JP3923230B2 - Underground excavation element and underground structure construction method - Google Patents
Underground excavation element and underground structure construction method Download PDFInfo
- Publication number
- JP3923230B2 JP3923230B2 JP2000050488A JP2000050488A JP3923230B2 JP 3923230 B2 JP3923230 B2 JP 3923230B2 JP 2000050488 A JP2000050488 A JP 2000050488A JP 2000050488 A JP2000050488 A JP 2000050488A JP 3923230 B2 JP3923230 B2 JP 3923230B2
- Authority
- JP
- Japan
- Prior art keywords
- side wall
- underground
- underground excavation
- opening
- excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、非開削方式で地下構造物を構築するために用いる地中掘削用エレメント、及びこの地中掘削用エレメントにより地下構造物を構築する方法に関するものである。
【0002】
【従来の技術】
従来、鉄道線路や道路等の下方に非開削方式で地下構造物を構築する方法として、「ロ」字状断面や「コ」字状断面等の地中掘削用エレメントを推進又はけん引により地中に順次挿入して組み合わせ、エレメントにより囲まれた部分の土砂等を掘削し、地中掘削用エレメントからなる構造体(以下、「エレメント構造体」という。)を地下構造物の本体として利用する工法が用いられている。
【0003】
【発明が解決しようとする課題】
しかしながら、上記した地中掘削用エレメントにおいては、「ロ」字状断面又は「コ」字状断面の側壁部は、例えば板状の部材等で構成されていたため、エレメントの挿入・掘削の段階では、エレメントの先端部の開口から地盤掘削を行い、掘削した土砂等をエレメント内に取り込んで後方に搬送して外部へ排出する構造となっていた。このため、エレメントの挿入・掘削時に支障物に遭遇した場合や、エレメント内での作業が必要となった場合には、当該エレメントの先端部開口からしか、この支障物を取り込んでてっ去することはできず、当該エレメントの内部からしか、エレメント内作業を行うことはできない、という問題があった。
【0004】
本発明は上記の問題を解決するためになされたものであり、本発明の解決しようとする課題は、エレメントの挿入・掘削時に支障物に遭遇した場合やエレメント内作業が必要となった場合に当該エレメント以外からも支障物てっ去やエレメント内作業が可能な地中掘削用エレメントと、このエレメントを用いた地下構造物構築方法を提供することにある。
【0005】
【課題を解決するための手段】
上記課題を解決するため、本発明に係る地中掘削用エレメントは、エレメント軸方向に延設される底板と、前記エレメント軸方向に延設されるとともに前記底板の上方に平行に配置された頂板と、側壁部において前記底板及び前記頂板を連結するとともに、外部と連通する側壁部開口を形成可能な連結構造と、前記エレメント軸方向に延設されるとともに、隣接するエレメント継手部どうしの嵌合により相互の接続を行い、前記エレメント継手部により前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能としたエレメント継手部を備え、中空箱状に構成され、前記側壁部開口を塞ぐと共に前記底板又は前記頂板若しくは前記連結構造に着脱具によって着脱可能に構成された側壁部仕切板とを備えたことを特徴とする。
【0006】
上記の地中掘削用エレメントにおいて、好ましくは、前記連結構造は、前記底板と頂板の中間となる前記側壁部において鉛直方向に延在するように複数配置される柱状部材である。
【0007】
また、上記の地中掘削用エレメントにおいて、好ましくは、前記側壁部仕切板は、側壁部の土留めとして用いる。
【0008】
また、上記の地中掘削用エレメントにおいて、好ましくは、前記側壁部仕切板は、前記底板又は前記頂板若しくは前記連結構造に作用する外力を負担しない構造である。
【0009】
また、上記の地中掘削用エレメントにおいて、好ましくは、前記側壁部仕切板は、前記底板又は前記頂板若しくは前記連結構造に移動可能に構成される。
【0010】
また、本発明に係る地下構造物構築方法は、エレメント軸方向に延設される底板と、前記エレメント軸方向に延設されるとともに前記底板の上方に平行に配置された頂板と、側壁部において前記底板及び前記頂板を連結するとともに外部と連通する側壁部開口を形成可能な連結構造と、前記エレメント軸方向に延設されるとともに隣接するエレメント継手部どうしの嵌合により相互の接続を行い前記エレメント継手部により前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能としたエレメント継手部を備え中空箱状に構成された地中掘削用エレメントを用いた地下構造物構築方法であって、前記地中掘削用エレメントを、前記エレメント軸方向を挿入方向とし、先端部開口で地盤の掘削を行いつつ地中に挿入し、次いで、他の地中掘削用エレメントのエレメント継手部を、既設の地中掘削用エレメントのエレメント継手部に嵌合させて誘導案内させ、他の地中掘削用エレメントを、前記エレメント軸方向を挿入方向として掘削しつつ地中に挿入することを繰り返すことにより、複数の地中掘削用エレメントを地中で接続させてエレメント構造体を形成し、次いで、前記エレメント構造体を防護工として前記エレメント構造体の内部の地盤を掘削し、次いで、前記エレメント構造体を本体として利用して地下構造物を構築し、地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に支障物と遭遇した場合には、前記支障物に遭遇した当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し前記支障物が前記側壁開口を通過することによって前記支障物のてっ去を行うことを特徴とする。
【0011】
上記の地下構造物構築方法において、好ましくは、前記側壁部開口を塞ぐ側壁部仕切板を備えて側壁部の土留めとして用いる。
【0012】
また、上記の地下構造物構築方法において、好ましくは、地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に支障物と遭遇した場合には、前記支障物に遭遇した当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して前記支障物が前記側壁部開口を通過することによって前記支障物のてっ去を行う。
【0013】
また、上記の地下構造物構築方法において、好ましくは、前記地中掘削用エレメントのいずれかに止水工を含むエレメント内作業を行う場合に、当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し又は前記隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して作業者が前記側壁部開口を通過して出入を行う。
【0014】
また、上記の地下構造物構築方法において、好ましくは、前記地中掘削用エレメントのいずれかに物体を搬入し、又は前記地中掘削用エレメントのいずれかから物体を搬出する場合に、当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し又は前記隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して前記物体が前記側壁部開口を通過することによって行う。
【0015】
【発明の実施の形態】
以下、本発明の実施形態について、図面を参照しながら詳細に説明する。
【0016】
(1)第1実施形態
まず、本発明の第1実施形態について説明する。
【0017】
図1は、本発明の第1実施形態である地下構造物の全体構成を示す断面図である。
【0018】
図1に示すように、この地下構造物101は、「ロ」字状の断面形状を有する箱型の構造物である。地下構造物101は、「ロ」字状の断面形状を有するエレメント構造体E1により構成されている。
【0019】
エレメント構造体E1は、上床版部の中央位置に設置される地中掘削用エレメント(以下、「基準エレメント」という。)10と、基準エレメント10に隣接させるように設置される地中掘削用エレメント(以下、「一般部エレメント」という。)20と、エレメント構造体E1の4つの隅角位置に設置される地中掘削用エレメント(以下、「隅角部エレメント」という。)30が組み合わされることによって構成されている。
【0020】
図2は、図1の地下構造物101における基準エレメント10の構成を示す図であり、図2(A)は一部を分解した斜視図を、図2(B)は隅の一部を拡大した断面図を、それぞれ示している。
【0021】
図2(A)に示すように、基準エレメント10は、底板11aと、頂板11bと、柱状部材12と、側壁部仕切板15を備え、「ロ」字状断面の中空箱状に構成されている。底板11aは、基準エレメント10の長手方向(以下、「エレメント軸方向」という。)に延設される鋼又はアルミニウム等の金属若しくは合金等からなる板状部材である。頂板11bは、エレメント軸方向に延設されるとともに、底板11aの上方に平行に配置される鋼又はアルミニウム等の金属若しくは合金等からなる板状部材である。
【0022】
また、柱状部材12は、底板11aと頂板11bの中間となる側壁部において、鉛直方向に延在するように複数配置されている。柱状部材12は、底板11aと頂板11bに溶接等により接合され、底板11aと頂板11bを連結している。また、柱状部材12は、基準エレメント10の内部の空洞部と外部を連通させる側壁部開口14を形成している。これらの柱状部材12は、連結構造を構成している。
【0023】
また、側壁部仕切板15は、側壁部開口14を塞ぐように配置される板状部材であり、鋼やアルミニウム等の金属又は合金、合成樹脂、FRP(繊維補強プラスチック)、木材等からなる。側壁部仕切板15は、後述するように、基準エレメント10を掘削しつつ地中に挿入する際に、側壁部の土留め等として用いられる。
【0024】
側壁部仕切板15は、図2(B)に示すように、着脱具16によって柱状部材12に着脱可能な構成となっている。着脱具16としては、ボルトとナットの組み合わせ、クランプ、バネを用いて挟み付けるクリップ、クサビを用いて挟み付ける保持具等が用いられる。側壁部仕切板15は、エレメント掘削・挿入時の周囲の地盤からの土圧に対しては、これを負担して支持するように設計される。しかし、エレメント構造体E1に作用する外力、例えば構造物として負担する活荷重、死荷重、地震時荷重等については、底板11a又は頂板11b若しくは柱状部材12が負担して支持し、側壁部仕切板15は外力を負担しない構造として設計されている。
【0025】
なお、図2においては図示を省略しているが、この基準エレメント10は、断面の4つの隅角部にエレメント継手部を有している。図3は、基準エレメント10に接続される一般部エレメント20の構成と、これらを接続するエレメント継手部13、23の構成を示した図である。図3(A)は、基準エレメント10と、一般部エレメント20がエレメント継手部13、23で接続する直前の状態の断面図を示している。また、図3(B)は、エレメント継手部13、23の接続状態を示す拡大断面図である。図3(A )と図3(B)は、いずれも、エレメント軸方向に垂直な平面で切断した場合の断面図を示している。
【0026】
図3(A)に示すように、基準エレメント10の断面の4つの隅部のそれぞれには、エレメント軸方向に沿って延び鋼又はアルミニウム等の金属若しくは合金等からなるエレメント継手部13が配設されている。
【0027】
エレメント継手部13の断面は、図3(B)に示すように、概略「C」字状の嵌合部13aと、嵌合部13aの背後に連続する基部13bを有して構成されている。また、嵌合部13aは、2つの突出部13c、13dを有している。突出部13cの先端は球根状に断面が拡大されている。また、突出部13cと突出部13dの中間は、ほぼ楕円状断面の凹部となっており、この部分は、略楕円状断面でエレメント軸方向に延びる溝13eとなっている。
【0028】
なお、図3(B)は、図3(A)に示した基準エレメント10における左上部位置のエレメント継手部13の断面を示しているが、図3(A)に示した基準エレメント10における左下部位置、右上部位置、右下部位置の隅部のエレメント継手部13についてもまったく同一形状のエレメント継手部位13が用いられており、その構成は図3(B)に図示するものとまったく同様である。
【0029】
また、頂板11b、柱状部材12と各エレメント継手部13との各接合箇所は、溶接部W1、W2、W3、W4によって接合されている。これらの接合は、ボルト等の機械的接合であってもよい。なお、図示はしていないが、底板11aについても同様である。
【0030】
上記のような構成により、エレメント継手部13の突出部13cの先端付近にエレメント軸方向に直角な方向(以下、「エレメント軸直角方向」という。)の力を作用させた場合、例えば、図3(B)における左方向に引張ると、この引張り力(以下、「第1引張り力」という。)は、突出部13cから基部13bに伝達され、基部13bから頂板11bに伝達され、頂板11bの図3(B)における左端に、図3(B)における左方向への引張り力を作用させることになる。
【0031】
一方、エレメント継手部13の突出部13dの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図3(B)における左方向に引張ると、この引張り力(以下、「第2引張り力」という。)は、突出部13dから基部13bを経て頂板11bに伝達され、鋼製板状部材11の図3(B)における左端に、図3(B)における左方向への引張り力を作用させることになる。
【0032】
上記のことから、エレメント継手部13の突出部13c及び13dと、基部13bは、外部から加えられる上記のエレメント軸直角方向の力(例えば、第1引張り力、第2引張り力)に抵抗可能な所定の強度と所定の断面を有している。また、エレメント継手部13の突出部13dには、上記の第1引張り力の一部と第2引張り力の一部との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面を有している。例えば、突出部13dの厚みは十分な厚みとなっている。
【0033】
また、エレメント継手部13の基部13bには、上記の第1引張り力と第2引張り力の一部との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面(例えば十分な厚み)を有している。また、頂板11bは、エレメント継手部13から伝達される上記のエレメント軸直角方向の力に抵抗可能な所定の強度と所定の断面を有している。なお、図示はしていないが、底板11aについても同様である。
【0034】
また、図3(A)に示すように、一般部エレメント20は、底板21aと、頂板21bと、柱状部材22と、エレメント継手部23及び13と、側壁部仕切板(図示せず)を備え、「コ」字状断面を有する部材となっている。底板21aは、一般部エレメント20のエレメント軸方向に延設される鋼又はアルミニウム等の金属若しくは合金等からなる板状部材である。頂板21bは、エレメント軸方向に延設されるとともに、底板21aの上方に平行に配置される鋼又はアルミニウム等の金属若しくは合金等からなる板状部材である。
【0035】
また、柱状部材22は、底板21aと頂板21bの中間となる側壁部において、鉛直方向に延在するように複数配置されている。柱状部材22は、底板21aと頂板21bに溶接等により接合され、底板21aと頂板21bを連結している。また、柱状部材22は、一般部エレメント20の内部の空洞部と外部を連通させる側壁部開口(図示せず)を形成している。これらの柱状部材22は、連結構造を構成している。なお、一般部エレメント20の側壁部開口は、基準エレメント10の側壁部開口14と同様の構成を有している。また、一般部エレメント20の側壁部仕切板(図示せず)は、基準エレメント10の側壁部仕切板15と同様の構成を有している。
【0036】
また、一般部エレメント20は、「コ」字状断面の4つの隅部のうち、外部に対して開放された隅部、すなわち図3(A)における右上隅部及び右下隅部のそれぞれに、エレメント軸方向に沿って延び鋼又はアルミニウム等の金属若しくは合金等からなるエレメント継手部23が配設されている。
【0037】
また、一般部エレメント20の「コ」字状断面の4つの隅部のうち、外部に対して閉塞された隅部、すなわち図3(A)における左上隅部及び左下隅部のそれぞれには、エレメント軸方向に沿って上述したエレメント継手部13が配設されている。
【0038】
エレメント継手部23の断面は、概略「C」字状の嵌合部23aと、嵌合部23aの背後に連続する基部23bを有して構成されている。また、嵌合部23aは、2つの突出部23c、23dを有している。突出部23cの先端は球根状に断面が拡大されている。また、突出部23cと突出部23dの中間は、ほぼ楕円状断面の凹部となっており、この部分は、略楕円状断面でエレメント軸方向に延びる溝23eとなっている。
【0039】
なお、図3(B)は、図3(A)に示した一般部エレメント20における右上部位置のエレメント継手部23の断面を示しているが、図3(A)に示した一般部エレメント20における右下部位置の隅部のエレメント継手部23についてもまったく同一形状のエレメント継手部23が用いられており、その構成は図3(B)に図示するものとまったく同様である。また、一般部エレメント20におけるエレメント継手部13とその付近の構成は、上述した基準エレメント10におけるエレメント継手部13とその付近の構成とまったく同様である。
【0040】
また、頂板21b、柱状部材22とエレメント継手部23との各接合箇所は、溶接部W5、W6等によって接合されている。これらの接合は、ボルト等の機械的接合であってもよい。なお、図示はしていないが、底板21aについても同様である。
【0041】
上記のような構成により、エレメント継手部23の突出部23cの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図3(B)における右方向に引張ると、この引張り力(以下、「第3引張り力」という。)は、突出部23cから基部23bに伝達され、基部23bから頂板21bに伝達され、頂板21bの図3(B)における右端に、図3(B)における右方向への引張り力を作用させることになる。
【0042】
一方、エレメント継手部23の突出部23dの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図3(B)における右方向に引張ると、この引張り力(以下、「第4引張り力」という。)は、突出部23dから基部23bに伝達され、基部23bから頂板21bに伝達され、頂板21bの図3(B)における右端に図3(B)における右方向への引張り力を作用させることになる。
【0043】
上記のことから、エレメント継手部23の突出部23c及び23dは、外部から加えられる上記のエレメント軸直角方向の力(例えば、第3引張り力、第4引張り力)に抵抗可能な所定の強度と所定の断面を有している。また、エレメント継手部23の突出部23dには、上記の第3引張り力の一部と第4引張り力の一部との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面を有している。例えば、突出部23dの厚みは十分な厚みとなっている。
【0044】
また、エレメント継手部23の基部23bには、上記の第3引張り力と第4引張り力との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面(例えば十分な厚み)を有している。また、頂板21b及び柱状部材22は、エレメント継手部13、23から伝達される上記のエレメント軸直角方向の力に抵抗可能な所定の強度と所定の断面を有している。
【0045】
また、図示はしていないが、隅角部エレメント30は、底板と、頂板と、柱状部材と、エレメント継手部と、側壁部仕切板を備え、基準エレメント10と同様の構成を有する「ロ」字状断面の部材である。隅角部エレメント30については、エレメント構造体の隅角部の内側に大きな引張り力が発生する場合があるが、この引張り力は、例えば「ロ」字状断面の1辺、さらにこの辺と直角となる辺に板状部材(補強板)をもう1枚配置し二重構造とするなどして負担させ、エレメント構造体の強度を高めることができる。また、エレメント構造体の隅角部の内側の引張り力が小さい場合には、補強板を適宜省略してもよい。
【0046】
次に、上記した基準エレメント10と一般部エレメント20と隅角部エレメント30を用いたエレメント構造体の施工方法について説明する。
【0047】
まず、、基準エレメント10を、エレメント軸方向に向けて地中に挿入する。この場合、基準エレメント10の内部にオーガードリル等を配備して、エレメント内部の土砂等を掘削、除去しつつ、エレメントの地中への挿入を行う。この際、基準エレメント10の側壁部仕切板15は、側壁部開口14から周囲の土砂等がエレメント内に流入しないように防護し、土圧を支持する土留めとしての機能を果たす。その後、一般部エレメント20の開放側隅部に設けられたエレメント継手部23、23のそれぞれを、基準エレメント10のエレメント継手部13のうちの2つ(例えば、図3(A)に示した基準エレメント10における左上隅部の継手と左下隅部の継手)と嵌合させる。
【0048】
その後、これらのエレメント継手部13、23を嵌合させた状態で、一般部エレメント20を、基準エレメント10に沿わせながら、基準エレメント10の場合と同様にしてエレメント軸方向に向けて地中に挿入する。この際、一般部エレメント20の側壁部仕切板(図示せず)は、側壁部開口(図示せず)から周囲の土砂等がエレメント内に流入しないように防護し、土圧を支持する土留めとしての機能を果たす。
【0049】
この場合、図3(B)に示すように、接続状態となっている基準エレメント10のエレメント継手部13と、一般部エレメント20のエレメント継手部23においては、エレメント継手部13の溝13e内にエレメント継手部23の突出部23cの拡大された先端が入り込んで嵌合し、かつ、エレメント継手部23の溝23e内にエレメント継手部13の突出部13cの拡大された先端が入り込んで嵌合している。このように、基準エレメント10のエレメント継手部13と一般部エレメント20のエレメント継手部23が互いに嵌合することにより、基準エレメント10と一般部エレメント20の相互間で、エレメント軸直角方向の力が伝達可能となっている。
【0050】
上記のように嵌合している基準エレメント10のエレメント継手部13と、一般部エレメント20のエレメント継手部23の内部の溝13e、23eには、必要に応じて、適宜の時期に、エレメント軸方向の一方の端(以下、「注入端」という。)から、無収縮モルタル、無収縮コンクリート、樹脂材料等のグラウト材(図示せず)を注入し、硬化させて継手接続を補強してもよい。このグラウト注入を行うと、継手が固定されるため、接続された後の複数の地中掘削用エレメントが、上載荷重等によりたわむなどの変形を生じることを防止することができる。また、この補強により、エレメント軸直角方向の力の伝達性能も向上する。
【0051】
次に、上記と同様にして、他の新たな一般部エレメント20の開放側隅部に設けられたエレメント継手部23、23のそれぞれを、すでに地中に挿入された一般部エレメント20の閉塞側隅部に設けられたエレメント継手部13、13のそれぞれと嵌合させる。そして、両継手を嵌合させた状態で、新たな一般部エレメント20を、すでに挿入された一般部エレメント20に沿わせながら、エレメント軸方向に向けて地中に挿入する。
【0052】
また、図1におけるエレメント構造体E1の4つの隅角位置では、隅角部エレメント30を、すでに挿入された一般部エレメント20に沿わせながら、エレメント軸方向に向けて地中に挿入する。この際、隅角部エレメント30の側壁部仕切板(図示せず)は、側壁部開口(図示せず)から周囲の土砂等がエレメント内に流入しないように防護し、土圧を支持する土留めとしての機能を果たす。その後、新たな一般部エレメント20を、すでに挿入された隅角部エレメント30に沿わせるが、それまでの挿入ラインとは直角に屈曲する方向となる面に沿わせるようにして、エレメント軸方向に向けて地中に挿入する。
【0053】
以下、上記のようにして一般部エレメント挿入工程を順次繰り返すことによって、地中に挿入され相互に接続された各地中掘削用エレメント10、20、30等によってエレメント構造体を構成することができる。例えば、平板状の構造体、半円状や円状あるいは楕円状等に囲まれた形状の断面を有するエレメント構造体、あるいは「ロ」字状断面、「日」を横にした形状の断面、「Π」字状の断面等を有するエレメント構造体である。
【0054】
次に、必要により、各エレメント内にコンクリート等を充填する。その後、地中に形成されたエレメント構造体を防護工として利用し、エレメント構造体の内部の土砂等を掘削する。次に、必要により、エレメント内面をコンクリートで被覆する等の施工を行うことにより、地下構造物を構築することができる。
【0055】
第1実施形態の地中掘削用エレメント10、20、30は、地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に、施工上の利点を有している。この点について、図4を参照しつつ説明を行う。図4は、掘削・挿入時の一般部エレメント20の状態を示した上面図である。
【0056】
図4に示すように、例えば、一般部エレメント20A、20Bが既に挿入されており、既設の一般部エレメント20Bに沿わせるようにして新たな一般部エレメント20Cを掘削・挿入している途中で、支障物70、例えば大きな岩塊等と遭遇した場合には、当該一般部エレメント20Cの先端部開口25Cから一般部エレメント20C内に取り込む方法以外に、当該一般部エレメント20Cに隣接する既設の一般部エレメント20Bの最寄りの側壁部仕切板を取り外し、側壁部開口24B1を開放状態し、この側壁部開口24B1を利用して、支障物70を一般部エレメント20B内に取り込み、一般部エレメント20B内を通しててっ去することができる。
【0057】
あるいは、さらに、一般部エレメント20Bの側壁部仕切板を取り外して側壁部開口24B2を開放状態とするとともに、一般部エレメント20Bに隣接する既設の一般部エレメント20Aの最寄りの側壁部仕切板を取り外して側壁部開口24Aを開放状態とする。これにより、この側壁部開口24B2及び24Aを利用して、支障物70をさらに隣りの一般部エレメント20A内に取り込み、一般部エレメント20A内を通しててっ去することもできる。
【0058】
また、基準エレメント10、一般部エレメント20、隅角部エレメント30のいずれかの内部で何らかの作業(以下、「エレメント内作業」という。)、例えば止水工等を行う場合に、エレメント内作業を行う当該エレメントに隣接する既設のエレメントの側壁部仕切板を取り外して側壁部開口を開放状態とし、この側壁部開口を利用して作業者の出入を行わせることができる。
【0059】
あるいは、基準エレメント10、一般部エレメント20、隅角部エレメント30のいずれかに何らかの物体(例えば建設資材)を搬入する場合、これらのエレメントのいずれかから物体(例えば掘削土砂等の工事発生物)を搬出する場合に、搬入又は搬出を行う当該エレメントに隣接する既設のエレメントの側壁部仕切板を取り外して側壁部開口を開放状態とし、この側壁部開口を利用して行うことも可能である。
【0060】
したがって、第1実施形態の基準エレメント10、一般部エレメント20、隅角部エレメント30を用いれば、施工時のタイムロスを防止することができ、施工の柔軟性が高まるため、地中掘削用エレメントにより地下構造物を構築する工法の施工効率や施工能力を飛躍的に向上させることができる、という利点がある。
【0061】
(2)第2実施形態
本発明は、他の構成によっても実現可能である。次に、本発明の第2実施形態について説明する。
【0062】
図5は、本発明の第2実施形態である地中掘削用エレメントの構成を示す図である。図5では、地中掘削用エレメントとして基準エレメントを例に挙げて図示している。
【0063】
図5(A)に示すように、第2実施形態の基準エレメント10Aは、底板11aと、頂板11bと、柱状部材12Aと、エレメント継手部(図示せず)と、側壁部仕切板15Aを備え、「ロ」字状断面の中空箱状に構成されている。第2実施形態の基準エレメント10Aが第1実施形態の基準エレメント10と異なる点は、異なる柱状部材12Aと異なる側壁部仕切板15Aを備えている点である。それ以外の構成要素については、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0064】
柱状部材12Aは、底板11aと頂板11bの中間となる側壁部において、鉛直方向に延在するように複数配置されている。これらの柱状部材12は、連結構造を構成している。柱状部材12Aは、図5(B)に示すように、略「H」字状の断面を有する部材であり、底板11aと頂板11bに溶接等により接合され、底板11aと頂板11bを連結している。また、柱状部材12Aは、基準エレメント10の内部の空洞部と外部を連通させる側壁部開口を形成しており、この側壁部開口に例えば3枚の側壁部仕切板15Aが配置されるようになっている。これらの側壁部仕切板15は、柱状部材12Aの「H」字状の断面の凹部に嵌合するようになっている。また、側壁部仕切板15Aは、図5(B)に示すように、柱状部材12Aに対して斜めに傾斜させることにより、容易に柱状部材12に着脱可能な構成となっている。
【0065】
上記のような構成の第2実施形態によっても、第1実施形態と同様に、本発明の特徴を有する作用・効果を発揮することができる。
【0066】
(3)第3実施形態
本発明は、他の構成によっても実現可能である。次に、本発明の第3実施形態について説明する。
【0067】
図6は、本発明の第3実施形態である地中掘削用エレメントの構成を示す図である。図6では、地中掘削用エレメントとして基準エレメントを例に挙げて図示している。
【0068】
図6(A)に示すように、第3実施形態の基準エレメント10Bは、底板11aと、頂板11bと、柱状部材12と、エレメント継手部(図示せず)と、側壁部仕切板15と、水平接合部材17を備え、「ロ」字状断面の中空箱状に構成されている。第3実施形態の基準エレメント10Bが第1実施形態の基準エレメント10と異なる点は、柱状部材12どうしを接合する水平接合部材17を備えている点、及び側壁部仕切板15が着脱具16Bによって水平接合部材17に着脱可能な構成となっている点である。それ以外の構成要素については、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0069】
第3実施形態においては、柱状部材12と水平接合部材17は、連結構造を構成している。また、着脱具16Bとしては、ボルトとナットの組み合わせ、クランプ、バネを用いて挟み付けるクリップ、クサビを用いて挟み付ける保持具等が用いられる。
【0070】
上記のような構成の第3実施形態によっても、第1実施形態及び第2実施形態と同様に、本発明の特徴を有する作用・効果を発揮することができる。
【0071】
(4)第4実施形態
本発明は、他の構成によっても実現可能である。次に、本発明の第4実施形態について説明する。
【0072】
図7は、本発明の第4実施形態である地中掘削用エレメントの構成を示す図である。図7では、地中掘削用エレメントとして基準エレメントを例に挙げて図示している。
【0073】
図7に示すように、第4実施形態の基準エレメント10Cは、底板11aと、頂板11bと、トラス斜材12Cと、エレメント継手部(図示せず)と、側壁部仕切板(図示せず)を備え、「ロ」字状断面の中空箱状に構成されている。第4実施形態の基準エレメント10Cが第1実施形態の基準エレメント10と異なる点は、柱状部材12のかわりにトラス斜材12Cを備えている点である。それ以外の構成要素については、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0074】
第4実施形態においては、トラス斜材12Cは、連結構造を構成している。また、トラス斜材12Cにより、外部と連通する略三角形状の側壁部開口14Cが形成されている。
【0075】
上記のような構成の第4実施形態によっても、上記各実施形態と同様に、本発明の特徴を有する作用・効果を発揮することができる。
【0076】
(5)第5実施形態
本発明は、他の構成によっても実現可能である。次に、本発明の第5実施形態について説明する。
【0077】
図8は、本発明の第5実施形態である地中掘削用エレメントの構成を示す図である。図8では、地中掘削用エレメントとして基準エレメントを例に挙げて図示している。
【0078】
図8に示すように、第5実施形態の基準エレメント10Dは、底板11aと、頂板11bと、板状部材12Dと、エレメント継手部(図示せず)と、側壁部仕切板(図示せず)を備え、「ロ」字状断面の中空箱状に構成されている。第5実施形態の基準エレメント10Dが第1実施形態の基準エレメント10と異なる点は、柱状部材12のかわりに円形の側壁部開口14Dが開設された板状部材12Dを備えている点である。それ以外の構成要素については、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0079】
第5実施形態においては、板状部材12Dは、連結構造を構成している。また、板状部材12Dにより、外部と連通する円形状の側壁部開口14Dが形成されている。
【0080】
上記のような構成の第5実施形態によっても、上記各実施形態と同様に、本発明の特徴を有する作用・効果を発揮することができる。
【0081】
なお、本発明は、上記各実施形態に限定されるものではない。上記各実施形態は、例示であり、本発明の特許請求の範囲に記載された技術的思想と実質的に同一な構成を有し、同様な作用効果を奏するものは、いかなるものであっても本発明の技術的範囲に包含される。
【0082】
例えば、上記実施形態においては、側壁部仕切板(例えば、15、15A)を備えた地中掘削用エレメント(例えば、10、10A)を例に挙げて説明したが、本発明はこの例には限定されず、他の構成、例えば、側壁部仕切板を設けず、側壁部の土留め機能を他の手段により実現するようにしてもよい。
【0083】
また、上記実施形態においては、側壁部仕切板を連結構造に着脱可能に取り付けた地中掘削用エレメント(例えば、10、10A)を例に挙げて説明したが、本発明はこの例には限定されず、他の構成、例えば、側壁部仕切板を底板に着脱可能に取り付けてもよいし、側壁部仕切板を頂板に着脱可能に取り付けてもよいし、側壁部仕切板を底板、頂板、連結構造のいずれか又は適宜の組み合わせに着脱可能に取り付けてもよい。
【0084】
また、側壁部仕切板は、地中掘削用エレメントの側壁部の土留めとして使用できれば、どのような構成であってもよく、着脱可能な構成以外の他の構成、例えば、蝶番やスライド機構等により連結構造に移動可能な状態で取り付けられ、必要な場合にのみ側壁部仕切板を動かし、外部と連通する側壁部開口を形成することができるように構成してもよい。
【0085】
また、上記実施形態においては、矩形管状の断面を有する基準エレメント10及び隅角部エレメント30、略「コ」字状の断面を有する一般部エレメント20によってエレメント構造体を構成する例について説明したが、本発明はこの例には限定されず、他の構成の地中掘削用エレメント、例えば、略「日」字状、略「目」字状、略「田」字状、略「円」字状等の断面を有する地中掘削用エレメントであってもよい。また、これらを適宜の組み合わせで用いてもよい。したがって、上記した実施形態とは異なり、基準エレメント10と隅角部エレメント30を用いずに、略「コ」字状断面の一般部エレメント20のみを用いて(エレメント構造体の4隅も略「コ」字状断面の一般部エレメント20のみを用いて)エレメント構造体E1を構成するようにしてもよい。
【0086】
また、上記実施形態においては、基準エレメント10等の隅部にエレメント継手部(例えば13又は23)が設けられている場合を例に挙げて説明したが、本発明はこの例には限定されず、他の構成の地中掘削用エレメント、例えば、地中掘削用エレメントの所定の辺の中間部分(例えば中央部)にエレメント継手部が設けられるように構成してもよい。
【0087】
【発明の効果】
以上説明したように、本発明によれば、地中掘削用エレメントの側壁部に外部と連通する側壁部開口を形成可能なように構成したので、エレメントを地中に掘削・挿入する際に支障物と遭遇した場合やエレメント内での作業が必要となった場合でも、支障物に遭遇した当該地中掘削用エレメント又はエレメント内作業を行う当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し、あるいは前記隣接する既設の地中掘削用エレメントの仕切板をてっ去し側壁部開口を形成して支障物のてっ去又はエレメント内作業を行うことや、各種施工、搬入・搬出等が可能となり、施工時のタイムロスを防止することができ、施工の柔軟性が高まるため、地中掘削用エレメントにより地下構造物を構築する工法の施工効率や施工能力を飛躍的に向上させることができる、という利点を有している。
【図面の簡単な説明】
【図1】本発明の第1実施形態である地下構造物の全体構成を示す断面図である。
【図2】図1の地下構造物における地中掘削用エレメントの構成を示す図である。
【図3】図1の地下構造物における地中掘削用エレメント及びエレメント継手部の構成を示す図である。
【図4】図1の地下構造物における施工方法を説明する図である。
【図5】本発明の第2実施形態である地中掘削用エレメントの構成を示す図である。
【図6】本発明の第3実施形態である地中掘削用エレメントの構成を示す図である。
【図7】本発明の第4実施形態である地中掘削用エレメントの構成を示す図である。
【図8】本発明の第5実施形態である地中掘削用エレメントの構成を示す図である。
【符号の説明】
10、10A〜10D 基準エレメント(地中掘削用エレメント)
11a 底板
11b 頂板
12、12A 柱状部材(連結構造)
12C トラス斜材(連結構造)
12D 板状部材(連結構造)
13 エレメント継手部
13a 嵌合部
13b 基部
13c、13d 突出部
13e 溝
14、14B〜14D 側壁部開口
15、15A 側壁部仕切板
16、16B 着脱具
17 水平接合部材(連結構造)
20、20A〜20C 一般部エレメント(地中掘削用エレメント)
21a 底板
21b 頂板
22 柱状部材(連結構造)
23 エレメント継手部
23a 嵌合部
23b 基部
23c、23d 突出部
23e 溝
24A〜24B2 側壁部開口
25C 先端部開口
30 隅角部エレメント(地中掘削用エレメント)
70 支障物
101 地下構造物
E1 エレメント構造体[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an underground excavation element used for constructing an underground structure by a non-open excavation method, and a method for constructing an underground structure using the underground excavation element.
[0002]
[Prior art]
Conventionally, as a method of constructing an underground structure under a railroad track or a road by a non-opening method, an underground excavation element such as a “B” -shaped cross-section or a “U” -shaped cross-section is propelled or pulled to the ground. A construction method that uses a structure consisting of elements for underground excavation (hereinafter referred to as “element structure”) as the main body of an underground structure. Is used.
[0003]
[Problems to be solved by the invention]
However, in the above-described underground excavation element, the side wall portion of the “B” -shaped cross section or the “U” -shaped cross section is composed of, for example, a plate-shaped member or the like. Then, ground excavation was performed from the opening at the tip of the element, and the excavated earth and sand were taken into the element, conveyed backward, and discharged to the outside. For this reason, when an obstacle is encountered during insertion or excavation of an element, or when work inside the element is required, the obstacle is taken in only through the opening at the tip of the element. There is a problem that the in-element work can be performed only from the inside of the element.
[0004]
The present invention has been made to solve the above problems, and the problem to be solved by the present invention is when an obstacle is encountered during insertion or excavation of the element or when work inside the element is required. An object of the present invention is to provide an underground excavation element capable of removing obstacles and working inside the element from other than the element, and an underground structure construction method using the element.
[0005]
[Means for Solving the Problems]
In order to solve the above problems, an underground excavation element according to the present invention includes a bottom plate extending in the element axial direction, and a top plate extending in the element axial direction and disposed in parallel above the bottom plate. And a connecting structure capable of connecting the bottom plate and the top plate in the side wall portion and forming a side wall portion opening communicating with the outside, and extending between the element axial directions and fitting between adjacent element joint portions Are connected to each other, and include an element joint portion that can transmit a force in a direction perpendicular to the element axis that is perpendicular to the element axis direction by the element joint portion, and is configured in a hollow box shape, A side wall partition plate configured to detachably attach to the bottom plate or the top plate or the connection structure by a detachable tool while closing the side wall portion opening. It is characterized by that.
[0006]
In the above-described underground excavation element, the connection structure is preferably a columnar member that is arranged in a plurality so as to extend in the vertical direction in the side wall portion that is intermediate between the bottom plate and the top plate.
[0007]
In the above-described underground excavation element, preferably, the front Side Wall divider Is Used as a retaining wall for the side wall.
[0008]
In the underground excavation element, preferably, the side wall partition plate does not bear an external force acting on the bottom plate, the top plate, or the connection structure.
[0009]
In the above-described underground excavation element, preferably, the side wall partition plate is the bottom plate, the top plate, or the connection structure. Moved to It is configured to be movable.
[0010]
Further, the underground structure building method according to the present invention includes a bottom plate extending in the element axial direction, a top plate extending in the element axial direction and disposed in parallel above the bottom plate, and a side wall portion. A connecting structure that connects the bottom plate and the top plate and can form a side wall opening that communicates with the outside, and is connected to each other by fitting between adjacent element joints that extend in the element axial direction. A method for constructing an underground structure using an element for underground excavation having an element joint portion capable of transmitting a force in a direction perpendicular to the element axis direction, which is a direction perpendicular to the element axis direction, by the element joint portion. Then, the element for underground excavation is inserted into the ground while excavating the ground at the tip end opening with the element axial direction as the insertion direction, The element joint part of another underground excavation element is fitted to the element joint part of the existing underground excavation element and guided, and the other underground excavation element is inserted in the element axial direction. By repeatedly inserting into the ground while excavating as a direction, a plurality of underground excavation elements are connected in the ground to form an element structure, and then the element structure is used as a protective work. Excavate the ground inside the body, then build an underground structure using the element structure as the body If an obstacle is encountered when the underground excavation element is inserted into the ground while performing ground excavation, the existing underground excavation adjacent to the underground excavation element that encounters the obstacle The obstacle is removed by passing the obstacle through the side wall opening using the side wall opening of the connecting structure for elements. It is characterized by that.
[0011]
In the above underground structure construction method, preferably, a side wall part partition plate that closes the side wall part opening is provided and used as a retaining wall for the side wall part.
[0012]
Further, in the above underground structure construction method, preferably, when an obstacle is encountered when the underground excavation element is inserted into the ground while performing ground excavation, the ground where the obstacle is encountered. Medium drilling element Next to Remove the side wall partition plate of the existing underground excavation element in contact with it to form the side wall opening. By passing the obstacle through the side wall opening The obstacle is removed.
[0013]
Further, in the above underground structure construction method, preferably, when an in-element work including a water stoppage is performed on any of the underground excavation elements, an existing underground adjacent to the underground excavation element is used. An operator using the side wall opening of the excavating element coupling structure or removing the side wall partition plate of the adjacent underground excavating element to form a side wall opening. Through the side wall opening Go in and out.
[0014]
In the above underground structure construction method, preferably, when an object is carried into any of the underground excavation elements or an object is carried out of any of the underground excavation elements, the underground The side wall opening of the existing underground excavation element connection structure adjacent to the excavation element is used or the side wall partition plate of the adjacent existing underground excavation element is removed to form the side wall opening. The By passing the object through the side wall opening Do.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0016]
(1) First embodiment
First, a first embodiment of the present invention will be described.
[0017]
FIG. 1 is a cross-sectional view showing the overall configuration of an underground structure according to the first embodiment of the present invention.
[0018]
As shown in FIG. 1, the
[0019]
The element structure E1 includes an underground excavation element (hereinafter referred to as “reference element”) 10 installed at the center position of the upper floor slab, and an underground excavation element installed adjacent to the
[0020]
2A and 2B are diagrams illustrating the configuration of the
[0021]
As shown in FIG. 2A, the
[0022]
In addition, a plurality of
[0023]
Moreover, the side wall
[0024]
As shown in FIG. 2B, the side
[0025]
In addition, although illustration is abbreviate | omitted in FIG. 2, this reference |
[0026]
As shown in FIG. 3A, an element
[0027]
As shown in FIG. 3B, the cross section of the element
[0028]
3B shows a cross section of the element
[0029]
Moreover, each joining location of the
[0030]
When a force in a direction perpendicular to the element axial direction (hereinafter referred to as “element axis perpendicular direction”) is applied to the vicinity of the tip of the protruding
[0031]
On the other hand, when a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting
[0032]
From the above, the projecting
[0033]
Further, considering that the combined force of the first tensile force and a part of the second tensile force acts on the
[0034]
As shown in FIG. 3A, the
[0035]
Further, a plurality of
[0036]
Moreover, the
[0037]
In addition, among the four corners of the “U” -shaped cross section of the
[0038]
The cross section of the element
[0039]
3B shows a cross section of the element
[0040]
Moreover, each joining location of the top plate 21b, the
[0041]
When a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting
[0042]
On the other hand, when a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting
[0043]
From the above, the projecting
[0044]
Further, in consideration of the combined force of the third tensile force and the fourth tensile force acting on the
[0045]
Although not shown, the
[0046]
Next, a method for constructing an element structure using the
[0047]
First, the
[0048]
After that, in a state where these element
[0049]
In this case, as shown in FIG. 3B, the element
[0050]
In the element
[0051]
Next, in the same manner as described above, each of the element
[0052]
Further, at the four corner positions of the element structure E1 in FIG. 1, the
[0053]
In the following, by repeating the general element insertion process as described above, the element structure can be constituted by the excavating
[0054]
Next, concrete or the like is filled in each element as necessary. Thereafter, the element structure formed in the ground is used as a protective work to excavate the soil and the like inside the element structure. Next, if necessary, an underground structure can be constructed by performing construction such as covering the inner surface of the element with concrete.
[0055]
The
[0056]
As shown in FIG. 4, for example, the
[0057]
Alternatively, the side wall part partition plate of the
[0058]
Further, when any work (hereinafter referred to as “in-element work”), for example, a water stop work, is performed inside any of the
[0059]
Alternatively, when any object (for example, construction material) is carried into any one of the
[0060]
Therefore, if the
[0061]
(2) Second embodiment
The present invention can be realized by other configurations. Next, a second embodiment of the present invention will be described.
[0062]
FIG. 5 is a diagram showing a configuration of an underground excavation element according to the second embodiment of the present invention. FIG. 5 shows a reference element as an example of the underground excavation element.
[0063]
As shown in FIG. 5A, the
[0064]
A plurality of
[0065]
Also according to the second embodiment having the above-described configuration, it is possible to exhibit the functions and effects having the features of the present invention, as in the first embodiment.
[0066]
(3) Third embodiment
The present invention can be realized by other configurations. Next, a third embodiment of the present invention will be described.
[0067]
FIG. 6 is a diagram showing a configuration of an underground excavation element according to the third embodiment of the present invention. FIG. 6 shows a reference element as an example of the underground excavation element.
[0068]
As shown in FIG. 6A, the
[0069]
In 3rd Embodiment, the
[0070]
Also according to the third embodiment having the above-described configuration, the functions and effects having the features of the present invention can be exhibited, similarly to the first embodiment and the second embodiment.
[0071]
(4) Fourth embodiment
The present invention can be realized by other configurations. Next, a fourth embodiment of the present invention will be described.
[0072]
FIG. 7 is a diagram showing a configuration of an underground excavation element according to the fourth embodiment of the present invention. In FIG. 7, a reference element is illustrated as an example of the underground excavation element.
[0073]
As shown in FIG. 7, the
[0074]
In the fourth embodiment, the truss
[0075]
Also according to the fourth embodiment having the above-described configuration, the functions and effects having the features of the present invention can be exhibited as in the above-described embodiments.
[0076]
(5) Fifth embodiment
The present invention can be realized by other configurations. Next, a fifth embodiment of the present invention will be described.
[0077]
FIG. 8 is a diagram showing a configuration of an underground excavation element according to a fifth embodiment of the present invention. FIG. 8 shows a reference element as an example of the underground excavation element.
[0078]
As shown in FIG. 8, the
[0079]
In 5th Embodiment, plate-shaped
[0080]
Also according to the fifth embodiment having the above-described configuration, the functions and effects having the features of the present invention can be exhibited as in the above-described embodiments.
[0081]
The present invention is not limited to the above embodiments. Each of the embodiments described above is an exemplification, and any configuration that has substantially the same configuration as the technical idea described in the claims of the present invention and has the same operational effects can be used. It is included in the technical scope of the present invention.
[0082]
For example, in the above embodiment, the underground excavation element (for example, 10, 10A) provided with the side wall partition plate (for example, 15, 15A) has been described as an example, but the present invention is not limited to this example. It is not limited, For example, you may make it implement | achieve the earth retaining function of a side wall part by another means, without providing a side wall part partition plate.
[0083]
Moreover, in the said embodiment, although the element for underground excavation (for example, 10, 10A) which attached the side wall part partition plate to the connection structure so that attachment or detachment was mentioned as an example was demonstrated, this invention is limited to this example. However, other configurations, for example, the side wall part partition plate may be detachably attached to the bottom plate, the side wall part partition plate may be detachably attached to the top plate, the side wall part partition plate may be the bottom plate, the top plate, It may be detachably attached to any of the connection structures or an appropriate combination.
[0084]
In addition, the side wall partition plate may have any configuration as long as it can be used as a retaining wall for the side wall portion of the underground excavation element, and other configurations other than the detachable configuration, such as a hinge and a slide mechanism, etc. The side wall partition plate may be moved only when necessary to form a side wall opening that communicates with the outside.
[0085]
In the above embodiment, the example in which the element structure is configured by the
[0086]
Moreover, in the said embodiment, although the case where the element coupling part (for example, 13 or 23) was provided in the corners of the reference |
[0087]
【The invention's effect】
As described above, according to the present invention, since the side wall portion opening communicating with the outside can be formed in the side wall portion of the underground excavation element, there is a problem in excavating and inserting the element into the ground. Even if an object is encountered or work in the element is required, the underground excavation element that encounters an obstacle or the existing underground excavation element adjacent to the underground excavation element that performs the work in the element is used. Use the side wall opening of the connecting structure for the elements, or remove the partition plate of the adjacent existing underground excavation element to form the side wall opening to remove obstacles or work inside the element. It is possible to perform, various construction, carry-in / out, etc., prevent time loss during construction, and increase the flexibility of construction. Can remarkably improve the construction efficiency and construction capabilities, has the advantage that.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing an overall configuration of an underground structure according to a first embodiment of the present invention.
FIG. 2 is a diagram showing a configuration of an underground excavation element in the underground structure of FIG. 1;
FIG. 3 is a diagram showing a configuration of an underground excavation element and an element joint portion in the underground structure of FIG. 1;
4 is a diagram for explaining a construction method in the underground structure of FIG. 1; FIG.
FIG. 5 is a diagram showing a configuration of an underground excavation element according to a second embodiment of the present invention.
FIG. 6 is a diagram showing a configuration of an underground excavation element according to a third embodiment of the present invention.
FIG. 7 is a diagram showing a configuration of an underground excavation element according to a fourth embodiment of the present invention.
FIG. 8 is a diagram showing a configuration of an underground excavation element according to a fifth embodiment of the present invention.
[Explanation of symbols]
10, 10A-10D Reference element (element for underground excavation)
11a Bottom plate
11b Top plate
12, 12A Columnar member (connection structure)
12C Truss diagonal (connection structure)
12D plate-like member (connection structure)
13 Element joint
13a Fitting part
13b base
13c, 13d Projection
13e groove
14, 14B-14D Side wall opening
15, 15A Side wall partition plate
16, 16B Detachment tool
17 Horizontal joining member (connection structure)
20, 20A-20C General part element (element for underground excavation)
21a Bottom plate
21b Top plate
22 Columnar member (connection structure)
23 Element joint
23a Fitting part
23b base
23c, 23d Projection
23e groove
24A-24B2 Side wall opening
25C Tip opening
30 Corner element (underground excavation element)
70 obstacles
101 Underground structure
E1 element structure
Claims (10)
前記エレメント軸方向に延設されるとともに前記底板の上方に平行に配置された頂板と、側壁部において前記底板及び前記頂板を連結するとともに、外部と連通する側壁部開口を形成可能な連結構造と、
前記エレメント軸方向に延設されるとともに、隣接するエレメント継手部どうしの嵌合により相互の接続を行い、前記エレメント継手部により前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能としたエレメント継手部を備え、中空箱状に構成され、
前記側壁部開口を塞ぐと共に前記底板又は前記頂板若しくは前記連結構造に着脱具によって着脱可能に構成された側壁部仕切板とを備えた
ことを特徴とする地中掘削用エレメント。A bottom plate extending in the element axial direction;
A top plate extending in the element axial direction and arranged in parallel above the bottom plate; and a connecting structure capable of connecting the bottom plate and the top plate at the side wall portion and forming a side wall portion opening communicating with the outside. ,
Extends in the element axial direction and connects to each other by fitting adjacent element joints, and transmits the force in the direction perpendicular to the element axis, which is perpendicular to the element axial direction, through the element joints. Equipped with a possible element joint, configured as a hollow box ,
An underground excavation element comprising: a side wall partition plate configured to detach and attach to the bottom plate, the top plate, or the connection structure by a detachable tool while closing the side wall opening .
前記連結構造は、前記底板と頂板の中間となる前記側壁部において鉛直方向に延在するように複数配置される柱状部材であることを特徴とする地中掘削用エレメント。The underground excavation element according to claim 1,
An underground excavation element characterized in that a plurality of the connecting structures are columnar members arranged so as to extend in the vertical direction in the side wall portion between the bottom plate and the top plate.
前記側壁部仕切板は、側壁部の土留めとして用いることを特徴とする地中掘削用エレメント。The underground excavation element according to claim 1,
Before SL side wall partition plate, element for ground drilling, which comprises using as the earth retaining wall portion.
前記側壁部仕切板は、前記底板又は前記頂板若しくは前記連結構造に作用する外力を負担しない構造であることを特徴とする地中掘削用エレメント。The underground excavation element according to claim 1 ,
The underground excavation element, wherein the side wall partition plate has a structure that does not bear an external force acting on the bottom plate, the top plate, or the connection structure.
前記地中掘削用エレメントを、前記エレメント軸方向を挿入方向とし、先端部開口で地盤の掘削を行いつつ地中に挿入し、次いで、他の地中掘削用エレメントのエレメント継手部を、既設の地中掘削用エレメントのエレメント継手部に嵌合させて誘導案内させ、他の地中掘削用エレメントを、前記エレメント軸方向を挿入方向として掘削しつつ地中に挿入することを繰り返すことにより、複数の地中掘削用エレメントを地中で接続させてエレメント構造体を形成し、
次いで、前記エレメント構造体を防護工として前記エレメント構造体の内部の地盤を掘削し、
次いで、前記エレメント構造体を本体として利用して地下構造物を構築し、
地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に支障物と遭遇した場合には、前記支障物に遭遇した当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し前記支障物が前記側壁部開口を通過することによって前記支障物のてっ去を行う
ことを特徴とする地下構造物構築方法。A bottom plate extending in the element axial direction, a top plate extending in the element axial direction and arranged in parallel above the bottom plate, and connecting the bottom plate and the top plate at the side wall portion and communicating with the outside. A connection structure capable of forming a side wall opening and a connection structure that extends in the axial direction of the element and is connected to each other by fitting between adjacent element joints in a direction perpendicular to the element axial direction by the element joint. An underground structure construction method using an element for underground excavation having an element joint portion capable of transmitting a force perpendicular to an element axis and having a hollow box shape,
The underground excavation element is inserted into the ground while excavating the ground at the tip end opening with the element axial direction as the insertion direction, and then an element joint portion of another underground excavation element is installed. By repeatedly inserting and guiding another element for underground excavation with the element axial direction as the insertion direction, the element coupling portion of the element for underground excavation is guided and guided, The elements for underground excavation are connected in the ground to form an element structure,
Next, excavating the ground inside the element structure as a protective work the element structure,
Next, an underground structure is constructed using the element structure as a main body,
When an obstacle is encountered when the underground excavation element is inserted into the ground while excavating the ground, an existing underground excavation element adjacent to the underground excavation element that has encountered the obstacle A method for constructing an underground structure , wherein the obstacle is removed by passing the obstacle through the side wall opening using the side wall opening of the connecting structure .
前記側壁部開口を塞ぐ側壁部仕切板を備えて側壁部の土留めとして用いることを特徴とする地下構造物構築方法。In the underground structure construction method according to claim 6,
A method for constructing an underground structure comprising a side wall part partition plate for closing the side wall part opening and used as a retaining wall for the side wall part.
地盤掘削を行いつつ前記地中掘削用エレメントを地中に挿入する際に支障物と遭遇した場合には、前記支障物に遭遇した当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して前記支障物が前記側壁部開口を通過することによって前記支障物のてっ去を行うことを特徴とする地下構造物構築方法。In the underground structure construction method according to claim 7,
Obstacle and when encountered, existing underground drilling element in contact next to the underground digging elements encountered the obstacle when inserting the element for underground excavating the ground while performing ground excavation A method for constructing an underground structure comprising removing a side wall part partition plate to form a side wall part opening and removing the obstacle by passing the obstacle through the side wall part opening .
前記地中掘削用エレメントのいずれかに止水工を含むエレメント内作業を行う場合に、当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し又は前記隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して作業者が前記側壁部開口を通過して出入を行うことを特徴とする地下構造物構築方法。In the underground structure construction method according to claim 7,
When performing an in-element work including a water stop for any of the underground excavation elements, use an opening of a side wall portion of an existing underground excavation element coupling structure adjacent to the underground excavation element or Construction of an underground structure characterized in that a side wall part partition plate of the adjacent existing underground excavation element is removed to form a side wall part opening, and an operator goes in and out through the side wall part opening. Method.
前記地中掘削用エレメントのいずれかに物体を搬入し、又は前記地中掘削用エレメントのいずれかから物体を搬出する場合に、当該地中掘削用エレメントに隣接する既設の地中掘削用エレメントの連結構造の側壁部開口を利用し又は前記隣接する既設の地中掘削用エレメントの側壁部仕切板をてっ去し側壁部開口を形成して前記物体が前記側壁部開口を通過することによって行うことを特徴とする地下構造物構築方法。In the underground structure construction method according to claim 7,
When an object is carried into any of the underground excavation elements or an object is carried out of any of the underground excavation elements, an existing underground excavation element adjacent to the underground excavation element is used. Using the side wall opening of the connection structure or by removing the side wall partition plate of the adjacent existing underground excavation element to form a side wall opening and passing the object through the side wall opening An underground structure construction method characterized by that.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000050488A JP3923230B2 (en) | 2000-02-22 | 2000-02-22 | Underground excavation element and underground structure construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000050488A JP3923230B2 (en) | 2000-02-22 | 2000-02-22 | Underground excavation element and underground structure construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001234691A JP2001234691A (en) | 2001-08-31 |
| JP3923230B2 true JP3923230B2 (en) | 2007-05-30 |
Family
ID=18572267
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000050488A Expired - Lifetime JP3923230B2 (en) | 2000-02-22 | 2000-02-22 | Underground excavation element and underground structure construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3923230B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101161332B1 (en) * | 2012-03-09 | 2012-07-03 | 김동수 | Construction method of the underground tunnel |
| KR102572805B1 (en) * | 2023-02-01 | 2023-08-31 | 윤기철 | Underground structure using steel pipe form and trenchless construction method of the same |
-
2000
- 2000-02-22 JP JP2000050488A patent/JP3923230B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001234691A (en) | 2001-08-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3923230B2 (en) | Underground excavation element and underground structure construction method | |
| KR101556674B1 (en) | Steel pipe assembly and construction method of steel pipe structure using the same | |
| KR101736094B1 (en) | Tube assembly and construction method of loop structure using the same | |
| KR102071647B1 (en) | Pipe roof structures and construction method of underground structure using thereof | |
| JP2000120372A (en) | Reference pipe steel element, general steel element, corner steel element, and method of constructing underground structure | |
| KR101060571B1 (en) | Box-type propulsion pipe connecting structure and its construction method | |
| JP3031191B2 (en) | Construction method of large section tunnel | |
| JPH09125417A (en) | Underground wall and asymmetric closed section steel sheet pile | |
| JP5746803B2 (en) | Drilling bucket | |
| JP3668194B2 (en) | Continuous underground wall construction method | |
| JP3765719B2 (en) | Closure adjustment element and underground structure construction method | |
| JP2005325556A (en) | Concrete sheet pile | |
| JP2001182477A (en) | Equipment for partition iron plate | |
| KR101240334B1 (en) | Under-ground structure construction method using steel pipe with bended guide pannel | |
| JP3691707B2 (en) | Top plate construction method for steel pipe sheet pile well foundation | |
| JP3117819B2 (en) | Lining method for shield tunnel with rectangular cross section | |
| KR102841969B1 (en) | Furlable earth retaining structure for provisional facilities | |
| KR102601492B1 (en) | Joint for connecting parts of slurry wallslurry wall and construction method of slurry wall using the joint | |
| JP3882882B2 (en) | Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method | |
| JP3404561B2 (en) | Connection method of shield tunnel | |
| JP3008804B2 (en) | Joint structure in underground diaphragm wall | |
| KR102305424B1 (en) | Construction meyhod for underground structure by non-excavation using closed section reinforcing member and underground structure therewith | |
| JP3923237B2 (en) | Tunnel lining element and tunnel lining method | |
| JP4037003B2 (en) | Construction method of underground structure | |
| JPH077438Y2 (en) | Cylindrical wall for lining drill holes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041109 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20061020 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061031 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20061102 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20061226 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070213 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070221 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3923230 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110302 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120302 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120302 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130302 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |