JP3807725B2 - Floor heating system - Google Patents
[go: Go Back, main page]

JP3807725B2 - Floor heating system - Google Patents

Floor heating system Download PDF

Info

Publication number
JP3807725B2
JP3807725B2 JP2001392955A JP2001392955A JP3807725B2 JP 3807725 B2 JP3807725 B2 JP 3807725B2 JP 2001392955 A JP2001392955 A JP 2001392955A JP 2001392955 A JP2001392955 A JP 2001392955A JP 3807725 B2 JP3807725 B2 JP 3807725B2
Authority
JP
Japan
Prior art keywords
panel body
dummy
header
heat
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001392955A
Other languages
Japanese (ja)
Other versions
JP2003207145A (en
Inventor
淳 日下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2001392955A priority Critical patent/JP3807725B2/en
Publication of JP2003207145A publication Critical patent/JP2003207145A/en
Application granted granted Critical
Publication of JP3807725B2 publication Critical patent/JP3807725B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、放熱手段からの熱を利用して床を暖房する床暖房装置及びその施工方法に関する。
【0002】
【従来の技術】
床暖房装置は、放熱手段を備えた放熱パネル体と、このような放熱手段を具備しないダミーパネル体とを備え、これらパネル体が床面に所要の通りに設置施工される。放熱手段は、例えば温水を利用する場合には放熱チューブから構成され、例えば電気を利用する場合には放熱ヒータから構成され、放熱手段からの熱を利用して放熱パネル体の表面が暖められる。
【0003】
【発明が解決しようとする課題】
このような床暖房装置の一形態では、放熱パネル体及びダミーパネル体が夫々分離構造に構成され、これらのパネル体は、それぞれ、床面に設置されるベース部材と、このベース部材の表面側に取り付けられる仕上げ部材(フローリングと称される)とを有している。このような形態の床暖房装置の施工は、例えば、次のようにして行われる。まず、放熱パネル体及びダミーパネル体の夫々のベース部材を設置すべき床面に対して所要の順序に順次設置し、次いで、放熱パネル体のベース部材の表面側に放熱手段、例えば放熱チューブを配設してこれらを所要の通りに配管接続し、その後、これらパネル体のベース部材の表面にその仕上げ部材を順次に取り付ける。このような施工様式では、放熱パネル体及びダミーパネル体の夫々のベース部材の設置作業及びそれらの仕上げ部材の取付作業は、複数の作業者が同時に行うことが困難で作業効率が悪く、施工時間が長くなる。また、このような設置作業及び取付作業は大工による大工工事となる一方、放熱手段としての放熱チューブ接続作業等は設備業者の設備工事となり、これによっても、施工作業の効率が悪く、その施工費用が高くなる問題がある。
【0004】
このような問題を解決するために、床暖房装置の他の形態では、放熱パネル体及びダミーパネル体がそれぞれ一体構造に構成されている。この形態の床暖房装置の施工は、例えば、設置すべき床面の片角部からダミーパネル体及び放熱パネル体を順次設置することによって行われる。しかし、このような床暖房装置においては、放熱パネル体及びダミーパネル体が一体構造であるので、これらパネル体自体の施工は簡単になるが、ダミーパネル体自体の厚さが厚くなるので、その切断等の作業は大工工事となり、大工工事を省略することができない。
【0005】
本発明の目的は、大工工事を省略し、比較的簡単に且つ短期間に施工することができる床暖房装置及びその施工方法を提供することである。
【0006】
【課題を解決するための手段】
本発明は、放熱手段を備えた放熱パネル体と、ダミーパネル体とを備え、前記放熱パネル体及び前記ダミーパネル体が床面に所要の通りに設置施工される床暖房装置であって、
前記放熱パネル体は一体構造に構成され、前記ダミーパネル体は、床面に設置されるダミーベース部材と、前記ダミーベース部材の表面側に取り付けられるダミー仕上げ部材とを有する分離構造に構成されており、
前記放熱パネル体の片側部には連結凹部が設けられ、またその他側部には前記連結凹部と組み合わされる連結凸部が設けられており、前記放熱パネル体を複数組み合わせることによって放熱パネル組立体が構成され、前記放熱パネル組立体の周囲の少なくとも一部に存在する間隙に前記ダミーパネル体が設置され、
前記放熱パネル体の片側部には、前記放熱パネル体の前記連結凹部と組み合わされる連結凸部を有する第1補助部材が装着され、前記第1補助部材を介して前記ダミーベース部材が配設され、また前記放熱パネル体の他側部には、前記放熱パネル体の前記連結凸部と組み合わされる連結凹部を有する第2補助部材が装着され、前記第2補助部材を介して前記ダミーベース部材が配設されることを特徴とする。
【0007】
本発明に従えば、放熱パネル体が一体構造に構成され、工場出荷時に完成しているので、施工現場ではこの放熱パネル体を床面に設置するのみでよく、従って、施工作業の簡素化を図り、作業時間を短縮することができる。また、ダミーパネル体は分離構造に構成されているので、放熱パネル体を床面に設置し、その後、ダミーパネル体を組み付けることが可能となり、施工作業の効率化を図ることができる。また、ダミーパネル体は分離構造であるので、例えば、床面に設置されるベース部材及びその表面に取り付けられる仕上げ部材の厚さは比較的薄くなり、カッター等の簡易な切断道具で切断可能となり、大工仕事を省略し、設備業者のみでの施工が可能となる。放熱手段は、温水を利用する場合には温水が循環される放熱チューブであり、電気を利用する場合には電気によって発熱する放熱ヒータである。また、放熱パネル体の片側部とこれと対向するダミーパネル体のダミーベース部材との間には、放熱パネル体の連結凹部と組み合わされて装着される連結凸部を有する第1補助部材が介在されるので、この第1補助部材によって放熱パネル体の片側部とこれに対向するダミーパネル体との間の隙間を実質上なくすことができ、放熱パネル体の片側の隙間にダミーパネル体を上方から確実に組み付けることができる。また、放熱パネル体の他側部とこれと対向するダミーパネル体のダミーベース部材との間には、放熱パネル体の連結凹部と組み合わされて装着される連結凸部を有する第2補助部材が介在されるので、この第2補助部材によって放熱パネル体の他側部とこれに対向するダミーパネル体との間の隙間を実質上なくすことができ、放熱パネル体の他側の隙間にダミーパネル体を上方から確実に組み付けることができる。
【0008】
また、本発明では、温水を分配するためのヘッダを具備するヘッダパネル体を更に備えており、前記ヘッダパネル体が分離構造に構成されていることを特徴とする。
【0009】
本発明に従えば、ヘッダパネル体も分離構造に構成されているので、ヘッダの取り付け、ヘッダの配管接続等を含めたヘッダパネル体の施工作業の簡素化を図ることができるとともに、ヘッダパネル体を用いた施工においても大工仕事を省略することができる。
【0012】
また、本発明では、前記第1及び第2補助部材における前記ダミーベース部材側は平坦に形成されていることを特徴とする。
本発明に従えば、第1及び第2補助部材におけるダミーベース部材側が平坦に形成されているので、ダミーベース部材を第1及び第2補助部材と壁等との間隙に上方から嵌め込むことができ、ダミーベース部材の施工を容易に行うことができる。
【0015】
【発明の実施の形態】
以下、添付図面を参照して、本発明に従う床暖房装置及びその施工方法の一実施形態について説明する。図1は、本発明に従う床暖房装置の一実施形態を示す平面図であり、図2は、図1の床暖房装置の第1の放熱パネル体を示す平面図であり、図3は、図1の床暖房装置の第2の放熱パネル体を示す平面図であり、図4は、図1の床暖房装置におけるヘッダパネル体のベース部材を示す平面図であり、図5は、図2におけるV−V線による断面図であり、図6は、図1の床暖房装置においける隣接する放熱パネル体の組合せ部を示す部分断面図であり、図7は、図1の床暖房装置における放熱パネル体とダミーパネル体との組合せ部を示す部分断面図であり、図8は、図1の床暖房装置のヘッダパネル体に設けられるヘッダを示す平面図であり、図9は、図1の床暖房装置において、ヘッダパネル体のベース部材にヘッダを取り付けた状態の一部を示す平面図であり、図10は、図1の床暖房装置の施工作業において、放熱パネル体を設置した状態を示す平面図であり、図11は、その施工作業において、放熱パネル組立体の周囲にヘッダパネル体及びダミーパネル体のベース部材を設置した状態を示す平面図であり、図12は、その施工作業において、放熱パネル体の放熱チューブ及びヘッダパネル体のヘッダ等を配管接続した状態を示す平面図である。
【0016】
図1において、図示の床暖房装置は、温水を利用して暖房する形態のものであり、放熱パネル体、ヘッダパネル体及びダミーパネル体を備え、放熱パネル体は2種類の放熱パネル体、即ち第1の放熱パネル体2及び第2の放熱パネル体4から構成され、ヘッダパネル体は1種類のヘッダパネル体6から構成され、ダミーパネル体は2種類のダミーパネル体、即ち第1のダミーパネル体8及び第2ダミーパネル体10から構成されている。図1に示す床暖房装置では、例えば6畳の大きさの床面に、3個の第1の放熱パネル体2、1個の第2の放熱パネル体4、1個のヘッダパネル体6、2個の第1のダミーパネル体8及び1個の第2のダミーパネル体10が後述する如く組み合わされて敷き詰めらる。尚、ヘッダーパネル体6は必ずしも必要なものではなく、例えば、床の下方空間に或いは床の上方に、ヘッダ及びそれに関連する部材を配設した場合、このヘッダパネル体10を省略することができる。この場合、ヘッダパネル体の代わりにダミーパネル体を設置する。
【0017】
図示の第1の放熱パネル体2は、図2及び図5に示す通りの構成を有している。放熱パネル本体2は、放熱パネル本体12と、この放熱パネル本体12内に内蔵された放熱手段としての放熱チューブ16とを備え、これらが一体的構成に形成され、工場出荷時に放熱パネルユニットとして出荷される。放熱パネル本体12は木製(例えば合板、木くず等)のフローリングから構成され、その厚さが12〜15mm程度に形成され、また放熱チューブ16は例えば合成樹脂製チューブから形成される。
【0018】
第1の放熱パネル体2は細長い矩形状であり、その一端片側部(図2において右端上側部)に、平面視にて略正方形状に凹んだ組付け凹部18が設けられ、その他端他側部(図2において左端下側部)に、組付け凹部18と同様の略正方形状の組付け凹部20が設けられている。
【0019】
放熱チューブ16は、第1の放熱パネル体2のほぼ全域を均等に暖めるように、図2に破線で示すように放熱パネル本体12に内蔵されている。この第1の放熱パネル体2では、放熱チューブ16は、このパネル体2の片側部を往復した後その他側部を往復し、その後この他側部の内側を往復した後その片側部の内側を往復している。この放熱チューブ16の一端部22及び他端部24は、第1の放熱パネル体2の一方の組付け凹部18から外方に延びている。この形態では、熱源機26(図12参照)からの温水は上記一端部22から流入し、放熱チューブ16を通して流れた温水は上記他端部24から流出して熱源機26に戻される。暖房用温水がこのように流れるので、放熱チューブ16の一端部22が流入端部として作用し、後述するヘッダ28(図8、図9参照)からの温水を第1の放熱パネル体2に導く分配送給配管として機能し、その他端部24が流出端部として作用し、温水を上記ヘッダ28に戻す分配戻し配管として機能する。
【0020】
第2の放熱パネル体4は、図3及び図5に示すように、その基本的構造が上述した第1の放熱パネル体2と実質上同一で、その外形が第1の放熱パネル体2の半分の大きさ、即ちその片側部と実質上同じ大きさに形成されている。即ち、第2の放熱パネル本体4は放熱パネル本体12aと、この放熱パネル本体12aに内蔵された放熱手段としての放熱チューブ16aとを備え、これらが一体構成に構成され、工場出荷時に放熱パネルユニットとして出荷される。第2の放熱パネル体4は細長い矩形状に形成され、放熱チューブ16aは、第2の放熱パネル体2のほぼ全域を均等に暖めるように、図3に破線で示すように放熱パネル本体12aに内蔵され、放熱パネル本体12aの外側部を往復した後にその内側部を往復して延びている。第1の放熱パネル体2と同様に、放熱チューブ16aの一端部22aが流入端部として作用し、ヘッダ28(図8、図9参照)からの温水を第2の放熱パネル体4に導く分配送給配管として機能し、その他端部24aが流出端部として作用し、温水を上記ヘッダ28に戻す分配戻し配管として機能する。
【0021】
この第1及び第2放熱パネル本体12,12aは、図示していないが、床面に設置される放熱ベース部材と、この放熱ベース部材の表面側に接着剤等で固定された放熱仕上げ部材とから構成してもよく、この場合、放熱ベース部材は例えば発泡スチロール等の発泡樹脂、合板、木クズ、木クズとプラスチック片の混合物等から形成され、その厚さが9〜12mm程度に形成され、放熱仕上げ部材14は例えば木板、合板等から形成され、その厚さが3mm程度に形成される。
【0022】
第1及び第2の放熱パネル体2,4はその幅方向に相互に組み合わせ可能に構成され、この形態では、次のように構成されている。主として図5及び図6を参照して、第1及び第2の放熱パネル体2,4の各々の幅方向の片側(図1及び図5において右側、図2において下側)には連結凹部30が設けられ、この連結凹部30が第1及び第2放熱パネル体2,4の一端(図1において上端、図2において右端)から他端まで設けられている。この形態では、連結凹部30を構成する下壁部32が上壁部33よりも外方に突出しており、このように構成することによって、下壁部32を通しての釘、ビス等の床面への固定が容易に行うことができ、第1及び第2の放熱パネル体2,4の床面への設置固定を容易に且つ確実に行うことができる。また、第1及び第2の放熱パネル体2,4の各々の幅方向の他側(図1及び図5において左側、図2において上側)には、上述した連結凹部30に着脱自在に組み合わすことができる連結凸部34が設けられている。
【0023】
第1放熱パネル体2と第1放熱パネル体2(又は第2放熱パネル体4)とは、図6に示すように、側端面どうしが相互に密に嵌合するように構成されており、一方(図6において左方)の第1の放熱パネル体2の連結凹部30とそれらの他方の第1の放熱パネル体2(又は第2の放熱パネル体4)の連結凸部34とが相互に組み合わされる。このような構成により、図1から理解されるように、暖房すべき領域に対応して、一つ又は複数個(図1では3個)の第1放熱パネル体2と一つの第2放熱パネル体4を組み合わせることによって、放熱パネル組立体が構成され、この放熱パネル組立体の表面が温水の熱を利用して温められる。
【0024】
この形態では、図示していないが、第1及び第2の放熱パネル体2,4の一端側(図1において上端側、図2及び図3において右端側)が、例えばそれらの片側と同様に構成され(連結凹部が設けられる)、それらの他端側(図1において下端側、図2及び図3において左端側)がそれらの他側と同様に構成される(連結凸部34が設けられる)。
【0025】
次に、図1及び図4を参照して、ヘッダパネル体6について説明する。図示のヘッダパネル体6は、床面に設置されるヘッダベース部材42と、このヘッダベース部材42の表面側に配設されるヘッダ仕上げ部材44とを備え、施工時にヘッダベース部材42の表面にヘッダ仕上げ部材44を取り付ける分離構造に構成されている。ヘッダベース部材42は、例えば、厚さ9〜12mm程度のポリスチレン等の発泡樹脂等から形成され、またヘッダ仕上げ部材44は、例えば厚さ3mm程度の合板等から形成され、このように形成したヘッダベース部材42及びヘッダ仕上げ部材44は、カッター等の簡易な切断道具で容易に切断することができる。従って、ヘッダパネル体6に関連して、その施工工事が容易となり、大工工事を省略することができる。
【0026】
ヘッダパネル体6は、後述するように組み合わされた放熱パネル組立体の一端側(図1において上側)に配置され、このことに関連して、その一側端部は、放熱パネル組立体の一端形状に対応した形状に形成され、放熱パネル組立体側の組付け凹部18に対応して組付け突部46,48が設けられている。外側の一対の組付け突部48は、放熱パネル組立体の両側に第1のダミーパネル体8を配置することに関連して、その幅が比較的大きく形成され、組付け凹部48の内側の一対の組付け凹部46は、第1の放熱パネル体2の組付け凹部18に組み合わされることに関連して、その幅が比較的小さく形成されている。
【0027】
このヘッダパネル体6のヘッダベース部材42の表面には、図4に示すように、第1及び第2の放熱パネル体2,4の各々に対応して、ヘッダ用収容凹部50が設けられ、これら収容凹部50に上述したヘッダ28が収容される。図示のヘッダ28は、図8に示すように、矩形状のヘッダ本体52を備え、このヘッダ本体52の3側面に合計6個の接続部54,56,58,60,62,64が設けられている。ヘッダ本体52の図8にて左側面には接続部54,56が設けられ、この接続部54には主送給配管66が配管接続され、熱源機26(図12)からの温水が主送給配管66を通して供給され、また接続部56には主戻し配管68が配管接続され、ヘッダ本体52からの温水が主戻し配管68を通して熱源機26に戻される。ヘッダ本体52の図8にて下側面には接続部58,60が設けられ、接続部58には対応する第1の放熱パネル体2(又は第2の放熱パネル体4)の放熱チューブ16(又は16a)の分配送給配管として機能する一端部22(又は22a)が配管接続され、ヘッダ本体52からの温水が分配送給配管を通して第1の放熱パネル体2(又は第2の放熱パネル体4)の放熱チューブ16(又は16a)に送給され、また接続部60には対応する第1の放熱パネル体2(又は第2の放熱パネル体4)の放熱チューブ16(又は16a)の分配戻し配管として機能する他端部24(又は24a)が配管接続され、第1の放熱パネル体2(又は第2の放熱パネル体4)の放熱チューブ16(又は16a)からの温水が分配戻し配管を通してヘッダ本体52に戻される。更に、ヘッダ本体52の図8にて右側面には接続部62,64が設けられ、この接続部62には主送給配管66が配管接続され、ヘッダ本体52からの温水が主送給配管66を通して下流側のヘッダ28に供給され、また接続部64には主戻し配管68が配管接続され、上流側のヘッダ28からの戻り温水が主戻し配管68を通してヘッダ本体52に流れる。
【0028】
ヘッダ本体52内の温水の流れは、図8に矢印で示すようように流れる。接続部54を通して流入した温水は分流し、その一部が接続部58から流出するとともに、その残部が接続部62から流出し、また接続部60及び64に流入した温水は合流して接続部56から流出する。
【0029】
この形態では、図4及び図9に示すように、ヘッダベース部材42の表面側には、更に、ヘッダ用収容凹部50を通して主送給配管用収容凹部70及び主戻し配管用収容凹部72が長手方向に直線状に設けられ、熱源機26からの温水を供給する主送給配管66が主送給配管用収容凹部70に収容され、また熱源機26に温水を戻す主戻し配管68が主戻し配管用収容凹部72に収容される。また、ヘッダベース部材42の各組付け突部46,48には、ヘッダ用収容凹部50からこれに対応する第1の放熱パネル体2(又は第2の放熱パネル体4)に向けて直線状に延びる分配送給配管用収容凹部74及び分配戻し配管用収容凹部76が設けられ、ヘッダ28にて分配された温水を第1の放熱パネル体2(又は第2の放熱パネル体4)に送給する分配送給配管、即ち放熱チューブ16(又は16a)の一端部22(又は22a)がこの分配送給配管用収容凹部74に収容され、また第1の放熱パネル体2(又は第2の放熱パネル体4)からの温水をヘッダ28に戻す分配戻し配管、即ち放熱チューブ16(又は16a)の他端部24(又は24a)が分配戻し配管用収容凹部76に収容される。
【0030】
温水を循環するためのヘッダ28及び各種配管が、上述したようにヘッダベース部材42の対応する収容凹部に収容されるので、このように収容した後に、その表面側にヘッダ仕上げ部材44を取り付けることができ、このように取り付けることによって、ヘッダ28及び各種配管をヘッダパネル体6に内蔵することができる。
【0031】
次に、図1及び図7を参照して、ダミーパネル体について説明する。この形態における第1及び第2のダミーパネル体8,10はそれらの形状は異なるが、それらの構造は実質上同一である。第1及び第2のダミーパネル体8,10は、ヘッダパネル体6と同様に、床面に設置されるダミーベース部材82と、このダミーベース部材82の表面側に配設されるダミー仕上げ部材84とを備え、施工時にダミーベース部材82の表面にダミー仕上げ部材84を取り付ける分離構造に構成されている。ダミーベース部材82は、例えば、厚さ9〜12mm程度のポリスチレン等の発泡樹脂等から形成され、またダミー仕上げ部材84は、例えば厚さ3mm程度の合板等から形成され、ダミーベース部材82及びダミー仕上げ部材84は、カッター等の簡易な切断道具で容易に切断することができる。従って、ダミーパネル体8,10の施工工事も容易となり、大工工事を省略することができる。
【0032】
第1のダミーパネル体8は細長い矩形状であり、図1に示すように、放熱パネル組立体の両側に設置される。そして、放熱パネル組立体の一側端(図1の右側端)の第2の放熱パネル体4とこれに隣接して配置される第1のダミーパネル体8とは、図7に示すように組み合わされ、この組合せの際には、第1補助部材86が用いられる。第1補助部材86は、細長い棒状の部材から構成され、その片側には、第1及び第2の放熱パネル体2,4の連結凹部30に着脱自在に組み合わされる連結凸部88が設けられ、その他側は、設置される部屋の壁等との隙間にダミーパネル体8のダミーベース部材82が上方から嵌り込むように、平坦に形成されている。この第1補助部材86の厚さは、第2の放熱パネル体4及び第1のダミーパネル体8の厚さよりも幾分薄く形成され、従って、図7に示すように、第2の放熱パネル体4の片側部に第1補助部材86を組み合わせた状態においては、第2の放熱パネル体4の上面と第1補助部材86の上面との間に段差が存在し、この段差を利用して、第1補助部材86を覆うように第1のダミーパネル体8のダミー仕上げ部材84が取り付けられる。
【0033】
また、放熱パネル組立体の他側端(図1の左側端)の第1の放熱パネル体2とこれに隣接して配置される第1のダミーパネル体8とは、図7に示すように組み合わされ、この組合せの際には、第2補助部材92が用いられる。第2補助部材92は、細長い棒状の部材から構成され、その片側には、第1の放熱パネル体2の連結凸部34と着脱自在に組み合わされる連結凹部94が設けられている。この第2補助部材92の厚さは、第1補助部材86と同様に、第1の放熱パネル体2及び第1のダミーパネル体8の厚さよりも幾分薄く形成され、従って、第1の放熱パネル体2の他側部に第2の補助部材92を組み合わせた状態においては、第1放熱パネル体2の上面と第2補助部材92の上面との間に段差が存在し、この段差を利用して、第2補助部材92を覆うように第1のダミーパネル体8のダミー仕上げ部材84が取り付けられる。このような第1及び第2補助部材86,92は、ポリスチレン等の発泡合成樹脂等から形成することができ、カッター等の簡易な切断工具で容易に切断することができる。
【0034】
第2のダミーパネル体10は、後述するように組み合わされた放熱パネル組立体の他端側(図1において下側)に配置され、このことに関連して、その一側端部は、放熱パネル組立体の他端形状に対応した形状に形成され、放熱パネル組立体側の組付け凹部20に対応して組付け突部93が設けられ、また、その両端部には、第1のダミーパネル体8に対応して組付け突部95が設けられている。尚、この組付け突部95は、第1のダミーパネル体8を第1及び第2の放熱パネル体2,4の他端まで延びるように施工した場合に省略することができる。
【0035】
この実施形態では、ダミーパネル体8,10のダミーベース部材82とダミー仕上げ部材84とを別体に形成して施工時に組み付ける分離構造に構成しているが、ダミーベース部材82とダミー仕上げ部材84とを一体構造としたユニット体として構成するようにしてもよく、このように構成した場合、ダミーパネル体8,10に関連して、その施工作業を簡素化することができる。
【0036】
次に、図1及び図10〜図12を参照して、上述した床暖房装置の施工手順について説明する。まず、設置すべき床面、例えばリビングルームの床面の所定の領域に、第1及び第2の放熱パネル体2,4を上述した如く組み合わせながら床面に設置固定する。例えば6畳の大きさの床面に設置する場合に設置する場合、3個の第1の放熱パネル体2及び1個の第2の放熱パネル体4を図10に示すように組み合わせて設置固定し(図1も参照)、このように組み合わせた状態では組み合わせた放熱パネル組立体の周囲に間隙が存在する。尚、第1及び第2の放熱パネル体2,4の床面への固定は、例えば釘、ビス、接着剤、両面テープ等を用いて行うことができる。第1及び第2の放熱パネル体2,4は一体構造に構成されているので、設置すべき床面にこのように固定するのみでこれら放熱パネル体2,4についての施工は実質上終了し、簡単に施工することができる。
【0037】
次に、設置固定した放熱パネル組立体の一端側、即ち第1及び第2の放熱パネル体2,4から放熱チューブ16,16aの両端部22,22a,24,24aが延びている側に、図11(図11では、放熱チューブ16,16aの両端部22,22a,24,24aを省略して示している)に示すように、ヘッダパネル体6のヘッダベース部材42を設置固定する。ヘッダベース部材42は簡易な切断道具で容易に切断することができるので、大工工事を必要とすることなく放熱パネル組立体の片端側の間隙に所要の通りに敷くことができる。
【0038】
そして、図12に示すように、ヘッダベース部材42のヘッダ用収容部50にヘッダ28を収容し、上述したように、各ヘッダ28の各種接続部54〜64に対応する各種配管、即ち放熱チューブ16,16aの両端部22,22a,24,24a及び配管66,68を配管接続するとともに、これら両端部22,22a,24,24a及び配管66,68を対応する収容凹部70〜76に収容する。これらの配管接続は、ヘッダベース部材44の表面側から行うことができるので、その作業を容易に行うことができる。また、放熱チューブ16の両端部22,24は第1の放熱パネル体2の組付け凹部18から延びているので、それらの長さが比較的長く確保されており、従って、放熱チューブ16の両端部22,24を対応するヘッダ28の接続部58,60に容易に配管接続することができる。
【0039】
尚、主送給配管66は熱源機26の温水供給側に接続され、また主戻し配管68は熱源機26の温水戻り側に接続される。また、第2の放熱パネル体4に対応するヘッダ28(図12において右端に配設されたもの)については、図9にも示すように、接続部62及び64が戻し配管98を介して接続され、ヘッダ28の接続部62から流出した温水は戻し配管98を通してその接続部64に流入される。従って、ガス給湯器、電気給湯器等から構成される熱源機26から主送給配管66を通して下流端側のヘッダ28に流れた温水は、この下流端側のヘッダ28から主戻し配管68を通して熱源機26に戻される。
【0040】
次いで、放熱パネル組立体の両側及び他端側に、第1及び第2補助部材86,92を取り付けた後に、放熱パネル組立体と部屋の壁等との間に存在する間隙に、図12に示すように、第1及び第2のダミーパネル体8,10のダミーベース部材82を設置固定する。ダミーベース部材82は簡易な切断道具によって容易に切断することができるので、この場合も大工工事を必要とすることなく放熱パネル組立体の両側及び他端側の間隙に所要の通りに敷くことができる。この第1及び第2のダミーパネル体2,4のダミーベース部材82の設置作業は、ヘッダ28と各種配管類との配管接続作業の前に、又はこの配管接続作業中に行うようにしてもよく、このように作業を遂行することによって、施工作業が効率よくなり、施工時間の短縮化を図ることができる。
【0041】
その後、ヘッダパネル体6のヘッダベース部材42並びに第1及び第2のダミーパネル体8,10のダミーベース部材82の表面側に、それぞれ、ヘッダ仕上げ部材44及びダミー仕上げ部材84を取り付ける。これら仕上げ部材44,84は簡易な切断道具で容易に切断することができるので、大工工事を必要とすることなく仕上げ部材44,84を所要の通りにベース部材44,84の上面に敷き詰めることができる。尚、仕上げ部材44,84は、接着剤、両面テープ等で固定することができる。また、仕上げ部材44,84の一部に、第1及び第2補助部材86,92に対応して受け凹部100,102(図7参照)を設けることによって、これら仕上げ部材44,84を第1及び第2補助部材86,92を介して第1及び第2の放熱パネル体2,4に組み合わせるように構成することができる。
【0042】
このように、床面側からの施工作業でもって、床面の設置すべき領域に床暖房装置を所要の通りに敷き詰めることができる。上述した施工方法では、まず、第1及び第2の放熱パネル体2,4を設置し、次いで放熱パネル組立体の一端側にヘッダパネル体6のヘッダベース部材42を設置し、その後、このヘッダベース部材42の表面側からヘッダ28及びそれに関連する部材の取付作業並びにそれらの配管接続を行うので、これら取付作業及び配管作業を容易に行うことができ、施工工事、特に配管接続作業に関連して施工作業の効率化、施工時間の短縮化を図ることができる。
【0043】
このように設置した状態では、第1及び第2の放熱パネル体2,4、ヘッダパネル体6並びに第1及び第2ダミーパネル体8,10の上面は同一平面を規定する。そして、熱源機26からの温水は、第1及び第2の放熱パネル体2,4の放熱チューブ16,16aを通して循環され、第1及び第2の放熱パネル体2,4の上面が温められ、かかる第1及び第2の放熱パネル体2,4によって室内を暖房することができる。
【0044】
以上、本発明に従う床暖房装置の一実施形態について説明したが、本発明はかかる実施形態に限定されるものではなく、本発明の範囲を逸脱することなく種々の変形乃至修正が可能である。
【0045】
例えば、図示の実施形態では、放熱パネル体として2種類のもの、即ち第1及び第2放熱パネル体2,4を用いているが、例えばそれらの1種類、例えば第1の放熱パネル体2のみを用いるようにしてもよく、或いは、例えば長さが異なる複数種の第1及び第2の放熱パネル体を用いるようにしてもよい。
【0046】
また、図示の実施形態では、ダミーパネル体についても2種類のもの、即ち第1及び第2のダミーパネル体8,10を用いているが、大きさ、形状等の異なる3種以上のダミーパネル体を組み合わせるようにしてもよい。
【0047】
また、図示の実施形態では、床面の中央部に放熱パネル組立体を設置固定し、放熱パネル組立体の全周囲にヘッダパネル体6及びダミーパネル体8,10を配設しているが、必ずしもこのように設置する必要はなく、例えば部屋の一端から第1の放熱パネル部2又は第2放熱パネル部4を敷き詰めるようにしてもよく、このように施工した場合、放熱パネル組立体の周囲の一部には間隙が存在せず、少なくともいずれか一方の第1のダミーパネル8を省略することができる。
【0048】
また、図示の実施形態では、ヘッダパネル体6が全体として矩形状で、その一側端部に組付け突部46,48が設けられているが、このヘッダパネル体6は設置する床面の一部の形状に対応した適宜の形状にすることができ、この床面の一部に例えば柱が位置しているときには、この柱の形状に対応した凹部を有する形状にすることができる。
【0049】
また、第1の放熱パネル体2の両端部に組付け凹部を設けるに際し、図13に示すように設けるようにしてもよい。即ち、この放熱パネル体2Aの両端部に、幅方向に実質上等間隔をおいて階段状に、図示の形態では3段状に凹んだ組付け凹部18A,20Aが設けられている。このように階段状の組付け凹部18A,20Aを設けることにより、放熱パネル組立体とヘッダパネル体6A及び第2ダミーパネル体10Aとの間にわずかながらに生じる段差を目立たなくすることができる。特に、図13から理解されるように、この組付け凹部18A,20Aを第1及び第2放熱パネル体2A,4A並びにヘッダパネル体6Aの表面に施されたフローリング目に合うように設けることによって、これら放熱パネル体2A,4Aとヘッダパネル体6Aとの継目部がフローリング目と一致し、施工後わずかながらに生じる段差をより目立たなくすることができる。また、このように構成することと併せて、第2の放熱パネル体4Aの両端部にも平面視にて凹んだ組付け凹部106A,108Aを設けるようにしてもよい。
【0050】
更に、図示の実施形態では、放熱手段としての放熱チューブを用いるものに適用して説明したが、これに限定されず、放熱手段として電気を利用した長尺状又は面状の放熱ヒータを用いるものにも同様に適用することができる。
【0051】
【発明の効果】
本発明の請求項1の床暖房装置によれば、放熱パネル体が一体構造に構成され、工場出荷時に完成しているので、施工現場ではこの放熱パネル体を床面に設置するのみでよく、従って、施工作業の簡素化を図り、作業時間を短縮することができる。また、ダミーパネル体は分離構造に構成されているので、放熱パネル体を床面に設置し、その後、ダミーパネル体を組み付けることが可能となり、施工作業の効率化を図ることができる。また、ダミーパネル体は分離構造であるので、例えば、床面に設置されるベース部材及びその表面に取り付けられる仕上げ部材の厚さは比較的薄くなり、カッター等の簡易な切断道具で切断可能となり、大工仕事を省略し、設備業者のみでの施工が可能となる。また、放熱パネル体の片側部とダミーパネル体のダミーベース部材との間には、放熱パネル体の連結凹部と組み合わされて装着される連結凸部を有する第1補助部材が介在されるので、この第1補助部材によって放熱パネル体の片側部とダミーパネル体との間の隙間を実質上なくすことができ、放熱パネル体の片側の隙間にダミーパネル体を上方から確実に組み付けることができる。また、放熱パネル体の他側部とダミーパネル体のダミーベース部材との間には、放熱パネル体の連結凹部と組み合わされて装着される連結凸部を有する第2補助部材が介在されるので、この第2補助部材によって放熱パネル体の他側部とダミーパネル体との間の隙間を実質上なくすことができ、放熱パネル体の他側の隙間にダミーパネル体を上方から確実に組み付けることができる。
【0052】
また、本発明の請求項2の床暖房装置によれば、ヘッダの取り付け、ヘッダの配管接続等を含めたヘッダパネル体の施工作業の簡素化を図ることができるとともに、ヘッダパネル体についても大工仕事を省略することができる。
【0054】
また、本発明の請求項の床暖房装置によれば、第1補助部材と壁等との間隙に、また第2補助部材と壁等との間隙に、ダミーベース部材を上方から嵌め込むことができ、ダミーベース部材の施工を容易にすることができる。
【図面の簡単な説明】
【図1】本発明に従う床暖房装置の一実施形態を示す平面図である。
【図2】図1の床暖房装置の第1の放熱パネル体を示す平面図である。
【図3】図1の床暖房装置の第2の放熱パネル体を示す平面図である。
【図4】図1の床暖房装置におけるヘッダパネル体のベース部材を示す平面図である。
【図5】図2におけるV−V線による断面図である。
【図6】図1の床暖房装置における隣接する放熱パネル体の組合せ部を示す部分断面図である。
【図7】図1の床暖房装置における放熱パネル体とダミーパネル体との組合せ部を示す部分断面図である。
【図8】図1の床暖房装置のヘッダパネル体に設けられるヘッダを示す平面図である。
【図9】図1の床暖房装置において、ヘッダパネル体のベース部材にヘッダを取り付けた状態の一部を示す平面図である。
【図10】図1の床暖房装置の施工作業において、放熱パネル体を設置した状態を示す平面図である。
【図11】施工作業において、放熱パネル組立体の周囲にヘッダパネル体及びダミーパネル体のベース部材を設置した状態を示す平面図である。
【図12】施工作業において、放熱パネル体の放熱チューブ及びヘッダパネル体のヘッダ等を配管接続した状態を示す平面図である。
【図13】床暖房装置の変形形態を示す平面図である。
【符号の説明】
2,2A,4,4A 放熱パネル体
6,6A ヘッダパネル体
8,8A,10,10A ダミーパネル体
12,12a 放熱パネル本体
16,16a 放熱チューブ
18,18A,20,20A 組付け凹部
26 熱源機
28 ヘッダ
30 連結凹部
34 連結凸部
42 ヘッダベース部材
44 ヘッダ仕上げ部材
86 第1補助部材
92 第2補助部材
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a floor heating apparatus that heats a floor using heat from a heat radiating means and a construction method thereof.
[0002]
[Prior art]
The floor heating device includes a heat radiating panel body provided with heat radiating means and a dummy panel body not provided with such heat radiating means, and these panel bodies are installed on the floor as required. The heat dissipating means is composed of a heat dissipating tube when using hot water, for example, and is composed of a heat dissipating heater when utilizing electricity, for example, and the surface of the heat dissipating panel body is warmed using heat from the heat dissipating means.
[0003]
[Problems to be solved by the invention]
In one form of such a floor heating device, each of the heat dissipating panel body and the dummy panel body is configured in a separate structure, and each of these panel bodies includes a base member installed on the floor surface and a surface side of the base member. And a finishing member (referred to as flooring) attached to. The construction of the floor heating apparatus having such a configuration is performed as follows, for example. First, the base members of the heat dissipating panel body and the dummy panel body are sequentially installed in the required order with respect to the floor surface to be installed, and then a heat dissipating means such as a heat dissipating tube is provided on the surface side of the base member of the heat dissipating panel body. These are arranged and connected by piping as required, and then the finishing members are sequentially attached to the surfaces of the base members of these panel bodies. In such a construction mode, it is difficult for a plurality of workers to perform the installation work of the base members of each of the heat radiating panel body and the dummy panel body and the installation work of those finishing members at the same time, the work efficiency is poor, and the construction time. Becomes longer. In addition, while such installation work and installation work are carpentry work by carpenters, heat radiation tube connection work, etc. as a heat dissipation means is equipment work of equipment contractors, which also makes the construction work inefficient and its construction cost There is a problem that becomes high.
[0004]
In order to solve such a problem, in another form of the floor heating apparatus, the heat dissipating panel body and the dummy panel body are each formed in an integral structure. Construction of the floor heating apparatus of this form is performed by, for example, sequentially installing a dummy panel body and a heat dissipation panel body from one corner of the floor surface to be installed. However, in such a floor heating device, since the heat dissipating panel body and the dummy panel body have an integral structure, the construction of these panel bodies themselves is simplified, but the thickness of the dummy panel body itself is increased. The work such as cutting is a carpentry work, and the carpentry work cannot be omitted.
[0005]
An object of the present invention is to provide a floor heating apparatus and a construction method thereof that can be constructed relatively easily and in a short period of time without carpentry work.
[0006]
[Means for Solving the Problems]
  The present invention is a floor heating device comprising a heat dissipating panel body provided with heat dissipating means, a dummy panel body, and the heat dissipating panel body and the dummy panel body are installed and constructed as required on the floor surface,
  The heat dissipating panel body is constructed in an integral structure, and the dummy panel body isA dummy base member installed on the floor, and a dummy finish member attached to the surface side of the dummy base memberComposed of separation structureAnd
A connecting recess is provided on one side of the heat dissipating panel body, and a connecting convex part combined with the connecting recess is provided on the other side, and a heat dissipating panel assembly is obtained by combining a plurality of the heat dissipating panel bodies. Configured, the dummy panel body is installed in a gap present in at least a part of the periphery of the heat dissipation panel assembly,
A first auxiliary member having a connection convex portion combined with the connection concave portion of the heat dissipation panel body is attached to one side portion of the heat dissipation panel body, and the dummy base member is disposed via the first auxiliary member. In addition, a second auxiliary member having a connection recess combined with the connection protrusion of the heat dissipation panel body is mounted on the other side of the heat dissipation panel body, and the dummy base member is interposed via the second auxiliary member. ArrangedIt is characterized by that.
[0007]
  According to the present invention, since the heat radiating panel body is constructed in an integrated structure and completed at the time of shipment from the factory, it is only necessary to install the heat radiating panel body on the floor surface at the construction site, thus simplifying the construction work. Planning and working time can be shortened. Further, since the dummy panel body has a separated structure, it is possible to install the heat dissipating panel body on the floor surface, and then assemble the dummy panel body, thereby improving the efficiency of construction work. Moreover, since the dummy panel body has a separation structure, for example, the thickness of the base member installed on the floor surface and the finishing member attached to the surface thereof is relatively thin and can be cut with a simple cutting tool such as a cutter. The carpentry work can be omitted, and the installation can be performed only by the equipment supplier. The heat dissipating means is a heat dissipating tube through which hot water is circulated when using hot water, and is a heat dissipating heater that generates heat by electricity when using electricity.In addition, a first auxiliary member having a connecting convex portion mounted in combination with a connecting concave portion of the heat dissipating panel body is interposed between one side portion of the heat dissipating panel body and the dummy base member of the dummy panel body opposed thereto. Therefore, the first auxiliary member can substantially eliminate the gap between the one side portion of the heat dissipation panel body and the dummy panel body opposed thereto, and the dummy panel body is placed upward in the gap on one side of the heat dissipation panel body. Can be securely assembled. In addition, a second auxiliary member having a connecting convex portion mounted in combination with the connecting concave portion of the heat dissipating panel body is provided between the other side portion of the heat dissipating panel body and the dummy base member of the dummy panel body opposed thereto. Since the second auxiliary member is interposed, the gap between the other side portion of the heat dissipation panel body and the dummy panel body facing the second auxiliary member can be substantially eliminated. The body can be securely assembled from above.
[0008]
The present invention further includes a header panel body including a header for distributing hot water, and the header panel body is configured in a separation structure.
[0009]
According to the present invention, since the header panel body is also configured in a separated structure, it is possible to simplify the construction work of the header panel body including attachment of the header, pipe connection of the header, etc. Carpentry work can be omitted even in construction using
[0012]
In the present invention, the dummy base member side of the first and second auxiliary members is formed flat.
According to the present invention, since the dummy base member side of the first and second auxiliary members is formed flat, the dummy base member can be fitted into the gap between the first and second auxiliary members and the wall from above. The dummy base member can be easily constructed.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, with reference to an accompanying drawing, one embodiment of a floor heating device and its construction method according to the present invention is described. FIG. 1 is a plan view showing an embodiment of a floor heating device according to the present invention, FIG. 2 is a plan view showing a first heat dissipating panel body of the floor heating device of FIG. 1, and FIG. FIG. 4 is a plan view showing a base member of a header panel body in the floor heating device of FIG. 1, and FIG. 5 is a plan view showing the second heat radiation panel body of the floor heating device of FIG. FIG. 6 is a cross-sectional view taken along line V-V, FIG. 6 is a partial cross-sectional view showing a combination portion of adjacent heat dissipating panel bodies in the floor heating apparatus of FIG. 1, and FIG. FIG. 8 is a partial cross-sectional view showing a combination part of a heat dissipating panel body and a dummy panel body, FIG. 8 is a plan view showing a header provided in the header panel body of the floor heating apparatus of FIG. 1, and FIG. In the floor heating device of the above, the header is attached to the base member of the header panel body. FIG. 10 is a plan view showing a state in which the heat dissipating panel body is installed in the construction work of the floor heating apparatus of FIG. 1, and FIG. 11 is a plan view of the heat dissipating panel assembly in the construction work. It is a top view which shows the state which installed the base member of the header panel body and the dummy panel body in the circumference | surroundings, FIG. 12 is the state which carried out piping connection of the heat radiation tube of the heat radiation panel body, the header of the header panel body, etc. in the construction work FIG.
[0016]
In FIG. 1, the illustrated floor heating apparatus is of a form that uses hot water to heat, and includes a heat dissipation panel body, a header panel body, and a dummy panel body, and the heat dissipation panel body includes two types of heat dissipation panel bodies, The first heat dissipating panel body 2 and the second heat dissipating panel body 4 are constituted, the header panel body is constituted by one kind of header panel body 6, and the dummy panel body is constituted by two kinds of dummy panel bodies, that is, the first dummy. The panel body 8 and the second dummy panel body 10 are configured. In the floor heating apparatus shown in FIG. 1, for example, three first heat radiating panel bodies 2, one second heat radiating panel body 4, one header panel body 6, Two first dummy panel bodies 8 and one second dummy panel body 10 are combined and spread as will be described later. Note that the header panel body 6 is not necessarily required. For example, when the header and the related members are disposed in the space below the floor or above the floor, the header panel body 10 can be omitted. . In this case, a dummy panel body is installed instead of the header panel body.
[0017]
The illustrated first heat radiating panel body 2 has a configuration as shown in FIGS. 2 and 5. The heat dissipating panel body 2 includes a heat dissipating panel body 12 and a heat dissipating tube 16 as a heat dissipating means built in the heat dissipating panel body 12, and these are integrally formed and shipped as a heat dissipating panel unit at the time of factory shipment. Is done. The heat dissipating panel body 12 is made of wooden (for example, plywood, wood waste, etc.) flooring, the thickness thereof is formed to be about 12 to 15 mm, and the heat dissipating tube 16 is formed of, for example, a synthetic resin tube.
[0018]
The first heat dissipating panel body 2 has an elongated rectangular shape, and an assembly recess 18 that is recessed in a substantially square shape in a plan view is provided on one end of one end (the upper right end in FIG. 2). A substantially square assembling recess 20 similar to the assembling recess 18 is provided in the portion (lower left side in FIG. 2).
[0019]
The heat radiating tube 16 is built in the heat radiating panel main body 12 as shown by a broken line in FIG. 2 so as to uniformly warm substantially the entire area of the first heat radiating panel body 2. In the first heat radiating panel body 2, the heat radiating tube 16 reciprocates the other side part after reciprocating the one side part of the panel body 2, and then reciprocates the inner side of the other side part. It is going back and forth. One end 22 and the other end 24 of the heat radiating tube 16 extend outward from one assembly recess 18 of the first heat radiating panel body 2. In this embodiment, the hot water from the heat source device 26 (see FIG. 12) flows in from the one end portion 22, and the hot water flowing through the heat radiating tube 16 flows out from the other end portion 24 and is returned to the heat source device 26. Since the warm water for heating flows in this way, one end portion 22 of the heat radiating tube 16 acts as an inflow end portion, and hot water from a header 28 (see FIGS. 8 and 9) described later is guided to the first heat radiating panel body 2. The other end portion 24 functions as an outflow end portion, and functions as a distribution return piping that returns hot water to the header 28.
[0020]
As shown in FIGS. 3 and 5, the second heat radiating panel body 4 has substantially the same basic structure as the first heat radiating panel body 2 described above, and the outer shape of the second heat radiating panel body 2 is the same as that of the first heat radiating panel body 2. It is half the size, i.e. substantially the same size as its one side. That is, the second heat dissipating panel body 4 includes a heat dissipating panel main body 12a and a heat dissipating tube 16a as a heat dissipating means built in the heat dissipating panel main body 12a. Will be shipped as. The second heat dissipating panel body 4 is formed in an elongated rectangular shape, and the heat dissipating tube 16a is formed on the heat dissipating panel body 12a as shown by a broken line in FIG. 3 so as to uniformly warm almost the entire area of the second heat dissipating panel body 2. It is built in and extends back and forth along the inner side after reciprocating the outer side of the heat radiating panel body 12a. Similarly to the first heat radiating panel body 2, the one end 22 a of the heat radiating tube 16 a acts as an inflow end, and the hot water from the header 28 (see FIGS. 8 and 9) is guided to the second heat radiating panel body 4. The other end 24a functions as an outflow end, and functions as a distribution return pipe that returns hot water to the header 28.
[0021]
Although not shown, the first and second heat radiating panel bodies 12 and 12a are a heat radiating base member installed on the floor, and a heat radiating finishing member fixed to the surface side of the heat radiating base member with an adhesive or the like. In this case, the heat radiating base member is formed from, for example, a foamed resin such as polystyrene foam, plywood, wood scrap, a mixture of wood scrap and plastic pieces, and the thickness thereof is formed to about 9 to 12 mm. The heat radiating finish member 14 is made of, for example, a wooden board, a plywood, etc., and has a thickness of about 3 mm.
[0022]
The first and second heat radiating panel bodies 2 and 4 can be combined with each other in the width direction. In this embodiment, the first and second heat radiating panel bodies 2 and 4 are configured as follows. Referring mainly to FIGS. 5 and 6, a connecting recess 30 is provided on one side (the right side in FIGS. 1 and 5 and the lower side in FIG. 2) of each of the first and second heat radiation panel bodies 2 and 4 in the width direction. The connection recess 30 is provided from one end (the upper end in FIG. 1 and the right end in FIG. 2) to the other end of the first and second heat radiation panel bodies 2 and 4. In this form, the lower wall part 32 which comprises the connection recessed part 30 protrudes outward rather than the upper wall part 33, By this structure, it is to floor surfaces, such as a nail and a screw, through the lower wall part 32. Can be easily fixed, and the first and second heat radiating panel bodies 2 and 4 can be easily and reliably fixed to the floor surface. In addition, the first and second heat radiating panel bodies 2 and 4 are detachably combined with the connecting recess 30 described above on the other side in the width direction (left side in FIGS. 1 and 5 and upper side in FIG. 2). A connecting projection 34 is provided.
[0023]
As shown in FIG. 6, the first heat dissipating panel body 2 and the first heat dissipating panel body 2 (or the second heat dissipating panel body 4) are configured such that the side end surfaces are closely fitted to each other. The connection recess 30 of the first heat dissipation panel body 2 on one side (left side in FIG. 6) and the connection protrusion 34 of the other first heat dissipation panel body 2 (or the second heat dissipation panel body 4) are mutually connected. To be combined. With this configuration, as can be understood from FIG. 1, one or more (three in FIG. 1) first heat dissipating panel bodies 2 and one second heat dissipating panel corresponding to the area to be heated. By combining the bodies 4, a heat radiating panel assembly is formed, and the surface of the heat radiating panel assembly is heated using the heat of hot water.
[0024]
Although not shown in this embodiment, one end side (the upper end side in FIG. 1 and the right end side in FIGS. 2 and 3) of the first and second heat radiation panel bodies 2 and 4 is, for example, the same as the one side thereof. The other end side (the lower end side in FIG. 1, the left end side in FIGS. 2 and 3) is configured in the same manner as the other side (the connection convex portion 34 is provided). ).
[0025]
Next, the header panel body 6 will be described with reference to FIGS. 1 and 4. The illustrated header panel body 6 includes a header base member 42 installed on the floor surface and a header finishing member 44 disposed on the surface side of the header base member 42. The header finishing member 44 is attached to a separation structure. The header base member 42 is formed of, for example, a foamed resin such as polystyrene having a thickness of about 9 to 12 mm, and the header finishing member 44 is formed of, for example, a plywood having a thickness of about 3 mm. The base member 42 and the header finishing member 44 can be easily cut with a simple cutting tool such as a cutter. Therefore, in connection with the header panel body 6, the construction work becomes easy and the carpentry work can be omitted.
[0026]
The header panel body 6 is disposed on one end side (upper side in FIG. 1) of the heat radiating panel assembly combined as described later, and in this connection, one end portion thereof is one end of the heat radiating panel assembly. Formed in a shape corresponding to the shape, assembly protrusions 46 and 48 are provided corresponding to the assembly recesses 18 on the heat dissipating panel assembly side. The pair of outer assembly protrusions 48 are formed to have a relatively large width in relation to disposing the first dummy panel body 8 on both sides of the heat dissipation panel assembly. The pair of assembling recesses 46 are formed to have a relatively small width in association with being assembled with the assembling recess 18 of the first heat radiation panel body 2.
[0027]
On the surface of the header base member 42 of the header panel body 6, as shown in FIG. 4, header accommodating recesses 50 are provided corresponding to the first and second heat radiating panel bodies 2 and 4, respectively. The header 28 described above is accommodated in these accommodating recesses 50. As shown in FIG. 8, the illustrated header 28 includes a rectangular header body 52, and a total of six connection portions 54, 56, 58, 60, 62, 64 are provided on three side surfaces of the header body 52. ing. Connection portions 54 and 56 are provided on the left side surface of the header main body 52 in FIG. 8, and a main supply pipe 66 is connected to the connection section 54, and hot water from the heat source unit 26 (FIG. 12) is supplied as main supply. A main return pipe 68 is connected to the connection portion 56 through a supply pipe 66, and hot water from the header body 52 is returned to the heat source unit 26 through the main return pipe 68. Connection portions 58 and 60 are provided on the lower side surface of the header main body 52 in FIG. 8, and the connection portions 58 are connected to the heat radiation tubes 16 of the corresponding first heat radiation panel body 2 (or second heat radiation panel body 4). Alternatively, one end portion 22 (or 22a) functioning as a distribution delivery pipe of 16a) is connected to the pipe, and the hot water from the header body 52 passes through the distribution delivery supply pipe through the first radiation panel body 2 (or the second radiation panel body). 4) is distributed to the heat radiation tube 16 (or 16a), and the distribution of the heat radiation tubes 16 (or 16a) of the corresponding first heat radiation panel body 2 (or second heat radiation panel body 4) is connected to the connection portion 60. The other end 24 (or 24a) functioning as a return pipe is connected by piping, and hot water from the heat dissipation tube 16 (or 16a) of the first heat dissipation panel body 2 (or second heat dissipation panel body 4) is distributed and returned. Through header body It is returned to the 2. Further, connection parts 62 and 64 are provided on the right side surface of the header main body 52 in FIG. 8, and a main supply pipe 66 is connected to the connection part 62, and hot water from the header main body 52 is supplied to the main supply pipe. 66 is supplied to the header 28 on the downstream side, and a main return pipe 68 is connected to the connection portion 64, and the return warm water from the upstream header 28 flows to the header body 52 through the main return pipe 68.
[0028]
The flow of hot water in the header body 52 flows as shown by arrows in FIG. The hot water that has flowed in through the connecting portion 54 is diverted, a part of which flows out of the connecting portion 58, the remaining portion of the hot water flows out of the connecting portion 62, and the hot water that has flowed into the connecting portions 60 and 64 joins together. Spill from.
[0029]
In this embodiment, as shown in FIG. 4 and FIG. 9, the main feed pipe housing recess 70 and the main return pipe housing recess 72 are further elongated on the surface side of the header base member 42 through the header housing recess 50. A main supply pipe 66 that is provided in a straight line in the direction and supplies hot water from the heat source unit 26 is accommodated in the main supply pipe accommodation recess 70, and a main return pipe 68 that returns hot water to the heat source unit 26 is main return. It is accommodated in the accommodating recess 72 for piping. In addition, the assembly protrusions 46 and 48 of the header base member 42 are linearly formed from the header housing recess 50 toward the corresponding first heat dissipation panel body 2 (or second heat dissipation panel body 4). The distribution recesses 74 and the distribution return piping accommodating recesses 76 are provided so as to extend the hot water distributed by the header 28 to the first heat dissipating panel body 2 (or the second heat dissipating panel body 4). One end 22 (or 22a) of the distribution delivery pipe to be fed, that is, the heat radiating tube 16 (or 16a) is accommodated in the delivery recess for the delivery delivery pipe 74, and the first radiating panel body 2 (or second The distribution return pipe for returning the hot water from the heat radiation panel body 4) to the header 28, that is, the other end portion 24 (or 24a) of the heat radiation tube 16 (or 16a) is accommodated in the distribution return pipe accommodating recess 76.
[0030]
Since the header 28 and various pipes for circulating the hot water are accommodated in the corresponding accommodating recesses of the header base member 42 as described above, the header finishing member 44 is attached to the surface side after being accommodated in this way. By mounting in this manner, the header 28 and various pipes can be built in the header panel body 6.
[0031]
Next, the dummy panel body will be described with reference to FIGS. 1 and 7. The first and second dummy panel bodies 8 and 10 in this embodiment have different shapes, but their structures are substantially the same. Like the header panel body 6, the first and second dummy panel bodies 8 and 10 are a dummy base member 82 installed on the floor surface and a dummy finishing member disposed on the surface side of the dummy base member 82. 84, and a separate structure for attaching the dummy finish member 84 to the surface of the dummy base member 82 during construction. The dummy base member 82 is made of, for example, a foamed resin such as polystyrene having a thickness of about 9 to 12 mm, and the dummy finishing member 84 is made of, for example, a plywood having a thickness of about 3 mm. The finishing member 84 can be easily cut with a simple cutting tool such as a cutter. Therefore, the construction work of the dummy panel bodies 8 and 10 becomes easy, and the carpentry work can be omitted.
[0032]
The first dummy panel body 8 has an elongated rectangular shape and is installed on both sides of the heat dissipation panel assembly as shown in FIG. As shown in FIG. 7, the second heat dissipating panel body 4 at one side end (the right end in FIG. 1) of the heat dissipating panel assembly and the first dummy panel body 8 disposed adjacent thereto are as shown in FIG. In this combination, the first auxiliary member 86 is used. The first auxiliary member 86 is composed of an elongated rod-like member, and on one side thereof, a connecting convex portion 88 that is detachably combined with the connecting concave portion 30 of the first and second heat radiation panel bodies 2 and 4 is provided. The other side is formed flat so that the dummy base member 82 of the dummy panel body 8 is fitted into the gap between the wall and the like of the installed room from above. The thickness of the first auxiliary member 86 is formed to be somewhat thinner than the thickness of the second heat radiating panel body 4 and the first dummy panel body 8, and accordingly, as shown in FIG. In a state where the first auxiliary member 86 is combined with one side of the body 4, there is a step between the upper surface of the second heat dissipation panel body 4 and the upper surface of the first auxiliary member 86, and this step is used. The dummy finishing member 84 of the first dummy panel body 8 is attached so as to cover the first auxiliary member 86.
[0033]
Further, the first heat dissipating panel body 2 at the other end (the left end in FIG. 1) of the heat dissipating panel assembly and the first dummy panel body 8 disposed adjacent thereto are as shown in FIG. In this combination, the second auxiliary member 92 is used. The second auxiliary member 92 is formed of a long and narrow bar-like member, and on one side thereof, a connection recess 94 is provided that is detachably combined with the connection protrusion 34 of the first heat radiation panel body 2. Similar to the first auxiliary member 86, the thickness of the second auxiliary member 92 is formed to be somewhat smaller than the thickness of the first heat dissipating panel body 2 and the first dummy panel body 8. In a state where the second auxiliary member 92 is combined with the other side portion of the heat radiating panel body 2, there is a step between the upper surface of the first heat radiating panel body 2 and the upper surface of the second auxiliary member 92. Utilizing this, the dummy finishing member 84 of the first dummy panel body 8 is attached so as to cover the second auxiliary member 92. Such first and second auxiliary members 86 and 92 can be formed of foamed synthetic resin such as polystyrene, and can be easily cut with a simple cutting tool such as a cutter.
[0034]
The second dummy panel body 10 is disposed on the other end side (lower side in FIG. 1) of the combined heat dissipation panel assembly as will be described later. Formed in a shape corresponding to the other end shape of the panel assembly, an assembly projection 93 is provided corresponding to the assembly recess 20 on the heat dissipating panel assembly side, and a first dummy panel is provided at both ends thereof. An assembly protrusion 95 is provided corresponding to the body 8. The assembling projection 95 can be omitted when the first dummy panel body 8 is constructed so as to extend to the other ends of the first and second heat radiation panel bodies 2 and 4.
[0035]
In this embodiment, the dummy base member 82 and the dummy finishing member 84 of the dummy panel bodies 8 and 10 are formed as separate bodies and configured to be assembled at the time of construction, but the dummy base member 82 and the dummy finishing member 84 are configured. May be configured as a unit body having an integrated structure. In this case, the construction work can be simplified in relation to the dummy panel bodies 8 and 10.
[0036]
Next, with reference to FIG.1 and FIG.10 ~ FIG. 12, the construction procedure of the floor heating apparatus mentioned above is demonstrated. First, the first and second heat radiating panel bodies 2 and 4 are installed and fixed on the floor surface in a predetermined area on the floor surface to be installed, for example, the floor surface of the living room, while being combined as described above. For example, when installing on a floor of 6 tatami size, the three first heat radiating panel bodies 2 and one second heat radiating panel body 4 are combined and fixed as shown in FIG. However (see also FIG. 1), in such a combined state, a gap exists around the combined heat dissipation panel assembly. The first and second heat radiating panel bodies 2 and 4 can be fixed to the floor using, for example, nails, screws, adhesives, double-sided tape, or the like. Since the first and second heat dissipating panel bodies 2 and 4 are formed in an integral structure, the construction of the heat dissipating panel bodies 2 and 4 is substantially completed simply by fixing the heat dissipating panel bodies 2 and 4 to the floor to be installed. Easy to install.
[0037]
Next, on one end side of the installed and fixed heat dissipation panel assembly, that is, on the side where both end portions 22, 22 a, 24, 24 a of the heat dissipation tubes 16, 16 a extend from the first and second heat dissipation panel bodies 2, 4, As shown in FIG. 11 (in FIG. 11, both end portions 22, 22a, 24, 24a of the heat radiation tubes 16, 16a are omitted), the header base member 42 of the header panel body 6 is installed and fixed. Since the header base member 42 can be easily cut with a simple cutting tool, the header base member 42 can be laid as required in the gap on one end side of the heat radiating panel assembly without requiring carpentry work.
[0038]
Then, as shown in FIG. 12, the header 28 is accommodated in the header accommodating portion 50 of the header base member 42, and as described above, various pipes corresponding to the various connecting portions 54 to 64 of each header 28, that is, heat radiation tubes. The both ends 22, 22a, 24, 24a and the pipes 66, 68 of the pipes 16, 16a are connected by piping, and the both ends 22, 22a, 24, 24a and the pipes 66, 68 are received in the corresponding receiving recesses 70 to 76. . Since these pipe connections can be made from the surface side of the header base member 44, the work can be easily performed. Moreover, since both the end portions 22 and 24 of the heat radiating tube 16 extend from the assembly recess 18 of the first heat radiating panel body 2, their lengths are secured relatively long. The parts 22 and 24 can be easily piped to the corresponding connection parts 58 and 60 of the header 28.
[0039]
The main feed pipe 66 is connected to the hot water supply side of the heat source machine 26, and the main return pipe 68 is connected to the hot water return side of the heat source machine 26. Further, for the header 28 corresponding to the second heat radiation panel body 4 (disposed at the right end in FIG. 12), as shown in FIG. 9, connecting portions 62 and 64 are connected via a return pipe 98. Then, the hot water flowing out from the connection portion 62 of the header 28 flows into the connection portion 64 through the return pipe 98. Accordingly, the hot water that has flowed from the heat source unit 26 including a gas water heater, an electric water heater, and the like to the header 28 on the downstream end side through the main supply pipe 66 passes through the main return pipe 68 from the header 28 on the downstream end side. Returned to machine 26.
[0040]
Next, after attaching the first and second auxiliary members 86 and 92 to both sides and the other end of the heat dissipating panel assembly, the gap between the heat dissipating panel assembly and the wall of the room is shown in FIG. As shown, the dummy base members 82 of the first and second dummy panel bodies 8 and 10 are installed and fixed. Since the dummy base member 82 can be easily cut with a simple cutting tool, the dummy base member 82 can be laid as required in the gaps on both sides and the other end of the heat radiating panel assembly without requiring carpentry work. it can. The installation work of the dummy base members 82 of the first and second dummy panel bodies 2 and 4 may be performed before or during the pipe connection work between the header 28 and various pipes. Well, by performing the work in this way, the construction work becomes efficient and the construction time can be shortened.
[0041]
Then, the header finishing member 44 and the dummy finishing member 84 are attached to the surface side of the header base member 42 of the header panel body 6 and the dummy base member 82 of the first and second dummy panel bodies 8 and 10, respectively. Since these finishing members 44 and 84 can be easily cut with a simple cutting tool, the finishing members 44 and 84 can be spread on the upper surfaces of the base members 44 and 84 as required without carpentry work. it can. The finishing members 44 and 84 can be fixed with an adhesive, a double-sided tape or the like. Further, by providing receiving recesses 100 and 102 (see FIG. 7) corresponding to the first and second auxiliary members 86 and 92 in a part of the finishing members 44 and 84, the finishing members 44 and 84 are provided in the first. In addition, the first and second heat radiation panel bodies 2 and 4 can be combined via the second auxiliary members 86 and 92.
[0042]
Thus, the floor heating apparatus can be laid as required in the area where the floor surface is to be installed by the construction work from the floor surface side. In the construction method described above, first, the first and second heat dissipating panel bodies 2 and 4 are installed, then the header base member 42 of the header panel body 6 is installed on one end side of the heat dissipating panel assembly. Since the header 28 and related members are attached from the surface side of the base member 42 and the pipes are connected to each other, the attachment work and the piping work can be easily performed. This makes it possible to improve the efficiency of construction work and shorten the construction time.
[0043]
In such a state, the upper surfaces of the first and second heat radiation panel bodies 2 and 4, the header panel body 6, and the first and second dummy panel bodies 8 and 10 define the same plane. And the hot water from the heat source unit 26 is circulated through the heat radiation tubes 16 and 16a of the first and second heat radiation panel bodies 2 and 4, and the upper surfaces of the first and second heat radiation panel bodies 2 and 4 are warmed. The first and second heat radiating panel bodies 2 and 4 can heat the room.
[0044]
As mentioned above, although one Embodiment of the floor heating apparatus according to this invention was described, this invention is not limited to this Embodiment, A various deformation | transformation thru | or correction | amendment are possible without deviating from the scope of the present invention.
[0045]
For example, in the illustrated embodiment, two types of heat dissipating panel bodies, that is, the first and second heat dissipating panel bodies 2 and 4 are used. For example, only one type thereof, for example, the first heat dissipating panel body 2 is used. Alternatively, for example, a plurality of types of first and second heat dissipating panel bodies having different lengths may be used.
[0046]
Further, in the illustrated embodiment, two types of dummy panel bodies are used, that is, the first and second dummy panel bodies 8 and 10 are used. However, three or more types of dummy panels having different sizes and shapes are used. You may make it combine a body.
[0047]
In the illustrated embodiment, the heat dissipating panel assembly is installed and fixed at the center of the floor surface, and the header panel body 6 and the dummy panel bodies 8 and 10 are disposed around the entire heat dissipating panel assembly. For example, the first heat radiating panel 2 or the second heat radiating panel 4 may be spread from one end of the room, and in such a case, the surroundings of the heat radiating panel assembly There is no gap in a part of this, and at least one of the first dummy panels 8 can be omitted.
[0048]
In the illustrated embodiment, the header panel body 6 has a rectangular shape as a whole, and is provided with assembly protrusions 46 and 48 at one end thereof. The header panel body 6 is provided on the floor surface to be installed. An appropriate shape corresponding to a part of the shape can be obtained, and for example, when a pillar is located on a part of the floor surface, a shape having a recess corresponding to the shape of the pillar can be obtained.
[0049]
Moreover, when providing an assembly recessed part in the both ends of the 1st thermal radiation panel body 2, you may make it provide as shown in FIG. That is, assembly recesses 18A and 20A are provided at both ends of the heat dissipating panel body 2A in a stepped manner at substantially equal intervals in the width direction, or in three steps in the illustrated form. By providing the stepped assembly recesses 18A and 20A in this way, a slight level difference between the heat dissipation panel assembly and the header panel body 6A and the second dummy panel body 10A can be made inconspicuous. In particular, as can be understood from FIG. 13, by providing the assembly recesses 18A and 20A so as to match the flooring applied to the surfaces of the first and second heat radiation panel bodies 2A and 4A and the header panel body 6A. The joint between the heat radiating panel bodies 2A, 4A and the header panel body 6A coincides with the flooring, so that the level difference slightly generated after construction can be made less noticeable. In addition to this configuration, assembly recesses 106A and 108A that are recessed in a plan view may be provided at both ends of the second heat radiation panel body 4A.
[0050]
Furthermore, in the illustrated embodiment, the present invention has been described as applied to one using a heat radiating tube as a heat radiating means, but the present invention is not limited to this and uses a long or planar heat radiating heater using electricity as a heat radiating means. It can be similarly applied to.
[0051]
【The invention's effect】
  According to the floor heating device of claim 1 of the present invention, since the heat dissipating panel body is constructed in an integral structure and completed at the time of factory shipment, it is only necessary to install the heat dissipating panel body on the floor surface at the construction site. Therefore, the construction work can be simplified and the work time can be shortened. Further, since the dummy panel body has a separated structure, it is possible to install the heat dissipating panel body on the floor surface, and then assemble the dummy panel body, thereby improving the efficiency of construction work. Moreover, since the dummy panel body has a separation structure, for example, the thickness of the base member installed on the floor surface and the finishing member attached to the surface thereof is relatively thin and can be cut with a simple cutting tool such as a cutter. The carpentry work can be omitted, and the installation can be performed only by the equipment supplier.In addition, since the first auxiliary member having a connection convex portion mounted in combination with the connection concave portion of the heat dissipation panel body is interposed between one side portion of the heat dissipation panel body and the dummy base member of the dummy panel body, The first auxiliary member can substantially eliminate the gap between the one side portion of the heat radiating panel body and the dummy panel body, and the dummy panel body can be reliably assembled from above into the gap on one side of the heat radiating panel body. Moreover, since the 2nd auxiliary member which has a connection convex part with which it combines with the connection recessed part of a heat sink panel body is interposed between the other side part of a heat sink panel body, and the dummy base member of a dummy panel body. The second auxiliary member can substantially eliminate the gap between the other side of the heat radiating panel body and the dummy panel body, and the dummy panel body is securely assembled from above into the gap on the other side of the heat radiating panel body. Can do.
[0052]
According to the floor heating device of claim 2 of the present invention, it is possible to simplify the construction work of the header panel body including the attachment of the header, the pipe connection of the header, etc., and the header panel body is also carpenter. Work can be omitted.
[0054]
  Further, the claims of the present invention3According to this floor heating apparatus, the dummy base member can be fitted from above into the gap between the first auxiliary member and the wall and the second auxiliary member and the wall. Can be made easy.
[Brief description of the drawings]
FIG. 1 is a plan view showing an embodiment of a floor heating apparatus according to the present invention.
2 is a plan view showing a first heat radiating panel body of the floor heating device of FIG. 1; FIG.
3 is a plan view showing a second heat dissipating panel body of the floor heating device of FIG. 1; FIG.
4 is a plan view showing a base member of a header panel body in the floor heating apparatus of FIG. 1. FIG.
5 is a cross-sectional view taken along line VV in FIG. 2. FIG.
6 is a partial cross-sectional view showing a combination part of adjacent heat dissipating panel bodies in the floor heating apparatus of FIG. 1;
7 is a partial cross-sectional view showing a combination part of a heat dissipating panel body and a dummy panel body in the floor heating apparatus of FIG. 1. FIG.
8 is a plan view showing a header provided in the header panel body of the floor heating device of FIG. 1. FIG.
9 is a plan view showing a part of the floor heating device of FIG. 1 in a state where the header is attached to the base member of the header panel body. FIG.
10 is a plan view showing a state in which a heat dissipation panel is installed in the construction work of the floor heating apparatus of FIG.
FIG. 11 is a plan view showing a state in which the base members of the header panel body and the dummy panel body are installed around the heat dissipation panel assembly in the construction work.
FIG. 12 is a plan view showing a state in which the heat radiating tube of the heat radiating panel body, the header of the header panel body and the like are connected by piping in the construction work.
FIG. 13 is a plan view showing a modification of the floor heating device.
[Explanation of symbols]
2,2A, 4,4A Heat dissipation panel
6,6A Header panel body
8, 8A, 10, 10A dummy panel body
12, 12a Heat dissipation panel body
16, 16a Radiation tube
18, 18A, 20, 20A Assembly recess
26 Heat source machine
28 Header
30 Connection recess
34 Connection convex part
42 Header base material
44 Header finishing material
86 First auxiliary member
92 Second auxiliary member

Claims (3)

放熱手段を備えた放熱パネル体と、ダミーパネル体とを備え、前記放熱パネル体及び前記ダミーパネル体が床面に所要の通りに設置施工される床暖房装置であって、
前記放熱パネル体は一体構造に構成され、前記ダミーパネル体は、床面に設置されるダミーベース部材と、前記ダミーベース部材の表面側に取り付けられるダミー仕上げ部材とを有する分離構造に構成されており、
前記放熱パネル体の片側部には連結凹部が設けられ、またその他側部には前記連結凹部と組み合わされる連結凸部が設けられており、前記放熱パネル体を複数組み合わせることによって放熱パネル組立体が構成され、前記放熱パネル組立体の周囲の少なくとも一部に存在する間隙に前記ダミーパネル体が設置され、
前記放熱パネル体の片側部には、前記放熱パネル体の前記連結凹部と組み合わされる連結凸部を有する第1補助部材が装着され、前記第1補助部材を介して前記ダミーベース部材が配設され、また前記放熱パネル体の他側部には、前記放熱パネル体の前記連結凸部と組み合わされる連結凹部を有する第2補助部材が装着され、前記第2補助部材を介して前記ダミーベース部材が配設されることを特徴とする床暖房装置。
A heat-dissipating panel body provided with heat dissipating means, a dummy panel body, and a floor heating device in which the heat dissipating panel body and the dummy panel body are installed and constructed as required on the floor surface,
The heat dissipating panel body is configured in an integral structure, and the dummy panel body is configured in a separation structure having a dummy base member installed on a floor surface and a dummy finishing member attached to the surface side of the dummy base member. And
A connecting recess is provided on one side of the heat dissipating panel body, and a connecting convex part combined with the connecting recess is provided on the other side, and a heat dissipating panel assembly is obtained by combining a plurality of the heat dissipating panel bodies. Configured, the dummy panel body is installed in a gap present in at least a part of the periphery of the heat dissipation panel assembly,
A first auxiliary member having a connection convex portion combined with the connection concave portion of the heat dissipation panel body is attached to one side portion of the heat dissipation panel body, and the dummy base member is disposed via the first auxiliary member. In addition, a second auxiliary member having a connection recess combined with the connection protrusion of the heat dissipation panel body is mounted on the other side of the heat dissipation panel body, and the dummy base member is interposed via the second auxiliary member. A floor heating device which is arranged .
温水を分配するためのヘッダを具備するヘッダパネル体を更に備えており、前記ヘッダパネル体が分離構造に構成されていることを特徴とする請求項1記載の床暖房装置。  The floor heating apparatus according to claim 1, further comprising a header panel body including a header for distributing hot water, wherein the header panel body is configured in a separation structure. 前記第1及び第2補助部材における前記ダミーベース部材側は平坦に形成されていることを特徴とする請求項1又は2記載の床暖房装置。The floor heating apparatus according to claim 1 or 2, wherein the dummy base member side of the first and second auxiliary members is formed flat.
JP2001392955A 2001-11-08 2001-12-26 Floor heating system Expired - Fee Related JP3807725B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001392955A JP3807725B2 (en) 2001-11-08 2001-12-26 Floor heating system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2001343787 2001-11-08
JP2001-343787 2001-11-08
JP2001392955A JP3807725B2 (en) 2001-11-08 2001-12-26 Floor heating system

Publications (2)

Publication Number Publication Date
JP2003207145A JP2003207145A (en) 2003-07-25
JP3807725B2 true JP3807725B2 (en) 2006-08-09

Family

ID=27667022

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001392955A Expired - Fee Related JP3807725B2 (en) 2001-11-08 2001-12-26 Floor heating system

Country Status (1)

Country Link
JP (1) JP3807725B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101168891B1 (en) * 2011-10-17 2012-08-02 정오철 Flooring system

Also Published As

Publication number Publication date
JP2003207145A (en) 2003-07-25

Similar Documents

Publication Publication Date Title
JP4803120B2 (en) Heating and cooling panel
JP3807725B2 (en) Floor heating system
JP3807724B2 (en) Floor heating device and construction method thereof
KR100983131B1 (en) Panel Assembly Structure for Ondol
JP2014062672A (en) Radiation panel for cooling/heating operation
JP3969704B2 (en) Flooring structure
KR100958414B1 (en) Structure for heating
KR101043091B1 (en) Ondol panel system and its construction method
JP2003222345A (en) Hot water type floor heating panel and method for constructing floor heating
US20160091212A1 (en) Surface temperature-control system
JP3594459B2 (en) Rollable wooden floor heating panel
JP2000220855A (en) Floor heating system utilizing base panel of dry sound insulating double floor, and its work execution method
US20210088226A1 (en) Thermal transfer panel system
JP3054879U (en) Heat radiation panel for hot water piping installation
JP3749393B2 (en) Fluid branch block for heat sink
JP3642589B2 (en) Temperature adjustment mat
KR19990006303A (en) Floor-mounted wood heating mat of floor heating system
KR200384608Y1 (en) Warm water heat plate
JPH09303799A (en) Manufacture of hot water floor heating radiating part
JPH0622759Y2 (en) Base material for floor heating
JP3777175B2 (en) Temperature adjustment mat
JP2006105477A (en) Heating or cooling panel
JP2001355863A (en) Floor heating panel
KR100711493B1 (en) Floor fixing top plate construction structure and construction method
JPH1150649A (en) Floor-heating panel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040312

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051212

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051222

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060220

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060511

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060515

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120526

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150526

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees