JP3923230B2 - Underground excavation element and underground structure construction method - Google Patents
[go: Go Back, main page]

JP3923230B2 - Underground excavation element and underground structure construction method - Google Patents

Underground excavation element and underground structure construction method Download PDF

Info

Publication number
JP3923230B2
JP3923230B2 JP2000050488A JP2000050488A JP3923230B2 JP 3923230 B2 JP3923230 B2 JP 3923230B2 JP 2000050488 A JP2000050488 A JP 2000050488A JP 2000050488 A JP2000050488 A JP 2000050488A JP 3923230 B2 JP3923230 B2 JP 3923230B2
Authority
JP
Japan
Prior art keywords
side wall
underground
underground excavation
opening
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000050488A
Other languages
Japanese (ja)
Other versions
JP2001234691A (en
Inventor
忠良 石橋
修司 富田
敏彦 新堀
明之 渡邊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2000050488A priority Critical patent/JP3923230B2/en
Publication of JP2001234691A publication Critical patent/JP2001234691A/en
Application granted granted Critical
Publication of JP3923230B2 publication Critical patent/JP3923230B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、非開削方式で地下構造物を構築するために用いる地中掘削用エレメント、及びこの地中掘削用エレメントにより地下構造物を構築する方法に関するものである。
【0002】
【従来の技術】
従来、鉄道線路や道路等の下方に非開削方式で地下構造物を構築する方法として、「ロ」字状断面や「コ」字状断面等の地中掘削用エレメントを推進又はけん引により地中に順次挿入して組み合わせ、エレメントにより囲まれた部分の土砂等を掘削し、地中掘削用エレメントからなる構造体(以下、「エレメント構造体」という。)を地下構造物の本体として利用する工法が用いられている。
【0003】
【発明が解決しようとする課題】
しかしながら、上記した地中掘削用エレメントにおいては、「ロ」字状断面又は「コ」字状断面の側壁部は、例えば板状の部材等で構成されていたため、エレメントの挿入・掘削の段階では、エレメントの先端部の開口から地盤掘削を行い、掘削した土砂等をエレメント内に取り込んで後方に搬送して外部へ排出する構造となっていた。このため、エレメントの挿入・掘削時に支障物に遭遇した場合や、エレメント内での作業が必要となった場合には、当該エレメントの先端部開口からしか、この支障物を取り込んでてっ去することはできず、当該エレメントの内部からしか、エレメント内作業を行うことはできない、という問題があった。
【0004】
本発明は上記の問題を解決するためになされたものであり、本発明の解決しようとする課題は、エレメントの挿入・掘削時に支障物に遭遇した場合やエレメント内作業が必要となった場合に当該エレメント以外からも支障物てっ去やエレメント内作業が可能な地中掘削用エレメントと、このエレメントを用いた地下構造物構築方法を提供することにある。
【0005】
【課題を解決するための手段】
上記課題を解決するため、本発明に係る地中掘削用エレメントは、エレメント軸方向に延設される底板と、前記エレメント軸方向に延設されるとともに前記底板の上方に平行に配置された頂板と、側壁部において前記底板及び前記頂板を連結するとともに、外部と連通する側壁部開口を形成可能な連結構造と、前記エレメント軸方向に延設されるとともに、隣接するエレメント継手部どうしの嵌合により相互の接続を行い、前記エレメント継手部により前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能としたエレメント継手部を備え、中空箱状に構成され、前記側壁部開口を塞ぐと共に前記底板又は前記頂板若しくは前記連結構造に着脱具によって着脱可能に構成された側壁部仕切板とを備えたことを特徴とする。
【0006】
上記の地中掘削用エレメントにおいて、好ましくは、前記連結構造は、前記底板と頂板の中間となる前記側壁部において鉛直方向に延在するように複数配置される柱状部材である。
【0007】
また、上記の地中掘削用エレメントにおいて、好ましくは、前記側壁部仕切板、側壁部の土留めとして用いる。
【0008】
また、上記の地中掘削用エレメントにおいて、好ましくは、前記側壁部仕切板は、前記底板又は前記頂板若しくは前記連結構造に作用する外力を負担しない構造である。
【0009】
また、上記の地中掘削用エレメントにおいて、好ましくは、前記側壁部仕切板は、前記底板又は前記頂板若しくは前記連結構造に移動可能に構成される。
【0010】
また、本発明に係る地下構造物構築方法は、エレメント軸方向に延設される底板と、前記エレメント軸方向に延設されるとともに前記底板の上方に平行に配置された頂板と、側壁部において前記底板及び前記頂板を連結するとともに外部と連通する側壁部開口を形成可能な連結構造と、前記エレメント軸方向に延設されるとともに隣接するエレメント継手部どうしの嵌合により相互の接続を行い前記エレメント継手部により前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能としたエレメント継手部を備え中空箱状に構成された地中掘削用エレメントを用いた地下構造物構築方法であって、前記地中掘削用エレメントを、前記エレメント軸方向を挿入方向とし、先端部開口で地盤の掘削を行いつつ地中に挿入し、次いで、他の地中掘削用エレメントのエレメント継手部を、既設の地中掘削用エレメントのエレメント継手部に嵌合させて誘導案内させ、他の地中掘削用エレメントを、前記エレメント軸方向を挿入方向として掘削しつつ地中に挿入することを繰り返すことにより、複数の地中掘削用エレメントを地中で接続させてエレメント構造体を形成し、次いで、前記エレメント構造体を防護工として前記エレメント構造体の内部の地盤を掘削し、次いで、前記エレメント構造体を本体として利用して地下構造物を構築し、地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に支障物と遭遇した場合には、前記支障物に遭遇した当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し前記支障物が前記側壁開口を通過することによって前記支障物のてっ去を行うことを特徴とする。
【0011】
上記の地下構造物構築方法において、好ましくは、前記側壁部開口を塞ぐ側壁部仕切板を備えて側壁部の土留めとして用いる。
【0012】
また、上記の地下構造物構築方法において、好ましくは、地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に支障物と遭遇した場合には、前記支障物に遭遇した当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して前記支障物が前記側壁部開口を通過することによって前記支障物のてっ去を行う。
【0013】
また、上記の地下構造物構築方法において、好ましくは、前記地中掘削用エレメントのいずれかに止水工を含むエレメント内作業を行う場合に、当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し又は前記隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して作業者が前記側壁部開口を通過して出入を行う。
【0014】
また、上記の地下構造物構築方法において、好ましくは、前記地中掘削用エレメントのいずれかに物体を搬入し、又は前記地中掘削用エレメントのいずれかから物体を搬出する場合に、当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し又は前記隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して前記物体が前記側壁部開口を通過することによって行う。
【0015】
【発明の実施の形態】
以下、本発明の実施形態について、図面を参照しながら詳細に説明する。
【0016】
(1)第1実施形態
まず、本発明の第1実施形態について説明する。
【0017】
図1は、本発明の第1実施形態である地下構造物の全体構成を示す断面図である。
【0018】
図1に示すように、この地下構造物101は、「ロ」字状の断面形状を有する箱型の構造物である。地下構造物101は、「ロ」字状の断面形状を有するエレメント構造体E1により構成されている。
【0019】
エレメント構造体E1は、上床版部の中央位置に設置される地中掘削用エレメント(以下、「基準エレメント」という。)10と、基準エレメント10に隣接させるように設置される地中掘削用エレメント(以下、「一般部エレメント」という。)20と、エレメント構造体E1の4つの隅角位置に設置される地中掘削用エレメント(以下、「隅角部エレメント」という。)30が組み合わされることによって構成されている。
【0020】
図2は、図1の地下構造物101における基準エレメント10の構成を示す図であり、図2(A)は一部を分解した斜視図を、図2(B)は隅の一部を拡大した断面図を、それぞれ示している。
【0021】
図2(A)に示すように、基準エレメント10は、底板11aと、頂板11bと、柱状部材12と、側壁部仕切板15を備え、「ロ」字状断面の中空箱状に構成されている。底板11aは、基準エレメント10の長手方向(以下、「エレメント軸方向」という。)に延設される鋼又はアルミニウム等の金属若しくは合金等からなる板状部材である。頂板11bは、エレメント軸方向に延設されるとともに、底板11aの上方に平行に配置される鋼又はアルミニウム等の金属若しくは合金等からなる板状部材である。
【0022】
また、柱状部材12は、底板11aと頂板11bの中間となる側壁部において、鉛直方向に延在するように複数配置されている。柱状部材12は、底板11aと頂板11bに溶接等により接合され、底板11aと頂板11bを連結している。また、柱状部材12は、基準エレメント10の内部の空洞部と外部を連通させる側壁部開口14を形成している。これらの柱状部材12は、連結構造を構成している。
【0023】
また、側壁部仕切板15は、側壁部開口14を塞ぐように配置される板状部材であり、鋼やアルミニウム等の金属又は合金、合成樹脂、FRP(繊維補強プラスチック)、木材等からなる。側壁部仕切板15は、後述するように、基準エレメント10を掘削しつつ地中に挿入する際に、側壁部の土留め等として用いられる。
【0024】
側壁部仕切板15は、図2(B)に示すように、着脱具16によって柱状部材12に着脱可能な構成となっている。着脱具16としては、ボルトとナットの組み合わせ、クランプ、バネを用いて挟み付けるクリップ、クサビを用いて挟み付ける保持具等が用いられる。側壁部仕切板15は、エレメント掘削・挿入時の周囲の地盤からの土圧に対しては、これを負担して支持するように設計される。しかし、エレメント構造体E1に作用する外力、例えば構造物として負担する活荷重、死荷重、地震時荷重等については、底板11a又は頂板11b若しくは柱状部材12が負担して支持し、側壁部仕切板15は外力を負担しない構造として設計されている。
【0025】
なお、図2においては図示を省略しているが、この基準エレメント10は、断面の4つの隅角部にエレメント継手部を有している。図3は、基準エレメント10に接続される一般部エレメント20の構成と、これらを接続するエレメント継手部13、23の構成を示した図である。図3(A)は、基準エレメント10と、一般部エレメント20がエレメント継手部13、23で接続する直前の状態の断面図を示している。また、図3(B)は、エレメント継手部13、23の接続状態を示す拡大断面図である。図3(A )と図3(B)は、いずれも、エレメント軸方向に垂直な平面で切断した場合の断面図を示している。
【0026】
図3(A)に示すように、基準エレメント10の断面の4つの隅部のそれぞれには、エレメント軸方向に沿って延び鋼又はアルミニウム等の金属若しくは合金等からなるエレメント継手部13が配設されている。
【0027】
エレメント継手部13の断面は、図3(B)に示すように、概略「C」字状の嵌合部13aと、嵌合部13aの背後に連続する基部13bを有して構成されている。また、嵌合部13aは、2つの突出部13c、13dを有している。突出部13cの先端は球根状に断面が拡大されている。また、突出部13cと突出部13dの中間は、ほぼ楕円状断面の凹部となっており、この部分は、略楕円状断面でエレメント軸方向に延びる溝13eとなっている。
【0028】
なお、図3(B)は、図3(A)に示した基準エレメント10における左上部位置のエレメント継手部13の断面を示しているが、図3(A)に示した基準エレメント10における左下部位置、右上部位置、右下部位置の隅部のエレメント継手部13についてもまったく同一形状のエレメント継手部位13が用いられており、その構成は図3(B)に図示するものとまったく同様である。
【0029】
また、頂板11b、柱状部材12と各エレメント継手部13との各接合箇所は、溶接部W1、W2、W3、W4によって接合されている。これらの接合は、ボルト等の機械的接合であってもよい。なお、図示はしていないが、底板11aについても同様である。
【0030】
上記のような構成により、エレメント継手部13の突出部13cの先端付近にエレメント軸方向に直角な方向(以下、「エレメント軸直角方向」という。)の力を作用させた場合、例えば、図3(B)における左方向に引張ると、この引張り力(以下、「第1引張り力」という。)は、突出部13cから基部13bに伝達され、基部13bから頂板11bに伝達され、頂板11bの図3(B)における左端に、図3(B)における左方向への引張り力を作用させることになる。
【0031】
一方、エレメント継手部13の突出部13dの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図3(B)における左方向に引張ると、この引張り力(以下、「第2引張り力」という。)は、突出部13dから基部13bを経て頂板11bに伝達され、鋼製板状部材11の図3(B)における左端に、図3(B)における左方向への引張り力を作用させることになる。
【0032】
上記のことから、エレメント継手部13の突出部13c及び13dと、基部13bは、外部から加えられる上記のエレメント軸直角方向の力(例えば、第1引張り力、第2引張り力)に抵抗可能な所定の強度と所定の断面を有している。また、エレメント継手部13の突出部13dには、上記の第1引張り力の一部と第2引張り力の一部との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面を有している。例えば、突出部13dの厚みは十分な厚みとなっている。
【0033】
また、エレメント継手部13の基部13bには、上記の第1引張り力と第2引張り力の一部との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面(例えば十分な厚み)を有している。また、頂板11bは、エレメント継手部13から伝達される上記のエレメント軸直角方向の力に抵抗可能な所定の強度と所定の断面を有している。なお、図示はしていないが、底板11aについても同様である。
【0034】
また、図3(A)に示すように、一般部エレメント20は、底板21aと、頂板21bと、柱状部材22と、エレメント継手部23及び13と、側壁部仕切板(図示せず)を備え、「コ」字状断面を有する部材となっている。底板21aは、一般部エレメント20のエレメント軸方向に延設される鋼又はアルミニウム等の金属若しくは合金等からなる板状部材である。頂板21bは、エレメント軸方向に延設されるとともに、底板21aの上方に平行に配置される鋼又はアルミニウム等の金属若しくは合金等からなる板状部材である。
【0035】
また、柱状部材22は、底板21aと頂板21bの中間となる側壁部において、鉛直方向に延在するように複数配置されている。柱状部材22は、底板21aと頂板21bに溶接等により接合され、底板21aと頂板21bを連結している。また、柱状部材22は、一般部エレメント20の内部の空洞部と外部を連通させる側壁部開口(図示せず)を形成している。これらの柱状部材22は、連結構造を構成している。なお、一般部エレメント20の側壁部開口は、基準エレメント10の側壁部開口14と同様の構成を有している。また、一般部エレメント20の側壁部仕切板(図示せず)は、基準エレメント10の側壁部仕切板15と同様の構成を有している。
【0036】
また、一般部エレメント20は、「コ」字状断面の4つの隅部のうち、外部に対して開放された隅部、すなわち図3(A)における右上隅部及び右下隅部のそれぞれに、エレメント軸方向に沿って延び鋼又はアルミニウム等の金属若しくは合金等からなるエレメント継手部23が配設されている。
【0037】
また、一般部エレメント20の「コ」字状断面の4つの隅部のうち、外部に対して閉塞された隅部、すなわち図3(A)における左上隅部及び左下隅部のそれぞれには、エレメント軸方向に沿って上述したエレメント継手部13が配設されている。
【0038】
エレメント継手部23の断面は、概略「C」字状の嵌合部23aと、嵌合部23aの背後に連続する基部23bを有して構成されている。また、嵌合部23aは、2つの突出部23c、23dを有している。突出部23cの先端は球根状に断面が拡大されている。また、突出部23cと突出部23dの中間は、ほぼ楕円状断面の凹部となっており、この部分は、略楕円状断面でエレメント軸方向に延びる溝23eとなっている。
【0039】
なお、図3(B)は、図3(A)に示した一般部エレメント20における右上部位置のエレメント継手部23の断面を示しているが、図3(A)に示した一般部エレメント20における右下部位置の隅部のエレメント継手部23についてもまったく同一形状のエレメント継手部23が用いられており、その構成は図3(B)に図示するものとまったく同様である。また、一般部エレメント20におけるエレメント継手部13とその付近の構成は、上述した基準エレメント10におけるエレメント継手部13とその付近の構成とまったく同様である。
【0040】
また、頂板21b、柱状部材22とエレメント継手部23との各接合箇所は、溶接部W5、W6等によって接合されている。これらの接合は、ボルト等の機械的接合であってもよい。なお、図示はしていないが、底板21aについても同様である。
【0041】
上記のような構成により、エレメント継手部23の突出部23cの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図3(B)における右方向に引張ると、この引張り力(以下、「第3引張り力」という。)は、突出部23cから基部23bに伝達され、基部23bから頂板21bに伝達され、頂板21bの図3(B)における右端に、図3(B)における右方向への引張り力を作用させることになる。
【0042】
一方、エレメント継手部23の突出部23dの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図3(B)における右方向に引張ると、この引張り力(以下、「第4引張り力」という。)は、突出部23dから基部23bに伝達され、基部23bから頂板21bに伝達され、頂板21bの図3(B)における右端に図3(B)における右方向への引張り力を作用させることになる。
【0043】
上記のことから、エレメント継手部23の突出部23c及び23dは、外部から加えられる上記のエレメント軸直角方向の力(例えば、第3引張り力、第4引張り力)に抵抗可能な所定の強度と所定の断面を有している。また、エレメント継手部23の突出部23dには、上記の第3引張り力の一部と第4引張り力の一部との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面を有している。例えば、突出部23dの厚みは十分な厚みとなっている。
【0044】
また、エレメント継手部23の基部23bには、上記の第3引張り力と第4引張り力との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面(例えば十分な厚み)を有している。また、頂板21b及び柱状部材22は、エレメント継手部13、23から伝達される上記のエレメント軸直角方向の力に抵抗可能な所定の強度と所定の断面を有している。
【0045】
また、図示はしていないが、隅角部エレメント30は、底板と、頂板と、柱状部材と、エレメント継手部と、側壁部仕切板を備え、基準エレメント10と同様の構成を有する「ロ」字状断面の部材である。隅角部エレメント30については、エレメント構造体の隅角部の内側に大きな引張り力が発生する場合があるが、この引張り力は、例えば「ロ」字状断面の1辺、さらにこの辺と直角となる辺に板状部材(補強板)をもう1枚配置し二重構造とするなどして負担させ、エレメント構造体の強度を高めることができる。また、エレメント構造体の隅角部の内側の引張り力が小さい場合には、補強板を適宜省略してもよい。
【0046】
次に、上記した基準エレメント10と一般部エレメント20と隅角部エレメント30を用いたエレメント構造体の施工方法について説明する。
【0047】
まず、、基準エレメント10を、エレメント軸方向に向けて地中に挿入する。この場合、基準エレメント10の内部にオーガードリル等を配備して、エレメント内部の土砂等を掘削、除去しつつ、エレメントの地中への挿入を行う。この際、基準エレメント10の側壁部仕切板15は、側壁部開口14から周囲の土砂等がエレメント内に流入しないように防護し、土圧を支持する土留めとしての機能を果たす。その後、一般部エレメント20の開放側隅部に設けられたエレメント継手部23、23のそれぞれを、基準エレメント10のエレメント継手部13のうちの2つ(例えば、図3(A)に示した基準エレメント10における左上隅部の継手と左下隅部の継手)と嵌合させる。
【0048】
その後、これらのエレメント継手部13、23を嵌合させた状態で、一般部エレメント20を、基準エレメント10に沿わせながら、基準エレメント10の場合と同様にしてエレメント軸方向に向けて地中に挿入する。この際、一般部エレメント20の側壁部仕切板(図示せず)は、側壁部開口(図示せず)から周囲の土砂等がエレメント内に流入しないように防護し、土圧を支持する土留めとしての機能を果たす。
【0049】
この場合、図3(B)に示すように、接続状態となっている基準エレメント10のエレメント継手部13と、一般部エレメント20のエレメント継手部23においては、エレメント継手部13の溝13e内にエレメント継手部23の突出部23cの拡大された先端が入り込んで嵌合し、かつ、エレメント継手部23の溝23e内にエレメント継手部13の突出部13cの拡大された先端が入り込んで嵌合している。このように、基準エレメント10のエレメント継手部13と一般部エレメント20のエレメント継手部23が互いに嵌合することにより、基準エレメント10と一般部エレメント20の相互間で、エレメント軸直角方向の力が伝達可能となっている。
【0050】
上記のように嵌合している基準エレメント10のエレメント継手部13と、一般部エレメント20のエレメント継手部23の内部の溝13e、23eには、必要に応じて、適宜の時期に、エレメント軸方向の一方の端(以下、「注入端」という。)から、無収縮モルタル、無収縮コンクリート、樹脂材料等のグラウト材(図示せず)を注入し、硬化させて継手接続を補強してもよい。このグラウト注入を行うと、継手が固定されるため、接続された後の複数の地中掘削用エレメントが、上載荷重等によりたわむなどの変形を生じることを防止することができる。また、この補強により、エレメント軸直角方向の力の伝達性能も向上する。
【0051】
次に、上記と同様にして、他の新たな一般部エレメント20の開放側隅部に設けられたエレメント継手部23、23のそれぞれを、すでに地中に挿入された一般部エレメント20の閉塞側隅部に設けられたエレメント継手部13、13のそれぞれと嵌合させる。そして、両継手を嵌合させた状態で、新たな一般部エレメント20を、すでに挿入された一般部エレメント20に沿わせながら、エレメント軸方向に向けて地中に挿入する。
【0052】
また、図1におけるエレメント構造体E1の4つの隅角位置では、隅角部エレメント30を、すでに挿入された一般部エレメント20に沿わせながら、エレメント軸方向に向けて地中に挿入する。この際、隅角部エレメント30の側壁部仕切板(図示せず)は、側壁部開口(図示せず)から周囲の土砂等がエレメント内に流入しないように防護し、土圧を支持する土留めとしての機能を果たす。その後、新たな一般部エレメント20を、すでに挿入された隅角部エレメント30に沿わせるが、それまでの挿入ラインとは直角に屈曲する方向となる面に沿わせるようにして、エレメント軸方向に向けて地中に挿入する。
【0053】
以下、上記のようにして一般部エレメント挿入工程を順次繰り返すことによって、地中に挿入され相互に接続された各地中掘削用エレメント10、20、30等によってエレメント構造体を構成することができる。例えば、平板状の構造体、半円状や円状あるいは楕円状等に囲まれた形状の断面を有するエレメント構造体、あるいは「ロ」字状断面、「日」を横にした形状の断面、「Π」字状の断面等を有するエレメント構造体である。
【0054】
次に、必要により、各エレメント内にコンクリート等を充填する。その後、地中に形成されたエレメント構造体を防護工として利用し、エレメント構造体の内部の土砂等を掘削する。次に、必要により、エレメント内面をコンクリートで被覆する等の施工を行うことにより、地下構造物を構築することができる。
【0055】
第1実施形態の地中掘削用エレメント10、20、30は、地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に、施工上の利点を有している。この点について、図4を参照しつつ説明を行う。図4は、掘削・挿入時の一般部エレメント20の状態を示した上面図である。
【0056】
図4に示すように、例えば、一般部エレメント20A、20Bが既に挿入されており、既設の一般部エレメント20Bに沿わせるようにして新たな一般部エレメント20Cを掘削・挿入している途中で、支障物70、例えば大きな岩塊等と遭遇した場合には、当該一般部エレメント20Cの先端部開口25Cから一般部エレメント20C内に取り込む方法以外に、当該一般部エレメント20Cに隣接する既設の一般部エレメント20Bの最寄りの側壁部仕切板を取り外し、側壁部開口24B1を開放状態し、この側壁部開口24B1を利用して、支障物70を一般部エレメント20B内に取り込み、一般部エレメント20B内を通しててっ去することができる。
【0057】
あるいは、さらに、一般部エレメント20Bの側壁部仕切板を取り外して側壁部開口24B2を開放状態とするとともに、一般部エレメント20Bに隣接する既設の一般部エレメント20Aの最寄りの側壁部仕切板を取り外して側壁部開口24Aを開放状態とする。これにより、この側壁部開口24B2及び24Aを利用して、支障物70をさらに隣りの一般部エレメント20A内に取り込み、一般部エレメント20A内を通しててっ去することもできる。
【0058】
また、基準エレメント10、一般部エレメント20、隅角部エレメント30のいずれかの内部で何らかの作業(以下、「エレメント内作業」という。)、例えば止水工等を行う場合に、エレメント内作業を行う当該エレメントに隣接する既設のエレメントの側壁部仕切板を取り外して側壁部開口を開放状態とし、この側壁部開口を利用して作業者の出入を行わせることができる。
【0059】
あるいは、基準エレメント10、一般部エレメント20、隅角部エレメント30のいずれかに何らかの物体(例えば建設資材)を搬入する場合、これらのエレメントのいずれかから物体(例えば掘削土砂等の工事発生物)を搬出する場合に、搬入又は搬出を行う当該エレメントに隣接する既設のエレメントの側壁部仕切板を取り外して側壁部開口を開放状態とし、この側壁部開口を利用して行うことも可能である。
【0060】
したがって、第1実施形態の基準エレメント10、一般部エレメント20、隅角部エレメント30を用いれば、施工時のタイムロスを防止することができ、施工の柔軟性が高まるため、地中掘削用エレメントにより地下構造物を構築する工法の施工効率や施工能力を飛躍的に向上させることができる、という利点がある。
【0061】
(2)第2実施形態
本発明は、他の構成によっても実現可能である。次に、本発明の第2実施形態について説明する。
【0062】
図5は、本発明の第2実施形態である地中掘削用エレメントの構成を示す図である。図5では、地中掘削用エレメントとして基準エレメントを例に挙げて図示している。
【0063】
図5(A)に示すように、第2実施形態の基準エレメント10Aは、底板11aと、頂板11bと、柱状部材12Aと、エレメント継手部(図示せず)と、側壁部仕切板15Aを備え、「ロ」字状断面の中空箱状に構成されている。第2実施形態の基準エレメント10Aが第1実施形態の基準エレメント10と異なる点は、異なる柱状部材12Aと異なる側壁部仕切板15Aを備えている点である。それ以外の構成要素については、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0064】
柱状部材12Aは、底板11aと頂板11bの中間となる側壁部において、鉛直方向に延在するように複数配置されている。これらの柱状部材12は、連結構造を構成している。柱状部材12Aは、図5(B)に示すように、略「H」字状の断面を有する部材であり、底板11aと頂板11bに溶接等により接合され、底板11aと頂板11bを連結している。また、柱状部材12Aは、基準エレメント10の内部の空洞部と外部を連通させる側壁部開口を形成しており、この側壁部開口に例えば3枚の側壁部仕切板15Aが配置されるようになっている。これらの側壁部仕切板15は、柱状部材12Aの「H」字状の断面の凹部に嵌合するようになっている。また、側壁部仕切板15Aは、図5(B)に示すように、柱状部材12Aに対して斜めに傾斜させることにより、容易に柱状部材12に着脱可能な構成となっている。
【0065】
上記のような構成の第2実施形態によっても、第1実施形態と同様に、本発明の特徴を有する作用・効果を発揮することができる。
【0066】
(3)第3実施形態
本発明は、他の構成によっても実現可能である。次に、本発明の第3実施形態について説明する。
【0067】
図6は、本発明の第3実施形態である地中掘削用エレメントの構成を示す図である。図6では、地中掘削用エレメントとして基準エレメントを例に挙げて図示している。
【0068】
図6(A)に示すように、第3実施形態の基準エレメント10Bは、底板11aと、頂板11bと、柱状部材12と、エレメント継手部(図示せず)と、側壁部仕切板15と、水平接合部材17を備え、「ロ」字状断面の中空箱状に構成されている。第3実施形態の基準エレメント10Bが第1実施形態の基準エレメント10と異なる点は、柱状部材12どうしを接合する水平接合部材17を備えている点、及び側壁部仕切板15が着脱具16Bによって水平接合部材17に着脱可能な構成となっている点である。それ以外の構成要素については、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0069】
第3実施形態においては、柱状部材12と水平接合部材17は、連結構造を構成している。また、着脱具16Bとしては、ボルトとナットの組み合わせ、クランプ、バネを用いて挟み付けるクリップ、クサビを用いて挟み付ける保持具等が用いられる。
【0070】
上記のような構成の第3実施形態によっても、第1実施形態及び第2実施形態と同様に、本発明の特徴を有する作用・効果を発揮することができる。
【0071】
(4)第4実施形態
本発明は、他の構成によっても実現可能である。次に、本発明の第4実施形態について説明する。
【0072】
図7は、本発明の第4実施形態である地中掘削用エレメントの構成を示す図である。図7では、地中掘削用エレメントとして基準エレメントを例に挙げて図示している。
【0073】
図7に示すように、第4実施形態の基準エレメント10Cは、底板11aと、頂板11bと、トラス斜材12Cと、エレメント継手部(図示せず)と、側壁部仕切板(図示せず)を備え、「ロ」字状断面の中空箱状に構成されている。第4実施形態の基準エレメント10Cが第1実施形態の基準エレメント10と異なる点は、柱状部材12のかわりにトラス斜材12Cを備えている点である。それ以外の構成要素については、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0074】
第4実施形態においては、トラス斜材12Cは、連結構造を構成している。また、トラス斜材12Cにより、外部と連通する略三角形状の側壁部開口14Cが形成されている。
【0075】
上記のような構成の第4実施形態によっても、上記各実施形態と同様に、本発明の特徴を有する作用・効果を発揮することができる。
【0076】
(5)第5実施形態
本発明は、他の構成によっても実現可能である。次に、本発明の第5実施形態について説明する。
【0077】
図8は、本発明の第5実施形態である地中掘削用エレメントの構成を示す図である。図8では、地中掘削用エレメントとして基準エレメントを例に挙げて図示している。
【0078】
図8に示すように、第5実施形態の基準エレメント10Dは、底板11aと、頂板11bと、板状部材12Dと、エレメント継手部(図示せず)と、側壁部仕切板(図示せず)を備え、「ロ」字状断面の中空箱状に構成されている。第5実施形態の基準エレメント10Dが第1実施形態の基準エレメント10と異なる点は、柱状部材12のかわりに円形の側壁部開口14Dが開設された板状部材12Dを備えている点である。それ以外の構成要素については、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0079】
第5実施形態においては、板状部材12Dは、連結構造を構成している。また、板状部材12Dにより、外部と連通する円形状の側壁部開口14Dが形成されている。
【0080】
上記のような構成の第5実施形態によっても、上記各実施形態と同様に、本発明の特徴を有する作用・効果を発揮することができる。
【0081】
なお、本発明は、上記各実施形態に限定されるものではない。上記各実施形態は、例示であり、本発明の特許請求の範囲に記載された技術的思想と実質的に同一な構成を有し、同様な作用効果を奏するものは、いかなるものであっても本発明の技術的範囲に包含される。
【0082】
例えば、上記実施形態においては、側壁部仕切板(例えば、15、15A)を備えた地中掘削用エレメント(例えば、10、10A)を例に挙げて説明したが、本発明はこの例には限定されず、他の構成、例えば、側壁部仕切板を設けず、側壁部の土留め機能を他の手段により実現するようにしてもよい。
【0083】
また、上記実施形態においては、側壁部仕切板を連結構造に着脱可能に取り付けた地中掘削用エレメント(例えば、10、10A)を例に挙げて説明したが、本発明はこの例には限定されず、他の構成、例えば、側壁部仕切板を底板に着脱可能に取り付けてもよいし、側壁部仕切板を頂板に着脱可能に取り付けてもよいし、側壁部仕切板を底板、頂板、連結構造のいずれか又は適宜の組み合わせに着脱可能に取り付けてもよい。
【0084】
また、側壁部仕切板は、地中掘削用エレメントの側壁部の土留めとして使用できれば、どのような構成であってもよく、着脱可能な構成以外の他の構成、例えば、蝶番やスライド機構等により連結構造に移動可能な状態で取り付けられ、必要な場合にのみ側壁部仕切板を動かし、外部と連通する側壁部開口を形成することができるように構成してもよい。
【0085】
また、上記実施形態においては、矩形管状の断面を有する基準エレメント10及び隅角部エレメント30、略「コ」字状の断面を有する一般部エレメント20によってエレメント構造体を構成する例について説明したが、本発明はこの例には限定されず、他の構成の地中掘削用エレメント、例えば、略「日」字状、略「目」字状、略「田」字状、略「円」字状等の断面を有する地中掘削用エレメントであってもよい。また、これらを適宜の組み合わせで用いてもよい。したがって、上記した実施形態とは異なり、基準エレメント10と隅角部エレメント30を用いずに、略「コ」字状断面の一般部エレメント20のみを用いて(エレメント構造体の4隅も略「コ」字状断面の一般部エレメント20のみを用いて)エレメント構造体E1を構成するようにしてもよい。
【0086】
また、上記実施形態においては、基準エレメント10等の隅部にエレメント継手部(例えば13又は23)が設けられている場合を例に挙げて説明したが、本発明はこの例には限定されず、他の構成の地中掘削用エレメント、例えば、地中掘削用エレメントの所定の辺の中間部分(例えば中央部)にエレメント継手部が設けられるように構成してもよい。
【0087】
【発明の効果】
以上説明したように、本発明によれば、地中掘削用エレメントの側壁部に外部と連通する側壁部開口を形成可能なように構成したので、エレメントを地中に掘削・挿入する際に支障物と遭遇した場合やエレメント内での作業が必要となった場合でも、支障物に遭遇した当該地中掘削用エレメント又はエレメント内作業を行う当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し、あるいは前記隣接する既設の地中掘削用エレメントの仕切板をてっ去し側壁部開口を形成して支障物のてっ去又はエレメント内作業を行うことや、各種施工、搬入・搬出等が可能となり、施工時のタイムロスを防止することができ、施工の柔軟性が高まるため、地中掘削用エレメントにより地下構造物を構築する工法の施工効率や施工能力を飛躍的に向上させることができる、という利点を有している。
【図面の簡単な説明】
【図1】本発明の第1実施形態である地下構造物の全体構成を示す断面図である。
【図2】図1の地下構造物における地中掘削用エレメントの構成を示す図である。
【図3】図1の地下構造物における地中掘削用エレメント及びエレメント継手部の構成を示す図である。
【図4】図1の地下構造物における施工方法を説明する図である。
【図5】本発明の第2実施形態である地中掘削用エレメントの構成を示す図である。
【図6】本発明の第3実施形態である地中掘削用エレメントの構成を示す図である。
【図7】本発明の第4実施形態である地中掘削用エレメントの構成を示す図である。
【図8】本発明の第5実施形態である地中掘削用エレメントの構成を示す図である。
【符号の説明】
10、10A〜10D 基準エレメント(地中掘削用エレメント)
11a 底板
11b 頂板
12、12A 柱状部材(連結構造)
12C トラス斜材(連結構造)
12D 板状部材(連結構造)
13 エレメント継手部
13a 嵌合部
13b 基部
13c、13d 突出部
13e 溝
14、14B〜14D 側壁部開口
15、15A 側壁部仕切板
16、16B 着脱具
17 水平接合部材(連結構造)
20、20A〜20C 一般部エレメント(地中掘削用エレメント)
21a 底板
21b 頂板
22 柱状部材(連結構造)
23 エレメント継手部
23a 嵌合部
23b 基部
23c、23d 突出部
23e 溝
24A〜24B2 側壁部開口
25C 先端部開口
30 隅角部エレメント(地中掘削用エレメント)
70 支障物
101 地下構造物
E1 エレメント構造体
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an underground excavation element used for constructing an underground structure by a non-open excavation method, and a method for constructing an underground structure using the underground excavation element.
[0002]
[Prior art]
Conventionally, as a method of constructing an underground structure under a railroad track or a road by a non-opening method, an underground excavation element such as a “B” -shaped cross-section or a “U” -shaped cross-section is propelled or pulled to the ground. A construction method that uses a structure consisting of elements for underground excavation (hereinafter referred to as “element structure”) as the main body of an underground structure. Is used.
[0003]
[Problems to be solved by the invention]
However, in the above-described underground excavation element, the side wall portion of the “B” -shaped cross section or the “U” -shaped cross section is composed of, for example, a plate-shaped member or the like. Then, ground excavation was performed from the opening at the tip of the element, and the excavated earth and sand were taken into the element, conveyed backward, and discharged to the outside. For this reason, when an obstacle is encountered during insertion or excavation of an element, or when work inside the element is required, the obstacle is taken in only through the opening at the tip of the element. There is a problem that the in-element work can be performed only from the inside of the element.
[0004]
The present invention has been made to solve the above problems, and the problem to be solved by the present invention is when an obstacle is encountered during insertion or excavation of the element or when work inside the element is required. An object of the present invention is to provide an underground excavation element capable of removing obstacles and working inside the element from other than the element, and an underground structure construction method using the element.
[0005]
[Means for Solving the Problems]
In order to solve the above problems, an underground excavation element according to the present invention includes a bottom plate extending in the element axial direction, and a top plate extending in the element axial direction and disposed in parallel above the bottom plate. And a connecting structure capable of connecting the bottom plate and the top plate in the side wall portion and forming a side wall portion opening communicating with the outside, and extending between the element axial directions and fitting between adjacent element joint portions Are connected to each other, and include an element joint portion that can transmit a force in a direction perpendicular to the element axis that is perpendicular to the element axis direction by the element joint portion, and is configured in a hollow box shape, A side wall partition plate configured to detachably attach to the bottom plate or the top plate or the connection structure by a detachable tool while closing the side wall portion opening. It is characterized by that.
[0006]
In the above-described underground excavation element, the connection structure is preferably a columnar member that is arranged in a plurality so as to extend in the vertical direction in the side wall portion that is intermediate between the bottom plate and the top plate.
[0007]
In the above-described underground excavation element, preferably, the front Side Wall divider Is Used as a retaining wall for the side wall.
[0008]
In the underground excavation element, preferably, the side wall partition plate does not bear an external force acting on the bottom plate, the top plate, or the connection structure.
[0009]
In the above-described underground excavation element, preferably, the side wall partition plate is the bottom plate, the top plate, or the connection structure. Moved to It is configured to be movable.
[0010]
Further, the underground structure building method according to the present invention includes a bottom plate extending in the element axial direction, a top plate extending in the element axial direction and disposed in parallel above the bottom plate, and a side wall portion. A connecting structure that connects the bottom plate and the top plate and can form a side wall opening that communicates with the outside, and is connected to each other by fitting between adjacent element joints that extend in the element axial direction. A method for constructing an underground structure using an element for underground excavation having an element joint portion capable of transmitting a force in a direction perpendicular to the element axis direction, which is a direction perpendicular to the element axis direction, by the element joint portion. Then, the element for underground excavation is inserted into the ground while excavating the ground at the tip end opening with the element axial direction as the insertion direction, The element joint part of another underground excavation element is fitted to the element joint part of the existing underground excavation element and guided, and the other underground excavation element is inserted in the element axial direction. By repeatedly inserting into the ground while excavating as a direction, a plurality of underground excavation elements are connected in the ground to form an element structure, and then the element structure is used as a protective work. Excavate the ground inside the body, then build an underground structure using the element structure as the body If an obstacle is encountered when the underground excavation element is inserted into the ground while performing ground excavation, the existing underground excavation adjacent to the underground excavation element that encounters the obstacle The obstacle is removed by passing the obstacle through the side wall opening using the side wall opening of the connecting structure for elements. It is characterized by that.
[0011]
In the above underground structure construction method, preferably, a side wall part partition plate that closes the side wall part opening is provided and used as a retaining wall for the side wall part.
[0012]
Further, in the above underground structure construction method, preferably, when an obstacle is encountered when the underground excavation element is inserted into the ground while performing ground excavation, the ground where the obstacle is encountered. Medium drilling element Next to Remove the side wall partition plate of the existing underground excavation element in contact with it to form the side wall opening. By passing the obstacle through the side wall opening The obstacle is removed.
[0013]
Further, in the above underground structure construction method, preferably, when an in-element work including a water stoppage is performed on any of the underground excavation elements, an existing underground adjacent to the underground excavation element is used. An operator using the side wall opening of the excavating element coupling structure or removing the side wall partition plate of the adjacent underground excavating element to form a side wall opening. Through the side wall opening Go in and out.
[0014]
In the above underground structure construction method, preferably, when an object is carried into any of the underground excavation elements or an object is carried out of any of the underground excavation elements, the underground The side wall opening of the existing underground excavation element connection structure adjacent to the excavation element is used or the side wall partition plate of the adjacent existing underground excavation element is removed to form the side wall opening. The By passing the object through the side wall opening Do.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0016]
(1) First embodiment
First, a first embodiment of the present invention will be described.
[0017]
FIG. 1 is a cross-sectional view showing the overall configuration of an underground structure according to the first embodiment of the present invention.
[0018]
As shown in FIG. 1, the underground structure 101 is a box-shaped structure having a “B” -shaped cross-sectional shape. The underground structure 101 is configured by an element structure E1 having a “B” -shaped cross-sectional shape.
[0019]
The element structure E1 includes an underground excavation element (hereinafter referred to as “reference element”) 10 installed at the center position of the upper floor slab, and an underground excavation element installed adjacent to the reference element 10. (Hereinafter referred to as “general part element”) 20 and an underground excavation element (hereinafter referred to as “corner element”) 30 installed at four corner positions of the element structure E1 are combined. It is constituted by.
[0020]
2A and 2B are diagrams illustrating the configuration of the reference element 10 in the underground structure 101 in FIG. 1. FIG. 2A is a partially exploded perspective view, and FIG. 2B is an enlarged part of a corner. Each cross-sectional view is shown.
[0021]
As shown in FIG. 2A, the reference element 10 includes a bottom plate 11a, a top plate 11b, a columnar member 12, and a side wall partition plate 15, and is configured in a hollow box shape having a “B” -shaped cross section. Yes. The bottom plate 11a is a plate-like member made of a metal or alloy such as steel or aluminum that extends in the longitudinal direction of the reference element 10 (hereinafter referred to as “element axial direction”). The top plate 11b is a plate-like member made of a metal such as steel or aluminum, an alloy, or the like that extends in the element axial direction and is arranged in parallel above the bottom plate 11a.
[0022]
In addition, a plurality of columnar members 12 are arranged so as to extend in the vertical direction in the side wall portion that is intermediate between the bottom plate 11a and the top plate 11b. The columnar member 12 is joined to the bottom plate 11a and the top plate 11b by welding or the like, and connects the bottom plate 11a and the top plate 11b. Further, the columnar member 12 forms a side wall opening 14 that communicates the cavity inside the reference element 10 with the outside. These columnar members 12 constitute a connection structure.
[0023]
Moreover, the side wall part partition plate 15 is a plate-like member arrange | positioned so that the side wall part opening 14 may be block | closed, and consists of metals or alloys, such as steel and aluminum, a synthetic resin, FRP (fiber reinforced plastic), wood, etc. As will be described later, the side wall partition plate 15 is used as a retaining wall for the side wall when the reference element 10 is inserted into the ground while excavating.
[0024]
As shown in FIG. 2B, the side wall partition plate 15 is configured to be detachable from the columnar member 12 by an attachment / detachment tool 16. As the detachable tool 16, a combination of a bolt and a nut, a clamp, a clip that is clamped using a spring, a holder that is clamped using a wedge, or the like is used. The side wall partition plate 15 is designed to bear and support the earth pressure from the surrounding ground during element excavation and insertion. However, the external force acting on the element structure E1, for example, the live load, the dead load, and the earthquake load that are borne by the structure, is supported by the bottom plate 11a, the top plate 11b, or the columnar member 12, and the side wall partition plate. 15 is designed as a structure that does not bear external force.
[0025]
In addition, although illustration is abbreviate | omitted in FIG. 2, this reference | standard element 10 has an element coupling part in four corners of a cross section. FIG. 3 is a diagram showing the configuration of the general element 20 connected to the reference element 10 and the configuration of the element joints 13 and 23 connecting them. FIG. 3A shows a cross-sectional view of a state immediately before the reference element 10 and the general part element 20 are connected by the element joint parts 13 and 23. FIG. 3B is an enlarged cross-sectional view showing a connection state of the element joint portions 13 and 23. 3A and 3B show cross-sectional views when cut along a plane perpendicular to the element axis direction.
[0026]
As shown in FIG. 3A, an element joint portion 13 made of a metal such as steel or aluminum, an alloy, or the like is disposed at each of the four corners of the cross section of the reference element 10. Has been.
[0027]
As shown in FIG. 3B, the cross section of the element joint portion 13 is configured to include a substantially “C” -shaped fitting portion 13a and a base portion 13b continuous behind the fitting portion 13a. . Moreover, the fitting part 13a has the two protrusion parts 13c and 13d. The tip of the protrusion 13c has a bulbous cross section. Further, the middle of the protruding portion 13c and the protruding portion 13d is a recess having an approximately elliptical cross section, and this portion is a groove 13e extending in the element axial direction with an approximately elliptical cross section.
[0028]
3B shows a cross section of the element joint portion 13 at the upper left position of the reference element 10 shown in FIG. 3A. The lower left of the reference element 10 shown in FIG. The element joint portion 13 having exactly the same shape is also used for the element joint portion 13 at the corners of the part position, the upper right position, and the lower right position, and the configuration is exactly the same as that illustrated in FIG. is there.
[0029]
Moreover, each joining location of the top plate 11b, the columnar member 12, and each element joint part 13 is joined by welding part W1, W2, W3, W4. These joints may be mechanical joints such as bolts. Although not shown, the same applies to the bottom plate 11a.
[0030]
When a force in a direction perpendicular to the element axial direction (hereinafter referred to as “element axis perpendicular direction”) is applied to the vicinity of the tip of the protruding portion 13c of the element joint portion 13 by the above-described configuration, for example, FIG. When pulled in the left direction in (B), this tensile force (hereinafter referred to as “first tensile force”) is transmitted from the projecting portion 13c to the base portion 13b, transmitted from the base portion 13b to the top plate 11b, and FIG. A tensile force in the left direction in FIG. 3B is applied to the left end of 3B.
[0031]
On the other hand, when a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting portion 13d of the element joint portion 13, for example, when pulling in the left direction in FIG. 3B, this tensile force (hereinafter referred to as “second tensile”). Is transmitted to the top plate 11b from the projecting portion 13d through the base portion 13b, and the tensile force in the left direction in FIG. 3B is applied to the left end of the steel plate-like member 11 in FIG. 3B. Will act.
[0032]
From the above, the projecting portions 13c and 13d of the element joint portion 13 and the base portion 13b can resist the force (for example, the first tensile force and the second tensile force) applied from the outside in the direction perpendicular to the element axis. It has a predetermined strength and a predetermined cross section. Further, in consideration of the combined force of the part of the first tensile force and the part of the second tensile force acting on the protruding part 13d of the element joint part 13, a predetermined resistance that can resist the force is given. It has strength and a predetermined cross section. For example, the protrusion 13d has a sufficient thickness.
[0033]
Further, considering that the combined force of the first tensile force and a part of the second tensile force acts on the base portion 13b of the element joint portion 13, a predetermined strength and a predetermined strength that can resist the force are applied. It has a cross section (for example, sufficient thickness). The top plate 11b has a predetermined strength and a predetermined cross section capable of resisting the force in the direction perpendicular to the element axis transmitted from the element joint portion 13. Although not shown, the same applies to the bottom plate 11a.
[0034]
As shown in FIG. 3A, the general element 20 includes a bottom plate 21a, a top plate 21b, a columnar member 22, element joint portions 23 and 13, and a side wall partition plate (not shown). , A member having a “U” -shaped cross section. The bottom plate 21 a is a plate-like member made of a metal or alloy such as steel or aluminum that extends in the element axial direction of the general element 20. The top plate 21b is a plate-like member made of a metal or an alloy such as steel or aluminum, which extends in the element axial direction and is arranged in parallel above the bottom plate 21a.
[0035]
Further, a plurality of columnar members 22 are arranged so as to extend in the vertical direction at the side wall portion that is intermediate between the bottom plate 21a and the top plate 21b. The columnar member 22 is joined to the bottom plate 21a and the top plate 21b by welding or the like, and connects the bottom plate 21a and the top plate 21b. Further, the columnar member 22 forms a side wall opening (not shown) that communicates the hollow portion inside the general portion element 20 with the outside. These columnar members 22 constitute a connection structure. Note that the side wall opening of the general element 20 has the same configuration as the side wall opening 14 of the reference element 10. Further, the side wall part partition plate (not shown) of the general part element 20 has the same configuration as the side wall part partition plate 15 of the reference element 10.
[0036]
Moreover, the general part element 20 has four corners of the “U” -shaped cross section, each of which is open to the outside, that is, each of the upper right corner and the lower right corner in FIG. An element joint portion 23 extending along the element axial direction and made of a metal such as steel or aluminum or an alloy is disposed.
[0037]
In addition, among the four corners of the “U” -shaped cross section of the general element 20, the corners closed to the outside, that is, the upper left corner and the lower left corner in FIG. The element joint portion 13 described above is disposed along the element axial direction.
[0038]
The cross section of the element joint portion 23 is configured to include a substantially “C” -shaped fitting portion 23a and a base portion 23b continuous behind the fitting portion 23a. Moreover, the fitting part 23a has the two protrusion parts 23c and 23d. The tip of the protrusion 23c has a bulbous cross section. Further, the middle of the projecting portion 23c and the projecting portion 23d is a recess having an approximately elliptical cross section, and this portion is a groove 23e extending in the element axis direction with an approximately elliptical cross section.
[0039]
3B shows a cross section of the element joint portion 23 at the upper right position of the general part element 20 shown in FIG. 3A, but the general part element 20 shown in FIG. The element joint portion 23 having the same shape is used for the element joint portion 23 at the corner at the lower right position in FIG. 3 and the configuration is exactly the same as that shown in FIG. Further, the configuration of the element joint portion 13 in the general element 20 and the vicinity thereof is exactly the same as the configuration of the element joint portion 13 in the reference element 10 and the vicinity thereof.
[0040]
Moreover, each joining location of the top plate 21b, the columnar member 22, and the element joint portion 23 is joined by welding portions W5, W6, and the like. These joints may be mechanical joints such as bolts. Although not shown, the same applies to the bottom plate 21a.
[0041]
When a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting portion 23c of the element joint portion 23 by the above-described configuration, for example, when the right direction in FIG. , "Third tensile force") is transmitted from the projecting portion 23c to the base portion 23b, from the base portion 23b to the top plate 21b, and at the right end in FIG. 3B of the top plate 21b, the right side in FIG. A tensile force in the direction is applied.
[0042]
On the other hand, when a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting portion 23d of the element joint portion 23, for example, when pulling in the right direction in FIG. Force ") is transmitted from the projecting portion 23d to the base portion 23b, transmitted from the base portion 23b to the top plate 21b, and a tensile force in the right direction in FIG. 3B is applied to the right end of the top plate 21b in FIG. 3B. Will act.
[0043]
From the above, the projecting portions 23c and 23d of the element joint portion 23 have a predetermined strength capable of resisting the force in the direction perpendicular to the element axis (for example, the third tensile force and the fourth tensile force) applied from the outside. It has a predetermined cross section. Further, in consideration of the combined force of a part of the third tensile force and a part of the fourth tensile force acting on the protruding portion 23d of the element joint portion 23, a predetermined resistance that can resist the force is applied. It has strength and a predetermined cross section. For example, the protrusion 23d has a sufficient thickness.
[0044]
Further, in consideration of the combined force of the third tensile force and the fourth tensile force acting on the base portion 23b of the element joint portion 23, a predetermined strength and a predetermined cross section (for example, resistance to the force) Sufficient thickness). The top plate 21b and the columnar member 22 have a predetermined strength and a predetermined cross section capable of resisting the force in the direction perpendicular to the element axis transmitted from the element joint portions 13 and 23.
[0045]
Although not shown, the corner element 30 includes a bottom plate, a top plate, a columnar member, an element joint portion, and a side wall partition plate, and has a configuration similar to that of the reference element 10. This is a member having a letter-shaped cross section. For the corner element 30, a large tensile force may be generated inside the corner portion of the element structure, and this tensile force is, for example, one side of a “B” -shaped cross section, and a right angle with this side. It is possible to increase the strength of the element structure by placing another plate-like member (reinforcing plate) on the side to form a double structure. Further, when the tensile force inside the corner portion of the element structure is small, the reinforcing plate may be omitted as appropriate.
[0046]
Next, a method for constructing an element structure using the reference element 10, the general element 20, and the corner element 30 will be described.
[0047]
First, the reference element 10 is inserted into the ground in the element axial direction. In this case, an auger drill or the like is provided inside the reference element 10, and the element is inserted into the ground while excavating and removing the earth and sand inside the element. At this time, the side wall part partition plate 15 of the reference element 10 protects the surrounding earth and sand from flowing into the element from the side wall part opening 14, and functions as a earth retaining for supporting earth pressure. Thereafter, each of the element joint portions 23 and 23 provided at the open-side corner of the general element 20 is replaced with two of the element joint portions 13 of the reference element 10 (for example, the reference shown in FIG. 3A). The element 10 is fitted with a joint at the upper left corner and a joint at the lower left corner).
[0048]
After that, in a state where these element joint portions 13 and 23 are fitted, the general portion element 20 is placed in the ground in the element axial direction in the same manner as the reference element 10 while being along the reference element 10. insert. At this time, the side wall partition plate (not shown) of the general element 20 protects the surrounding earth and sand from flowing into the element from the side wall opening (not shown) and supports earth pressure. Serves as a function.
[0049]
In this case, as shown in FIG. 3B, the element joint portion 13 of the reference element 10 and the element joint portion 23 of the general part element 20 in the connected state are in the grooves 13e of the element joint portion 13. The enlarged tip of the protruding portion 23c of the element joint portion 23 enters and fits, and the enlarged tip of the protruding portion 13c of the element joint portion 13 enters and fits into the groove 23e of the element joint portion 23. ing. In this way, when the element joint portion 13 of the reference element 10 and the element joint portion 23 of the general element 20 are fitted to each other, a force in the direction perpendicular to the element axis is generated between the reference element 10 and the general element 20. Communication is possible.
[0050]
In the element joint portion 13 of the reference element 10 and the grooves 13e and 23e inside the element joint portion 23 of the general element 20 that are fitted as described above, the element shaft can be inserted at an appropriate time as necessary. A grout material (not shown) such as non-shrink mortar, non-shrink concrete, or resin material is injected from one end of the direction (hereinafter referred to as “injection end”) and cured to reinforce the joint connection. Good. When this grout injection is performed, the joint is fixed, so that it is possible to prevent the plurality of underground excavation elements after being connected from being deformed by bending due to an overload or the like. This reinforcement also improves the force transmission performance in the direction perpendicular to the element axis.
[0051]
Next, in the same manner as described above, each of the element joint portions 23 and 23 provided at the open-side corners of the other new general part elements 20 is closed on the closed side of the general part elements 20 already inserted into the ground. It is made to fit with each of the element joint parts 13 and 13 provided in the corner. Then, in a state where both the joints are fitted, a new general part element 20 is inserted into the ground in the element axial direction while being along the already inserted general part element 20.
[0052]
Further, at the four corner positions of the element structure E1 in FIG. 1, the corner element 30 is inserted into the ground in the element axial direction while being along the already inserted general part element 20. At this time, the side wall partition plate (not shown) of the corner element 30 protects the surrounding earth and sand from flowing into the element from the side wall opening (not shown) and supports the earth pressure. It serves as a clasp. Thereafter, the new general element 20 is placed along the corner element 30 that has already been inserted, but along the surface that is bent at a right angle to the previous insertion line, in the element axial direction. Insert it into the ground.
[0053]
In the following, by repeating the general element insertion process as described above, the element structure can be constituted by the excavating elements 10, 20, 30, etc., which are inserted into the ground and connected to each other. For example, a flat structure, an element structure having a cross section surrounded by a semicircle, a circle, an ellipse, or the like, or a “B” -shaped cross section, a cross section having a shape of “Sun” beside, It is an element structure having a “Π” -shaped cross section.
[0054]
Next, concrete or the like is filled in each element as necessary. Thereafter, the element structure formed in the ground is used as a protective work to excavate the soil and the like inside the element structure. Next, if necessary, an underground structure can be constructed by performing construction such as covering the inner surface of the element with concrete.
[0055]
The underground excavation elements 10, 20, and 30 of the first embodiment have a construction advantage when the underground excavation element is inserted into the ground while excavating the ground. This point will be described with reference to FIG. FIG. 4 is a top view showing a state of the general element 20 during excavation / insertion.
[0056]
As shown in FIG. 4, for example, the general element 20A, 20B has already been inserted, and in the middle of excavating / inserting the new general element 20C so as to follow the existing general element 20B, When encountering an obstacle 70 such as a large rock block, the existing general part adjacent to the general part element 20C is used in addition to the method of taking the general part element 20C from the tip opening 25C of the general part element 20C. The side wall part partition plate nearest to the element 20B is removed, the side wall part opening 24B1 is opened, and the obstacle 70 is taken into the general part element 20B using this side wall part opening 24B1 and passed through the general part element 20B. Can be gone.
[0057]
Alternatively, the side wall part partition plate of the general part element 20B is removed to open the side wall part opening 24B2, and the nearest side wall part partition plate of the existing general part element 20A adjacent to the general part element 20B is removed. Side wall part opening 24A is made into an open state. Accordingly, the obstacle 70 can be further taken into the adjacent general part element 20A by using the side wall part openings 24B2 and 24A, and can be removed through the general part element 20A.
[0058]
Further, when any work (hereinafter referred to as “in-element work”), for example, a water stop work, is performed inside any of the reference element 10, the general element 20, and the corner element 30, The side wall part partition plate of the existing element adjacent to the element to be performed can be removed to open the side wall part opening, and the worker can be put in and out using the side wall part opening.
[0059]
Alternatively, when any object (for example, construction material) is carried into any one of the reference element 10, the general part element 20, and the corner part element 30, the object (for example, construction generated material such as excavated earth and sand) from any of these elements. It is also possible to remove the side wall part partition plate of the existing element adjacent to the element to be carried in or out to make the side wall part open, and use this side wall part opening.
[0060]
Therefore, if the reference element 10, the general part element 20, and the corner element 30 of the first embodiment are used, the time loss during construction can be prevented and the construction flexibility is increased. There is an advantage that the construction efficiency and construction capacity of the construction method for constructing an underground structure can be dramatically improved.
[0061]
(2) Second embodiment
The present invention can be realized by other configurations. Next, a second embodiment of the present invention will be described.
[0062]
FIG. 5 is a diagram showing a configuration of an underground excavation element according to the second embodiment of the present invention. FIG. 5 shows a reference element as an example of the underground excavation element.
[0063]
As shown in FIG. 5A, the reference element 10A of the second embodiment includes a bottom plate 11a, a top plate 11b, a columnar member 12A, an element joint (not shown), and a side wall partition plate 15A. , “B” shaped hollow box shape. The reference element 10A of the second embodiment is different from the reference element 10 of the first embodiment in that a different columnar member 12A and a different side wall partition plate 15A are provided. The other components are the same as those in the first embodiment, and the description thereof is omitted.
[0064]
A plurality of columnar members 12 </ b> A are arranged so as to extend in the vertical direction at the side wall portion that is intermediate between the bottom plate 11 a and the top plate 11 b. These columnar members 12 constitute a connection structure. As shown in FIG. 5B, the columnar member 12A is a member having a substantially “H” -shaped cross section, which is joined to the bottom plate 11a and the top plate 11b by welding or the like, and connects the bottom plate 11a and the top plate 11b. Yes. Further, the columnar member 12A forms a side wall opening that communicates the hollow portion inside the reference element 10 with the outside. For example, three side wall partition plates 15A are arranged in the side wall opening. ing. These side wall partition plates 15 are adapted to be fitted into the recesses of the “H” -shaped cross section of the columnar member 12A. Further, as shown in FIG. 5B, the side wall partition plate 15 </ b> A is configured to be easily detachable from the columnar member 12 by being inclined obliquely with respect to the columnar member 12 </ b> A.
[0065]
Also according to the second embodiment having the above-described configuration, it is possible to exhibit the functions and effects having the features of the present invention, as in the first embodiment.
[0066]
(3) Third embodiment
The present invention can be realized by other configurations. Next, a third embodiment of the present invention will be described.
[0067]
FIG. 6 is a diagram showing a configuration of an underground excavation element according to the third embodiment of the present invention. FIG. 6 shows a reference element as an example of the underground excavation element.
[0068]
As shown in FIG. 6A, the reference element 10B of the third embodiment includes a bottom plate 11a, a top plate 11b, a columnar member 12, an element joint (not shown), a side wall partition plate 15, A horizontal joining member 17 is provided, and is configured in a hollow box shape having a “B” -shaped cross section. The reference element 10B of the third embodiment is different from the reference element 10 of the first embodiment in that a horizontal joining member 17 that joins the columnar members 12 is provided, and the side wall partition plate 15 is provided by the attachment / detachment tool 16B. This is a configuration that is detachable from the horizontal joining member 17. The other components are the same as those in the first embodiment, and the description thereof is omitted.
[0069]
In 3rd Embodiment, the columnar member 12 and the horizontal joining member 17 comprise the connection structure. Further, as the attachment / detachment tool 16B, a combination of a bolt and a nut, a clamp, a clip that is sandwiched using a spring, a holder that is sandwiched using a wedge, and the like are used.
[0070]
Also according to the third embodiment having the above-described configuration, the functions and effects having the features of the present invention can be exhibited, similarly to the first embodiment and the second embodiment.
[0071]
(4) Fourth embodiment
The present invention can be realized by other configurations. Next, a fourth embodiment of the present invention will be described.
[0072]
FIG. 7 is a diagram showing a configuration of an underground excavation element according to the fourth embodiment of the present invention. In FIG. 7, a reference element is illustrated as an example of the underground excavation element.
[0073]
As shown in FIG. 7, the reference element 10C of the fourth embodiment includes a bottom plate 11a, a top plate 11b, a truss diagonal member 12C, an element joint (not shown), and a side wall partition plate (not shown). It is comprised in the hollow box shape of a "B" -shaped cross section. The difference between the reference element 10 </ b> C of the fourth embodiment and the reference element 10 of the first embodiment is that a truss diagonal member 12 </ b> C is provided instead of the columnar member 12. The other components are the same as those in the first embodiment, and the description thereof is omitted.
[0074]
In the fourth embodiment, the truss diagonal member 12C constitutes a connection structure. Further, the truss diagonal member 12C forms a substantially triangular side wall opening 14C communicating with the outside.
[0075]
Also according to the fourth embodiment having the above-described configuration, the functions and effects having the features of the present invention can be exhibited as in the above-described embodiments.
[0076]
(5) Fifth embodiment
The present invention can be realized by other configurations. Next, a fifth embodiment of the present invention will be described.
[0077]
FIG. 8 is a diagram showing a configuration of an underground excavation element according to a fifth embodiment of the present invention. FIG. 8 shows a reference element as an example of the underground excavation element.
[0078]
As shown in FIG. 8, the reference element 10D of the fifth embodiment includes a bottom plate 11a, a top plate 11b, a plate member 12D, an element joint (not shown), and a side wall partition plate (not shown). It is comprised in the hollow box shape of a "B" -shaped cross section. The difference between the reference element 10D of the fifth embodiment and the reference element 10 of the first embodiment is that a plate-like member 12D having a circular side wall opening 14D is provided instead of the columnar member 12. The other components are the same as those in the first embodiment, and the description thereof is omitted.
[0079]
In 5th Embodiment, plate-shaped member 12D comprises the connection structure. In addition, a circular side wall opening 14D communicating with the outside is formed by the plate-like member 12D.
[0080]
Also according to the fifth embodiment having the above-described configuration, the functions and effects having the features of the present invention can be exhibited as in the above-described embodiments.
[0081]
The present invention is not limited to the above embodiments. Each of the embodiments described above is an exemplification, and any configuration that has substantially the same configuration as the technical idea described in the claims of the present invention and has the same operational effects can be used. It is included in the technical scope of the present invention.
[0082]
For example, in the above embodiment, the underground excavation element (for example, 10, 10A) provided with the side wall partition plate (for example, 15, 15A) has been described as an example, but the present invention is not limited to this example. It is not limited, For example, you may make it implement | achieve the earth retaining function of a side wall part by another means, without providing a side wall part partition plate.
[0083]
Moreover, in the said embodiment, although the element for underground excavation (for example, 10, 10A) which attached the side wall part partition plate to the connection structure so that attachment or detachment was mentioned as an example was demonstrated, this invention is limited to this example. However, other configurations, for example, the side wall part partition plate may be detachably attached to the bottom plate, the side wall part partition plate may be detachably attached to the top plate, the side wall part partition plate may be the bottom plate, the top plate, It may be detachably attached to any of the connection structures or an appropriate combination.
[0084]
In addition, the side wall partition plate may have any configuration as long as it can be used as a retaining wall for the side wall portion of the underground excavation element, and other configurations other than the detachable configuration, such as a hinge and a slide mechanism, etc. The side wall partition plate may be moved only when necessary to form a side wall opening that communicates with the outside.
[0085]
In the above embodiment, the example in which the element structure is configured by the reference element 10 and the corner element 30 having a rectangular tubular cross section and the general element 20 having a substantially “U” -shaped cross section has been described. However, the present invention is not limited to this example, and the underground excavation element having other configurations, for example, a substantially “day” shape, a substantially “eye” shape, a substantially “field” shape, and a substantially “circle” shape. An underground excavation element having a cross-section such as a shape may be used. These may be used in an appropriate combination. Therefore, unlike the above-described embodiment, the reference element 10 and the corner element 30 are not used, but only the general element 20 having a substantially “U” -shaped cross section is used (the four corners of the element structure are also substantially “ The element structure E1 may be configured using only the general element 20 having a U-shaped cross section.
[0086]
Moreover, in the said embodiment, although the case where the element coupling part (for example, 13 or 23) was provided in the corners of the reference | standard element 10 etc. was mentioned as an example, this invention is not limited to this example. The element joint portion may be provided in an intermediate portion (for example, a central portion) of a predetermined side of the underground excavation element having another configuration, for example, the underground excavation element.
[0087]
【The invention's effect】
As described above, according to the present invention, since the side wall portion opening communicating with the outside can be formed in the side wall portion of the underground excavation element, there is a problem in excavating and inserting the element into the ground. Even if an object is encountered or work in the element is required, the underground excavation element that encounters an obstacle or the existing underground excavation element adjacent to the underground excavation element that performs the work in the element is used. Use the side wall opening of the connecting structure for the elements, or remove the partition plate of the adjacent existing underground excavation element to form the side wall opening to remove obstacles or work inside the element. It is possible to perform, various construction, carry-in / out, etc., prevent time loss during construction, and increase the flexibility of construction. Can remarkably improve the construction efficiency and construction capabilities, has the advantage that.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing an overall configuration of an underground structure according to a first embodiment of the present invention.
FIG. 2 is a diagram showing a configuration of an underground excavation element in the underground structure of FIG. 1;
FIG. 3 is a diagram showing a configuration of an underground excavation element and an element joint portion in the underground structure of FIG. 1;
4 is a diagram for explaining a construction method in the underground structure of FIG. 1; FIG.
FIG. 5 is a diagram showing a configuration of an underground excavation element according to a second embodiment of the present invention.
FIG. 6 is a diagram showing a configuration of an underground excavation element according to a third embodiment of the present invention.
FIG. 7 is a diagram showing a configuration of an underground excavation element according to a fourth embodiment of the present invention.
FIG. 8 is a diagram showing a configuration of an underground excavation element according to a fifth embodiment of the present invention.
[Explanation of symbols]
10, 10A-10D Reference element (element for underground excavation)
11a Bottom plate
11b Top plate
12, 12A Columnar member (connection structure)
12C Truss diagonal (connection structure)
12D plate-like member (connection structure)
13 Element joint
13a Fitting part
13b base
13c, 13d Projection
13e groove
14, 14B-14D Side wall opening
15, 15A Side wall partition plate
16, 16B Detachment tool
17 Horizontal joining member (connection structure)
20, 20A-20C General part element (element for underground excavation)
21a Bottom plate
21b Top plate
22 Columnar member (connection structure)
23 Element joint
23a Fitting part
23b base
23c, 23d Projection
23e groove
24A-24B2 Side wall opening
25C Tip opening
30 Corner element (underground excavation element)
70 obstacles
101 Underground structure
E1 element structure

Claims (10)

エレメント軸方向に延設される底板と、
前記エレメント軸方向に延設されるとともに前記底板の上方に平行に配置された頂板と、側壁部において前記底板及び前記頂板を連結するとともに、外部と連通する側壁部開口を形成可能な連結構造と、
前記エレメント軸方向に延設されるとともに、隣接するエレメント継手部どうしの嵌合により相互の接続を行い、前記エレメント継手部により前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能としたエレメント継手部を備え、中空箱状に構成され
前記側壁部開口を塞ぐと共に前記底板又は前記頂板若しくは前記連結構造に着脱具によって着脱可能に構成された側壁部仕切板とを備えた
ことを特徴とする地中掘削用エレメント。
A bottom plate extending in the element axial direction;
A top plate extending in the element axial direction and arranged in parallel above the bottom plate; and a connecting structure capable of connecting the bottom plate and the top plate at the side wall portion and forming a side wall portion opening communicating with the outside. ,
Extends in the element axial direction and connects to each other by fitting adjacent element joints, and transmits the force in the direction perpendicular to the element axis, which is perpendicular to the element axial direction, through the element joints. Equipped with a possible element joint, configured as a hollow box ,
An underground excavation element comprising: a side wall partition plate configured to detach and attach to the bottom plate, the top plate, or the connection structure by a detachable tool while closing the side wall opening .
請求項1記載の地中掘削用エレメントにおいて、
前記連結構造は、前記底板と頂板の中間となる前記側壁部において鉛直方向に延在するように複数配置される柱状部材であることを特徴とする地中掘削用エレメント。
The underground excavation element according to claim 1,
An underground excavation element characterized in that a plurality of the connecting structures are columnar members arranged so as to extend in the vertical direction in the side wall portion between the bottom plate and the top plate.
請求項1記載の地中掘削用エレメントにおいて、
記側壁部仕切板、側壁部の土留めとして用いることを特徴とする地中掘削用エレメント。
The underground excavation element according to claim 1,
Before SL side wall partition plate, element for ground drilling, which comprises using as the earth retaining wall portion.
請求項記載の地中掘削用エレメントにおいて、
前記側壁部仕切板は、前記底板又は前記頂板若しくは前記連結構造に作用する外力を負担しない構造であることを特徴とする地中掘削用エレメント。
The underground excavation element according to claim 1 ,
The underground excavation element, wherein the side wall partition plate has a structure that does not bear an external force acting on the bottom plate, the top plate, or the connection structure.
請求項記載の地中掘削用エレメントにおいて、前記側壁部仕切板は、前記底板又は前記頂板若しくは前記連結構造に移動可能に構成されることを特徴とする地中掘削用エレメント。In underground drilling element according to claim 1, wherein said sidewall partition plate is ground drilling element, characterized in that it is constituted the bottom plate or moved can be in the top plate or the connecting structure. エレメント軸方向に延設される底板と、前記エレメント軸方向に延設されるとともに前記底板の上方に平行に配置された頂板と、側壁部において前記底板及び前記頂板を連結するとともに外部と連通する側壁部開口を形成可能な連結構造と、前記エレメント軸方向に延設されるとともに隣接するエレメント継手部どうしの嵌合により相互の接続を行い前記エレメント継手部により前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能としたエレメント継手部を備え中空箱状に構成された地中掘削用エレメントを用いた地下構造物構築方法であって、
前記地中掘削用エレメントを、前記エレメント軸方向を挿入方向とし、先端部開口で地盤の掘削を行いつつ地中に挿入し、次いで、他の地中掘削用エレメントのエレメント継手部を、既設の地中掘削用エレメントのエレメント継手部に嵌合させて誘導案内させ、他の地中掘削用エレメントを、前記エレメント軸方向を挿入方向として掘削しつつ地中に挿入することを繰り返すことにより、複数の地中掘削用エレメントを地中で接続させてエレメント構造体を形成し、
次いで、前記エレメント構造体を防護工として前記エレメント構造体の内部の地盤を掘削し、
次いで、前記エレメント構造体を本体として利用して地下構造物を構築し、
地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に支障物と遭遇した場合には、前記支障物に遭遇した当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し前記支障物が前記側壁部開口を通過することによって前記支障物のてっ去を行う
ことを特徴とする地下構造物構築方法。
A bottom plate extending in the element axial direction, a top plate extending in the element axial direction and arranged in parallel above the bottom plate, and connecting the bottom plate and the top plate at the side wall portion and communicating with the outside. A connection structure capable of forming a side wall opening and a connection structure that extends in the axial direction of the element and is connected to each other by fitting between adjacent element joints in a direction perpendicular to the element axial direction by the element joint. An underground structure construction method using an element for underground excavation having an element joint portion capable of transmitting a force perpendicular to an element axis and having a hollow box shape,
The underground excavation element is inserted into the ground while excavating the ground at the tip end opening with the element axial direction as the insertion direction, and then an element joint portion of another underground excavation element is installed. By repeatedly inserting and guiding another element for underground excavation with the element axial direction as the insertion direction, the element coupling portion of the element for underground excavation is guided and guided, The elements for underground excavation are connected in the ground to form an element structure,
Next, excavating the ground inside the element structure as a protective work the element structure,
Next, an underground structure is constructed using the element structure as a main body,
When an obstacle is encountered when the underground excavation element is inserted into the ground while excavating the ground, an existing underground excavation element adjacent to the underground excavation element that has encountered the obstacle A method for constructing an underground structure , wherein the obstacle is removed by passing the obstacle through the side wall opening using the side wall opening of the connecting structure .
請求項6記載の地下構造物構築方法において、
前記側壁部開口を塞ぐ側壁部仕切板を備えて側壁部の土留めとして用いることを特徴とする地下構造物構築方法。
In the underground structure construction method according to claim 6,
A method for constructing an underground structure comprising a side wall part partition plate for closing the side wall part opening and used as a retaining wall for the side wall part.
請求項7記載の地下構造物構築方法において、
地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に支障物と遭遇した場合には、前記支障物に遭遇した当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して前記支障物が前記側壁部開口を通過することによって前記支障物のてっ去を行うことを特徴とする地下構造物構築方法。
In the underground structure construction method according to claim 7,
Obstacle and when encountered, existing underground drilling element in contact next to the underground digging elements encountered the obstacle when inserting the element for underground excavating the ground while performing ground excavation A method for constructing an underground structure comprising removing a side wall part partition plate to form a side wall part opening and removing the obstacle by passing the obstacle through the side wall part opening .
請求項7記載の地下構造物構築方法において、
前記地中掘削用エレメントのいずれかに止水工を含むエレメント内作業を行う場合に、当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し又は前記隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して作業者が前記側壁部開口を通過して出入を行うことを特徴とする地下構造物構築方法。
In the underground structure construction method according to claim 7,
When performing an in-element work including a water stop for any of the underground excavation elements, use an opening of a side wall portion of an existing underground excavation element coupling structure adjacent to the underground excavation element or Construction of an underground structure characterized in that a side wall part partition plate of the adjacent existing underground excavation element is removed to form a side wall part opening, and an operator goes in and out through the side wall part opening. Method.
請求項7記載の地下構造物構築方法において、
前記地中掘削用エレメントのいずれかに物体を搬入し、又は前記地中掘削用エレメントのいずれかから物体を搬出する場合に、当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し又は前記隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して前記物体が前記側壁部開口を通過することによって行うことを特徴とする地下構造物構築方法。
In the underground structure construction method according to claim 7,
When an object is carried into any of the underground excavation elements or an object is carried out of any of the underground excavation elements, an existing underground excavation element adjacent to the underground excavation element is used. Using the side wall opening of the connection structure or by removing the side wall partition plate of the adjacent existing underground excavation element to form a side wall opening and passing the object through the side wall opening An underground structure construction method characterized by that.
JP2000050488A 2000-02-22 2000-02-22 Underground excavation element and underground structure construction method Expired - Lifetime JP3923230B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000050488A JP3923230B2 (en) 2000-02-22 2000-02-22 Underground excavation element and underground structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000050488A JP3923230B2 (en) 2000-02-22 2000-02-22 Underground excavation element and underground structure construction method

Publications (2)

Publication Number Publication Date
JP2001234691A JP2001234691A (en) 2001-08-31
JP3923230B2 true JP3923230B2 (en) 2007-05-30

Family

ID=18572267

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000050488A Expired - Lifetime JP3923230B2 (en) 2000-02-22 2000-02-22 Underground excavation element and underground structure construction method

Country Status (1)

Country Link
JP (1) JP3923230B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101161332B1 (en) * 2012-03-09 2012-07-03 김동수 Construction method of the underground tunnel
KR102572805B1 (en) * 2023-02-01 2023-08-31 윤기철 Underground structure using steel pipe form and trenchless construction method of the same

Also Published As

Publication number Publication date
JP2001234691A (en) 2001-08-31

Similar Documents

Publication Publication Date Title
JP3923230B2 (en) Underground excavation element and underground structure construction method
KR101556674B1 (en) Steel pipe assembly and construction method of steel pipe structure using the same
KR101736094B1 (en) Tube assembly and construction method of loop structure using the same
KR102071647B1 (en) Pipe roof structures and construction method of underground structure using thereof
JP2000120372A (en) Reference pipe steel element, general steel element, corner steel element, and method of constructing underground structure
KR101060571B1 (en) Box-type propulsion pipe connecting structure and its construction method
JP3031191B2 (en) Construction method of large section tunnel
JPH09125417A (en) Underground wall and asymmetric closed section steel sheet pile
JP5746803B2 (en) Drilling bucket
JP3668194B2 (en) Continuous underground wall construction method
JP3765719B2 (en) Closure adjustment element and underground structure construction method
JP2005325556A (en) Concrete sheet pile
JP2001182477A (en) Equipment for partition iron plate
KR101240334B1 (en) Under-ground structure construction method using steel pipe with bended guide pannel
JP3691707B2 (en) Top plate construction method for steel pipe sheet pile well foundation
JP3117819B2 (en) Lining method for shield tunnel with rectangular cross section
KR102841969B1 (en) Furlable earth retaining structure for provisional facilities
KR102601492B1 (en) Joint for connecting parts of slurry wallslurry wall and construction method of slurry wall using the joint
JP3882882B2 (en) Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method
JP3404561B2 (en) Connection method of shield tunnel
JP3008804B2 (en) Joint structure in underground diaphragm wall
KR102305424B1 (en) Construction meyhod for underground structure by non-excavation using closed section reinforcing member and underground structure therewith
JP3923237B2 (en) Tunnel lining element and tunnel lining method
JP4037003B2 (en) Construction method of underground structure
JPH077438Y2 (en) Cylindrical wall for lining drill holes

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041109

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061020

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061031

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20061102

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070221

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3923230

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120302

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120302

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term