】
1 アーチ構造物
2、3 柱脚
4 基礎
5、34 アーチ架構
6 引張材
7 アーチ用組立部材
8 トラス材
9 連結材
10 分割材
11、35 ジャッキ
12、33 架設構台
13 受け材
14 両柱脚用組立部材
15 ドーム構造物
16 地上躯体
17 開口部
18 ドーム屋根
19 フィーレンデイールトラス梁
20 メイントラス梁
21 屋根架構
22 樹脂膜
23 テンションリング
24 テンションリング用鉄骨材
25 屋根用組立部材
26 四角支柱
27 フィーレンデイールトラス梁用のトラス材
28 メイントラス梁用のトラス材
29 第1のエリア
30 第2のエリア
31 第3のエリア
32 第4のエリア
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an arch structure construction method, a dome structure, and a construction method thereof.
[0002]
[Prior art]
Conventionally, as an arch structure construction method, a dome structure, and a construction method thereof, the invention of Japanese Patent Laid-Open No. Hei 6-261101 has been disclosed. This dome structure was constructed while supporting the dome roof or arch frame with the erection gantry, and after this construction, the dome roof was pushed up with the jack installed on the erection gantry and released from the erection gantry, and then the erection gantry was removed .
[0003]
[Patent Document 1]
JP-A-6-261101 (FIG. 10)
[0004]
[Problems to be solved by the invention]
However, in the construction method described above, as shown in FIG. 17, the work of pushing up and jacking down the arch frame 34 supported by a large number of construction bases 33 with the jack 35 is balanced with the other jacks 35. It was very difficult to do one by one while taking it, and it required a lot of labor and time.
[0005]
[Means for Solving the Problems]
The construction method of the arch structure to solve the above-mentioned problems is to install a column base assembly member on the foundation, form a column base with one pin support and the other roller support, , an arch rack構全body by joining a plurality of the arch for assembling member divided into blocks continuously while supporting at erection gantry arch Frames assembled form, a tensile member installed between the both pedestal with a predetermined force It is characterized by removing the erection frame after tensioning the arch frame to lift it away from the erection frame.
In addition, the dome structure has a planar curved ground frame with one opening, and an assembly member for both column bases is installed on the foundation at the opening side of the ground frame, with one being a pin support and the other being a roller support. An arch frame formed by continuously joining an arch frame divided into a plurality of blocks while supporting the arch frame by a continuous gantry while being supported by a frame frame; The arch frame and the dome roof are formed by tensioning the tension member installed between the two column bases of the arch frame with a predetermined force. To do.
In addition, the dome structure is constructed by installing a column base assembly member on the foundation on the opening side of a plane-curved ground frame that is open on one side, one with pin support and the other with roller support. forming a leg, to the column base, with the arch rack構全body continuously joined while supporting the arch for assembling member divided into a plurality of blocks in erection gantry assembling form an arch Frames, the arch Frames and plane After installing the dome roof while supporting it on the curved ground frame with the gantry base, tension the tension material installed between the two column bases of the arch frame with a predetermined force to peel off the arch frame and the dome roof It is characterized in that it is lifted away from the erection gantry and the erection gantry is removed.
[0006]
[Means for Solving the Problems]
The method for constructing arch structure for solving the above problems, forming a pedestal that pin bearing one by installing a Ryohashiraashi for assembly member on a foundation, the other to the roller bearing, these pedestals The entire arch frame is divided into 9 blocks of arch assembly members, the top of the arch frame is the 9th block, and the first, second, third, 4 blocks, the fifth, sixth, seventh and eighth blocks from the column base side of the pin support to the ninth block are the first, fifth, second, third, fourth and sixth blocks. The arch assembly is formed by continuously joining the arch assembly members in the order of the seventh, eighth, and ninth blocks while being supported by the construction base, and the tension member installed between the column bases is subjected to a predetermined force. After tensioning up and lifting the arch frame away from the erection gantry, Characterized in that it removed by.
In addition, the dome structure has a planar curved ground frame with one opening, and an assembly member for both column bases is installed on the foundation at the opening side of the ground frame, with one being a pin support and the other being a roller support. The entire arch frame formed on these column bases is divided into 9 blocks of arch assembly members, and the top of the arch frame extends from the 9th block to the 9th block from the column base side of the roller support. Are the first, second, third, and fourth blocks, and the fifth, sixth, seventh, and eighth blocks from the column base side to the ninth block of the pin support, and the first, fifth, An arch frame formed by continuously joining the arch assembly members in the order of the second, third, fourth, sixth, seventh, eighth, and ninth blocks while being supported by the gantry frame, and the arch frame And a dome roof installed over a flat curved ground frame. Characterized in that the tension member disposed between the two pillars leg of the arch Frames are taut arch rack Kamao and dome roof with a predetermined force has been formed by raised Mukuri.
In addition, the dome structure is constructed by installing a column base assembly member on the foundation on the opening side of a plane-curved ground frame that is open on one side, one with pin support and the other with roller support. Legs are formed, and the entire arch frame formed on these column bases is divided into nine blocks of arch assembly members. The top of the arch frame is divided into the ninth block, from the column base side of the roller support to the ninth block. 1st, 2nd, 3rd, 4th block, 5th, 6th, 7th, 8th block from the column base side to the 9th block of the pin support, the 1st, 5th, 2nd on the said column base The arch frame is assembled by continuously joining the arch assembly members in the order of the third, fourth, sixth, seventh, eighth, and ninth blocks while being supported by the gantry frame. A dome roof is supported by a erection base over a flat curved ground frame. After installation, the tension member installed between the two column bases of the arch frame is tensioned with a predetermined force to lift the arch frame and the dome roof away from the frame and remove the frame. It is characterized by that.
[0007]
As the column base of the roller bearing moves laterally inward due to the tension of the tensile material, and the other column base rotates around the pin support, the arch frame is lifted up and separated from the installation base at a stretch. The gantry can be removed without the need for a jack, making it easier to build arch structures.
Since the entire dome roof is rolled up as the arch frame is rolled up, it is possible to reduce the stress of the arch frame and the dome roof and reduce the number of components.
As the arch frame is rolled up, the entire dome roof is lifted and separated from the installation frame at a stretch, so that the installation frame can be easily removed and the construction of the dome structure can be simplified.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EMBODIMENTS Embodiments of an arch structure construction method, a dome structure, and a construction method thereof according to the present invention will be described below in detail with reference to the drawings. First, the construction method of the arch structure will be described, and then the dome structure and the construction method of the dome structure will be described. In the embodiments, the same components are described with the same reference numerals, and only different components are described with different reference numerals.
[0009]
As shown in FIG. 1, the arch structure 1 has an arch frame 5 in which both column bases 2, 3 are supported by a foundation 4, and is tensioned by a tension member 6 installed below the both column bases 2, 3. It is made up.
[0010]
The arch frame 5 is constructed by continuously connecting arch assembly members 7 as shown in FIG. 2, and the arch assembly member 7 is formed by a truss member 8 made of H-shaped steel in the lateral direction. Are connected at appropriate intervals.
[0011]
On the other hand, as shown in FIG. 3, the tensile member 6 is divided into two H-shaped steels connected by a connecting member 9 with an appropriate interval at left and right at an appropriate interval at the center, and these divided into left and right parts. The material 10 is configured to be connected by a center hole type jack 11. Therefore, when the divided material 10 is pulled and tensioned by the jack 11, as shown in FIG. 4, the column base 3 of the roller support moves inward, and the other leg column 2 is centered on the pin support. Since it rotates, it will be in the state by which the arch frame 5 was pulled up, and both the column bases 2 and 3 are supported by the foundation 4 in this state.
[0012]
Next, a method for constructing the arch structure 1 will be described. As shown in FIG. 1, the arch frame 5 is constructed by dividing the entire arch frame 5 into nine blocks of arch assembly members 7, 1 block, 5 blocks, 2, 3, 4, 6, 7, Assume that building is done in the order of 8 and 9 blocks.
[0013]
Under such an order of construction, seven erection frames (corner bent support) 12 are assembled and formed, and a receiving material 13 for smoothly flowing a vertical load is installed on the top. And the assembly member 14 for both column bases assembled in the production yard is installed on the foundation 4, and one is used as a pin support and the other is used as a roller support.
[0014]
Next, according to the order of construction described above, when each grounded arch assembly member 7 is lifted with a crane and connected while being supported by the construction base 12, one column base 2 is a pin support and the other column base 3 is connected. The arch frame 5 of the roller support is assembled and formed.
[0015]
Next, as shown in FIG. 4, the above-described tension member 6 is installed at the lower part between the two column bases 2 and 3 of the arch frame, and when this is pulled by the jack 11, the arch frame 5 is lifted and the erection frame 12 apart. Thus, since the whole arch frame 5 remains away from the erection gantry 12, disassembly and removal of each erection gantry 12 becomes easy.
[0016]
FIG. 5 shows a dome structure 15 using the arch frame 5 described above. The arch frame 5 is constructed on the side of the opening 17 of the ground frame 16 having a curved surface, that is, a horseshoe shape. 16 and a dome roof 18 is installed. As shown in FIG. 6, the dome structure 15 is configured such that the dome roof 18 is entirely lifted by lifting the arch frame 5 due to tension of the tension member 6, and the load on the dome roof 18 and The structure is such that the horizontal thrust is lifted by the arch frame 5 and is borne by the tension member 6. The ground frame is not limited to the horseshoe shape, but may be a shape having an opening in one of a plane circular shape and a plane ellipse shape as long as it is a plane curved shape.
[0017]
As shown in FIG. 7, the dome roof 18 is composed of a grit-type roof frame 21 and a resin film 22 covered therewith. Further, as shown in FIG. 8, the roof frame 21 is installed in the feeler rail truss beam 19 installed in the meridian direction (perpendicular to the arch frame 5), and in the latitude direction (direction along the arch frame 5). The main truss beam 20 is connected to an SRC tension ring 23 formed on the ground frame 16, and the tension ring 23 bears a vertical force and a horizontal force due to a roof load. ing. The main truss beam 20 has a mountain structure in which a diagonal member 20b is joined to a vertical member 20a, and the resin film 22 is supported at the top of the mountain.
[0018]
Next, the construction method of this dome structure will be described. First, as shown in FIG. 9, a flat horseshoe-shaped ground frame 16 provided with a steel ring 24 for a tension ring on the upper surface and an arch frame 5 are constructed. The construction method of the arch frame 5 is constructed by the same method as described above until the tension member 6 is tensioned and the arch frame 5 is lifted up. Therefore, on the opening 17 side of the ground frame 16, an arch frame 5 is constructed in which a tension member 6 is installed between the pin support column base 2 and the roller support column base 3.
[0019]
As shown in FIG. 10, this roof frame 21 is constructed by dividing the entire roof frame 21 into 31 blocks of roof assembly members 25 and building them in order from one block. The installation location of the erection gantry (square bent support) 12 and the square support 26 is determined. Further, as shown in FIG. 11, the roof assembly member 25 is formed by intersecting a truss member 27 for a feeler rail truss beam and a truss member 28 for a main truss beam.
[0020]
Next, in accordance with the order of construction described above, as shown in FIG. 12 (1), the roof assembly member 25 lifted by the crane is supported on the first block in the first area 29 while being supported by the gantry 12. The end portion is connected to the steel frame 24 for the tension ring of the ground frame 16. When such operations are sequentially repeated, the construction of the roof assembly member 25 in the first area 29 is completed as shown in FIG.
[0021]
Next, as shown in FIGS. 13 to 15, when the roof assembly members 25 in the remaining second to fourth areas 30, 31, and 32 are constructed by sequentially repeating the same operation as described above, ( As shown in 2), a grit-type roof frame 21 composed of a feeler rail truss beam 19 installed in the meridian direction and a main truss beam 20 installed in the latitude direction is completed.
[0022]
After the roof frame 21 is completed, the tension ring 23 is completed by placing concrete on the tension ring steel frame 24 (not shown). Further, the column base 3 of the roller support slightly moves laterally due to the deformation of the arch frame 5 due to the load of the roof frame 21 and the horizontal thrust.
[0023]
Next, when the tension member 6 installed at the lower part between the two column bases 2 and 3 of the arch frame 5 is pulled by the jack 11, the arch frame 5 is lifted and separated from the frame 12 as shown in FIG. At the same time, the roof frame 21 is also raised and separated from the erection frame 12.
[0024]
When the column base 3 of the roller support is fixed to the ground frame 16 with reinforced concrete, the entire arch frame 5 and the roof frame 21 are separated from the frame 12 so that each frame 12 can be easily disassembled and removed. Become. When a resin film (not shown) is installed on the roof frame 21 and a curtain wall (not shown) is installed on the arch frame 5, a dome structure 15 as shown in FIG. 5 is completed.
[0025]
【The invention's effect】
The work of the arch structure and the dome structure can be simplified.
[Brief description of the drawings]
FIG. 1 is a front view of an arch structure.
FIG. 2 is a perspective view of an assembly member for an arch.
3 shows a tensile material, (1) is a front view, (2) is an enlarged view of the main part of (1), (3) is a cross-sectional view taken along line AA of (2), and (4) is a plan view. FIG.
FIG. 4 is a conceptual diagram showing that an arch frame is rolled up by tension of a tensile member.
FIG. 5 is a perspective view of a dome structure.
FIG. 6 is a conceptual diagram showing that an arch frame and a roof frame are rolled up by tension of a tensile member.
FIG. 7 is an exploded perspective view of the dome structure.
8A is a front view of a feeler rail truss beam, and FIG. 8B is a front view of a main truss beam.
FIG. 9 is a perspective view in which an arch frame is constructed on the opening side of the ground frame.
FIGS. 10A and 10B are diagrams showing how to construct a roof frame, and FIG. 10B is an index diagram of the installation location of the frame.
FIGS. 11A and 11B are plan views of the roofing assembly material. FIGS.
FIG. 12 is a view showing how to construct the roof assembly member in the first area.
FIG. 13 is a view showing how to construct the roof assembly member in the second area.
FIG. 14 is a view showing how to construct a roof assembly member in a third area.
FIG. 15 is a view showing how to assemble a roof assembly member in a fourth area.
FIG. 16 is a sectional view in which an arch frame and a roof frame are rolled up.
FIG. 17 is a front view showing a conventional method for constructing an arch frame.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Arch structure 2, 3 Column base 4 Foundation 5, 34 Arch frame 6 Tensile material 7 Arch assembly member 8 Truss material 9 Connection material 10 Split material 11, 35 Jack 12, 33 Construction frame 13 Receiving material 14 For both column bases Assembling member 15 Dome structure 16 Ground frame 17 Opening 18 Dome roof 19 Feeler day truss beam 20 Main truss beam 21 Roof frame 22 Resin film 23 Tension ring 24 Steel frame member for tension ring 25 Roof assembly member 26 Square support 27 Fee Truss material 28 for the lenticular truss beam Truss material 29 for the main truss beam 1st area 30 2nd area 31 3rd area 32 4th area

Claims (3)

両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成し、前記両柱脚間に設置した引張材を所定の力で緊張してアーチ架構をむくり上げて架設構台から離した後、該架設構台を撤去することを特徴とするアーチ構造物の構築方法。Both column base assembly members are installed on the foundation to form column bases with one pin support and the other roller support, and the entire arch frame formed on these column bases is a 9-block arch assembly member The top of the arch frame is divided into the ninth block, the roller support from the column base side to the ninth block, the first, second, third, and fourth blocks, and the pin support from the column base side to the ninth block. The fifth, sixth, seventh, and eighth blocks, and the arch assembly members in the order of the first, fifth, second, third, fourth, sixth, seventh, eighth, and ninth blocks on the column base. The arch frame is assembled by continuously joining while supporting the frame with the erection frame, and the tension member installed between the two column bases is tensioned with a predetermined force to lift the arch frame and away from the gantry frame. Then, the construction method of the arch structure characterized by removing the installation base. 一方が開口した平面湾曲状の地上躯体と、該地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合して組立形成したアーチ架構と、該アーチ架構と平面湾曲状の地上躯体とにわたって設置されたドーム屋根とからなり、前記アーチ架構の両柱脚間に設置された引張材が所定の力で緊張されてアーチ架構およびドーム屋根がむくり上げられて形成されたことを特徴とするドーム構造物。A plane-curved ground frame with one opening, and a column base with two column base assembly members installed on the foundation on the opening side of the ground frame, one with pin support and the other with roller support The entire arch frame formed on these column bases is divided into nine blocks of arch assembly members, the top of the arch frame is the ninth block, and the first and second blocks from the column base side of the roller support to the ninth block 3rd, 4th block, 5th, 6th, 7th, 8th block from the column base side to the 9th block of the pin support, the 1st, 5th, 2nd, 3rd, An arch frame formed by continuously joining the arch assembly members in the order of the fourth, sixth, seventh, eighth, and ninth blocks while being supported by the gantry frame, and the arch frame and the flat curved ground surface And a dome roof installed over the frame, Dome structure, characterized in that the installed tension member is given the tension force arch rack Kamao and dome roof is formed by raised Mukuri between pedestal. 一方が開口した平面湾曲状の地上躯体の開口部側に、両柱脚用組立部材を基礎上に設置して一方をピン支承、他方をローラー支承にした柱脚を形成し、これらの柱脚に形成されるアーチ架構全体を9ブロックのアーチ用組立部材に分割し、アーチ架構の頂部を第9ブロック、ローラ支承の柱脚側から第9ブロックにかけてを第1、第2、第3、第4ブロック、ピン支承の柱脚側から第9ブロックにかけてを第5、第6、第7、第8ブロックとし、前記柱脚に第1、第5、第2、第3、第4、第6、第7、第8、第9ブロックの順にアーチ用組立部材を架設構台で支持しながら連続的に接合してアーチ架構を組立形成するとともに、該アーチ架構と平面湾曲状の地上躯体とにわたってドーム屋根を架設構台で支持しながら設置した後、前記アーチ架構の両柱脚間に設置した引張材を所定の力で緊張してアーチ架構とドーム屋根とをむくり上げて架設構台から離すとともに、該架設構台を撤去することを特徴とするドーム構造物の構築方法。On one opening portion side of the flat curved ground precursor having an opening, the pin bearing one by installing a Ryohashiraashi for assembly member on a foundation, the other to form a pedestal that a roller bearing, these pedestals The entire arch frame is divided into 9 blocks of arch assembly members, the top of the arch frame is the 9th block, and the first, second, third, 4 blocks, the fifth, sixth, seventh and eighth blocks from the column base side of the pin support to the ninth block are the first, fifth, second, third, fourth and sixth blocks. The arch assembly is formed by continuously joining the arch assembly members in the order of the seventh, eighth, and ninth blocks while being supported by the construction base, and the dome extends over the arch frame and the plane curved ground frame. After installing the roof while supporting it on the construction base, A dome structure characterized by tensioning a tension member installed between both column bases of the frame with a predetermined force to lift the arch frame and the dome roof away from the frame and removing the frame. How to build.
JP2002325264A 2002-11-08 2002-11-08 Construction method of arch structure, dome structure and construction method thereof Expired - Lifetime JP3798367B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002325264A JP3798367B2 (en) 2002-11-08 2002-11-08 Construction method of arch structure, dome structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002325264A JP3798367B2 (en) 2002-11-08 2002-11-08 Construction method of arch structure, dome structure and construction method thereof

Publications (2)

Publication Number Publication Date
JP2004156388A JP2004156388A (en) 2004-06-03
JP3798367B2 true JP3798367B2 (en) 2006-07-19

Family

ID=32804548

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002325264A Expired - Lifetime JP3798367B2 (en) 2002-11-08 2002-11-08 Construction method of arch structure, dome structure and construction method thereof

Country Status (1)

Country Link
JP (1) JP3798367B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104986663A (en) * 2015-05-21 2015-10-21 中交一航局安装工程有限公司 Lifting installation technology for steel structure arched door
CN109610335A (en) * 2018-12-24 2019-04-12 中冶天工集团有限公司 Temporary support for mounting box-separated box girder of steel arch bridge

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425326B (en) * 2011-09-14 2012-11-21 徐州中煤百甲重钢科技有限公司 Installation construction process of bolt net rack cylindrical shell storage bin
CN103195165B (en) * 2013-03-27 2014-12-10 中国三冶集团有限公司 Spiral dome and processing method and processing platform thereof
JP6663639B2 (en) * 2014-10-28 2020-03-13 株式会社竹中工務店 Construction method of frame
JP6960082B2 (en) * 2017-05-18 2021-11-05 株式会社大林組 How to build a skeleton by spraying concrete
CN114165060A (en) * 2021-10-30 2022-03-11 北京首钢建设集团有限公司 Method for mounting ultra-large-breadth curved surface porous steel plate curtain wall
CN116556692B (en) * 2023-07-11 2023-11-03 中铁建工集团有限公司 Sliding construction method of triple span arch truss

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0788692B2 (en) * 1987-03-16 1995-09-27 鹿島建設株式会社 Large space building
JP3110876B2 (en) * 1992-07-07 2000-11-20 株式会社竹中工務店 Dome roof and construction method
JPH06200625A (en) * 1992-12-29 1994-07-19 Daiwa House Ind Co Ltd Frame method of arch truss construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104986663A (en) * 2015-05-21 2015-10-21 中交一航局安装工程有限公司 Lifting installation technology for steel structure arched door
CN109610335A (en) * 2018-12-24 2019-04-12 中冶天工集团有限公司 Temporary support for mounting box-separated box girder of steel arch bridge

Also Published As

Publication number Publication date
JP2004156388A (en) 2004-06-03

Similar Documents

Publication Publication Date Title
JP3798367B2 (en) Construction method of arch structure, dome structure and construction method thereof
JP7548869B2 (en) How to build structures
JP4691431B2 (en) Roof structure and construction method thereof
CN210289133U (en) Batter post template support system
CN116657964B (en) A comprehensive steel structure for the stands containing long-span arch trusses and its construction method
CN118345858A (en) A walking tower crane foundation on steps and construction method thereof
JP3981469B2 (en) Construction method of concrete structure
JPH0633627B2 (en) New construction method on existing facility
JP6736226B2 (en) Structure and construction method of the structure constructed on the tower-shaped building
CN105971287A (en) Vertical prestress construction method of reaction wall
JP2021059908A (en) Large-space structure and method for constructing the same
JPH04161566A (en) Constructing apparatus for large space building
JPH09310512A (en) Demolition method for temporary roof
JP2000129785A (en) Construction method of dome roof
JPH0932120A (en) Method of construction of structure
JPH11256690A (en) Constructing method of roof structure
JPH10110500A (en) Dome roof structure and construction method
CN118704624B (en) A large-slope large-span roof grid construction method and roof grid
JP3357882B2 (en) Composite structure of precast panel and steel truss
JPH06185120A (en) Construction method for upper structure of roof, etc.
CN210033474U (en) A kind of support device for roof arch lining of special-shaped tunnel
JP3318717B2 (en) Construction method of PC cable stayed bridge
JP2532333B2 (en) Curing tent
JPS6393943A (en) Construction of reinforcement bar dome
JPH0489939A (en) Large span truss erecting method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050909

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051205

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060227

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060301

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060329

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060419

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3798367

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090428

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100428

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100428

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110428

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140428

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term