JP3813843B2 - Overlay method, cutting overlay method and pavement method - Google Patents
Overlay method, cutting overlay method and pavement method Download PDFInfo
- Publication number
- JP3813843B2 JP3813843B2 JP2001217137A JP2001217137A JP3813843B2 JP 3813843 B2 JP3813843 B2 JP 3813843B2 JP 2001217137 A JP2001217137 A JP 2001217137A JP 2001217137 A JP2001217137 A JP 2001217137A JP 3813843 B2 JP3813843 B2 JP 3813843B2
- Authority
- JP
- Japan
- Prior art keywords
- frame
- manhole
- pavement
- manhole frame
- overlay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 93
- 238000005520 cutting process Methods 0.000 title claims description 31
- 230000008569 process Effects 0.000 claims description 46
- 239000000463 material Substances 0.000 claims description 34
- 238000009434 installation Methods 0.000 claims description 19
- 238000007711 solidification Methods 0.000 claims 2
- 230000008023 solidification Effects 0.000 claims 2
- 238000010276 construction Methods 0.000 description 20
- 238000005429 filling process Methods 0.000 description 10
- 230000008439 repair process Effects 0.000 description 8
- 238000000605 extraction Methods 0.000 description 6
- 239000002344 surface layer Substances 0.000 description 5
- 239000000725 suspension Substances 0.000 description 5
- 241000617482 Kiwa Species 0.000 description 3
- 238000007667 floating Methods 0.000 description 3
- 239000010410 layer Substances 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 206010039203 Road traffic accident Diseases 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 210000000078 claw Anatomy 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Images
Landscapes
- Road Repair (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、マンホール枠のかさ高調整又は設置を含むオーバーレイ工法、切削オーバーレイ工法及び舗装工法に関するものである。
【0002】
【従来の技術】
舗装表面にひび割れや破損が多くなり、車両通行のために舗装厚さが不十分になるとともに、マンホール枠が舗装表面から突出してその周囲に段差が生じるようになると、車両通行に伴う振動や騒音が沿道環境に拡がるとともに車両や歩行者等の安全且つ円滑な通行が阻害され、ひいては重大な交通事故を招く恐れが生じる。そこで、このような場合は、マンホール枠が所定高さまでかさ上げされるとともに、現状の舗装表面にそのまま所要厚さの新たな表層(オーバーレイ)が施工されるか(オーバーレイ工法)、または、現状の舗装表面を所要厚さだけ切削してからマンホール枠の高さが調節されるとともに、その切削面に所要厚さの新たな表層が施工され(切削オーバーレイ工法)、それによって道路が修繕されるとともにマンホール枠周囲の前記段差の解消が図られる。
【0003】
しかしながら、このような従来のオーバーレイ工法及び切削オーバーレイ工法では、オーバーレイの施工に際して、道路に生じる縦横方向の勾配のために高さ調節済みのマンホール枠の上面に対してそれと同一平面になるようにオーバーレイ表面を正確に整合させることが施工技術的に困難であり、食い違いを生じ易い上に舗装表面から突出するマンホール枠が表層舗装機械による円滑な表層施工の障害になること、さらに高さ調節後のマンホール枠が舗装表面から突出してその周囲に段差を生じるので、工事途中の交通開放に際して前記マンホール枠周囲の段差部分に新たにすり付け舗装を施すなどして段差を緩和する必要があること等の問題があった。
【0004】
なお、切削オーバーレイ工法の場合には、オーバーレイの施工の前に切削工程が入るため、上記したオーバーレイの施工に伴う問題点に加えて、舗装表面の切削に際してマンホール枠が切削機械による円滑な切削作業の障害になるという問題もある。そこで、舗装表面に対する切削やオーバーレイの施工をマンホール枠に阻害されずに極めて容易に作業性よく行なうことができるとともに、オーバーレイの施工に際してマンホール枠上面とオーバーレイ表面を容易に整合させることができるオーバーレイ工法及び切削オーバーレイ工法が既に開発されている(特許第2623490号公報、特許第2623491号公報参照)。
【0005】
一方、マンホール枠の設置を含む舗装の新設や打ち換えを行う舗装工法では、従来、被舗装路面上のマンホール基壁上に据え付け基礎を介してマンホール枠が施工予定の舗装表面の高さに合わせて設置された後に舗装材が前記高さまで打設される。しかしながら、このような従来の舗装工法では、舗装材の打設に際してマンホール枠が上方に突出して周囲に段差を生じるとともに、舗装機械による円滑な舗装施工の障害になり、特にマンホール枠近辺の舗装に転圧不足が生じて締め固めが不十分になり易いこと、及び舗装施工の最終段階における表層の施工に際して、道路に生じる縦横方向の勾配のために高さ調節済みのマンホール枠上面に対してそれと同一平面になるように表層表面を正確に整合させることが施工技術的に困難であり、食い違いを生じ易い上にマンホール枠が表層舗装機械による円滑な表層施工の障害になること等の問題があった。
【0006】
そこで、被舗装路面への舗装の施工をマンホール枠に阻害されずに極めて容易に作業性よく行うことができるとともに、マンホール枠上面と舗装表面を容易に整合させることができる舗装工法が既に開発されている(特許第2623492号公報参照)。
【0007】
【発明が解決しようとする課題】
マンホール枠のかさ高調整又は設置を含む従来のオーバーレイ工法(特許第2623490号公報)、切削オーバーレイ工法(特許第2623491号公報)及び舗装工法(特許第2623492号公報)では、マンホール枠又は仮設置用の支持蓋を撤去するに当たってその周囲の舗装を最終舗装表面(オーバーレイ工法の場合はオーバーレイ表面を意味する。以下、同じ。)から筒状に切断するようにしているため、その切断作業に伴う騒音の発生が余儀なくされるという欠点がある。
【0008】
また、上記従来の各工法では、マンホール基壁上にマンホール枠の据え付け基礎を構築し、その据え付け基礎上にマンホール枠を設置するようにしているため、新たに設置すべきマンホール枠の上面を最終舗装表面に正確に一致させるのに据え付け基礎の厚さを微調整する作業が必要となり、このため、現場におけるマンホール枠の高さ調整作業が非常に煩雑であるという欠点がある。更に、上記従来の各工法では、マンホール枠周囲の空洞部をすべて舗装材で充填するようにしているため、その舗装材はマンホール枠周囲に同枠よりも分厚く巻き付いた状態で硬化することになる。このため、次にマンホール枠をかさ上げしないで道路補修を行うに当たり、オーバーレイ等の表層を撤去してマンホール枠をその際(きわ)まで露出させる必要がある場合に、そのマンホール枠周囲の舗装材のはつり作業が非常に行い難くなるという欠点もある。
【0009】
本発明は、このような実情に鑑み、施工期間中における騒音の発生時間を可及的に短くでき、マンホール枠の高さ調整作業を極めて簡単に行え、しかも、次の道路補修の際のマンホール枠周囲のはつり作業を容易に行えるマンホール枠のかさ高調整又は設置を含むオーバーレイ工法、切削オーバーレイ工法及び舗装工法を提供することを目的とする。
【0010】
【課題を解決するための手段】
上記目的を達成すべく、本発明は次の技術的手段を講じた。すなわち、本発明は、マンホール枠のかさ高調整又は設置を含むオーバーレイ工法、切削オーバーレイ工法及び舗装工法において、
(i) 従来では、マンホール枠周囲の舗装を最終舗装表面(オーバーレイ表面又は新設の舗装表面)上から筒状に切断して撤去していたのを、本発明では、マンホール枠(又は支持枠)をリフターで強制的に上方へ引き抜くことにより、その周囲の舗装部分を予め切断せずに撤去するようにしたこと、
(ii) 従来では、マンホール基壁上にマンホール枠の据え付け基礎を構築し、その据え付け基礎上にマンホール枠を設置していたのを、本発明では、マンホール枠の上面に保持フレームを固定し、その保持フレームの先端部を最終舗装表面(オーバーレイ表面又は新設の舗装表面)に当接させるようにしてマンホール枠をマンホール基壁の上方に浮かしてセットするようにしたこと、及び、
(iii) 従来では、マンホール枠周囲の空洞部をすべて舗装材で充填していたのを、マンホール枠周囲の空洞部を据え付け用の基礎コンクリートと舗装材との二層に分けて充填するようにしたことを特徴としており、本発明の各工法は、これらの諸点において従来の各工法と本質的に相違している。
【0011】
そして、本発明では、マンホール枠(又は支持枠)をリフターで強制的に上方へ引き抜くことにより、その周囲の舗装部分を予め切断せずに撤去するようにしているので、従来のような舗装の切断作業に伴う騒音の発生がなくなり、施工期間中における騒音の発生時間を可及的に短くすることができる。なお、殆ど騒音を発生させないでマンホール枠(又は支持枠)をその周囲の舗装部分と一緒に強制的に引き抜くことができるリフターとしては、例えば、登録実用新案第3010469号に記載された蓋受枠引抜き機を使用することができる。
【0012】
また、本発明では、マンホール枠の上面に保持フレームを固定し、その保持フレームの先端部を最終舗装表面に当接させるようにしてマンホール枠をマンホール基壁の上方に浮かしてセットするようにしているので、その保持フレームを最終舗装表面の表面に当接させた時点でマンホール枠の上面が自動的に最終舗装表面に一致することになる。このため、従来のような据え付け基礎の厚さ調整という煩雑な作業が不要であり、マンホール枠の高さ調整作業を極めて簡単に行うことができる。
【0013】
更に、本発明では、マンホール枠周囲の空洞部を据え付け用の基礎コンクリートと舗装材との二層に分けて充填するようにしているので、次にマンホール枠をかさ上げしないで道路補修を行うに当たり、オーバーレイ等の表層を撤去してマンホール枠をその際(きわ)まで露出させる必要がある場合に、基礎コンクリート上の舗装材をそこから比較的容易に捲ることができ、このため、次の道路補修の際のマンホール枠周囲のはつり作業を容易に行うことができる。
【0014】
【発明の実施の形態】
以下、図面に基づいて本発明の実施の形態を説明する。図1及び図2は、本発明の第一実施形態であるオーバーレイ工法を時系列的に示す舗装の断面図である。この各断面図のうち、図1(a)はオーバーレイ工程、図1(b)はマンホール枠の引き抜き工程、図2(c)はマンホール枠のセット工程、図2(d)は基礎コンクリート及び仕上げ舗装材の充填工程を示している。以下、これらの各工程に分けて、本実施形態のオーバーレイ工法を説明する。
【0015】
〔オーバーレイ工程〕
図1(a)に示すように、本実施形態のオーバーレイ工法においては、前処理として、マンホール枠1の蓋2の表面に、これとほぼ同径又はこれよりやや大径の円形の路盤紙等よりなる剥離材3が貼り付けられ、その次に、補修対象である現状の舗装4の表面に、上記剥離材3も含めて所要厚さのオーバーレイ5がマンホール枠1を迂回せずにタックコート(図示を省略)等を介して施工される。すなわち、補修されるべき舗装4の表面にオーバーレイ5がマンホール枠1を迂回せずに施工され、マンホール枠1は舗装4の表面とともにオーバーレイ5によって一旦被覆された状態となる。なお、上記剥離材3は、後でマンホール蓋2の表面からオーバーレイ5を剥離し易くするために使用されるものであり、かかる剥離材3としては、例えば、剥離処理剤等の各種薬剤や路盤紙等の各種シートを使用することができる。
【0016】
〔マンホール枠の引き抜き工程〕
上記オーバーレイ工程に引き続いて次のマンホール枠1の引き抜き工程に移るが、その引き抜きを行うためにはマンホール蓋2を取り外して、マンホール枠1を開放する必要がある。従って、上記オーバーレイ工法が終わったあとは、マンホール蓋2上のオーバーレイ5が図示しないハンドブレーカー等ではつられて撤去され、マンホール蓋2がマンホール枠1から取り外される。次に、図1(b)に示すように、マンホール枠1をリフター12で強制的に上方へ引き抜くことにより、そのマンホール枠1周囲の舗装部分7が予め切断されることなく同マンホール枠1とともに撤去される。なお、図1(b)において、符号8は、マンホール枠1の下面とマンホール基壁6の上面との間に介在されたスペーサーである。
【0017】
このようなマンホール枠1及びその周囲の舗装部分7の強制的な引き抜き作業は、前記した登録実用新案第3010469号に記載された油圧式の蓋受枠引抜き機を使用すれば、殆ど騒音を発生させることなくマンホール枠1の撤去を行うことができる。もっとも、この引抜き機以外の装置を使用してもよい。なお、図1(b)では、リフター12の掛止爪をスペーサー8の下面側に引っ掛けているが、この掛止爪をマンホール枠1の内周部に形成されている段差部分に引っ掛けて、同マンホール枠1を引き抜くこともできる。
【0018】
〔マンホール枠のセット工程〕
その後、図2(c)に示すように、マンホール枠1の上面に保持フレーム13が固定され、その保持フレーム13の先端部をオーバーレイ5の表面に当接させるようにしてマンホール枠1がマンホール基壁6の上方に浮いた状態でセットされ、そのマンホール枠1とマンホール基壁6との間の隙間が内型枠14で埋められる。本実施形態の保持フレーム13は、マンホール枠1の受け口部とほぼ同径のリング状に形成されたフレーム本体15と、このフレーム本体15から径外方向に放射状に突設された複数本の当接アーム16とを備えており、この当接アーム16は、その下面がフレーム本体15の下面と面一となるように、当該フレーム本体15に固定されている。
【0019】
また、この保持フレーム13は、フレーム本体15の下面側にマンホール枠1を吊り下げ状態で固定するための吊り下げ機構を備えており、この吊り下げ機構は、上記当接アーム16を上下方向に貫通する締め付けボルト17と、マンホール枠1の下部フランジに引っ掛け可能なナット付きの掛止金具18とから構成されている。従って、保持フレーム13のフレーム本体15をマンホール枠1の受け口部に重ね合わせて、掛止金具18をマンホール枠1の下部フランジに引っ掛けたあと、その掛止金具18のナットに締め付けボルト17の下端部を挿通して締め付けることにより、マンホール枠1の上面(受け口部の上縁面)が当接アーム16の下面と同じレベルになった状態で、同マンホール枠1に保持フレーム13を固定できるようになっている。
【0020】
このため、上記のようにして保持フレーム13が固定されたマンホール枠1を舗装4の引き抜き孔内に収納することにより、保持フレーム13の先端部(当接アーム16)がオーバーレイ5の表面に当接した状態でマンホール枠1がマンホール基壁6の上方に浮いた状態でセットされ、このときマンホール枠1の上面がオーバーレイ5の表面と厳密に一致することになる。なお、マンホール枠1とマンホール基壁6との間の隙間を埋めるための内型枠14は、その隙間高さよりも幅の広いゴム製の帯状体より構成されている。また、このマンホール枠のセット工程において設置されるマンホール枠1は、前記引き抜き工程において被補修舗装4から取り外した旧枠が未だ使用に耐える場合にはそれを転用することができ、そうでない場合は新品のマンホール枠に交換すればよい。
【0021】
〔基礎コンクリート及び仕上げ舗装材の充填工程〕
次に、図2(d)に示すように、マンホール枠1周囲の空洞部のうち、マンホール基壁6の上面からマンホール枠1の下面以上の高さの部分に、例えば瞬結モルタル等よりなる根固め用の基礎コンクリート9が現場打ちされる。なお、この基礎コンクリート9の打設レベルは、少なくともマンホール枠1の下面に達しておればよいが、マンホール枠1の下部フランジをすべて基礎コンクリート9の内部に埋設させるようにすれば、当該コンクリート9による根固め強度を十分に発揮させることができる。
【0022】
その後、締め付けボルト17を緩めて掛止金具18から取り外すことによって保持フレーム13がマンホール枠1から取り外され、基礎コンクリート9が硬化した後に内型枠14が脱型される。そして、最後に、マンホール枠1周囲の空洞部のうち、上記基礎コンクリート9の上面からオーバーレイ5の表面の高さまでの部分に舗装材10が打設され、これによって全工程が完了する。このように、本実施形態のオーバーレイ工法では、マンホール枠1周囲の空洞部を据え付け用の基礎コンクリート9と舗装材10との二層に分けて充填するようにしているので、次にマンホール枠1をかさ上げしないで道路補修を行うに当たり、オーバーレイ5を撤去してマンホール枠1をその際(きわ)まで露出させる必要がある場合に、基礎コンクリート9上の舗装材10をそこから比較的容易に捲ることができ、このため、次の道路補修の際のマンホール枠1周囲のはつり作業を容易に行うことができる。
【0023】
また、本実施形態によれば、マンホール枠1周囲の空洞部にまず基礎コンクリート9を充填することによって、同マンホール枠1を基礎コンクリート9に対して根固めしてから舗装材10を充填するようにしているので、マンホール枠1の芯ずれを防止するために同マンホール枠1をマンホール基壁6にアンカーボルト等の固定部材を介して連結する必要がなくなり、この点で施工手間を低減できるという利点もある。もっとも、基礎コンクリート9の初期硬化強度ではマンホール枠1回りの支持力に問題がある場合には、マンホール基壁6とマンホール枠1とをアンカーボルト等の固定部材で連結してから、基礎コンクリート9を充填することにしてもよい。
【0024】
なお、特に図2(d)に示すように、最後に打設する舗装材10の厚さをオーバーレイ5の厚さとほぼ同じ厚さに設定しておけば、次の道路補修の際にオーバーレイ5のはつり作業と同じ調子でマンホール枠1周囲の舗装材10をはつることができるので、当該道路補修の際のマンホール枠1周囲のはつり作業がより簡便になる。図3〜図5は、本発明の第二実施形態である切削オーバーレイ工法を時系列的に示す舗装の断面図である。この各断面図のうち、図3(a)はマンホール枠の引き抜き工程、図3(b)は仮復旧舗装の充填工程、図4R>4(c)は切削及びオーバーレイ工程、図4(d)は支持枠の引き抜き工程、図5(e)はマンホール枠のセット工程、図5(f)は基礎コンクリート及び仕上げ舗装材の充填工程を示している。以下、これらの各工程に分けて、本実施形態の切削オーバーレイ工法を説明する。なお、この第二実施形態においては、前記第一実施形態の場合と機能ないし構造が同様の部材については、図面に同一符号を付してその詳細な説明を省略する。
【0025】
〔マンホール枠の引き抜き工程〕
本実施形態の切削オーバーレイ工法においては、まず、図3(a)に示すように、前記リフター12を用いて、マンホール枠1を強制的に上方へ引き抜くことにより、そのマンホール枠1周囲の舗装部分7が予め切断されることなく同マンホール枠1とともに撤去される。
〔仮復旧舗装の充填工程〕次に、図3(b)に示すように、マンホール基壁6上に、鉄製の円形リングよりなる支持枠20と、この支持枠20内に嵌め込まれた支持蓋21が仮設されるとともに、その支持蓋21の周囲の空洞部に、補修対象である旧舗装4と同じレベルまで、仮復旧用の舗装材22が打設される。なお、本実施形態では、この支持蓋21の上面に前記剥離材3を貼り付けることにより、舗装材22が支持蓋21から簡単に分離できるようにしてある。
【0026】
〔切削及びオーバーレイ工程〕
次に、図4(c)に示すように、補修対象である舗装4の表面がマンホール基壁6上の舗装材7の表面も含めて切削されるとともに、その切削面23に、所要厚さのオーバーレイ5がタックコート(図示を省略)を介して施工される。
〔支持枠の引き抜き工程〕
上記オーバーレイ工程に引き続いて次の支持枠20の引き抜き工程に移るが、その引き抜きを行うためには支持蓋21を取り外して、支持枠20を開放する必要がある。従って、上記オーバーレイ工法が終わったあとは、支持蓋21上のオーバーレイ5及び仮復旧舗装材22が図示しないハンドブレーカー等ではつられて撤去され、支持蓋21が支持枠20から取り外される。
【0027】
次に、図4(d)に示すように、支持枠20を前記リフター12で強制的に上方へ引き抜くことにより、その支持枠20周囲の舗装部分24が予め切断されることなく同支持枠20とともに撤去される。
〔マンホール枠のセット工程〕
その後、図5(e)に示すように、マンホール枠1の上面に保持フレーム13が固定され、その保持フレーム13の先端部をオーバーレイ5の表面に当接させるようにしてマンホール枠1がマンホール基壁6の上方に浮いた状態でセットされ、そのマンホール枠1とマンホール基壁6との間の隙間が内型枠14で埋められる。
【0028】
〔基礎コンクリート及び仕上げ舗装材の充填工程〕
次に、図5(f)に示すように、マンホール枠1周囲の空洞部のうち、マンホール基壁6の上面からマンホール枠1の下面以上の高さの部分に、例えば瞬結モルタル等よりなる根固め用の基礎コンクリート9が現場打ちされ、締め付けボルト17を緩めて掛止金具18から取り外すことによって保持フレーム13がマンホール枠1から取り外される。そして、基礎コンクリート9が硬化した後に内型枠14が脱型され、最後に、マンホール枠1周囲の空洞部のうち、上記基礎コンクリート9の上面からオーバーレイ5の表面の高さまでの部分に舗装材10が打設され、これによって全工程が完了する。
【0029】
図6及び図7は、本発明の第三実施形態であるマンホール枠の設置を含む舗装工法を時系列的に示す舗装の断面図である。この各断面図のうち、図6(a)は新設又は打ち換え舗装工程、図6(b)は支持枠の引き抜き工程、図7(c)はマンホール枠のセット工程、図7(d)は基礎コンクリート及び仕上げ舗装材の充填工程を示している。以下、これらの各工程に分けて、本実施形態のオーバーレイ工法を説明する。なお、この第三実施形態においては、前記第一及び第二実施形態の場合と機能ないし構造が同様の部材については、図面に同一符号を付してその詳細な説明を省略する。
【0030】
〔新設又は打ち換え舗装工程〕
まず、図6(a)に示すように、被舗装路面26内のマンホール基壁6上に、前記した支持枠20付きの支持蓋21が仮設されるとともに、その被舗装路面26に、支持蓋21の表面を含めて新設又は打ち換えのための舗装27が施工される。
【0031】
〔支持枠の引き抜き工程〕
上記舗装工程に引き続いて次の支持枠20の引き抜き工程に移るが、その引き抜きを行うためには支持蓋21を取り外して、支持枠20を開放する必要がある。従って、上記舗装工法が終わったあとは、支持蓋21上の舗装27が図示しないハンドブレーカー等ではつられて撤去され、支持蓋21が支持枠20から取り外される。
【0032】
次に、図6(b)に示すように、支持枠20を前記リフター12で強制的に上方へ引き抜くことにより、その支持枠20周囲の舗装部分24が予め切断されることなく同支持枠20とともに撤去される。
〔マンホール枠のセット工程〕
その後、図7(c)に示すように、マンホール枠1の上面に保持フレーム13が固定され、その保持フレーム13の先端部を新設又は打ち換えの舗装27の表面に当接させるようにしてマンホール枠1がマンホール基壁6の上方に浮いた状態でセットされ、そのマンホール枠1とマンホール基壁6との間の隙間が内型枠14で埋められる。
〔基礎コンクリート及び仕上げ舗装材の充填工程〕
次に、図7(d)に示すように、マンホール枠1周囲の空洞部のうち、マンホール基壁6の上面からマンホール枠1の下面以上の高さの部分に、例えば瞬結モルタル等よりなる根固め用の基礎コンクリート9が現場打ちされ、締め付けボルト17を緩めて掛止金具18から取り外すことによって保持フレーム13がマンホール枠1から取り外される。そして、基礎コンクリート9が硬化した後に内型枠14が脱型され、最後に、マンホール枠1周囲の空洞部のうち、上記基礎コンクリート9の上面から新設又は打ち換えの舗装27の表面の高さまでの部分に舗装材10が打設され、これによって全工程が完了する。
【0033】
【発明の効果】
以上説明したように、本発明によれば、マンホール枠の高調整又は設置を含むオーバーレイ工法、切削オーバーレイ工法及び舗装工法を行うに当たり、施工期間中における騒音の発生時間を可及的に短くでき、マンホール枠の高さ調整作業を極めて簡単に行え、しかも、次の道路補修の際のマンホール枠周囲のはつり作業を容易に行うことができる。
【図面の簡単な説明】
【図1】 本発明のオーバーレイ工法を時系列的に示す舗装の断面図であり、(a)はオーバーレイ工程、(b)はマンホール枠の引き抜き工程を示す。
【図2】 本発明のオーバーレイ工法を時系列的に示す舗装の断面図であり、(c)はマンホール枠のセット工程、(d)は基礎コンクリート及び仕上げ舗装材の充填工程を示す。
【図3】 本発明の切削オーバーレイ工法を時系列的に示す舗装の断面図であり、(a)はマンホール枠の引き抜き工程、(b)は仮復旧舗装の充填工程を示す。
【図4】 本発明の切削オーバーレイ工法を時系列的に示す舗装の断面図であり、(c)は切削及びオーバーレイ工程、(d)は支持枠の引き抜き工程を示す。
【図5】 本発明の切削オーバーレイ工法を時系列的に示す舗装の断面図であり、(e)はマンホール枠のセット工程、(f)は基礎コンクリート及び仕上げ舗装材の充填工程を示す。
【図6】 本発明のマンホール枠の設置を含む舗装工法を時系列的に示す舗装の断面図であり、(a)は新設又は打ち換え舗装工程、(b)は支持枠の引き抜き工程を示す。
【図7】 本発明のマンホール枠の設置を含む舗装工法を時系列的に示す舗装の断面図であり、(c)はマンホール枠のセット工程、(d)は基礎コンクリート及び仕上げ舗装材の充填工程を示す。
【符号の説明】
1 マンホール枠
2 マンホール蓋
3 剥離材
4 補修対象となる舗装
5 オーバーレイ
6 マンホール基壁
7 マンホール枠周囲の舗装部分
9 基礎コンクリート
10 舗装材
12 リフター
13 保持フレーム
14 内型枠
20 支持枠
21 支持蓋
22 仮復旧用の舗装材
23 切削面
24 支持枠周囲の舗装部分
26 被舗装路面
27 新設又は打ち換えのための舗装[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an overlay method, a cutting overlay method, and a pavement method that include adjusting or setting the bulk height of a manhole frame.
[0002]
[Prior art]
If the pavement surface is cracked and damaged, and the pavement thickness becomes insufficient for vehicle traffic, and if the manhole frame protrudes from the pavement surface and steps are created around it, vibration and noise associated with vehicle traffic will occur. As the road spreads to the roadside environment, safe and smooth traffic of vehicles and pedestrians is hindered, which may lead to serious traffic accidents. Therefore, in such a case, the manhole frame is raised to a predetermined height, and a new surface layer (overlay) of the required thickness is directly applied to the current pavement surface (overlay method), or the current After cutting the pavement surface by the required thickness, the height of the manhole frame is adjusted, and a new surface layer of the required thickness is constructed on the cut surface (cutting overlay method), thereby repairing the road The step around the manhole frame can be eliminated.
[0003]
However, in the conventional overlay method and the cutting overlay method, when overlaying is performed, the overlay is made to be flush with the upper surface of the manhole frame whose height has been adjusted due to the vertical and horizontal gradients generated on the road. It is difficult in terms of construction technology to accurately align the surface, and it is easy for discrepancies to occur, and the manhole frame protruding from the pavement surface becomes an obstacle to smooth surface construction by the surface pavement machine, and after height adjustment Since the manhole frame protrudes from the pavement surface and creates a step around it, it is necessary to relieve the step by, for example, newly rubbing the stepped part around the manhole frame when opening traffic during construction. There was a problem.
[0004]
In the case of the cutting overlay method, since the cutting process is performed before the overlay construction, in addition to the problems associated with the overlay construction described above, the manhole frame is smoothly cut by the cutting machine when cutting the pavement surface. There is also the problem of becoming an obstacle. Therefore, it is possible to carry out cutting and overlay construction on the pavement surface very easily and with good workability without being obstructed by the manhole frame, and it is possible to easily align the upper surface of the manhole frame and the overlay surface when constructing the overlay. In addition, a cutting overlay method has already been developed (see Japanese Patent Nos. 2623490 and 2623491).
[0005]
On the other hand, in the pavement method that newly installs and replaces pavements including the installation of manhole frames, conventionally, the manhole frames are adjusted to the height of the pavement surface that is planned to be installed on the manhole base wall on the pavement surface via the installation foundation. After being installed, the paving material is driven to the height. However, in such a conventional pavement method, the manhole frame protrudes upward when the pavement material is placed, creating a step around it, and hinders smooth pavement construction by the paving machine, especially for pavement near the manhole frame. Insufficient compaction due to insufficient rolling pressure, and the surface layer in the final stage of pavement construction, the height of the manhole frame adjusted to the height due to the vertical and horizontal gradients on the road It is difficult in terms of construction technology to accurately align the surface of the surface so that it is in the same plane, and there are problems such as discrepancies and the manhole frame obstructing smooth surface construction by the surface paving machine. It was.
[0006]
Therefore, a pavement method has been developed that can perform pavement construction on the paved road surface very easily and efficiently without being obstructed by the manhole frame, and can easily align the upper surface of the manhole frame with the pavement surface. (See Japanese Patent No. 2623492).
[0007]
[Problems to be solved by the invention]
In the conventional overlay method (Patent No. 2623490), cutting overlay method (Patent No. 2623491) and pavement method (Patent No. 2623492) including adjusting the height of the manhole frame or installing it, for manhole frame or temporary installation When removing the support lid, the surrounding pavement is cut into a cylindrical shape from the final pavement surface (in the case of the overlay method, it means the overlay surface; the same shall apply hereinafter). There is a drawback that the occurrence of this is forced.
[0008]
Also, in each of the above conventional methods, a manhole frame mounting base is constructed on the manhole base wall, and the manhole frame is installed on the mounting base. In order to accurately match the surface of the pavement, it is necessary to finely adjust the thickness of the mounting foundation, and there is a drawback that the height adjustment work of the manhole frame on the site is very complicated. Furthermore, in each of the above conventional methods, since all the cavity around the manhole frame is filled with the pavement material, the pavement material is hardened in a state of being wound around the manhole frame more thickly than the same frame. . For this reason, when performing road repair without raising the manhole frame next time, if it is necessary to remove the surface layer such as overlay and expose the manhole frame to that point (kiwa), the pavement material around the manhole frame However, there is also a drawback that it is very difficult to carry out the fishing work.
[0009]
In view of such a situation, the present invention can shorten the generation time of noise during the construction period as much as possible, can extremely easily adjust the height of the manhole frame, and further, manholes for the next road repair An object of the present invention is to provide an overlay method, a cutting overlay method, and a pavement method including adjusting the height of a manhole frame or installing a manhole frame that can be easily suspended around the frame.
[0010]
[Means for Solving the Problems]
In order to achieve the above object, the present invention takes the following technical means. That is, the present invention is an overlay method, a cutting overlay method and a pavement method including a manhole frame bulk height adjustment or installation,
(i) Conventionally, the pavement around the manhole frame is cut and removed from the final pavement surface (overlay surface or new pavement surface) into a cylindrical shape. In the present invention, the manhole frame (or support frame) is removed. By forcibly pulling up with a lifter, the surrounding pavement was removed without cutting in advance ,
(ii) In the past, a manhole frame installation base was constructed on the manhole base wall, and the manhole frame was installed on the installation base.In the present invention, the holding frame is fixed to the upper surface of the manhole frame, The manhole frame is set to float above the manhole base wall so that the tip of the holding frame is brought into contact with the final pavement surface (overlay surface or new pavement surface), and
(iii) In the past, the entire cavity around the manhole frame was filled with pavement material, but the cavity around the manhole frame was filled in two layers: foundation concrete for installation and pavement material. The construction methods of the present invention are essentially different from the conventional construction methods in these respects.
[0011]
In the present invention, the manhole frame (or support frame) is forcibly pulled upward with a lifter, so that the surrounding pavement portion is removed without being cut in advance . Generation of noise associated with cutting work is eliminated, and noise generation time during the construction period can be shortened as much as possible. In addition, as a lifter that can forcibly pull out the manhole frame (or support frame) together with the surrounding pavement without generating almost any noise, for example, a lid receiving frame pull-out described in registered utility model No. 3010469 You can use the machine.
[0012]
Further, in the present invention, the holding frame is fixed to the upper surface of the manhole frame, and the manhole frame is set above the manhole base wall so that the tip of the holding frame is in contact with the final pavement surface. Therefore, when the holding frame is brought into contact with the surface of the final pavement surface, the upper surface of the manhole frame automatically matches the final pavement surface. For this reason, the conventional troublesome work of adjusting the thickness of the installation foundation is unnecessary, and the height adjustment work of the manhole frame can be performed very easily.
[0013]
Furthermore, in the present invention, the cavity around the manhole frame is filled in two layers of foundation concrete for installation and pavement material, so the next time the road is repaired without raising the manhole frame. When it is necessary to remove the surface layer such as overlay and expose the manhole frame to that point (kiwa), the pavement material on the foundation concrete can be swept relatively easily from there, so that the next road The suspension work around the manhole frame during repair can be easily performed.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings. 1 and 2 are cross-sectional views of a pavement showing the overlay method according to the first embodiment of the present invention in time series. Among these sectional views, FIG. 1A is an overlay process, FIG. 1B is a manhole frame drawing process, FIG. 2C is a manhole frame setting process, and FIG. 2D is foundation concrete and finishing. The pavement filling process is shown. Hereinafter, the overlay method of the present embodiment will be described separately for each of these steps.
[0015]
[Overlay process]
As shown in FIG. 1 (a), in the overlay method of the present embodiment, as a pretreatment, a circular roadbed paper having the same diameter as or slightly larger than the surface of the
[0016]
[Manhole frame drawing process]
Subsequent to the overlay process, the process proceeds to the
[0017]
Forcibly pulling out the
[0018]
[Manhole frame setting process]
Thereafter, as shown in FIG. 2 (c), the holding
[0019]
The holding
[0020]
For this reason, by storing the
[0021]
[Filling process of basic concrete and finishing pavement]
Next, as shown in FIG. 2 (d), of the hollow portion around the
[0022]
Thereafter, the holding
[0023]
In addition, according to the present embodiment, first, the concrete around the
[0024]
In particular, as shown in FIG. 2D, if the thickness of the
[0025]
[Manhole frame drawing process]
In the cutting overlay method of the present embodiment, first, as shown in FIG. 3A, by using the
[Temporary Restoration Pavement Filling Step] Next, as shown in FIG. 3B, on the
[0026]
[Cutting and overlay process]
Next, as shown in FIG. 4C, the surface of the
[Support frame extraction process]
Subsequent to the overlaying process, the process proceeds to the next drawing process of the
[0027]
Next, as shown in FIG. 4 (d), the
[Manhole frame setting process]
Thereafter, as shown in FIG. 5 (e), the holding
[0028]
[Filling process of basic concrete and finishing pavement]
Next, as shown in FIG. 5 (f), of the hollow portion around the
[0029]
FIG.6 and FIG.7 is sectional drawing of the pavement which shows the pavement construction method including installation of the manhole frame which is 3rd embodiment of this invention in time series. Among these sectional views, FIG. 6 (a) is a new installation or replacement pavement process, FIG. 6 (b) is a support frame drawing process, FIG. 7 (c) is a manhole frame setting process, and FIG. The filling process of basic concrete and finishing pavement is shown. Hereinafter, the overlay method of the present embodiment will be described separately for each of these steps. In the third embodiment, members having the same functions or structures as those in the first and second embodiments are denoted by the same reference numerals in the drawings, and detailed description thereof is omitted.
[0030]
[New construction or replacement paving process]
First, as shown in FIG. 6A, a
[0031]
[Support frame extraction process]
Subsequent to the paving process, the process proceeds to the next drawing process of the
[0032]
Next, as shown in FIG. 6B, the
[Manhole frame setting process]
Thereafter, as shown in FIG. 7 (c), the holding
[Filling process of basic concrete and finishing pavement]
Next, as shown in FIG. 7 (d), of the hollow portion around the
[0033]
【The invention's effect】
As described above, according to the present invention, when performing the overlay method including the height adjustment or installation of the manhole frame, the cutting overlay method and the pavement method, the generation time of noise during the construction period can be shortened as much as possible. The manhole frame height adjustment operation can be performed very easily, and the suspension work around the manhole frame during the next road repair can be easily performed.
[Brief description of the drawings]
FIGS. 1A and 1B are cross-sectional views of a pavement showing the overlay method of the present invention in time series, wherein FIG. 1A shows an overlay process, and FIG. 1B shows a manhole frame drawing process.
FIG. 2 is a cross-sectional view of a pavement showing the overlay method of the present invention in time series, (c) shows a manhole frame setting process, and (d) shows a filling process of basic concrete and finished pavement material.
FIGS. 3A and 3B are cross-sectional views of a pavement showing the cutting overlay method of the present invention in time series, wherein FIG. 3A shows a manhole frame drawing process, and FIG. 3B shows a temporary restoration pavement filling process.
FIG. 4 is a cross-sectional view of a pavement showing the cutting overlay method of the present invention in time series, (c) shows a cutting and overlay process, and (d) shows a support frame drawing process.
FIG. 5 is a cross-sectional view of a pavement showing the cutting overlay method of the present invention in time series, (e) shows a manhole frame setting process, and (f) shows a foundation concrete and finishing pavement filling process.
FIG. 6 is a cross-sectional view of a pavement showing the pavement method including the installation of a manhole frame according to the present invention in a time series, (a) shows a new installation or replacement pavement process, and (b) shows a support frame extraction process. .
FIG. 7 is a cross-sectional view of the pavement showing the pavement construction method including the installation of the manhole frame of the present invention in time series, (c) is the manhole frame setting process, (d) is the filling of the basic concrete and the finished pavement material A process is shown.
[Explanation of symbols]
DESCRIPTION OF
Claims (3)
(a) マンホール蓋表面が剥離材で被覆されるとともに、舗装表面に剥離材表面も含めてオーバーレイが施工される工程
(b) マンホール枠をリフターで強制的に引き抜くことにより、そのマンホール枠周囲の舗装部分が予め切断されることなく同マンホール枠とともに撤去される工程
(c) マンホール枠の上面に保持フレームが固定され、その保持フレームの先端部をオーバーレイ表面に当接させるようにしてマンホール枠がマンホール基壁の上方に浮かしてセットされ、そのマンホール枠とマンホール基壁との間の隙間が内型枠で埋められる工程
(d) マンホール枠周囲の空洞部のうち、マンホール基壁の上面からマンホール枠の下面以上の高さの部分に根固め用の基礎コンクリートが現場打ちされたあと、基礎コンクリートからオーバーレイ表面の高さまでの部分に舗装材が打設される工程A pavement overlay method including a manhole frame having the following steps (a) to (d).
(A) The manhole cover surface is covered with a release material and the overlay is applied to the pavement surface including the release material surface. (B) The manhole frame is forcibly pulled out with a lifter, the holding frame on the upper surface of the pavement is precut without being step being removed together with the manhole frame (c) manhole frame is fixed, the manhole frame so as to abut the tip portion of the holding frame to the overlay surface (D) A process in which the gap between the manhole frame and the manhole base wall is filled with the inner mold frame. (D) Among the hollow portions around the manhole frame, the manhole is inserted from the upper surface of the manhole base wall. After foundation concrete for solidification has been struck in the field at a level higher than the lower surface of the frame, -The process of placing pavement material up to the height of the Burleigh surface
(a) マンホール枠をリフターで強制的に上方へ引き抜くことにより、そのマンホール枠周囲の舗装部分が予め切断されることなく同マンホール枠とともに撤去される工程
(b) マンホール基壁上に支持枠付きの支持蓋が仮設されるとともに、支持蓋周囲の空洞部に舗装材が打設される工程
(c) 舗装表面がマンホール基壁上の舗装材表面も含めて切削されるとともに、その切削面にオーバーレイが施工される工程
(d) 支持蓋上の舗装をオーバーレイ上から取り除いて支持蓋が撤去されるとともに、支持枠をリフターで強制的に上方へ引き抜くことにより、その支持枠周囲の舗装部分が予め切断されることなく同支持枠とともに撤去される工程
(e) マンホール枠の上面に保持フレームが固定され、その保持フレームの先端部をオーバーレイ表面に当接させるようにしてマンホール枠がマンホール基壁の上方に浮かしてセットされ、そのマンホール枠とマンホール基壁との間の隙間が内型枠で埋められる工程
(f) マンホール枠周囲の空洞部のうち、マンホール基壁の上面からマンホール枠の下面以上の高さの部分に根固め用の基礎コンクリートが現場打ちされたあと、基礎コンクリートからオーバーレイ表面の高さまでの部分に舗装材が打設される工程A pavement cutting overlay method including a manhole frame having the following steps (a) to (f).
(A) By forcibly pulling out the manhole frame with a lifter, the pavement around the manhole frame is removed together with the manhole frame without being cut in advance. (B) With a support frame on the manhole base wall (C) The pavement surface is cut including the surface of the pavement material on the manhole base wall, and the cutting surface is applied to the cutting surface. (D) The pavement on the support lid is removed from the overlay, the support lid is removed, and the support frame is forcibly pulled upward by a lifter, so that the pavement around the support frame is removed. pre-holding frame on the upper surface of the step (e) manhole frame is removed together with the support frame without being cut is fixed, O the tip portion of the holding frame -A process in which the manhole frame is set to float above the manhole base wall so as to be in contact with the surface of the lay, and the gap between the manhole frame and the manhole base wall is filled with the inner mold frame (f) In the cavity, after foundation concrete for solidification is cast in the area from the upper surface of the manhole base wall to the height of the lower surface of the manhole frame, the pavement material is struck from the foundation concrete to the height of the overlay surface. Process to be established
(a) 被舗装路面内のマンホール基壁上に支持枠付きの支持蓋が仮設されるとともに、被舗装路面に支持蓋表面を含めて舗装が施工される工程
(b) 支持蓋上の舗装を取り除いて支持蓋が撤去されるとともに、支持枠をリフターで強制的に上方へ引き抜くことにより、その支持枠周囲の舗装部分が予め切断されることなく同支持枠とともに撤去される工程
(c) マンホール枠の上面に保持フレームが固定され、その保持フレームの先端部を舗装表面に当接させるようにしてマンホール枠がマンホール基壁の上方に浮かしてセットされ、そのマンホール枠とマンホール基壁との間の隙間が内型枠で埋められる工程
(d) マンホール枠周囲の空洞部のうち、マンホール基壁の上面からマンホール枠の下面以上の高さの部分に根固め用の基礎コンクリートが現場打ちされたあと、基礎コンクリートから舗装表面の高さまでの部分に舗装材が打設される工程A paving method including the installation of a manhole frame having the following steps (a) to (d).
(A) A process of temporarily placing a support lid with a support frame on the manhole base wall in the paved road surface and pavement including the surface of the support lid on the paved road surface. (B) Paving on the support lid. (C) Manhole A process of removing the support lid by removing the support frame and forcibly pulling the support frame upward with a lifter so that the pavement around the support frame is removed without being cut in advance. A holding frame is fixed to the upper surface of the frame, and the manhole frame is set so as to float above the manhole base wall so that the tip of the holding frame is in contact with the pavement surface, and between the manhole frame and the manhole base wall (D) Of the hollow portion around the manhole frame, the foundation core for rooting is formed in a portion of the cavity around the manhole frame that is higher than the lower surface of the manhole frame from the upper surface of the manhole base wall. After the concrete is hit on site, the pavement material is placed in the area from the foundation concrete to the height of the pavement surface.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001217137A JP3813843B2 (en) | 2001-07-17 | 2001-07-17 | Overlay method, cutting overlay method and pavement method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001217137A JP3813843B2 (en) | 2001-07-17 | 2001-07-17 | Overlay method, cutting overlay method and pavement method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003027413A JP2003027413A (en) | 2003-01-29 |
| JP3813843B2 true JP3813843B2 (en) | 2006-08-23 |
Family
ID=19051518
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001217137A Expired - Fee Related JP3813843B2 (en) | 2001-07-17 | 2001-07-17 | Overlay method, cutting overlay method and pavement method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3813843B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100919492B1 (en) * | 2007-12-24 | 2009-09-28 | 삼서공업 주식회사 | Pressurization device for manhole |
| CN113622234A (en) * | 2020-05-09 | 2021-11-09 | 北京建工路桥集团有限公司 | Method for synchronously constructing road base and inspection well |
| CN114263088A (en) * | 2021-12-30 | 2022-04-01 | 中国民航大学 | Special equipment for integrally replacing cement concrete runway and construction method |
-
2001
- 2001-07-17 JP JP2001217137A patent/JP3813843B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003027413A (en) | 2003-01-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100869969B1 (en) | Manhole Lift Repair | |
| CN105133655A (en) | Construction method of well lid of road surface inspection well and auxiliary installation device | |
| JP3522268B2 (en) | Frame replacement method including manhole cover | |
| KR100905728B1 (en) | Manhole repair mechanism and manhole repair method using the same | |
| US6435760B1 (en) | Quick re-install bumper guard system and method | |
| JP3813843B2 (en) | Overlay method, cutting overlay method and pavement method | |
| JP2623491B2 (en) | Cutting overlay method | |
| CN115559356A (en) | Construction method for cooperative construction of heavy well lid and pavement structure of municipal road | |
| KR100374540B1 (en) | Method of Manhole Repair and Used the Method of Equipment | |
| KR100966639B1 (en) | Manhole repair method | |
| KR100639786B1 (en) | Installation structure of precast impression slab for manhole and precast impression slab for manhole and construction method of precast impression slab for manhole | |
| JP4097098B2 (en) | How to remove underground objects | |
| JP2004332522A (en) | Overlay construction method, cutting overlay construction method, and paving construction method | |
| JP2874573B2 (en) | Rail foundation and its repair method | |
| JP4377846B2 (en) | Gutter repair method | |
| JP2006328666A (en) | Integrated construction method of pile and column | |
| KR101062209B1 (en) | Manhole Repair | |
| JP6904542B2 (en) | Circular waterway repair method | |
| JP3783386B2 (en) | Joint method and foundation structure of column material and steel pipe pile in one pillar and one pile foundation | |
| CN110616744A (en) | Method for installing well cover of roadway | |
| JP2623492B2 (en) | Paving method | |
| KR101151831B1 (en) | Construction method of filling-up girder for bridge footway | |
| CN110778110B (en) | Post-pouring method for plugging plate at hollow-out structure of hyperboloid diagonal grid concrete member | |
| JP2623490B2 (en) | Overlay method | |
| JP3890055B2 (en) | Gutter repair method and gutter repair material |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060131 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060310 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060523 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060601 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090609 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100609 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110609 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110609 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120609 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120609 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130609 Year of fee payment: 7 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |