JP3923129B2 - How to connect split ring pieces. - Google Patents
[go: Go Back, main page]

JP3923129B2 - How to connect split ring pieces. - Google Patents

How to connect split ring pieces. Download PDF

Info

Publication number
JP3923129B2
JP3923129B2 JP07435697A JP7435697A JP3923129B2 JP 3923129 B2 JP3923129 B2 JP 3923129B2 JP 07435697 A JP07435697 A JP 07435697A JP 7435697 A JP7435697 A JP 7435697A JP 3923129 B2 JP3923129 B2 JP 3923129B2
Authority
JP
Japan
Prior art keywords
split ring
piece
pieces
segment
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP07435697A
Other languages
Japanese (ja)
Other versions
JPH10252394A (en
Inventor
和義 佐藤
篤 伊藤
良幸 浜田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Metal Products and Engineering Inc
Kato Construction Co Ltd
Original Assignee
JFE Metal Products and Engineering Inc
Kato Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Metal Products and Engineering Inc, Kato Construction Co Ltd filed Critical JFE Metal Products and Engineering Inc
Priority to JP07435697A priority Critical patent/JP3923129B2/en
Publication of JPH10252394A publication Critical patent/JPH10252394A/en
Application granted granted Critical
Publication of JP3923129B2 publication Critical patent/JP3923129B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、セグメントピース等と呼ばれる分割リングピースを連結して構成し地中に圧入して沈設体を構築する技術に関し、詳しくは前記分割リングピースの連結方法に関する。
【0002】
【従来の技術】
従来、鋼製セグメントピースあるいは鉄筋コンクリートセグメントピース等と呼ばれる分割リングピースを連結して構成した沈設体を、地中に圧入によって構築する技術が存在する。この沈設体としては、地中に構築される立坑、集水井、水槽などの構造物がある。
【0003】
さらに、高速道路、鉄橋、あるいは陸橋等の橋脚の耐震補強を行う際の土留壁の構築にも、上記沈設体を用いることが提案されている。すなわち、この橋脚の耐震補強は、橋脚の周囲に所定の距離をおいて、分割リングピースを連結して構成した筒体を油圧ジャッキ等で地盤に圧入し土留壁として構築し、この橋脚と土留壁の間を掘削した後、掘削によって形成されるスペースを作業スペースとして、鋼板やセメントなどによって橋脚の補強作業を行う。
【0004】
このような沈設体の連結作業の例を図6に表す。
この図は円筒状の沈設体を構成するための初期の連結作業を示すもので、最下段の分割リング51と刃口53とを構成するための連結がなされる。
最下段の分割リング51の下端縁に沿ってリング状に据え付けられる刃口53は、リング状の周方向に、図の例では4つに分離され刃口ピース55となっている。刃口53の下端が地面に接している部分が小さいため、この分離数があまり多いと、刃口ピース55は不安定となり自立できず転倒してしまう。分離数を少なくすることで転倒せずに自立した刃口ピース55は、互いに溶接されて連結され、リング状になり刃口53を構成する。
【0005】
構成された刃口53の上には、分割リングピース57が載置され、分割リングピース57が互いに連結され最下段の分割リング51を構成する。同時に、分割リングピース57と刃口53との連結がなされる。これらの連結は、溶接によってなされる。
【0006】
このようにして、刃口53および最下段の分割リング51、場合によっては更に2段目、3段目の分割リング(図示せず)が連結され沈設体の下方部分が構成された後に、この構成状態における最上端の分割リングの上方から圧力が加えられ、地中への圧入が行われ、同時に分割リングの内側の掘削が行われる。
この圧入および掘削が行われた後に、次の段の分割リングが連結構成され、再び圧入および掘削が行われる。このように圧入および掘削が繰り返されて、地中には、分割リングが上下に連結した状態の筒状の構成を有する沈設体が構築される。
【0007】
【発明が解決しようとする課題】
しかしながら、以上の従来技術によれば、分割リングピース57と刃口ピース55は、別々に、工場で製作され現場で溶接などにより連結されていた。そのため、以下のような問題があった。
(1)現場における連結作業に手間がかかるものであった。
(2)また、現場における溶接では、丁寧な溶接が行いにくく、連結強度が不十分になる可能性があった。
(3)また、連結によって構成される分割リング51や刃口53の全体の水平面内での寸法精度が不十分になる可能性があった。
【0008】
例えば、図6のように沈設体が円筒状であり従って刃口53が円リング状である場合には、刃口53の真円精度が不十分になる可能性があった。そして、この真円精度を十分なものにするために従来は、図に示すような部材59を刃口53の半径方向に渡し、半径寸法を確認しながら連結作業を進める必要があり、この場合には(1)の連結作業の手間が更にかかるものであった。
【0009】
この発明は、以上の問題点を解決するためになされたもので、連結作業に手間がかからず、連結強度が十分になり、連結によって構成される分割リング51や刃口53の全体の水平面内での周方向の寸法精度が十分になる分割リングピースの連結方法を提供することを目的とする。
【0010】
【課題を解決するための手段】
以上の目的を達成するために、下記の発明をするに至った。すなわち、本発明は、沈設体の最下段の分割リングを構成するために、吊り下げられたセグメントピース(1)同士を、継手板(5)のボルト孔(17)に通したボルトとナットにより仮に相互に連結する工程と、前記連結されたセグメントピースを周方向に所定の長さとして、自立させる工程と、前記自立したセグメントピース(1)に対し、次のセグメントピース(1)を吊り下げた状態で、周方向に仮連結する工程を有し、一周分の上記仮連結により最下段の分割リングが構成されたら、セグメントピース外表面に設けられた締結用継手金具を用いて連結誤差を矯正する工程と、前記最下段の分割リングを構成するセグメントピース(1)を互いに溶接して最下段の分割リングを完成させる工程を、有する沈設体を構成するための分割リングピースの連結方法において、前記最下段の分割リングを構成するセグメントピースには現場ではなく工場において取り付けられた刃口が備え付けられていることを特徴とする分割リングピースの連結方法である。
【0014】
【発明の実施の形態】
以下、この発明の一実施形態を図1乃至図5において説明する。
この実施形態においては分割リングピースは、図1または図4に示すような鋼製セグメントピース1と呼ばれるものである。すなわち、この鋼製セグメントピース1は、工場で製作され、一対の平行な湾曲した主桁3の両端部に、一対の平行な直線的な継手板5が溶接されて枠体が構成される。
【0015】
さらに、この枠体には、前記一対の主桁3に対し平行に、1本の中主桁8が配置される。各中主桁8は互いに所定の間隔をあけ、継手板5に渡される。更に、継手板5に対し平行に、5本の縦リブ7が配置される。各縦リブ7は互いに所定の間隔をあけ、主桁3に渡される。これら主桁3、継手板5、縦リブ7、中主桁8の外側にスキンプレート9が張りわたされて鋼製セグメントピース1が構成される。
【0016】
すなわち、湾曲しているものの概略四角形の形状を有するスキンプレート9の内面で、前記四角形の上端縁および下端縁に主桁3が溶接され、前記四角形の左端縁および右端縁に継手板5が溶接される。
【0017】
なお、縦リブ7の内側には、当て板11が鋼製セグメントピース1の中央に部分的に張りわたされ、掘削用重機のワイヤでつり下げられたバケットが接触して、反跳し、回動してしまうことでバケットの位置のコントロールが困難になるのを防止する。
【0018】
このような鋼製セグメントピース1がリング周方向に連結された状態で、分割リング13である鋼製セグメントリングが構成される(図2、図3)。この分割リング13を軸方向に重ねて連結した状態で筒状の沈設体15が構成される(図2)。これらの連結のため、各桁3、5には連結のためのボルト孔17(図4)が形成される。
【0019】
もっとも、実際の施工では、分割リング13同士がリング単位で連結されるのではなく、下段の分割リング13の上には、次の段の分割リング13を構成する分割リングピース57が千鳥組のため一つずつ載置される(図2参照)ことが多い。この載置された分割リングピース57が互いに連結され次の段の分割リング53を構成する。同時に、各分割リングピース57と下段の分割リング13との連結がなされる。これらの連結は、ボルト締結又は溶接によってなされる。
【0020】
さて、重ねられる複数の分割リング13のうち最下段の分割リングピースである鋼製セグメントピース13には、この鋼製セグメントピース13の下端縁に沿って、予め工場で、リング状の刃口19が据え付けられる(図1、図3、図4)。
【0021】
すなわち、最下段の鋼製セグメントピース13を構成するスキンプレート9の下端縁に溶接される主桁3の下側に沿って、この下端縁の長さの分だけ、刃口外板21および刃口内板23からなる刃口19が据えられる。
【0022】
刃口外板21は、スキンプレート9の下端縁の外面に沿って溶接されるので、刃口外板の肉厚の分だけスキンプレートよりも外側に位置し、よって、フリクションカットが形成される。このフリクションカットにより、分割リング13の圧入に伴い、地盤は外側へ押しのけられ、スキンプレートと地盤との摩擦による抵抗が軽減される。また、この刃口外板は、同時に、下端縁の主桁3の外周端から下方へ伸びることとなる。
【0023】
また、刃口内板23は、下端縁の主桁3の内周端から、前記刃口外板21の下端に向かって伸び、この下端に鋭角に突き合わされて溶接される。これら溶接された刃口外板21と刃口内板23は内部に断面三角形の空間25を形成する。空間25の内部には、空間25と同じ形状の補強板26が複数箇所に配置される。配置の個所は、複数の縦リブ7のうち一部の縦リブの下端に連続する箇所である。
【0024】
スキンプレート9の外面で左右両端部の下方には、リング周方向の連結の際に正確な溶接を行うための仮組用のボルト締結用継手金具27が、それぞれ1箇所に取り付けられる。このボルトまた、締結用継手金具27はL字断面を有し、L字の一辺はスキンプレート9に溶接29され、他辺は突出してボルト孔31が形成される。ボルト締結用継手金具27は、隣り合う鋼製セグメントピース1で、対となって向かい合い、ボルト孔31を通すボルト33とナット35による締結が可能となる。
【0025】
同様に、刃口外板21の外面で左右両端部の下方には、同様のボルト締結用継手金具27がそれぞれ2箇所に取り付けられる。
【0026】
以下、図1を中心にして、刃口19を有する分割リングピースである鋼製セグメントピース1の製作手順は、例えば以下に説明する通りである。
(1)上側と下側の主桁3、3と、左右の継手板5、5を取り付けて溶接し、枠体を製作する。
(2)補強板26を刃口外板21に取り付け溶接する。
(3)刃口内板23を補強板26に取り付け溶接する。よって、刃口19を製作する。
(4)スキンプレート9に、(1)の枠体と(3)の刃口を、取り付けて溶接する。
(5)中主桁8や縦リブ7を取り付け溶接する。締結用継手金具27を溶接する。
【0027】
もっとも(4)において、枠体と刃口のいずれか一方を製作してスキンプレート9に溶接した後、他方を製作して、スキンプレート9に溶接してもよい。
また、補強板26は、縦リブ7の下端を延長して一体的に設けても良い。
さらに、刃口19は、より短くブロック化しておき、溶接して必要な長さにしても良い。すなわち、より短い刃口外板、刃口内板、及び補強板26によってブロックを製作しておき、工場において必要に応じて複数のブロックを周方向に連続して溶接し、刃口19としても良い。
【0028】
次に、製作された鋼製セグメントピース1によって、連結作業を行う手順及び沈設体の構築作業を説明する。
例えば、クレーンなどでつり下げられた最下段の二つの鋼製セグメントピース1は、継手板5のボルト孔17に通したボルト、ナットにより仮に連結される。
【0029】
この仮連結により、連結された鋼製セグメントピース1は周方向の長さは十分なものになり、自立でき転倒が防止される。この自立した鋼製セグメントピース1に対し、次の鋼製セグメントピース1がつり下げられた状態で、仮連結される。このようにして、一個の分割リング13を構成するすべての鋼製セグメントピース1が仮連結されたら、締結用継手金具27を用いて連結誤差を矯正する。
【0030】
この状態で、各鋼製セグメントピース1は互いに溶接される。最下段の二つの鋼製セグメントピース1には、予め刃口19が据え付けられているので、刃口の連結も同時になされたことになる。この溶接の後、締結用継手金具27は溶接用のバーナーによって取り除かれる。
【0031】
なお、刃口19および最下段の分割リング13の上には、場合によっては更に2段目、3段目の分割リング(図2参照)が連結される。この連結は従来と同様に、鋼製セグメントピース1が千鳥組のため一つずつ連結されて行われる。このようにして、沈設体の下方部分が構成された後に、この構成状態における最上端の分割リングの上方から圧力が加えられ、地中への圧入が行われ、同時に分割リングの内側の掘削が行われる。
【0032】
この圧入および掘削が行われた後に、次の段の分割リングが連結構成され、再び圧入および掘削が行われる。このように圧入および掘削が繰り返されて、地中には、分割リングが上下に連結した状態の筒状の構成を有する沈設体が構築される。
【0033】
この実施形態によれば、以下の効果を得ることができる。
以上説明したように、分割リングピースである鋼製セグメントピース1に刃口19を据え付けておくことで、鋼製セグメントピース1と刃口19との間の現場での連結が不要となり、その分だけ現場における連結作業の手間がかからなくなる。また、鋼製セグメントピース1と刃口19との間の連結を行う溶接は、工場で行うことができ、丁寧な溶接が行え、その分だけ連結強度が十分になる。
【0034】
また、従来は刃口ピース55(図6参照)の連結は、刃口ピース55の小さな連結面において行うしかなかったが、この実施形態によれば鋼製セグメントピース1の連結面、すなわち継手板5で連結が行われるので、連結面が大きくなり、水平面内での寸法精度、すなわちこの実施形態における真円精度が十分なものとなる。
【0035】
さらに、ボルト締結用継手金具27によって、刃口19が予め据え付けられた鋼製セグメント1の仮組をボルトの締結力を用いて行うことができる。よって、製作時あるいは連結時の溶接による熱歪みなどを原因とする誤差を、ボルトの締結力によって矯正することができる。したがって、水平面内での寸法精度が更に十分なものとなる。
【0036】
(他の実施形態)
以上の実施形態では、刃口19にフリクションカットが形成されるものであったが、他の実施形態では必ずしもフリクションカットは必要ではなく、スキンプレート9と刃口外板21が同一面に位置するものであっても良い。
【0037】
また、以上の実施形態では、スキンプレート9の外面で左右両端部の下方には、仮組用のボルト締結用継手金具27が、それぞれ1箇所に取り付けられ、刃口外板21の外面で左右両端部の下方には、それぞれ2箇所に取り付けられるものであったが、他の実施形態では取り付けられるボルト締結用継手金具27の数は任意の数が採用されうる。
【0038】
また、以上の実施形態では、鋼セグメントピース1の構造は、一対の平行な主桁3の両端部に、一対の平行な直線的な継手板5が溶接されて、主桁3に対し平行に1本の中主桁8が配置され、継手板5に対しほぼ平行に5本の縦リブ7が配置され、これらの外側にスキンプレート9が張りわたされてなるものであったが、他の実施形態では必ずしもこのような構造でなくても良い。
【0039】
即ち、中主桁8の数は2本以上であっても良い。あるいは、全く設けられなくても良い。
また、縦リブ7の数は1本、2本、3本、4本、または6本以上であっても良い。あるいは、全く設けられなくても良い。
また、スキンプレート9の左右端縁に沿って連続して設けられる継手板5(図1参照)の代わりに、不連続な複数個の、例えば2個の継手部材を溶接で取り付けたものであっても良い。
【0040】
また、一対の平行な主桁3も必ずしも不要である。たとえば、略四角形のスキンプレート9に対角線上に桁材を溶接したものであっても良い。
また、スキンプレート9は必ずしも略四角形である必要はない。筒状の沈設体15を展開した面を、単一の形状で、あるいはいくつかの画一な形状でモザイク状に隙間なく覆うことができる形状であればよい。
【0041】
また、以上の実施形態では、分割リングピースとして鋼セグメントピース1と呼ばれるものを例に説明したが、分割リングピースの名称には複数のものが存在する。この明細書中では、名称の如何に拘わらず、上記構造を有するものはすべて、分割リングピースとする。
【0042】
また、以上の実施形態では、鋼製セグメントピース1によって構成される沈設体15は完全な円形断面を有するものであった(図2)が、他の実施形態では必ずしも円形断面でなくても良く、概略四角形や楕円形であっても良い。その場合であっても、水平面内における寸法精度が良くなることで、正確な概略四角形や楕円形が得られる。
【0043】
また、以上の実施形態では、鋼製セグメントピース1は周方向に6つが連結された分割リング13を構成するものであった。すなわち、鋼製セグメントピース1は分割リング13を6つに分離されたものであったが、他の実施形態では5つ以下、または7つ以上に分離されたものでも良い。
【0044】
【発明の効果】
以上説明したように、発明によれば、工場において予め分割リングピースに刃口が据え付けられているので、以下に述べる効果がある。(1)連結作業現場において分割リングピースと刃口との間の連結が不要となり、その分だけ連結作業の手間がかからなくなる。(2)また、分割リングピースと刃口との間の連結を行う溶接は、工場で行うことができ、丁寧な溶接が行い易い。よって、その分だけ連結強度が十分になる。(3)また、従来は刃口ピースの連結は、刃口ピースの小さな連結面において行うしかなかったが、この発明によれば刃口ピースの連結面のみならず分割リングピースの連結面において連結が行われるので、連結面が大きくなり、水平面内での寸法精度が十分なものとなる。
【0045】
さらに、ボルト締結用継手金具によって、刃口が予め据え付けられた分割リングピースの仮組をボルトの締結力を用いて行うことができる。よって、製作時あるいは連結時の溶接による熱歪みなどを原因とする誤差を、締結力によって矯正することができる。したがって、前記水平面内での寸法精度が更に十分なものとなる。
【図面の簡単な説明】
【図1】この発明の一実施形態に係る刃口が据え付けられた分割リングピースの斜視図である。
【図2】図1の分割リングピースが複数連結されて構成される沈設体の斜視図である。
【図3】図1の分割リングピースが連結されて構成した最下段の分割リングを示すもので、(A)は平面図、(B)は側面図である。
【図4】図1の分割リングピースを示すもので、
(A)は正面図、(B)は側面図、(C)は平面図、(D)は底面図である。
【図5】図1の分割リングピース同士を連結する際の用いるボルト締結用継手金具の働きを説明する斜視図である。
(B)は側面図である。
【図6】従来の鋼製セグメントピース連結する作業の様子を表すための斜視図である。
【符号の説明】
1 鋼製セグメントピース(分割リングピース) 3 主桁
5 継手板 8 中主桁
9 スキンプレート 13 分割リング
15 沈設体 19 刃口
21 刃口外板 23 刃口内板
25 空間 26 補強板
27 ボルト締結用継手金具
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a technique for connecting divided ring pieces called segment pieces or the like and press-fitting them into the ground to construct a sinking body, and more particularly to a method for connecting the divided ring pieces.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, there is a technique for constructing a subsidized body formed by connecting divided ring pieces called steel segment pieces or reinforced concrete segment pieces or the like by press-fitting into the ground. As this subsidence body, there are structures such as a shaft, a water collection well, and a water tank constructed in the ground.
[0003]
Furthermore, it has been proposed to use the above-mentioned subsidence for the construction of retaining walls when performing seismic reinforcement of piers such as highways, iron bridges, and overpasses. In other words, the seismic reinforcement of this pier is constructed as a retaining wall by press-fitting a cylindrical body constructed by connecting split ring pieces with a predetermined distance around the pier, using a hydraulic jack or the like. After excavating between the walls, the pier is reinforced with steel plates, cement, etc., using the space formed by excavation as the work space.
[0004]
An example of the connecting operation of such a sinking body is shown in FIG.
This figure shows an initial connection operation for forming a cylindrical sedimentary body, and the connection for forming the lowermost split ring 51 and the blade edge 53 is performed.
The blade edge 53 installed in a ring shape along the lower end edge of the lowermost split ring 51 is separated into four in the ring-shaped circumferential direction as a blade edge piece 55 in the illustrated example. Since the portion where the lower end of the blade edge 53 is in contact with the ground is small, if the number of separation is too large, the blade edge piece 55 becomes unstable and cannot stand on its own and falls. By reducing the number of separations, the blade edge pieces 55 that are self-supporting without falling down are welded and connected to each other, forming a ring shape.
[0005]
A split ring piece 57 is placed on the blade edge 53 thus configured, and the split ring pieces 57 are connected to each other to form the lowermost split ring 51. At the same time, the split ring piece 57 and the blade 53 are connected. These connections are made by welding.
[0006]
In this way, after the blade 53 and the lowermost split ring 51, and in some cases, the second and third split rings (not shown) are connected to form the lower part of the sinking body, Pressure is applied from above the uppermost split ring in the configuration state, and press-fitting into the ground is performed, and at the same time, excavation inside the split ring is performed.
After the press-fitting and excavation are performed, the next-stage split ring is connected and configured, and the press-fitting and excavation are performed again. In this way, the press-fitting and excavation are repeated, and a subsidence body having a cylindrical configuration in which the split rings are connected in the vertical direction is constructed in the ground.
[0007]
[Problems to be solved by the invention]
However, according to the above prior art, the split ring piece 57 and the blade edge piece 55 are separately manufactured at the factory and connected by welding or the like at the site. Therefore, there are the following problems.
(1) It takes a lot of time to perform the connecting work on site.
(2) In addition, in-site welding, it is difficult to perform careful welding, and the connection strength may be insufficient.
(3) In addition, there is a possibility that the dimensional accuracy in the entire horizontal plane of the split ring 51 and the blade edge 53 constituted by the connection may be insufficient.
[0008]
For example, when the sinking body is cylindrical as shown in FIG. 6 and the blade edge 53 is in a circular ring shape, the roundness accuracy of the blade edge 53 may be insufficient. In order to make this perfect circle accuracy sufficient, conventionally, it is necessary to pass a member 59 as shown in the figure in the radial direction of the blade edge 53 and to proceed with the connecting work while checking the radial dimension. In this case, the labor of the connecting work (1) is further required.
[0009]
The present invention has been made in order to solve the above-described problems, and does not require a labor for the connection work, the connection strength is sufficient, and the entire horizontal surface of the split ring 51 and the blade edge 53 constituted by the connection. It is an object of the present invention to provide a method for connecting split ring pieces with sufficient circumferential dimensional accuracy.
[0010]
[Means for Solving the Problems]
In order to achieve the above object, the inventors have made the following invention. That is, according to the present invention, in order to constitute the lowermost split ring of the sinking body, the suspended segment pieces (1) are passed through the bolt holes (17) of the joint plate (5) with bolts and nuts. Temporarily connecting to each other, a step of making the connected segment pieces a predetermined length in the circumferential direction, and a next segment piece (1) suspended from the self-supporting segment piece (1) In this state, a temporary connection in the circumferential direction is included, and when the lowermost split ring is formed by the temporary connection for one turn, the connection error is reduced by using the fastening fitting provided on the outer surface of the segment piece. A division for constituting a sinking body comprising a step of correcting and a step of welding the segment pieces (1) constituting the lowermost division ring together to complete the lowermost division ring In connection method Ngupisu, said a method of connecting split ring pieces, characterized in that attached cutting edge in a factory instead of field in the segment piece which constitutes the lowermost split ring is equipped.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of the present invention will be described below with reference to FIGS.
In this embodiment, the split ring piece is a steel segment piece 1 as shown in FIG. 1 or FIG. That is, the steel segment piece 1 is manufactured at a factory, and a pair of parallel linear joint plates 5 are welded to both ends of a pair of parallel curved main girders 3 to form a frame.
[0015]
Further, in the frame body, one middle main beam 8 is arranged in parallel to the pair of main beams 3. Each middle main beam 8 is passed to the joint plate 5 with a predetermined interval therebetween. Further, five vertical ribs 7 are arranged in parallel to the joint plate 5. The vertical ribs 7 are passed to the main beam 3 at a predetermined interval. A skin plate 9 is stretched on the outside of the main girder 3, the joint plate 5, the vertical ribs 7, and the middle main girder 8 to constitute the steel segment piece 1.
[0016]
That is, the main girder 3 is welded to the upper and lower edges of the square on the inner surface of the skin plate 9 that is curved but has a substantially square shape, and the joint plate 5 is welded to the left and right edges of the square. Is done.
[0017]
In addition, a backing plate 11 is partially stretched in the center of the steel segment piece 1 inside the vertical rib 7, and a bucket suspended by a wire of a heavy excavator makes contact, recoils, and rotates. This prevents the bucket position from becoming difficult to control.
[0018]
With such a steel segment piece 1 connected in the ring circumferential direction, a steel segment ring which is a split ring 13 is configured (FIGS. 2 and 3). A cylindrical set-up body 15 is configured in a state where the split rings 13 are connected in an axial direction (FIG. 2). For these connections, bolt holes 17 (FIG. 4) for connection are formed in the girders 3 and 5.
[0019]
However, in actual construction, the split rings 13 are not connected to each other in a ring unit, but the split ring pieces 57 constituting the split ring 13 of the next stage are arranged in a staggered manner on the lower split ring 13. Therefore, it is often placed one by one (see FIG. 2). The mounted divided ring pieces 57 are connected to each other to form a divided ring 53 of the next stage. At the same time, each divided ring piece 57 is connected to the lower divided ring 13. These connections are made by bolt fastening or welding.
[0020]
Now, the steel segment piece 13 which is the lowermost split ring piece among the plurality of split rings 13 to be overlaid is provided with a ring-shaped blade 19 in advance at the factory along the lower edge of the steel segment piece 13. Is installed (FIGS. 1, 3, and 4).
[0021]
That is, along the lower side of the main girder 3 welded to the lower end edge of the skin plate 9 constituting the lowermost steel segment piece 13, the blade edge outer plate 21 and the inside of the blade edge are provided by the length of the lower edge. A blade edge 19 made of a plate 23 is set.
[0022]
Since the blade edge outer plate 21 is welded along the outer surface of the lower end edge of the skin plate 9, the blade edge outer plate 21 is positioned outside the skin plate by the thickness of the blade edge outer plate, thereby forming a friction cut. By this friction cut, the ground is pushed outward with the press-fitting of the split ring 13, and the resistance due to friction between the skin plate and the ground is reduced. Moreover, this blade edge | side outer plate will be extended below from the outer peripheral end of the main girder 3 of a lower end edge simultaneously.
[0023]
Further, the blade inner plate 23 extends from the inner peripheral end of the main girder 3 at the lower edge toward the lower end of the blade outer plate 21 and is abutted at an acute angle and welded to the lower end. The welded blade edge outer plate 21 and blade edge inner plate 23 form a space 25 having a triangular cross section inside. Inside the space 25, reinforcing plates 26 having the same shape as the space 25 are arranged at a plurality of locations. The location of arrangement is a location that continues to the lower end of some of the vertical ribs 7.
[0024]
On the outer surface of the skin plate 9, below the left and right end portions, bolt assembly fittings 27 for temporary assembly for performing accurate welding at the time of connection in the ring circumferential direction are respectively attached at one place. This bolt or fastening fitting 27 has an L-shaped cross section, one side of the L-shape is welded 29 to the skin plate 9, and the other side protrudes to form a bolt hole 31. The bolt fastening joint fittings 27 are adjacent steel segment pieces 1 that face each other in pairs and can be fastened by bolts 33 and nuts 35 through which the bolt holes 31 are passed.
[0025]
Similarly, on the outer surface of the blade outer plate 21, below the left and right ends, similar bolt fastening joint fittings 27 are respectively attached at two locations.
[0026]
Hereinafter, with reference to FIG. 1, for example, the manufacturing procedure of the steel segment piece 1 which is a split ring piece having the blade edge 19 is as described below.
(1) The upper and lower main girders 3, 3 and the left and right joint plates 5, 5 are attached and welded to produce a frame.
(2) The reinforcing plate 26 is attached to the blade outer plate 21 and welded.
(3) The blade edge inner plate 23 is attached to the reinforcing plate 26 and welded. Therefore, the blade 19 is manufactured.
(4) The frame body (1) and the blade edge (3) are attached to the skin plate 9 and welded.
(5) The middle main beam 8 and the vertical rib 7 are attached and welded. The fastening fitting 27 is welded.
[0027]
However, in (4), either one of the frame and the blade edge may be manufactured and welded to the skin plate 9, and then the other may be manufactured and welded to the skin plate 9.
Further, the reinforcing plate 26 may be integrally provided by extending the lower end of the vertical rib 7.
Further, the blade edge 19 may be made shorter and welded to have a required length. That is, a block may be manufactured by using a shorter blade outer plate, a blade inner plate, and a reinforcing plate 26, and welding a plurality of blocks in the circumferential direction as needed in a factory.
[0028]
Next, a procedure for performing a connection operation and a construction operation for a sinking body will be described using the manufactured steel segment piece 1.
For example, the bottom two steel segment pieces 1 suspended by a crane or the like are temporarily connected by bolts and nuts passed through the bolt holes 17 of the joint plate 5.
[0029]
By this temporary connection, the connected steel segment pieces 1 have a sufficient length in the circumferential direction, can be self-supporting, and are prevented from falling. The self-standing steel segment piece 1 is temporarily connected in a state where the next steel segment piece 1 is suspended. In this way, when all the steel segment pieces 1 constituting one split ring 13 are temporarily connected, the connection error is corrected using the fastening fitting 27.
[0030]
In this state, the steel segment pieces 1 are welded to each other. Since the blade edge 19 is previously installed in the two lower steel segment pieces 1, the blade edge is also connected at the same time. After this welding, the fastening fitting 27 is removed by a welding burner.
[0031]
In addition, a second stage and a third stage split ring (see FIG. 2) are connected to the blade edge 19 and the lowermost split ring 13 in some cases. As in the prior art, this connection is performed by connecting the steel segment pieces 1 one by one for the staggered group. In this way, after the lower part of the sinking body is configured, pressure is applied from above the uppermost split ring in this configuration state, press-fitting into the ground is performed, and at the same time, excavation inside the split ring is performed. Done.
[0032]
After the press-fitting and excavation are performed, the next-stage split ring is connected and configured, and the press-fitting and excavation are performed again. In this way, the press-fitting and excavation are repeated, and a subsidence body having a cylindrical configuration in which the split rings are connected in the vertical direction is constructed in the ground.
[0033]
According to this embodiment, the following effects can be obtained.
As described above, by installing the blade edge 19 on the steel segment piece 1 which is a split ring piece, the connection between the steel segment piece 1 and the blade edge 19 in the field becomes unnecessary. This eliminates the need for connecting work on site. Moreover, the welding which connects between the steel segment piece 1 and the blade edge 19 can be performed at a factory, and can be performed carefully, and the connection strength becomes sufficient by that amount.
[0034]
Further, conventionally, the cutting edge piece 55 (see FIG. 6) can only be connected to a small connecting surface of the cutting edge piece 55. According to this embodiment, the connecting surface of the steel segment piece 1, that is, a joint plate, is used. Since the connection is performed at 5, the connecting surface becomes large, and the dimensional accuracy in the horizontal plane, that is, the perfect circle accuracy in this embodiment is sufficient.
[0035]
Furthermore, the temporary fastening of the steel segment 1 on which the blade edge 19 has been installed in advance can be performed by the bolt fastening joint fitting 27 using the fastening force of the bolt. Therefore, an error caused by thermal distortion caused by welding at the time of manufacture or connection can be corrected by the fastening force of the bolt. Therefore, the dimensional accuracy in the horizontal plane is further sufficient.
[0036]
(Other embodiments)
In the above embodiment, the friction cut is formed in the blade edge 19, but in other embodiments, the friction cut is not necessarily required, and the skin plate 9 and the blade edge outer plate 21 are located on the same plane. It may be.
[0037]
Further, in the above embodiment, the bolt assembly fitting 27 for temporary assembly is attached to each of the outer surfaces of the skin plate 9 below the left and right ends. Although it was attached to two places below the part, in the other embodiments, any number of bolt fastening joint fittings 27 may be employed.
[0038]
Moreover, in the above embodiment, the structure of the steel segment piece 1 is parallel to the main girder 3 by welding a pair of parallel linear joint plates 5 to both ends of the pair of parallel main girder 3. One middle main girder 8 is arranged, five vertical ribs 7 are arranged substantially parallel to the joint plate 5, and a skin plate 9 is stretched on the outside thereof. In the embodiment, such a structure is not necessarily required.
[0039]
That is, the number of middle main digits 8 may be two or more. Alternatively, it may not be provided at all.
Further, the number of the longitudinal ribs 7 may be 1, 2, 3, 4, or 6 or more. Alternatively, it may not be provided at all.
Further, instead of the joint plate 5 (see FIG. 1) continuously provided along the left and right edges of the skin plate 9, a plurality of discontinuous, for example, two joint members are attached by welding. May be.
[0040]
Further, the pair of parallel main girders 3 is not necessarily required. For example, a girder material may be welded diagonally to a substantially rectangular skin plate 9.
Further, the skin plate 9 does not necessarily have a substantially rectangular shape. It is only necessary that the surface on which the cylindrical set-up body 15 is developed can be covered with a single shape or with a number of uniform shapes in a mosaic shape without gaps.
[0041]
Moreover, although the above embodiment demonstrated as an example what was called the steel segment piece 1 as a division | segmentation ring piece, there exist several names in the division | segmentation ring piece. In this specification, regardless of the name, anything having the above structure is a split ring piece.
[0042]
Moreover, in the above embodiment, the settling body 15 constituted by the steel segment piece 1 has a complete circular cross section (FIG. 2). However, in other embodiments, it may not necessarily have a circular cross section. , It may be roughly square or oval. Even in such a case, an accurate approximate quadrangle or ellipse can be obtained by improving the dimensional accuracy in the horizontal plane.
[0043]
Moreover, in the above embodiment, the steel segment piece 1 comprised the division | segmentation ring 13 with which six were connected in the circumferential direction. In other words, the steel segment piece 1 is obtained by separating the dividing ring 13 into six pieces. However, in another embodiment, it may be divided into five pieces or less, or seven pieces or more.
[0044]
【The invention's effect】
As described above, according to the present invention, since the cutting edge is installed in advance in the split ring piece in the factory, the following effects can be obtained. (1) The connection between the split ring piece and the cutting edge becomes unnecessary at the connection work site, and the connection work is not required much. (2) Moreover, the welding which connects between a division | segmentation ring piece and a blade edge can be performed in a factory, and it is easy to perform polite welding. Therefore, the connection strength becomes sufficient by that amount. (3) Further, conventionally, the cutting edge piece can only be connected on the small connecting surface of the cutting edge piece. However, according to the present invention, not only the connecting surface of the cutting edge piece but also the connecting surface of the split ring piece is connected. obtained been conducted Runode, coupling surface is increased, the dimensional accuracy in the horizontal plane is sufficient.
[0045]
Further, a bolt fastening joint fitting can be performed using the fastening force of the temporarily assembled split ring piece cutting edge is mounted in advance volts. Therefore, errors caused by thermal distortion caused by welding during manufacture or connection can be corrected by the fastening force. Therefore, the dimensional accuracy in the horizontal plane is further sufficient.
[Brief description of the drawings]
FIG. 1 is a perspective view of a split ring piece on which a blade is installed according to an embodiment of the present invention.
2 is a perspective view of a sinking body constituted by connecting a plurality of split ring pieces in FIG. 1; FIG.
FIGS. 3A and 3B show a lowermost split ring configured by connecting the split ring pieces of FIG. 1, wherein FIG. 3A is a plan view and FIG. 3B is a side view.
FIG. 4 shows the split ring piece of FIG.
(A) is a front view, (B) is a side view, (C) is a plan view, and (D) is a bottom view.
FIG. 5 is a perspective view for explaining the function of a bolt fastening joint fitting used when connecting the divided ring pieces of FIG. 1;
(B) is a side view.
FIG. 6 is a perspective view for illustrating a state of work of connecting conventional steel segment pieces.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Steel segment piece (split ring piece) 3 Main girder 5 Joint plate 8 Middle main girder 9 Skin plate 13 Split ring 15 Sedimentation body 19 Cutting edge 21 Cutting edge outer plate 23 Cutting edge inner plate 25 Space 26 Reinforcement plate 27 Joint for bolt fastening Metal fittings

Claims (1)

沈設体の最下段の分割リングを構成するために、
吊り下げられたセグメントピース(1)同士を、継手板(5)のボルト孔(17)に通したボルトとナットにより仮に相互に連結する工程と、
前記連結されたセグメントピースを周方向に所定の長さとして、自立させる工程と
前記自立したセグメントピース(1)に対し、次のセグメントピース(1)を吊り下げた状態で、周方向に仮連結する工程を有し
一周分の上記仮連結により最下段の分割リングが構成されたら、セグメントピース外表面に設けられた締結用継手金具を用いて連結誤差を矯正する工程と
前記最下段の分割リングを構成するセグメントピース(1)を互いに溶接して最下段の分割リングを完成させる工程を、
有する沈設体を構成するための分割リングピースの連結方法において、
前記最下段の分割リングを構成するセグメントピースには現場ではなく工場において取り付けられた刃口が備え付けられていることを特徴とする分割リングピースの連結方法。
To make up the split ring at the bottom of the sinking body,
Temporarily connecting the suspended segment pieces (1) to each other with bolts and nuts passed through the bolt holes (17) of the joint plate (5) ;
As the linked segment pieces circumferential direction of the predetermined length, a step of Ru is self,
In the state which suspended the next segment piece (1) with respect to the said self-supporting segment piece (1), it has the process of temporarily connecting in the circumferential direction ,
When the lowermost split ring is configured by the temporary connection for one turn, a step of correcting the connection error using the fastening fitting provided on the outer surface of the segment piece ;
A step of welding the segment pieces (1) constituting the lowermost split ring together to complete the lowermost split ring ,
In a connecting method of split ring pieces for constituting a sinking body having:
A segment ring piece connecting method for split ring pieces, characterized in that a segment piece constituting the lowermost split ring is provided with a cutting edge attached at a factory rather than at the site.
JP07435697A 1997-03-11 1997-03-11 How to connect split ring pieces. Expired - Lifetime JP3923129B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07435697A JP3923129B2 (en) 1997-03-11 1997-03-11 How to connect split ring pieces.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07435697A JP3923129B2 (en) 1997-03-11 1997-03-11 How to connect split ring pieces.

Publications (2)

Publication Number Publication Date
JPH10252394A JPH10252394A (en) 1998-09-22
JP3923129B2 true JP3923129B2 (en) 2007-05-30

Family

ID=13544775

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07435697A Expired - Lifetime JP3923129B2 (en) 1997-03-11 1997-03-11 How to connect split ring pieces.

Country Status (1)

Country Link
JP (1) JP3923129B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102094642B1 (en) * 2019-08-16 2020-03-27 박진감 Connection structure of steel shoe for constructing vertical hall

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020084709A1 (en) * 2018-10-24 2020-04-30 Jfe建材株式会社 Press-fit method for immersion body, press-fit device, and removal method for immersion body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102094642B1 (en) * 2019-08-16 2020-03-27 박진감 Connection structure of steel shoe for constructing vertical hall

Also Published As

Publication number Publication date
JPH10252394A (en) 1998-09-22

Similar Documents

Publication Publication Date Title
KR101308575B1 (en) Integral segment of steel strip and steel strut
JP6320500B1 (en) Bridge main girder, bridge with the main girder, and method of constructing the bridge
JP4326908B2 (en) Retaining wall and method for constructing retaining wall
JP3923129B2 (en) How to connect split ring pieces.
JP4028928B2 (en) Segment structure
JP3930149B2 (en) Segment piece and underground structure construction method
JP3887071B2 (en) Steel segment piece with joint box opening on outer surface and method for constructing subsidence body using the steel segment piece
JP7535429B2 (en) Foundation structure, steel segment used in foundation structure, and construction method for foundation structure
JP3833602B2 (en) Underground structure and its construction method
JP4025464B2 (en) Hollow cylinder structure
JP3832606B2 (en) Oval hollow cylinder
KR100908479B1 (en) Multi-girder for construction and civil engineering
JP2022127984A (en) earth retaining structure
JPH05287980A (en) Shaft lining and concrete segment
JP4133268B2 (en) caisson
JPH0587096U (en) Shield construction segment with hollow cross section for filling
JP7138146B2 (en) Foundation structure, annular body, connecting mechanism of steel segments, and construction method of foundation structure
JP4616582B2 (en) Retaining wall and method for constructing retaining wall
JP2596852B2 (en) Method of erection of horizontal beam in shore retaining work
JP3921380B2 (en) Construction method of underground structure and its reinforcement structure
JP2022149045A (en) earth retaining structure
JPH05295979A (en) Liner plate assembly
JP4459800B2 (en) Sink structure
JPH08199970A (en) Construction method and division segment of large section tunnel
JP2683644B2 (en) Tubular wall for excavation hole lining

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040303

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060524

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060530

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060731

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061114

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070112

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070221

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160302

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term