JP3919079B2 - Construction site ground survey system - Google Patents

Construction site ground survey system Download PDF

Info

Publication number
JP3919079B2
JP3919079B2 JP2002027624A JP2002027624A JP3919079B2 JP 3919079 B2 JP3919079 B2 JP 3919079B2 JP 2002027624 A JP2002027624 A JP 2002027624A JP 2002027624 A JP2002027624 A JP 2002027624A JP 3919079 B2 JP3919079 B2 JP 3919079B2
Authority
JP
Japan
Prior art keywords
building
site
input
building site
ground survey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002027624A
Other languages
Japanese (ja)
Other versions
JP2003227127A (en
Inventor
公 深井
泰夫 岡庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP2002027624A priority Critical patent/JP3919079B2/en
Publication of JP2003227127A publication Critical patent/JP2003227127A/en
Application granted granted Critical
Publication of JP3919079B2 publication Critical patent/JP3919079B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、住宅等の建築地の地盤を調査し、最適な基礎仕様を判定するとともに、その調査結果を地盤調査報告書として出力することが可能な建築地の地盤調査システムに関する。
【0002】
【従来の技術】
従来は、住宅等の建築地の地盤調査においては、スウェーデン式サウンディング試験等の地盤の支持力を測定する地盤調査方法により測定した測定結果や、建築地の周辺の地形、あるいは建築地及びその周辺の状況等の様々な情報を収集した後、専門知識を有した技術者がそれらの情報を集計分析し、各自の知識と経験に基づいて、不同沈下が発生する可能性の判断や、その対策としての基礎仕様の判定等の地盤調査を行なっていた。また、このような建築地の地盤調査の結果は、報告書にまとめて当該建築地に建築する住宅の施主等の顧客に報告するために用いられる場合が多い。
【0003】
【発明が解決しようとする課題】
しかしながら、地盤調査方法により測定した測定結果や、建築地の周辺の地形、あるいは建築地及びその周辺の状況等の収集された様々な情報を集計分析し、不同沈下が発生する可能性の判断や、基礎仕様の判定等を行なうためには、高度の専門知識と経験が必要であり、適切な地盤調査を行なうことができる技術者の数が限られるとともに、新たな技術者の育成に非常に多くの時間を要するという問題があった。
【0004】
また、技術者の各自の知識と経験に基づいて判断を行なうために、地盤調査を行なう技術者によって判断の結果が異なるという問題があった。更に、適切な情報の収集を効率的に行なうことが困難であり、情報収集に多大な時間と労力を要するという問題があった。また、建築地の地盤調査の結果を報告書としてまとめて顧客に報告する場合には、見栄えの良い報告書にする必要があるため、報告書の作成にも多くの時間と労力を要するという問題があった。
【0005】
本発明は、上記課題に鑑みてなされたものであり、建築地の地盤調査に関する高度の専門知識や経験を有しない技術者であっても、少ない時間と労力で容易に質の高い地盤調査を行なうことを可能とするとともに、その地盤調査の結果を容易に見栄えの良い報告書の形式にまとめることを可能とする建築地の地盤調査システムを提供することを技術課題とするものである。
【0006】
【課題を解決するための手段】
上記技術課題を解決するための具体的手段は、次のようなものである。すなわち、請求項1に記載する建築地の地盤調査システムは、所定の地盤調査方法により建築地の地盤の支持力を測定した測定データを格納する測定データ格納手段と、座標を有する電子データである建築地の敷地図データを格納する敷地図格納手段と、前記測定データの測定点を前記敷地図データに関連付けて格納する測定点格納手段と、建築地の基礎仕様判定条件を格納する判定条件格納手段と、これらの各格納手段に格納されるデータを入力する入力手段と、前記測定データ、敷地図データ、及び測定点に基づいて、N値と、該N値のグラフと、自沈層と、支持層とを示す建築地の地層推定断面図を作成する地層断面作成手段と、この地層推定断面図と前記基礎仕様判定条件とに基づいて当該建築地に適した基礎の仕様を判定する基礎仕様判定手段とを有すると共に、前記地層断面作成手段は、前記地層推定断面図を作成する断面を前記敷地図データに関連付けて入力する断面指定手段を有することを特徴とするものである。
【0008】
請求項2に記載する建築地の地盤調査システムは、請求項1に記載する構成において、前記地層推定断面図、及び基礎仕様判定手段による基礎仕様判定結果を含む地盤調査に関する情報を所定の報告書の形式に配置して出力する報告書作成手段を有することを特徴とするものである。
【0009】
請求項3に記載する建築地の地盤調査システムは、請求項2に記載する構成において、地盤調査を行なう建築地に関する情報を格納する建築地情報格納手段を有し、この建築地情報格納手段に格納された情報を、前記報告書を作成する際の地盤調査に関する情報として用いることを特徴とするものである。
【0010】
請求項4に記載する建築地の地盤調査システムは、請求項3に記載する構成において、前記建築地に関する情報として、当該建築地の住所及び顧客情報を含む一般情報、当該建築地及びその周辺の状況、当該建築地周辺の地図、若しくは当該建築地及びその周辺の写真、の一部又は全部を含むことを特徴とするものである。
【0011】
【発明の実施の形態】
以下、本発明に係る建築地の地盤調査システム1について図面に基づいて説明する。図1は、本発明の実施形態に係る建築地の地盤調査システム1の構成を示す説明図である。この図に示すように、本実施形態に係る建築地の地盤調査システム1は、ハードウェア構成として、各種データや動作プログラムを記憶する記憶装置2と、この記憶装置2に記憶されるデータや処理装置3における処理の実行命令等を入力する入力装置4と、この入力装置4からの実行命令に従って記憶装置2に記憶された各種データや動作プログラムに基づく演算処理を行なう処理装置3と、この処理装置3による演算処理の結果等を出力する出力装置5とを有している。このようなハードウェア構成は、パーソナルコンピュータやワークステーション等の汎用装置のほか、専用装置によっても実現することができるが、本実施形態においては、主としてパーソナルコンピュータを用いる場合について説明する。
【0012】
記憶装置2は、各種のデータやプログラム等を記憶する装置であって、ここでは、各種データを格納するデータ格納領域6と、処理装置3の動作制御をおこなうための各種動作プログラムを格納するプログラム格納領域7と、処理装置3が各種動作プログラムに従って動作処理を行なった結果のデータを格納する処理結果格納領域8とを有している。このような記憶装置2としては、具体的には、ハードディスクドライブやその他の記憶媒体を用いた大容量の記憶装置等が用いられる。
【0013】
そして、この記憶装置2のデータ格納領域6には、測定データ9、敷地図データ10、測定点11、基礎仕様判定条件12、及び建築地情報13の各データが格納されている。したがって、この記憶装置2は、所定の地盤調査方法により建築地の地盤の支持力を測定した測定データ9を格納する測定データ格納手段、建築地の敷地図データ10を格納する敷地図格納手段、測定データ9の測定点11を敷地図データ10に関連付けて格納する測定点格納手段、建築地の基礎仕様判定条件12を格納する判定条件格納手段、及び地盤調査を行なう建築地に関する情報すなわち建築地情報13を格納する建築地情報格納手段の各格納手段を構成することとなる。
【0014】
ここで、測定データ9とは、所定の地盤調査方法により建築地の地盤の支持力を測定した結果のデータであって、後述する地層推定断面図14(図3参照)を作成するために用いられるデータである。このため、測定データ9は、地盤の各深度における支持力を把握できるものとする必要がある。そこで、本実施形態においては、地盤調査方法としてスウェーデン式サウンディング試験を用いることとしている。この地盤調査方法は、所定の貫入ロッドを地盤に対して垂直に貫入する際の各深度における地盤の抵抗値を検査する方法であって、この方法によれば、地盤の各深度における支持力や土質等を把握することができる。この測定データ9は、1つの建築地について複数の測定点11で測定され、各測定点11毎に記憶装置2に格納される。また、本実施形態においては、地盤調査を専用の地盤調査装置15により行ない、その出力データを測定データ9として入力して記憶装置2に格納することとしている。この地盤調査装置15からの測定データ9の入力方法としては、地盤調査装置15と処理装置3とを入力装置4の通信装置16を用いてインターネット等により接続し、データ送信を行なうことによって入力する方法や、地盤調査装置15の出力データを一旦磁気ディスク等の記録媒体に記憶させてから、当該記録媒体を入力装置4の記録媒体ドライブ17により読み出して入力する方法や、入力装置4のキーボード18とマウス19を用いて手入力する方法等がある。
【0015】
敷地図データ10とは、地盤調査を行なう対象の建築地の敷地の図面データのことである。この敷地図データ10は、測定データ9を測定した測定点11と関連付けることができようにするため、座標を有する電子データとする。そこで、本実施形態においては、CAD(Computer Aided Design)装置20により描いた当該建築地の敷地の平面図を敷地図データ10として入力して記憶装置2に格納する。このCAD装置20からの敷地図データ10の入力方法としては、CAD装置20と処理装置3とを入力装置4の通信装置16を用いてLAN(Local Area Network)等により接続し、データ送信を行なうことによって入力する方法や、CAD装置20により描いた敷地図データ10を一旦磁気ディスク等の記録媒体に記憶させてから、当該記録媒体を入力装置4の記録媒体ドライブ17により読み出して入力する方法等がある。
【0016】
測定点11とは、建築地の敷地上における測定データ9を測定した点の座標データのことである。前述の測定データ9は、この測定点11毎に測定されて記憶装置2に格納されている。そして、本実施形態においては、この測定点11は、前述の座標を有する敷地図データ10の敷地図上における座標データとして、敷地図データ10に関連付けられた状態で格納される。そのため、この測定点11の入力に際しては、地層断面作成プログラム21に従って動作する処理装置3によって、出力装置5のモニタ22に敷地図データ10の敷地図とともに、測定点11の座標入力を求める測定点11の入力画面が表示されるので、その入力画面に従い、入力装置4のキーボード18及びマウス19を用いて敷地図上に測定点11の座標を入力することにより測定点11が敷地図データ10に関連付けられて格納される。
【0017】
基礎仕様判定条件12とは、建築地の基礎仕様を判定する際の条件となる事項についてのデータであって、具体的には、以下のような事項が含まれる。すなわち、当該建築地が、これから造成されるのか、現状で更地の状態であるのか、又は既に建築物が存在する土地の建替えであるのかといった「造成タイプ」や、当該建築地が、現状で水平な土地であるのか、現状で傾斜している土地であるのかといった「造成条件」や、既に当該建築地に盛土がされているのか否かといった「旧盛土の有無」や、このような旧盛土がある場合にはその盛土がされてから何年が経過しているのかといった「盛土経年」や、当該建築地にされている盛土が一部にされているのか、全体にされているのか、一部が盛土で一部が切土の切り盛りであるのかといった「造成種類」や、当該建築地に擁壁があるのか否かといった「擁壁の有無」や、敷地条件により切土が可能であるのか、切土が不可能であるのかといった「切土の可否」等の事項が基礎仕様判定条件12に含まれる。そして、この基礎仕様判定条件12の入力に際しては、基礎仕様判定プログラム23に従って動作する処理装置3によって、出力装置5のモニタ22に基礎仕様判定条件12の入力画面が表示されるので、その入力画面に従い、入力装置4のキーボード18及びマウス19を用いて所定の項目の入力を行なうことにより、基礎仕様判定条件12を入力することができる。
【0018】
建築地情報13とは、地盤調査を行なう対象の建築地に関する各種の情報についてのデータであって、本実施形態においては、一般情報24、建築地状況25、周辺地図26、及び周辺写真27が含まれている。なお、建築地情報13としては、これらの一部のみを含むものとすることもできる。ここで、一般情報24とは、当該建築地の住所、顧客氏名等の顧客情報、担当営業所や調査担当者や設計担当者等の担当情報、受付日や調査日等の日付情報等、各種の一般的な情報のことである。この一般情報24の入力に際しては、報告書作成プログラム28に従って動作する処理装置3によって、出力装置5のモニタ22に一般情報24の入力画面が表示されるので、その入力画面に従い、入力装置4のキーボード18及びマウス19を用いて所定の項目の入力を行なうことにより、一般情報24を入力することができる。
【0019】
建築地状況25とは、当該建築地の状況及び当該建築地の周辺の状況に関する情報であって、具体的には、当該建築地の周辺の地形や、造成地盤の地形や、造成以前の地形や、過去の自然災害の有無及びその種類等の地形造成状況、当該建築地の土質や、既存の建築物の種類や、擁壁の有無及びその種類、地下埋設物の有無及びその種類等の敷地状況、あるいは、当該建築地の周辺の建築物の種類や、道路の路面状況等の周辺状況等の情報が含まれる。この建築地状況25の入力に際しては、報告書作成プログラム28に従って動作する処理装置3によって、出力装置5のモニタ22に建築地状況25の入力画面が表示されるので、その入力画面に従い、入力装置4のキーボード18及びマウス19を用いて所定の項目の入力を行なうことにより、建築地状況25を入力することができる。
【0020】
周辺地図26とは、当該建築地の周辺の情報を表わす各種の地図であって、具体的には、当該建築地の周辺の道路や建築物の状況を示す都市地図や、当該建築地の周辺の地形を示す地形図や、当該建築地の周辺の地質等を示す土地条件図や、当該建築地の周辺の古い時代の地図である古地図等が含まれる。本実施形態においては、日本全国における上記各種の地図のデータを格納した地図データベース29を用いることとしている。すなわち、周辺地図26の入力に際しては、入力装置4のキーボード18及びマウス19を用いて処理装置3から地図データベース29を読み出し、当該建築地の周辺の必要な地図のデータを取り出して、記憶装置2に格納することにより、周辺地図26を入力することができる。また、通常の紙に印刷された各種の地図を入力装置4のスキャナ30により電子データとして読み取って記憶装置2に格納することによっても周辺地図26を入力することができる。
【0021】
周辺写真27とは、当該建築地及びその周辺の状況を撮影した写真であって、具体的には、当該建築地に既存の建築物がある場合には、その建築物の各部の写真や、周辺の道路の路面状況を撮影した写真や、既存の建築物を解体した場合には、その解体後の建築地の写真や、測定点11の周囲の写真や、擁壁がある場合には擁壁の状況を撮影した写真等が含まれる。この周辺写真27の入力に際しては、その写真を入力装置4のデジタルカメラ31により撮影した場合には、そのデジタルカメラ31から処理装置3を介して記憶装置2に格納することにより入力することができる。また、その写真を通常のフィルムを用いるカメラにより撮影した場合には、現像した写真を入力装置4のスキャナ30により電子データとして読み取って記憶装置2に格納することによっても周辺写真27を入力することができる。
【0022】
また、記憶装置2のプログラム格納領域7には、地層断面作成プログラム21、基礎仕様判定プログラム23、及び報告書作成プログラム28の各動作プログラムが格納されている。そして、これらの各動作プログラムに従って処理装置3が動作することにより、処理装置3は地層断面作成手段、基礎仕様判定手段、及び報告書作成手段の各処理手段を構成することとなる。したがって、この記憶装置2は、処理装置3と一体となることによって、これらの各処理手段をも構成するものである。なお、これらの各処理手段による動作処理については後述する。
【0023】
また、記憶装置2の処理結果格納領域8には、処理装置3が、地層断面作成プログラム21に従って動作した結果作成された地層推定断面図14、基礎仕様判定プログラム23に従って動作した結果作成された基礎仕様判定結果32、及び報告書作成プログラム28に従って動作した結果作成された地盤調査の報告書33が、処理結果のデータとして格納されている。
【0024】
入力装置4は、記憶装置2に記憶される各種のデータや処理装置3における処理の実行命令等を入力する装置であって、本実施形態においては、キーボード18、マウス19、磁気ディスクドライブやMOドライブ等の記録媒体ドライブ17、LANに接続するためのLANボードやインターネットに接続するためのモデム等の通信装置16、スキャナ30、及びデジタルカメラ31を有して構成されている。そして、この入力装置4が入力手段を構成することとなる。この入力装置4を用いた各種データの入力方法は、上述の通りである。
【0025】
処理装置3は、入力装置4のキーボード18又はマウス19等からの実行命令に従って、記憶装置2に記憶された各種データや動作プログラムに基づく演算処理を行なう装置であって、ここでは、CPU(Central Processing Unit)34とRAM(Random Access Memory)35とを有して構成されている。そして、この処理装置3が、記憶装置2のプログラム格納領域7に格納されている地層断面作成プログラム21、基礎仕様判定プログラム23、及び報告書作成プログラム28の各動作プログラムに従って動作することにより、処理装置3は地層断面作成手段、基礎仕様判定手段、及び報告書作成手段の各処理手段を構成する。すなわち、処理装置3は、地層断面作成プログラム21に従って動作することにより、測定データ9、敷地図データ10、及び測定点11に基づいて建築地の地層推定断面図14(図3参照)を作成する地層断面作成手段を構成し、基礎仕様判定プログラム23に従って動作することにより、地層推定断面図14と基礎仕様判定条件12とに基づいて当該建築地に適した基礎の仕様を判定する基礎仕様判定手段を構成し、報告書作成プログラム28に従って動作することにより、地層推定断面図14及び基礎仕様判定結果32を含む地盤調査に関する情報を所定の報告書33の形式に配置して出力する報告書作成手段を構成する。この処理装置3がこれらの各動作プログラムに従って動作する際の動作処理については、後述する。
【0026】
出力装置5は、処理装置3による演算処理の結果や、入力装置4により入力された内容や、記憶装置2に記憶された各種データの内容等を出力する装置であって、本実施形態においては、それらを画面に表示出力するモニタ22と、紙に印字出力するプリンタ36とを有して構成されている。出力装置5により出力される内容としては、具体的には、プリンタ36には、地層推定断面図14(図3参照)や、地盤調査の報告書33等が出力される。モニタ22には、これらのプリンタ36に出力されるのと同じ内容に加えて、各種動作プログラムに従って表示される各種データの入力画面や、入力装置4により入力された内容、記憶装置2に記憶された各種データの内容等が出力される。そして、この出力装置5が出力手段を構成することとなる。
【0027】
次に、処理装置3が記憶装置2のプログラム格納領域7に記憶された各動作プログラムに従って動作する際の動作処理について説明する。まず、処理装置3が地層断面作成プログラム21に従って建築地の地層推定断面図を作成する際の動作処理について、図2に示すフローチャートに基づいて説明する。この動作処理は、前述の所定の方法により、測定データ9が各測定点11毎に記憶装置2に格納されているとともに、当該建築地の敷地図データ10も記憶装置2に格納されている状態において行なう。
【0028】
まず、入力装置4により地層断面作成プログラム21の実行命令が入力されたか否かについて判断する(S1)。地層断面作成プログラム21の実行命令が入力されていない場合には(S1:NO)、そのまま待機する。地層断面作成プログラム21の実行命令が入力された場合には(S1:YES)、記憶装置2から敷地図データ10を読み出して出力装置5のモニタ22に表示する(S2)。次に、測定点11の入力画面をモニタ22に表示する(S3)。この測定点11の入力画面は敷地図データ10の敷地図とともにモニタ22に表示され、入力装置4によってこの敷地図上に測定点11の座標を入力することにより測定点11が入力される。そして、測定点11の入力が終了したか否かについて判断する(S4)。測定点11の入力が終了していない場合には(S4:NO)、処理はS3へ戻り、測定点11の入力画面を継続して表示する。
【0029】
測定点11の入力が終了した場合には(S4:YES)、次に、地層推定断面図14を作成する断面の入力画面をモニタ22に表示する(S5)。この断面の入力画面も、測定点11の入力画面と同様に、敷地図データ10の敷地図とともにモニタ22に表示される。そして、この敷地図上に断面を生成する線の始点と終点の座標を入力することにより地層推定断面図を作成する断面が敷地図データ10に関連付けられて入力される。これにより、処理装置3が地層断面作成プログラム21に従って動作することにより構成される地層断面作成手段は、地層推定断面図を作成する断面を敷地図データに関連付けて入力する断面指定手段を有することとなる。次に、地層推定断面図14を作成する断面の入力が終了したか否かについて判断する(S6)。地層推定断面図14を作成する断面の入力が終了していない場合には(S6:NO)、処理はS5へ戻り、地層推定断面図14を作成する断面の入力画面を継続して表示する。そして、地層推定断面図14を作成する断面の入力が終了した場合には(S6:YES)、測定データ9、敷地図データ10、及び測定点11に基づいて、入力された断面についての地層推定断面図14を作成する(S7)。
【0030】
図3は、地層推定断面図14の具体例である。この図に示すように、地層推定断面図14には、当該断面上にある測定点11、各測定点11における測定データ9から算出したN値のグラフ37、及び、ハッチングが施されて表わされている自沈層38と支持層39等が表わされており、当該建築地の地盤の支持力が一見して容易にわかるようになっている。なお、測定データ9から算出したN値とは、スウェーデン式サウンディング試験により得られる値であって、このN値が大きい程硬い地盤であるといえる。
【0031】
その後、地層推定断面図14の編集画面をモニタ22に表示する(S8)。この地層推定断面図14の編集画面において、入力装置4を用いて作成された地層推定断面図14の編集を行なうことができる。そして、地層推定断面図14の編集が終了したか否かについて判断する(S9)。編集が終了していない場合には(S9:NO)、処理はS8へ戻り、地層推定断面図14の編集画面を継続して表示する。編集が終了した場合には(S9:YES)、作成された地層推定断面図14をモニタ22に表示するとともに、記憶装置2の処理結果格納領域8に格納する(S10)。その後、作成された地層推定断面図14を紙に印字出力するか否かについて判断する(S11)。この判断は、入力装置4により印字出力の実行命令が入力されたか否かにより行なう。そして、印字出力する場合には(S11:YES)、記憶装置2の処理結果格納領域8に格納された地層推定断面図14を出力装置5のプリンタ36により紙に印字出力し(S12)、処理は終了する。印字出力しない場合には(S11:NO)、そのまま処理は終了する。
【0032】
次に、処理装置3が基礎仕様判定プログラム23に従って当該建築地に適した基礎の仕様を判定する際の動作処理について、図4に示すフローチャートに基づいて説明する。この動作処理は、前述の処理により、当該建築地の地層推定断面図14が作成されて記憶装置2の処理結果格納領域8に格納されている状態において行なう。
【0033】
まず、入力装置4により基礎仕様判定プログラム23の実行命令が入力されたか否かについて判断する(S21)。基礎仕様判定プログラム23の実行命令が入力されていない場合には(S21:NO)、そのまま待機する。基礎仕様判定プログラム23の実行命令が入力された場合には(S21:YES)、基礎仕様判定条件12の入力画面を出力装置5のモニタ22に表示する(S22)。この入力画面に従って所定の項目の入力を行なうことにより、基礎仕様判定条件12を入力することができる。そして、基礎仕様判定条件12の入力が終了したか否かについて判断する(S23)。基礎仕様判定条件12の入力が終了していない場合には(S23:NO)、処理はS22へ戻り、基礎仕様判定条件12の入力画面を継続して表示する。
【0034】
基礎仕様判定条件12の入力が終了した場合には(S23:YES)、既に作成された地層推定断面図14と入力された基礎仕様判定条件12とに基づいて当該建築地に適した基礎の仕様を判定する(S24)。この基礎仕様の判定は、地層推定断面図14から得られる地盤の支持力の大きさと、基礎仕様判定条件12とに基づいて、複数の基礎仕様の中から最も適した基礎仕様を選択することにより行なわれる。本実施形態においては、不同沈下の防止の必要がない場合に用いる基礎仕様としての標準基礎、不同沈下の防止の必要がある場合に用いる基礎仕様として、平面的な基礎を設けるベタ基礎、地盤の表層を固化材等により固化させて強化した上に基礎を設ける表層改良工法、固化材等により地盤の内部に柱状の固化した部分を形成して強化した上に基礎を設ける柱状改良工法、地盤に鋼管杭を打ち込んでその上に基礎を設ける鋼管杭工法等の中から最適な基礎仕様を選択できることとしている。
【0035】
そして、判定された結果である基礎仕様判定結果32をモニタ22に表示するとともに、記憶装置2の処理結果格納領域8に格納する(S25)。その後、作成された基礎仕様判定結果32を紙に印字出力するか否かについて判断する(S26)。この判断は、入力装置4により印字出力の実行命令が入力されたか否かにより行なう。そして、印字出力する場合には(S26:YES)、記憶装置2の処理結果格納領域8に格納された基礎仕様判定結果32を出力装置5のプリンタ36により紙に印字出力し(S27)、処理は終了する。印字出力しない場合には(S26:NO)、そのまま処理は終了する。
【0036】
次に、処理装置3が報告書作成プログラム28に従って当該建築地の地盤調査の報告書33を作成する際の動作処理について、図5に示すフローチャートに基づいて説明する。この動作処理は、地層推定断面図14及び基礎仕様判定結果32が作成されて記憶装置2の処理結果格納領域8に格納されており、なおかつ、建築地情報13のうちの周辺地図26、及び周辺写真27が記憶装置2に格納されている状態において行なう。
【0037】
まず、入力装置4により報告書作成プログラム28の実行命令が入力されたか否かについて判断する(S31)。報告書作成プログラム28の実行命令が入力されていない場合には(S31:NO)、そのまま待機する。報告書作成プログラム28の実行命令が入力されてた場合には(S31:YES)、建築地情報13のうちの一般情報24の入力画面を出力装置5のモニタ22に表示する(S32)。この入力画面に従って所定の項目の入力を行なうことにより、一般情報24を入力することができる。そして、一般情報24の入力が終了したか否かについて判断する(S33)。一般情報24の入力が終了していない場合には(S33:NO)、処理はS32へ戻り、一般情報24の入力画面を継続して表示する。一般情報24の入力が終了した場合には(S33:YES)、次に、建築地情報13のうちの建築地状況25の入力画面を出力装置5のモニタ22に表示する(S34)。この入力画面に従って所定の項目の入力を行なうことにより、建築地状況25を入力することができる。そして、建築地状況25の入力が終了したか否かについて判断する(S35)。建築地状況25の入力が終了していない場合には(S35:NO)、処理はS34へ戻り、建築地状況25の入力画面を継続して表示する。
【0038】
建築地状況25の入力が終了した場合には(S35:YES)、既に作成された地層推定断面図14及び基礎仕様判定結果32を含む地盤調査に関する情報を、所定の形式に配置して報告書33を作成する(S36)。ここで、報告書33に記載する地盤調査に関する情報としては、前述の地層推定断面図14及び基礎仕様判定結果32に加えて、敷地図データ10、測定データ9、測定点11、及び建築地情報13等を含めることができる。また、この建築地情報13には、一般情報24、建築地状況25、周辺地図26、及び周辺写真27が含まれる。そして、これらの各種地盤調査に関する情報を、所定の形式に配置して報告書を作成する。また、この報告書33は通常複数ページを有するものとなるので、ここでは、一般情報24の顧客氏名や調査日等の内容を反映した表紙を自動的に作成し、それを報告書33の最初のページとするようにしている。
【0039】
そして、作成された報告書33をモニタに表示するとともに、記憶装置2の処理結果格納領域8に格納する(S37)。その後、作成された報告書33を紙に印字出力するか否かについて判断する(S38)。この判断は、入力装置4により印字出力の実行命令が入力されたか否かにより行なう。そして、印字出力する場合には(S38:YES)、記憶装置2の処理結果格納領域8に格納された報告書33を出力装置5のプリンタ36により紙に印字出力し(S39)、処理は終了する。印字出力しない場合には(S38:NO)、そのまま処理は終了する。
【0040】
【発明の効果】
以上説明したように、本発明の請求項1に係る建築地の地盤調査システムによれば、所定の地盤調査方法により建築地の地盤の支持力を測定した測定データと、建築地の敷地図データと、敷地図データに関連付けられた測定データの測定点とに基づいて地盤調査の対象となる建築地の地層推定断面図を自動的に作成できるとともに、この地層推定断面図と、入力された基礎仕様判定条件とに基づいて当該建築地に適した基礎の仕様を判定することができる。したがって、様々な情報を集計分析するために要する労力と時間を大幅に削減することができるとともに、建築地の地盤調査に関する高度の専門知識や経験を有しない技術者であっても、容易に質の高い地盤調査を行なうことができる。さらに、前記地層断面作成手段が、地層推定断面図を作成する断面を前記敷地図データに関連付けて入力する断面指定手段を有することにより、複数の地層推定断面図を必要に応じて自由に作成することができる。
【0042】
本発明の請求項2に係る建築地の地盤調査システムによれば、上述の効果に加えて、前記地層推定断面図、及び基礎仕様判定手段による基礎仕様判定結果を含む地盤調査に関する情報を所定の報告書の形式に配置して出力する報告書作成手段を有することにより、地層断面作成手段により作成した地層推定断面図、及び基礎仕様判定手段により作成した基礎仕様判定結果等を用いて、その地盤調査の結果を容易に見栄えが良くわかり易い報告書の形式にまとめることができる。
【0043】
本発明の請求項3又は4に係る建築地の地盤調査システムによれば、上述の効果に加えて、建築地情報として、建築地の住所及び顧客情報を含む一般情報、当該建築地及びその周辺の状況、当該建築地周辺の地図、若しくは当該建築地及びその周辺の写真等の様々な情報を報告書にまとめて記載することができるので、報告書をより一層わかり易いものとすることができる。
【図面の簡単な説明】
【図1】本発明の実施形態に係る建築地の地盤調査システムの構成を示す説明図である。
【図2】本発明の実施形態に係る建築地の地盤調査システムの処理装置が地層断面作成プログラムに従って建築地の地層推定断面図を作成する際の動作処理を示すフローチャートである。
【図3】本発明の実施形態に係る建築地の地盤調査システムにより作成した地層推定断面図の具体例を示す図である。
【図4】本発明の実施形態に係る建築地の地盤調査システムの処理装置が基礎仕様判定プログラムに従って当該建築地に適した基礎の仕様を判定する際の動作処理を示すフローチャートである。
【図5】本発明の実施形態に係る建築地の地盤調査システムの処理装置が報告書作成プログラムに従って当該建築地の地盤調査の報告書を作成する際の動作処理を示すフローチャートである。
【符号の説明】
1 建築地の地盤調査システム
2 記憶装置
3 処理装置
4 入力装置
5 出力装置
6 記憶装置のデータ格納領域
7 記憶装置のプログラム格納領域
8 記憶装置の処理結果格納領域
9 測定データ
10 敷地図データ
11 測定点
12 基礎仕様判定条件
13 建築地情報
14 地層推定断面図
21 地層断面作成プログラム
22 出力装置のモニタ
23 基礎仕様判定プログラム
24 一般情報
25 建築地状況
26 周辺地図
27 周辺写真
28 報告書作成プログラム
32 基礎仕様判定結果
33 報告書
36 出力装置のプリンタ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a ground survey system for a building that can investigate the ground of a building such as a house, determine an optimum basic specification, and output the survey result as a ground survey report.
[0002]
[Prior art]
Conventionally, in the ground survey of residential buildings, etc., the measurement results measured by the ground survey method that measures the bearing capacity of the ground, such as the Swedish sounding test, the topography around the building site, or the building site and its surroundings After collecting various information such as the situation of the person, an engineer who has specialized knowledge collects and analyzes the information, and based on their own knowledge and experience, determines the possibility of undue subsidence and measures against it As a result, ground investigation such as judgment of basic specifications was conducted. In addition, the results of such ground surveys are often used for reporting to customers such as owners of houses to be built on the building site.
[0003]
[Problems to be solved by the invention]
However, the collected results such as the measurement results measured by the ground survey method, the terrain around the building area, or the situation of the building area and its surroundings are tabulated and analyzed to determine the possibility of unsettled settlement. In order to determine basic specifications, etc., advanced expertise and experience are required, and the number of engineers who can perform appropriate ground surveys is limited, and it is extremely useful for training new engineers. There was a problem that it took a lot of time.
[0004]
In addition, in order to make a judgment based on the knowledge and experience of each engineer, there is a problem that the result of the judgment varies depending on the engineer who conducts the ground survey. Furthermore, it is difficult to efficiently collect appropriate information, and there is a problem that it takes a lot of time and labor to collect information. In addition, when the results of the ground survey of the building site are compiled into a report and reported to the customer, it is necessary to make the report look good, so it takes a lot of time and effort to prepare the report. was there.
[0005]
The present invention has been made in view of the above problems, and even an engineer who does not have a high level of expertise and experience regarding ground surveys in a building site can easily conduct high-quality ground surveys with less time and effort. It is a technical problem to provide a ground survey system for a building site that can be performed and can easily compile the results of the ground survey into a good-looking report format.
[0006]
[Means for Solving the Problems]
Specific means for solving the above technical problems are as follows. That is, the building ground survey system according to claim 1 is a measurement data storage means for storing measurement data obtained by measuring the bearing capacity of the building ground by a predetermined ground survey method;Electronic data with coordinatesSite map storage means for storing site map data of a building site, measurement point storage means for storing measurement points of the measurement data in association with the site map data, and determination condition storage for storing basic specification determination conditions of the building site Means, input means for inputting data stored in each storage means, based on the measurement data, site map data, and measurement points, N value, graph of the N value, self-settled layer, and support layerA stratum section creating means for creating a stratum estimated sectional view of a building site, and a basic specification judging means for judging the specifications of the foundation suitable for the building ground based on the stratum estimated sectional view and the basic specification judging conditions.In addition, the formation section creating means has a section designating section for inputting a section for creating the formation estimated sectional view in association with the site map data.It is characterized by this.
[0008]
Claim 2The ground survey system for building sites described inClaim 1In the configuration described in the above, it has a report creation means for arranging and outputting information related to ground survey including the estimated geological sectional view and the basic specification determination result by the basic specification determination means in a predetermined report format. It is what.
[0009]
Claim 3The ground survey system for building sites described inClaim 2In the structure described in the above, it has a building site information storage means for storing information on a building site to be subjected to a ground survey, and the information stored in the building site information storage unit is related to a ground survey when creating the report. It is used as information.
[0010]
Claim 4The ground survey system for building sites described inClaim 3In the configuration described in the above, as the information on the building site, general information including the address of the building site and customer information, the situation of the building site and its surroundings, a map around the building site, or the building site and its surroundings It includes a part or all of a photograph.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a ground survey system 1 for a building according to the present invention will be described with reference to the drawings. FIG. 1 is an explanatory diagram showing a configuration of a ground survey system 1 for a building according to an embodiment of the present invention. As shown in this figure, the ground survey system 1 for a building site according to the present embodiment includes a storage device 2 that stores various data and operation programs as a hardware configuration, and data and processing stored in the storage device 2. An input device 4 for inputting an execution instruction or the like of processing in the device 3, a processing device 3 for performing arithmetic processing based on various data and operation programs stored in the storage device 2 in accordance with the execution command from the input device 4, and the processing And an output device 5 for outputting the result of the arithmetic processing by the device 3. Such a hardware configuration can be realized not only by a general-purpose device such as a personal computer and a workstation, but also by a dedicated device. In the present embodiment, a case where a personal computer is mainly used will be described.
[0012]
The storage device 2 is a device that stores various data, programs, and the like. Here, the data storage area 6 that stores various data and a program that stores various operation programs for controlling the operation of the processing device 3. It has a storage area 7 and a processing result storage area 8 for storing data resulting from operation processing performed by the processing device 3 in accordance with various operation programs. As such a storage device 2, specifically, a large-capacity storage device using a hard disk drive or other storage medium is used.
[0013]
In the data storage area 6 of the storage device 2, measurement data 9, site map data 10, measurement points 11, basic specification determination conditions 12, and building site information 13 are stored. Therefore, the storage device 2 includes a measurement data storage means for storing measurement data 9 obtained by measuring the bearing capacity of the ground of the building by a predetermined ground survey method, a site map storage means for storing the site map data 10 of the building, Measurement point storage means for storing the measurement points 11 of the measurement data 9 in association with the site map data 10; determination condition storage means for storing the basic specification determination conditions 12 for the building area; Each storage means of the building site information storage means for storing the information 13 is configured.
[0014]
Here, the measurement data 9 is data obtained as a result of measuring the bearing capacity of the ground of the building site by a predetermined ground survey method, and is used to create a formation estimated sectional view 14 (see FIG. 3) described later. Data. For this reason, it is necessary for the measurement data 9 to be able to grasp the supporting force at each depth of the ground. Therefore, in this embodiment, the Swedish sounding test is used as the ground survey method. This ground survey method is a method for inspecting the resistance value of the ground at each depth when penetrating a predetermined penetration rod perpendicularly to the ground, and according to this method, The soil quality can be grasped. The measurement data 9 is measured at a plurality of measurement points 11 for one building site and stored in the storage device 2 for each measurement point 11. In the present embodiment, the ground survey is performed by the dedicated ground survey device 15, and the output data is input as the measurement data 9 and stored in the storage device 2. As a method for inputting the measurement data 9 from the ground survey device 15, the ground survey device 15 and the processing device 3 are connected by using the communication device 16 of the input device 4 via the Internet or the like and input by performing data transmission. A method, a method in which output data of the ground survey device 15 is temporarily stored in a recording medium such as a magnetic disk, and the recording medium is read and input by the recording medium drive 17 of the input device 4 or a keyboard 18 of the input device 4 And manual input using the mouse 19.
[0015]
The site map data 10 is drawing data of a site of a building site to be subjected to ground survey. The site map data 10 is electronic data having coordinates so that the measurement data 9 can be associated with the measured measurement point 11. Therefore, in the present embodiment, a plan view of the site of the building site drawn by a CAD (Computer Aided Design) device 20 is input as site map data 10 and stored in the storage device 2. As a method for inputting the site map data 10 from the CAD device 20, the CAD device 20 and the processing device 3 are connected by a LAN (Local Area Network) or the like using the communication device 16 of the input device 4 to transmit data. The site map data 10 drawn by the CAD device 20 is temporarily stored in a recording medium such as a magnetic disk, and then the recording medium is read and input by the recording medium drive 17 of the input device 4. There is.
[0016]
The measurement point 11 is the coordinate data of the point which measured the measurement data 9 on the site of a building area. The aforementioned measurement data 9 is measured at each measurement point 11 and stored in the storage device 2. And in this embodiment, this measurement point 11 is stored in the state linked | related with the site map data 10 as coordinate data on the site map of the site map data 10 which has the above-mentioned coordinate. Therefore, when inputting the measurement point 11, the processing device 3 operating according to the formation section creation program 21 determines the coordinate input of the measurement point 11 together with the site map of the site map data 10 on the monitor 22 of the output device 5. 11 input screen is displayed. According to the input screen, the coordinates of the measurement point 11 are input on the site map using the keyboard 18 and the mouse 19 of the input device 4, so that the measurement point 11 becomes the site map data 10. Stored in association.
[0017]
The basic specification determination condition 12 is data on matters that serve as conditions when determining the basic specifications of a building site, and specifically includes the following items. In other words, whether the construction site is to be constructed, is currently in a state of lands, or is a rebuilding of land that already has buildings, It is a "landing condition" such as whether it is a horizontal land or a sloping land in the current situation, "presence or absence of old embankment" such as whether or not the construction site has already been embanked, and such If there is an old embankment, it is the whole of whether it is part of the embankment that is in the “landfill age” such as how many years have passed since the embankment was done, or the building site concerned Depending on the site conditions, there is a “creation type”, such as whether some are embankment and some are cut, and whether there is a retaining wall in the construction site, or the site conditions. Whether it is possible or impossible to cut It was "whether the Cut" and the like of the matter is included in the base specification decision condition 12. When inputting the basic specification determination condition 12, an input screen for the basic specification determination condition 12 is displayed on the monitor 22 of the output device 5 by the processing device 3 operating according to the basic specification determination program 23. Accordingly, the basic specification determination condition 12 can be input by inputting predetermined items using the keyboard 18 and the mouse 19 of the input device 4.
[0018]
The building site information 13 is data about various types of information regarding the building site to be subjected to the ground survey. In this embodiment, the general information 24, the building site situation 25, the surrounding map 26, and the surrounding photo 27 are included. include. Note that the building site information 13 may include only a part of these. Here, the general information 24 includes various information such as the address of the building site, customer information such as the customer's name, responsible information such as the sales office, the investigator, and the designer, date information such as the reception date and the survey date, etc. It is general information. When the general information 24 is input, the processing device 3 operating according to the report creation program 28 displays the input screen for the general information 24 on the monitor 22 of the output device 5. By inputting predetermined items using the keyboard 18 and the mouse 19, the general information 24 can be input.
[0019]
The building site status 25 is information on the status of the building site and the surroundings of the building site. Specifically, the topography around the building site, the topography of the creation ground, and the topography before the creation. And the status of terrain development including the presence and type of past natural disasters, the soil quality of the building, the type of existing building, the presence and type of retaining walls, the presence and type of underground burial, etc. It includes information on the site situation, the type of buildings around the building, and the surrounding situation such as the road surface condition. When inputting the building site status 25, the processing device 3 operating according to the report creation program 28 displays the input screen of the building site status 25 on the monitor 22 of the output device 5. Therefore, according to the input screen, the input device By inputting predetermined items using the keyboard 18 and the mouse 19, it is possible to input the building situation 25.
[0020]
The surrounding map 26 is various maps representing information around the building area, specifically, a city map showing the roads and the situation of the building around the building area, and the surrounding area of the building area. Topographical map showing the topography of the building, a land condition map showing the geology around the building, and an old map that is a map of an old period around the building. In the present embodiment, the map database 29 storing the above-mentioned various map data in Japan is used. That is, when inputting the surrounding map 26, the map database 29 is read from the processing device 3 using the keyboard 18 and the mouse 19 of the input device 4, and necessary map data around the building site is extracted to store the storage device 2. The surrounding map 26 can be input by storing it in. The peripheral map 26 can also be input by reading various maps printed on normal paper as electronic data by the scanner 30 of the input device 4 and storing them in the storage device 2.
[0021]
Peripheral photograph 27 is a photograph of the building site and its surroundings. Specifically, if there is an existing building in the building area, a photograph of each part of the building, If you have taken a picture of the road surface condition of the surrounding road, or if you have demolished an existing building, you will see a picture of the building after the dismantling, a picture of the area around the measuring point 11, or a retaining wall. Includes photos of wall conditions. When inputting the peripheral photograph 27, if the photograph is taken by the digital camera 31 of the input device 4, it can be input by storing it in the storage device 2 from the digital camera 31 via the processing device 3. . Further, when the photograph is taken with a camera using a normal film, the peripheral photograph 27 is also inputted by reading the developed photograph as electronic data by the scanner 30 of the input device 4 and storing it in the storage device 2. Can do.
[0022]
The program storage area 7 of the storage device 2 stores operation programs such as a formation section creation program 21, a basic specification determination program 23, and a report creation program 28. Then, when the processing device 3 operates according to each of these operation programs, the processing device 3 constitutes each processing means of a formation section creation means, a basic specification determination means, and a report creation means. Therefore, the storage device 2 is also integrated with the processing device 3 to constitute each of these processing means. The operation processing by each of these processing means will be described later.
[0023]
Further, in the processing result storage area 8 of the storage device 2, the basis created as a result of the processing device 3 operating according to the formation estimated sectional view 14 and the basic specification determining program 23 generated as a result of operating according to the formation cross-section creating program 21. A specification determination result 32 and a ground survey report 33 created as a result of operating according to the report creation program 28 are stored as processing result data.
[0024]
The input device 4 is a device for inputting various data stored in the storage device 2, processing execution instructions in the processing device 3, and the like. In this embodiment, the keyboard 18, mouse 19, magnetic disk drive, MO A recording medium drive 17 such as a drive, a LAN board for connecting to a LAN, a communication device 16 such as a modem for connecting to the Internet, a scanner 30, and a digital camera 31 are configured. This input device 4 constitutes an input means. The method of inputting various data using the input device 4 is as described above.
[0025]
The processing device 3 is a device that performs arithmetic processing based on various data and operation programs stored in the storage device 2 in accordance with execution instructions from the keyboard 18 or the mouse 19 of the input device 4. It has a processing unit (34) and a RAM (Random Access Memory) 35. Then, the processing device 3 operates according to the operation programs of the formation section creation program 21, the basic specification determination program 23, and the report creation program 28 stored in the program storage area 7 of the storage device 2, thereby The apparatus 3 constitutes each processing means of a formation section creation means, a basic specification determination means, and a report creation means. That is, the processing device 3 operates in accordance with the formation section creation program 21 to create the estimated formation section view 14 (see FIG. 3) of the building site based on the measurement data 9, the site map data 10, and the measurement points 11. Basic specification determination means for determining the specification of the foundation suitable for the building site based on the estimated formation sectional view 14 and the basic specification determination condition 12 by configuring the formation section forming means and operating according to the basic specification determination program 23 Generating means for arranging and outputting information relating to ground investigation including the estimated geological sectional view 14 and the basic specification determination result 32 in the form of a predetermined report 33 by operating according to the report preparation program 28 Configure. The operation process when the processing device 3 operates according to these operation programs will be described later.
[0026]
The output device 5 is a device that outputs the result of arithmetic processing by the processing device 3, the content input by the input device 4, the content of various data stored in the storage device 2, and the like in the present embodiment. The monitor 22 displays and outputs them on the screen, and the printer 36 prints and outputs them on paper. Specifically, as the content output by the output device 5, the formation estimated sectional view 14 (see FIG. 3), the ground survey report 33, and the like are output to the printer 36. In addition to the same contents output to the printer 36, the monitor 22 stores various data input screens displayed according to various operation programs, contents input by the input device 4, and the storage device 2. The contents of various data are output. This output device 5 constitutes an output means.
[0027]
Next, operation processing when the processing device 3 operates according to each operation program stored in the program storage area 7 of the storage device 2 will be described. First, an operation process when the processing device 3 creates a stratum estimated sectional view of a building according to the stratum section creating program 21 will be described based on the flowchart shown in FIG. In this operation process, the measurement data 9 is stored in the storage device 2 for each measurement point 11 and the site map data 10 of the building site is also stored in the storage device 2 by the predetermined method described above. At.
[0028]
First, it is determined whether or not an execution command of the formation section creation program 21 is input by the input device 4 (S1). When the execution command of the formation section creating program 21 is not input (S1: NO), the process waits as it is. When the execution command of the formation section creation program 21 is input (S1: YES), the site map data 10 is read from the storage device 2 and displayed on the monitor 22 of the output device 5 (S2). Next, the input screen of the measurement point 11 is displayed on the monitor 22 (S3). The input screen of the measurement point 11 is displayed on the monitor 22 together with the site map of the site map data 10, and the measurement point 11 is input by inputting the coordinates of the measurement point 11 on the site map by the input device 4. Then, it is determined whether or not the input of the measurement point 11 is completed (S4). If the input of the measurement point 11 is not completed (S4: NO), the process returns to S3, and the input screen of the measurement point 11 is continuously displayed.
[0029]
When the input of the measurement point 11 is completed (S4: YES), a cross section input screen for creating the formation estimated cross section map 14 is displayed on the monitor 22 (S5). This cross-section input screen is also displayed on the monitor 22 together with the site map of the site map data 10 in the same manner as the input screen for the measurement point 11. Then, by inputting the coordinates of the start point and the end point of the line for generating the cross section on this site map, the cross section for creating the stratum estimated cross section is input in association with the site map data 10. Thereby, the formation section creation means configured by the processing device 3 operating in accordance with the formation section creation program 21 includes a section designation means for inputting the section for creating the formation estimated section view in association with the site map data. Become. Next, it is determined whether or not the input of the cross section for creating the formation estimation cross section 14 has been completed (S6). When the input of the cross section for creating the formation estimated sectional view 14 is not completed (S6: NO), the process returns to S5, and the cross section input screen for creating the formation estimated sectional view 14 is continuously displayed. And when the input of the cross section which produces the geological formation estimated cross section map 14 is complete | finished (S6: YES), based on the measurement data 9, the site map data 10, and the measurement point 11, the formation estimation about the input cross section A sectional view 14 is created (S7).
[0030]
FIG. 3 is a specific example of the formation estimation sectional view 14. As shown in this figure, the estimated formation sectional view 14 shows a measurement point 11 on the section, a graph 37 of N values calculated from the measurement data 9 at each measurement point 11, and hatched. The self-settled layer 38 and the support layer 39 are shown so that the supporting force of the ground of the construction site can be easily understood at a glance. The N value calculated from the measurement data 9 is a value obtained by a Swedish sounding test, and it can be said that the larger the N value, the harder the ground.
[0031]
After that, the edit screen of the estimated formation sectional view 14 is displayed on the monitor 22 (S8). On the editing screen of this formation estimated sectional view 14, the formation estimated sectional view 14 created using the input device 4 can be edited. Then, it is determined whether or not the editing of the formation estimation sectional view 14 is completed (S9). If the editing has not been completed (S9: NO), the process returns to S8, and the editing screen of the formation estimated sectional view 14 is continuously displayed. When the editing is completed (S9: YES), the created formation estimated sectional view 14 is displayed on the monitor 22 and stored in the processing result storage area 8 of the storage device 2 (S10). Thereafter, it is determined whether or not the created formation estimated sectional view 14 is printed on paper (S11). This determination is made based on whether or not a print output execution command is input by the input device 4. When printing out (S11: YES), the formation estimated sectional view 14 stored in the processing result storage area 8 of the storage device 2 is printed out on paper by the printer 36 of the output device 5 (S12). Ends. If no print output is to be made (S11: NO), the process ends.
[0032]
Next, the operation process when the processing device 3 determines the basic specifications suitable for the building site according to the basic specification determination program 23 will be described based on the flowchart shown in FIG. This operation process is performed in a state where the estimated formation sectional view 14 of the building site is created and stored in the process result storage area 8 of the storage device 2 by the above-described process.
[0033]
First, it is determined whether or not an execution instruction of the basic specification determination program 23 is input by the input device 4 (S21). When the execution instruction of the basic specification determination program 23 is not input (S21: NO), the process waits as it is. When the execution instruction of the basic specification determination program 23 is input (S21: YES), the input screen of the basic specification determination condition 12 is displayed on the monitor 22 of the output device 5 (S22). By inputting predetermined items according to the input screen, the basic specification determination condition 12 can be input. Then, it is determined whether or not the input of the basic specification determination condition 12 has been completed (S23). If the input of the basic specification determination condition 12 has not ended (S23: NO), the process returns to S22, and the input screen of the basic specification determination condition 12 is continuously displayed.
[0034]
When the input of the basic specification determination condition 12 is completed (S23: YES), the specification of the foundation suitable for the building site based on the already created formation estimated sectional view 14 and the input basic specification determination condition 12 Is determined (S24). The determination of the basic specification is performed by selecting the most suitable basic specification from a plurality of basic specifications based on the magnitude of the ground supporting force obtained from the formation estimation sectional view 14 and the basic specification determination condition 12. Done. In this embodiment, a standard foundation as a basic specification used when there is no need for prevention of uneven settlement, a solid foundation with a flat foundation as a foundation specification used when there is a need for prevention of uneven settlement, A surface improvement method that provides a foundation after solidifying the surface layer with a solidifying material, etc., and a columnar improvement method that provides a foundation after forming a solidified columnar portion inside the ground with a solidifying material, etc. The optimum foundation specifications can be selected from the steel pipe pile construction method in which a steel pipe pile is driven and a foundation is provided on it.
[0035]
The basic specification determination result 32, which is the determined result, is displayed on the monitor 22 and stored in the processing result storage area 8 of the storage device 2 (S25). Thereafter, it is determined whether or not the created basic specification determination result 32 is printed out on paper (S26). This determination is made based on whether or not a print output execution command is input by the input device 4. When printing out (S26: YES), the basic specification determination result 32 stored in the processing result storage area 8 of the storage device 2 is printed out on paper by the printer 36 of the output device 5 (S27). Ends. If printing is not output (S26: NO), the process ends.
[0036]
Next, the operation processing when the processing device 3 creates the ground survey report 33 of the building site according to the report creation program 28 will be described based on the flowchart shown in FIG. In this operation process, the formation estimation sectional view 14 and the basic specification determination result 32 are created and stored in the processing result storage area 8 of the storage device 2, and the surrounding map 26 in the building area information 13 and the surrounding area This is performed in a state where the photograph 27 is stored in the storage device 2.
[0037]
First, it is determined whether or not an execution command for the report creation program 28 is input by the input device 4 (S31). If the execution command of the report creation program 28 is not input (S31: NO), the process waits as it is. When the execution command of the report creation program 28 is input (S31: YES), the input screen of the general information 24 of the building site information 13 is displayed on the monitor 22 of the output device 5 (S32). General information 24 can be input by inputting predetermined items according to the input screen. Then, it is determined whether or not the input of the general information 24 is completed (S33). If the input of the general information 24 has not ended (S33: NO), the process returns to S32, and the input screen for the general information 24 is continuously displayed. When the input of the general information 24 is completed (S33: YES), next, an input screen of the building site status 25 in the building site information 13 is displayed on the monitor 22 of the output device 5 (S34). By inputting predetermined items in accordance with this input screen, the building situation 25 can be input. Then, it is determined whether or not the input of the building site status 25 is completed (S35). When the input of the building site status 25 is not completed (S35: NO), the process returns to S34 and the input screen of the building site status 25 is continuously displayed.
[0038]
When the input of the building site status 25 is completed (S35: YES), the report on the ground survey including the already created formation estimation sectional view 14 and the basic specification determination result 32 is arranged in a predetermined format. 33 is created (S36). Here, as information related to the ground investigation described in the report 33, in addition to the above-described formation estimation sectional view 14 and the basic specification determination result 32, the site map data 10, the measurement data 9, the measurement point 11, and the building site information 13 etc. can be included. The building site information 13 includes general information 24, a building site situation 25, a surrounding map 26, and a surrounding photo 27. Then, a report is prepared by arranging information on these various ground surveys in a predetermined format. In addition, since this report 33 usually has a plurality of pages, here, a cover reflecting the contents of the customer name and survey date of the general information 24 is automatically created, and this is the first of the reports 33. I am trying to make it a page.
[0039]
The generated report 33 is displayed on the monitor and stored in the processing result storage area 8 of the storage device 2 (S37). Thereafter, it is determined whether or not the generated report 33 is printed on paper (S38). This determination is made based on whether or not a print output execution command is input by the input device 4. When printing out (S38: YES), the report 33 stored in the processing result storage area 8 of the storage device 2 is printed out on paper by the printer 36 of the output device 5 (S39), and the processing ends. To do. If printing is not output (S38: NO), the process ends.
[0040]
【The invention's effect】
  As described above, according to the ground survey system for a building site according to claim 1 of the present invention, the measurement data obtained by measuring the supporting force of the ground of the building site by the predetermined ground survey method, and the site map data of the building site In addition, it is possible to automatically create an estimated cross-sectional view of the building site that is the subject of the ground survey based on the measurement points associated with the site map data. Based on the specification determination conditions, it is possible to determine the basic specifications suitable for the building site. Therefore, the labor and time required to aggregate and analyze various information can be greatly reduced, and even engineers who do not have advanced expertise and experience in ground surveys of building sites can easily obtain quality. High ground survey can be performed.Further, the formation section creating means has section specifying means for inputting a section for creating the estimated formation sectional view in association with the site map data, thereby creating a plurality of estimated formation sectional views as required. be able to.
[0042]
  Of the present inventionClaim 2In addition to the above-mentioned effects, according to the ground survey system for a building site according to the above, the information related to ground survey including the estimated cross-sectional view of the strata and the basic specification determination result by the basic specification determination means is arranged in a predetermined report format. By using the report creation means to output, the geological survey results created by the geological section creation means and the basic specification judgment results created by the foundation specification judgment means can be used to facilitate the ground survey results. It can be put together in a report format that looks good and is easy to understand.
[0043]
  Of the present inventionClaim 3 or 4In addition to the above-mentioned effects, the construction site information includes general information including the address of the building site and customer information, the status of the building site and its surroundings, and the surroundings of the building site. Since various information such as a map or a photograph of the building site and its surroundings can be described together in the report, the report can be made easier to understand.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram showing a configuration of a ground survey system for a building according to an embodiment of the present invention.
FIG. 2 is a flowchart showing an operation process when the processing device of the ground survey system for a building according to the embodiment of the present invention creates an estimated formation sectional view of the building according to the formation section creation program.
FIG. 3 is a diagram showing a specific example of an estimated formation sectional view created by the ground survey system for a building site according to the embodiment of the present invention.
FIG. 4 is a flowchart showing an operation process when the processing device of the ground survey system for a building site according to the embodiment of the present invention determines a foundation specification suitable for the building site according to a foundation specification determination program.
FIG. 5 is a flowchart showing an operation process when the processing device of the ground survey system for a building site according to the embodiment of the present invention creates a report of the ground survey of the building site according to the report creation program.
[Explanation of symbols]
1 Ground survey system for building sites
2 storage devices
3 processing equipment
4 input devices
5 Output device
6 Data storage area of storage device
7 Program storage area of storage device
8 Storage device processing result storage area
9 Measurement data
10 Site map data
11 Measurement points
12 Judgment conditions for basic specifications
13 Building information
14 Estimated cross section of strata
21 Cross-section creation program
22 Monitor of output device
23 Basic specification judgment program
24 General information
25 Building site status
26 Surrounding map
27 Nearby photos
28 Report preparation program
32 Basic specification judgment result
33 Report
36 Printer of output device

Claims (4)

所定の地盤調査方法により建築地の地盤の支持力を測定した測定データを格納する測定データ格納手段と、座標を有する電子データである建築地の敷地図データを格納する敷地図格納手段と、前記測定データの測定点を前記敷地図データに関連付けて格納する測定点格納手段と、建築地の基礎仕様判定条件を格納する判定条件格納手段と、これらの各格納手段に格納されるデータを入力する入力手段と、前記測定データ、敷地図データ、及び測定点に基づいて、N値と、該N値のグラフと、自沈層と、支持層とを示す建築地の地層推定断面図を作成する地層断面作成手段と、この地層推定断面図と前記基礎仕様判定条件とに基づいて当該建築地に適した基礎の仕様を判定する基礎仕様判定手段とを有すると共に、前記地層断面作成手段は前記地層推定断面図を作成する断面を前記敷地図データに関連付けて入力する断面指定手段を有することを特徴とする建築地の地盤調査システム。Measurement data storage means for storing measurement data obtained by measuring the bearing capacity of the ground of the building area by a predetermined ground survey method, site map storage means for storing site map data of the building area which is electronic data having coordinates, and Measurement point storage means for storing measurement points of measurement data in association with the site map data, determination condition storage means for storing basic specification determination conditions for the building site, and data stored in these storage means are input. A stratum for creating an estimated sectional view of a building showing an N value, a graph of the N value, a self-settled layer, and a support layer based on the input means, the measurement data, the site map data, and the measurement points and sectioning means, which has a the stratum estimated cross-sectional view with the base specification determination means for determining the specifications of the foundation suitable for the building locations based on said base specification determination condition, the formation section forming means the Construction land ground survey system, characterized in that it has a section-designating means for inputting associating section that creates a layer estimation sectional view on the site plan data. 前記地層推定断面図、及び基礎仕様判定手段による基礎仕様判定結果を含む地盤調査に関する情報を所定の報告書の形式に配置して出力する報告書作成手段を有することを特徴とする請求項1記載の建築地の地盤調査システム。The stratum estimated cross-sectional view, and according to claim 1, characterized in that it has a reporting means for arranging and outputting information about the ground survey in the form of a predetermined reports including base specification determination result by the base specification determination means Ground survey system for building sites in Japan. 地盤調査を行なう建築地に関する情報を格納する建築地情報格納手段を有し、この建築地情報格納手段に格納された情報を、前記報告書を作成する際の地盤調査に関する情報として用いることを特徴とする請求項2記載の建築地の地盤調査システム。It has a building site information storage means for storing information relating to a building site to be subjected to a ground survey, and the information stored in the building site information storage unit is used as information related to a ground survey when creating the report. The ground survey system for architectural sites according to claim 2 . 前記建築地に関する情報として、当該建築地の住所及び顧客情報を含む一般情報、当該建築地及びその周辺の状況、当該建築地周辺の地図、若しくは当該建築地及びその周辺の写真、の一部又は全部を含むことを特徴とする請求項3記載の建築地の地盤調査システム。As information about the building site, a part of the general information including the address and customer information of the building site, the situation of the building site and its surroundings, a map around the building site, or a photograph of the building site and its surroundings, or The ground survey system for a building site according to claim 3 , comprising all of them.
JP2002027624A 2002-02-05 2002-02-05 Construction site ground survey system Expired - Fee Related JP3919079B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002027624A JP3919079B2 (en) 2002-02-05 2002-02-05 Construction site ground survey system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002027624A JP3919079B2 (en) 2002-02-05 2002-02-05 Construction site ground survey system

Publications (2)

Publication Number Publication Date
JP2003227127A JP2003227127A (en) 2003-08-15
JP3919079B2 true JP3919079B2 (en) 2007-05-23

Family

ID=27749080

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002027624A Expired - Fee Related JP3919079B2 (en) 2002-02-05 2002-02-05 Construction site ground survey system

Country Status (1)

Country Link
JP (1) JP3919079B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5012563B2 (en) * 2008-02-27 2012-08-29 富士通株式会社 Soft ground judgment device, soft ground judgment method, and soft ground judgment program
JP2012158872A (en) * 2011-01-31 2012-08-23 Mitsui Home Co Ltd Ground condition determination device and ground condition determination program
JP2013019121A (en) * 2011-07-08 2013-01-31 Sumitomo Forestry Co Ltd Soil property determination method by swedish sounding test

Also Published As

Publication number Publication date
JP2003227127A (en) 2003-08-15

Similar Documents

Publication Publication Date Title
Van der Meulen et al. 3D geology in a 2D country: perspectives for geological surveying in the Netherlands
KR101165130B1 (en) System of automatically calculating and displaying amount of earthwork materials based on three dimensional design
CN111339691A (en) Intelligent geotechnical engineering parameter three-dimensional analysis and evaluation system and method based on voxler software
US20150009215A1 (en) Generating a 3d image for geological modeling
Lu A simplified calculation method for liquefaction-induced settlement of shallow foundation
CN111221930A (en) Ground texture data application platform for urban planning and construction
JP2002081008A (en) Earthwork design support system using digital map data
Masson-MacLean et al. Digitally recording excavations on a budget: A (low-cost) DIY approach from Scotland
JP3919079B2 (en) Construction site ground survey system
US20240420419A1 (en) Method for creating a three-dimensional soil model for a plot of land
Schindler et al. An interaction platform for mechanized tunnelling. Application on the Wehrhahn‐Line in Düsseldorf (Germany)/Eine Interaktionsplattform für maschinelle Tunnelvortriebe. Anwendung am Beispiel der Wehrhahn‐Linie in Düsseldorf: Application on the Wehrhahn‐Line in Düsseldorf (Germany)/Anwendung am Beispiel der Wehrhahn‐Linie in Düsseldorf
van Zijl et al. Digital soil mapping for hydrological modelling
CN117056284A (en) Management system for water transportation engineering drilling results
Rengers et al. Information Technology applied to engineering geology
Oloufa et al. Construction applications of relational data bases in three-dimensional GIS
Peng et al. Automated Interpretation and Evaluation of Spatial Variability and Model Uncertainty in Geotechnical Site Characterization
Gaafar et al. Digital transformation solution for identification of geotechnical parameters using statistical data analysis
CN119128330B (en) Foundation pit sand content detection method, device, equipment and storage medium
Jones Flow-based effective properties of sub-seismic karst
JP7826787B2 (en) Evaluation support device, evaluation support method, and evaluation support program
JP2005220687A (en) Civil engineering management system
Chen et al. Assessment and prediction of contaminant transport and migration at a Florida superfund site
Kinakin et al. Improving the Consistency of Joint Roughness Estimation in Drill Core with a Visual Guide
Cavers et al. The survey and analysis of brochs
Colapietro et al. Integrated Methods and Technologies for the Safeguarding of Parish Churches in Lunigiana

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060829

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061005

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061127

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070208

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070208

R150 Certificate of patent or registration of utility model

Ref document number: 3919079

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100223

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130223

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130223

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160223

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees