JP6960082B2 - How to build a skeleton by spraying concrete - Google Patents
[go: Go Back, main page]

JP6960082B2 - How to build a skeleton by spraying concrete - Google Patents

How to build a skeleton by spraying concrete Download PDF

Info

Publication number
JP6960082B2
JP6960082B2 JP2017099158A JP2017099158A JP6960082B2 JP 6960082 B2 JP6960082 B2 JP 6960082B2 JP 2017099158 A JP2017099158 A JP 2017099158A JP 2017099158 A JP2017099158 A JP 2017099158A JP 6960082 B2 JP6960082 B2 JP 6960082B2
Authority
JP
Japan
Prior art keywords
skeleton
concrete
spraying
reinforcing
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017099158A
Other languages
Japanese (ja)
Other versions
JP2018193794A (en
Inventor
将希 田中
利隆 末宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2017099158A priority Critical patent/JP6960082B2/en
Publication of JP2018193794A publication Critical patent/JP2018193794A/en
Application granted granted Critical
Publication of JP6960082B2 publication Critical patent/JP6960082B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、コンクリート吹付けによる躯体構築方法に関する。 The present invention relates to a method for constructing a skeleton by spraying concrete.

従来、例えば、ボックスカルバートなど頂版を有する構造物においては、当該頂版を構築する際に、足場を設置し、型枠支保工を設置して鉄筋の組み立てを行い、現場打ちコンクリートにて頂版の躯体コンクリートを打設するという施工方法が一般的に採用されていた。 Conventionally, in a structure having a top plate such as a box culvert, when constructing the top plate, a scaffolding is installed, a formwork support is installed, reinforcing bars are assembled, and cast-in-place concrete is used. The construction method of placing slab formwork concrete was generally adopted.

また、工期の短縮や施工性の観点から、ボックスカルバートをプレキャストコンクリートによって構成し、頂版ブロックを揚重機によって吊り上げ、側壁ブロックの上に載置するという施工方法も採用されていた。(特許文献1参照) In addition, from the viewpoint of shortening the construction period and workability, a construction method was also adopted in which the box culvert was constructed of precast concrete, the top plate block was lifted by a lifting machine, and the box culvert was placed on the side wall block. (See Patent Document 1)

特許第4917576号公報Japanese Patent No. 4917576

しかし、上記従来の施工方法においては、頂版を構築する際に、足場の設置や型枠支保工の設置など、仮設工事に要する時間や手間による、工期やコストに及ぼす影響が非常に大きかった。 However, in the above-mentioned conventional construction method, when constructing the top plate, the time and labor required for temporary construction such as scaffolding and formwork support work have a great influence on the construction period and cost. ..

また、上記特許文献1に記載されているようなプレキャストコンクリート製の頂版ブロックを載置する方法においては、揚重機の揚重能力によって、頂版ブロック1基当りの重さは制限を受けることから、当該頂版ブロックの縦断方向の長さを小さくせざるを得ず、施工延長の長いボックスカルバートでは、返って工期を短縮することができない場合もある。 Further, in the method of mounting the top plate block made of precast concrete as described in Patent Document 1, the weight per top plate block is limited by the lifting capacity of the lifting machine. Therefore, it is inevitable to reduce the length of the top plate block in the longitudinal direction, and in the case of a box culvert with a long construction extension, it may not be possible to shorten the construction period.

さらに、10mを超えるような大きなスパンを有する頂版を構築するような場合は、プレキャストコンクリート製にすると非常に大きな重量となってしまうことから、揚重機による頂版ブロックの設置は現実的に困難である。 Furthermore, when constructing a top plate with a large span of more than 10 m, it is practically difficult to install a top plate block with a lifting machine because precast concrete would result in a very large weight. Is.

そこで、本願発明は、足場や型枠支保工を設置することなく、従来の躯体構築方法に比べて大幅に工期の短縮を可能とする、コンクリート吹付けによる躯体構築方法を提供することを目的とする。 Therefore, an object of the present invention is to provide a skeleton construction method by concrete spraying, which enables a significant shortening of the construction period as compared with the conventional skeleton construction method without installing scaffolding or formwork support. do.

(1)吹付けコンクリート(吹付けコンクリート3)を吹き付けて躯体(頂版10、床スラブ、梁10A)を構築する、コンクリート吹付けによる躯体構築方法であって、前記躯体の所定方向に複数の補強材(補強材1)を所定の間隔で配置するとともに、当該複数の補強材に渡って格子状の繋ぎ材(繋ぎ材2)を結束し、前記繋ぎ材に対して、下方および上方から前記吹付けコンクリートを吹き付けて前記躯体を構築することを特徴とするコンクリート吹付けによる躯体構築方法。 (1) A method of constructing a skeleton by spraying sprayed concrete (sprayed concrete 3) to construct a skeleton (top plate 10, floor slab, beam 10A) by spraying concrete, and a plurality of skeletons are constructed in a predetermined direction of the skeleton. Reinforcing materials (reinforcing material 1) are arranged at predetermined intervals, and a grid-like connecting material (connecting material 2) is bound over the plurality of reinforcing materials, and the connecting material is described from below and above. A method for constructing a skeleton by spraying concrete, which comprises spraying sprayed concrete to construct the skeleton.

上記(1)の構成によれば、従来のような足場の設置や型枠支保工の設置を行うことなく、吹付けコンクリート3を吹き付けることによって頂版10、床スラブ、梁10Aなどの躯体を構築することができるので、工期を大幅に短縮して経済的に躯体を構築することが可能となる。すなわち、吹付けコンクリート3を吹き付ける際、格子状の繋ぎ材2が型枠代わりとなり、当該繋ぎ材2に対して下方および上方から吹付けコンクリート3を付着させ、所定の構造断面を有する躯体を短期間で構築することが可能である。 According to the configuration of (1) above, the skeleton such as the top plate 10, the floor slab, and the beam 10A can be formed by spraying the sprayed concrete 3 without installing the scaffolding or the formwork support as in the past. Since it can be constructed, it is possible to significantly shorten the construction period and construct the formwork economically. That is, when the sprayed concrete 3 is sprayed, the lattice-shaped connecting material 2 serves as a formwork, and the spraying concrete 3 is attached to the connecting material 2 from below and above to form a skeleton having a predetermined structural cross section for a short period of time. It is possible to build between.

(2)吹付けコンクリート(吹付けコンクリート3)を吹き付けて躯体(頂版10、床スラブ、梁10A)を構築する、コンクリート吹付けによる躯体構築方法であって、前記躯体の所定方向に複数の補強材(補強材1)を所定の間隔で配置するとともに、当該複数の補強材に渡って格子状の繋ぎ材(繋ぎ材2)を結束し、前記繋ぎ材に対して、下方から前記吹付けコンクリートを吹き付けて、上方からは現場打ちコンクリートを打設して前記躯体を構築することを特徴とするコンクリート吹付けによる躯体構築方法。 (2) A method of constructing a skeleton by spraying sprayed concrete (sprayed concrete 3) to construct a skeleton (top plate 10, floor slab, beam 10A) by spraying concrete, and a plurality of skeletons are constructed in a predetermined direction of the skeleton. Reinforcing materials (reinforcing material 1) are arranged at predetermined intervals, and a grid-like connecting material (connecting material 2) is bound over the plurality of reinforcing materials, and the connecting material is sprayed from below. A method for constructing a skeleton by spraying concrete, which comprises spraying concrete and casting cast-in-place concrete from above to construct the skeleton.

上記(2)の構成によれば、従来のような足場の設置や型枠支保工の設置を行うことなく、吹付けコンクリート3を吹き付けることによって頂版10、床スラブ、梁10Aなどの躯体を構築することができるので、工期を大幅に短縮して経済的に躯体を構築することが可能となる。すなわち、吹付けコンクリート3を吹き付ける際、格子状の繋ぎ材2に対して下方から吹付けコンクリート3を付着させて躯体下部を構築し、さらに、躯体上部に現場打ちコンクリートを打設することによって、所定の構造断面を有する躯体を短期間で構築することが可能である。 According to the configuration of (2) above, the skeleton such as the top plate 10, the floor slab, and the beam 10A can be formed by spraying the sprayed concrete 3 without installing the scaffolding or the formwork support as in the past. Since it can be constructed, it is possible to significantly shorten the construction period and construct the formwork economically. That is, when the sprayed concrete 3 is sprayed, the sprayed concrete 3 is attached to the lattice-shaped connecting material 2 from below to construct the lower part of the skeleton, and further, the cast-in-place concrete is cast on the upper part of the skeleton. It is possible to construct a skeleton having a predetermined structural cross section in a short period of time.

(3)前記躯体は、頂版(頂版10)または床スラブである(1)または(2)に記載のコンクリート吹付けによる躯体構築方法。 (3) The method for constructing a skeleton by spraying concrete according to (1) or (2), wherein the skeleton is a top slab (top slab 10) or a floor slab.

上記(3)の構成によれば、足場の設置や型枠支保工の設置作業に多くの手間や資機材を必要とする頂版(頂版10)または床スラブを構築する場合、上記(1)または(2)に記載した構成によって得られる効果を、より顕著に得ることが可能である。 According to the configuration of (3) above, when constructing a top plate (top plate 10) or a floor slab that requires a lot of labor and materials and equipment for scaffolding installation and formwork support installation work, the above (1) ) Or the effect obtained by the configuration described in (2) can be obtained more remarkably.

(4)前記補強材(補強材1)と前記繋ぎ材(繋ぎ材2)とのうち少なくとも前記補強材は、炭素繊維強化プラスチックまたはアラミド繊維強化プラスチックにて成形されて成る(1)〜(3)のいずれかに記載のコンクリート吹付けによる躯体構築方法。 (4) Of the reinforcing material (reinforcing material 1) and the connecting material (connecting material 2), at least the reinforcing material is formed of carbon fiber reinforced plastic or aramid fiber reinforced plastic (1) to (3). ), The method of constructing the skeleton by spraying concrete.

上記(4)の構成によれば、補強材(補強材1)と繋ぎ材(繋ぎ材2)とのうち少なくとも上記補強材は、炭素繊維強化プラスチックまたはアラミド繊維強化プラスチックにて成形されている。つまり、通常使用される鉄筋に比べて非常に高強度かつ軽量であるので、補強材(補強材1)および繋ぎ材(繋ぎ材2)の組立て作業をより効率的に行うことが可能となる。 According to the configuration of (4) above, at least the reinforcing material of the reinforcing material (reinforcing material 1) and the connecting material (connecting material 2) is formed of carbon fiber reinforced plastic or aramid fiber reinforced plastic. That is, since it is much stronger and lighter than the normally used reinforcing bars, it is possible to more efficiently assemble the reinforcing material (reinforcing material 1) and the connecting material (connecting material 2).

(5)前記補強材(補強材1)と前記繋ぎ材(繋ぎ材2)とを地組みする(1)〜(4)のいずれかに記載のコンクリート吹付けによる躯体構築方法。 (5) The method for constructing a skeleton by spraying concrete according to any one of (1) to (4), wherein the reinforcing material (reinforcing material 1) and the connecting material (connecting material 2) are grounded.

上記(5)の構成によれば、前記補強材(補強材1)と前記繋ぎ材(繋ぎ材2)とを地組みして、揚重機によって躯体の構築場所に設置するので、構築場所における足場の設置を最小限とすることができる。さらに、上記補強材や上記繋ぎ材が炭素繊維強化プラスチックまたはアラミド繊維強化プラスチックにて成形されている場合、地組みされた上記補強材や上記繋ぎ材は非常に軽いので、大きく地組みすることが可能となり、さらに工期を短縮することが可能となる。 According to the configuration of (5) above, the reinforcing material (reinforcing material 1) and the connecting material (connecting material 2) are grounded and installed at the construction site of the skeleton by a lifting machine. Installation can be minimized. Further, when the reinforcing material and the connecting material are molded of carbon fiber reinforced plastic or aramid fiber reinforced plastic, the reinforcing material and the connecting material that have been grounded are very light, so that they can be grounded largely. It becomes possible, and the construction period can be further shortened.

本発明の実施例における、ボックスカルバートの一例を示す模式断面図である。It is a schematic cross-sectional view which shows an example of the box culvert in the Example of this invention. 本発明の実施例における、コンクリート吹付けによる頂版の施工フローの一例が示されている。An example of the construction flow of the top slab by spraying concrete in the embodiment of the present invention is shown. 本発明における、地組ガイドの設置態様および断面図の一例を示す図である。It is a figure which shows an example of the installation mode and the cross-sectional view of the groundwork guide in this invention. 本発明における、補強材および繋ぎ材の組み立て態様の一例を示す図である。It is a figure which shows an example of the assembling mode of a reinforcing material and a connecting material in this invention. 本発明における、地組みされた補強材および繋ぎ材の側壁上への設置態様の一例を示す図である。It is a figure which shows an example of the installation mode on the side wall of the ground-assembled reinforcing material and the connecting material in this invention. 本発明における、吹付けコンクリートの吹き付け手順の一例を示す図である。It is a figure which shows an example of the spraying procedure of the sprayed concrete in this invention. 本発明の別実施例における、梁の一例を示す模式断面図である。It is a schematic cross-sectional view which shows an example of a beam in another Example of this invention.

以下、図面を参照しつつ、本発明のコンクリート吹付けによる躯体構築方法において、実施例として頂版の構築方法について説明する。 Hereinafter, the method of constructing the top plate will be described as an example in the method of constructing the skeleton by spraying concrete of the present invention with reference to the drawings.

本発明のコンクリート吹付けによる躯体構築物の一例として、図1(a)にはボックスカルバート100の全体模式断面図が示されている。図示された実施例では、アーチ形状の頂版10がピン接合に近い態様で左右の側壁20に架設されている。なお、本発明のコンクリート吹付けによる躯体構築方法は、図1(a)に示された実施例に限定されるものではなく、直線形状の頂版の他、様々な形状の頂版、さらに床スラブや梁にも適用が可能である。また、頂版の接合方法はピン接合の他、剛結接合であっても同様に適用が可能である。 As an example of the skeleton structure by concrete spraying of the present invention, FIG. 1A shows an overall schematic cross-sectional view of the box culvert 100. In the illustrated embodiment, the arch-shaped top plate 10 is erected on the left and right side walls 20 in a manner similar to a pin joint. The method for constructing a skeleton by spraying concrete of the present invention is not limited to the embodiment shown in FIG. 1 (a), and includes a linear top slab, various shapes of top slabs, and a floor. It can also be applied to slabs and beams. Further, the method of joining the top plate can be similarly applied not only to pin joining but also to rigid joining.

また、図1(a)および(b)には頂版10の模式断面図が示されており、頂版10内には、横断方向(短辺方向)に配置される補強材1が所定の間隔で配置され、さらに当該補強材1の上部に格子状の繋ぎ材2が結束されて配置されている。すなわち、上記補強材1は主筋の役割を、上記繋ぎ材2は配力筋の役割を担っている。 Further, FIGS. 1 (a) and 1 (b) show schematic cross-sectional views of the top plate 10, and a reinforcing member 1 arranged in the transverse direction (short side direction) is predetermined in the top plate 10. They are arranged at intervals, and a grid-like connecting member 2 is bound and arranged on the upper part of the reinforcing member 1. That is, the reinforcing member 1 plays the role of the main bar, and the connecting member 2 plays the role of the force distribution bar.

そして、格子状の繋ぎ材2に対し、下方から下側吹付けコンクリート3aが、上方からは上側吹付けコンクリート3bが吹付けられて頂版10が構築されている。 Then, the lower sprayed concrete 3a is sprayed from the lower side and the upper sprayed concrete 3b is sprayed from the upper side onto the lattice-shaped connecting member 2, and the top plate 10 is constructed.

(使用材料)
本実施例で使用される補強材1は、炭素繊維強化プラスチック(所謂CFRP)を中空円筒形状に成形したものであり、軽量で強度の高い材料である。なお、軽量かつ強度が高いという観点から、アラミド繊維強化プラスチックを使用して補強材1を成形することも可能である。さらに、カーボン製のロッド・パイプを補強材1とすることも可能である。
(Material used)
The reinforcing material 1 used in this embodiment is made by molding carbon fiber reinforced plastic (so-called CFRP) into a hollow cylindrical shape, and is a lightweight and high-strength material. From the viewpoint of light weight and high strength, it is also possible to mold the reinforcing material 1 using aramid fiber reinforced plastic. Further, the carbon rod / pipe can be used as the reinforcing material 1.

また、補強材1の形状は上記した中空円筒形状に限られず、中実のロッド形状やH型、I型、多角形状など他の形状とすることが可能であり、頂版10の形状、寸法などに応じて形状を変更することが可能である。例えば、頂版10の断面形状がアーチ状である場合は、補強材1を設置する際に、当該補強材1をアーチ状に変形する必要があることから、中空円筒形状とするのが好ましい。また、頂版10の形状が直線形状であれば、H型やI型とすることで架設時に撓み難くすることが可能である。 Further, the shape of the reinforcing material 1 is not limited to the hollow cylindrical shape described above, and other shapes such as a solid rod shape, an H type, an I type, and a polygonal shape can be used, and the shape and dimensions of the top plate 10 can be used. It is possible to change the shape according to such factors. For example, when the cross-sectional shape of the top plate 10 is arch-shaped, it is preferable to use a hollow cylindrical shape because the reinforcing member 1 needs to be deformed into an arch shape when the reinforcing member 1 is installed. Further, if the shape of the top plate 10 is a linear shape, it is possible to make it difficult to bend at the time of erection by making it H-shaped or I-shaped.

本実施例で使用される格子状の繋ぎ材2は、炭素繊維強化プラスチック(所謂CFRP)により成形された網材であり、約2cm四方のグリッドが形成され、軽量で強度が高く、腐食に強い材料となっている。なお、繋ぎ材2は、吹付けコンクリート3の型枠としても機能するものであるため、グリッドの形状、寸法については上記したものに限られず、吹付けコンクリート3が適切に付着するものであればよい。 The lattice-shaped connecting material 2 used in this embodiment is a net material formed of carbon fiber reinforced plastic (so-called CFRP), has a grid of about 2 cm square, is lightweight, has high strength, and is resistant to corrosion. It is a material. Since the connecting material 2 also functions as a formwork for the sprayed concrete 3, the shape and dimensions of the grid are not limited to those described above, as long as the sprayed concrete 3 is appropriately attached. good.

また、軽量かつ強度が高いという観点から、アラミド繊維によって構成されたメッシュシートを繋ぎ材2とすることも可能であり、炭素繊維によるものに比べてコストの低減を図ることが可能である。またこれに限られず、鋼製の溶接金網やラス金網を繋ぎ材2として利用することも可能である。 Further, from the viewpoint of light weight and high strength, it is possible to use a mesh sheet made of aramid fiber as a connecting material 2, and it is possible to reduce the cost as compared with the one made of carbon fiber. Further, the present invention is not limited to this, and a steel welded wire mesh or a lath wire mesh can be used as the connecting material 2.

本実施例で使用される吹付けコンクリート3は、骨材の最大粒径を15mmとし、混和剤として急結剤が配合されており、初期強度の発現速度が極めて速い材料となっている。なお、骨材の最大粒径や配合される混和剤等は上記したものに限られず、要求される初期強度および長期強度、上記繋ぎ材2への付着性や施工性などを考慮して、吹付けコンクリート3の配合設計を行うことが必要である。 The sprayed concrete 3 used in this embodiment has an aggregate having a maximum particle size of 15 mm and a quick-setting agent as an admixture, and is a material having an extremely fast onset rate of initial strength. The maximum particle size of the aggregate and the admixture to be blended are not limited to those described above, and the required initial strength and long-term strength, adhesion to the binder 2 and workability are taken into consideration. It is necessary to design the composition of the attached concrete 3.

(施工手順)
次に、本実施例における、コンクリート吹付けによる頂版の施工手順について、図2のフローに従って各図を参照しながら以下に説明する。
(Construction procedure)
Next, the construction procedure of the top slab by spraying concrete in this embodiment will be described below with reference to each figure according to the flow of FIG.

[地組ガイドの設置(S100)]
図3には、補強材1および繋ぎ材2を地組みするための地組ガイド4の設置態様およびその断面図が示されている。図3(a)に示されるように、頂版10の形状、寸法に応じ、横断方向(図示Bの方向)の両端部にL型の地組ガイド4を地上に設置する。さらに、頂版10の寸法に対応して地組ガイド4同士の間隔を維持、固定するため、少なくとも、当該地組ガイド4の縦断方向(図示Aの方向)の両端部に地組ガイド固定部材5を設置する。
[Installation of ground guide (S100)]
FIG. 3 shows an installation mode of the groundwork guide 4 for grounding the reinforcing material 1 and the connecting material 2 and a cross-sectional view thereof. As shown in FIG. 3A, L-shaped ground guides 4 are installed on the ground at both ends in the transverse direction (direction B in the drawing) according to the shape and dimensions of the top plate 10. Further, in order to maintain and fix the distance between the ground guides 4 corresponding to the dimensions of the top plate 10, the ground guide fixing members are at least at both ends in the longitudinal direction (direction of FIG. A) of the ground guide 4. Install 5.

なお、本実施例では、図3(a)に示されるように上記地組ガイド固定部材5として平鋼を使用しているが、これに限られるものではなく、地組ガイド4の間隔を固定することが可能であれば、棒鋼やアングル、ワイヤ等を使用してもよい。このような構成により、直線形状の補強材1を上方に曲げて地組ガイド4に配置する場合であっても、当該補強材1が元の直線形状に戻ることを防ぎ、頂版10の形状に対応して補強材1および繋ぎ材2を地上で組み立てることができる。 In this embodiment, as shown in FIG. 3A, flat steel is used as the ground guide fixing member 5, but the present invention is not limited to this, and the distance between the ground guides 4 is fixed. If possible, steel bars, angles, wires, etc. may be used. With such a configuration, even when the linear reinforcing material 1 is bent upward and arranged on the ground guide 4, the reinforcing material 1 is prevented from returning to the original linear shape, and the shape of the top plate 10 is formed. The reinforcing member 1 and the connecting member 2 can be assembled on the ground corresponding to the above.

また、図3(b)には地組ガイド4への補強材1の設置態様が示されているが、本実施例では、地組ガイド4に中空円筒形状の補強材1を所定の位置に配置するための固定突起6が所定の間隔で設けられている。なお、当該固定突起6を地組ガイド4に設けることなく、補強材1を地組ガイド4に配置することも可能ではあるが、上記固定突起6など、補強材1を所定の間隔で配置するための何らかの位置決め部材を地組ガイド4に設けることで、補強材1の配置作業の作業性を向上させることが可能となる。 Further, FIG. 3B shows how to install the reinforcing material 1 on the groundwork guide 4, but in this embodiment, the hollow cylindrical reinforcing material 1 is placed at a predetermined position on the groundwork guide 4. Fixing protrusions 6 for arranging are provided at predetermined intervals. Although it is possible to arrange the reinforcing material 1 on the ground guide 4 without providing the fixing protrusions 6 on the ground guide 4, the reinforcing materials 1 such as the fixing protrusions 6 are arranged at predetermined intervals. By providing the groundwork guide 4 with some kind of positioning member for this purpose, it is possible to improve the workability of the work of arranging the reinforcing member 1.

[補強材の組立て(S110)]
図3(b)に示されるように、本実施例では、地組ガイド4上に、頂版10の形状に応じて補強材1を曲げながら上記固定突起6に挿入し、当該補強材1を所定の位置に配置する。その後、軸方向(図3(a)のAの方向)に、各補強材1の間隔を維持、固定する軸方向繋ぎ材7を設置して、各補強材1と結束材8によって結束する。上記軸方向繋ぎ材7は、鉄筋や炭素繊維強化プラスチックなど、補強材1同士の間隔を維持、固定できるものであればよい。
[Assembly of Reinforcing Material (S110)]
As shown in FIG. 3B, in this embodiment, the reinforcing material 1 is inserted into the fixing protrusion 6 while being bent according to the shape of the top plate 10 on the groundwork guide 4, and the reinforcing material 1 is inserted. Place in place. After that, in the axial direction (direction A in FIG. 3A), an axial connecting member 7 for maintaining and fixing the interval between the reinforcing members 1 is installed, and the reinforcing members 1 and the binding member 8 bind the reinforcing members 1. The axial connecting material 7 may be any material such as a reinforcing bar or carbon fiber reinforced plastic that can maintain and fix the distance between the reinforcing materials 1.

続いて、図3(b)および図4(b)に示されるように、横断方向(図3(a)のBの方向)の両端部に設置された上記軸方向繋ぎ材7間にタイワイヤ9を張る。このような構成により、地組みが完了した補強材1および繋ぎ材2が吊り上げられて、地組ガイド4から離脱した後であっても、補強材1および繋ぎ材2の組立て形状(本実施例ではアーチ形状)が保持されることとなる。 Subsequently, as shown in FIGS. 3 (b) and 4 (b), the tie wires 9 are provided between the axial connecting members 7 installed at both ends in the transverse direction (direction B in FIG. 3 (a)). Put up. With such a configuration, even after the reinforcing material 1 and the connecting material 2 for which the groundwork has been completed are lifted and separated from the groundwork guide 4, the assembled shape of the reinforcing material 1 and the connecting material 2 (the present embodiment). Then the arch shape) will be retained.

[繋ぎ材の設置、結束(S120)]
図4(a)および(b)に示されるように、地組ガイド4に配置された補強材1の上部に格子状の繋ぎ材2を配置し、当該繋ぎ材2を結束線等を用いて補強材1に結束する。
[Installation of connecting material, binding (S120)]
As shown in FIGS. 4A and 4B, a grid-like connecting member 2 is arranged on the upper part of the reinforcing member 1 arranged in the groundwork guide 4, and the connecting member 2 is connected by using a binding line or the like. Bind to the reinforcing material 1.

[地組み補強材、繋ぎ材の揚重設置(S130)]
図5には、地組ガイド4上において組み立てられた補強材1および繋ぎ材2を吊り上げて、頂版10の構築箇所に設置する態様が示されている。地組ガイド4上において補強材1および繋ぎ材2の組み立てが完了した後、図5(a)および(b)に示されるように、軸方向繋ぎ材7に玉掛けワイヤ40を取り付け、クレーンなどの揚重機50によって組み立てられた補強材1および繋ぎ材2を吊り上げて、頂版10の構築箇所まで移動して側壁20上部の設置箇所に設置する。
[Floating installation of ground reinforcement and connecting material (S130)]
FIG. 5 shows a mode in which the reinforcing member 1 and the connecting member 2 assembled on the groundwork guide 4 are lifted and installed at the construction location of the top plate 10. After the assembly of the reinforcing material 1 and the connecting material 2 is completed on the groundwork guide 4, the slinging wire 40 is attached to the axial connecting material 7 as shown in FIGS. The reinforcing member 1 and the connecting member 2 assembled by the lifting machine 50 are lifted, moved to the construction location of the top plate 10, and installed at the installation location on the upper side wall 20.

側壁20上部の設置箇所への設置が完了したら、玉掛けワイヤ40を外すとともに、補強材1の組立て形状を保持するために張られていたタイワイヤ9を撤去する。なお、頂版10と側壁20とを剛結接合する場合には、側壁20上部から定着用鉄筋(図示略)を露出させておき、当該定着用鉄筋(図示略)と補強材1とを結束する作業を行うこととなる。 When the installation at the installation location on the upper part of the side wall 20 is completed, the sling wire 40 is removed, and the tie wire 9 stretched to maintain the assembled shape of the reinforcing member 1 is removed. When the top plate 10 and the side wall 20 are rigidly joined, the fixing reinforcing bar (not shown) is exposed from the upper part of the side wall 20 and the fixing reinforcing bar (not shown) is bound to the reinforcing material 1. Will be done.

[吹付けコンクリートの吹き付け(S140)]
図6には側壁20の上部に架設された補強材1および繋ぎ材2に対する吹付けコンクリート3の吹き付け態様が段階的に示されている。まず、図6(a)に示されるように、頂版10の下方から吹付けコンクリート3を繋ぎ材2に対して吹き付け、図6(b)に示されるように所定の設計厚さとなるまで吹き付けを行って下側吹付けコンクリート3aを構築する。
[Spraying concrete spraying (S140)]
FIG. 6 shows stepwise the spraying mode of the sprayed concrete 3 on the reinforcing member 1 and the connecting member 2 erected on the upper part of the side wall 20. First, as shown in FIG. 6 (a), the sprayed concrete 3 is sprayed onto the connecting material 2 from below the top plate 10, and then sprayed until the predetermined design thickness is reached as shown in FIG. 6 (b). To construct the lower sprayed concrete 3a.

次に、図6(c)に示されるように、繋ぎ材2の上面側に所定の設計厚さとなるまで吹付けコンクリート3を吹き付け、上側吹付けコンクリート3bを構築する。なお、上面側の上側吹付けコンクリート3bの部分は、吹き付けによる方法に限定されるものではなく、既に構築された下側吹付けコンクリート3aにコンクリートを打ち足すように、ポンプ圧送等によってコンクリートを現場打ちして頂版10を構築することも可能である。その際、既に構築された下側吹付けコンクリート3a上に作業員が立ち入る必要があるので、当該下側吹付けコンクリート3aがそれに耐え得る強度を有していることが必要となる。 Next, as shown in FIG. 6C, the sprayed concrete 3 is sprayed onto the upper surface side of the connecting member 2 until it reaches a predetermined design thickness, and the upper sprayed concrete 3b is constructed. The portion of the upper sprayed concrete 3b on the upper surface side is not limited to the method by spraying, and the concrete is pumped to the site by pumping or the like so as to add concrete to the already constructed lower sprayed concrete 3a. It is also possible to hit and build the top plate 10. At that time, since it is necessary for the worker to enter the already constructed lower spray concrete 3a, it is necessary that the lower spray concrete 3a has a strength that can withstand it.

[養生(S150)]
吹付けコンクリートの吹き付けが完了すると、所定の期間の養生を行う。
[Cure (S150)]
When the spraying of the sprayed concrete is completed, it is cured for a predetermined period.

以上、本実施例における施工手順を説明したが、補強材1および繋ぎ材2を組み立てる際に使用した地組ガイド4および地組ガイド固定部材5、タイワイヤ9は再利用することができるので、当該地組ガイド4および地組ガイド固定部材5、タイワイヤ9を使用し、繰り返し、補強材1および繋ぎ材2の組立てに利用することが可能である。 Although the construction procedure in this embodiment has been described above, the groundwork guide 4, the groundwork guide fixing member 5, and the tie wire 9 used when assembling the reinforcing material 1 and the connecting material 2 can be reused. The groundwork guide 4, the groundwork guide fixing member 5, and the tie wire 9 can be repeatedly used for assembling the reinforcing material 1 and the connecting material 2.

また、上記した施工手順の説明は、頂版の形状をアーチ形状とした実施例にもとづいているが、平坦形状の頂版を構築する場合や、予め、補強材1をアーチ形状に成形するような場合は、必ずしもタイワイヤ9を必要とするものではない。 Further, the above description of the construction procedure is based on an example in which the shape of the top slab is an arch shape, but when constructing a flat top slab or in advance, the reinforcing material 1 is formed into an arch shape. In this case, the tie wire 9 is not always required.

(その他の実施例)
前述の実施例では、主にアーチ形状の頂版における、コンクリート吹付けによる頂版の構築方法について説明したが、梁や床スラブなどの躯体をコンクリート吹付けによって構築することも可能である。例えば、図7の梁10Aの模式断面図に示されているように、まず、横断方向に補強材1を配置するとともに、格子状の繋ぎ材2を補強材1に図示されるように結束する。
(Other Examples)
In the above-described embodiment, the method of constructing the top slab by spraying concrete mainly in the arch-shaped top slab has been described, but it is also possible to construct a skeleton such as a beam or a floor slab by spraying concrete. For example, as shown in the schematic cross-sectional view of the beam 10A of FIG. 7, first, the reinforcing member 1 is arranged in the transverse direction, and the lattice-shaped connecting member 2 is bound as shown in the reinforcing member 1. ..

そして、下方から吹付けコンクリート3を繋ぎ材2に吹き付けて下側吹付けコンクリート3aを構築する。その後、上方から梁10A内部に吹き付けを行って上側吹付けコンクリート3bを構築する。なお、上側吹付けコンクリート3bの部分は、吹き付けによる方法に限定されるものではなく、既に構築された下側吹付けコンクリート3aにコンクリートを打ち足すように、ポンプ圧送等によってコンクリートを現場打ちし、梁10Aを構築することも可能である。 Then, the sprayed concrete 3 is sprayed onto the connecting member 2 from below to construct the lower sprayed concrete 3a. After that, the inside of the beam 10A is sprayed from above to construct the upper sprayed concrete 3b. The portion of the upper sprayed concrete 3b is not limited to the method by spraying, and the concrete is cast on-site by pumping or the like so as to add concrete to the already constructed lower sprayed concrete 3a. It is also possible to construct the beam 10A.

以上、本発明の実施形態について図面にもとづいて説明したが、具体的な構成は、これらの実施形態に限定されるものではない。本発明の範囲は、上記した実施形態の説明ではなく特許請求の範囲によって示され、さらに特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれる。また、上記実施例に記載された具体的な材質、寸法形状等は本発明の課題を解決する範囲において、変更が可能である。 Although the embodiments of the present invention have been described above with reference to the drawings, the specific configuration is not limited to these embodiments. The scope of the present invention is shown by the scope of claims rather than the description of the above-described embodiment, and further includes all modifications within the meaning and scope equivalent to the scope of claims. In addition, the specific materials, dimensions, shapes, etc. described in the above examples can be changed as long as the problems of the present invention are solved.

1 補強材
2 繋ぎ材
3 吹付けコンクリート
10 頂版
10A 梁
1 Reinforcing material 2 Connecting material 3 Sprayed concrete 10 Top plate 10A Beam

Claims (5)

吹付けコンクリートを吹き付けて架設される躯体を構築する、コンクリート吹付けによる躯体構築方法であって、
前記躯体が接合されて支持される方向に、直線又は曲線形状を有する補強材を所定の間隔で並行して配置するとともに、該補強材を前記躯体の架設方向に架け渡し、
前記吹付けコンクリートが付着可能な平面格子状の繋ぎ材を、並行して配置された複数の前記補強材に渡って面状に配置するとともに、該繋ぎ材を前記補強材に結束し、
前記繋ぎ材の一方の面に対して、架設される前記躯体の下方側から前記吹付けコンクリートを吹き付け、その後、前記繋ぎ材の他方の面に対して、架設される前記躯体の上方から前記吹付けコンクリートを吹き付けて、架設される前記躯体を構築する
ことを特徴とするコンクリート吹付けによる躯体構築方法。
It is a method of constructing a skeleton by spraying concrete, which constructs a skeleton that is erected by spraying sprayed concrete.
Reinforcing materials having a straight or curved shape are arranged in parallel at predetermined intervals in the direction in which the skeletons are joined and supported, and the reinforcing materials are bridged in the erection direction of the skeletons.
The shotcrete plane lattice tether possible adhesion, as well as arranged in a planar across a plurality of the reinforcing material disposed in parallel, and bundling the該繋skill material to said reinforcing member,
Against one surface of the connecting member, spraying the shotcrete from the lower side of the skeleton to be laid, then from said upper side of said skeleton member to the other surface of the connecting member is bridged A method for constructing a skeleton by spraying concrete, which comprises spraying sprayed concrete to construct the skeleton to be erected.
吹付けコンクリートを吹き付けて架設される躯体を構築する、コンクリート吹付けによる躯体構築方法であって、
前記躯体が接合されて支持される方向に、直線又は曲線形状を有する補強材を所定の間隔で並行して配置するとともに、該補強材を前記躯体の架設方向に架け渡し、
前記吹付けコンクリートが付着可能な平面格子状の繋ぎ材を、並行して配置された複数の前記補強材に渡って面状に配置するとともに、該繋ぎ材を前記補強材に結束し、
前記繋ぎ材の一方の面に対して、架設される前記躯体の下方側から前記吹付けコンクリートを吹き付け、その後、前記繋ぎ材の他方の面に対して、架設される前記躯体の上方ら現場打ちコンクリートを打設して、架設される前記躯体を構築する
ことを特徴とするコンクリート吹付けによる躯体構築方法。
It is a method of constructing a skeleton by spraying concrete, which constructs a skeleton that is erected by spraying sprayed concrete.
Reinforcing materials having a straight or curved shape are arranged in parallel at predetermined intervals in the direction in which the skeletons are joined and supported, and the reinforcing materials are bridged in the erection direction of the skeletons.
The shotcrete plane lattice tether possible adhesion, as well as arranged in a planar across a plurality of the reinforcing material disposed in parallel, and bundling the該繋skill material to said reinforcing member,
Against one surface of the connecting member, spraying the shotcrete from the lower side of the skeleton to be laid, then to the other surface of the connecting member, the upper side or al of the skeleton to be bridged and Da設the onsite concrete, the skeleton construction method according to the concrete spraying, characterized in that to construct a building frame to be bridged.
架設される前記躯体は、頂版または床スラブである
請求項1または2に記載のコンクリート吹付けによる躯体構築方法。
The method for constructing a skeleton by spraying concrete according to claim 1 or 2, wherein the skeleton to be erected is a top plate or a floor slab.
前記補強材と前記繋ぎ材とのうち少なくとも前記補強材は、炭素繊維強化プラスチックまたはアラミド繊維強化プラスチックにて成形されて成る
請求項1〜3のいずれかに記載のコンクリート吹付けによる躯体構築方法。
The method for constructing a skeleton by spraying concrete according to any one of claims 1 to 3, wherein at least the reinforcing material among the reinforcing material and the connecting material is formed of carbon fiber reinforced plastic or aramid fiber reinforced plastic.
前記補強材と前記繋ぎ材とを地組みする
請求項1〜4のいずれかに記載のコンクリート吹付けによる躯体構築方法。

The method for constructing a skeleton by spraying concrete according to any one of claims 1 to 4, wherein the reinforcing material and the connecting material are grounded.

JP2017099158A 2017-05-18 2017-05-18 How to build a skeleton by spraying concrete Active JP6960082B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017099158A JP6960082B2 (en) 2017-05-18 2017-05-18 How to build a skeleton by spraying concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017099158A JP6960082B2 (en) 2017-05-18 2017-05-18 How to build a skeleton by spraying concrete

Publications (2)

Publication Number Publication Date
JP2018193794A JP2018193794A (en) 2018-12-06
JP6960082B2 true JP6960082B2 (en) 2021-11-05

Family

ID=64569147

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017099158A Active JP6960082B2 (en) 2017-05-18 2017-05-18 How to build a skeleton by spraying concrete

Country Status (1)

Country Link
JP (1) JP6960082B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487827B (en) * 2018-12-28 2021-03-26 上海二十冶建设有限公司 Modular processing and binding method for comprehensive pipe gallery steel reinforcement framework
JP7484416B2 (en) 2020-05-25 2024-05-16 株式会社大林組 Method for constructing a concrete structure
CN112681162A (en) * 2021-01-15 2021-04-20 四川路航建设工程有限责任公司 Construction method for movable split mounting type light formwork cast-in-situ box culvert
CN116550536B (en) * 2023-04-23 2026-03-03 中建八局第二建设有限公司 Culvert inner wall coating construction method based on rainwater and sewage diversion
KR102584192B1 (en) * 2023-06-23 2023-10-05 홍순선 Temporary support structure and method for constructing metal plate / concrete composite structure

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5088815A (en) * 1973-12-12 1975-07-16
JPS63118423A (en) * 1986-11-06 1988-05-23 Mitsubishi Heavy Ind Ltd Construction of underground concrete structure
JPS63284332A (en) * 1987-05-18 1988-11-21 富士住宅センタ−株式会社 Construction method of dome and bag body for mold frame thereof
JPH0612008B2 (en) * 1990-05-08 1994-02-16 建設基礎エンジニアリング株式会社 Concrete frame and its construction method
JP2585182B2 (en) * 1993-07-17 1997-02-26 日本植生株式会社 Construction method of cast-in-place grid frame using covered formwork
JP2509156B2 (en) * 1994-01-18 1996-06-19 建設基礎エンジニアリング株式会社 Vegetation shelf
JP3418807B2 (en) * 1994-12-20 2003-06-23 清水建設株式会社 Construction method of underground concrete wall
JP3144266B2 (en) * 1995-06-19 2001-03-12 東レ株式会社 Deterioration detection method for concrete structures
JP3421785B2 (en) * 2000-04-28 2003-06-30 元 松岡 Tunnel structure and tunnel construction method
JP3798367B2 (en) * 2002-11-08 2006-07-19 戸田建設株式会社 Construction method of arch structure, dome structure and construction method thereof
JP4264095B2 (en) * 2006-06-23 2009-05-13 株式会社協和エクシオ Manhole reinforcement structure
JP2009024438A (en) * 2007-07-23 2009-02-05 Tsutomu Kondo Mesh form for molding
JP3185863U (en) * 2013-06-26 2013-09-05 青森昭和産業 株式会社 Crimp wire mesh
JP2015218442A (en) * 2014-05-14 2015-12-07 株式会社竹中工務店 Construction method for structure
US9617705B2 (en) * 2014-05-22 2017-04-11 Sturda, Inc Retainment wall for underground mine and method of construction
JP6595239B2 (en) * 2015-07-08 2019-10-23 三菱ケミカルインフラテック株式会社 Architectural civil structures and bridges

Also Published As

Publication number Publication date
JP2018193794A (en) 2018-12-06

Similar Documents

Publication Publication Date Title
JP6960082B2 (en) How to build a skeleton by spraying concrete
KR101570484B1 (en) Half-PC Column using lightweight Encased Inner Form And Manufacturing Method Thereof, And Construction Method Using The Same
KR101021854B1 (en) Half precast synthetic slab and preparation method thereof
KR101663132B1 (en) Self-supporting type column structure
KR101627820B1 (en) Steel horizontal assembly for forming a hollow slab
KR101150369B1 (en) Complex girder for building
KR102269141B1 (en) Deck plate wall installation method using underground pavement
KR100593664B1 (en) Prestressed Composite Floorboard Construction Method
KR100540625B1 (en) Construction method of concrete panel composite beam with integrated concrete pouring method with bottom flange buried structure
KR200383490Y1 (en) System for constructing composite reinforced concrete girders and beams using FRP
KR101350797B1 (en) a precast slab with a pc strand holding apparatus, and the construction method thereof
KR20230105152A (en) Skin deck assembly for form having demountable shape maintenance saddle and beam construction method using the same
KR100694824B1 (en) Deck plate of reinforced concrete structure and construction method
KR101338890B1 (en) Wall system with frame pannel and method for fabricating and constructing the wall system
KR20110088563A (en) Prestressed Slab Elements
KR102409371B1 (en) Rib-type PC slab having welded wire mesh with upper end hook and method for manufacturing and construction of the rib-type PC slab
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
KR20210020297A (en) Frame and reinforced steel net integrated beam structure
KR102354464B1 (en) Multi-rib PC slab having welded wire mesh and method for manufacturing and construction of the multi-rib PC slab
KR102227639B1 (en) Steel composite precast slab
KR20200075600A (en) Method for constructing transfer layer of building using precast concrete slab
KR102234463B1 (en) the shear reinforcement unit and the shear reinforcing structure of reinforced concrete structure using the same
US5535562A (en) Saddle anchorage and mounting method thereof
KR102247787B1 (en) Partial reinforced concrete permanent Cement Mortar form and method of constructing the same
KR101028372B1 (en) Connection structure of truss composite deck plate

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20180123

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20180123

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200408

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210302

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210421

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210909

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210922

R150 Certificate of patent or registration of utility model

Ref document number: 6960082

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150