Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3960467B2 - Water supply method in unit control operation of multi-pipe once-through boiler - Google Patents
[go: Go Back, main page]

JP3960467B2 - Water supply method in unit control operation of multi-pipe once-through boiler - Google Patents

Water supply method in unit control operation of multi-pipe once-through boiler Download PDF

Info

Publication number
JP3960467B2
JP3960467B2 JP2002099031A JP2002099031A JP3960467B2 JP 3960467 B2 JP3960467 B2 JP 3960467B2 JP 2002099031 A JP2002099031 A JP 2002099031A JP 2002099031 A JP2002099031 A JP 2002099031A JP 3960467 B2 JP3960467 B2 JP 3960467B2
Authority
JP
Japan
Prior art keywords
water level
water
boiler
steam
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002099031A
Other languages
Japanese (ja)
Other versions
JP2003294203A (en
Inventor
雅之 古山
文敏 正井
尹 戸田
訓央 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Thermal Engineering Co Ltd
Original Assignee
Kawasaki Thermal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Thermal Engineering Co Ltd filed Critical Kawasaki Thermal Engineering Co Ltd
Priority to JP2002099031A priority Critical patent/JP3960467B2/en
Publication of JP2003294203A publication Critical patent/JP2003294203A/en
Application granted granted Critical
Publication of JP3960467B2 publication Critical patent/JP3960467B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、多管式貫流ボイラの台数制御運転における給水方法に係り、詳しくは、気水分離器を介してボイラ本体に給水するようにしている複数台の多管式貫流ボイラの台数制御において、燃焼負荷急増指令を受けた過渡的な運転状態にあるボイラでの気水分離器付設水位検出器における水位の修正方法に関するものである。
【0002】
【従来の技術】
多管式貫流ボイラは、ボイラ本体に上部管寄と下部管寄及びそれらの間に接続された多数の水管群を備える。この種のボイラでは燃焼室を取り囲むように垂直な水管が多重に配置されたり、供給された排ガスと熱交換する水管が密集して配置されたりする。
【0003】
いずれにしても、それが貫流ボイラであって発生蒸気中の残留水滴と溶存不純物を除去する目的の気水分離器が設けられている場合、その基準水位は水管の上端よりも低い位置となるように設定される。それによって全ての蒸発管(水管)が上昇管として機能し、その内部全体が缶水で満たされることなく、水管上部で蒸気相が生じるようになっている。
【0004】
ボイラが正規の運転にあると、水管内で発生した気水混濁物は上部管寄から気水分離器に導入され、飽和水が分離された後の蒸気が蒸気配管を経て蒸気ヘッダへ送り出される。気水分離器は小型の多管式貫流ボイラでは不可欠であってボイラ本体より高い位置に取り付けられ、これが下部管寄と連通されているので、気水分離器に溜まった飽和水は給水配管を介してボイラ本体へ自然循環される。
【0005】
ボイラの運転中は当然のことながら本体内の缶水が蒸発して減少し、気水分離器の水面も低下する。ところで、気水分離器を介してボイラ本体に給水するようにしている場合には、缶水を供給するために水位の低下を検知する水位検出器が気水分離器に付設される。そして、水位検出器で検出された水位をもとにして水位制御装置が動作し、そこからのオン・オフ指令により給水ポンプが発停されるようになっている。
【0006】
水位検出器には設定上限水位を検出する給水ポンプオフ水位検出用電極と設定下限水位を検出する給水ポンプオン水位検出用電極とが設けられており、各電極の検出信号が水位制御装置に入力される。例えば、給水指令があった場合には設定上限水位に到達するまで給水され、給水ポンプオフ水位検出用電極が上限位置に到達した検水信号を出力すると給水は停止される。水位が下がり給水ポンプオン水位検出用電極が下限位置に缶水の無いことを検出した信号を出力すると、給水は再開される。このようにして、缶水は設定下限水位と設定上限水位との間に保たれる。
【0007】
ところで、大きい蒸発量が要求されるとき、それを一台のボイラで賄うのではなく、小容量又は中容量のボイラを複数台並べ、これらを台数制御することによって負荷の幅広い変動に対応させることができるようにすることがしばしば行われる。この場合、低負荷指令を受けて低燃焼状態が続いているボイラや、送気しないが圧力保持は行い負荷の上昇に備えるべく待機運転にあるボイラでは、設定下限水位より少し高い基準水位をとる。
【0008】
【発明が解決しようとする課題】
上記した台数制御運転で、小容量のボイラ例えば蒸発量2トン/時程度のものが数台並べられる場合、各々が0,50,100%といった三位置制御される。このような断続制御においてボイラ3台とすると、各ボイラが低圧インターロックを抜け出した後は、{(50/300)×100}%刻みで増減する大きさの負荷の変化に対応させることができる。ところが、蒸発量が4トン/時といった容量の大きいボイラで三位置による台数制御をした場合にはきめ細かい負荷対応がとりにくくなり、それが必要とされる場合には、PI制御(比例積分制御)が導入されることになる。
【0009】
このPI制御に基づく台数制御においても、三位置制御の場合と同様に、ボイラ本体の圧力により制御されるのでなく、負荷に応じて要求される蒸気ヘッダでの圧力条件に基づいて制御される。即ち、台数制御においては蒸気ヘッダが一つしか備えられず、全ボイラの気水分離器から蒸気が送り込まれる一方で、蒸気供給先での負荷の変化を系全体に反映させやすくしている。それゆえ、蒸気ヘッダからの圧力指令値に応じた負荷指令に基づき、蒸発量の増減を荷担すべく選定された一もしくは複数のボイラに対してその燃焼量が制御される。
【0010】
ところが、ボイラと蒸気ヘッダにおける台数制御圧検出部との間の配管熱容量が大きいと、制御圧検出部での圧力変動がボイラに及ぶまで時間を要し、従ってボイラ圧力と運転負荷とが必ずしも当該ボイラにとって最適なモードになるとは限らない。このような状況下で急激な負荷上昇指令があると、水管内のボイラ水は過渡的に一気に膨張して蒸発量(ボイド)を増やし、これによって水位は上がり、キャリーオーバが生じるなどしてその湿り蒸気を気水分離器に流出させる。その結果、気水分離器では水位が過剰に上昇し、水位検出器も設定上限水位を超える事態となる。
【0011】
このようなことは、気水分離作用のために蒸気を旋回させていることも原因の一つと考えられるが、貫流ボイラでは気水分離器の径が或るサイズを超えないように法規制されている関係から、ボイラ容量に応じた気水分離器のサイズアップを図ることができるとは限らないこと、急激な湿り蒸気の導入やボイドを含んだ缶水の混入が余儀なくされること、それが原因してフォーミングやバブリングが発生することなど幾つかの要因が重なって、水位検出器においては実勢とかけ離れた水位を現出させることがある。
【0012】
このような事態が生じると、図1の一点鎖線Aのように、先ず水位が設定上限水位LH を超えている時間が、ボイド等が極めて少ない場合を破線Bで表した実勢水位に比較して著しく長くなる。そのうえ、その高い水位から降下して設定下限水位LL に接近するまでにも多くの時間を要してしまうことがある。
【0013】
ところが、設定下限水位LL に到達して給水されるとこの時点で一気にボイドは下がり、水位はLD まで急落して低水位を起こす。これは、設定下限水位LL に到るまでは水位が缶水量に見合った実勢水位を呈しなく、給水された時点で急に実勢水位に戻るからである。
【0014】
このようなことが起こるのは特殊な条件が重なったときだけとはいえ、設定下限水位に到達する以前に低水位を起こしてしまっていることを意味する。設定下限水位を切ると給水が開始されはするが、缶水が減りすぎているゆえ給水に時間を要したり、蒸気の発生を停滞させたり減退させることになり、台数制御の応答を悪くするという問題がある。
【0015】
本発明は上記の問題に鑑みなされたもので、その目的は、三位置制御のみならずPI制御においても、台数制御の対象となるボイラに負荷の急増に基づいた上昇幅の大きい燃焼負荷が掛かったとき、水位検出器において実勢とかけ離れた水位が生じるのを防止して缶水量の回復遅延を回避し、応答性のよい台数制御を実現できるようにした多管式貫流ボイラの台数制御運転における給水方法を提供することである。
【0016】
【課題を解決するための手段】
本発明は、ボイラ本体からの蒸気を受け入れると共に蒸気から分離された飽和水をボイラ本体へ戻す気水分離器が備えられ、この気水分離器を介してボイラ本体に給水するようにしている多管式貫流ボイラの複数台のうち、負荷変更に対応して燃焼量変更の対象となるボイラに対し、各ボイラの気水分離器から蒸気が集められている蒸気ヘッダの圧力条件に応じた負荷指令に基づき、燃焼度を制御するようにした台数制御運転法に適用される。その特徴とするところは、図1,図2及び図4を参照して、燃焼量変更の対象となっているボイラ1Aに対する蒸気ヘッダ4からの負荷指令値の上昇幅が予め決められた上昇幅以上となっている場合(S2)、そのボイラの給水ポンプ3Aがオフであるにもかかわらず(S5)水位検出器7Aにおいて設定上限水位LH を上回る水位の検出が継続すれば(S6)、且つその継続中設定下限水位LL より高い水位も検出され続けていれば(S12)、その継続中に指令された負荷の時間積分値(K)が予め設定された負荷積算限界値を超えた時点で(S13)、予め定められた長さの時間(tc )、給水ポンプ3Aを駆動して気水分離器2Aを介したボイラ水補充を行う(S16)ようにしたことである。
【0017】
予め定められた長さの時間(tc )給水ポンプを駆動させるときの開始を、負荷の時間積分値が予め設定された負荷積算限界値を超えた時点としていることに代えて、水位検出器7Aにおいて設定上限水位LH を上回る水位の検出があったときからの時間Ta が、予め設定された待機限界時間(tb )を超えた時点としてもよい。
【0018】
【発明の実施の形態】
以下に、本発明に係る多管式貫流ボイラの台数制御運転における給水方法を、図面を参照して詳細に説明する。図2は、三台の多管式貫流ボイラ1A,1B,1Cを台数制御している場合の系統図を示す。それぞれのボイラには、ボイラ本体からの蒸気を受け入れると共に蒸気から分離された飽和水をボイラ本体の水管へ自然循環して戻す気水分離器2A,2B,2Cが備えられている。この気水分離器を介してボイラ本体に給水するようにしているため、各給水ポンプ3A,3B,3Cは、それぞれの気水分離器に接続されている。
【0019】
これらの多管式貫流ボイラから発生する蒸気は、それぞれの気水分離器を通過した後、一つの蒸気ヘッダ4に集められるようになっている。従って、台数制御装置5からの指令で、蒸気供給先の負荷変更に対応して燃焼量変更の対象となるボイラに、蒸気ヘッダの圧力条件に応じた負荷指令に基づき燃焼度を制御させることができるようになっている。
【0020】
その台数制御装置はマイクロコンピュータであり、蒸気ヘッダ4の圧力指令値を読み込み、台数制御に必要な演算をすると、各ボイラの燃焼装置6A,6B,6Cに対して燃焼量を規定する信号を出力するようになっている。尚、給水ポンプ3A,3B,3Cは、各気水分離器に付設された水位検出器7A,7B,7Cの検出信号を受けた水位制御器8A,8B,8Cによって発停される。因みに、図中の9A,9B,9Cは水面計であり、水位検出器7A,7B,7Cの水位を目視できるようにするためのものである。
【0021】
このような装置構成の台数制御系において蒸気量例えば4トン/時の貫流ボイラが使用されると、その運転制御にはPI(比例積分)制御が採用され、負荷の変更にきめ細かく対応した燃焼量の増減が可能となるよう配慮される。このPI制御によれば、いずれのボイラに対しても種々な燃焼負荷を指令することはできるが、以降の説明を簡単にするために、ボイラ1B,1Cは現在100%負荷運転されており、ボイラ1Aが40%負荷の定常的運転になっているとする。従って、全体で最大の300%に対応する蒸気量を発生させるまで、60%分の増大代があることになる。
【0022】
次に、台数制御運転における補充給水方法を述べる。図1の(a)をも参照して、従来技術の項で説明したように、一点鎖線Aは設定下限水位LL までボイド等の影響を受けた水位であるが、本発明においては、正規の給水によってボイドを消滅させるのではなく、水位が設定下限水位LL に到達するかなり以前の段階で別の給水を強制的に行い、この補充給水により水位検出器7A内の缶水の膨張を予め消滅させ、その水位を修正しておこうとするものである。
【0023】
ここで、本方法における動作の主要部分の概要を、後の説明の理解を助けるために予め述べることにする。一点鎖線A上の点M、即ち水位が未だ設定上限水位LH にある時点で、台数制御装置5から水位制御器8Aに給水命令が入るようにしておき、それに基づいて給水ポンプを3Aを少しの時間稼働させる。ボイドの存否によらず缶水が例えば水位LD に相当する量に減るまでの時間td が同じであると仮定すると、点Mで給水された後の水位は点Nに向かって降りる実線Cをたどる。
【0024】
この実線Cが設定下限水位LL に到達すると、水位制御器8Aは正規の給水を開始させるべく給水ポンプ3Aを稼働させる。その後は水位が設定下限水位LL 以上に回復し、燃焼量の大幅な変更指令が出ない限り、許容された範囲の水位を保って運転が続けられる。発生した蒸気は、気水分離器2Aを介して、他のボイラ1B,1Cからの蒸気と共に蒸気ヘッダ4に導出される。
【0025】
もう少し詳しく述べる。先ず、上記したボイラ1Aは、台数制御運転において待機運転となっているか、負荷に応じた燃焼量に基づき既に定常運転となっているボイラである。そして、このボイラが、台数制御の負荷変更制御時の燃焼量増減の対象としての扱いになっている。この場合、そのボイラの本体、気水分離器2A及び水位検出器7Aのいずれの水位も、当初は図1の(a)中の一点鎖線Aの左部分のごとく基準水位LR にある。
【0026】
いま、図1の(b)に示すように、台数制御装置5から40%負荷で定常運転にあるボイラ1Aに対して、蒸気ヘッダ4の圧力指令値に基づきその燃焼負荷をいきなり例えば100%に上げよという高燃焼指令が出たとする。PI制御で支配されているから100%まで一気にステップ状に上昇させるわけではないにしても、40%から連続的にもしくは例えば3%刻みで短時間のうちに100%に到る漸増指令が与えられる(線Xを参照)。
【0027】
