Water gate Download PDF

Info

Publication number
JP3890527B2
JP3890527B2 JP2002160585A JP2002160585A JP3890527B2 JP 3890527 B2 JP3890527 B2 JP 3890527B2 JP 2002160585 A JP2002160585 A JP 2002160585A JP 2002160585 A JP2002160585 A JP 2002160585A JP 3890527 B2 JP3890527 B2 JP 3890527B2
Authority
JP
Japan
Prior art keywords
box
gate
support device
foundation
gate box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002160585A
Other languages
Japanese (ja)
Other versions
JP2004003211A (en
Inventor
友宏 別所
和雄 遠藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2002160585A priority Critical patent/JP3890527B2/en
Publication of JP2004003211A publication Critical patent/JP2004003211A/en
Application granted granted Critical
Publication of JP3890527B2 publication Critical patent/JP3890527B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Barrages (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、主に港湾の高潮対策用の防潮堤水門として適用可能な大型水門に関するものである。
【0002】
【発明が解決しようとする課題】
我が国の港湾都市の多くは、沖積層や埋立地などの比較的低い位置に存在するため、地球温暖化や気象変動による海面上昇に対し、柔軟な対応が必要とされている。特に、水域、埋立地を含めた港湾全体を締め切る防潮ラインを形成するには、大型船舶の航行が可能な大型水門を設置する必要がある。この大型水門については現在検討中であるが、その中には開口450m程度のものもあり、従来技術では以下の問題点が挙げられている。
【0003】
・大型船舶の通行を想定していないため比較的小規模のものが多い。
・複雑な機械を使用しているものは維持修理が困難になり易い。
・大規模な重力式水門の場合、基礎の幅が広くなる。また水門の開閉操作も容易ではない。
【0004】
この発明は上記従来の課題を解決するために考えられたものであって、その目的は、大型船舶の航行が可能な大型水門であっても基礎の幅が小さく設定でき、しかも簡単な移動装置により大型のゲート函体をも容易に開閉操作できる新たな水門を提供することにある。
【0005】
【課題を解決するための手段】
上記目的によるこの発明は、水路部を横断して水底に設置された基礎部と、基礎部上を移動して水路部を開閉する複数のゲート函体と、基礎部とゲート函体底面との間に設けられ、基礎部との摩擦を低減する低摩擦機構を備えた走行自在な函体支持装置と、基礎部とゲート函体とにわたり設けられた推進装置とからなり、上記基礎部を突堤の内側から水路部に設置し、その突堤の内側をゲート函体の格納部と、上記函体支持装置と推進装置とからなる移動装置の陸揚部に構成してなる、というものである。
【0006】
また上記基礎部は、上面に並設したガイド溝の底面に函体推進用のガイドレールと共に敷設されたガイドプレートを備え、そのガイドプレートに上下移動機構を有する上記低摩擦機構を設置してガイド溝内に走行自在に収容した上記函体支持装置と、上記ガイドレールに載せて牽引ロッドをゲート函体に連結し、そのガイドレールとゲート函体とに反力を交互に取って函体支持装置上のゲート函体と共に移動するガイド溝内の上記推進装置とを具備する、というものである。
【0007】
また上記函体支持装置は、上記上下移動機構の頂面に設けた函体受桁に油圧又は電動の車輪による自走装置を備える、というものである
【0008】
上記構成では、函体支持装置で移動に際するゲート函体の底面摩擦を大幅に減少させるため、大型のゲート函体に適用できる。また函体支持装置と推進装置は、基礎部又はゲート函体に組み込まれていないので、水門の開閉完了毎に水底から突堤に陸揚げして、オーバーホールや取替えができ、維持補修を容易に行い得る。
【0009】
【発明の実施の形態】
図1は、この発明に係わる水門の1実施形態を示すもので、1は水路部、2は水路部1の両側に構築された固定の突堤、3は突堤2,2の側部から水路部1を横断して基礎杭3aを打設した水底4に設置した基礎部、5は基礎部上を移動して水路部1を開閉するゲート函体である。
【0010】
このゲート函体5は鉄筋コンクリート製で4つのブロックに分割され、それらブロックの当接端は互いに嵌合して、上記水路部1を閉鎖する一連の水門を構成するように凹端面と凸端面に形成してあり、その当接面に止水部材6が底面を除く函体外郭に沿って取り付けてある。
【0011】
上記基礎部3は横断面が凹状形の鋼殻による外部と、その内部に打設したコンクリートとからなり、その上面の両側縁間に上記ゲート函体5の底部が収まって、横ずれを起こすことなくゲート函体5が長手方向に移動する。なお、上面の両側縁は断続的に形成されていてもよく、場合によっては、上面両側に突設した一定間隔の突部であってもよい。
【0012】
また基礎部3の側縁間の上面には、4条のガイド溝7が長手方向に並設してあり、そのガイド溝7を除く上面に弾性保護材によるコンクリート保護マット3bが施してある。ガイド溝7の底面両側には、外側面にストッパー81を一定間隔ごとに有する函体推進用のガイドレール8が敷設してある。そのガイドレール8を反力として上記ゲート函体5を牽引移動する油圧作動の推進ジャッキ9による推進装置が、函体端面に連結してガイド溝7内に配設してある。
【0013】
さらに、各ガイド溝7のガイドレール間の底面には、ガイドプレート10が全長にわたり敷設され、そのガイドプレート10の上に函体支持装置11が三基を一組として、六組が1ブロックのゲート函体5の全長にわたり等間隔に位置するように設置してある。この函体支持装置11の頂面には三基を一組として連結する函体受桁14が設けてある。
【0014】
この函体受桁14の両端には、図7にその概略を示すように、昇降自在な車輪が取付けられており、その一方を駆動輪とする油圧又は電動の自走装置15が函体受桁14に取付けて、各組ごとに移動できるようにしてある。また各組は間隔維持のために連結管16により連結してあり、図では省略するが、その連結管16に油圧ホースや電気コード等を取り付けて、函体支持装置11の移動に支障を来さぬようにしてある。
【0015】
また図5に示すように、基礎部3の上記ブロック相互の当接部下側の基礎部上面には止水溝17が部分的に設けられており、その止水溝17に止水ゴムチューブ18が収容してある。この止水ゴムチューブ18は図(A)に示すような断面形状が四辺形のゴムチューブであるが、止水溝17がゲート函体5により塞がれた状態では、上記ゲート函体5の止水材6の下側に位置して図(B)のように膨張接触し、当接面下の函体底面と基礎部上面との隙間を水密に遮断する。
なお、止水溝17は函体相互の当接部位だけではなく基礎部3の長手方向に連続的に設けてもよい。
【0016】
また図6に示すように、突堤2の突端内側とゲート函体5の側端部との重なり部分には、水路部閉鎖時に注水により膨張するゴムパッキン又はゴムチューブ等による止水材19が取付けてあり、突堤2の内側面にはローラーフェンダーによる緩衝材20が取付けてある。
【0017】
上記推進ジャッキ9は、ピストンロッド92に接続した牽引ロッド93をゲート函体5の端面に連結して、ガイドレール8の上に走行自在に車輪を載せた油圧シリンダー91と、油圧シリンダー上の受部材に軸承したホイール94に吊下して、油圧シリンダー91に上下動自在に跨設し、下面が傾斜面で後端を係合突起に形成した両端の係止爪95を、ガイドレール8の上記ストッパー81の間に位置させた固定部材96と、ホイール94の回動軸端に取り付けたアーム先端のカウンターウェイト97とからなる。
【0018】
このような推進ジャッキ9では、縮小状態を示す図9において、ピストン伸長側に油圧を掛けると、ゲート函体側を反力として油圧シリンダ91側が移動するようになる。これにより図は省略するが、推進ジャッキ9が図左側に移動して係止爪95がストッパー81から離れる。この前進移動により係止爪95が前側のストッパー81aに達すると、カウンターウェイト94により係脱部材96が自動的に上がり、両端の係止爪95は下面の傾斜面によりストッパー81aを乗越える。乗越後の係止爪95はカウンターウェイト94との吊り持ち位置まで下がってストッパー81aの前面に位置するようになり、推進ジャッキ9はストッパー間隔だけ前進移動して、ピストンロッド92は伸長状態となる。
【0019】
その状態で油圧を切り換えてピストン縮小側に加圧すると、係止爪95の後端がストッパー81aと係合する。これにより油圧シリンダー91ではガイドレール側が反力となってピストンロッド92が縮小し、牽引ロッド93によりゲート函体5はピストンの縮小限界まで引っ張られて、ストッパー間隔分だけ前進移動する。したがつて、油圧シリンダー91における伸縮作動を繰り返し行うことによって、ゲート函体5を設定位置に移動することができる。また後退移動時には係止爪95を180度回転させて向きを変えるだけでよく、前進移動時と同様な伸縮操作によりゲート函体5を移動することができる。
【0020】
上記函体支持装置11は、図8に示すようにゲート函体5の移動時に、該ゲート函体5の底面摩擦を低減する低摩擦機構12と、その上部の上下移動機構13とからなり、その上下移動機構13の頂面に三基を一組として連結する函体受桁14が設けてある。
【0021】
上記低摩擦機構12は、上下移動機構13を載置固定した円盤状のサポートフレーム121と底板122との間に、受圧面積が小さな外周囲の一次圧力室123と、そのピストン124により囲繞された受圧面積が大きな内部の二次圧力室125とを、同心円に形成したシリンダからなり、函体支持装置11に載せたゲート函体5の荷重を、図(A)に示すように、底板周囲のピストン124の下端で支える。この状態で、一次圧力室123に水を高圧供給すると、サポートフレーム121が上下移動機構13と共に上昇し始め、二次圧力室125にも水が供給される。
【0022】
さらに水を供給すると、上下移動機構13のサポートフレーム121が押し上げられるとともに、底版122に空けられた微小な孔(図は省略)から水が僅かに流れ出ることにより、図(B)に示すように、水の流体膜が底版122とガイドプレート10の上面との間に生じ、この流体膜により函体支持装置11の底面摩擦が低減されて、ゲート函体5をスライドできる状態となる。
【0023】
上記サポートフレーム121が完全に上昇した後に、上下移動機構13を上昇作動すると、上記函体受桁14を介して支持していたゲート函体5が、基礎部上面から持ち上げられて底面摩擦が低減されるようになる。これによりゲート函体5と函体支持装置11の両方の底面摩擦が減少した状態(摩擦係数2%以下)で、上記推進ジャッキ9による移動をスムーズに行えるようになる。
【0024】
上記構成の水門では、図11に示すように、上記水路部1の両側の突堤2,2の内側を、ゲート函体5の格納部101、その両端を推進ジャッキ9と函体支持装置11とによる移動装置の陸揚部102として利用することができる。
例えば、水路部1が450mの大型水門では、1ブロックのゲート函体長さ115mに設定して、4ブロックのゲート函体5により閉鎖することができる。また、ゲート函体5の格納部101は240m、陸揚げ部102は移動装置の維持管理では移動装置を陸揚げするのに必要な長さとなっている。
またゲート函体5の移動による水路部1の開閉は、推進ジャッキ9と函体支持装置11の駆動を陸上で遠隔操作することにより確実に行い得る。
【0025】
図11は水門の閉鎖手順の説明図で、図11(A)に示す開放中は、ゲート函体5を両突堤2,2の側部に仮置きし、陸揚部102にて上記移動装置を水中から引き上げてメンテナンスを行う。
【0026】
以下、図11(B)〜(D)により閉鎖作動中の動作と閉鎖完了とを順に示すと、先ず陸揚部102の函体支持装置11を内側のゲート函体51の下に自走移動により送込む。この移送は低摩擦機構12を加圧作動してガイドプレート10との摩擦を低減した状態で行うのが好ましい。ゲート函体51の設定位置に達したら、上記自走装置15の車輪を上げて函体支持装置11をガイドプレート10の上に据え置く。その状態で低摩擦機構12と上下移動機構13を加圧作動し、基礎部3とゲート函体及び基礎部3と函体支持装置11との摩擦を低減した後、推進ジャッキ9の伸縮移動を繰り返し行って、両突堤2,2から水路部1の中央にゲート函体51を移動する。中央の設定位置まで移動したら推進ジャッキ9を停止し、函体支持装置11の加圧作動を停止して、必要によりゲート函体51内にバラスト水を注入し、安定重量を確保する。
【0027】
この1ブロックの内側のゲート函体51の設置が完了したら、自走装置15の車輪を下ろして函体支持装置11を次の1ブロックの待機位置まで自走移動により戻し、外側のゲート函体52の下に据え替える。そして再び函体支持装置11の加圧作動によりゲート函体52の底面摩擦を低減して水路部1に移動し、既に設置されているゲート函体51の後端に当接して端面相互を嵌合した後、移動と函体支持装置11の加圧作動とを停止し、ゲート函体52内に必要によりバラスト水を注入し、安定重量を確保する。
【0028】
その後に、両突堤2,2の突端内側とゲート函体52の側端部と間の上記止水材18に注水を行って膨らませ、水密に仕切って閉鎖を完了する。なお、水路部1の開放は上記閉鎖手順を反対に行えばよい。
また閉鎖移動時の推進ジャッキ9は、ゲート函体51に対しては前側に、ゲート函体52の場合には後側に取付けるのが好ましい。このような状態であればゲート函体51からゲート函体52に函体支持装置11を戻す際に、ガイド溝7を推進ジャッキ9が共用していても後方移送の障害とならず、函体支持装置11の入れ替えを迅速に行うことができる。
【0029】
また設置後のゲート函体51の推進ジャッキ9は撤去して、解放時に後側に盛り替えて使用するのが好ましい。撤去により対向側のゲート函体51の推進ジャッキ9の障害とならず、対向側を先行設置したゲート函体51の当接面まで支障なく移動できるからである。当接後の対向側のゲート函体51の推進ジャッキ9は撤去できないので、解放用として残置する。
【0030】
上記施形態では、左右のゲート函体51,52の配列を1列としているが、図12(A)(B)に示すように、複数ブロックで複数列にして、ブロック間で適宜のラップをとって移動することにより、開閉するようにしてもよい。このようにすれば、開門時にゲート函体51,52を収める奥行が少なく済む。さらに突堤を形成しなくとも、水路1が所定幅で狭くなっていれば、水路1の少なくとも一方を切り込むことで、ゲート函体51,52を収めるようにしてもよい。
【0031】
図13〜図16は、基礎部3とゲート函体5の構築例を示すものである。
上記基礎部3は外部を鋼殻とし、その状態で曳航して基礎杭3aを打設した場所まで運搬し、図13に示すように、起重機船21により基礎杭3aの上に沈設する。その後に鋼殻内にコンクリートを打設して水底に設置してから、図14に示すように、クリーン付台船22によりレール等を設置することで完成することができる。
【0032】
上記ゲート函体5は、陸上又は水上で図15に示すように、クローラクレーン23により底版、外壁、隔壁の一部を鉄筋コンクリートにより水上に浮く状態まで構築し、それを曳航により上記基礎部3を設置した場所まで運搬して、図16に示すように沈設したのち、水面上にて残部の構築を行って完成することができる。
【0033】
この実施形態では、基礎部3を鋼殻製、ゲート函体5を鉄筋コンクリート製としているが、鋼殻製は精度的な面からの採用であり、また鉄筋コンクリート製はコスト的な面からの採用によるものであるから、基礎部3を鉄筋コンクリート製、ゲート函体5を鋼殻製としても構成上は何等差支えがなく、要は、この発明の主旨を逸脱しない範囲内であれば、いかなる構成を採用してもよい、というものである。
【図面の簡単な説明】
【図1】 この発明に係わる水門の概略を示す斜視図である。
【図2】 ゲート函体の平面図である。
【図3】 同上の側面図である。
【図4】 水門の水路部における基礎部を縦断して示すとゲート函体の正面図である。
【図5】 ゲート函体相互の当接部位における止水ゴムの止水時(A)と止水前(B)の状態を示す基礎部の部分断面図である。
【図6】 突堤とゲート函体の重なり部分の部分平面図である。
【図7】 ゲート函体に対する函体支持装置と推進ジャッキの配置状態を示すゲート函体と基礎部の部分縦断面図である。
【図8】 ガイド溝内における推進ジャッキの側面図である。
【図9】 同上の拡大正面図である。
【図10】 函体支持装置の作動時(A)と非作動時(B)の状態説明図である。
【図11】 この発明の水門の閉鎖手順の説明図である。
【図12】 他の実施形態の水門の閉鎖手順の説明図である。
【図13】 基礎部の沈設状態図である。
【図14】 基礎部の設置状態図である。
【図15】 ゲート函体の水上構築状態図である。
【図16】 ゲート函体の設置状態図である。
【符号の説明】
1 水路部
2 突堤
3 基礎部
3b コンクリート保護マット
4 海底
5 ゲート函体
6 当接面の止水材
7 ガイド溝
8 ガイドレール
9 推進ジャッキ
10 ガイドプレート
11 函体支持装置
12 低摩擦機構
13 上下移動機構
14 函体受桁
17 止水溝
18 止水ゴムチューブ
19 止水材
20 緩衝材
[0001]
BACKGROUND OF THE INVENTION
This invention is mainly related to large floodgate applicable as seawall sluices for storm surge measures of the port.
[0002]
[Problems to be solved by the invention]
Many of Japan's port cities are located in relatively low positions such as alluvium and landfills, so a flexible response to global warming and sea level rise due to weather changes is required. In particular, in order to form a tide line that closes the entire port including the water area and landfill, it is necessary to install a large sluice that allows large ships to navigate. Although this large sluice is currently under investigation, some of them have an opening of about 450 m, and the following problems are raised in the prior art.
[0003]
・ There are many relatively small ones because they do not assume the passage of large ships.
・ Maintenance and repair are likely to be difficult when using complex machines.
・ In the case of a large-scale gravity sluice, the width of the foundation becomes wider. In addition, opening and closing the sluice is not easy.
[0004]
The present invention has been conceived in order to solve the above-described conventional problems, and its purpose is to make the base width small even for a large sluice gate capable of navigating a large ship, and to make a simple moving device. It is to provide a new sluice gate that can easily open and close even a large gate box.
[0005]
[Means for Solving the Problems]
According to the above-described object, the present invention provides a foundation part installed at the bottom of the water across the water channel part, a plurality of gate boxes that move on the base part to open and close the water channel part, and a base part and a bottom surface of the gate box. A movable box support device provided with a low friction mechanism for reducing friction with the foundation, and a propulsion device provided between the foundation and the gate box. The inside of the jetty is configured as the storage part of the gate box and the landing part of the moving device composed of the box support device and the propulsion device .
[0006]
In addition, the base portion includes a guide plate laid with a guide rail for the box propulsion on the bottom surface of the guide groove arranged in parallel on the upper surface, and the low friction mechanism having the vertical movement mechanism is installed on the guide plate. The box support device slidably accommodated in the groove and the pulling rod mounted on the guide rail and connected to the gate box, and the reaction force is alternately applied to the guide rail and the gate box to support the box. And the propulsion device in the guide groove that moves with the gate box on the device .
[0007]
Moreover, the said box support apparatus equips the box receiving girder provided in the top face of the said vertical movement mechanism with the self-propelled apparatus by a hydraulic or electric wheel .
[0008]
In the above arrangement, in order to significantly reduce the bottom friction of the gate a box body when the moving box-body supporting apparatus, Ru can be applied to the gate a box of large. Also, the box support device and the propulsion device are not incorporated in the foundation or gate box, so every time the sluice gate is opened and closed, it can be landed on the jetty, overhauled and replaced, and maintenance and repair can be performed easily. .
[0009]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 shows an embodiment of a sluice according to the present invention, wherein 1 is a waterway part, 2 is a fixed jetty constructed on both sides of the waterway part 1, and 3 is a waterway part from the side of the jetty 2 and 2. Reference numeral 5 denotes a gate box that moves on the base part and opens and closes the water channel part 1.
[0010]
The gate box 5 is made of reinforced concrete and is divided into four blocks. The contact ends of these blocks are fitted to each other to form a series of sluices that close the water channel portion 1 so as to form a concave end surface and a convex end surface. It forms, and the water stop member 6 is attached to the contact surface along the box outline except a bottom face.
[0011]
The base part 3 is made of a steel shell having a concave cross section and concrete cast in the inside, and the bottom part of the gate box 5 is accommodated between both side edges of the upper surface, causing lateral displacement. The gate box 5 moves in the longitudinal direction. In addition, the both side edges of the upper surface may be formed intermittently, and in some cases, the protrusions may be protruding at regular intervals protruding from both sides of the upper surface.
[0012]
Further, four guide grooves 7 are arranged in the longitudinal direction on the upper surface between the side edges of the base portion 3, and a concrete protective mat 3 b made of an elastic protective material is provided on the upper surface excluding the guide grooves 7. On both sides of the bottom surface of the guide groove 7, a box-propelling guide rail 8 having stoppers 81 on the outer surface at regular intervals is laid. A propulsion device using a hydraulically operated propulsion jack 9 that pulls and moves the gate box 5 using the guide rail 8 as a reaction force is connected to the box end face and disposed in the guide groove 7.
[0013]
Further, a guide plate 10 is laid over the entire length of the bottom surface between the guide rails of each guide groove 7, and the box support device 11 is composed of three sets on the guide plate 10, and six sets are one block. It is installed so as to be located at equal intervals over the entire length of the gate box 5. A box receiving girder 14 is provided on the top surface of the box supporting apparatus 11 to connect the three sets as a set.
[0014]
As shown schematically in FIG. 7, wheels that can freely move up and down are attached to both ends of the box receiving girder 14, and a hydraulic or electric self-propelled device 15 that uses one of the wheels as a driving wheel is mounted on the box receiving girder. It is attached to a girder 14 so that it can be moved for each group. In addition, each set is connected by a connecting pipe 16 in order to maintain a distance, and although omitted in the drawing, a hydraulic hose, an electric cord, or the like is attached to the connecting pipe 16 to hinder the movement of the box support device 11. It ’s like that.
[0015]
Further, as shown in FIG. 5, a water stop groove 17 is partially provided on the upper surface of the base portion 3 below the contact portion between the blocks, and the water stop rubber tube 18 is provided in the water stop groove 17. Is housed. The water blocking rubber tube 18 is a rubber tube having a quadrangular cross section as shown in FIG. 1A. However, in the state where the water blocking groove 17 is closed by the gate box 5, Positioned below the water blocking material 6 and inflated as shown in FIG. (B), the gap between the bottom surface of the box below the contact surface and the top surface of the base portion is shut off in a watertight manner.
In addition, you may provide the water stop groove | channel 17 not only in the contact | abutting site | part of a box but continuous in the longitudinal direction of the base part 3. FIG.
[0016]
In addition, as shown in FIG. 6, a waterproofing material 19 made of rubber packing or a rubber tube or the like that expands by water injection when the water channel portion is closed is attached to the overlapping portion between the inner side of the protruding end of the jetty 2 and the side end portion of the gate box 5. The shock absorbing material 20 by the roller fender is attached to the inner surface of the jetty 2.
[0017]
The propulsion jack 9 has a traction rod 93 connected to a piston rod 92 connected to an end face of the gate box 5 and a hydraulic cylinder 91 on which wheels are movably mounted on the guide rail 8, and a receiving on the hydraulic cylinder. Suspended by a wheel 94 supported by the member, straddles the hydraulic cylinder 91 so as to be movable up and down, and has locking claws 95 at both ends formed on the lower surface of the inclined surface and the rear end formed as an engaging projection. It comprises a fixing member 96 positioned between the stoppers 81 and a counterweight 97 at the end of the arm attached to the end of the rotating shaft of the wheel 94.
[0018]
In such a propulsion jack 9, 9 showing the collapsed state, when subjected to hydraulic pressure on the piston extension side, the hydraulic cylinder over 91 side is to move the gate box making side as a reaction force. Thereby, although illustration is abbreviate | omitted, the pushing jack 9 moves to the left side of a figure, and the latching claw 95 leaves | separates from the stopper 81. FIG. When the locking claw 95 reaches the front stopper 81a by this forward movement, the engaging / disengaging member 96 is automatically raised by the counterweight 94, and the locking claw 95 at both ends gets over the stopper 81a by the inclined surface of the lower surface. The locking claw 95 after getting over is lowered to a position where it is suspended from the counterweight 94 and is positioned in front of the stopper 81a, the propulsion jack 9 is moved forward by the distance of the stopper, and the piston rod 92 is extended. .
[0019]
In this state, when the hydraulic pressure is switched and the pressure is applied to the piston reduction side, the rear end of the locking claw 95 is engaged with the stopper 81a. As a result, in the hydraulic cylinder 91, the piston rod 92 is contracted by the reaction force on the guide rail side, and the gate box 5 is pulled to the contraction limit of the piston by the pulling rod 93 and moves forward by the stopper interval. Therefore, the gate box 5 can be moved to the set position by repeatedly performing the expansion and contraction operation in the hydraulic cylinder 91. Further, at the time of backward movement, it is only necessary to change the direction by rotating the locking claw 95 by 180 degrees, and the gate box 5 can be moved by the same expansion and contraction operation as at the time of forward movement.
[0020]
The box support device 11 includes a low friction mechanism 12 that reduces the bottom friction of the gate box 5 and a vertical movement mechanism 13 on the upper side when the gate box 5 moves as shown in FIG. A box receiving girder 14 is provided on the top surface of the vertical movement mechanism 13 to connect the three groups as a set.
[0021]
The low friction mechanism 12 is surrounded by a primary pressure chamber 123 having a small pressure receiving area and a piston 124 between a disc-shaped support frame 121 on which the vertical movement mechanism 13 is mounted and fixed, and a bottom plate 122. The secondary pressure chamber 125 having a large pressure receiving area is formed of a concentric cylinder, and the load of the gate box 5 placed on the box support device 11 is applied to the periphery of the bottom plate as shown in FIG. It is supported at the lower end of the piston 124. In this state, when water is supplied to the primary pressure chamber 123 at a high pressure, the support frame 121 starts to rise together with the vertical movement mechanism 13, and water is also supplied to the secondary pressure chamber 125.
[0022]
When water is further supplied, the support frame 121 of the vertical movement mechanism 13 is pushed up, and water slightly flows out from the minute holes (not shown) formed in the bottom plate 122, as shown in FIG. A fluid film of water is generated between the bottom plate 122 and the upper surface of the guide plate 10, and the fluid film reduces the bottom friction of the box support device 11 so that the gate box 5 can be slid.
[0023]
When the up-and-down moving mechanism 13 is lifted after the support frame 121 is completely lifted, the gate box 5 that has been supported via the box receiving girder 14 is lifted from the upper surface of the base portion to reduce bottom friction. Will come to be. As a result, in the state where the bottom friction of both the gate box 5 and the box support device 11 is reduced (friction coefficient is 2% or less), the movement by the propulsion jack 9 can be performed smoothly.
[0024]
In the sluice having the above-described structure, as shown in FIG. 11, the inside of the jetties 2 and 2 on both sides of the water channel portion 1 is provided with the storage portion 101 of the gate box 5, and both ends of the jacks 9 and the box support device 11 Can be used as the landing unit 102 of the mobile device.
For example, in the case of a large sluice with a water channel portion 1 of 450 m, the gate box length of 1 block can be set to 115 m and the gate box 5 can be closed by 4 blocks. In addition, the storage unit 101 of the gate box 5 is 240 m, and the landing unit 102 has a length necessary for landing the moving device in the maintenance management of the moving device.
Further, the opening and closing of the water channel portion 1 by the movement of the gate box 5 can be reliably performed by remotely operating the propulsion jack 9 and the box support device 11 on land.
[0025]
FIG. 11 is an explanatory view of a sluice closing procedure. During the opening shown in FIG. 11 (A), the gate box 5 is temporarily placed on the sides of the two jetty ridges 2 and 2, and the moving device is placed underwater at the landing section 102. Pull it up to perform maintenance.
[0026]
Hereinafter, when the operation during the closing operation and the completion of the closing are sequentially shown in FIGS. 11B to 11D, first, the box support device 11 of the landing unit 102 is sent by the self-propelled movement under the inner gate box 51. Include. This transfer is preferably performed in a state where the friction with the guide plate 10 is reduced by pressurizing the low friction mechanism 12. When the set position of the gate box 51 is reached, the wheel of the self-propelled device 15 is raised and the box support device 11 is placed on the guide plate 10. In this state, the low friction mechanism 12 and the vertical movement mechanism 13 are pressurized and actuated to reduce the friction between the base portion 3 and the gate box and the base portion 3 and the box support device 11, and then the propulsion jack 9 is expanded and contracted. Repeatedly, the gate box 51 is moved from both jetties 2 and 2 to the center of the water channel 1. After moving to the central set position, the propulsion jack 9 is stopped, the pressurizing operation of the box support device 11 is stopped, and ballast water is injected into the gate box 51 as necessary to ensure a stable weight.
[0027]
When the installation of the gate box 51 inside the one block is completed, the wheel of the self-propelled device 15 is lowered and the box support device 11 is returned to the standby position of the next one block by self-propelled movement, and the outer gate box is restored. Change to below 52. Then, the bottom face friction of the gate box 52 is reduced by the pressurizing operation of the box support device 11 to move to the water channel portion 1 and contact the rear end of the gate box 51 that has already been installed to fit the end faces together. After the combination, the movement and the pressurizing operation of the box support device 11 are stopped, and ballast water is injected into the gate box 52 as necessary to ensure a stable weight.
[0028]
Thereafter, the water-stopping material 18 between the inner ends of the two piers 2 and 2 and the side end portions of the gate box 52 is poured and inflated, and the water-tight partitioning is completed to complete the closing. In addition, what is necessary is just to perform the opening procedure of the said water channel part 1 reversely.
Further, the propulsion jack 9 at the time of closing movement is preferably attached to the front side with respect to the gate box 51 and to the rear side in the case of the gate box 52. In such a state, when the box support device 11 is returned from the gate box 51 to the gate box 52, the forward jack 9 does not become an obstacle to the backward transfer even if the propulsion jack 9 is shared. The support device 11 can be replaced quickly.
[0029]
Further, it is preferable that the propulsion jack 9 of the gate box 51 after installation is removed and used after being rearranged when released. This is because the removal does not cause an obstacle to the propulsion jack 9 of the gate box 51 on the opposite side, and can move without trouble to the contact surface of the gate box 51 that is installed on the opposite side in advance. Since the jack jack 9 of the gate box 51 on the opposite side after the contact cannot be removed, it is left for release.
[0030]
In the above embodiment, the left and right gate boxes 51 and 52 are arranged in a single row, but as shown in FIGS. 12A and 12B, a plurality of blocks are arranged in a plurality of rows, and appropriate wrapping is performed between the blocks. You may make it open and close by moving. In this way, the depth for accommodating the gate boxes 51 and 52 at the time of opening is small. Further, even if the jetty is not formed, the gate boxes 51 and 52 may be accommodated by cutting at least one of the water channels 1 if the water channel 1 is narrowed with a predetermined width.
[0031]
FIGS. 13-16 shows the construction example of the base part 3 and the gate box 5. FIG.
The foundation 3 is made of a steel shell, and is towed in that state and transported to the place where the foundation pile 3a is placed, and is placed on the foundation pile 3a by a hoist ship 21 as shown in FIG. Thereafter, concrete can be placed in the steel shell and installed on the bottom of the water, and then, as shown in FIG.
[0032]
As shown in FIG. 15, the gate box 5 is constructed by crawler crane 23 so that a part of the bottom plate, outer wall, and partition wall are floated on the water by reinforced concrete, and the foundation 3 is then towed by towing. After transporting to the place where it was installed and sunk as shown in FIG. 16, it can be completed by constructing the rest on the water surface.
[0033]
In this embodiment, the base portion 3 is made of steel shell and the gate box 5 is made of reinforced concrete, but the steel shell is adopted from the precision aspect, and the reinforced concrete is adopted from the cost aspect. Therefore, even if the foundation part 3 is made of reinforced concrete and the gate box 5 is made of steel shell, there is no difference in configuration, and in short, any configuration is adopted as long as it does not depart from the gist of the present invention. You can do it.
[Brief description of the drawings]
FIG. 1 is a perspective view schematically showing a sluice according to the present invention.
FIG. 2 is a plan view of a gate box.
FIG. 3 is a side view of the above.
FIG. 4 is a front view of a gate box when a foundation portion in a water channel portion of a sluice is cut vertically.
FIG. 5 is a partial cross-sectional view of a base portion showing a state (A) and before a water stop (B) of a water stop rubber at a contact portion between gate boxes.
FIG. 6 is a partial plan view of an overlapping portion between a jetty and a gate box.
FIG. 7 is a partial longitudinal sectional view of the gate box and the foundation showing the arrangement of the box support device and the propulsion jack with respect to the gate box.
FIG. 8 is a side view of the propulsion jack in the guide groove.
FIG. 9 is an enlarged front view of the above.
FIGS. 10A and 10B are diagrams for explaining the state of the box support device when it is in operation (A) and when it is not in operation (B).
FIG. 11 is an explanatory diagram of a sluice closing procedure according to the present invention.
FIG. 12 is an explanatory diagram of a sluice closing procedure according to another embodiment.
FIG. 13 is a diagram showing a state where the foundation is set.
FIG. 14 is an installation state diagram of the foundation.
FIG. 15 is a state diagram of the construction of the gate box on the water.
FIG. 16 is an installation state diagram of the gate box.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Waterway part 2 Jetty 3 Base part 3b Concrete protection mat 4 Sea bottom 5 Gate box 6 Water stop material of abutment surface 7 Guide groove 8 Guide rail 9 Propulsion jack 10 Guide plate 11 Box support device 12 Low friction mechanism 13 Vertical movement Mechanism 14 Box receiving girder 17 Water stop groove 18 Water stop rubber tube 19 Water stop material 20 Buffer material

Claims (3)

水路部を横断して水底に設置された基礎部と、基礎部上を移動して水路部を開閉する複数のゲート函体と、基礎部とゲート函体底面との間に設けられ、基礎部との摩擦を低減する低摩擦機構を備えた走行自在な函体支持装置と、基礎部とゲート函体とにわたり設けられた推進装置とからなり、上記基礎部を突堤の内側から水路部に設置し、その突堤の内側をゲート函体の格納部と、上記函体支持装置と推進装置とからなる移動装置の陸揚部に構成してなることを特徴とする水門A foundation part installed on the bottom of the water across the water channel part, a plurality of gate boxes that move on the foundation part to open and close the water channel part, and the foundation part and the bottom surface of the gate box. It is composed of a free-running box support device equipped with a low friction mechanism that reduces friction with the propeller and a propulsion device provided between the foundation and the gate box, and the foundation is installed in the channel from the inside of the jetty And a sluice characterized in that the inside of the jetty is configured as a storage part of a gate box and a landing part of a moving device comprising the box support device and the propulsion device . 上記基礎部は、上面に並設したガイド溝の底面に函体推進用のガイドレールと共に敷設されたガイドプレートを備え、そのガイドプレートに上下移動機構を上部に有する上記低摩擦機構を設置してガイド溝内に走行自在に収容した上記函体支持装置と、上記ガイドレールに載せて牽引ロッドをゲート函体に連結し、そのガイドレールとゲート函体とに反力を交互に取って函体支持装置上のゲート函体と共に移動するガイド溝内の上記推進装置とを具備することを特徴とす請求項1記載の水門The base portion includes a guide plate laid together with a guide rail for box driving on the bottom surface of a guide groove arranged side by side on the upper surface, and the low friction mechanism having an up-and-down moving mechanism on the guide plate is installed on the guide plate. The box support device housed in the guide groove so as to run freely, and the tow rod is connected to the gate box on the guide rail, and the reaction force is alternately applied to the guide rail and the gate box. claim 1 sluice according you characterized by comprising the said propulsion device in the guide groove which moves together with the gate a box body on the support device. 上記函体支持装置は、上記上下移動機構の頂面に設けた函体受桁に油圧又は電動の車輪による自走装置を備えることを特徴とする請求項1又は2記載の水門。 The sluice according to claim 1 or 2, wherein the box support device includes a self-propelled device using hydraulic or electric wheels on a box receiving girder provided on a top surface of the vertical movement mechanism.
JP2002160585A 2002-05-31 2002-05-31 Water gate Expired - Fee Related JP3890527B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002160585A JP3890527B2 (en) 2002-05-31 2002-05-31 Water gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002160585A JP3890527B2 (en) 2002-05-31 2002-05-31 Water gate

Publications (2)

Publication Number Publication Date
JP2004003211A JP2004003211A (en) 2004-01-08
JP3890527B2 true JP3890527B2 (en) 2007-03-07

Family

ID=30429941

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002160585A Expired - Fee Related JP3890527B2 (en) 2002-05-31 2002-05-31 Water gate

Country Status (1)

Country Link
JP (1) JP3890527B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9970170B2 (en) 2012-09-04 2018-05-15 Hiroshi Terata Sluice gate
EP2894259B1 (en) 2012-09-04 2018-02-07 Terata, Hiroshi Sluice
KR101638160B1 (en) * 2016-01-20 2016-07-11 주식회사 동인 Gate for preventing flood damage of slide type

Also Published As

Publication number Publication date
JP2004003211A (en) 2004-01-08

Similar Documents

Publication Publication Date Title
CN111254981B (en) Draw formula suspension tunnel structure to one side under water
CA1095204A (en) Port ramp for access to a roll-on roll-off ship
JP2021063433A (en) Temporary cofferdam, and construction method of closed temporary cofferdam
US4118941A (en) Stressed caisson retained island
JP3890527B2 (en) Water gate
US2050727A (en) Caisson belt apparatus and method
JP3135833B2 (en) How to build underwater structures
JP2021063436A (en) Settling and fixing method for box body constituting temporary cofferdam body, and fixing structure
CN116290104A (en) A construction method for underwater section-by-section installation of an anchored floating tunnel
CN112779967B (en) Construction method for sea-land connecting section of sewage sea area discharge pipe
CN114856271A (en) Structure foundation for prefabricating immersed tube by factory method and arrangement method
JPS5812409B2 (en) Basic equipment for boring platform
CN116464099B (en) A connect bank structure that is used for anchor suspension tunnel to install under water section by section
KR101529091B1 (en) Submerged floating tunnel and construction method thereof
CN215367409U (en) Reusable slope prefabricated immersed tube joint platform device
CN110805044A (en) Working method for stone throwing and tamping integrated ship
GB2157739A (en) Trench shoring apparatus
JP6867559B2 (en) The method of transporting and installing the boxes that make up the temporary cut-off body, and the float carrier for transporting the boxes that make up the temporary cut-off body.
JP4051950B2 (en) Sluice facility
CN109736336B (en) A kind of installation technology of steel sleeve box for bridge pier cap construction
JP3378982B2 (en) Basic structure of underwater tunnel
JP2000120095A (en) How to build an underwater tunnel
JP2021063438A (en) Temporary gate provided to temporary cofferdam and temporary gate lifting system constituting temporary cofferdam
JP6867561B2 (en) The water-stopping structure of the box and bottom plate that make up the temporary cut-off body, and the water-stopping structure of the box and dam pillars that make up the temporary cut-off body.
JPS6233822Y2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060714

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060725

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060921

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061031

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061122

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121215

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees