Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3882882B2 - Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method - Google Patents
[go: Go Back, main page]

JP3882882B2 - Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method - Google Patents

Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method Download PDF

Info

Publication number
JP3882882B2
JP3882882B2 JP28542299A JP28542299A JP3882882B2 JP 3882882 B2 JP3882882 B2 JP 3882882B2 JP 28542299 A JP28542299 A JP 28542299A JP 28542299 A JP28542299 A JP 28542299A JP 3882882 B2 JP3882882 B2 JP 3882882B2
Authority
JP
Japan
Prior art keywords
joint
steel
reinforced concrete
axial direction
shaped cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP28542299A
Other languages
Japanese (ja)
Other versions
JP2001107678A (en
Inventor
忠良 石橋
修司 富田
満 清水
智明 森山
芳範 松田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP28542299A priority Critical patent/JP3882882B2/en
Publication of JP2001107678A publication Critical patent/JP2001107678A/en
Application granted granted Critical
Publication of JP3882882B2 publication Critical patent/JP3882882B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、非開削方式で地下構造物を構築するために使用する鋼製エレメントと現場打ち鉄筋コンクリートを結合する構造とその方法、及びこの鋼製エレメントと現場打ち鉄筋コンクリートにより地下構造物を構築する方法に関するものである。
【0002】
【従来の技術】
従来、鉄道線路や道路等の下方に非開削方式で地下構造物を構築する方法として、鋼製エレメントを推進又はけん引により地中に順次挿入して組み合わせ、エレメントにより囲まれた部分の土砂等を掘削し、鋼製エレメントからなる構造体(以下、「エレメント構造体」という。)を地下構造物の本体として利用する方法が用いられている。
【0003】
このような工法において、下床版を現場打ち鉄筋コンクリートで構成する場合、側壁部の下端のエレメントと下床版を剛結合構造とする必要がある。また、エレメント構造体の断面形状が「日」を横にした形状や「目」を横にした形状の場合に、中間に配置される中壁部の上端のエレメントと、対応する箇所の上床版のエレメントを剛結合構造とする場合がある。あるいは、例えばエレメント構造体の断面形状が「ロ」字状の場合に、最後にエレメントどうしを接合させる閉合部において、これらのエレメントを剛結合構造とする場合がある。
【0004】
このような場合、例えば、側壁部下端のエレメントと鉄筋コンクリート下床版との剛結合構造では、側壁部下端のエレメント内などに鉄筋を配置し、これらの鉄筋と下床版の鉄筋を接続して現場打ちコンクリートを打設し、側壁下端部と下床版との一体化を図っている。
【0005】
【発明が解決しようとする課題】
しかしながら、上記したエレメントによる地下構造物構築方法においては、エレメントという限られた狭い空間内で多数の鉄筋を定着又は接続しなければならず、作業が困難で施工性が悪く、施工の精度も低下する、という問題があった。
【0006】
本発明は上記の問題を解決するためになされたものであり、本発明の解決しようとする課題は、鋼製エレメントと現場打ち鉄筋コンクリートを施工性良く、かつ高い施工精度で結合し得る結合構造、及びその方法等を提供することにある。
【0007】
【課題を解決するための手段】
上記課題を解決するため、本発明に係る鋼製エレメントと現場打ち鉄筋コンクリートの結合構造は、矩形管状又は略「コ」字状の断面を有してエレメント軸方向に延設される鋼製部材の隅部に前記エレメント軸方向に沿って略「C」字状断面のエレメント継手部を設け、隣接するエレメント継手部の嵌合により相互の接合を行うとともに、前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能とした鋼製エレメントと現場打ち鉄筋コンクリートを結合する構造であって、「−」字状断面を有しエレメント軸方向に延在する鋼製平板部の前記「−」字状断面における一端部に前記エレメント軸方向に沿って略「C」字状断面の結合継手部が設けられた接続継手部材の前記結合継手部と前記鋼製エレメントのエレメント継手が嵌合され、前記嵌合された各継手部の内部に形成される嵌合空間内にグラウト材が注入され硬化することにより前記接続継手部材が固定され、前記接続継手部材の前記結合継手部が設けられた前記一端部とは反対側の他端部付近に設けられ前記エレメント軸直角方向に延びるようにして並設された複数の結合鉄筋と現場打ち鉄筋コンクリート用鉄筋が重ね合わせ配置されて重ね鉄筋継手が形成され現場打ちコンクリートが打設され硬化することにより前記鋼製エレメントと現場打ち鉄筋コンクリートが結合されることを特徴とする。
【0008】
上記の鋼製エレメントと現場打ち鉄筋コンクリートの結合構造において、好ましくは、前記接続継手部材は、「−」字状断面を有し長手方向に延在する鋼製平板部の前記「−」字状断面における両端部に前記長手方向に沿って略「C」字状断面の結合継手部が設けられた直線鋼矢板の前記鋼製平板部を前記長手方向に沿って切断することにより形成される。
【0009】
また、上記の鋼製エレメントと現場打ち鉄筋コンクリートの結合構造において、好ましくは、前記結合鉄筋は、溶接又は機械的接合により前記鋼製平板部に接合される。
【0010】
また、上記の鋼製エレメントと現場打ち鉄筋コンクリートの結合構造において、好ましくは、前記結合鉄筋は、帯鉄筋により取り囲まれて補強される。
【0011】
また、本発明に係る鋼製エレメントと現場打ち鉄筋コンクリートの第1の結合方法は、矩形管状又は略「コ」字状の断面を有してエレメント軸方向に延設される鋼製部材の隅部に前記エレメント軸方向に沿って略「C」字状断面のエレメント継手部を設け、隣接するエレメント継手部の嵌合により相互の接合を行うとともに、前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能とした鋼製エレメントと現場打ち鉄筋コンクリートを結合する方法であって、「−」字状断面を有しエレメント軸方向に延在する鋼製平板部の前記「−」字状断面における一端部に前記エレメント軸方向に沿って略「C」字状断面の結合継手部が設けられた接続継手部材の前記結合継手部が設けられた前記一端部とは反対側の他端部付近に複数の結合鉄筋が前記エレメント軸直角方向に延びるようにして並設された結合部材の前記結合継手部と前記鋼製エレメントのエレメント継手を嵌合させ、次いで、前記嵌合した継手内に形成される嵌合空間内にグラウト材を注入して硬化させることにより前記結合部材を固定し、次いで、前記結合鉄筋と現場打ち鉄筋コンクリート用鉄筋を重ね合わせ配置して重ね鉄筋継手を形成し現場打ちコンクリートを打設し硬化させることを特徴とする。
【0012】
また、本発明に係る鋼製エレメントと現場打ち鉄筋コンクリートの第2の結合方法は、矩形管状又は略「コ」字状の断面を有してエレメント軸方向に延設される鋼製部材の隅部に前記エレメント軸方向に沿って略「C」字状断面のエレメント継手部を設け、隣接するエレメント継手部の嵌合により相互の接合を行うとともに、前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能とした鋼製エレメントと現場打ち鉄筋コンクリートを結合する方法であって、「−」字状断面を有しエレメント軸方向に延在する鋼製平板部の前記「−」字状断面における一端部に前記エレメント軸方向に沿って略「C」字状断面の結合継手部が設けられた接続継手部材の前記結合継手部と前記鋼製エレメントのエレメント継手を嵌合させ、次いで、前記嵌合した継手内に形成される嵌合空間内にグラウト材を注入して硬化させることにより前記接続継手部材を固定し、次いで、前記接続継手部材の結合継手部が設けられた前記一端部とは反対側の他端部付近に複数の結合鉄筋を前記エレメント軸直角方向に延びるようにして並設し、次いで、前記結合鉄筋と現場打ち鉄筋コンクリート用鉄筋を重ね合わせ配置して重ね鉄筋継手を形成し現場打ちコンクリートを打設し硬化させることを特徴とする。
【0013】
また、本発明に係る地下構造物構築方法は、矩形管状又は略「コ」字状の断面を有してエレメント軸方向に延設される鋼製部材の隅部に前記エレメント軸方向に沿って略「C」字状断面のエレメント継手部を設けて前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能とした鋼製エレメントを、前記エレメント軸方向を挿入方向として地中に挿入し、次いで、他の鋼製エレメントを、前記エレメント継手部どうしを相互に嵌合させつつ地中に挿入し、前記嵌合したエレメント継手部内にグラウト材を注入し硬化させて前記鋼製エレメントどうしを固定することを繰り返して複数の鋼製エレメントを地中で連結させ、次いで、前記複数の鋼製エレメントが閉合する前に、閉合箇所の地盤を掘削して閉合空間を形成し、次いで、「−」字状断面を有しエレメント軸方向に延在する鋼製平板部の前記「−」字状断面における一端部に前記エレメント軸方向に沿って略「C」字状断面の結合継手部が設けられた接続継手部材の前記結合継手部が設けられた前記一端部とは反対側の他端部付近に複数の結合鉄筋が前記エレメント軸直角方向に延びるようにして並設された結合部材を2個用いて前記結合鉄筋が対向するように配置させた構造体を上下2段に平行配置して前記結合鉄筋を帯鉄筋で取り囲んでカゴ状に構成したカゴ状部材の前記結合継手部と前記閉合空間内のエレメント継手を相互に嵌合させつつ前記カゴ状部材を前記掘削された閉合空間内に挿入し、次いで、前記カゴ状部材が挿入された閉合空間内に現場打ちコンクリートを打設し硬化させ、次いで、前記地中で連結された鋼製エレメントと前記閉合空間に形成された現場打ち鉄筋コンクリートによって構成されたエレメント構造体を防護工として前記エレメント構造体の内部の地盤を掘削し、次いで、前記エレメント構造体を本体として利用して地下構造物を構築することを特徴とする。
【0014】
上記の地下構造物構築方法において、好ましくは、前記閉合箇所には、前記閉合空間を掘削する時の土留めと前記現場打ちコンクリートを打設する時の型枠の機能を有する保護部材が配置される。
【0015】
【発明の実施の形態】
以下、本発明の実施形態について、図面を参照しながら詳細に説明する。
【0016】
(1)第1実施形態
まず、本発明の第1実施形態について説明する。
【0017】
図1は、本発明の第1実施形態である地下構造物の全体構成を示す断面図である。
【0018】
図1に示すように、この地下構造物101は、「ロ」字状の断面形状を有する箱型の構造物である。地下構造物101は、現場打ち鉄筋コンクリートからなる下床版40と、「コ」を横にした形状の断面を有するエレメント構造体E1により構成されている。下床版40とエレメント構造体E1は、結合構造部41、42によって剛結合されている。
【0019】
また、エレメント構造体E1は、上床版部の中央位置に設置される基準管鋼製エレメント10と、基準管鋼製エレメント10に隣接させるように設置される一般部鋼製エレメント20と、エレメント構造体の4つの隅角位置に設置される隅角部鋼製エレメント30が組み合わされて構成されている。
【0020】
図2は、基準管鋼製エレメント10と、一般部鋼製エレメント20の構成と、接合状態を示している。図2(A)は、基準管鋼製エレメント10と、一般部鋼製エレメント20の断面図を示している。また、図2(B)は、エレメント継手部13、23の接合状態を示す拡大断面図である。図2(A )と図2(B)は、いずれも、鋼製エレメントの長手方向の軸の方向(以下、「エレメント軸方向」という。)に垂直な平面で切断した場合の基準管鋼製エレメント10と、一般部鋼製エレメント20の断面図を示している。
【0021】
図2(A)に示すように、基準管鋼製エレメント10は、2つの鋼製板状部材11と、2つの鋼製板状部材12と、4つのエレメント継手部13を有している。鋼製板状部材11と他の鋼製板状部材11は、互いに対向するように配置されてエレメント軸方向に延設されている。また、鋼製板状部材12と他の鋼製板状部材12は、互いに対向するように配置されるとともに鋼製板状部材11と直角となるように配置され、エレメント軸方向に延設される。これにより、2つの鋼製板状部材11と2つの鋼製板状部材12は、全体として矩形管状(「ロ」字状)の断面の鋼製部材を形成している。
【0022】
また、各鋼製板状部材11、12、11、12によって形成される矩形管状断面の4つの隅部のそれぞれには、エレメント軸方向に沿って延びる鋼製のエレメント継手部13が配設されている。
【0023】
エレメント継手部13の断面は、図2(B)に示すように、概略「C」字状の嵌合部13aと、嵌合部13aの背後に接続する基部13bを有して構成されている。また、嵌合部13aは、2つの突出部13c、13dを有している。突出部13cの先端は球根状に断面が拡大されている。また、突出部13cと突出部13dの中間は、ほぼ楕円状断面の凹部となっており、この部分は、略楕円状断面でエレメント軸方向に延びる溝13eとなっている。
【0024】
なお、図2(B)は、図2(A)における上部中央位置のエレメント継手部13の断面を示しているが、図2(A)における下部中央位置、右上位置、右下位置の隅部のエレメント継手部13についてもまったく同一形状のエレメント継手部位13が用いられており、その構成は図2(B)に図示するものとまったく同様である。
【0025】
また、各鋼製板状部材11、12と各エレメント継手部13との各接合箇所は、溶接部W1、W2、W3、W4によって接合されている。各鋼製板状部材11、12と各エレメント継手部13との接合は、ボルト等の機械的接合であってもよい。
【0026】
上記のような構成により、エレメント継手部13の突出部13cの先端付近にエレメント軸方向に直角な方向(以下、「エレメント軸直角方向」という。)の力を作用させた場合、例えば、図2(B)における左方向に引張ると、この引張り力(以下、「第1引張り力」という。)は、突出部13cから基部13bに伝達され、基部13bから鋼製板状部材11に伝達され、鋼製板状部材11の図2(B)における左端に、図2(B)における左方向への引張り力を作用させることになる。
【0027】
一方、エレメント継手部13の突出部13dの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図2(B)における左方向に引張ると、この引張り力(以下、「第2引張り力」という。)は、突出部13dから基部13bを経て鋼製板状部材11に伝達され、鋼製板状部材11の図2(B)における左端に、図2(B)における左方向への引張り力を作用させることになる。
【0028】
上記のことから、エレメント継手部13の突出部13c及び13dと、基部13bは、外部から加えられる上記のエレメント軸直角方向の力(例えば、第1引張り力、第2引張り力)に抵抗可能な所定の強度と所定の断面を有している。また、エレメント継手部13の突出部13dには、上記の第1引張り力の一部と第2引張り力の一部との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面を有している。例えば、突出部13dの厚みは十分な厚みとなっている。
【0029】
また、エレメント継手部13の基部13bには、上記の第1引張り力と第2引張り力の一部との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面(例えば十分な厚み)を有している。また、鋼製板状部材11は、エレメント継手部13から伝達される上記のエレメント軸直角方向の力に抵抗可能な所定の強度と所定の断面を有している。
【0030】
また、図2(A)に示すように、一般部鋼製エレメント20は、2つの鋼製板状部材21と、1つの鋼製板状部材22と、2つのエレメント継手部13と、2つのエレメント継手部23を有している。鋼製板状部材21と他の鋼製板状部材21は、互いに対向するように配置されてエレメント軸方向に延設されている。また、鋼製板状部材22は、鋼製板状部材21、21と直角となるように配置され、エレメント軸方向に延設される。これにより、2つの鋼製板状部材21と1つの鋼製板状部材22は、全体として「コ」字状の断面の鋼製部材を形成している。
【0031】
また、各鋼製板状部材21、22、21によって形成される「コ」字状断面の4つの隅部のうち、外部に対して開放された隅部、すなわち図2(A)における右上隅部及び右下隅部のそれぞれには、エレメント軸方向に沿って鋼製のエレメント継手部23が配設されている。
【0032】
また、各鋼製板状部材21、22、21によって形成される「コ」字状断面の4つの隅部のうち、外部に対して閉塞された隅部、すなわち図2(A)における左上隅部及び左下隅部のそれぞれには、エレメント軸方向に沿って上述したエレメント継手部13が配設されている。
【0033】
エレメント継手部23の断面は、概略「C」字状の嵌合部23aと、嵌合部23aの背後に接続する基部23bを有して構成されている。また、嵌合部23aは、2つの突出部23c、23dを有している。突出部23cの先端は球根状に断面が拡大されている。また、突出部23cと突出部23dの中間は、ほぼ楕円状断面の凹部となっており、この部分は、略楕円状断面でエレメント軸方向に延びる溝23eとなっている。
【0034】
なお、図2(B)は、図2(A)における上部中央位置のエレメント継手部23の断面を示しているが、図2(A)における下部中央位置の隅部のエレメント継手部23についてもまったく同一形状のエレメント継手部23が用いられており、その構成は図2(B)に図示するものとまったく同様である。また、一般部鋼製エレメント20におけるエレメント継手部13とその付近の構成は、上述した基準管鋼製エレメント10におけるエレメント継手部13とその付近の構成とまったく同様である。
【0035】
また、各鋼製板状部材21、22と各エレメント継手部13、23との各接合箇所は、溶接部W5、W6等によって接合されている。各鋼製板状部材21、22と各エレメント継手部13、23との接合は、ボルト等の機械的接合であってもよい。
【0036】
上記のような構成により、エレメント継手部23の突出部23cの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図2(B)における右方向に引張ると、この引張り力(以下、「第3引張り力」という。)は、突出部23cから基部23bに伝達され、基部23bから鋼製板状部材21に伝達され、鋼製板状部材21の図2(B)における右端に、図2(B)における右方向への引張り力を作用させることになる。
【0037】
一方、エレメント継手部23の突出部23dの先端付近にエレメント軸直角方向の力を作用させた場合、例えば、図2(B)における右方向に引張ると、この引張り力(以下、「第4引張り力」という。)は、突出部23dから基部23bに伝達され、基部23bから鋼製板状部材21に伝達され、鋼製板状部材21の図2(B)における右端にM図2(B)における右方向への引張り力を作用させることになる。
【0038】
上記のことから、エレメント継手部23の突出部23c及び23dは、外部から加えられる上記のエレメント軸直角方向の力(例えば、第3引張り力、第4引張り力)に抵抗可能な所定の強度と所定の断面を有している。また、エレメント継手部23の突出部23dには、上記の第4引張り力と、第4引張り力に起因する曲げモーメントによる力の合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面を有している。例えば、突出部23dの厚みは十分な厚みとなっている。
【0039】
また、エレメント継手部23の基部23bには、上記の第3引張り力と第4引張り力との合成力が作用することを考慮し、その力に抵抗可能な所定の強度と所定の断面(例えば十分な厚み)を有している。また、鋼製板状部材21及び22は、エレメント継手部13、23から伝達される上記のエレメント軸直角方向の力に抵抗可能な所定の強度と所定の断面を有している。
【0040】
次に、上記した基準管鋼製エレメント10と一般部鋼製エレメント20によるエレメント構造体の施工方法について説明する。
【0041】
まず、、基準管鋼製エレメント10を、エレメント軸方向に向けて地中に挿入する。この場合、基準管鋼製エレメント10の内部にオーガードリル等を配備して、エレメント内部の土砂等を掘削、除去しつつ、エレメントの地中への挿入を行う。その後、一般部鋼製エレメント20の開放側隅部に設けられたエレメント継手部23、23のそれぞれを、基準管鋼製エレメント10のエレメント継手部13のうちの2つ(例えば、図2(A)における左上隅部の継手と左下隅部の継手)と嵌合させて接合する。
【0042】
その後、これらのエレメント継手部13、23を嵌合させた状態で、一般部鋼製エレメント20を、基準管路鋼製エレメント10に沿わせながら、基準管鋼製エレメント10の場合と同様にしてエレメント軸方向に向けて地中に挿入する。これにより、図2(A)に示した状態となる。
【0043】
この場合、図2(B)に示すように、接合状態となっている基準管鋼製エレメント10のエレメント継手部13と、一般部鋼製エレメント20のエレメント継手部23においては、エレメント継手部13の溝13e内にエレメント継手部23の突出部23cの拡大された先端が入り込んで嵌合し、かつ、エレメント継手部23の溝23e内にエレメント継手部13の突出部13cの拡大された先端が入り込んで嵌合している。このように、基準管鋼製エレメント10のエレメント継手部13と一般部鋼製エレメント20のエレメント継手部23が互いに嵌合することにより、基準管鋼製エレメント10と一般部鋼製エレメント20の相互間で、エレメント軸直角方向の力が伝達可能となっている。
【0044】
上記のように嵌合している基準管鋼製エレメント10のエレメント継手部13と、一般部鋼製エレメント20のエレメント継手部23の内部の溝13e、23eには、必要に応じて、適宜の時期に、エレメント軸方向の一方の端(以下、「注入端」という。)から、無収縮モルタル、無収縮コンクリート、樹脂材料等のグラウト材(図示せず)を注入し、硬化させて継手接合を補強してもよい。このグラウト注入を行うと、継手が固定されるため、接合された後の複数の鋼製エレメントが、上載荷重等によりたわむなどの変形を生じることを防止することができる。また、この補強により、エレメント軸直角方向の力の伝達性能も向上する。
【0045】
次に、上記と同様にして、他の新たな一般部鋼製エレメント20の開放側隅部に設けられたエレメント継手部23、23のそれぞれを、すでに地中に挿入された一般部鋼製エレメント20の閉塞側隅部に設けられたエレメント継手部13、13のそれぞれと嵌合させて接合する。そして、両継手を嵌合させた状態で、新たな一般部鋼製エレメント20を、すでに挿入された一般部路鋼製エレメント20に沿わせながら、エレメント軸方向に向けて地中に挿入する。
【0046】
以下、上記のようにして一般部エレメント挿入工程を順次繰り返すことによって、地中に挿入され相互に接合された各鋼製エレメント10、20等によってエレメント構造体を構成することができる。例えば、平板状の構造体、半円状や円状あるいは楕円状等に囲まれた形状のエレメント構造体である。
【0047】
次に、必要により、各エレメント内にコンクリート等を充填する。次に、地中に形成されたエレメント構造体を防護工として利用し、エレメント構造体の内部の土砂等を掘削する。次に、エレメント内面をコンクリートで被覆する等の施工を行うことにより、地下構造物を構築することができる。
【0048】
エレメント構造体が「ロ」字状断面などの場合には、エレメントが直角に曲がる隅角部が必要となる。この隅角部には、上記した基準管鋼製エレメント10や一般部鋼製エレメント20とは異なる構成の隅角部構成エレメント30が用いられる。
【0049】
次に、隅角部鋼製エレメント30の構成を、図3を参照しつつ説明する。図3は、図1に示すエレメント構造体E1の左側壁の下端位置となる隅角部鋼製エレメント30と、下床版40の左端部との結合構造部41の断面図を示している。図3は、エレメント軸方向に垂直な平面で切断した場合の隅角部鋼製エレメント30と、結合構造部41の断面図を示している。
【0050】
図3に示すように、隅角部鋼製エレメント30は、5つの鋼製板状部材31、31、32、34、34と、2つのエレメント継手部13と、2つのエレメント継手部23を有している。鋼製板状部材31と他の鋼製板状部材31は、互いに対向するように配置されてエレメント軸方向に延設されている。また、鋼製板状部材34と他の鋼製板状部材34は、互いに対向するように配置されるとともに鋼製板状部材31と直角となるように配置され、エレメント軸方向に延設される。鋼製板状部材32は、鋼製板状部材31と直角となるとともに、鋼製板状部材34と平行となるように配置され、エレメント軸方向に延設される。これにより、5つの鋼製板状部材31、31、32、34、34は、全体として矩形管状の断面の鋼製部材を形成している。
【0051】
また、各鋼製板状部材31、31、32、34、34によって形成される矩形管状断面の4つの隅部のうち、エレメント軸直角方向のうちの一方向、例えば、図3における上下方向において互いに隣接する2つの隅部、すなわち図3における左上隅部と右上隅部のそれぞれに、エレメント軸方向に沿ってエレメント継手部23、23が設けられている。
【0052】
また、上記した上下方向と直角となる他方向、例えば、図3における左右方向において互いに隣接する2つの隅部、すなわち図3における右上隅部と右下隅部のそれぞれにエレメント軸方向に沿ってエレメント継手部13、13が設けられている。
【0053】
各エレメント継手部13、23の構成は上記とまったく同様である。また、鋼製板状部材31、32、34は、エレメント継手部13、23から伝達される上記のエレメント軸直角方向の力に抵抗可能な所定の強度と所定の断面を有している。また、各鋼製板状部材31、32、31、34と各エレメント継手部13、23との各接合箇所は、溶接部によって接合されている。この接合は、ボルト等の機械的接合であってもよい。
【0054】
隅角部鋼製エレメント30は、エレメント構造体E1の右上、右下、左上の各隅部にも設けられている。隅角部鋼製エレメント30は、上記した構成により、エレメント軸直角方向の力のうち、「L」字状の隅角部の各方向の成分、例えば、図3における左右方向(水平方向)の成分は、隅角部鋼製エレメント30の側に設けられた水平方向のエレメント継手部13と、相手側に設けられた継手部(例えばエレメント継手部23)により伝達可能である。また、エレメント軸直角方向の力のうち、上下方向(垂直方向)の成分は、隅角部鋼製エレメント30の側に設けられた上下方向のエレメント継手部13と、相手側に設けられた継手部(例えばエレメント継手部23)により伝達可能である。
【0055】
上記した隅角部鋼製エレメント30の地中への挿入については、上記した基準部鋼製エレメント10、一般部鋼製エレメント20の場合とまったく同様であり、すでに地中に挿入された隣接するエレメントに沿わせて挿入すればよい。また、隅角部鋼製エレメント30の下方に隣接する一般部鋼製エレメント20についても同様である。
【0056】
上記した隅角部鋼製エレメント30については、エレメント構造体の隅角部の内側、例えば、図3における右上隅部に大きな引張り力が発生する場合があるが、この引張り力は、例えば上側の鋼製板状部材34に負担させ、エレメント構造体の強度を高めることができる。
【0057】
また、エレメント構造体の隅角部の内側(図3の右上隅部)の引張り力が小さい場合には、上側の鋼製板状部材34を省略してもよい。あるいは、施工時(隅角部鋼製エレメント30の挿入時)には鋼製板状部材34を省略した「コ」字状断面としておき、エレメントの地中挿入後に溶接や、ボルト接合等の機械的接合などによって鋼製板状部材34を取り付けるようにしてもよい。下側の鋼製板状部材34についても適宜に付加又は省略可能である。
【0058】
第1実施形態の地下構造物101は、下床版40が現場打ち鉄筋コンクリートであり、エレメント構造体E1の側壁下端と下床版40を、結合構造部41、42により剛結構造としている。地下構造物101の左下隅部の結合構造部41と、右下隅部の結合構造部42は、まったく同様の構成を有している。次に、地下構造物101の左下隅部の結合構造部41の構成について説明する。
【0059】
図3に示すように、結合構造部41は、接続継手部材43と、結合鉄筋44と、現場打ちコンクリート45を有して構成されている。
【0060】
図4は、接続継手部材43は、図3に示した結合構造部41における接続継手部材43の構成を示す図である。図4(A)の断面図(エレメント軸方向に垂直な平面で切断した場合の断面図)に示すように、接続継手部材43は、いわゆる直線鋼矢板46を、矢板長手方向の中央線に沿って2等分するように切断することによって形成される。
【0061】
接続継手部材43は、鋼製平板部43aと結合継手部43bを有している。鋼製平板部43aは、「−」字状の断面を有し、エレメント軸方向に延在する鋼製の平板状部分である。また、結合継手部43bは、鋼からなり、鋼製平板部43aの「−」字状断面における一端部に、エレメント軸方向に沿って形成された略「C」字状断面の部分であり、上述したエレメント継手部13と同様の構成を有している。
【0062】
図4(B)は、接続継手部材43と結合鉄筋44の配置関係及び両者の構成を示す斜視図である。図4(B)に示すように、接続継手部材43の鋼製平板部43aのうち、結合継手部43bが設けられている一端部とは反対側の他端部付近に、複数の結合鉄筋44設けられ、エレメント軸方向に直角となる方向に沿って延びるように並べて配置されている。これらの結合鉄筋44は、溶接部47によって鋼製平板部43aに接合されている。鋼製平板部43aと結合鉄筋44との接合は、ボルト等の機械的接合であってもよい。
【0063】
上記のような構造により、図3に示すように、エレメント構造体E1の左側壁下端の隅角部鋼製エレメント30の右上隅部のエレメント継手部13と上段の接続継手部材43の結合継手部43bが互いに嵌合するとともに、この隅角部鋼製エレメント30の右下隅部のエレメント継手部13と下段の接続継手部材43の結合継手部43bが互いに嵌合することにより、隅角部鋼製エレメント30と結合構造部41の相互間で、エレメント軸直角方向の力が伝達可能となっている。
【0064】
また、図3に示すように、接続継手部材43に接合された結合鉄筋44には、下床版40の現場打ち鉄筋コンクリート用鉄筋49が沿わされて重ね鉄筋継手が形成されている。これにより、エレメント構造体E1の左側壁下端の隅角部鋼製エレメント30のエレメント継手部13から結合継手部43bにより接続継手部材43に伝達された力は、結合鉄筋44から現場打ち鉄筋コンクリート用鉄筋49を経て下床版40に伝達されるようになっている。
【0065】
また、図3に示すように、結合鉄筋44には、帯状に取り囲む帯鉄筋48を配置し、さらに補強をはかるようにしてもよい。
【0066】
次に、結合構造部41を施工するための第1の方法について説明する。
【0067】
まず、あらかじめ、上記の接続継手部材43に複数の結合鉄筋44を溶接して図4(B)の状態に形成した部材(以下、「結合部材」という。)を2個作成しておく。
【0068】
次に、エレメント構造体E1内の土砂等を、隅角部鋼製エレメント30の底部位置(図3における鋼製板状部材32の位置)まで掘削する。
【0069】
次に、一方の結合部材の結合継手部43bを隅角部鋼製エレメント30の右上隅部のエレメント継手部13に嵌合させ、エレメント軸方向にスライドさせるように挿入する。その後、互いに嵌合した結合継手部43bとエレメント継手部13の内部に形成される嵌合空間(図2(A)における13e又は23eに相当する部分)の内部にグラウト材を注入して硬化させる。これにより、一方の結合部材を隅角部鋼製エレメント30に固定することができる。
【0070】
同様にして、他方の結合部材の結合継手部43bを隅角部鋼製エレメント30の右下隅部のエレメント継手部13に嵌合させ、エレメント軸方向にスライドさせるように挿入し、互いに嵌合した結合継手部43bとエレメント継手部13の内部に形成される嵌合空間の中にグラウト材を注入して硬化させ、他方の結合部材を隅角部鋼製エレメント30に固定する。
【0071】
次に、結合部材の結合鉄筋44と、下床版40の現場打ち鉄筋コンクリート用鉄筋49を重ね合わせ配置して重ね鉄筋継手を形成する。また、必要に応じ、結合鉄筋44の周囲を帯鉄筋48で取り巻いて補強を行う。その後、現場打ちコンクリート45を打設し、硬化させる。これにより、地下構造物101の下床版40と隅角部鋼製エレメント30を剛結合することができる。
【0072】
次に、結合構造部41を施工するための第2の方法について説明する。
【0073】
まず、エレメント構造体E1内の土砂等を、隅角部鋼製エレメント30の底部位置(図3における鋼製板状部材32の位置)まで掘削する。
【0074】
次に、1つの接続継手部材43の結合継手部43bを隅角部鋼製エレメント30の右上隅部のエレメント継手部13に嵌合させ、エレメント軸方向にスライドさせるように挿入する。その後、互いに嵌合した結合継手部43bとエレメント継手部13の内部に形成される嵌合空間(図2(A)における13e又は23eに相当する部分)の内部にグラウト材を注入して硬化させる。これにより、1つの接続継手部材43を隅角部鋼製エレメント30に固定することができる。
【0075】
次に、接続継手部材43のうち、結合継手部43bが設けられた一端部とは反対側の他端部付近に、複数の結合鉄筋44をエレメント軸直角方向に延びるようにして溶接等により並べて接合し、図4(B)に図示するような状態とする。
【0076】
次に、上記と同様にして、他の接続継手部材43の結合継手部43bを隅角部鋼製エレメント30の右下隅部のエレメント継手部13に嵌合させ、エレメント軸方向にスライドさせるように挿入し、互いに嵌合した結合継手部43bとエレメント継手部13の内部に形成される嵌合空間の中にグラウト材を注入して硬化させ、他の接続継手部材43を隅角部鋼製エレメント30に固定する。
【0077】
その後、上記と同様にして、他の接続継手部材43のうち、結合継手部43bが設けられた一端部とは反対側の他端部付近に、複数の結合鉄筋44をエレメント軸直角方向に延びるようにして溶接等により並べて接合し、図4(B)に図示するような状態とする。
【0078】
次に、結合鉄筋44と、下床版40の現場打ち鉄筋コンクリート用鉄筋49を重ね合わせ配置して重ね鉄筋継手を形成する。また、必要に応じ、結合鉄筋44の周囲を帯鉄筋48で取り巻いて補強を行う。その後、現場打ちコンクリート45を打設し、硬化させる。これにより、地下構造物101の下床版40と隅角部鋼製エレメント30を剛結合することができる。
【0079】
なお、帯鉄筋は、図5に示すように、取り囲む結合鉄筋44を順次ずらして、48a、48b、48cのように配置し、いわゆる「千鳥配置」となるようにしてもよい。このように構成することにより、帯鉄筋の立ち上がり箇所が集中しないようにして、より強固な構造とすることができる。
【0080】
(2)第2実施形態
次に、本発明の第2実施形態について説明する。
【0081】
図6は、本発明の第2実施形態である地下構造物の全体構成を示す断面図である。
【0082】
図6に示すように、この地下構造物102は、「ロ」字状の断面形状を有する箱型の構造物である。地下構造物102は、「ロ」字の下部中央付近の一部分のみが欠けた形状の断面を有するエレメント構造体E2と、閉合構造部51により構成されている。
【0083】
エレメント構造体E2は、上床版部の中央位置に設置される基準管鋼製エレメント10と、基準管鋼製エレメント10に隣接させるように設置される一般部鋼製エレメント20と、エレメント構造体の4つの隅角位置に設置される隅角部鋼製エレメント30が組み合わされて構成されており、各鋼製エレメント10、20、30の構成は、第1実施形態の場合とまったく同様であるため、その説明は省略する。
【0084】
第2実施形態の地下構造物102が第1実施形態の地下構造物101と異なる点は、一般部鋼製エレメント20の間に設けられて剛結合する閉合構造部51を備えている点である。
【0085】
図7は、閉合構造部51の構成を示している。図7は、鋼製エレメントのエレメント軸方向に垂直な平面で切断した場合の断面図を示している。
【0086】
図7に示すように、閉合構造部51は、カゴ状部材59と、保護部材52a及び52bと、現場打ちコンクリート55を有して構成されている。
【0087】
カゴ状部材59は、図4(B)に示すような結合部材の結合鉄筋44の端部(接続継手部材43とは逆側の端部)にさらに他の接続継手部材43を溶接等によって接合した部材(以下、「柵状部材」という。)を2個用い、2つの柵状部材57aと57bを互いに対向配置させて各結合鉄筋44が平行になるようにし、各柵状部材57a及び57bの結合鉄筋44を帯鉄筋58で取り囲むようにし、帯鉄筋58を結合鉄筋44に適宜に接合することにより構成される。なお、柵状部材における鋼製平板部43aと結合鉄筋44との接合は、ボルト等の機械的接合であってもよい。
【0088】
上記のような構造により、図7に示すように、エレメント構造体E2(図6参照)の下部中央付近の左側の一般部鋼製エレメント20Lの右上隅部のエレメント継手部23と、カゴ状部材59の上段の柵状部材57aの左端の結合継手部43bが互いに嵌合するとともに、左側の一般部鋼製エレメント20Lの右下隅部のエレメント継手部23と、カゴ状部材59の下段の柵状部材57bの左端の結合継手部43bが互いに嵌合している。
【0089】
また、エレメント構造体E2(図6参照)の下部中央付近の右側の一般部鋼製エレメント20Rの左上隅部のエレメント継手部23と、カゴ状部材59の上段の柵状部材57aの右端の結合継手部43bが互いに嵌合するとともに、右側の一般部鋼製エレメント20Rの左下隅部のエレメント継手部23と、カゴ状部材59の下段の柵状部材57bの右端の結合継手部43bが互いに嵌合している。
【0090】
また、図7に示すように、カゴ状部材59を構成する上下の柵状部材57a及び57bにおいては、両端の接続継手部材43と結合鉄筋44が溶接等によって接合されている。
【0091】
このような構成により、左側の一般部鋼製エレメント20Lと、閉合構造部51と、右側の一般部鋼製エレメント20Rの相互間で、エレメント軸直角方向の力が伝達可能となっている。
【0092】
次に、閉合構造部51の施工方法について説明する。
【0093】
まず、あらかじめ、上記のカゴ状部材59を作成しておく。
【0094】
次に、上記した基準管鋼製エレメント10、一般部鋼製エレメント20、隅角部鋼製エレメント30のエレメント継手部13、23等を相互に嵌合させつつ地中に挿入し、嵌合したエレメント継手部内にグラウト材を注入し硬化させ、鋼製エレメントどうしを固定することを繰り返し、複数の鋼製エレメントを地中で連結させ、「ロ」字の下部中央付近の一部分(一般部鋼製エレメント20Lと20Rとの間)が欠けた形状の断面を有するエレメント構造体E2を地中に形成する。
【0095】
次に、一般部鋼製エレメント20Lと20Rとの間が閉合していない状態で、この箇所(以下、「閉合箇所」という。)の上部の地中に保護部材52aを挿入する。また、同様にして、閉合箇所の下部の地中に保護部材52b挿入する。保護部材52a、52bとしては、鋼鈑等が用いられる。この場合、保護部材52a及び52bの両端部は、一般部鋼製エレメント20L、20Rに、溶接等の接合部材53によって接合する。一般部鋼製エレメント20L等への接合部材53の接合は、ボルト等の機械的接合であってもよい。
【0096】
次に、図8(A)に示すように、保護部材52a及び52bを土留め手段として利用し、保護部材52a及び52bによって囲まれた部分の内部の地盤を掘削して除去し、閉合空間54を形成する。
【0097】
その後、図8(B)に示すように、上記したカゴ状部材59の結合継手部43bを一般部鋼製エレメント20L等のエレメント継手部23に嵌合させ、エレメント軸方向にスライドさせるように挿入し、カゴ状部材59を掘削された閉合空間54内に挿入する。
【0098】
次に、図8(C)に示すように、保護部材52a及び52bをコンクリート型枠として利用し、カゴ状部材59が挿入された閉合空間54内に現場打ちコンクリート55を打設して硬化させる。これにより、閉合構造部51が完成し、エレメント構造体E2が、「ロ」字状断面となって閉合する。
【0099】
次に、上記のようにして閉合した「ロ」字状の構造体を防護工として、その内部の地盤を掘削する。次に、閉合した「ロ」字状の構造体を本体構造として利用し、地下構造物を構築する。
【0100】
このように施工すれば、エレメント構造体の剛結閉合を短時間で行うことができ、施工精度も向上させることができる。
【0101】
なお、本発明は、上記各実施形態に限定されるものではない。上記各実施形態は、例示であり、本発明の特許請求の範囲に記載された技術的思想と実質的に同一な構成を有し、同様な作用効果を奏するものは、いかなるものであっても本発明の技術的範囲に包含される。
【0102】
例えば、上記実施形態においては、直線鋼矢板を切断することにより接続継手部材(例えば43)を形成する例について説明したが、本発明はこの例には限定されず、他の構成の接続継手部材、例えば、帯状の鋼鈑の一側端にエレメント継手部(例えば13又は23)を溶接や機械的接合によって接合させて接続継手部材を形成してもよい。
【0103】
また、上記実施形態においては、矩形管状の断面を有する基準管鋼製エレメント10及び隅角部鋼製エレメント30、略「コ」字状の断面を有する一般部鋼製エレメント20によってエレメント構造体を構成する例について説明したが、本発明はこの例には限定されず、他の構成の鋼製エレメント、例えば、略「日」字状、略「目」字状、略「田」字状、略「円」字状等の断面を有する鋼製エレメントであってもよい。
【0104】
また、上記実施形態においては、基準管鋼製エレメント10等の隅部にエレメント継手部(例えば13又は23)が設けられている場合を例に挙げて説明したが、本発明はこの例には限定されず、他の構成の鋼製エレメント、例えば、鋼製エレメントの辺の中間部分にエレメント継手部が設けられるように構成してもよい。
【0105】
【発明の効果】
以上説明したように、本発明によれば、結合継手部を有する接続継手部材を用い、結合継手部によって既設の鋼製エレメントのエレメント継手部に嵌合させるとともに現場打ちコンクリートの補強部材として利用することができるため、鋼製エレメントの狭い空間内であっても作業が容易で施工性が良く、かつ施工精度も向上する、という利点を有している。
【図面の簡単な説明】
【図1】本発明の第1実施形態である地下構造物の全体構成を示す断面図である。
【図2】図1の地下構造物における基準管鋼製エレメントと一般部鋼製エレメントの構成を示す図である。
【図3】図1の地下構造物における隅角部鋼製エレメントと下床版の結合構造部の構成を示す断面図である。
【図4】図3の結合構造部における接続継手部材の構成を示す図である。
【図5】図3の結合構造部における帯鉄筋の配置状態を示す図である。
【図6】本発明の第2実施形態である地下構造物の全体構成を示す断面図である。
【図7】図6の地下構造物における閉合構造部の構成を示す図である。
【図8】図6の地下構造物における閉合構造部の施工方法を説明する図である。
【符号の説明】
10 基準管鋼製エレメント
11、12 鋼製板状部材
13 エレメント継手部
13a 嵌合部
13b 基部
13c、13d 突出部
13e 溝
20、20L、20R 一般部鋼製エレメント
21、22 鋼製板状部材
23 エレメント継手部
23a 嵌合部
23b 基部
23c、23d 突出部
23e 溝
30 隅角部鋼製エレメント
31、32、34 鋼製板状部材
40 下床版
41、42 結合構造部
43 接続継手部材
43a 鋼製平板部
43b 結合継手部
44 結合鉄筋
45 現場打ちコンクリート
46 直線鋼矢板
47 溶接部
48、48a〜48c 帯鉄筋
49 現場打ち鉄筋コンクリート用鉄筋
51 閉合構造部
52a、52b 保護部材
53 接合部材
54 閉合空間
55 現場打ちコンクリート
57a、57b 柵状部材
58 帯鉄筋
59 カゴ状部材
101、102 地下構造物
E1、E2 エレメント構造体
L 中央線
W1〜W6 溶接部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a structure and a method for joining a steel element and an in-situ reinforced concrete used for constructing an underground structure by a non-opening method, and a method for constructing an underground structure by using the steel element and the in-situ reinforced concrete. It is about.
[0002]
[Prior art]
Conventionally, as a method of constructing an underground structure by a non-opening method under a railroad track or road, steel elements are sequentially inserted and combined into the ground by propulsion or towing, and the earth and sand surrounded by the elements are combined. A method of excavating and using a structure made of steel elements (hereinafter referred to as “element structure”) as a main body of an underground structure is used.
[0003]
In such a construction method, when the lower floor slab is made of cast-in-place reinforced concrete, the element at the lower end of the side wall and the lower floor slab need to have a rigid connection structure. In addition, when the cross-sectional shape of the element structure is a shape with the “Sun” sideways or a shape with the “eyes” sideways, the upper-end plate of the middle wall portion arranged in the middle and the corresponding part of the upper floor slab The element may have a rigid coupling structure. Alternatively, for example, when the cross-sectional shape of the element structure is “B” -shaped, these elements may have a rigid coupling structure in a closing portion where the elements are finally joined.
[0004]
In such a case, for example, in the rigid connection structure between the element at the lower end of the side wall part and the reinforced concrete lower floor slab, the reinforcing bar is arranged in the element at the lower end of the side wall part, and these reinforcing bars are connected to the reinforcing bar of the lower floor slab. The cast-in-place concrete is placed to integrate the lower end of the side wall and the lower floor slab.
[0005]
[Problems to be solved by the invention]
However, in the above-described method for constructing an underground structure using elements, a large number of reinforcing bars must be fixed or connected in a limited and narrow space called an element, which is difficult to work, has poor workability, and lowers construction accuracy. There was a problem of doing.
[0006]
The present invention has been made in order to solve the above problems, and the problem to be solved by the present invention is a coupling structure capable of coupling a steel element and a cast-in-place reinforced concrete with good workability and high construction accuracy, And providing such a method.
[0007]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, a steel element and in-situ reinforced concrete connection structure according to the present invention is a steel member that has a rectangular tubular or substantially “U” -shaped cross section and extends in the element axial direction. An element joint portion having a substantially “C” -shaped cross section is provided at the corner portion along the element axial direction, and the elements are joined together by fitting of adjacent element joint portions, and the direction is perpendicular to the element axial direction. A structure in which a steel element capable of transmitting a force in a direction perpendicular to the element axis and a cast-in-place reinforced concrete are coupled, and the “−”-shaped cross section of the steel flat plate portion extending in the element axial direction has a “−”-shaped cross section. The joint joint part of the connection joint member in which the joint joint part having a substantially “C” -shaped cross section is provided along the element axial direction at one end of the “-shaped cross section” and the element of the steel element The connecting joint member is fixed by a hand being fitted, and a grout material is injected and cured in a fitting space formed inside each of the fitted joint parts, and the joint joint of the connection joint member is fixed. A plurality of coupled rebars provided in the vicinity of the other end opposite to the one end provided with the portion and arranged in parallel so as to extend in the direction perpendicular to the element axis are superposed and placed on the cast-in-place reinforced concrete. The steel element and the cast-in-place reinforced concrete are combined by forming a reinforced joint and placing and hardening the cast-in-place concrete.
[0008]
In the combined structure of the steel element and the in-situ reinforced concrete, preferably, the connection joint member has a “−”-shaped cross section of a steel flat plate portion having a “−”-shaped cross section and extending in a longitudinal direction. It is formed by cutting the steel flat plate portion of the straight steel sheet pile provided with a joint joint portion having a substantially “C” -shaped cross section along the longitudinal direction at both ends.
[0009]
Further, in the above-described structure of joining the steel element and the in-situ reinforced concrete, preferably, the joining reinforcing bar is joined to the steel flat plate portion by welding or mechanical joining.
[0010]
Further, in the above-described structure of joining steel elements and cast-in-place reinforced concrete, preferably, the connecting reinforcing bars are surrounded and reinforced by belt reinforcing bars.
[0011]
The first joining method of the steel element and the in-situ reinforced concrete according to the present invention is a corner of a steel member having a rectangular tubular shape or a substantially “U” shaped cross section and extending in the element axial direction. Are provided with element joint portions having a substantially “C” -shaped cross section along the element axial direction, and are joined together by fitting of adjacent element joint portions, and an element shaft that is perpendicular to the element axial direction. A method of joining a steel element capable of transmitting a force in a perpendicular direction and a cast-in-place reinforced concrete, wherein the “−” character of the steel plate portion having a “−”-shaped cross section and extending in the element axial direction is provided. The other end opposite to the one end provided with the joint joint portion of the connection joint member provided with the joint joint portion having a substantially “C” -shaped cross section along the element axial direction at one end portion in the cross section Near the club The coupling joint portion of the coupling member arranged in parallel so that a plurality of coupling rebars extend in a direction perpendicular to the element axis is fitted to the element coupling of the steel element, and then formed in the fitted joint. The joint member is fixed by injecting and hardening a grout material in the fitting space, and then forming a lap joint by superposing and arranging the joint reinforcing bar and the reinforcing steel for the in-situ reinforced concrete. It is characterized by being cast and cured.
[0012]
Further, the second joining method of the steel element and the in-situ reinforced concrete according to the present invention is a corner portion of a steel member having a rectangular tubular shape or a substantially “U” -shaped cross section and extending in the element axial direction. Are provided with element joint portions having a substantially “C” -shaped cross section along the element axial direction, and are joined together by fitting of adjacent element joint portions, and an element shaft that is perpendicular to the element axial direction. A method of joining a steel element capable of transmitting a force in a perpendicular direction and a cast-in-place reinforced concrete, wherein the “−” character of the steel plate portion having a “−”-shaped cross section and extending in the element axial direction is provided. The joint joint portion of the connection joint member, in which the joint joint portion having a substantially “C” -shaped cross section is provided along the element axial direction at one end of the cross section, and the element joint of the steel element are fitted. Then, the connecting joint member is fixed by injecting and hardening a grout material in a fitting space formed in the fitting joint, and then a joint joint portion of the connecting joint member is provided. A plurality of connecting reinforcing bars are juxtaposed in the vicinity of the other end opposite to the one end so as to extend in a direction perpendicular to the element axis, and then the connecting reinforcing bars and the reinforcing bars for in-situ reinforced concrete are overlapped and stacked. It is characterized by forming reinforced joints and casting and hardening in-situ concrete.
[0013]
Further, the underground structure construction method according to the present invention has a rectangular tubular shape or a substantially “U” -shaped cross section and extends in the element axial direction along the element axial direction at the corner of the steel member. A steel element provided with an element joint portion having a substantially “C” -shaped cross section and capable of transmitting a force in a direction perpendicular to the element axis direction, which is perpendicular to the element axis direction, Then, another steel element is inserted into the ground while the element joint portions are fitted to each other, and a grout material is injected into the fitted element joint portion to be hardened. By repeatedly fixing the elements to connect the plurality of steel elements in the ground, and then before the plurality of steel elements are closed, excavate the ground at the closing point to form a closed space, A substantially “C” -shaped cross-section along the element axial direction at one end of the “−”-shaped cross section of a steel flat plate portion having a “−”-shaped cross section and extending in the element axial direction. A plurality of connecting reinforcing bars are juxtaposed so as to extend in the direction perpendicular to the element axis in the vicinity of the other end portion of the connecting joint member provided with the joint portion on the side opposite to the one end portion provided with the joint joint portion. The coupling joint of the cage-shaped member constructed by using two coupling members so that the coupling reinforcing bars are opposed to each other and arranged in parallel in two upper and lower stages and surrounding the coupling reinforcing bars with band reinforcing bars. The cage member is inserted into the excavated closed space while the element joint in the closed space is fitted to each other, and then the cast-in-place concrete is inserted into the closed space in which the cage member is inserted. Cast and harden, then Excavating the ground inside the element structure using an element structure composed of steel elements connected in the ground and a cast-in-place reinforced concrete formed in the enclosed space, and then the element structure It is characterized by constructing an underground structure using as a main body.
[0014]
In the above-described underground structure construction method, preferably, a protective member having a function of a formwork when placing the earth retaining when excavating the closed space and the cast-in-place concrete is disposed at the closed location. The
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0016]
(1) First embodiment
First, a first embodiment of the present invention will be described.
[0017]
FIG. 1 is a cross-sectional view showing the overall configuration of an underground structure according to the first embodiment of the present invention.
[0018]
As shown in FIG. 1, the underground structure 101 is a box-shaped structure having a “B” -shaped cross-sectional shape. The underground structure 101 is composed of a lower floor slab 40 made of in-situ reinforced concrete and an element structure E1 having a cross-section with a shape of “ko”. The lower floor slab 40 and the element structure E1 are rigidly coupled by coupling structure portions 41 and 42.
[0019]
The element structure E1 includes a reference pipe steel element 10 installed at the center position of the upper floor slab, a general steel element 20 installed so as to be adjacent to the reference pipe steel element 10, and an element structure. The corner portion steel elements 30 installed at the four corner positions of the body are combined.
[0020]
FIG. 2 shows the configuration of the reference tube steel element 10 and the general steel element 20 and the joined state. FIG. 2A shows a cross-sectional view of the reference pipe steel element 10 and the general steel element 20. FIG. 2B is an enlarged cross-sectional view showing a joined state of the element joint portions 13 and 23. 2 (A) and 2 (B) are both made of reference tube steel when cut in a plane perpendicular to the direction of the longitudinal axis of the steel element (hereinafter referred to as “element axial direction”). Sectional drawing of the element 10 and the general steel element 20 is shown.
[0021]
As shown in FIG. 2A, the reference pipe steel element 10 has two steel plate members 11, two steel plate members 12, and four element joint portions 13. The steel plate-like member 11 and the other steel plate-like members 11 are arranged so as to face each other and extend in the element axial direction. The steel plate-like member 12 and the other steel plate-like member 12 are arranged so as to face each other and are arranged so as to be perpendicular to the steel plate-like member 11 and extend in the element axial direction. The Thereby, the two steel plate-like members 11 and the two steel plate-like members 12 form a steel member having a rectangular tubular (“B” -shaped) cross section as a whole.
[0022]
Further, steel element joint portions 13 extending along the element axial direction are disposed at each of the four corners of the rectangular tubular cross section formed by the steel plate-like members 11, 12, 11, 12. ing.
[0023]
As shown in FIG. 2 (B), the cross section of the element joint portion 13 is configured to have a substantially “C” -shaped fitting portion 13a and a base portion 13b connected to the back of the fitting portion 13a. . Moreover, the fitting part 13a has the two protrusion parts 13c and 13d. The tip of the protrusion 13c has a bulbous cross section. Further, the middle of the protruding portion 13c and the protruding portion 13d is a recess having an approximately elliptical cross section, and this portion is a groove 13e extending in the element axial direction with an approximately elliptical cross section.
[0024]
2B shows a cross section of the element joint portion 13 at the upper center position in FIG. 2A, but the lower center position, the upper right position, and the lower right position corners in FIG. 2A. The element joint portion 13 having exactly the same shape is also used for the element joint portion 13, and the configuration thereof is exactly the same as that illustrated in FIG.
[0025]
Moreover, each joining location of each steel plate-shaped member 11 and 12 and each element joint part 13 is joined by welding part W1, W2, W3, and W4. The steel plate-like members 11 and 12 and the element joint portions 13 may be joined by mechanical joining such as bolts.
[0026]
When a force in a direction perpendicular to the element axis direction (hereinafter referred to as “element axis perpendicular direction”) is applied to the vicinity of the tip of the protruding portion 13c of the element joint portion 13 by the above-described configuration, for example, FIG. When pulled in the left direction in (B), this tensile force (hereinafter referred to as “first tensile force”) is transmitted from the projecting portion 13c to the base portion 13b, transmitted from the base portion 13b to the steel plate member 11, A tensile force in the left direction in FIG. 2 (B) is applied to the left end of the steel plate-like member 11 in FIG. 2 (B).
[0027]
On the other hand, when a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting portion 13d of the element joint portion 13, for example, when pulling in the left direction in FIG. 2 (B), this tensile force (hereinafter referred to as “second tension”). 2) is transmitted to the steel plate member 11 from the protruding portion 13d through the base portion 13b, to the left end in FIG. 2 (B) of the steel plate member 11 in the left direction in FIG. 2 (B). That is, the tensile force is applied.
[0028]
From the above, the projecting portions 13c and 13d of the element joint portion 13 and the base portion 13b can resist the force (for example, the first tensile force and the second tensile force) applied from the outside in the direction perpendicular to the element axis. It has a predetermined strength and a predetermined cross section. Further, in consideration of the combined force of the part of the first tensile force and the part of the second tensile force acting on the protruding part 13d of the element joint part 13, a predetermined resistance that can resist the force is given. It has strength and a predetermined cross section. For example, the protrusion 13d has a sufficient thickness.
[0029]
Further, considering that the combined force of the first tensile force and a part of the second tensile force acts on the base portion 13b of the element joint portion 13, a predetermined strength and a predetermined strength that can resist the force are applied. It has a cross section (for example, sufficient thickness). The steel plate-like member 11 has a predetermined strength and a predetermined cross section capable of resisting the force in the direction perpendicular to the element axis transmitted from the element joint portion 13.
[0030]
As shown in FIG. 2A, the general steel element 20 includes two steel plate-like members 21, one steel plate-like member 22, two element joint portions 13, and two steel plate-like members 22. An element joint portion 23 is provided. The steel plate member 21 and the other steel plate members 21 are arranged so as to face each other and extend in the element axial direction. The steel plate-like member 22 is disposed so as to be perpendicular to the steel plate-like members 21 and 21 and extends in the element axial direction. As a result, the two steel plate-like members 21 and the one steel plate-like member 22 form a steel member having a “U” -shaped cross section as a whole.
[0031]
Of the four corners of the “U” -shaped cross section formed by the steel plate-like members 21, 22, 21, the corner opened to the outside, that is, the upper right corner in FIG. A steel element joint portion 23 is disposed along the element axial direction at each of the upper and lower right corners.
[0032]
Of the four corners of the “U” -shaped cross section formed by the steel plate-like members 21, 22, 21, the corner closed to the outside, that is, the upper left corner in FIG. The element joint portion 13 described above is disposed along the element axial direction at each of the portion and the lower left corner.
[0033]
The cross section of the element joint portion 23 is configured to include a substantially “C” -shaped fitting portion 23a and a base portion 23b connected to the back of the fitting portion 23a. Moreover, the fitting part 23a has the two protrusion parts 23c and 23d. The tip of the protrusion 23c has a bulbous cross section. Further, the middle of the projecting portion 23c and the projecting portion 23d is a recess having an approximately elliptical cross section, and this portion is a groove 23e extending in the element axis direction with an approximately elliptical cross section.
[0034]
2B shows a cross section of the element joint portion 23 at the upper center position in FIG. 2A, but the element joint portion 23 at the corner portion at the lower center position in FIG. An element joint portion 23 having exactly the same shape is used, and its configuration is exactly the same as that illustrated in FIG. In addition, the configuration of the element joint portion 13 and the vicinity thereof in the general steel element 20 is exactly the same as the configuration of the element joint portion 13 and the vicinity thereof in the reference pipe steel element 10 described above.
[0035]
Moreover, each joining location of each steel plate-shaped member 21 and 22 and each element joint part 13 and 23 is joined by welding part W5, W6, etc. FIG. The joining of the steel plate-like members 21 and 22 and the element joint portions 13 and 23 may be mechanical joining such as bolts.
[0036]
When a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting portion 23c of the element joint portion 23 by the above-described configuration, for example, when the force is pulled in the right direction in FIG. , "Third tensile force") is transmitted from the projecting portion 23c to the base portion 23b, from the base portion 23b to the steel plate member 21, and at the right end of the steel plate member 21 in FIG. A tensile force in the right direction in FIG. 2B is applied.
[0037]
On the other hand, when a force in the direction perpendicular to the element axis is applied to the vicinity of the tip of the projecting portion 23d of the element joint portion 23, for example, when pulling in the right direction in FIG. Force ") is transmitted from the projecting portion 23d to the base portion 23b, from the base portion 23b to the steel plate-like member 21, and at the right end of the steel plate-like member 21 in FIG. ) In the right direction.
[0038]
From the above, the projecting portions 23c and 23d of the element joint portion 23 have a predetermined strength capable of resisting the force in the direction perpendicular to the element axis (for example, the third tensile force and the fourth tensile force) applied from the outside. It has a predetermined cross section. Further, in consideration of the fact that the combined force of the fourth tensile force and the bending moment resulting from the fourth tensile force acts on the protruding portion 23d of the element joint portion 23, a predetermined resistance that can resist the force is applied. And has a predetermined cross section. For example, the protrusion 23d has a sufficient thickness.
[0039]
Further, in consideration of the combined force of the third tensile force and the fourth tensile force acting on the base portion 23b of the element joint portion 23, a predetermined strength and a predetermined cross section (for example, resistance to the force) Sufficient thickness). The steel plate-like members 21 and 22 have a predetermined strength and a predetermined cross section that can resist the force in the direction perpendicular to the element axis transmitted from the element joint portions 13 and 23.
[0040]
Next, the construction method of the element structure by the reference pipe steel element 10 and the general part steel element 20 will be described.
[0041]
First, the reference pipe steel element 10 is inserted into the ground in the element axial direction. In this case, an auger drill or the like is provided inside the reference pipe steel element 10, and the element is inserted into the ground while excavating and removing the soil and the like inside the element. Then, each of the element joint parts 23 and 23 provided at the open side corner of the general steel element 20 is replaced with two of the element joint parts 13 of the reference pipe steel element 10 (for example, FIG. The upper left corner joint and the lower left corner joint) in FIG.
[0042]
Thereafter, in a state where these element joint portions 13 and 23 are fitted, the general steel element 20 is made to follow the reference pipe steel element 10 in the same manner as in the case of the reference pipe steel element 10. Insert it into the ground in the direction of the element axis. As a result, the state shown in FIG.
[0043]
In this case, as shown in FIG. 2 (B), the element joint portion 13 of the element joint portion 13 of the reference pipe steel element 10 and the element joint portion 23 of the general steel element 20 which are in a joined state are used. The enlarged tip of the projecting portion 23c of the element joint portion 23 enters and fits into the groove 13e, and the enlarged tip of the projecting portion 13c of the element joint portion 13 enters the groove 23e of the element joint portion 23. It fits in. In this way, the element joint portion 13 of the reference pipe steel element 10 and the element joint portion 23 of the general steel element 20 are fitted to each other, so that the reference pipe steel element 10 and the general steel element 20 are mutually connected. The force in the direction perpendicular to the element axis can be transmitted between them.
[0044]
In the groove 13e, 23e inside the element joint part 13 of the reference pipe steel element 10 and the element joint part 23 of the general steel element 20 fitted as described above, an appropriate one can be provided. At one time, grout materials (not shown) such as non-shrink mortar, non-shrink concrete, resin material, etc. are injected from one end in the axial direction of the element (hereinafter referred to as “injection end”), cured and jointed. May be reinforced. When this grout injection is performed, the joint is fixed, so that it is possible to prevent the plurality of steel elements after being joined from being deformed by bending due to an overload or the like. This reinforcement also improves the force transmission performance in the direction perpendicular to the element axis.
[0045]
Next, in the same manner as described above, each of the element joint portions 23 and 23 provided at the open side corners of other new general steel elements 20 is already inserted into the ground. The element joint portions 13 and 13 provided at the corners on the closing side of 20 are fitted and joined. And in the state which fitted both joints, the new general part steel element 20 is inserted in the underground toward the element axial direction, along with the already inserted general part steel element 20.
[0046]
Hereinafter, by repeating the general element insertion process sequentially as described above, an element structure can be configured by the steel elements 10 and 20 inserted into the ground and joined to each other. For example, a flat structure or an element structure having a shape surrounded by a semicircle, a circle, an ellipse, or the like.
[0047]
Next, concrete or the like is filled in each element as necessary. Next, the element structure formed in the ground is used as a protective work to excavate the soil and the like inside the element structure. Next, an underground structure can be constructed by performing construction such as covering the inner surface of the element with concrete.
[0048]
When the element structure has a “B” -shaped cross section or the like, a corner where the element bends at a right angle is required. In this corner portion, a corner portion constituting element 30 having a different configuration from the reference pipe steel element 10 and the general portion steel element 20 is used.
[0049]
Next, the configuration of the corner steel element 30 will be described with reference to FIG. FIG. 3 shows a cross-sectional view of a connecting structure 41 between the corner steel element 30 that is the lower end position of the left side wall of the element structure E1 shown in FIG. 1 and the left end of the lower floor slab 40. FIG. 3 shows a cross-sectional view of the corner steel element 30 and the coupling structure 41 when cut along a plane perpendicular to the element axial direction.
[0050]
As shown in FIG. 3, the corner steel element 30 has five steel plate members 31, 31, 32, 34, 34, two element joint parts 13, and two element joint parts 23. is doing. The steel plate-like member 31 and the other steel plate-like member 31 are arranged so as to face each other and extend in the element axial direction. The steel plate-like member 34 and the other steel plate-like member 34 are arranged so as to face each other and are arranged so as to be perpendicular to the steel plate-like member 31 and extend in the element axial direction. The The steel plate-like member 32 is arranged so as to be perpendicular to the steel plate-like member 31 and parallel to the steel plate-like member 34, and extends in the element axial direction. Thereby, the five steel plate-shaped members 31, 31, 32, 34, and 34 form a steel member having a rectangular tubular cross section as a whole.
[0051]
Further, of the four corners of the rectangular tubular cross section formed by the steel plate-like members 31, 31, 32, 34, 34, one direction in the direction perpendicular to the element axis, for example, in the vertical direction in FIG. Element joint portions 23, 23 are provided along the element axial direction at two corners adjacent to each other, that is, at the upper left corner and the upper right corner in FIG.
[0052]
Also, the elements along the element axial direction are arranged at two corners adjacent to each other in the other direction perpendicular to the above-described vertical direction, for example, the left-right direction in FIG. 3, that is, the upper right corner and the lower right corner in FIG. Joint portions 13 and 13 are provided.
[0053]
The structure of each element joint part 13 and 23 is completely the same as the above. The steel plate-like members 31, 32, and 34 have a predetermined strength and a predetermined cross section that can resist the force in the direction perpendicular to the element axis transmitted from the element joint portions 13 and 23. Moreover, each joining location of each steel plate-shaped member 31, 32, 31, 34 and each element joint part 13 and 23 is joined by the welding part. This joining may be a mechanical joining such as a bolt.
[0054]
The corner steel elements 30 are also provided at the upper right, lower right, and upper left corners of the element structure E1. With the above-described configuration, the corner steel element 30 has a component in each direction of the “L” -shaped corner portion of the force in the direction perpendicular to the element axis, for example, the horizontal direction (horizontal direction) in FIG. The component can be transmitted by the horizontal element joint portion 13 provided on the corner steel element 30 side and the joint portion (for example, the element joint portion 23) provided on the counterpart side. Of the force perpendicular to the element axis, the component in the vertical direction (vertical direction) includes the vertical element joint 13 provided on the corner steel element 30 side and the joint provided on the mating side. It can be transmitted by a part (for example, element joint part 23).
[0055]
The insertion of the corner portion steel element 30 into the ground is exactly the same as the case of the reference portion steel element 10 and the general portion steel element 20 described above, and is adjacent to the ground portion already inserted into the ground. Insert it along the element. The same applies to the general steel element 20 adjacent to the lower corner steel element 30.
[0056]
For the corner steel element 30 described above, a large tensile force may be generated inside the corner of the element structure, for example, the upper right corner in FIG. The steel plate-like member 34 can be made to bear and the strength of the element structure can be increased.
[0057]
Further, when the tensile force inside the corner portion (upper right corner portion in FIG. 3) of the element structure is small, the upper steel plate member 34 may be omitted. Alternatively, when construction is performed (when the corner steel element 30 is inserted), the steel plate-like member 34 is omitted, and a “U” -shaped cross section is provided. The steel plate-like member 34 may be attached by, for example, mechanical joining. The lower steel plate-like member 34 can be added or omitted as appropriate.
[0058]
In the underground structure 101 of the first embodiment, the lower floor slab 40 is made of cast-in-place reinforced concrete, and the lower end of the side wall of the element structure E1 and the lower floor slab 40 are rigidly connected by connecting structures 41 and 42. The coupling structure 41 at the lower left corner of the underground structure 101 and the coupling structure 42 at the lower right corner have exactly the same configuration. Next, the structure of the joint structure 41 at the lower left corner of the underground structure 101 will be described.
[0059]
As shown in FIG. 3, the coupling structure portion 41 includes a connection joint member 43, a coupling reinforcing bar 44, and a cast-in-place concrete 45.
[0060]
FIG. 4 is a diagram illustrating the configuration of the connection joint member 43 in the coupling structure portion 41 illustrated in FIG. 3. As shown in the cross-sectional view of FIG. 4A (cross-sectional view when cut along a plane perpendicular to the element axial direction), the connection joint member 43 has a so-called straight steel sheet pile 46 along the center line in the longitudinal direction of the sheet pile. And cut into two equal parts.
[0061]
The connection joint member 43 has a steel flat plate portion 43a and a joint joint portion 43b. The steel flat plate portion 43a is a flat plate portion made of steel having a “−”-shaped cross section and extending in the element axial direction. The joint joint 43b is made of steel, and is a portion of a substantially “C” -shaped cross section formed along the element axial direction at one end of the “−”-shaped cross section of the steel flat plate portion 43a. It has the same configuration as the element joint portion 13 described above.
[0062]
FIG. 4B is a perspective view showing the arrangement relationship between the connecting joint member 43 and the coupling reinforcing bar 44 and the configuration of both. As shown in FIG. 4B, among the steel flat plate portion 43a of the connection joint member 43, a plurality of coupling rebars 44 are provided in the vicinity of the other end portion on the side opposite to the one end portion where the coupling joint portion 43b is provided. Provided and arranged side by side so as to extend along a direction perpendicular to the element axial direction. These connecting reinforcing bars 44 are joined to the steel flat plate portion 43 a by a welded portion 47. The joining of the steel flat plate portion 43a and the connecting reinforcing bar 44 may be a mechanical joining such as a bolt.
[0063]
With the above structure, as shown in FIG. 3, the joint joint portion of the element joint portion 13 at the upper right corner of the steel element 30 at the lower corner of the left side wall of the element structure E1 and the joint joint member 43 at the upper stage is provided. 43b are fitted to each other, and the element joint 13 at the lower right corner of the corner steel element 30 and the joint joint 43b of the lower connection joint member 43 are fitted to each other, thereby making the corner steel. A force in a direction perpendicular to the element axis can be transmitted between the element 30 and the coupling structure portion 41.
[0064]
Further, as shown in FIG. 3, the jointed reinforcing bar 44 joined to the connection joint member 43 is provided with a reinforced concrete joint 49 in place of the in-situ reinforced concrete of the lower floor slab 40. Accordingly, the force transmitted from the element joint 13 of the corner steel element 30 at the lower end of the left side wall of the element structure E1 to the connection joint member 43 by the joint joint 43b from the joint rebar 44 to the on-site reinforced concrete rebar. 49 is transmitted to the lower floor slab 40.
[0065]
Further, as shown in FIG. 3, a band reinforcing bar 48 that surrounds the band may be arranged in the connecting reinforcing bar 44 to further reinforce it.
[0066]
Next, the 1st method for constructing the connection structure part 41 is demonstrated.
[0067]
First, two members (hereinafter referred to as “joining members”) formed in a state shown in FIG. 4B by welding a plurality of joint reinforcing bars 44 to the connection joint member 43 are prepared in advance.
[0068]
Next, the earth and sand in the element structure E1 is excavated to the bottom position of the corner steel element 30 (the position of the steel plate member 32 in FIG. 3).
[0069]
Next, the coupling joint portion 43b of one coupling member is fitted into the element coupling portion 13 at the upper right corner of the corner steel element 30, and inserted so as to slide in the element axial direction. Thereafter, the grout material is injected into the inside of the fitting space (the portion corresponding to 13e or 23e in FIG. 2A) formed inside the joint joint portion 43b and the element joint portion 13 that are fitted to each other, and is cured. . Thereby, one coupling member can be fixed to the corner steel element 30.
[0070]
Similarly, the coupling joint portion 43b of the other coupling member is fitted into the element coupling portion 13 at the lower right corner of the corner steel element 30, and is inserted so as to slide in the element axial direction, and fitted together. A grout material is injected into a fitting space formed inside the joint joint portion 43 b and the element joint portion 13 and hardened, and the other joint member is fixed to the corner steel element 30.
[0071]
Next, the connecting reinforcing bar 44 of the connecting member and the in-situ reinforced concrete reinforcing bar 49 of the lower floor slab 40 are overlapped to form a lap joint. Further, if necessary, the periphery of the joint reinforcing bar 44 is surrounded by the band reinforcing bar 48 to reinforce. Thereafter, the cast-in-place concrete 45 is placed and cured. Thereby, the lower floor 40 of the underground structure 101 and the corner steel element 30 can be rigidly coupled.
[0072]
Next, the 2nd method for constructing the connection structure part 41 is demonstrated.
[0073]
First, the earth and sand in the element structure E1 is excavated to the bottom position of the corner steel element 30 (the position of the steel plate member 32 in FIG. 3).
[0074]
Next, the joint joint portion 43b of one connection joint member 43 is fitted into the element joint portion 13 at the upper right corner of the corner steel element 30, and is inserted so as to slide in the element axial direction. Thereafter, the grout material is injected into the inside of the fitting space (the portion corresponding to 13e or 23e in FIG. 2A) formed inside the joint joint portion 43b and the element joint portion 13 that are fitted to each other, and is cured. . Thereby, one connection joint member 43 can be fixed to the corner steel element 30.
[0075]
Next, among the connecting joint members 43, a plurality of connecting reinforcing bars 44 are arranged by welding or the like so as to extend in the direction perpendicular to the element axis in the vicinity of the other end opposite to the one end provided with the connecting joint 43b. Bonded to the state shown in FIG.
[0076]
Next, in the same manner as described above, the joint joint portion 43b of the other connection joint member 43 is fitted to the element joint portion 13 at the lower right corner of the corner steel element 30, and is slid in the element axial direction. The grout material is injected into the fitting space formed inside the joint joint portion 43b and the element joint portion 13 which are inserted and fitted to each other and hardened, and the other joint joint member 43 is made of a corner steel element. Fix to 30.
[0077]
Thereafter, in the same manner as described above, among the other connecting joint members 43, a plurality of connecting reinforcing bars 44 extend in the direction perpendicular to the element axis in the vicinity of the other end opposite to the one end provided with the connecting joint 43b. In this way, they are aligned and joined by welding or the like to obtain a state as shown in FIG.
[0078]
Next, the joint reinforcing bar 44 and the in-situ reinforced concrete reinforcing bar 49 of the lower floor slab 40 are overlapped to form a lap joint. Further, if necessary, the periphery of the joint reinforcing bar 44 is surrounded by the band reinforcing bar 48 to reinforce. Thereafter, the cast-in-place concrete 45 is placed and cured. Thereby, the lower floor 40 of the underground structure 101 and the corner steel element 30 can be rigidly coupled.
[0079]
As shown in FIG. 5, the band reinforcing bars may be arranged like 48a, 48b, and 48c by sequentially shifting the surrounding connecting reinforcing bars 44 so as to form a so-called “staggered arrangement”. By comprising in this way, it can be set as a firmer structure so that the rising part of a band reinforcement may not concentrate.
[0080]
(2) Second embodiment
Next, a second embodiment of the present invention will be described.
[0081]
FIG. 6 is a cross-sectional view showing the overall configuration of an underground structure that is the second embodiment of the present invention.
[0082]
As shown in FIG. 6, the underground structure 102 is a box-shaped structure having a “B” -shaped cross-sectional shape. The underground structure 102 includes an element structure E2 having a cross-sectional shape in which only a part near the center of the lower part of the “R” shape is cut off, and a closed structure portion 51.
[0083]
The element structure E2 includes a reference pipe steel element 10 installed at the center position of the upper floor slab, a general steel element 20 installed so as to be adjacent to the reference pipe steel element 10, and an element structure. Since the corner steel elements 30 installed at the four corner positions are combined, the structure of each steel element 10, 20, 30 is exactly the same as in the first embodiment. The description is omitted.
[0084]
The difference between the underground structure 102 of the second embodiment and the underground structure 101 of the first embodiment is that it includes a closed structure portion 51 that is provided between the general steel elements 20 and is rigidly coupled. .
[0085]
FIG. 7 shows a configuration of the closing structure portion 51. FIG. 7 shows a cross-sectional view of the steel element cut along a plane perpendicular to the element axial direction.
[0086]
As shown in FIG. 7, the closing structure 51 includes a cage member 59, protective members 52 a and 52 b, and a cast-in-place concrete 55.
[0087]
In the cage member 59, another connecting joint member 43 is joined by welding or the like to the end of the connecting bar 44 (the end opposite to the connecting joint member 43) of the connecting member as shown in FIG. 4B. Two members (hereinafter referred to as “fence-like members”) are used, the two fence-like members 57a and 57b are arranged opposite to each other so that the connecting reinforcing bars 44 are parallel to each other, and each of the fence-like members 57a and 57b. The rebars 44 are surrounded by the rebars 58, and the rebars 58 are appropriately joined to the rebars 44. The steel flat plate portion 43a and the connecting rebar 44 in the fence-like member may be joined by mechanical joining such as bolts.
[0088]
With the structure as described above, as shown in FIG. 7, the element joint portion 23 at the upper right corner of the general steel element 20L on the left side in the vicinity of the lower center of the element structure E2 (see FIG. 6), and the cage member The joint joint 43b at the left end of the upper fence-like member 57a of the upper 59 is fitted to each other, the element joint 23 at the lower right corner of the left general steel element 20L, and the lower fence-like form of the cage-like member 59 The coupling joint portion 43b at the left end of the member 57b is fitted to each other.
[0089]
Further, the element joint 23 at the upper left corner of the right general steel element 20R near the lower center of the element structure E2 (see FIG. 6) and the right end of the upper fence-like member 57a of the cage member 59 are connected. The joint 43b fits together, and the element joint 23 at the lower left corner of the right general steel element 20R and the joint joint 43b at the right end of the lower fence-like member 57b of the cage member 59 are fitted together. Match.
[0090]
As shown in FIG. 7, in the upper and lower fence members 57a and 57b constituting the cage member 59, the connecting joint members 43 and the connecting reinforcing bars 44 at both ends are joined by welding or the like.
[0091]
With such a configuration, the force in the direction perpendicular to the element axis can be transmitted between the left general-part steel element 20L, the closing structure 51, and the right general-part steel element 20R.
[0092]
Next, the construction method of the closed structure part 51 is demonstrated.
[0093]
First, the cage member 59 is prepared in advance.
[0094]
Next, the above-described reference pipe steel element 10, the general part steel element 20, the element joint parts 13 and 23 of the corner steel element 30, etc. are inserted into the ground and fitted together. The grout material is injected into the element joint and hardened, and the steel elements are repeatedly fixed. The multiple steel elements are connected in the ground, and a portion near the lower center of the “B” character (general part steel) An element structure E2 having a cross section with a shape lacking between the elements 20L and 20R is formed in the ground.
[0095]
Next, the protective member 52a is inserted into the ground above this location (hereinafter referred to as the “close location”) in a state where the general steel elements 20L and 20R are not closed. Similarly, the protective member 52b is inserted into the ground below the closing location. Steel plates or the like are used as the protection members 52a and 52b. In this case, both ends of the protection members 52a and 52b are joined to the general steel elements 20L and 20R by a joining member 53 such as welding. The joining of the joining member 53 to the general steel element 20L or the like may be a mechanical joining such as a bolt.
[0096]
Next, as shown in FIG. 8A, the protective members 52a and 52b are used as earth retaining means, the ground inside the portion surrounded by the protective members 52a and 52b is excavated and removed, and the closed space 54 Form.
[0097]
After that, as shown in FIG. 8 (B), the coupling joint portion 43b of the cage member 59 described above is fitted to the element joint portion 23 such as the general steel element 20L and inserted so as to slide in the element axial direction. Then, the cage member 59 is inserted into the excavated closed space 54.
[0098]
Next, as shown in FIG. 8C, using the protective members 52a and 52b as a concrete formwork, the cast-in-place concrete 55 is placed in the closed space 54 in which the cage member 59 is inserted and cured. . Thereby, the closing structure part 51 is completed, and the element structure E2 is closed with a “B” -shaped cross section.
[0099]
Next, using the “B” -shaped structure closed as described above as a protective work, the ground inside is excavated. Next, an underground structure is constructed using the closed “B” -shaped structure as the main body structure.
[0100]
If constructed in this way, the element structure can be rigidly closed and closed in a short time, and the construction accuracy can be improved.
[0101]
The present invention is not limited to the above embodiments. Each of the embodiments described above is an exemplification, and any configuration that has substantially the same configuration as the technical idea described in the claims of the present invention and has the same operational effects can be used. It is included in the technical scope of the present invention.
[0102]
For example, in the said embodiment, although the example which forms a connection joint member (for example, 43) by cut | disconnecting a linear steel sheet pile was demonstrated, this invention is not limited to this example, The connection joint member of another structure For example, the connection joint member may be formed by joining an element joint portion (for example, 13 or 23) to one side end of a strip-shaped steel plate by welding or mechanical joining.
[0103]
In the above embodiment, the element structure is formed by the reference tube steel element 10 and the corner steel element 30 having a rectangular tubular cross section, and the general steel element 20 having a substantially “U” -shaped cross section. Although the example which comprises is explained, the present invention is not limited to this example, steel elements of other constitutions, for example, a substantially “day” shape, a substantially “eye” shape, a substantially “field” shape, It may be a steel element having a substantially “circle” -shaped cross section.
[0104]
Moreover, in the said embodiment, although the case where the element coupling part (for example, 13 or 23) was provided in the corners, such as the reference | standard pipe steel element 10, etc. was mentioned as an example, this invention is shown in this example. It is not limited, You may comprise so that an element coupling part may be provided in the steel element of another structure, for example, the intermediate part of the edge | side of a steel element.
[0105]
【The invention's effect】
As described above, according to the present invention, a connection joint member having a joint joint portion is used, and the joint joint portion is fitted to an element joint portion of an existing steel element and used as a reinforcement member for in-situ concrete. Therefore, even in a narrow space of the steel element, there is an advantage that the work is easy, the workability is good, and the work accuracy is improved.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing an overall configuration of an underground structure according to a first embodiment of the present invention.
FIG. 2 is a diagram showing a configuration of a reference pipe steel element and a general part steel element in the underground structure of FIG. 1;
3 is a cross-sectional view showing a configuration of a connecting structure portion of a corner steel element and a lower floor slab in the underground structure of FIG. 1;
4 is a diagram showing a configuration of a connection joint member in the coupling structure portion of FIG. 3;
FIG. 5 is a diagram showing a state of arrangement of band reinforcing bars in the coupling structure portion of FIG. 3;
FIG. 6 is a cross-sectional view showing an overall configuration of an underground structure according to a second embodiment of the present invention.
7 is a diagram showing a configuration of a closed structure portion in the underground structure of FIG. 6;
8 is a diagram illustrating a construction method of a closed structure portion in the underground structure of FIG.
[Explanation of symbols]
10 Reference pipe steel element
11, 12 Steel plate-like member
13 Element joint
13a Fitting part
13b base
13c, 13d Projection
13e groove
20, 20L, 20R General steel element
21, 22 Steel plate-like member
23 Element joint
23a Fitting part
23b base
23c, 23d Projection
23e groove
30 Corner steel element
31, 32, 34 Steel plate-like members
40 Lower floor version
41, 42 Bonding structure
43 Connection joint members
43a Steel plate
43b Joint joint
44 Reinforcing bar
45 Cast-in-place concrete
46 Straight steel sheet pile
47 Welded part
48, 48a-48c Reinforcing bars
49 Reinforcement for on-site reinforced concrete
51 Closure structure
52a, 52b Protective member
53 Joining members
54 closed space
55 On-site concrete
57a, 57b Fence-like member
58 Reinforcing bar
59 Basket-shaped member
101, 102 Underground structure
E1, E2 element structure
L Chuo Line
W1-W6 weld zone

