JP3810673B2 - Solder supply device - Google Patents
Solder supply device Download PDFInfo
- Publication number
- JP3810673B2 JP3810673B2 JP2001361822A JP2001361822A JP3810673B2 JP 3810673 B2 JP3810673 B2 JP 3810673B2 JP 2001361822 A JP2001361822 A JP 2001361822A JP 2001361822 A JP2001361822 A JP 2001361822A JP 3810673 B2 JP3810673 B2 JP 3810673B2
- Authority
- JP
- Japan
- Prior art keywords
- solder
- supply
- bonding
- lead frame
- amount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- H—ELECTRICITY
- H10—SEMICONDUCTOR DEVICES; ELECTRIC SOLID-STATE DEVICES NOT OTHERWISE PROVIDED FOR
- H10W—GENERIC PACKAGES, INTERCONNECTIONS, CONNECTORS OR OTHER CONSTRUCTIONAL DETAILS OF DEVICES COVERED BY CLASS H10
- H10W72/00—Interconnections or connectors in packages
- H10W72/01—Manufacture or treatment
- H10W72/011—Apparatus therefor
- H10W72/0113—Apparatus for manufacturing die-attach connectors
Landscapes
- Electric Connection Of Electric Components To Printed Circuits (AREA)
- Die Bonding (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、チップがボンディングされるリードフレーム上へ半田を供給する半田供給装置に関する。
【0002】
【従来の技術】
従来、ウエハのチップをリードフレームにボンディングする際には、予めリードフレームに半田を供給し、その半田でチップを固定しており、前記半田の供給には、図7に示すように、半田供給装置101が用いられていた。
【0003】
すなわち、リードフレーム111を搬送する搬送路112の側部には、前記半田供給装置101と、塗布量検査装置113と、チップ114をボンディングするボンディング装置115とが上流より順に配設されている。
【0004】
前記半田供給装置101は、図外のリールに巻かれた線状の半田121を加熱されたリードフレーム111上に供給する装置であり、半田ツール122から所定長の半田121を送出することで、所定量の半田121をリードフレーム111上で溶融して塗布できるように構成されている。
【0005】
また、前記塗布量検査装置113は、光源131を有するカメラ132と図外の画像認識装置とを備えてなり、該カメラ132で得られたリードフレーム111上部画像を、画像認識装置で画像処理することによって、その塗布量を検出できるように構成されている。この画像認識装置は、塗布量の検出結果において、半田121の塗布量が所定値より少ない場合又は多い場合に、エラー信号を前記ボンディング装置115へ出力するように構成されている。
【0006】
該ボンディング装置115は、ウエハリングのシート上に載置されたチップ114を、リードフレーム111に塗布された半田121上に移送する装置であり、移送されたチップ114を前記半田121によってリードフレーム111にボンディングするように構成されている。そして、このボンディング装置115は、前記塗布量検査装置113からエラー信号を受けた際には、次のボンディング箇所へのチップ114の移送を中止するスキップ処理を行うように構成されている。
【0007】
【発明が解決しようとする課題】
しかしながら、このようなシステムにあっては、リードフレーム111への半田121の塗布量を検出するために大がかりな塗布量検査装置113が不可欠であった。これにより、システム全体の省スペース化の阻害要因となっていた。
【0008】
本発明は、このような従来の課題に鑑みてなされたものであり、システム全体の省スペース化に寄与することができる半田供給装置を提供することを目的とするものである。
【0009】
【課題を解決するための手段】
前記課題を解決するために本発明の請求項1の半田供給装置においては、チップがボンディングされるリードフレームのボンディング位置へ線状の半田を半田ツールから送出して供給した後、送出された前記半田を前記半田ツール内へ規定量戻す半田供給サイクルを繰り返すことによって、前記半田を各ボンディング位置へ順次供給する半田供給装置であって、前記半田ツールから前記半田を送出する際に、前記半田がリードフレームに到達したことを検出する検出手段と、該検出手段が前記到達を検出した時点での前記半田を送出した長さが、予め定められた規定範囲外の場合に、当該ボンディング位置への半田の供給量が不良であると判定する判定手段と、を備えている。
【0010】
すなわち、リードフレームへチップをボンディングする際には、リードフレームのボンディング位置へ線状の半田を半田ツールから送出して供給する。このとき、前記半田がリードフレームに到達したことが検出手段で検出され、この検出時点での半田の送出長が、予め定められた規定範囲外の場合には、当該ボンディング位置への半田の供給量が不良であると判定手段によって判定される。
【0011】
つまり、供給後の半田は、前記半田ツール内へ規定量戻されており、半田の先端からリードフレームまでの離間距離は、常に等距離となるように構成されている。
【0012】
しかし、半田がリードフレームに到達したことを検出した時点において、半田の送出長が予め定められた規定範囲より短く、通常よりリードフレームへ早く到達した場合、前位置に予定より少なめの半田がボンディング位置へ供給されていることとなり、半田の供給不足が予測される。このため、当該ボンディング位置への半田の供給量が不良であると判定される。
【0013】
一方、半田がリードフレームに到達したことを検出した時点において、半田の送出長が予め定められた規定範囲より長く、通常よりリードフレームへ遅く到達した場合、前位置に予定より多めの半田がボンディング位置へ供給されていることとなり、半田の供給過多が予測される。このため、当該ボンディング位置への半田の供給量が不良であると判定される。
【0014】
また、請求項2の半田供給装置にあっては、前記判定手段にて前記供給量が不良であると判定した際に、その判定したボンディング位置の少なくとも前であって、前記半田が供給されたボンディング位置への半田の供給量も不良であると推定する前位置不良推定手段をさらに備えている。
【0015】
すなわち、前記判定手段にて前記供給量が不良であると判定された際には、その判定されたボンディング位置の少なくとも前であって、前記半田が供給されたボンディング位置への半田の供給量も不良であると前位置不良推定手段によって推定される。
【0016】
つまり、供給後の半田は、前記半田ツール内へ規定量戻されており、半田の先端からリードフレームまでの離間距離は、常に等距離となるように構成されている。
【0017】
しかし、何らかの理由によって、手前のボンディング位置で溶融された半田の塗布量が少なくなった場合には、現時点において半田の残存長が長くなり、規定量戻された半田からリードフレームまでの距離が短くなる。このため、半田がリードフレームに到達するまでの半田の送出長が短くなり、これが検出される。
【0018】
このように、前述した理由によって、半田がリードフレームに到達するまでの前記送出長が短い場合には、現在のボンディング位置より前のボンディング位置での半田の供給量が少ないことが予測され、前位置不良推定手段にて不良であると推定される。
【0019】
一方、何らかの理由によって、手前のボンディング位置で溶融された半田の塗布量が多くなった場合には、現時点において半田の残存長が短くなり、規定量戻された半田からリードフレームまでの距離が長くなる。このため、半田がリードフレームに到達するまでの半田の送出長が長くなり、これが検出される。
【0020】
このように、前述した理由によって、半田がリードフレームに到達するまでの前記送出長が長い場合には、現在のボンディング位置より前のボンディング位置での半田の供給量が多いことが予測され、前位置不良推定手段にて不良であると推定される。
【0021】
さらに、請求項3の半田供給装置では、前記前位置不良推定手段は、前記判定手段にて前記供給量が不良であると判定したボンディング位置から、予め定められた所定数前のボンディング位置までを供給量不良と推定する。
【0022】
すなわち、前記判定手段にて前記供給量が不良であると判定した場合、そのボンディング位置から予め定められた所定数前のボンディング位置までが、前記前位置不良推定手段によって供給量不良と推定される。
【0023】
【発明の実施の形態】
以下、本発明の一実施の形態を図に従って説明する。図1は、本実施の形態にかかる半田供給装置1を示すブロック図である。該半田供給装置1は、チップ2がボンディングされるリードフレーム3のボンディング位置4,・・・へ半田5を供給する装置であり、半田5を、搬送路6のヒートブロック7で加熱されたリードフレーム3上で溶融して塗布するように構成されている。
【0024】
この半田供給装置1は、リードフレーム3が搬送される搬送路6の側部に配設されており、図外のリールに巻かれた線状の半田5を、回転して送り出す一対のローラ11,11と、両ローラ11,11によって送られた半田5を挿通して案内するとともに、その送出位置を定める半田ツール12を備えている。また、前記半田供給装置1は、リードフレーム3上に半田5を塗布した後に、前記半田ツール12から送出された半田5を、当該半田ツール12内へ規定量戻すように構成されており、前述した半田5の送出と、半田ツール12内への規定量の戻しとからなる半田供給サイクルを繰り返すことによって、前記半田5を、搬送路6に沿って搬送されるリードフレーム3の各ボンディング位置4,・・・へ順次供給して塗布するように構成されている。
【0025】
前記半田供給装置1は、マイコンを中心に構成された制御部21と、該制御部21に接続された接触検出部22と、前記制御部21に接続された半田供給部23と、前記制御部21に接続された設定数入力部24とを備えている。
【0026】
前記接触検出部22には、5V電源31にプルアップ抵抗32を介してプルアップされるとともに前記半田5に電気的に接続された信号が入力されており、前記半田5が供給される前記リードフレーム3は、グランドライン33に接続されている。これにより、前記半田5が前記リードフレーム3から離れた状態では5Vが入力されるように構成されており、”H”信号を前記制御部21へ出力するように構成されている。また、前記半田5が前記リードフレーム3に接触して接地された際には0Vが入力されるように構成されており、”L”信号を前記制御部21へ出力するように構成されている。
【0027】
前記半田供給部23は、前記ローラ11,11を回転する為の図外の供給パルスモータを駆動制御するように構成されており、前記供給パルスモータへ駆動パルスを出力するように構成されている。また、この半田供給部23には、前記制御部21からの制御信号が入力されるように構成されており、この制御信号に従って前記供給パルスモータを所定パルス数、正転又は逆転するように構成されている。さらに、前記半田供給部23は、前記供給パルスモータの駆動パルス数を記憶するとともに、駆動毎に、その駆動パルス数と回転方向とを前記制御部21へ出力するように構成されている。これにより、前記駆動パルス数に応じた長さ寸法の半田5を、前記半田ツール12から下方へ延出、又は上方へ後退できるように構成されている。
【0028】
前記設定数入力部24は、設定数のデータを、前記制御部21へ出力するように構成されている。
【0029】
そして、前記制御部21は、当該半田供給装置1より下流側に設置されたボンディング装置41に接続されており、所定のボンディング位置4を示すボンディング位置信号と、スキップ命令を示すエラー信号とを前記ボンディング装置41へ出力できるように構成されている。
【0030】
該ボンディング装置41は、図外のウエハリングのシート上に載置されたウエハのチップ2をピックアップしてリードフレーム3上へ移送する装置であり、前記半田供給装置1によって半田5が塗布されたリードフレーム3のボンディング位置4へ、移送した前記チップ2を載置固定してボンディングするように構成されている。
【0031】
以上の構成にかかる本実施の形態の動作を、図2及び図3に示すフローチャートに従って説明する。
【0032】
すなわち、搬送路6上リードフレーム3へチップ2をボンディングする際には、マイコン内のRAMに設定されたカウンタを0にし(S1)、半田供給部23へ制御信号を出力して供給パルスモータを1パルス正転させるとともに(S2)、前記カウンタに1を加算する(S3)。これにより、前記供給パルスモータによって半田5が半田ツール12よりリードフレーム3のボンディング位置へ向けて1パルス分送出される。
【0033】
そして、リードフレーム3への半田5の接触を示す接触検出部22からの信号が”H”であるか否かから、送出した半田5がリードフレーム3に到達したか否かを判断する(S4)。この判断において、リードフレーム3に到達していない場合には、前記ステップS2へ分岐して各ステップS2〜S4を繰り返す一方、半田5がリードフレームに到達していた場合には、その時のカウンタ数が規定範囲の下限のしきい値である600以上であるか否かを判断する(S5)。
【0034】
ここで、当該半田供給装置1にあっては、図5に示すように、リードフレーム3への半田5の供給を完了した際に、半田5を800パルス分、半田ツール12内へ戻すように構成されている(詳細は後述する)。つまり、供給後の半田5は、前記半田ツール12内へ規定量である800パルス分、戻されており、半田5の先端からリードフレーム3までの離間距離は、図5の(a)に示すように、常に等距離(800パルス分)となるように構成されている。
【0035】
このとき、前記カウンタ数が600未満であった場合、前記供給パルスモータを600パルス正転させる前に、半田5がリードフレーム3に接したこととなる。
【0036】
この場合、半田5がリードフレーム3に到達したことを検出した時点において、図5の(b)に示したように、半田5の送出長R1が予め定められた規定範囲より短く、通常よりリードフレーム3へ早く到達することによって、前回半田供給した箇所の半田量が不足していると予想される。このため、当該ボンディング位置4への半田5の供給量が不良であると判定し、マイコンのRAMに容易された半田不良フラグをセットして(S6)、供給不良処理を実行する(S7)。
【0037】
また、前記ステップS5にて、前記カウンタ数が600以上の場合、カウンタ数が、規定範囲の上限のしきい値である900未満であるか否かを判断する(S8)。
【0038】
このとき、前記カウンタ数が900未満の場合には、図5の(a)に示したように、半田5がリードフレーム3に到達したことを検出した時点において、半田5の送出長Rが予め定められた規定範囲内にあり、通常通りリードフレーム3へ到達することにより、予定通りの長さの半田5をボンディング位置4へ供給することができ、半田5の供給量を適量に保つことができる。このため、次ステップS9へ移行する。
【0039】
一方、前記ステップS8において、前記カウンタ数が900以上の場合には、前記供給パルスモータを900パルス以上正転させてから、前記半田5がリードフレーム3に接したこととなる。
【0040】
この場合、図5の(c)に示したように、半田5がリードフレーム3に到達したことを検出した時点において、半田5の送出長R2が予め定められた規定範囲より長く、通常よりリードフレーム3へ遅く到達することによって、前回半田供給した箇所が半田量供給過多と予想される。このため、当該ボンディング位置4への半田5の供給量が不良であると判定し、マイコンのRAMに容易された半田不足フラグをセットして(S9)、供給不良処理を実行する(S7)。
【0041】
この供給不足処理は、図4に示すように、設定数入力部24から、当該設定数右入力部24にて設定された設定数のデータを入力して読み込み(SB1)、現在半田5を供給している半田位置から一つ手前のボンディング位置4に対応して前記RAMに設定された供給不良フラグをセットする(SB2)。また、前記半田位置に応ずるボンディング位置4から、前記設定数手前まで、すなわち既に半田5の塗布を完了したボンディング位置4までの総てのボンディング位置4に対応して前記RAMに設定された供給不良フラグをセットする(SB3)。
【0042】
そして、前記半田位置に応ずるボンディング位置4から、前記設定数後まで、すなわち、これから半田5を塗布するボンディング位置4までの総てのボンディング位置4に対応して前記RAMに設定された供給不良フラグをセットし(SB4)、前記各供給不良フラグがセットされたボンディング位置4,・・・へのチップ2のボンディングのスキップ命令を示すエラー信号を、前記ボンディング装置41へ出力して(SB5)、前記ステップS9へ戻る。
【0043】
すなわち、供給後の半田5は、図5の(a)に示すように、前記半田ツール12内へ規定量である800パルス戻されており、半田5の先端からリードフレーム3までの離間距離Rは、常に等距離(800パルス分)となるように構成されている。
【0044】
しかし、何らかの理由によって、図5の(b)に示すように、手前のボンディング位置4で溶融された半田4の塗布量が少なくなった場合には、半田5が戻された現時点において、半田5の残存長Z1が長くなり、前記規定量戻された半田5からリードフレーム3までの距離R1が短くなる。このため、半田5がリードフレーム3に到達するまでの半田5の送出長が短くなり、これが検出されるとともにRAMに記憶される(SB3参照)。
【0045】
このように、前述した理由によって、半田5がリードフレーム3に到達するまでの前記送出長が短い場合には、現在のボンディング位置4より前のボンディング位置4での半田5の供給量が少ないことが予測され、半田不良であると推定される。
【0046】
一方、何らかの理由によって、図5の(c)に示すように、手前のボンディング位置4で溶融された半田5の塗布量が多くなった場合には、現時点において半田5の残存長Z2が短くなり、前記規定量戻された半田5からリードフレーム3までの距離R2が長くなる。このため、半田5がリードフレーム3に到達するまでの半田5の送出長が長くなり、これが検出されるとともにRAMに記憶される(SB3参照)。
【0047】
このように、前述した理由によって、半田5がリードフレーム3に到達するまでの前記送出長が長い場合には、現在のボンディング位置4より前のボンディング位置4での半田5の供給量が多いことが予測され、半田不良であると推定される。
【0048】
さらに、本実施の形態にあっては、半田5がリードフレーム3に到達するまでの半田5の送出長が短くあるいは長く、これが検出された際には、現在のボンディング位置4より後のボンディング位置4での半田不良も推定されるため、これをRAMに記憶する(SB4参照)。
【0049】
そして、前記各供給不良フラグがセットされたボンディング位置4,・・・へのチップ2のボンディングのスキップ命令を示すエラー信号を受けた前記ボンディング装置41では、これらのボンディング位置4,・・・へのチップ2の移送を中止するスキップ処理を行う。
【0050】
このように、半田5の供給不足や供給過多を当該半田供給装置1単体で判定することができる。このため、この判定結果を、下流のボンディング装置41へ出力することで、図6に示すように、半田不良を検出した不良検出位置71におけるボンディング位置4へのチップ2のボンディングをスキップすることが可能となり、ボンディング不良を事前に防止し、歩留まりを向上することができる。
【0051】
そして、半田5の塗布量を検出するための大がかりな塗布量検査装置が不要となるため、システム全体の省スペース化を図ることができるとともに、低コスト化も可能となる。
【0052】
また、本実施の形態にあっては、現時点での半田5の供給量の不良の判定を利用することによって、判定されたボンディング位置4(図7中の不良検出位置71)の前後のボンディング位置4,4への半田5の供給量の不良をも推定することができる。このため、この推定結果を、下流のボンディング装置41へ出力することで、半田5の供給不良が推定される前後のボンディング位置4,4へのチップ2のボンディングをスキップすることも可能となり、前述と同様に、ボンディング不良を事前に防止し、歩留まりを、さらに向上することができる。
【0053】
加えて、本実施の形態にあっては、半田5の供給量が不良であると判定した場合、そのボンディング位置4から、設定数入力部24にて予め定められた所定の設定数前後のボンディング位置4までを供給量不良と推定することができる。これにより、搭載されるチップサイズや使用環境などに応じて前記設定数を変更することで、ボンディング不良に対する対応策を柔軟に行うことができる。
【0054】
そして、前記供給パルスモータを1パルス正転させるとともに(S9)、前記カウンタに1を加算し(S10)、カウンタ数が供給ステップ数以上となるまで(S11)、前記ステップS9〜S11を繰り返す。前記カウンタ数が供給ステップ数に到達した際には、前記供給パルスモータを800パルス逆転して、送出した半田5を、図5の(a)に示したように、規定値へ戻して(S12)、メインルーチンへ戻る。
【0055】
【発明の効果】
以上説明したように本発明の請求項1の半田供給装置においては、半田の供給不足や供給過多を当該半田供給装置単体で判定することができる。このため、この判定結果を、下流のボンディング装置へ出力することで、半田の供給不良が予測される箇所へのチップのボンディングをスキップすることが可能となり、ボンディング不良を事前に防止し、歩留まりを向上することができる。
【0056】
そして、半田の塗布量を検出するための大がかりな塗布量検査装置が不要となるため、システム全体の省スペース化を図ることができるとともに、低コスト化も可能となる。
【0057】
また、請求項2の半田供給装置にあっては、判定手段での半田の供給量の不良の判定を利用することによって、判定されたボンディング位置の少なくとも前のボンディング位置への半田の供給量の不良をも推定することができる。このため、この推定結果を、下流のボンディング装置へ出力することで、半田の供給不良が推定される箇所へのチップのボンディングをスキップすることが可能となり、前述と同様に、ボンディング不良を事前に防止し、歩留まりを、より向上することができる。
【0058】
さらに、請求項3の半田供給装置では、半田の供給量が不良であると判定した場合、そのボンディング位置から予め定められた所定数前のボンディング位置までを供給量不良と推定することができる。これにより、搭載されるチップサイズや使用環境などに応じて前記所定数を変更することで、ボンディング不良に対する対応策を柔軟に行うことができる。
【図面の簡単な説明】
【図1】本発明の一実施の形態を示すブロック図である。
【図2】同実施の形態の動作を示すフローチャートである。
【図3】図2に続く動作を示すフローチャートである。
【図4】同実施の形態の供給不良処理の動作を示すフローチャートである。
【図5】同実施の形態で半田をボンディング位置へ供給した後の状態を示す説明図である。
【図6】同実施の形態のリードフレームにチップをボンディングした状態を示す説明図である。
【図7】従来のシステムを示す模式図である。
【符号の説明】
1 半田供給装置
2 チップ
3 リードフレーム
4 ボンディング位置
5 半田
21 制御部
22 接触検出部
23 半田供給部
24 設定数入力部
41 ボンディング装置[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a solder supply apparatus that supplies solder onto a lead frame to which a chip is bonded.
[0002]
[Prior art]
Conventionally, when bonding a wafer chip to a lead frame, solder is supplied to the lead frame in advance, and the chip is fixed with the solder, and the solder is supplied as shown in FIG. The
[0003]
That is, the
[0004]
The
[0005]
The coating
[0006]
The
[0007]
[Problems to be solved by the invention]
However, in such a system, a large coating
[0008]
The present invention has been made in view of such conventional problems, and an object of the present invention is to provide a solder supply apparatus that can contribute to space saving of the entire system.
[0009]
[Means for Solving the Problems]
In order to solve the above-mentioned problem, in the solder supply apparatus according to the first aspect of the present invention, the linear solder is sent from the solder tool and supplied to the bonding position of the lead frame to which the chip is bonded. A solder supply device for sequentially supplying the solder to each bonding position by repeating a solder supply cycle for returning a predetermined amount of solder into the solder tool, and when the solder is sent from the solder tool, A detecting means for detecting that the lead frame has been reached, and the length at which the solder is sent out when the detecting means detects the arrival is outside the predetermined range, the position to the bonding position is detected. Determining means for determining that the supply amount of solder is defective.
[0010]
That is, when bonding a chip to a lead frame, linear solder is sent from a solder tool and supplied to the bonding position of the lead frame. At this time, it is detected by the detecting means that the solder has reached the lead frame, and if the solder sending length at the time of detection is outside the predetermined specified range, the solder is supplied to the bonding position. The determination means determines that the amount is defective.
[0011]
That is, the supplied solder is returned into the solder tool by a specified amount, and the distance from the solder tip to the lead frame is always equal.
[0012]
However, when it is detected that the solder has reached the lead frame, if the solder delivery length is shorter than the predetermined specified range and reaches the lead frame earlier than usual, a smaller amount of solder is bonded to the front position than expected. This means that the solder is insufficiently supplied. For this reason, it is determined that the amount of solder supplied to the bonding position is defective.
[0013]
On the other hand, when it is detected that the solder has reached the lead frame, if the solder delivery length is longer than a predetermined range and arrives later than usual in the lead frame, more solder than expected is bonded to the previous position. As a result, the solder is excessively supplied. For this reason, it is determined that the amount of solder supplied to the bonding position is defective.
[0014]
In the solder supply apparatus according to
[0015]
That is, when the determination unit determines that the supply amount is defective, the supply amount of solder to the bonding position to which the solder is supplied is at least before the determined bonding position. It is estimated by the previous position defect estimation means that it is defective.
[0016]
That is, the supplied solder is returned into the solder tool by a specified amount, and the distance from the solder tip to the lead frame is always equal.
[0017]
However, if for some reason the amount of solder melted at the previous bonding position decreases, the remaining length of the solder is increased at the present time, and the distance from the solder that has been returned to the specified amount to the lead frame is shortened. Become. For this reason, the sending length of the solder until the solder reaches the lead frame is shortened, and this is detected.
[0018]
Thus, for the above-described reason, when the delivery length until the solder reaches the lead frame is short, it is predicted that the amount of solder supplied at the bonding position before the current bonding position is small. It is presumed to be defective by the position defect estimation means.
[0019]
On the other hand, if for some reason the amount of solder melted at the previous bonding position increases, the remaining length of the solder is reduced at the present time, and the distance from the solder returned to the specified amount to the lead frame is increased. Become. For this reason, the sending length of the solder until the solder reaches the lead frame becomes long, and this is detected.
[0020]
As described above, for the reason described above, when the delivery length until the solder reaches the lead frame is long, it is predicted that the amount of solder supplied at the bonding position before the current bonding position is large. It is presumed to be defective by the position defect estimation means.
[0021]
Furthermore, in the solder supply apparatus according to
[0022]
That is, when the determination unit determines that the supply amount is defective, the previous position defect estimation unit estimates a supply amount defect from the bonding position to a predetermined predetermined number of bonding positions. .
[0023]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing a solder supply apparatus 1 according to the present embodiment. The solder supply device 1 is a device for supplying the
[0024]
The solder supply device 1 is disposed on a side portion of a
[0025]
The solder supply apparatus 1 includes a
[0026]
The
[0027]
The
[0028]
The set
[0029]
The
[0030]
The
[0031]
The operation of the present embodiment according to the above configuration will be described with reference to the flowcharts shown in FIGS.
[0032]
That is, when bonding the
[0033]
Then, it is determined whether or not the sent
[0034]
Here, in the solder supply apparatus 1, as shown in FIG. 5, when supply of the
[0035]
At this time, if the number of counters is less than 600, the
[0036]
In this case, when it is detected that the
[0037]
In step S5, if the number of counters is 600 or more, it is determined whether or not the number of counters is less than 900 which is the upper limit threshold value of the specified range (S8).
[0038]
At this time, if the number of counters is less than 900, the sending length R of the
[0039]
On the other hand, in step S8, when the number of counters is 900 or more, the supply pulse motor is rotated forward by 900 pulses or more, and the
[0040]
In this case, as shown in FIG. 5 (c), when it is detected that the
[0041]
In this supply shortage process, as shown in FIG. 4, the set number data set by the set number
[0042]
Then, the supply failure flag set in the RAM corresponding to all the
[0043]
That is, as shown in FIG. 5A, the supplied
[0044]
However, for some reason, as shown in FIG. 5B, when the amount of the
[0045]
Thus, for the reason described above, when the delivery length until the
[0046]
On the other hand, if for some reason, as shown in FIG. 5C, the amount of the
[0047]
Thus, for the reason described above, when the delivery length until the
[0048]
Furthermore, in the present embodiment, the delivery length of the
[0049]
Then, in the
[0050]
Thus, the supply shortage or excessive supply of the
[0051]
Further, since a large coating amount inspection device for detecting the coating amount of the
[0052]
In the present embodiment, the bonding position before and after the determined bonding position 4 (defect detection position 71 in FIG. 7) is determined by using the determination of the defect in the supply amount of the
[0053]
In addition, in the present embodiment, when it is determined that the supply amount of the
[0054]
Then, the supply pulse motor is rotated forward by one pulse (S9), 1 is added to the counter (S10), and steps S9 to S11 are repeated until the number of counters is equal to or greater than the number of supply steps (S11). When the number of counters reaches the number of supply steps, the supply pulse motor is reversed by 800 pulses, and the delivered
[0055]
【The invention's effect】
As described above, in the solder supply apparatus according to the first aspect of the present invention, it is possible to determine whether the solder supply is insufficient or excessive, with the solder supply apparatus alone. For this reason, by outputting this determination result to a downstream bonding apparatus, it becomes possible to skip chip bonding to a place where solder supply failure is predicted, preventing bonding failure in advance, and yield. Can be improved.
[0056]
In addition, since a large coating amount inspection device for detecting the solder coating amount is not required, the entire system can be saved in space, and the cost can be reduced.
[0057]
In the solder supply apparatus according to the second aspect of the present invention, the determination of the supply amount of the solder by the determination unit is used to determine the supply amount of the solder to the bonding position at least before the determined bonding position. Defects can also be estimated. For this reason, by outputting this estimation result to the downstream bonding apparatus, it becomes possible to skip the bonding of the chip to the place where the supply failure of the solder is estimated. And the yield can be further improved.
[0058]
Further, in the solder supply device according to the third aspect, when it is determined that the amount of supplied solder is defective, it is possible to estimate that the supply amount is defective from the bonding position to a predetermined predetermined number of previous bonding positions. Thus, by changing the predetermined number in accordance with the chip size to be mounted, the usage environment, etc., it is possible to flexibly take measures against bonding defects.
[Brief description of the drawings]
FIG. 1 is a block diagram showing an embodiment of the present invention.
FIG. 2 is a flowchart showing the operation of the embodiment.
FIG. 3 is a flowchart showing an operation following FIG. 2;
FIG. 4 is a flowchart showing an operation of supply failure processing according to the embodiment;
FIG. 5 is an explanatory view showing a state after supplying solder to the bonding position in the same embodiment;
6 is an explanatory view showing a state in which a chip is bonded to the lead frame of the embodiment; FIG.
FIG. 7 is a schematic diagram showing a conventional system.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1
Claims (3)
前記半田ツールから前記半田を送出する際に、前記半田がリードフレームに到達したことを検出する検出手段と、
該検出手段が前記到達を検出した時点での前記半田を送出した長さが、予め定められた規定範囲外の場合に、当該ボンディング位置への半田の供給量が不良であると判定する判定手段と、
を備えたことを特徴とする半田供給装置。After the linear solder is sent out from the solder tool and supplied to the bonding position of the lead frame to which the chip is bonded, the solder is supplied by repeating a solder supply cycle for returning the supplied solder into the solder tool by a predetermined amount. Is a solder supply device that sequentially supplies each bonding position,
Detecting means for detecting that the solder has reached the lead frame when the solder is delivered from the solder tool;
Determination means for determining that the amount of solder supplied to the bonding position is defective when the length at which the detection means detects that the solder has been delivered is out of a predetermined range. When,
A solder supply device comprising:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001361822A JP3810673B2 (en) | 2001-11-28 | 2001-11-28 | Solder supply device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001361822A JP3810673B2 (en) | 2001-11-28 | 2001-11-28 | Solder supply device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003163230A JP2003163230A (en) | 2003-06-06 |
| JP3810673B2 true JP3810673B2 (en) | 2006-08-16 |
Family
ID=19172420
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001361822A Expired - Fee Related JP3810673B2 (en) | 2001-11-28 | 2001-11-28 | Solder supply device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3810673B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109396584B (en) * | 2018-11-20 | 2020-10-20 | 武汉欣远拓尔科技有限公司 | Intelligent welding method, system and device and storage medium |
-
2001
- 2001-11-28 JP JP2001361822A patent/JP3810673B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003163230A (en) | 2003-06-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR20150136970A (en) | A tape feeder and self-diagnosing method of the tape feeder | |
| JP5723121B2 (en) | Component mounting system, control device therefor, and component mounting method | |
| CN107583820A (en) | A kind of point gum machine | |
| JP3810673B2 (en) | Solder supply device | |
| JP2794486B2 (en) | Lead frame transfer device | |
| CN117347394A (en) | A method for improving detection efficiency in wheel hub non-destructive X-ray inspection system | |
| CN209515710U (en) | The assembly line and solar cell module of solar cell module | |
| JP2768898B2 (en) | Sorting device and sorting method | |
| CN103997884B (en) | The substrate carrying method of electronic component mounting system and electronic component mounting system | |
| CN106165560A (en) | Transfer device for printed circuit board | |
| JP2000211029A (en) | Method and apparatus for tack-welding film to base material | |
| JP5711712B2 (en) | Terminal crimping machine, terminal crimping wire manufacturing device, terminal crimping wire manufacturing method | |
| JP3568794B2 (en) | Automatic cutting and crimping equipment | |
| JP4850200B2 (en) | Work system | |
| JPS63171753A (en) | Buffer device between hoop working processes | |
| JPH0845484A (en) | Method and device for detecting normality and reverse of battery carrier | |
| JP3459273B2 (en) | Device for cutting and sending out hoop-shaped lead frames for manufacturing electronic components | |
| JP2002217594A (en) | Method and apparatus for inserting electronic component | |
| JPH07237186A (en) | Chip removing method and chip removing device for long size material | |
| JP3885906B2 (en) | Semiconductor pellet bonding method | |
| JP2007084164A (en) | Defect selection device | |
| JPS62201762A (en) | Film joint method for packer or the like | |
| JP4111817B2 (en) | Semiconductor device mounting device | |
| JPH10275816A (en) | Die bonding equipment | |
| JPH0431985B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041105 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060515 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060523 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060524 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090602 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100602 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110602 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110602 Year of fee payment: 5 |
|
| S201 | Request for registration of exclusive licence |
Free format text: JAPANESE INTERMEDIATE CODE: R314201 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110602 Year of fee payment: 5 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120602 Year of fee payment: 6 |
|
| LAPS | Cancellation because of no payment of annual fees |