このように60%もの立ち上げは燃焼度の急増を要求するものであるから、急激に加熱されたボイラ水は一気に膨張し、蒸発が活発になると同時にボイドも増え、これによって水位は大きく持ち上がる。従来技術の項でも説明したが、水位検出器7Aでは図1の(a)に示したように設定上限水位LH を超える。いま、負荷上昇幅が20%までなら問題ないが、それを超えると気水分離器2Aひいては水位検出器7Aで異常水位が現れることが予め分かっているとすると、上記の60%上昇幅は明らかに異常水位の発現域にある。
【0028】
上記の20%といった数値はボイラごとに固有のものであり、台数制御のためのソフトを導入する際に予め決めておけばよい。その値を以後、負荷上昇基準値と称することにするが、上の説明は、ボイラ1Aに対する蒸気ヘッダ4からの負荷指令値の上昇幅がこの負荷上昇基準値以上となっている場合に、即ち、このボイラがその負荷上昇指令値に見合う運転となるように現在の燃焼度からそれに対応する燃焼度となるような燃焼指令を受けている場合には、次に述べる他の条件も重なった時点で補充給水制御が働くようになっている。
【0029】
他の条件とは、このボイラ1Aの給水ポンプ3Aがオフであること、及び、水位検出器7Aにおいてポンプオフ指令水位である設定上限水位LH を上回る水位の検出が継続し、且つポンプオン指令水位である設定下限水位LL より高い水位が検出され続けているということである。即ち、前者は缶水の膨張が甚だしいことを教え、後者は今までこの監視時間中一度も給水が行われていないことを教える。
【0030】
尚、後者については水位を監視することに代えて、給水ポンプの発動の有無を監視してもできることである。給水ポンプの未発動は水位が設定下限水位LL を一度も切っていないことを意味し、一度でもポンプの発動があったときは、再度負荷上昇基準値を超える負荷指令値が出ない限り、その後には補充給水制御を実行しなければならない事態はあり得ないからである。
【0031】
ところで、上の制御において、水位が設定上限水位LH をどの程度の長さ続いたときに補充給水するのが適切であるのか、又その補充給水時間はどの程度でよいのかという点が残る。前者の決定の一つは、最も簡単にはそのボイラ特有の許容継続時間(以下待機限界時間という)を経験的に見出しておけばよい。それを制御ソフトに折り込むことで、その待機限界時間が経過した時点をもって補充給水を開始させることができる。この動作については、後に図6,図7を用いて手短に説明する。
【0032】
台数制御装置は上記したようにマイクロコンピュータであり、その高速演算機能を利用すれば、以下のような制御を導入することができる。それは、設定上限水位LH を超えている間に指令された負荷の時間積分値を求め、これが予め設定された負荷積算限界値を超えた時点で、給水ポンプを駆動してボイド等に原因した缶水の所望外の挙動の沈静化を図ろうとするものである。これによって実勢水位に修正されることは言うまでもなく、以後100%負荷に対する運転が給水ポンプ3Aのオン・オフ制御を伴いながら続けられる。
【0033】
補充給水のためのポンプの運転には、例えば10秒といった時間をあてがうことを予め定めておけばよい。この補充給水時間は気水分離器2A内の缶水収容能力と給水ポンプ3Aの吐出性能等をもとにして決めればよいものであって、長い時間を必要とするものではない。負荷積算限界値を超えたところで給水ポンプを駆動し、ボイド等の消散を図る動作は、図4及び図5のフローチャート等を用いて以下に説明される。
【0034】
台数制御運転にあるとき、蒸気ヘッダからの圧力指令値に基づく負荷上昇指令が出ると、40%負荷運転状態にあるボイラ1Aを対象にして燃焼量変更指令が出される(図4のフローチャートのステップ1、以下S1などと記す)。先ず、その負荷指令値の上昇幅が負荷上昇基準値以上であるかが判断され(S2)、それが上記した20%以上であれば、後で説明する演算記憶値Kが0と置かれる(S4)。
【0035】
この時点で、給水ポンプ3Aが動いていないかどうか、即ち水位検出器7Aで図3に示す給水ポンプオン水位検出用電極10Lがポンプオン指令水位(設定下限水位LL )を切っていないことを検出していれば(S5)、引き続いて水位が設定上限水位LH を超えているかどうか、即ち給水ポンプオフ水位検出用電極10Hがポンプオフ指令水位(設定上限水位LH )以上の水位を検出しているかどうか調べられる(S6)。因みに、図3中の符号10Eは、運転限界水位を検出するための下限水位検出用電極であり、これから検水信号が出力されなくなれば、該当するボイラのバーナは停止され、空焚きが防止される。
【0036】
現在の水位が設定上限水位LH を超えていれば、この時点で初めて補充給水の制御モードに入る。ステップ3でカウンタiが0とされているので、それを1つ上げ(S7)、iが1であることを確認して(S8)、台数制御装置5は現在の負荷指令値LCi (=LC1 )を読み込む(S9)。上記したように40%から100%に上昇する負荷指令であってもそれが例えば43,46,49,52%と徐々に増加するように上昇されているから、100%への指令が出た時刻はT0 (図1の(a)を参照)であっても、水位が設定上限水位LH を超えるまでに時間ta を要しているので、その(T0 +ta )の時刻での負荷指令値LC1 が読み込まれる。
【0037】
いま読み込んだ負荷指令値LC1 に例えば0.2秒の所定時間を乗じて、図1の(b)中の短冊状の面積となる演算記憶値F1 が求められる(S10)。そして、そのF1 を先のKに加えて、新しくKと置かれる(S11)。その時点で再度現在の水位が設定下限水位LL を切っていないか調べられる(S12)。設定下限水位LL を切っていれば給水ポンプ3Aが稼働することになるので、今の制御は以後不要となり、フローチャートはリターンして次の負荷上昇指令が出るのを待つ。
【0038】
設定下限水位LL を切っていなければ、今のKが負荷積算限界値を超えているか判断される(S13)。今は負荷指令値を一つ読み込んだだけであり、負荷積算限界値を超えている状態にないので、制御はステップ5へ戻される。以後ステップ6,7をたどる。カウンタiが2に繰り上げられているから、ステップ8を経てステップ14に進められ、ここで前回の負荷指令値の読み込みから上記した所定時間の0.2秒が経過するまで待機状態に置かれる。尚、この0.2秒は、制御が先に処理したステップ9からステップ13を経てステップ5に戻り、現在のステップ14に到達するまでに0.2秒も消費されることがないとの前提に立って定められた値である。
【0039】
その0.2秒の経過後にステップ9で現在の負荷指令値LC2 が読み込まれ、0.2秒の所定時間を乗じて、演算記憶値F2 が求められる(S10)。ステップ11でのKの値はF1 +F2 となり、ステップ12,13へと向かう。この動作がi=170まで繰り返されたとする。このとき得られたKは、170本の短冊の面積を合算した0.2×ΣLCi (i=1,2・・・170 )となる。
【0040】
この値は図1の(b)中の縦縞を施した面積で与えられる。このK170 が負荷積算限界値を超えたなら(S13)、台数制御装置5は水位制御器8Aを通じて給水ポンプ3Aの稼働を指令し、補充給水が開始される(S15)。尚、図1の(a)には、負荷の時間積分値が負荷積算限界値に達するまでの時間をtb (=0.2秒×170=34秒)で表している。
【0041】
時間がカウントされ、補充給水規定時間である例えば10秒が経過すると(S16)、給水ポンプ3Aは止められる。図1の(a)には、この補充給水する時間帯がtc として表されている。補充給水が終わると(S17)、制御はステップ1に戻される。
【0042】
この制御の間に、設定下限水位LL を下回る水位が検出されたとき(S12)や、ステップ5,6で否定回答があったときは、それまでに演算されていた負荷の時間積分値をクリアすることができるように、先に述べたステップ4においてKが0にリセットされるようになっている。
【0043】
上記した0.2×ΣLCi (i=1,2・・・・170 )は、負荷の時間積分値であることが式のうえから明らかであるので、LCi = constant の場合でも差し支えなく、本制御における演算は、図1の(c)に示したように、三位置制御などステップ状に変化する断続制御(線Yを参照)においても適用することができる。
【0044】
因みに、先に述べた負荷積算限界値は、図1の(b)の場合も(c)の場合も縦縞部分の面積であり、それが同じであることは言うまでもない。図では、負荷積算限界値に到達するまでに要する時間がtb と表されているが、(c)の場合に対応する(a)中のそれは、(b)の場合に対応する(a)中に図示されたそれよりも短くなる。
【0045】
図6及び図7のフローチャートは、水位検出器において設定上限水位を上回る水位の検出があったとき(S26)からの時間Ta が、予め設定された待機限界時間tb を超えた時点で(S33)、補充給水規定時間tc の10秒間給水ポンプを駆動して(S38)、ボイド等に原因した缶水の膨張を沈静化させるようとする例を示している。なお、ステップ27から31及び34から36は、クロックから読み出した時刻をもとに、設定上限水位を上回る水位が継続している時間を算出している。
【0046】
上記の待機限界時間とは、例えば40秒といったように単純な時間であるが、その時間は負荷上昇基準値を超えた負荷指令値の大きさに比例するなどして変化させることができるマップをソフトに加えておけば、一義的なものに陥らないようにすることができる。しかし、図4及び図5のフローチャートにおける負荷積算限界値は投入エネルギをもとにして判定することになるので、図6及び図7の場合より制御精度はよくなる。
【0047】
【発明の効果】
以上の詳細な説明から分かるように、本発明によれば、台数制御に原因して負荷指令に基づく高燃焼の要求があった場合、ボイド等の発生に伴う過剰に長い高水位が発現しても、正規の給水とは別に確保した補充給水によって解消することができる。即ち、気水分離器や水位検出器における水位が実勢水位を示すよう予め修正しておくことができる。従って、水位が設定下限水位を切った時点で既に低水位になってしまっているという事態は避けられる。
【0048】
負荷上昇が大きいことに原因した低水位が解消されれば、通常運転時のボイラ本体での挙動が維持され、台数制御の間に缶水の蒸発減退や停滞が生じるのは避けられ、ひいては応答性を損なうことのない台数制御が実現される。
【0049】
その補充給水の要否やタイミングを負荷の時間積分値をもとに判定するにしても待機限界時間をもとにするにしても、急激な燃焼負荷の上昇に伴って現出する水位を、適宜な時点で実勢水位に修正しておくことができる。負荷の時間積分値を使用する場合は制御精度の向上が期待され、待機限界時間をもとにする場合は制御の簡素化が期待される。
【図面の簡単な説明】
【図1】 本発明に係る多管式貫流ボイラの台数制御運転における給水方法を説明するもので、(a)は水位検出器内の水位の時間的変化を示したグラフ、(b)はPI制御における負荷の時間積分値の演算要領を示すグラフ、(c)は断続制御に適用した場合のグラフ。
【図2】 三台の多管式貫流ボイラが台数制御運転されるときの全体システム図。
【図3】 水位検出器の内部構造を表した概略図。
【図4】 負荷の時間積分値をもとに補充給水させる場合の手順を示したフローチャート。
【図5】 図4に続くフローチャート。
【図6】 設定上限水位を超える時間の長さをもとに補充給水させる場合の手順を示したフローチャート。
【図7】 図6に続くフローチャート。
【符号の説明】
1A,1B,1C…多管式貫流ボイラ、2A,2B,2C…気水分離器、3A,3B,3C…給水ポンプ、4…蒸気ヘッダ、5…台数制御装置、6A,6B,6C…燃焼装置、7A,7B,7C…水位検出器、10H…給水ポンプオフ水位検出用電極、10L…給水ポンプオン水位検出用電極、LH …設定上限水位(ポンプオフ指令水位)、LL …設定下限水位(ポンプオン指令水位)、LR …基準水位、LCi …負荷指令値、tb …PI制御時負荷積算限界値に達するまでの時間、及び断続制御時の待機限界時間、tc …補充給水時間。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a water supply method in a multi-tube once-through boiler control operation, and more specifically, in the number control of a plurality of multi-tube once-through boilers that supply water to a boiler body via a steam separator. The present invention relates to a method for correcting a water level in a water level detector with a steam / water separator in a boiler in a transient operating state in response to a combustion load rapid increase command.
[0002]
[Prior art]
The multi-pipe once-through boiler includes an upper header, a lower header, and a number of water pipe groups connected between the upper header and the lower header. In this type of boiler, vertical water pipes are arranged in multiple layers so as to surround the combustion chamber, and water pipes that exchange heat with the supplied exhaust gas are densely arranged.
[0003]
In any case, when it is a once-through boiler and a steam separator for removing residual water droplets and dissolved impurities in the generated steam is provided, the reference water level is lower than the upper end of the water pipe. Is set as follows. As a result, all the evaporation pipes (water pipes) function as rising pipes, and the entire interior is not filled with canned water, and a vapor phase is generated in the upper part of the water pipe.
[0004]
When the boiler is in normal operation, the air / water turbidity generated in the water pipe is introduced from the upper pipe to the water / water separator, and the steam after the saturated water is separated is sent to the steam header through the steam pipe. . The steam separator is indispensable for small multi-tube once-through boilers, and is installed at a higher position than the boiler body, which is in communication with the lower header. It is naturally circulated through the boiler body.
[0005]
During operation of the boiler, naturally, the can water in the main body evaporates and decreases, and the water level of the steam separator also decreases. By the way, when water is supplied to the boiler body via the air / water separator, a water level detector that detects a drop in the water level is attached to the air / water separator to supply can water. Then, the water level control device operates based on the water level detected by the water level detector, and the water supply pump is started and stopped by an on / off command from there.
[0006]
The water level detector is provided with a feed water pump off water level detection electrode for detecting the set upper limit water level and a feed water pump on water level detection electrode for detecting the set lower limit water level, and the detection signal of each electrode is input to the water level control device. . For example, when there is a water supply command, water is supplied until the set upper limit water level is reached, and the water supply is stopped when the water supply pump-off water level detection electrode outputs a water detection signal that has reached the upper limit position. When the water level falls and the feed pump on water level detection electrode outputs a signal indicating that there is no canned water at the lower limit position, the water supply is resumed. In this way, the can water is kept between the set lower limit water level and the set upper limit water level.
[0007]
By the way, when a large amount of evaporation is required, instead of covering it with a single boiler, multiple small-capacity or medium-capacity boilers are arranged, and the number of these is controlled to cope with a wide range of load fluctuations. It is often done to be able to. In this case, in a boiler that has received a low load command and continues in a low combustion state, or a boiler that does not supply air but maintains pressure and is on standby to prepare for an increase in load, the reference water level is slightly higher than the set lower limit water level. .
[0008]
[Problems to be solved by the invention]
In the above-mentioned number control operation, when several small capacity boilers, for example, those with an evaporation amount of about 2 tons / hour are arranged, three-position control is performed such that each is 0, 50, 100%. If three boilers are used in such intermittent control, after each boiler exits the low-pressure interlock, it is possible to cope with a change in load that increases or decreases in increments of {(50/300) × 100}%. . However, when controlling the number of units in three positions with a boiler with a large evaporation capacity of 4 tons / hour, it becomes difficult to deal with fine loads, and when it is necessary, PI control (proportional integral control) Will be introduced.
[0009]
In the unit control based on the PI control, as in the case of the three-position control, the control is not based on the pressure of the boiler body, but based on the pressure condition in the steam header required according to the load. That is, in the number control, only one steam header is provided, and steam is sent from the steam separators of all the boilers. On the other hand, changes in the load at the steam supply destination are easily reflected in the entire system. Therefore, based on the load command corresponding to the pressure command value from the steam header, the combustion amount is controlled for one or a plurality of boilers selected to bear the increase / decrease in the evaporation amount.
[0010]
However, if the piping heat capacity between the boiler and the number control pressure detection unit in the steam header is large, it takes time until the pressure fluctuation in the control pressure detection unit reaches the boiler. It is not always the best mode for the boiler. If there is a sudden load increase command in such a situation, the boiler water in the water pipe will transiently expand at once, increasing the amount of evaporation (void), thereby raising the water level and causing carryover. Let the wet steam flow to the steam separator. As a result, the water level rises excessively in the steam / water separator, and the water level detector also exceeds the set upper limit water level.
[0011]
This is thought to be due to the fact that steam is swirling for the steam-water separation action, but in the once-through boiler, the diameter of the steam-water separator is regulated so as not to exceed a certain size. Therefore, it is not always possible to increase the size of the steam separator according to the boiler capacity, sudden introduction of wet steam and forced mixing of water containing voids, Several factors, such as the occurrence of foaming and bubbling due to the above, may cause the water level detector to appear at a level far from the actual level.
[0012]
When such a situation occurs, the water level is first set to the set upper limit water level L as indicated by the one-dot chain line A in FIG. H When the voids and the like are extremely few, the time exceeding the actual water level is significantly longer than the actual water level represented by the broken line B. In addition, the set lower limit water level L descends from the high water level. L It may take a lot of time to get close to.
[0013]
However, the set lower limit water level L L When the water is reached and water is supplied, the void drops at this point and the water level is L D Plunges to a low water level. This is the lower limit water level L L This is because the water level does not exhibit the actual water level commensurate with the amount of canned water until it reaches the point, and suddenly returns to the actual water level when water is supplied.
[0014]
This happens only when special conditions overlap, but it means that the low water level has been raised before the set lower limit water level is reached. Water supply will start when the set lower limit water level is exceeded, but it will take time for water supply because the canned water is too low, or the generation of steam will stagnate or decrease, making the number control response worse. There is a problem.
[0015]
The present invention has been made in view of the above problems, and its purpose is to apply a combustion load with a large increase based on a rapid increase in load to a boiler subject to unit control not only in three-position control but also in PI control. In the unit control operation of a multi-tube type once-through boiler, the water level detector prevents the occurrence of a water level far from the actual situation, avoids the delay in recovery of canned water volume, and realizes unit control with good response. It is to provide a water supply method.
[0016]
[Means for Solving the Problems]
The present invention is provided with a steam / water separator that receives steam from the boiler body and returns saturated water separated from the steam to the boiler body, and supplies water to the boiler body through the steam / water separator. Among the multiple tubular once-through boilers, the load corresponding to the pressure condition of the steam header where steam is collected from the steam separator of each boiler for the boiler whose combustion amount is to be changed in response to the load change This is applied to the unit control operation method in which the burnup is controlled based on the command. The feature is that, referring to FIG. 1, FIG. 2 and FIG. 4, the increase range of the load command value from the steam header 4 for the boiler 1A whose combustion amount is to be changed is determined in advance. When it is above (S2), even though the water supply pump 3A of the boiler is off (S5), the set upper limit water level L in the water level detector 7A H If the detection of the water level exceeding S is continued (S6), and the setting lower limit water level L during the continuation L If a higher water level continues to be detected (S12), a predetermined time integration value (K) of the load commanded during the continuation exceeds a preset load integration limit value (S13). Length of time (t c ), The feed water pump 3A is driven to replenish boiler water via the steam separator 2A (S16).
[0017]
A predetermined length of time (t c ) Instead of setting the time when the feed water pump is driven to be the time when the time integral value of the load exceeds a preset load integration limit value, the set upper limit water level L in the water level detector 7A H The time Ta from the time when the water level was detected exceeding the preset time limit (t b ) May be exceeded.
[0018]
DETAILED DESCRIPTION OF THE INVENTION
Below, the water supply method in the unit control operation of the multi-tube once-through boiler according to the present invention will be described in detail with reference to the drawings. FIG. 2 shows a system diagram in the case where the number of three multi-tube once-through boilers 1A, 1B, 1C is controlled. Each boiler is provided with steam / water separators 2A, 2B, and 2C that receive steam from the boiler body and return naturally separated saturated water separated from the steam to the water pipe of the boiler body. Since water is supplied to the boiler body through this steam separator, each of the feed water pumps 3A, 3B, 3C is connected to each steam separator.
[0019]
The steam generated from these multitubular once-through boilers is collected in one steam header 4 after passing through each steam separator. Therefore, it is possible to control the burnup based on the load command corresponding to the pressure condition of the steam header by the command from the unit control device 5 so that the boiler whose combustion amount is to be changed in response to the load change of the steam supply destination. It can be done.
[0020]
The number control device is a microcomputer, and when the pressure command value of the steam header 4 is read and calculation necessary for the number control is performed, a signal for defining the combustion amount is output to the combustion devices 6A, 6B, 6C of each boiler. It is supposed to be. The water supply pumps 3A, 3B, and 3C are started and stopped by water level controllers 8A, 8B, and 8C that receive detection signals from the water level detectors 7A, 7B, and 7C attached to the respective steam separators. Incidentally, 9A, 9B, and 9C in the figure are water level meters, which are used for visualizing the water levels of the water level detectors 7A, 7B, and 7C.
[0021]
When a once-through boiler with a steam amount of, for example, 4 tons / hour is used in the unit control system having such a device configuration, PI (proportional integral) control is adopted for the operation control, and the combustion amount that closely corresponds to the load change. Consideration will be given to increase or decrease. According to this PI control, various combustion loads can be commanded to any boiler, but in order to simplify the following explanation, the boilers 1B and 1C are currently operated at 100% load, It is assumed that the boiler 1A is in a steady operation with a 40% load. Therefore, there is an increase allowance of 60% until the total amount of steam corresponding to the maximum 300% is generated.
[0022]
Next, a supplementary water supply method in the unit control operation will be described. Referring also to FIG. 1A, as described in the section of the prior art, the alternate long and short dash line A indicates the set lower limit water level L. L However, in the present invention, the water level is not set to the set lower limit water level L instead of eliminating the void by normal water supply. L Another water supply is forcibly performed at a very early stage before reaching the water level, and the expansion of the can water in the water level detector 7A is extinguished in advance by this supplementary water supply, and the water level is corrected.
[0023]
Here, an outline of the main part of the operation in the present method will be described in advance in order to facilitate understanding of the later description. Point M on the dot-and-dash line A, that is, the water level is still the set upper limit water level L H At a certain time, a water supply command is input from the number control device 5 to the water level controller 8A, and based on this, the water supply pump 3A is operated for a short time. Regardless of the presence or absence of voids, D The time t until the amount corresponding to d Are the same, the water level after being fed at point M follows a solid line C descending towards point N.
[0024]
This solid line C is the set lower limit water level L L When reaching the water level controller 8A, the water level controller 8A operates the water supply pump 3A to start regular water supply. After that, the water level is the set lower limit water level L L As long as it recovers as described above and a command to change the combustion amount is not issued, the operation is continued with the water level within the allowable range. The generated steam is led to the steam header 4 together with steam from the other boilers 1B and 1C through the steam separator 2A.
[0025]
A little more detail. First, the above-described boiler 1A is a boiler that is in a standby operation in the unit control operation or is already in a steady operation based on a combustion amount corresponding to a load. And this boiler is handled as the object of the combustion amount increase / decrease at the time of load change control of unit control. In this case, the water levels of the boiler main body, the steam separator 2A, and the water level detector 7A are initially set at the reference water level L as shown in the left part of the alternate long and short dash line A in FIG. R It is in.
[0026]
Now, as shown in FIG. 1B, the combustion load is suddenly reduced to, for example, 100% based on the pressure command value of the steam header 4 with respect to the boiler 1A in a steady operation with a load of 40% from the unit control device 5. Suppose a high combustion command is issued. Because it is dominated by PI control, even if it does not increase step by step to 100%, a gradual increase command is given from 40% to 100% continuously or in 3% increments in a short time (See line X).
[0027]
Thus, since the startup of 60% requires a rapid increase in the burnup, the rapidly heated boiler water expands at once, the evaporation becomes active and at the same time the voids increase, thereby greatly increasing the water level. As described in the section of the prior art, in the water level detector 7A, as shown in FIG. H Over. Now, if the load increase range is up to 20%, there is no problem, but if it is known in advance that an abnormal water level will appear in the steam separator 2A and then the water level detector 7A, the above 60% increase range is obvious. It is in the area where the abnormal water level appears.
[0028]
The above numerical value such as 20% is unique to each boiler, and may be determined in advance when introducing software for controlling the number of units. The value will be referred to as a load increase reference value hereinafter. The above explanation is that when the increase width of the load command value from the steam header 4 for the boiler 1A is equal to or greater than the load increase reference value, that is, When the combustion command is received from the current burnup to the corresponding burnup so that the boiler operates in accordance with the load increase command value, the following other conditions also overlap The replenishment water supply control comes to work.
[0029]
The other conditions are that the feed water pump 3A of the boiler 1A is off, and the set upper limit water level L that is the pump-off command water level in the water level detector 7A. H The detection lower limit water level L is continuously detected and the pump-on command water level is exceeded. L This means that higher water levels continue to be detected. That is, the former teaches that the expansion of can water is severe, and the latter teaches that no water has been supplied until this monitoring time.
[0030]
In addition, about the latter, it can replace with monitoring a water level and can also monitor the presence or absence of activation of a water supply pump. When the water pump is not activated, the water level is the set lower limit water level L L If the pump has been activated even once, the supplementary water supply control must be executed after that unless the load command value exceeds the load increase reference value again. Because there is no possibility.
[0031]
By the way, in the above control, the water level is the set upper limit water level L. H How long it lasts for the replenishment water supply is appropriate, and what is the replenishment water supply time. One of the determinations of the former is, in the simplest case, only to find out empirically the allowable duration (hereinafter referred to as the waiting time limit) specific to the boiler. By folding it into the control software, the replenishment water supply can be started when the standby limit time has elapsed. This operation will be briefly described later with reference to FIGS.
[0032]
The number control device is a microcomputer as described above, and the following control can be introduced by utilizing the high-speed calculation function. It is the set upper limit water level L H The time integral value of the commanded load is calculated while exceeding the limit value, and when this exceeds the preset load integration limit value, the undesired behavior of the can water caused by voids by driving the feed pump It is intended to calm down. Needless to say, the actual water level is corrected by this, and thereafter, the operation for 100% load is continued with the on / off control of the feed water pump 3A.
[0033]
The operation of the pump for replenishing water supply may be determined in advance to be given a time of, for example, 10 seconds. This replenishment water supply time may be determined based on the capacity for storing canned water in the steam separator 2A, the discharge performance of the water supply pump 3A, etc., and does not require a long time. The operation of driving the water supply pump to dissipate voids when the load integration limit value is exceeded will be described below using the flowcharts of FIGS. 4 and 5.
[0034]
When the load increase command based on the pressure command value from the steam header is issued during the unit control operation, the combustion amount change command is issued for the boiler 1A in the 40% load operation state (step of the flowchart of FIG. 4). 1, hereinafter referred to as S1). First, it is determined whether the increase range of the load command value is equal to or greater than the load increase reference value (S2). If it is equal to or greater than 20% as described above, a calculation storage value K described later is set to 0 ( S4).
[0035]
At this time, whether or not the feed water pump 3A is moving, that is, the feed water pump on water level detection electrode 10L shown in FIG. L ) Is not cut (S5), the water level continues to be the set upper limit water level L. H , That is, the feed water pump-off water level detection electrode 10H has a pump-off command water level (set upper limit water level L H It is checked whether or not the above water level is detected (S6). Incidentally, reference numeral 10E in FIG. 3 is a lower limit water level detection electrode for detecting the operation limit water level. If no water detection signal is output from now on, the burner of the corresponding boiler is stopped and airing is prevented. The
[0036]
Current water level is set upper limit water level L H If it exceeds, the control mode for the supplementary water supply is entered for the first time at this point. Since the counter i is set to 0 in step 3, the counter i is incremented by 1 (S 7), i is confirmed to be 1 (S 8), and the unit control device 5 determines the current load command value LC i (= LC 1 ) Is read (S9). Even if the load command increases from 40% to 100% as described above, it is increased so that it gradually increases, for example, 43, 46, 49, 52%. Time is T 0 Even if (see (a) of FIG. 1), the water level is the set upper limit water level L H Time to exceed a (T 0 + T a ) Load command value LC at time 1 Is read.
[0037]
Load command value LC just read 1 Is multiplied by a predetermined time of, for example, 0.2 seconds, and the calculated storage value F becomes a strip-shaped area in FIG. 1 Is required (S10). And that F 1 Is added to the previous K, and a new K is set (S11). At that time, the current water level is again the set lower limit water level L L Is checked (S12). Setting lower limit water level L L Since the feed water pump 3A will operate if it is turned off, the current control is no longer necessary, and the flowchart returns and waits for the next load increase command.
[0038]
Setting lower limit water level L L If not, it is determined whether the current K exceeds the load integration limit value (S13). At present, only one load command value has been read, and since the load integration limit value is not exceeded, control is returned to step 5. Thereafter, steps 6 and 7 are followed. Since the counter i has been incremented to 2, the process proceeds to step 14 via step 8 where the standby state is kept until 0.2 seconds of the predetermined time elapses from the previous reading of the load command value. It should be noted that this 0.2 second is assumed that the control returns to step 5 from step 9 to step 13 processed earlier, and that 0.2 seconds is not consumed until the current step 14 is reached. It is a value set by standing.
[0039]
After the elapse of 0.2 seconds, in step 9 the current load command value LC 2 Is read and multiplied by a predetermined time of 0.2 seconds to obtain the calculated stored value F 2 Is required (S10). The value of K in step 11 is F 1 + F 2 Then go to Steps 12 and 13. It is assumed that this operation is repeated until i = 170. K obtained at this time is the sum of the area of 170 strips 0.2 × ΣLC i (I = 1, 2,... 170).
[0040]
This value is given by the area with vertical stripes in FIG. This K 170 If the load integration limit value is exceeded (S13), the number control device 5 commands the operation of the water supply pump 3A through the water level controller 8A, and supplementary water supply is started (S15). In FIG. 1 (a), the time until the load time integral value reaches the load integration limit value is indicated by t. b (= 0.2 seconds × 170 = 34 seconds).
[0041]
When the time is counted and, for example, 10 seconds, which is the specified replenishment water supply time, has elapsed (S16), the water supply pump 3A is stopped. In FIG. 1 (a), the replenishment water supply time zone is t. c It is expressed as When the replenishment water supply ends (S17), the control is returned to step 1.
[0042]
During this control, the set lower limit water level L L When a water level lower than S is detected (S12) or when a negative answer is made in Steps 5 and 6, the time integral value of the load that has been calculated so far can be cleared. In step 4, K is reset to zero.
[0043]
0.2 × ΣLC mentioned above i Since (i = 1, 2,... 170) is the time integral value of the load, it is clear from the equation that LC i == constant, the calculation in this control can also be applied to intermittent control (see line Y) that changes stepwise, such as three-position control, as shown in FIG. .
[0044]
Incidentally, the load integration limit value described above is the area of the vertical stripe portion in both cases (b) and (c) of FIG. 1, and it goes without saying that it is the same. In the figure, the time required to reach the load integration limit value t b However, it is shorter in (a) corresponding to the case of (c) than that shown in (a) corresponding to the case of (b).
[0045]
In the flowcharts of FIGS. 6 and 7, the time Ta from when the water level detector detects a water level exceeding the set upper limit water level (S26) is a preset waiting time limit t. b (S33), the supplementary water supply specified time t c In this example, the water supply pump is driven for 10 seconds (S38) and the expansion of the can water caused by the voids is calmed down. Steps 27 to 31 and 34 to 36 calculate the time during which the water level exceeding the set upper limit water level continues based on the time read from the clock.
[0046]
The standby limit time is a simple time such as 40 seconds, for example, but the time can be changed in proportion to the magnitude of the load command value exceeding the load increase reference value. If you add it to the software, you can avoid falling into something unique. However, since the load integration limit value in the flowcharts of FIGS. 4 and 5 is determined based on the input energy, the control accuracy is better than in the case of FIGS. 6 and 7.
[0047]
【The invention's effect】
As can be seen from the above detailed description, according to the present invention, when there is a demand for high combustion based on the load command due to the unit control, an excessively long high water level is generated due to the occurrence of voids and the like. However, it can be solved by replenishing water that is secured separately from regular water supply. That is, the water level in the steam separator or the water level detector can be corrected in advance so as to indicate the actual water level. Therefore, the situation where the water level has already become low when the water level falls below the set lower limit water level can be avoided.
[0048]
If the low water level caused by the large load increase is resolved, the behavior of the boiler body during normal operation is maintained, and evaporation of water and stagnation during the unit control can be avoided, and as a result Unit control without sacrificing performance.
[0049]
Whether the replenishment water supply is necessary or not based on the integrated time value of the load or on the basis of the standby limit time, the water level that appears as the combustion load suddenly increases is appropriately determined. It can be corrected to the actual water level at any time. When using the time integral value of the load, improvement of control accuracy is expected, and when based on the standby limit time, simplification of control is expected.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 explains a water supply method in a unit control operation of a multitubular once-through boiler according to the present invention, wherein (a) is a graph showing a temporal change of a water level in a water level detector, and (b) is a PI. The graph which shows the calculation point of the time integral value of the load in control, (c) is a graph at the time of applying to intermittent control.
FIG. 2 is an overall system diagram when three multi-pipe once-through boilers are operated in a unit-controlled manner.
FIG. 3 is a schematic diagram showing the internal structure of a water level detector.
FIG. 4 is a flowchart showing a procedure for supplying supplementary water based on a time integral value of a load.
FIG. 5 is a flowchart following FIG. 4;
FIG. 6 is a flowchart showing a procedure for supplying supplementary water based on a length of time exceeding a set upper limit water level.
FIG. 7 is a flowchart following FIG. 6;
[Explanation of symbols]
1A, 1B, 1C ... multi-pipe once-through boiler, 2A, 2B, 2C ... steam separator, 3A, 3B, 3C ... feed pump, 4 ... steam header, 5 ... number control device, 6A, 6B, 6C ... combustion 7A, 7B, 7C ... Water level detector, 10H ... Feed water pump-off water level detection electrode, 10L ... Feed water pump on water level detection electrode, L H ... Set upper limit water level (pump-off command water level), L L ... Setting lower limit water level (pump-on command water level), L R ... reference water level, LC i ... Load command value, t b ... Time to reach load integration limit value during PI control, and standby limit time during intermittent control, t c ... replenishment water supply time.

Claims (2)

ボイラ本体からの蒸気を受け入れると共に蒸気から分離された飽和水をボイラ本体へ戻す気水分離器が備えられ、該気水分離器を介してボイラ本体に給水するようにしている多管式貫流ボイラの複数台のうち、負荷変更に対応して燃焼量変更の対象となるボイラに対し、各ボイラの気水分離器から蒸気が集められている蒸気ヘッダの圧力条件に応じた負荷指令に基づき、燃焼度を制御するようにした台数制御運転法において、
燃焼量変更の対象となっているボイラに対する前記蒸気ヘッダからの負荷指令値の上昇幅が、予め決められた上昇幅以上となっている場合、当該ボイラの給水ポンプがオフであるにもかかわらず水位検出器において設定上限水位を上回る水位の検出が継続すれば、且つその継続中設定下限水位より高い水位も検出され続けていれば、その継続中に指令された負荷の時間積分値が予め設定された負荷積算限界値を超えた時点で、予め定められた長さの時間給水ポンプを駆動して気水分離器を介したボイラ水補充を行わせるようにしたことを特徴とする多管式貫流ボイラの台数制御運転における給水方法。
A multi-pipe once-through boiler is provided with a steam-water separator that receives steam from the boiler body and returns saturated water separated from the steam to the boiler body, and supplies water to the boiler body through the steam-water separator. Based on the load command according to the pressure condition of the steam header in which steam is collected from the steam separator of each boiler, for the boiler that is subject to combustion amount change in response to the load change, In the unit control operation method to control the burnup,
When the increase range of the load command value from the steam header for the boiler whose combustion amount is to be changed is greater than or equal to a predetermined increase range, the water supply pump of the boiler is off If the water level detector continues to detect the water level that exceeds the set upper limit water level and continues to detect a water level that is higher than the set lower limit water level, the time integral value of the load commanded during the continuation is preset. A multi-tube system characterized in that when a predetermined load integration limit value is exceeded, a predetermined time length water supply pump is driven to replenish boiler water via a steam-water separator. Water supply method in unit control operation of once-through boiler.
請求項1に記載された予め定められた長さの時間給水ポンプを駆動させるときの開始を、前記負荷の時間積分値が予め設定された負荷積算限界値を超えた時点としていることに代えて、前記水位検出器において設定上限水位を上回る水位の検出があったときからの時間が、予め設定された待機限界時間を超えた時点とすることを特徴とする請求項1に記載された多管式貫流ボイラの台数制御運転における給水方法。The start of driving the time water supply pump of a predetermined length according to claim 1 is replaced with a time when the time integral value of the load exceeds a preset load integration limit value. The multi-tube according to claim 1, wherein a time from when a water level exceeding a set upper limit water level is detected by the water level detector is a time point when a preset standby limit time is exceeded. Water supply method in the unit control operation of the type once-through boiler.
JP2002099031A 2002-04-01 2002-04-01 Water supply method in unit control operation of multi-pipe once-through boiler Expired - Lifetime JP3960467B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002099031A JP3960467B2 (en) 2002-04-01 2002-04-01 Water supply method in unit control operation of multi-pipe once-through boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002099031A JP3960467B2 (en) 2002-04-01 2002-04-01 Water supply method in unit control operation of multi-pipe once-through boiler

Publications (2)

Publication Number Publication Date
JP2003294203A JP2003294203A (en) 2003-10-15
JP3960467B2 true JP3960467B2 (en) 2007-08-15

Family

ID=29240733

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002099031A Expired - Lifetime JP3960467B2 (en) 2002-04-01 2002-04-01 Water supply method in unit control operation of multi-pipe once-through boiler

Country Status (1)

Country Link
JP (1) JP3960467B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5750605B2 (en) * 2011-01-11 2015-07-22 川重冷熱工業株式会社 Multi-pipe once-through boiler feed water control device
CN109855084B (en) * 2018-12-31 2024-03-19 中国能源建设集团华东电力试验研究院有限公司 Boiler makeup water level gauge measurement value jump eliminating system and control method

Also Published As

Publication number Publication date
JP2003294203A (en) 2003-10-15

Similar Documents

Publication Publication Date Title
JPH11132405A (en) Method and device of multiple unit control of proportional control boiler
JP2002130602A (en) Method for controlling number of boilers
JP3960467B2 (en) Water supply method in unit control operation of multi-pipe once-through boiler
JP5189174B2 (en) Starting method of once-through boiler
EP0155706B1 (en) Method and apparatus for controlling an operation of plant
JP4148514B2 (en) Number control device in boiler multi-can installation system
JP7764777B2 (en) boiler
JP2015031467A (en) Boiler system
JP3922008B2 (en) Control method for boiler equipment
JP5370918B2 (en) Boiler control system
JP6341073B2 (en) Boiler system
JP6380113B2 (en) Boiler system
JP7400934B2 (en) Water supply control device
JP6606917B2 (en) Boiler system
JP6485187B2 (en) Boiler system
JP5672314B2 (en) Boiler system
JP4529731B2 (en) Boiler control method
JP2003090507A (en) Method of controlling feed water to boiler
JP3602167B2 (en) Operation control device for power plant
JP6485186B2 (en) Boiler system
JP6550999B2 (en) Boiler system
JP4059573B2 (en) Water supply control device with two water level detection cylinders
JPH0333967B2 (en)
JP2706996B2 (en) Boiler water level control method
JPH0565763B2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050310

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070427

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070510

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070510

R150 Certificate of patent or registration of utility model

Ref document number: 3960467

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110525

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120525

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120525

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130525

Year of fee payment: 6

EXPY Cancellation because of completion of term