Claims (8)

エレメント軸方向に延設される鋼製部材に前記エレメント軸方向に沿って略「C」字状断面のエレメント継手部を設け、隣接するエレメント継手部の嵌合により相互の接合を行うとともに、前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能とした鋼製エレメントと現場打ち鉄筋コンクリートを結合する構造であって、
「−」字状断面を有しエレメント軸方向に延在する鋼製平板部の前記「−」字状断面における一端部に前記エレメント軸方向に沿って略「C」字状断面の結合継手部が設けられた接続継手部材の前記結合継手部と前記鋼製エレメントのエレメント継手が嵌合され、前記嵌合された各継手部の内部に形成される嵌合空間内にグラウト材が注入され硬化することにより前記接続継手部材が固定され、前記接続継手部材の前記結合継手部が設けられた前記一端部とは反対側の他端部付近に設けられ前記エレメント軸直角方向に延びるようにして並設された複数の結合鉄筋と現場打ち鉄筋コンクリート用鉄筋が重ね合わせ配置されて重ね鉄筋継手が形成され現場打ちコンクリートが打設され硬化することにより前記鋼製エレメントと現場打ち鉄筋コンクリートが結合されること
を特徴とする鋼製エレメントと現場打ち鉄筋コンクリートの結合構造。
A steel member extending in the element axial direction is provided with an element joint portion having a substantially “C” -shaped cross section along the element axial direction, and the elements are joined to each other by fitting adjacent element joint portions. It is a structure that joins steel elements and in-situ reinforced concrete that can transmit the force in the direction perpendicular to the element axis that is perpendicular to the element axis direction,
A joint joint portion having a substantially “C” -shaped cross section along the element axial direction at one end of the “−”-shaped cross section of the steel flat plate portion having a “−”-shaped cross section and extending in the element axial direction The joint joint part of the connection joint member provided with the element joint of the steel element is fitted, and a grout material is injected into the fitting space formed inside each of the fitted joint parts and hardened. By doing so, the connecting joint member is fixed, and the connecting joint member is provided in the vicinity of the other end portion of the connecting joint member opposite to the one end portion where the connecting joint portion is provided. The steel elements and the cast-in-place reinforced steel joint are formed by superposing and arranging a plurality of jointed reinforcing bars and the steel-reinforced concrete for the cast-in-place reinforced concrete to form a lap joint. Coupling structure steel elements and cast-in-place reinforced concrete, characterized in that REITs are combined.
請求項1記載の鋼製エレメントと現場打ち鉄筋コンクリートの結合構造において、
前記接続継手部材は、「−」字状断面を有し長手方向に延在する鋼製平板部の前記「−」字状断面における両端部に前記長手方向に沿って略「C」字状断面の結合継手部が設けられた直線鋼矢板の前記鋼製平板部を前記長手方向に沿って切断することにより形成されること
を特徴とする鋼製エレメントと現場打ち鉄筋コンクリートの結合構造。
In the combined structure of the steel element according to claim 1 and on-site reinforced concrete,
The connection joint member has a substantially “C” -shaped cross section along the longitudinal direction at both ends of the “−”-shaped cross section of the steel flat plate portion having a “−”-shaped cross section and extending in the longitudinal direction. A steel element and in-situ reinforced concrete connection structure formed by cutting the steel flat plate portion of a straight steel sheet pile provided with a joint joint portion of the steel plate along the longitudinal direction.
請求項1記載の鋼製エレメントと現場打ち鉄筋コンクリートの結合構造において、
前記結合鉄筋は、溶接又は機械的接合により前記鋼製平板部に接合されること
を特徴とする鋼製エレメントと現場打ち鉄筋コンクリートの結合構造。
In the combined structure of the steel element according to claim 1 and on-site reinforced concrete,
The joint structure of the steel element and the in-situ reinforced concrete, wherein the joint reinforcement is joined to the steel flat plate portion by welding or mechanical joining.
請求項1記載の鋼製エレメントと現場打ち鉄筋コンクリートの結合構造において、
前記結合鉄筋は、帯鉄筋により取り囲まれて補強されること
を特徴とする鋼製エレメントと現場打ち鉄筋コンクリートの結合構造。
In the combined structure of the steel element according to claim 1 and on-site reinforced concrete,
The bonded reinforcing bar is surrounded and reinforced by a band reinforcing bar, and is a bonded structure of a steel element and a cast-in-place reinforced concrete.
エレメント軸方向に延設される鋼製部材に前記エレメント軸方向に沿って略「C」字状断面のエレメント継手部を設け、隣接するエレメント継手部の嵌合により相互の接合を行うとともに、前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能とした鋼製エレメントと現場打ち鉄筋コンクリートを結合する方法であって、
「−」字状断面を有しエレメント軸方向に延在する鋼製平板部の前記「−」字状断面における一端部に前記エレメント軸方向に沿って略「C」字状断面の結合継手部が設けられた接続継手部材の前記結合継手部が設けられた前記一端部とは反対側の他端部付近に複数の結合鉄筋が前記エレメント軸直角方向に延びるようにして並設された結合部材の前記結合継手部と前記鋼製エレメントのエレメント継手を嵌合させ、
次いで、前記嵌合した継手内に形成される嵌合空間内にグラウト材を注入して硬化させることにより前記結合部材を固定し、
次いで、前記結合鉄筋と現場打ち鉄筋コンクリート用鉄筋を重ね合わせ配置して重ね鉄筋継手を形成し現場打ちコンクリートを打設し硬化させること
を特徴とする鋼製エレメントと現場打ち鉄筋コンクリートの結合方法。
A steel member extending in the element axial direction is provided with an element joint portion having a substantially “C” -shaped cross section along the element axial direction, and the elements are joined to each other by fitting adjacent element joint portions. A method of joining a steel element capable of transmitting a force perpendicular to the element axis direction, which is a direction perpendicular to the element axis direction, and a cast-in-place reinforced concrete,
A joint joint portion having a substantially “C” -shaped cross section along the element axial direction at one end of the “−”-shaped cross section of the steel flat plate portion having a “−”-shaped cross section and extending in the element axial direction A connecting member in which a plurality of connecting reinforcing bars extend in a direction perpendicular to the element axis in the vicinity of the other end opposite to the one end where the connecting joint is provided. The coupling joint portion of the steel element and the element joint of the steel element are fitted,
Subsequently, the coupling member is fixed by injecting and curing a grout material in a fitting space formed in the fitted joint.
Next, a method of joining a steel element and a cast-in-place reinforced concrete, characterized in that the jointed reinforcing bar and the steel-reinforced concrete for in-situ reinforced concrete are arranged to overlap to form a lap joint, and the cast-in-place concrete is cast and cured.
エレメント軸方向に延設される鋼製部材に前記エレメント軸方向に沿って略「C」字状断面のエレメント継手部を設け、隣接するエレメント継手部の嵌合により相互の接合を行うとともに、前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能とした鋼製エレメントと現場打ち鉄筋コンクリートを結合する方法であって、
「−」字状断面を有しエレメント軸方向に延在する鋼製平板部の前記「−」字状断面における一端部に前記エレメント軸方向に沿って略「C」字状断面の結合継手部が設けられた接続継手部材の前記結合継手部と前記鋼製エレメントのエレメント継手を嵌合させ、
次いで、前記嵌合した継手内に形成される嵌合空間内にグラウト材を注入して硬化させることにより前記接続継手部材を固定し、
次いで、前記接続継手部材の結合継手部が設けられた前記一端部とは反対側の他端部付近に複数の結合鉄筋を前記エレメント軸直角方向に延びるようにして並設し、
次いで、前記結合鉄筋と現場打ち鉄筋コンクリート用鉄筋を重ね合わせ配置して重ね鉄筋継手を形成し現場打ちコンクリートを打設し硬化させること
を特徴とする鋼製エレメントと現場打ち鉄筋コンクリートの結合方法。
A steel member extending in the element axial direction is provided with an element joint portion having a substantially “C” -shaped cross section along the element axial direction, and the elements are joined to each other by fitting adjacent element joint portions. A method of joining a steel element capable of transmitting a force perpendicular to the element axis direction, which is a direction perpendicular to the element axis direction, and a cast-in-place reinforced concrete,
A joint joint portion having a substantially “C” -shaped cross section along the element axial direction at one end of the “−”-shaped cross section of the steel flat plate portion having a “−”-shaped cross section and extending in the element axial direction And fitting the joint joint portion of the connection joint member provided with the element joint of the steel element,
Subsequently, the connecting joint member is fixed by injecting and curing a grout material in a fitting space formed in the fitted joint,
Next, a plurality of coupling reinforcing bars are arranged in parallel so as to extend in the direction perpendicular to the element axis in the vicinity of the other end portion on the side opposite to the one end portion where the coupling joint portion of the connection joint member is provided,
Next, a method of joining a steel element and a cast-in-place reinforced concrete, characterized in that the jointed reinforcing bar and the steel-reinforced concrete for in-situ reinforced concrete are arranged to overlap to form a lap joint, and the cast-in-place concrete is cast and cured.
エレメント軸方向に延設される鋼製部材に前記エレメント軸方向に沿って略「C」字状断面のエレメント継手部を設けて前記エレメント軸方向に直角な方向であるエレメント軸直角方向の力を伝達可能とした鋼製エレメントを、前記エレメント軸方向を挿入方向として地中に挿入し、
次いで、他の鋼製エレメントを、前記エレメント継手部どうしを相互に嵌合させつつ地中に挿入し、前記嵌合したエレメント継手部内にグラウト材を注入し硬化させて前記鋼製エレメントどうしを固定することを繰り返して複数の鋼製エレメントを地中で連結させ、
次いで、前記複数の鋼製エレメントが閉合する前に、閉合箇所の地盤を掘削して閉合空間を形成し、
次いで、「−」字状断面を有しエレメント軸方向に延在する鋼製平板部の前記「−」字状断面における一端部に前記エレメント軸方向に沿って略「C」字状断面の結合継手部が設けられた接続継手部材の前記結合継手部が設けられた前記一端部とは反対側の他端部付近に複数の結合鉄筋が前記エレメント軸直角方向に延びるようにして並設された結合部材を2個用いて前記結合鉄筋が対向するように配置させた構造体を上下2段に平行配置して前記結合鉄筋を帯鉄筋で取り囲んでカゴ状に構成したカゴ状部材の前記結合継手部と前記閉合空間内のエレメント継手を相互に嵌合させつつ前記カゴ状部材を前記掘削された閉合空間内に挿入し、次いで、前記カゴ状部材が挿入された閉合空間内に現場打ちコンクリートを打設し硬化させ、
次いで、前記地中で連結された鋼製エレメントと前記閉合空間に形成された現場打ち鉄筋コンクリートによって構成されたエレメント構造体を防護工として前記エレメント構造体の内部の地盤を掘削し、
次いで、前記エレメント構造体を本体として利用して地下構造物を構築すること
を特徴とする地下構造物構築方法。
A steel member extending in the element axial direction is provided with an element joint portion having a substantially “C” -shaped cross section along the element axial direction, and the force in the direction perpendicular to the element axial direction is perpendicular to the element axial direction. Insert the steel element that can be transmitted into the ground with the element axial direction as the insertion direction,
Next, another steel element is inserted into the ground while fitting the element joints to each other, and grout material is injected into the fitted element joints and cured to fix the steel elements. Repeatedly to connect multiple steel elements in the ground,
Next, before the plurality of steel elements are closed, the closed space is excavated to form a closed space,
Next, a substantially “C” -shaped cross-section is bonded to one end of the “−”-shaped cross section of the steel flat plate portion having a “−”-shaped cross section and extending in the element axial direction along the element axial direction. A plurality of connecting reinforcing bars are juxtaposed so as to extend in the direction perpendicular to the element axis in the vicinity of the other end portion of the connecting joint member provided with the joint portion on the side opposite to the one end portion provided with the joint joint portion. The coupling joint of the cage-shaped member constructed by using two coupling members so that the coupling reinforcing bars are opposed to each other and arranged in parallel in two upper and lower stages and surrounding the coupling reinforcing bars with band reinforcing bars. The cage-shaped member is inserted into the excavated closed space while the element joint in the closed space is fitted to each other, and then the cast-in-place concrete is inserted into the closed space in which the cage-shaped member is inserted. Cast and harden,
Then, excavating the ground inside the element structure as a protective work element structure composed of steel elements connected in the ground and on-site reinforced concrete formed in the closed space,
Next, an underground structure construction method comprising constructing an underground structure using the element structure as a main body.
請求項7記載の地下構造物構築方法において、
前記閉合箇所には、前記閉合空間を掘削する時の土留めと前記現場打ちコンクリートを打設する時の型枠の機能を有する保護部材が配置されること
を特徴とする地下構造物構築方法。
In the underground structure construction method according to claim 7,
The underground construction method according to claim 1, wherein a protective member having a function of a formwork for placing the earth retaining when excavating the closed space and the cast-in-place concrete is disposed at the closed location.
JP28542299A 1999-10-06 1999-10-06 Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method Expired - Lifetime JP3882882B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28542299A JP3882882B2 (en) 1999-10-06 1999-10-06 Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28542299A JP3882882B2 (en) 1999-10-06 1999-10-06 Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method

Publications (2)

Publication Number Publication Date
JP2001107678A JP2001107678A (en) 2001-04-17
JP3882882B2 true JP3882882B2 (en) 2007-02-21

Family

ID=17691326

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28542299A Expired - Lifetime JP3882882B2 (en) 1999-10-06 1999-10-06 Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method

Country Status (1)

Country Link
JP (1) JP3882882B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101266113B1 (en) * 2012-08-28 2013-05-27 주식회사 청문티앤씨 Joint construction method for steel tube for non-open cut excavation

Also Published As

Publication number Publication date
JP2001107678A (en) 2001-04-17

Similar Documents

Publication Publication Date Title
KR102712549B1 (en) Structure using precast concrete and cast-in-place concrete and construction method thereof
JP5061804B2 (en) Joint structure of a pair of full PC members
KR101255027B1 (en) Precast rahmen type box culvert
JP3882882B2 (en) Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method
JP2000120372A (en) Reference pipe steel element, general steel element, corner steel element, and method of constructing underground structure
JP2003027462A (en) Construction method of underground continuous wall, and construction method of underground structure
JP3765719B2 (en) Closure adjustment element and underground structure construction method
KR20220065461A (en) WIRE STRUCTURE FOR STAGGERED LAPPING IN SLURRY WALL, SLURRY WALL and CONSTRUCTION METHOD FOR THE SAME
JP3668194B2 (en) Continuous underground wall construction method
JP3802009B2 (en) Method for joining joints of split reinforced concrete structure elements
JP3251698B2 (en) Tunnel lining element and tunnel construction method using the same
JP4382974B2 (en) Connection structure of wall and sheet pile member
JP3799185B2 (en) Reference pipe steel element, general steel element, corner steel element, and underground structure construction method
JPH07252884A (en) Construction method of frame with precast members
JP5559075B2 (en) Underground structure
JP3691707B2 (en) Top plate construction method for steel pipe sheet pile well foundation
JPH07292858A (en) Structure for connecting pc member
JP7757594B2 (en) Grout injection formwork and grout injection method
JP7611004B2 (en) Wall beam and full precast concrete slab joint structure
JP3923230B2 (en) Underground excavation element and underground structure construction method
JPH0749757B2 (en) Tunnel construction method using tunnel lining element
JP3923237B2 (en) Tunnel lining element and tunnel lining method
JP2024113855A (en) Method for constructing underground wall joints, joint forming tool and reinforcing bar cage
JPH10317488A (en) Tubular rebar joints and joint methods for reinforced concrete members.
JP2007077628A (en) Joint structure of joint and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041109

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061031

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20061102

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061107

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3882882

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101124

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111124

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121124

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131124

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term