Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3833231B2 - Pillar foundation construction method - Google Patents
[go: Go Back, main page]

JP3833231B2 - Pillar foundation construction method - Google Patents

Pillar foundation construction method Download PDF

Info

Publication number
JP3833231B2
JP3833231B2 JP2005022010A JP2005022010A JP3833231B2 JP 3833231 B2 JP3833231 B2 JP 3833231B2 JP 2005022010 A JP2005022010 A JP 2005022010A JP 2005022010 A JP2005022010 A JP 2005022010A JP 3833231 B2 JP3833231 B2 JP 3833231B2
Authority
JP
Japan
Prior art keywords
pile
pillar
steel pipe
column
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005022010A
Other languages
Japanese (ja)
Other versions
JP2006083683A (en
Inventor
栄三 斎藤
幸一 奥野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2005022010A priority Critical patent/JP3833231B2/en
Publication of JP2006083683A publication Critical patent/JP2006083683A/en
Application granted granted Critical
Publication of JP3833231B2 publication Critical patent/JP3833231B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

この発明は、柱の基礎の施工方法に関し、特に、施工が困難な状況において十分な強度を有する柱の設置が可能な柱の基礎の施工方法に関する。   The present invention relates to a column foundation construction method, and more particularly to a column foundation construction method capable of installing a pillar having sufficient strength in a situation where construction is difficult.

従来、隣地との境界の近くに、ガレージの柱や、背の高い目隠しフェンスを設けることがある。この場合のガレージの屋根の柱用の基礎の配置を図(A)に示す。図(A)を参照して、隣地との境界50に近い位置にガレージの屋根を施工する場合の基礎73と、柱71と、隣地との境界50との関係が示されている。一方、図は、境界50の近くにフェンスを構築する場合の、基礎83の施工断面を示す図である。図を参照して、従来は、深い穴85を掘削し、そこにある程度、栗石84やクラッシャランを転圧し、捨てコンを打ち、その内部に空洞82を有するコンクリートの基礎83を作り、穴85を土で埋め戻す。空洞82の中にフェンスを支持する柱81を垂直に保持し、フェンスを設置する。その後、空洞82にはモルタルが流し込まれて、基礎との一体化がなされる。 Conventionally, a garage column or a tall blindfold fence is often provided near the boundary with the adjacent land. The arrangement of the basis for the pillars garage roof in this case is shown in FIG. 6 (A). With reference to FIG. 6 (A), the relationship between the foundation 73, the pillar 71, and the boundary 50 with an adjacent land in the case of constructing a garage roof at a position close to the boundary 50 with the adjacent land is shown. On the other hand, FIG. 7 is a diagram showing a construction cross section of the foundation 83 when a fence is constructed near the boundary 50. Referring to FIG. 7 , conventionally, a deep hole 85 is excavated, to which a chestnut stone 84 or a crusher run is rolled to some extent, a thrown away container is struck, and a concrete base 83 having a cavity 82 is formed therein. Backfill with soil. A pillar 81 supporting the fence is held vertically in the cavity 82, and the fence is installed. After that, mortar is poured into the cavity 82 to be integrated with the foundation.

(B)は、図(A)において、B−Bで示す部分の矢視図であり、図(A)に示した隣地との境界近傍部分にカーポートを設ける場合の、従来における、カーポートの支柱を基礎に埋め込む場合の施工状態を示す図である。図6(B)を参照して、従来は、日本の土地事情から、隣地との境界50ぎりぎりにカーポートを設ける場合が多い。この場合に、カーポートの柱71の基礎73に、コンクリートのかぶり厚を確保しようとすると、境界50からその一部(図(B)においてdで示す部分)が隣地側にはみ出すため、敷地境界内では、コンクリートのかぶり厚が確保できず、その基礎73は、十分な平面上の面積を得ることができない。一方、境界50の反対側のカーポートの位置が決められている場合、かぶり厚dを確保しようとすると、かぶり厚d分だけカーポートとしての有効面積が減る。 FIG. 6 (B) in FIG. 6 (A), the a arrow view of a portion indicated by B-B, in the case of providing a carport near the boundary portion between the adjacent land shown in FIG. 6 (A), conventional It is a figure which shows the construction state in the case of embedding the support | pillar of a carport in the foundation. With reference to FIG. 6 (B), conventionally, there are many cases where a carport is provided just at the border 50 with the adjacent land due to the land situation in Japan. In this case, the basis 73 of the pillar 71 of the carport, an attempt to secure a cover thickness of concrete, for a portion from the boundary 50 (a portion indicated by d in FIG. 6 (B)) protrudes into adjacent land side, grounds Within the boundary, the cover thickness of the concrete cannot be secured, and the foundation 73 cannot obtain a sufficient plane area. On the other hand, when the position of the carport on the opposite side of the boundary 50 is determined, if an attempt is made to secure the cover thickness d, the effective area as the carport is reduced by the cover thickness d.

に示すフェンスの基礎83についても同様で、図において、境界50ぎりぎりにフェンスの基礎83を設ける場合に、敷地境界内において、フェンスの基礎83に、敷地内でコンクリートのかぶり厚が確保できず、その一部がはみ出し(図においてdで示す部分)、基礎83は、十分な平面上の面積を得ることができない。 The same applies to the fence foundation 83 shown in FIG. 7. In FIG. 7 , when the fence foundation 83 is provided at the border 50, the concrete cover thickness is secured on the fence foundation 83 within the site boundary within the site boundary. It cannot be partly projected (portion indicated by d in FIG. 7 ), and the base 83 cannot obtain a sufficient plane area.

上記のように、基礎コンクリートのかぶりを確保せず施工をすると、図に示すような、背の高いフェンスの基礎を施工した場合、強風時にフェンスが傾いたり、図に示したカーポートの場合は、屋根に積もった雪の重みでカーポートが倒れるという問題があった。 As described above, when the construction without securing the head of the foundation concrete, as shown in FIG. 7, when the construction of the foundation for tall fences, or inclined fence strong winds, carport shown in FIG. 6 In this case, there was a problem that the carport collapsed due to the weight of snow on the roof.

上記のように、柱を境界ぎりぎりに設置するときは、片持ち梁形式のカーポートの柱やフェンスの基礎のような、引き抜き荷重および/または転倒モーメントのかかる柱の基礎の施工は、基礎のコンクリートのかぶり厚が確保できないため、困難であるという問題があった。   As described above, when installing a column near the boundary, the foundation of a column subject to a pull-out load and / or tipping moment, such as a cantilever type carport column or a fence foundation, There was a problem that it was difficult because the cover thickness of concrete could not be secured.

この発明は、上記のような従来の課題に鑑みてなされたもので、片持ち梁形式のカーポート用の柱のような、引き抜き荷重および/または転倒モーメントのかかる柱に、十分な強度を持たせることのできる、柱の基礎の施工方法を提供することを目的とする。   The present invention has been made in view of the above-described conventional problems, and has sufficient strength for a column subjected to a pulling load and / or a tipping moment, such as a column for a carport of a cantilever type. It aims at providing the construction method of the foundation of a pillar which can be made.

この発明の他の目的は、片持ち梁形式のカーポート用の柱のような、引き抜き荷重および/または転倒モーメントのかかる柱を簡単に施工できる、柱の基礎の施工方法を提供することを目的とする。   Another object of the present invention is to provide a column foundation construction method capable of easily constructing a column with a pulling load and / or a tipping moment, such as a cantilever type carport column. And

この発明にかかる、柱の基礎の施工方法は、柱の立設位置に縦穴を掘削し、縦穴内に、杭を、縦穴の掘削深度よりも深い位置まで打ち込むステップと、縦穴内に杭と離間して柱を設置するステップと、柱と前記杭に強度部材を巻きつけて接続するステップと、柱と杭が接続された状態で、縦穴の空間内を含む基礎構築部にコンクリートを打設することにより、柱と前記杭とを一体化するステップとを含み、強度部材は、高強度繊維体である。 The column foundation construction method according to the present invention includes a step of excavating a vertical hole in a standing position of the column, driving a pile into the vertical hole to a position deeper than a depth of excavation of the vertical hole, and a distance from the pile in the vertical hole. The step of installing a column, the step of winding and connecting a strength member around the column and the pile, and placing the concrete in the foundation construction part including the inside of the vertical hole with the column and the pile connected The strength member is a high-strength fibrous body including a step of integrating the pillar and the pile.

好ましくは、杭は、鋼管であり、鋼管の上部近傍を貫通するかんざし筋を有する。   Preferably, the pile is a steel pipe and has a knurled line penetrating the vicinity of the upper part of the steel pipe.

さらに好ましくは、杭は、内部に充填材と縦筋とを有する鋼管杭である。   More preferably, the pile is a steel pipe pile having a filler and vertical bars inside.

なお、高強度繊維体は網目状、ベルト、ロープのいずれかである。 The high-strength fiber body is one of a mesh , a belt, and a rope.

この発明においては、柱と杭とが接続された状態で、縦穴の空間内を含む基礎構築部にコンクリートを打設することにより、柱と杭とを一体化するため、柱に転倒モーメントがかかっても、杭によって、鉛直方向でもって支持される。   In this invention, with the column and the pile connected, the column and the pile are integrated by placing concrete in the foundation construction part including the inside of the vertical hole, so that a falling moment is applied to the column. However, it is supported in the vertical direction by the pile.

その結果、片持ち梁形式のカーポート用の柱のような、引抜荷重および/または転倒モーメントのかかる柱に、十分な強度を持たせることのできる、柱の基礎の施工方法を提供できる。   As a result, it is possible to provide a column foundation construction method capable of giving sufficient strength to a column subject to a pulling load and / or a tipping moment, such as a cantilever type carport column.

したがって、たとえば、カーポートやフェンスの柱を敷地境界のぎりぎりの位置に設けた場合のように、境界側にコンクリートのかぶり厚が確保しづらい柱についても、網目状の高強度繊維体(ジオグリッド)のような厚さが2mm〜3mm程度の強度部材が柱と杭接続されるため、安全が確保でき、十分な強度を持たせることができる。 Therefore, for example, in the case of a column where it is difficult to secure concrete cover thickness on the boundary side, such as when a carport or fence column is provided at the limit of the site boundary, a mesh-like high-strength fiber body (Geogrid) ), A strength member having a thickness of about 2 mm to 3 mm is connected to the pillar and the pile , so that safety can be secured and sufficient strength can be provided.

以下、この発明の一実施の形態を図面を参照して説明する。図1(A),(B)は、この発明の一実施の形態における、従来の図(A)、(B)に対応する図であり、図2は、図1において、II−IIで示す部分の断面図である。ここでは、カーポートの柱を施工する場合について説明するが、背の高いフェンスの柱を施工する場合も同様である。 An embodiment of the present invention will be described below with reference to the drawings. Figure 1 (A), (B) is, in the embodiment of the invention, conventional in FIG. 6 (A), is a diagram corresponding (B), the 2, 1, in II-II It is sectional drawing of the part shown. Here, the case of constructing a carport column will be described, but the same applies to the case of constructing a tall fence column.

図1および図2を参照して、柱11の転倒を防止するための杭として、図に示す鋼管杭21,22を使用する。すなわち、柱11の施工用の縦穴41に、杭頭補強部として、掘削穴42を複式スコップで掘削する。この杭頭補強の掘削穴42に、垂直でなくても良い状態で、一対の鋼管杭21、22を打ち込む。 With reference to FIG. 1 and FIG. 2, the steel pipe piles 21 and 22 shown in FIG. 4 are used as a pile for preventing the fall of the pillar 11. FIG. That is, the excavation hole 42 is excavated in the vertical hole 41 for construction of the pillar 11 as a pile head reinforcement part with a double scoop. A pair of steel pipe piles 21 and 22 is driven into the excavation hole 42 for reinforcing the pile head in a state where it is not necessary to be vertical.

この実施の形態においては、カーポートの柱11に対して、鋼管杭21,22は、隣地境界50の反対側に2本設けられ、カーポートの柱11、鋼管杭21、22は、強度部材23で接続されて、コンクリートを打設することにより、一体化される。このように、鋼管杭21,22を、カーポートの柱11に対して、敷地内に設けることにより、柱の上部の転倒モーメントを、強度部材23を通じて鋼管杭21,22で吸収する。その結果、鋼管杭21,22で、隣地境界50の近傍において、隣地側または敷地内部側へ転倒することなく、柱11を建てることができる。 In this embodiment, two steel pipe piles 21 and 22 are provided on the opposite side of the adjacent land boundary 50 with respect to the carport pillar 11, and the carport pillar 11 and the steel pipe piles 21 and 22 are strength members. 23, and are integrated by placing concrete. Thus, by providing the steel pipe piles 21 and 22 in the site with respect to the column 11 of the carport, the falling moment of the upper part of the pillar is absorbed by the steel pipe piles 21 and 22 through the strength member 23. As a result, the pillar 11 can be built by the steel pipe piles 21 and 22 in the vicinity of the adjacent land boundary 50 without falling down to the adjacent land side or the site interior side.

図2に示すように、離間した柱11の下部と鋼管杭21、22(図示無し)の上部に網目状の高強度繊維体の強度部材23が巻きつけられて接続されている。なお、鋼管杭21,22には、その中央部に縦筋25が設けられている。柱のかんざし筋33と、鋼管杭のかんざし筋32とを用いて、柱11と鋼管杭21,22とを接続するようにしてもよい。 As shown in FIG. 2, a strength member 23 of a mesh-like high-strength fibrous body is wound around and connected to the lower part of the separated pillar 11 and the upper part of steel pipe piles 21 and 22 (not shown). The steel pipe piles 21 and 22 are provided with vertical bars 25 at the center thereof. The column 11 and the steel pipe piles 21, 22 may be connected using the column barb bars 33 and the steel pipe pile barb bars 32.

また、通常はこのような位置に柱11を建てると、隣地境界50側の基礎のコンクリートのかぶり厚を十分確保できないため、コンクリートにクラックが入って問題になるが、この実施の形態のように、柱11と隣地境界50との間に強度部材23を通すことによって、強度部材23とコンクリートとが一体化するため、そのような問題は生じない。 In addition, usually, if the pillar 11 is built at such a position, the concrete cover thickness of the foundation on the adjacent land boundary 50 side cannot be secured sufficiently, so there is a problem that the concrete cracks, but as in this embodiment Since the strength member 23 and the concrete are integrated by passing the strength member 23 between the pillar 11 and the adjacent land boundary 50, such a problem does not occur.

なお、ここでは、鋼管杭を2本用いた例について説明したが、これに限らず、鋼管杭は1本でもよい。   In addition, although the example using two steel pipe piles was demonstrated here, not only this but one steel pipe pile may be sufficient.

ここで、網目状の高強度繊維体(ジオグリッド)とは、盛土の不等沈下防止等を目的として開発された繊維原織物を樹脂でコーティングしたものであり、繊維原織物としては、ポリエステル繊維、ナイロン繊維、ポリアラミド繊維、ガラス繊維、ビニロン繊維、炭素繊維、ポリアリレート繊維、ポリアセタール繊維等が好ましい。このように合成繊維を用いているため、さびが生じない。なお、原織物に使用される繊維としては、上記繊維の高強度繊維が好ましい。このような高強度繊維としては、高分子量ポリエチレン、PET(ポリエチレンテレフタラート)、ナイロン6、ポリアラミド(パラ、メタ)、ガラス、ビニロン、PAN系炭素繊維、ピッチ系炭素繊維、ポリアリレート繊維、ポリアセタール繊維、PPS繊維、ポリイミド繊維、PEEK繊維、フッソ繊維等がある。 Here, a mesh-like high-strength fibrous body (Geogrid) is a fiber base fabric that has been developed for the purpose of preventing uneven settlement of embankments, etc., and is coated with a resin. Nylon fiber, polyaramid fiber, glass fiber, vinylon fiber, carbon fiber, polyarylate fiber, polyacetal fiber and the like are preferable. Since synthetic fibers are used in this way, rust does not occur. Contact name as the fibers used in the original woven fabric, high strength fibers of the fiber are preferred. Such high-strength fibers include high molecular weight polyethylene, PET (polyethylene terephthalate), nylon 6, polyaramid (para, meta), glass, vinylon, PAN-based carbon fiber, pitch-based carbon fiber, polyarylate fiber, and polyacetal fiber. , PPS fiber, polyimide fiber, PEEK fiber, and fluorine fiber.

また、コンクリートの付着等を考慮して、網目の寸法は、10mmから100mm程度が好ましい。   In consideration of adhesion of concrete and the like, the mesh size is preferably about 10 mm to 100 mm.

以上のように、強度部材23で柱11と杭21,22とを抱き込み、コンクリートを打設し、一体化することにより、隣地側基礎コンクリートのかぶり厚がゼロでも、十分な強度が確保できる。 As described above, by embedding the pillar 11 and the piles 21 and 22 with the strength member 23 and placing and integrating the concrete, sufficient strength can be ensured even when the cover thickness of the adjacent foundation concrete is zero. .

また、強度部材23を構成する繊維は、地中に埋設されるため、紫外線による劣化は生じない上に、必要な強度を計算して繊維量を増すことによって、安全を確保できる。 Moreover, since the fiber which comprises the strength member 23 is embed | buried under the ground, safety | security can be ensured by calculating required intensity | strength and increasing a fiber quantity, without the deterioration by an ultraviolet-ray occurring.

図3は、図2の変形例を示す図である。図3を参照して、ここでは、網目状のものの代わりに、水平方向の上下に離れた、2本以上のベルト、または、ロープ23a、23bで柱11と、一対の鋼管杭21、22(図示無し)とが接続されている。 FIG. 3 is a diagram showing a modification of FIG. Referring to FIG. 3, here, instead of a net-like one , two or more belts separated from each other in the horizontal direction or ropes 23 a and 23 b and a pillar 11 and a pair of steel pipe piles 21 and 22 ( (Not shown).

ここで、ベルトおよびロープ23a、23bは、上記した網目状のものの生布に用いられる高強度繊維で製織されたものが好ましい。 Here, the belts and ropes 23a and 23b are preferably woven with high-strength fibers used for the net-like raw cloth described above.

なお、この場合も、柱のかんざし筋38と、鋼管杭のかんざし筋32とを用いて、柱11と鋼管杭21,22(図示なし)とを接続するようにしてもよい。   In this case, the column 11 and the steel pipe piles 21 and 22 (not shown) may be connected using the column barb 38 and the steel pipe pile barb 32.

なお、図を参照して、鋼管杭21、22は、頂部が開放され、下端部28が尖塔型を有しており、内部に縦筋を回転自在に支持するための支持部材29が設けられている。図2や3においては、図に示す支持部材29によって、縦筋25、26が支持されている。施工時には、この鋼管杭21、22の内部にも無収縮モルタルが充填される。 Referring to FIG. 4 , steel pipe piles 21 and 22 have top portions opened, lower end portions 28 have a spire shape, and support members 29 for rotatably supporting longitudinal bars are provided therein. It has been. In FIG. 2 and 3, by a support member 29 shown in FIG. 4, a vertical stripe 25 and 26 is supported. During construction, the steel pipe piles 21 and 22 are also filled with non-shrink mortar.

また、鋼管杭21,22にはかんざし筋を貫通して保持するためのかんざし筋穴27が設けられている。   Moreover, the steel pipe piles 21 and 22 are provided with a knurled bar hole 27 for penetrating and holding the knurled bar.

上記実施の形態においては、杭として、鋼管杭を用いた例について説明した。しかしながら、杭として、鋼管杭以外にコンクリート杭や樹脂製の杭を用いてもよい。図5は、コンクリート杭75を示す図である。図5を参照して、コンクリート杭は、コンクリート杭本体75と、コンクリート杭本体75の上部に設けられ、鉄製のキャップを埋め込んだ保護具76と、コンクリート杭本体75に埋め込まれたかんざし筋77、78とを含み、その下端部79は尖塔型を有している。なお、かんざし筋は1本でもよい。 In the said embodiment, the example which used the steel pipe pile as a pile was demonstrated. However, a concrete pile or a resin pile may be used as the pile in addition to the steel pipe pile. FIG. 5 is a view showing the concrete pile 75. Referring to FIG. 5 , the concrete pile includes a concrete pile main body 75, a protector 76 provided on an upper portion of the concrete pile main body 75 and embedded with an iron cap, and a hairpin 77 embedded in the concrete pile main body 75. and a 78, the lower end portion 79 that has a spire-type. Name your, hairpin muscle may be a single.

なお、コンクリート杭75を用いた場合でも、先の実施の形態と同様に、この杭75と柱に網目状の高強度繊維体を接続する。 Even in the case where the concrete pile 75 is used, a mesh-like high-strength fiber body is connected to the pile 75 and the column as in the previous embodiment.

上記実施の形態においては、カーポートの柱や、背の高いフェンスの柱を補強する場合について説明したが、これに限らず、この柱の基礎の施工方法は、道路標識、ガードレール、看板、信号機、電柱、電灯柱、ポール、バスケットゴールの固定等にも利用が可能である。これらの柱において、鋼管杭を用いた場合は、その径は、柱の寸法にもよるが、約30mm〜150mm程度である。   In the above embodiment, the case of reinforcing a carport pillar or a tall fence pillar has been described, but the construction method of the foundation of this pillar is not limited to this, road signs, guardrails, signboards, traffic lights It can also be used to fix utility poles, light poles, poles and basket goals. In these columns, when steel pipe piles are used, the diameter is about 30 mm to 150 mm, although it depends on the dimensions of the columns.

また、上記実施の形態においては、杭として、一対の鋼管杭を用いて柱と接続する場合について説明したが、これに限らず、1本の鋼管杭を用いてもよいし、地盤に応じて、3本以上の杭を用いてもよい。また、鋼管杭に限らず、非鉄金属の管を用いてもよい。   Moreover, in the said embodiment, although the case where it connected with a pillar using a pair of steel pipe pile as a pile was demonstrated, not only this but one steel pipe pile may be used and according to the ground Three or more piles may be used. Moreover, you may use not only a steel pipe pile but a nonferrous metal pipe.

なお、上記実施の形態の形態では、掘削穴にコンクリートを流し込むと記載したが、これは、使用する箇所に応じて、モルタルを使用してもよいことを意味する。 In the form of the above embodiment has been described as poured concrete in the excavation, which, depending on the position to be used, which means that may be used mortar.

上記実施の形態においては、杭の寸法については、特に規定しなかったが、地盤の悪いところでは、通常に比べて、杭を太く、長くすることで対処可能である。   In the said embodiment, although the dimension of the pile was not prescribed | regulated in particular, in the place where the ground is bad, it can cope by making a pile thicker and longer than usual.

上記実施の形態においては、施工用の縦穴に、杭頭補強部として、より深い縦穴を設けた場合について説明したが、これに限らず、縦穴と杭頭補強部とを同一深さの穴としてもよい。   In the said embodiment, although the case where the deeper vertical hole was provided as a pile head reinforcement part in the vertical hole for construction was demonstrated, not only this but a vertical hole and a pile head reinforcement part as a hole of the same depth Also good.

以上、図面を参照してこの発明の実施形態を説明したが、この発明は、図示した実施形態のものに限定されない。図示された実施形態に対して、この発明と同一の範囲内において、あるいは均等の範囲内において、種々の修正や変形を加えることが可能である。   As mentioned above, although embodiment of this invention was described with reference to drawings, this invention is not limited to the thing of embodiment shown in figure. Various modifications and variations can be made to the illustrated embodiment within the same range or equivalent range as the present invention.

この発明の一実施の形態に係る基礎の施工例を示す平面図および立面図である。It is the top view and elevation which show the example of construction of the foundation concerning one embodiment of this invention. 図1においてII−IIで示す部分の断面図である。It is sectional drawing of the part shown by II-II in FIG. 図1においてII−IIで示す部分の他の実施の形態を示す断面図である。It is sectional drawing which shows other embodiment of the part shown by II-II in FIG. 鋼管杭を示す図である。It is a figure which shows a steel pipe pile. コンクリート杭または樹脂製杭を示す図である。It is a figure which shows a concrete pile or a resin pile. 従来の、隣地に隣接している位置にカーポートの基礎を施工する場合の柱と隣地との境界の位置関係を示す図である。It is a figure which shows the conventional positional relationship of the boundary of a pillar and an adjacent place in the case of constructing the foundation of a carport in the position adjacent to an adjacent place. 従来のフェンスを支持する柱の基礎を示す図である。It is a figure which shows the foundation of the pillar which supports the conventional fence.

符号の説明Explanation of symbols

11 柱、21,22 鋼管杭、23 強度部材、25 縦筋、28,79 下端部、29 支持部材、41 縦穴、32,33,38,77,78 かんざし筋、42 杭頭補強の掘削穴。 11 Pillars, 21 and 22 Steel pipe piles, 23 Strength members, 25 Longitudinal bars, 28, 79 Lower ends, 29 Support members, 41 Vertical holes, 32 , 33 , 38 , 77 , 78 Shark bars , 42 Drilling holes for reinforcing pile heads.

Claims (4)

柱の立設位置に縦穴を掘削し、前記縦穴内に、杭を、前記縦穴の掘削深度よりも深い位置まで打ち込むステップと、
前記縦穴内に杭と離間して柱を設置するステップと、
前記柱と前記杭に強度部材を巻きつけて接続するステップと、
前記柱と前記杭が接続された状態で、前記縦穴の空間内を含む基礎構築部にコンクリートを打設することにより、前記柱と前記杭とを一体化するステップとを含み、
前記強度部材は、高強度繊維体である、柱の基礎の施工方法。
Drilling a vertical hole in the standing position of the column, and driving a pile into the vertical hole to a position deeper than the drilling depth of the vertical hole;
Installing a pillar spaced apart from the pile in the vertical hole;
Wrapping and connecting a strength member to the pillar and the pile;
In the state where the pillar and the pile are connected, by placing concrete in the foundation construction part including the space of the vertical hole, the step of integrating the pillar and the pile,
The said strength member is a construction method of the foundation of a pillar which is a high strength fiber body .
前記杭は、鋼管であり、前記鋼管の上部近傍を貫通するかんざし筋を有する、請求項1に記載の柱の基礎の施工方法。 The pillar pile construction method according to claim 1, wherein the pile is a steel pipe and has a barb that penetrates the vicinity of the upper part of the steel pipe. 前記杭は、内部に充填材と縦筋とを有する鋼管杭である、請求項1または2に記載の柱の基礎の施工方法。 The said pile is the construction method of the foundation of a pillar of Claim 1 or 2 which is a steel pipe pile which has a filler and a vertical reinforcement inside. 前記高強度繊維体は網目状、ベルト、ロープのいずれかである、請求項1から3のいずれかに記載の柱の基礎の施工方法。 The column foundation construction method according to any one of claims 1 to 3, wherein the high-strength fiber body is one of a mesh , a belt, and a rope.
JP2005022010A 2004-01-29 2005-01-28 Pillar foundation construction method Expired - Fee Related JP3833231B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005022010A JP3833231B2 (en) 2004-01-29 2005-01-28 Pillar foundation construction method

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
JP2004022024 2004-01-29
JP2004022024 2004-01-29
JP2004238711 2004-08-18
JP2004238711 2004-08-18
JP2005022010A JP3833231B2 (en) 2004-01-29 2005-01-28 Pillar foundation construction method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP2005179487A Division JP4636409B2 (en) 2004-01-29 2005-06-20 Pillar foundation construction method
JP2006155366A Division JP4470208B2 (en) 2004-01-29 2006-06-02 Pillar foundation construction method

Publications (2)

Publication Number Publication Date
JP2006083683A JP2006083683A (en) 2006-03-30
JP3833231B2 true JP3833231B2 (en) 2006-10-11

Family

ID=36162416

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005022010A Expired - Fee Related JP3833231B2 (en) 2004-01-29 2005-01-28 Pillar foundation construction method

Country Status (1)

Country Link
JP (1) JP3833231B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4964791B2 (en) * 2008-01-15 2012-07-04 株式会社Lixil Prop foundation structure
JP2017008486A (en) * 2015-06-16 2017-01-12 株式会社Lixil Prop construction method
JP6800764B2 (en) * 2017-01-20 2020-12-16 四国化成工業株式会社 Foundation members
CN110042857B (en) * 2019-05-24 2023-12-15 中信国安建工集团有限公司 Reinforced concrete frame column plug-in column foot structure and connecting method thereof
JP7817690B2 (en) * 2023-06-14 2026-02-19 株式会社ラスコジャパン Foundation structure for carport, solar carport, construction method for foundation structure for carport, and guide plate for pin foundation construction method

Also Published As

Publication number Publication date
JP2006083683A (en) 2006-03-30

Similar Documents

Publication Publication Date Title
KR101023660B1 (en) Retaining wall using anchor and concrete panel and construction method using same
US9151070B2 (en) Anchor post
KR101253678B1 (en) Pile foundation and method for constucting the same
EP3420138B1 (en) Anchoring device for a fence
JP3833231B2 (en) Pillar foundation construction method
KR101008478B1 (en) Geogrid installation structure to prevent expansion and destruction of crushed columns and construction method of crushed columns using them
KR20080092639A (en) Foundation of landlord and construction method
KR101401730B1 (en) Reinforcing method of bearing power for soft ground and reinforcing apparatus used in the same method
JP4636409B2 (en) Pillar foundation construction method
JP4470208B2 (en) Pillar foundation construction method
KR20110137644A (en) Column fixing structure and construction method
JP2009084864A (en) Rockfall protection and avalanche prevention facility
KR100458928B1 (en) Reinforced Earth Retaining-Wall for using Steel-Frame and Geogrid
JPWO2015102032A1 (en) Guard fence support structure
CN115094944A (en) Gabion retaining wall and construction method thereof
KR101186563B1 (en) Construction method and foundation structure used pile foundation of precast concrete for soundproofing fence
US20080273927A1 (en) Security barrier
KR101020217B1 (en) Rock construction using anchor and construction method
KR101058628B1 (en) Retaining wall construction structure using landscape stone
JP7421835B1 (en) protective fence
KR101003855B1 (en) Road sign structure and construction method
JP3383610B2 (en) Establishment method of pillars such as fences, pillars and equipment
KR101316719B1 (en) Structure for reinforcing sloping ground of roadside having guardrail
KR200253330Y1 (en) Reinforced Earth Retaining-Wall for using Steel-Frame and Geogrid
JP2024103910A (en) How to Install a Security Fence

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050726

A912 Removal of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20051228

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060602

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060718

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100728

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120728

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120728

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150728

Year of fee payment: 9

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees