JP3923129B2 - How to connect split ring pieces. - Google Patents
How to connect split ring pieces. Download PDFInfo
- Publication number
- JP3923129B2 JP3923129B2 JP07435697A JP7435697A JP3923129B2 JP 3923129 B2 JP3923129 B2 JP 3923129B2 JP 07435697 A JP07435697 A JP 07435697A JP 7435697 A JP7435697 A JP 7435697A JP 3923129 B2 JP3923129 B2 JP 3923129B2
- Authority
- JP
- Japan
- Prior art keywords
- split ring
- piece
- pieces
- segment
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000003466 welding Methods 0.000 claims description 18
- 238000005520 cutting process Methods 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 description 34
- 239000010959 steel Substances 0.000 description 34
- 238000009412 basement excavation Methods 0.000 description 9
- 230000003014 reinforcing effect Effects 0.000 description 5
- 230000011218 segmentation Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241001122315 Polites Species 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Substances [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、セグメントピース等と呼ばれる分割リングピースを連結して構成し地中に圧入して沈設体を構築する技術に関し、詳しくは前記分割リングピースの連結方法に関する。
【0002】
【従来の技術】
従来、鋼製セグメントピースあるいは鉄筋コンクリートセグメントピース等と呼ばれる分割リングピースを連結して構成した沈設体を、地中に圧入によって構築する技術が存在する。この沈設体としては、地中に構築される立坑、集水井、水槽などの構造物がある。
【0003】
さらに、高速道路、鉄橋、あるいは陸橋等の橋脚の耐震補強を行う際の土留壁の構築にも、上記沈設体を用いることが提案されている。すなわち、この橋脚の耐震補強は、橋脚の周囲に所定の距離をおいて、分割リングピースを連結して構成した筒体を油圧ジャッキ等で地盤に圧入し土留壁として構築し、この橋脚と土留壁の間を掘削した後、掘削によって形成されるスペースを作業スペースとして、鋼板やセメントなどによって橋脚の補強作業を行う。
【0004】
このような沈設体の連結作業の例を図6に表す。
この図は円筒状の沈設体を構成するための初期の連結作業を示すもので、最下段の分割リング51と刃口53とを構成するための連結がなされる。
最下段の分割リング51の下端縁に沿ってリング状に据え付けられる刃口53は、リング状の周方向に、図の例では4つに分離され刃口ピース55となっている。刃口53の下端が地面に接している部分が小さいため、この分離数があまり多いと、刃口ピース55は不安定となり自立できず転倒してしまう。分離数を少なくすることで転倒せずに自立した刃口ピース55は、互いに溶接されて連結され、リング状になり刃口53を構成する。
【0005】
構成された刃口53の上には、分割リングピース57が載置され、分割リングピース57が互いに連結され最下段の分割リング51を構成する。同時に、分割リングピース57と刃口53との連結がなされる。これらの連結は、溶接によってなされる。
【0006】
このようにして、刃口53および最下段の分割リング51、場合によっては更に2段目、3段目の分割リング(図示せず)が連結され沈設体の下方部分が構成された後に、この構成状態における最上端の分割リングの上方から圧力が加えられ、地中への圧入が行われ、同時に分割リングの内側の掘削が行われる。
この圧入および掘削が行われた後に、次の段の分割リングが連結構成され、再び圧入および掘削が行われる。このように圧入および掘削が繰り返されて、地中には、分割リングが上下に連結した状態の筒状の構成を有する沈設体が構築される。
【0007】
【発明が解決しようとする課題】
しかしながら、以上の従来技術によれば、分割リングピース57と刃口ピース55は、別々に、工場で製作され現場で溶接などにより連結されていた。そのため、以下のような問題があった。
(1)現場における連結作業に手間がかかるものであった。
(2)また、現場における溶接では、丁寧な溶接が行いにくく、連結強度が不十分になる可能性があった。
(3)また、連結によって構成される分割リング51や刃口53の全体の水平面内での寸法精度が不十分になる可能性があった。
【0008】
例えば、図6のように沈設体が円筒状であり従って刃口53が円リング状である場合には、刃口53の真円精度が不十分になる可能性があった。そして、この真円精度を十分なものにするために従来は、図に示すような部材59を刃口53の半径方向に渡し、半径寸法を確認しながら連結作業を進める必要があり、この場合には(1)の連結作業の手間が更にかかるものであった。
【0009】
この発明は、以上の問題点を解決するためになされたもので、連結作業に手間がかからず、連結強度が十分になり、連結によって構成される分割リング51や刃口53の全体の水平面内での周方向の寸法精度が十分になる分割リングピースの連結方法を提供することを目的とする。
【0010】
【課題を解決するための手段】
以上の目的を達成するために、下記の発明をするに至った。すなわち、本発明は、沈設体の最下段の分割リングを構成するために、吊り下げられたセグメントピース(1)同士を、継手板(5)のボルト孔(17)に通したボルトとナットにより仮に相互に連結する工程と、前記連結されたセグメントピースを周方向に所定の長さとして、自立させる工程と、前記自立したセグメントピース(1)に対し、次のセグメントピース(1)を吊り下げた状態で、周方向に仮連結する工程を有し、一周分の上記仮連結により最下段の分割リングが構成されたら、セグメントピース外表面に設けられた締結用継手金具を用いて連結誤差を矯正する工程と、前記最下段の分割リングを構成するセグメントピース(1)を互いに溶接して最下段の分割リングを完成させる工程を、有する沈設体を構成するための分割リングピースの連結方法において、前記最下段の分割リングを構成するセグメントピースには現場ではなく工場において取り付けられた刃口が備え付けられていることを特徴とする分割リングピースの連結方法である。
【0014】
【発明の実施の形態】
以下、この発明の一実施形態を図1乃至図5において説明する。
この実施形態においては分割リングピースは、図1または図4に示すような鋼製セグメントピース1と呼ばれるものである。すなわち、この鋼製セグメントピース1は、工場で製作され、一対の平行な湾曲した主桁3の両端部に、一対の平行な直線的な継手板5が溶接されて枠体が構成される。
【0015】
さらに、この枠体には、前記一対の主桁3に対し平行に、1本の中主桁8が配置される。各中主桁8は互いに所定の間隔をあけ、継手板5に渡される。更に、継手板5に対し平行に、5本の縦リブ7が配置される。各縦リブ7は互いに所定の間隔をあけ、主桁3に渡される。これら主桁3、継手板5、縦リブ7、中主桁8の外側にスキンプレート9が張りわたされて鋼製セグメントピース1が構成される。
【0016】
すなわち、湾曲しているものの概略四角形の形状を有するスキンプレート9の内面で、前記四角形の上端縁および下端縁に主桁3が溶接され、前記四角形の左端縁および右端縁に継手板5が溶接される。
【0017】
なお、縦リブ7の内側には、当て板11が鋼製セグメントピース1の中央に部分的に張りわたされ、掘削用重機のワイヤでつり下げられたバケットが接触して、反跳し、回動してしまうことでバケットの位置のコントロールが困難になるのを防止する。
【0018】
このような鋼製セグメントピース1がリング周方向に連結された状態で、分割リング13である鋼製セグメントリングが構成される(図2、図3)。この分割リング13を軸方向に重ねて連結した状態で筒状の沈設体15が構成される(図2)。これらの連結のため、各桁3、5には連結のためのボルト孔17(図4)が形成される。
【0019】
もっとも、実際の施工では、分割リング13同士がリング単位で連結されるのではなく、下段の分割リング13の上には、次の段の分割リング13を構成する分割リングピース57が千鳥組のため一つずつ載置される(図2参照)ことが多い。この載置された分割リングピース57が互いに連結され次の段の分割リング53を構成する。同時に、各分割リングピース57と下段の分割リング13との連結がなされる。これらの連結は、ボルト締結又は溶接によってなされる。
【0020】
さて、重ねられる複数の分割リング13のうち最下段の分割リングピースである鋼製セグメントピース13には、この鋼製セグメントピース13の下端縁に沿って、予め工場で、リング状の刃口19が据え付けられる(図1、図3、図4)。
【0021】
すなわち、最下段の鋼製セグメントピース13を構成するスキンプレート9の下端縁に溶接される主桁3の下側に沿って、この下端縁の長さの分だけ、刃口外板21および刃口内板23からなる刃口19が据えられる。
【0022】
刃口外板21は、スキンプレート9の下端縁の外面に沿って溶接されるので、刃口外板の肉厚の分だけスキンプレートよりも外側に位置し、よって、フリクションカットが形成される。このフリクションカットにより、分割リング13の圧入に伴い、地盤は外側へ押しのけられ、スキンプレートと地盤との摩擦による抵抗が軽減される。また、この刃口外板は、同時に、下端縁の主桁3の外周端から下方へ伸びることとなる。
【0023】
また、刃口内板23は、下端縁の主桁3の内周端から、前記刃口外板21の下端に向かって伸び、この下端に鋭角に突き合わされて溶接される。これら溶接された刃口外板21と刃口内板23は内部に断面三角形の空間25を形成する。空間25の内部には、空間25と同じ形状の補強板26が複数箇所に配置される。配置の個所は、複数の縦リブ7のうち一部の縦リブの下端に連続する箇所である。
【0024】
スキンプレート9の外面で左右両端部の下方には、リング周方向の連結の際に正確な溶接を行うための仮組用のボルト締結用継手金具27が、それぞれ1箇所に取り付けられる。このボルトまた、締結用継手金具27はL字断面を有し、L字の一辺はスキンプレート9に溶接29され、他辺は突出してボルト孔31が形成される。ボルト締結用継手金具27は、隣り合う鋼製セグメントピース1で、対となって向かい合い、ボルト孔31を通すボルト33とナット35による締結が可能となる。
【0025】
同様に、刃口外板21の外面で左右両端部の下方には、同様のボルト締結用継手金具27がそれぞれ2箇所に取り付けられる。
【0026】
以下、図1を中心にして、刃口19を有する分割リングピースである鋼製セグメントピース1の製作手順は、例えば以下に説明する通りである。
(1)上側と下側の主桁3、3と、左右の継手板5、5を取り付けて溶接し、枠体を製作する。
(2)補強板26を刃口外板21に取り付け溶接する。
(3)刃口内板23を補強板26に取り付け溶接する。よって、刃口19を製作する。
(4)スキンプレート9に、(1)の枠体と(3)の刃口を、取り付けて溶接する。
(5)中主桁8や縦リブ7を取り付け溶接する。締結用継手金具27を溶接する。
【0027】
もっとも(4)において、枠体と刃口のいずれか一方を製作してスキンプレート9に溶接した後、他方を製作して、スキンプレート9に溶接してもよい。
また、補強板26は、縦リブ7の下端を延長して一体的に設けても良い。
さらに、刃口19は、より短くブロック化しておき、溶接して必要な長さにしても良い。すなわち、より短い刃口外板、刃口内板、及び補強板26によってブロックを製作しておき、工場において必要に応じて複数のブロックを周方向に連続して溶接し、刃口19としても良い。
【0028】
次に、製作された鋼製セグメントピース1によって、連結作業を行う手順及び沈設体の構築作業を説明する。
例えば、クレーンなどでつり下げられた最下段の二つの鋼製セグメントピース1は、継手板5のボルト孔17に通したボルト、ナットにより仮に連結される。
【0029】
この仮連結により、連結された鋼製セグメントピース1は周方向の長さは十分なものになり、自立でき転倒が防止される。この自立した鋼製セグメントピース1に対し、次の鋼製セグメントピース1がつり下げられた状態で、仮連結される。このようにして、一個の分割リング13を構成するすべての鋼製セグメントピース1が仮連結されたら、締結用継手金具27を用いて連結誤差を矯正する。
【0030】
この状態で、各鋼製セグメントピース1は互いに溶接される。最下段の二つの鋼製セグメントピース1には、予め刃口19が据え付けられているので、刃口の連結も同時になされたことになる。この溶接の後、締結用継手金具27は溶接用のバーナーによって取り除かれる。
【0031】
なお、刃口19および最下段の分割リング13の上には、場合によっては更に2段目、3段目の分割リング(図2参照)が連結される。この連結は従来と同様に、鋼製セグメントピース1が千鳥組のため一つずつ連結されて行われる。このようにして、沈設体の下方部分が構成された後に、この構成状態における最上端の分割リングの上方から圧力が加えられ、地中への圧入が行われ、同時に分割リングの内側の掘削が行われる。
【0032】
この圧入および掘削が行われた後に、次の段の分割リングが連結構成され、再び圧入および掘削が行われる。このように圧入および掘削が繰り返されて、地中には、分割リングが上下に連結した状態の筒状の構成を有する沈設体が構築される。
【0033】
この実施形態によれば、以下の効果を得ることができる。
以上説明したように、分割リングピースである鋼製セグメントピース1に刃口19を据え付けておくことで、鋼製セグメントピース1と刃口19との間の現場での連結が不要となり、その分だけ現場における連結作業の手間がかからなくなる。また、鋼製セグメントピース1と刃口19との間の連結を行う溶接は、工場で行うことができ、丁寧な溶接が行え、その分だけ連結強度が十分になる。
【0034】
また、従来は刃口ピース55(図6参照)の連結は、刃口ピース55の小さな連結面において行うしかなかったが、この実施形態によれば鋼製セグメントピース1の連結面、すなわち継手板5で連結が行われるので、連結面が大きくなり、水平面内での寸法精度、すなわちこの実施形態における真円精度が十分なものとなる。
【0035】
さらに、ボルト締結用継手金具27によって、刃口19が予め据え付けられた鋼製セグメント1の仮組をボルトの締結力を用いて行うことができる。よって、製作時あるいは連結時の溶接による熱歪みなどを原因とする誤差を、ボルトの締結力によって矯正することができる。したがって、水平面内での寸法精度が更に十分なものとなる。
【0036】
(他の実施形態)
以上の実施形態では、刃口19にフリクションカットが形成されるものであったが、他の実施形態では必ずしもフリクションカットは必要ではなく、スキンプレート9と刃口外板21が同一面に位置するものであっても良い。
【0037】
また、以上の実施形態では、スキンプレート9の外面で左右両端部の下方には、仮組用のボルト締結用継手金具27が、それぞれ1箇所に取り付けられ、刃口外板21の外面で左右両端部の下方には、それぞれ2箇所に取り付けられるものであったが、他の実施形態では取り付けられるボルト締結用継手金具27の数は任意の数が採用されうる。
【0038】
また、以上の実施形態では、鋼セグメントピース1の構造は、一対の平行な主桁3の両端部に、一対の平行な直線的な継手板5が溶接されて、主桁3に対し平行に1本の中主桁8が配置され、継手板5に対しほぼ平行に5本の縦リブ7が配置され、これらの外側にスキンプレート9が張りわたされてなるものであったが、他の実施形態では必ずしもこのような構造でなくても良い。
【0039】
即ち、中主桁8の数は2本以上であっても良い。あるいは、全く設けられなくても良い。
また、縦リブ7の数は1本、2本、3本、4本、または6本以上であっても良い。あるいは、全く設けられなくても良い。
また、スキンプレート9の左右端縁に沿って連続して設けられる継手板5(図1参照)の代わりに、不連続な複数個の、例えば2個の継手部材を溶接で取り付けたものであっても良い。
【0040】
また、一対の平行な主桁3も必ずしも不要である。たとえば、略四角形のスキンプレート9に対角線上に桁材を溶接したものであっても良い。
また、スキンプレート9は必ずしも略四角形である必要はない。筒状の沈設体15を展開した面を、単一の形状で、あるいはいくつかの画一な形状でモザイク状に隙間なく覆うことができる形状であればよい。
【0041】
また、以上の実施形態では、分割リングピースとして鋼セグメントピース1と呼ばれるものを例に説明したが、分割リングピースの名称には複数のものが存在する。この明細書中では、名称の如何に拘わらず、上記構造を有するものはすべて、分割リングピースとする。
【0042】
また、以上の実施形態では、鋼製セグメントピース1によって構成される沈設体15は完全な円形断面を有するものであった(図2)が、他の実施形態では必ずしも円形断面でなくても良く、概略四角形や楕円形であっても良い。その場合であっても、水平面内における寸法精度が良くなることで、正確な概略四角形や楕円形が得られる。
【0043】
また、以上の実施形態では、鋼製セグメントピース1は周方向に6つが連結された分割リング13を構成するものであった。すなわち、鋼製セグメントピース1は分割リング13を6つに分離されたものであったが、他の実施形態では5つ以下、または7つ以上に分離されたものでも良い。
【0044】
【発明の効果】
以上説明したように、本発明によれば、工場において予め分割リングピースに刃口が据え付けられているので、以下に述べる効果がある。(1)連結作業現場において分割リングピースと刃口との間の連結が不要となり、その分だけ連結作業の手間がかからなくなる。(2)また、分割リングピースと刃口との間の連結を行う溶接は、工場で行うことができ、丁寧な溶接が行い易い。よって、その分だけ連結強度が十分になる。(3)また、従来は刃口ピースの連結は、刃口ピースの小さな連結面において行うしかなかったが、この発明によれば刃口ピースの連結面のみならず分割リングピースの連結面において連結が行われ得るので、連結面が大きくなり、水平面内での寸法精度が十分なものとなる。
【0045】
さらには、ボルト締結用継手金具によって、刃口が予め据え付けられた分割リングピースの仮組をボルトの締結力を用いて行うことができる。よって、製作時あるいは連結時の溶接による熱歪みなどを原因とする誤差を、締結力によって矯正することができる。したがって、前記水平面内での寸法精度が更に十分なものとなる。
【図面の簡単な説明】
【図1】この発明の一実施形態に係る刃口が据え付けられた分割リングピースの斜視図である。
【図2】図1の分割リングピースが複数連結されて構成される沈設体の斜視図である。
【図3】図1の分割リングピースが連結されて構成した最下段の分割リングを示すもので、(A)は平面図、(B)は側面図である。
【図4】図1の分割リングピースを示すもので、
(A)は正面図、(B)は側面図、(C)は平面図、(D)は底面図である。
【図5】図1の分割リングピース同士を連結する際の用いるボルト締結用継手金具の働きを説明する斜視図である。
(B)は側面図である。
【図6】従来の鋼製セグメントピース連結する作業の様子を表すための斜視図である。
【符号の説明】
1 鋼製セグメントピース(分割リングピース) 3 主桁
5 継手板 8 中主桁
9 スキンプレート 13 分割リング
15 沈設体 19 刃口
21 刃口外板 23 刃口内板
25 空間 26 補強板
27 ボルト締結用継手金具[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a technique for connecting divided ring pieces called segment pieces or the like and press-fitting them into the ground to construct a sinking body, and more particularly to a method for connecting the divided ring pieces.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, there is a technique for constructing a subsidized body formed by connecting divided ring pieces called steel segment pieces or reinforced concrete segment pieces or the like by press-fitting into the ground. As this subsidence body, there are structures such as a shaft, a water collection well, and a water tank constructed in the ground.
[0003]
Furthermore, it has been proposed to use the above-mentioned subsidence for the construction of retaining walls when performing seismic reinforcement of piers such as highways, iron bridges, and overpasses. In other words, the seismic reinforcement of this pier is constructed as a retaining wall by press-fitting a cylindrical body constructed by connecting split ring pieces with a predetermined distance around the pier, using a hydraulic jack or the like. After excavating between the walls, the pier is reinforced with steel plates, cement, etc., using the space formed by excavation as the work space.
[0004]
An example of the connecting operation of such a sinking body is shown in FIG.
This figure shows an initial connection operation for forming a cylindrical sedimentary body, and the connection for forming the
The
[0005]
A
[0006]
In this way, after the
After the press-fitting and excavation are performed, the next-stage split ring is connected and configured, and the press-fitting and excavation are performed again. In this way, the press-fitting and excavation are repeated, and a subsidence body having a cylindrical configuration in which the split rings are connected in the vertical direction is constructed in the ground.
[0007]
[Problems to be solved by the invention]
However, according to the above prior art, the
(1) It takes a lot of time to perform the connecting work on site.
(2) In addition, in-site welding, it is difficult to perform careful welding, and the connection strength may be insufficient.
(3) In addition, there is a possibility that the dimensional accuracy in the entire horizontal plane of the
[0008]
For example, when the sinking body is cylindrical as shown in FIG. 6 and the
[0009]
The present invention has been made in order to solve the above-described problems, and does not require a labor for the connection work, the connection strength is sufficient, and the entire horizontal surface of the
[0010]
[Means for Solving the Problems]
In order to achieve the above object, the inventors have made the following invention. That is, according to the present invention, in order to constitute the lowermost split ring of the sinking body, the suspended segment pieces (1) are passed through the bolt holes (17) of the joint plate (5) with bolts and nuts. Temporarily connecting to each other, a step of making the connected segment pieces a predetermined length in the circumferential direction, and a next segment piece (1) suspended from the self-supporting segment piece (1) In this state, a temporary connection in the circumferential direction is included, and when the lowermost split ring is formed by the temporary connection for one turn, the connection error is reduced by using the fastening fitting provided on the outer surface of the segment piece. A division for constituting a sinking body comprising a step of correcting and a step of welding the segment pieces (1) constituting the lowermost division ring together to complete the lowermost division ring In connection method Ngupisu, said a method of connecting split ring pieces, characterized in that attached cutting edge in a factory instead of field in the segment piece which constitutes the lowermost split ring is equipped.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of the present invention will be described below with reference to FIGS.
In this embodiment, the split ring piece is a
[0015]
Further, in the frame body, one middle
[0016]
That is, the
[0017]
In addition, a
[0018]
With such a
[0019]
However, in actual construction, the split rings 13 are not connected to each other in a ring unit, but the
[0020]
Now, the
[0021]
That is, along the lower side of the
[0022]
Since the blade edge
[0023]
Further, the blade
[0024]
On the outer surface of the
[0025]
Similarly, on the outer surface of the blade
[0026]
Hereinafter, with reference to FIG. 1, for example, the manufacturing procedure of the
(1) The upper and lower
(2) The reinforcing
(3) The blade edge
(4) The frame body (1) and the blade edge (3) are attached to the
(5) The middle
[0027]
However, in (4), either one of the frame and the blade edge may be manufactured and welded to the
Further, the reinforcing
Further, the
[0028]
Next, a procedure for performing a connection operation and a construction operation for a sinking body will be described using the manufactured
For example, the bottom two
[0029]
By this temporary connection, the connected
[0030]
In this state, the
[0031]
In addition, a second stage and a third stage split ring (see FIG. 2) are connected to the
[0032]
After the press-fitting and excavation are performed, the next-stage split ring is connected and configured, and the press-fitting and excavation are performed again. In this way, the press-fitting and excavation are repeated, and a subsidence body having a cylindrical configuration in which the split rings are connected in the vertical direction is constructed in the ground.
[0033]
According to this embodiment, the following effects can be obtained.
As described above, by installing the
[0034]
Further, conventionally, the cutting edge piece 55 (see FIG. 6) can only be connected to a small connecting surface of the
[0035]
Furthermore, the temporary fastening of the
[0036]
(Other embodiments)
In the above embodiment, the friction cut is formed in the
[0037]
Further, in the above embodiment, the bolt assembly fitting 27 for temporary assembly is attached to each of the outer surfaces of the
[0038]
Moreover, in the above embodiment, the structure of the
[0039]
That is, the number of middle
Further, the number of the
Further, instead of the joint plate 5 (see FIG. 1) continuously provided along the left and right edges of the
[0040]
Further, the pair of parallel
Further, the
[0041]
Moreover, although the above embodiment demonstrated as an example what was called the
[0042]
Moreover, in the above embodiment, the settling
[0043]
Moreover, in the above embodiment, the
[0044]
【The invention's effect】
As described above, according to the present invention, since the cutting edge is installed in advance in the split ring piece in the factory, the following effects can be obtained. (1) The connection between the split ring piece and the cutting edge becomes unnecessary at the connection work site, and the connection work is not required much. (2) Moreover, the welding which connects between a division | segmentation ring piece and a blade edge can be performed in a factory, and it is easy to perform polite welding. Therefore, the connection strength becomes sufficient by that amount. (3) Further, conventionally, the cutting edge piece can only be connected on the small connecting surface of the cutting edge piece. However, according to the present invention, not only the connecting surface of the cutting edge piece but also the connecting surface of the split ring piece is connected. obtained been conducted Runode, coupling surface is increased, the dimensional accuracy in the horizontal plane is sufficient.
[0045]
Further, a bolt fastening joint fitting can be performed using the fastening force of the temporarily assembled split ring piece cutting edge is mounted in advance volts. Therefore, errors caused by thermal distortion caused by welding during manufacture or connection can be corrected by the fastening force. Therefore, the dimensional accuracy in the horizontal plane is further sufficient.
[Brief description of the drawings]
FIG. 1 is a perspective view of a split ring piece on which a blade is installed according to an embodiment of the present invention.
2 is a perspective view of a sinking body constituted by connecting a plurality of split ring pieces in FIG. 1; FIG.
FIGS. 3A and 3B show a lowermost split ring configured by connecting the split ring pieces of FIG. 1, wherein FIG. 3A is a plan view and FIG. 3B is a side view.
FIG. 4 shows the split ring piece of FIG.
(A) is a front view, (B) is a side view, (C) is a plan view, and (D) is a bottom view.
FIG. 5 is a perspective view for explaining the function of a bolt fastening joint fitting used when connecting the divided ring pieces of FIG. 1;
(B) is a side view.
FIG. 6 is a perspective view for illustrating a state of work of connecting conventional steel segment pieces.
[Explanation of symbols]
DESCRIPTION OF
Claims (1)
吊り下げられたセグメントピース(1)同士を、継手板(5)のボルト孔(17)に通したボルトとナットにより仮に相互に連結する工程と、
前記連結されたセグメントピースを周方向に所定の長さとして、自立させる工程と、
前記自立したセグメントピース(1)に対し、次のセグメントピース(1)を吊り下げた状態で、周方向に仮連結する工程を有し、
一周分の上記仮連結により最下段の分割リングが構成されたら、セグメントピース外表面に設けられた締結用継手金具を用いて連結誤差を矯正する工程と、
前記最下段の分割リングを構成するセグメントピース(1)を互いに溶接して最下段の分割リングを完成させる工程を、
有する沈設体を構成するための分割リングピースの連結方法において、
前記最下段の分割リングを構成するセグメントピースには現場ではなく工場において取り付けられた刃口が備え付けられていることを特徴とする分割リングピースの連結方法。 To make up the split ring at the bottom of the sinking body,
Temporarily connecting the suspended segment pieces (1) to each other with bolts and nuts passed through the bolt holes (17) of the joint plate (5) ;
As the linked segment pieces circumferential direction of the predetermined length, a step of Ru is self,
In the state which suspended the next segment piece (1) with respect to the said self-supporting segment piece (1), it has the process of temporarily connecting in the circumferential direction ,
When the lowermost split ring is configured by the temporary connection for one turn, a step of correcting the connection error using the fastening fitting provided on the outer surface of the segment piece ;
A step of welding the segment pieces (1) constituting the lowermost split ring together to complete the lowermost split ring ,
In a connecting method of split ring pieces for constituting a sinking body having:
A segment ring piece connecting method for split ring pieces, characterized in that a segment piece constituting the lowermost split ring is provided with a cutting edge attached at a factory rather than at the site.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP07435697A JP3923129B2 (en) | 1997-03-11 | 1997-03-11 | How to connect split ring pieces. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP07435697A JP3923129B2 (en) | 1997-03-11 | 1997-03-11 | How to connect split ring pieces. |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10252394A JPH10252394A (en) | 1998-09-22 |
| JP3923129B2 true JP3923129B2 (en) | 2007-05-30 |
Family
ID=13544775
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP07435697A Expired - Lifetime JP3923129B2 (en) | 1997-03-11 | 1997-03-11 | How to connect split ring pieces. |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3923129B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102094642B1 (en) * | 2019-08-16 | 2020-03-27 | 박진감 | Connection structure of steel shoe for constructing vertical hall |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020084709A1 (en) * | 2018-10-24 | 2020-04-30 | Jfe建材株式会社 | Press-fit method for immersion body, press-fit device, and removal method for immersion body |
-
1997
- 1997-03-11 JP JP07435697A patent/JP3923129B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102094642B1 (en) * | 2019-08-16 | 2020-03-27 | 박진감 | Connection structure of steel shoe for constructing vertical hall |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10252394A (en) | 1998-09-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101308575B1 (en) | Integral segment of steel strip and steel strut | |
| JP6320500B1 (en) | Bridge main girder, bridge with the main girder, and method of constructing the bridge | |
| JP4326908B2 (en) | Retaining wall and method for constructing retaining wall | |
| JP3923129B2 (en) | How to connect split ring pieces. | |
| JP4028928B2 (en) | Segment structure | |
| JP3930149B2 (en) | Segment piece and underground structure construction method | |
| JP3887071B2 (en) | Steel segment piece with joint box opening on outer surface and method for constructing subsidence body using the steel segment piece | |
| JP7535429B2 (en) | Foundation structure, steel segment used in foundation structure, and construction method for foundation structure | |
| JP3833602B2 (en) | Underground structure and its construction method | |
| JP4025464B2 (en) | Hollow cylinder structure | |
| JP3832606B2 (en) | Oval hollow cylinder | |
| KR100908479B1 (en) | Multi-girder for construction and civil engineering | |
| JP2022127984A (en) | earth retaining structure | |
| JPH05287980A (en) | Shaft lining and concrete segment | |
| JP4133268B2 (en) | caisson | |
| JPH0587096U (en) | Shield construction segment with hollow cross section for filling | |
| JP7138146B2 (en) | Foundation structure, annular body, connecting mechanism of steel segments, and construction method of foundation structure | |
| JP4616582B2 (en) | Retaining wall and method for constructing retaining wall | |
| JP2596852B2 (en) | Method of erection of horizontal beam in shore retaining work | |
| JP3921380B2 (en) | Construction method of underground structure and its reinforcement structure | |
| JP2022149045A (en) | earth retaining structure | |
| JPH05295979A (en) | Liner plate assembly | |
| JP4459800B2 (en) | Sink structure | |
| JPH08199970A (en) | Construction method and division segment of large section tunnel | |
| JP2683644B2 (en) | Tubular wall for excavation hole lining |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040303 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060524 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060530 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060731 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061114 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070112 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070213 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070221 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100302 Year of fee payment: 3 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130302 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130302 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160302 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |