JPH0565763B2 - - Google Patents
Info
- Publication number
- JPH0565763B2 JPH0565763B2 JP59015036A JP1503684A JPH0565763B2 JP H0565763 B2 JPH0565763 B2 JP H0565763B2 JP 59015036 A JP59015036 A JP 59015036A JP 1503684 A JP1503684 A JP 1503684A JP H0565763 B2 JPH0565763 B2 JP H0565763B2
- Authority
- JP
- Japan
- Prior art keywords
- boiler
- drain tank
- level
- level control
- furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は、例えば変圧貫流ボイラのようなボイ
ラ装置において、そのドレンタンクのレベルを制
御するボイラ装置のドレンタンクレベル制御装置
に関する。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a drain tank level control device for a boiler device, which controls the level of a drain tank in a boiler device such as a variable pressure once-through boiler.
近年、火力プラントを高効率で運用するため、
ボイラ装置は可成りの頻度で起動、停止を行なう
運転が実施されるようになつている。ところで、
このような運転におけるボイラ起動時、特に変圧
貫流ボイラではボイラ火炉流体の膨出現象が発生
する。即ち、変圧貫流ボイラでは、ボイラ圧力が
低く、ボイラ火炉流体温度は飽和温度に近いた
め、起動時、このような状態でボイラに点火して
燃料量を増加すると、火炉流体における蒸気量が
急速に増大して沸騰状態となり、上記膨出現象が
発生するのである。この膨出現象は、バーナ容量
が大きいバーナを点火したとき、特に顕著に発生
する。なお、従来の定圧貫流ボイラでは、起動
時、バーナを順次点火操作しても、ボイラ火炉は
全圧(超臨界圧ボイラではボイラ圧力は250Kg/
cm2g)に保持されており、又、火炉流体温度は臨
界温度以下であるので、火炉流体の膨出現象はみ
られない。
In recent years, in order to operate thermal power plants with high efficiency,
Boiler systems are now started and stopped quite frequently. by the way,
When the boiler is started in such an operation, a swelling phenomenon of the boiler furnace fluid occurs, especially in a variable pressure once-through boiler. In other words, in a variable pressure once-through boiler, the boiler pressure is low and the boiler furnace fluid temperature is close to the saturation temperature, so if the boiler is ignited under these conditions at startup to increase the amount of fuel, the amount of steam in the furnace fluid will rapidly increase. It increases and reaches a boiling state, causing the above-mentioned bulging phenomenon. This bulging phenomenon occurs particularly prominently when a burner with a large burner capacity is ignited. In addition, in a conventional constant pressure once-through boiler, even if the burners are ignited sequentially at startup, the boiler furnace is at full pressure (in a supercritical pressure boiler, the boiler pressure is 250 kg/
cm 2 g) and the furnace fluid temperature is below the critical temperature, so no swelling phenomenon of the furnace fluid is observed.
ボイラ起動時、火炉流体をボイラ循環ポンプに
より、火炉、汽水分離器、ドレンタンクと循環さ
せる起動系統においては、上記火炉流体の膨出現
象が発生すると、多量の蒸気発生によりドレンタ
ンクのレベル(水位)がみかけ上急上昇し、この
ためドレンタンクのレベル調節弁が大きく開い
て、ドレンタンク内の火炉流体を大量に復水器に
放出し、このため、ドレンタンクのレベルが異常
に低下し、前記循環させるべき流体が不足する。
ボイラ装置にあつてはこのような流体の不足が生
じるとボイラ循環ポンプを停止させ、ボイラ起動
をも停止させるシステムになつている。したがつ
て、上記火炉流体の膨出現象が発生するとボイラ
を起動させることができないという事態が生じて
いた。 In the startup system where the boiler circulation pump circulates the furnace fluid through the furnace, the steam separator, and the drain tank when the boiler is started, if the above-mentioned swelling phenomenon of the furnace fluid occurs, a large amount of steam is generated and the drain tank level (water level ), which causes the level control valve in the drain tank to open wide and release a large amount of furnace fluid in the drain tank to the condenser, which causes the level in the drain tank to drop abnormally, causing the above-mentioned There is not enough fluid to circulate.
In the case of boiler equipment, when such a fluid shortage occurs, the system is such that the boiler circulation pump is stopped and the boiler startup is also stopped. Therefore, when the above-mentioned swelling phenomenon of the furnace fluid occurs, a situation has arisen in which the boiler cannot be started.
この事態を避けるため、従来、ボイラ循環流量
を少なくし、その分ボイラ給水ポンプからの冷水
を増加させることにより、ボイラ点火操作に先立
つて火炉流体温度を飽和温度以下に下げ、膨出現
象を防止する手段が採られていた。しかし、この
ような手段は起動時の熱損失を甚だしく増大させ
るという欠点を生じていた。さらに他の手段とし
て、燃料量を徐々に増加することにより膨出現象
を防止し、レベル変動を小さくする手段も採用さ
れていたが、このような手段は起動時間が極めて
長くなるという欠点があつた。
In order to avoid this situation, conventional methods have been to reduce the boiler circulation flow rate and increase the amount of cold water from the boiler feed water pump accordingly, thereby lowering the furnace fluid temperature to below the saturation temperature prior to the boiler ignition operation and preventing the bulging phenomenon. Measures were taken to do so. However, such measures have the disadvantage of significantly increasing heat losses during start-up. Another method has been to gradually increase the amount of fuel to prevent the bulging phenomenon and reduce level fluctuations, but this method has the disadvantage of requiring an extremely long startup time. Ta.
本発明は、このような事情に鑑みてなされたも
のであり、その目的は、上記従来の問題点を解決
し、ボイラ起動時におけるドレンタンクレベルの
異常な低下を防止することができ、これによりボ
イラ起動を円滑に行なうことができるボイラ装置
のドレンタンクレベル制御装置を提供するにあ
る。 The present invention has been made in view of the above circumstances, and its purpose is to solve the above-mentioned conventional problems and prevent an abnormal drop in the drain tank level when starting a boiler. An object of the present invention is to provide a drain tank level control device for a boiler device that can smoothly start up the boiler.
上記の目的を達成するため、本発明は、ボイラ
装置の汽水分離器に接続されたドレンタンクと、
このドレンタンクのレベルを調節するレベル調節
弁と、前記ドレンタンクのレベルに応じて前記レ
ベル調節弁を調節するレベル制御手段とを備えた
ボイラ装置のドレンタンクレベル制御装置におい
て、火炉管壁温度および火炉流体温度に基づいて
火炉流体の膨出を予測する膨出予測手段と、この
膨出予測手段によつて火炉流体の膨出が予測され
たとき前記レベル制御手段による制御を停止して
前記レベル調節弁を所定の一定値で制御するレベ
ル低下防止手段とを設けたことを特徴とする。
In order to achieve the above object, the present invention provides a drain tank connected to a brackish water separator of a boiler device,
A drain tank level control device for a boiler apparatus comprising a level control valve that adjusts the level of the drain tank and a level control means that adjusts the level control valve according to the level of the drain tank. a bulge prediction means for predicting the bulge of the furnace fluid based on the furnace fluid temperature; and when the bulge prediction means predicts the bulge of the furnace fluid, the control by the level control means is stopped to adjust the level to the level. The present invention is characterized by providing a level drop prevention means for controlling the control valve at a predetermined constant value.
ボイラ装置の通常運転時、ドレンタンクのレベ
ルはレベル制御手段によるレベル調節弁の制御に
より行われる。ボイラ装置の起動時、火炉管壁温
度および火炉流体温度に基づいて火炉流体の膨出
予測が行われ、火炉流体の膨出が予測されたとき
レベル制御手段による通常の制御が停止され、レ
ベル調節弁は所定の一定値で制御される。
During normal operation of the boiler system, the level of the drain tank is controlled by the level control valve controlled by the level control means. When starting up the boiler equipment, the expansion of the furnace fluid is predicted based on the furnace tube wall temperature and the furnace fluid temperature, and when the expansion of the furnace fluid is predicted, the normal control by the level control means is stopped and the level is adjusted. The valve is controlled at a predetermined constant value.
以下、本発明を図示の実施例に基づいて説明す
る。
Hereinafter, the present invention will be explained based on illustrated embodiments.
第1図は本発明の実施例に係る変圧貫流ボイラ
の起動系統図である。図で、1はボイラ火炉、2
はボイラ火炉を構成する火炉管からの火炉流体か
ら水分を分離する汽水分離器、3は汽水分離器2
からの蒸気を過熱する過熱器、4は過熱器3から
の蒸気により駆動されるタービン、5はタービン
4で使用された蒸気を復水する復水器である。 FIG. 1 is a startup system diagram of a variable pressure once-through boiler according to an embodiment of the present invention. In the diagram, 1 is the boiler furnace, 2
3 is a brackish water separator that separates moisture from the furnace fluid from the furnace tubes constituting the boiler furnace; 3 is the brackish water separator 2;
4 is a turbine driven by the steam from the superheater 3, and 5 is a condenser that condenses the steam used in the turbine 4.
6は汽水分離器2で分離された水が流入するド
レンタンク、7はドレンタンク6のレベルを調節
するレベル調節弁、8はドレンタンク6の水をボ
イラ火炉1、汽水分離器2、ドレンタンク6と循
環させるボイラ循環ポンプ、9はボイラ循環流量
調節弁である。10はボイラ火炉1に水を供給す
る給水ポンプ、11は給水ポンプ10で給水され
た水を加熱する高圧給水加熱器である。12はボ
イラ火炉1の温度を検出する火炉管壁温度検出
器、13はボイラ火炉1からの流体の温度を検出
する火炉流体温度検出器、14はドレンタンク6
のレベルを検出するドレンタンクレベル検出器、
15はドレンタンク6の圧力を検出するドレンタ
ンク圧力検出器である。16はレベル調節弁7お
よびボイラ循環流量調節弁9を制御する制御装置
である。 6 is a drain tank into which the water separated by the brackish water separator 2 flows; 7 is a level control valve that adjusts the level of the drain tank 6; 8 is a level control valve that controls the level of the drain tank 6; 6 is a boiler circulation pump for circulating the water, and 9 is a boiler circulation flow control valve. 10 is a water supply pump that supplies water to the boiler furnace 1, and 11 is a high-pressure water supply heater that heats the water supplied by the water supply pump 10. 12 is a furnace tube wall temperature detector for detecting the temperature of the boiler furnace 1; 13 is a furnace fluid temperature detector for detecting the temperature of the fluid from the boiler furnace 1; 14 is a drain tank 6
Drain tank level detector, which detects the level of
15 is a drain tank pressure detector that detects the pressure of the drain tank 6. 16 is a control device that controls the level control valve 7 and the boiler circulation flow rate control valve 9.
ドレンタンク6の水はボイラ循環ポンプ8によ
り、ボイラ循環流量調節弁9、ボイラ火炉1、汽
水分離器2を通つて循環され、又、この間、給水
ポンプ10からの給水も高圧給水加熱器11を経
てドレンタンク6の水に合流せしめられる。この
ようにボイラ循環ポンプ8を運転している循環モ
ード時、ドレンタンク6のレベルは制御装置16
によりレベル調節弁7およびボイラ循環流量調節
弁9を調節して制御され、ドレンタンク6のレベ
ルが上昇した場合にはレベル調節弁7およびボイ
ラ循環流量調節弁9の開度を大きくしてドレンタ
ンク6の水を復水器5へ排出するとともに給水ポ
ンプ10からの給水を抑え、逆にレベルが下降し
ている場合にはレベル調節弁7およびボイラ循環
流量調節弁9を絞つて給水ポンプ10からの給水
を多くする。 The water in the drain tank 6 is circulated by the boiler circulation pump 8 through the boiler circulation flow control valve 9, the boiler furnace 1, and the brackish water separator 2. During this period, the water supplied from the feed water pump 10 is also circulated through the high pressure feed water heater 11. After that, it is made to join the water in the drain tank 6. In the circulation mode in which the boiler circulation pump 8 is operated in this way, the level of the drain tank 6 is controlled by the control device 16.
Control is performed by adjusting the level control valve 7 and boiler circulation flow control valve 9, and when the level of the drain tank 6 rises, the opening degree of the level control valve 7 and the boiler circulation flow control valve 9 is increased to increase the opening of the drain tank. 6 is discharged to the condenser 5 and the water supply from the water supply pump 10 is suppressed. Conversely, if the level is decreasing, the level control valve 7 and the boiler circulation flow rate control valve 9 are throttled and the water is discharged from the water supply pump 10. increase water supply.
第2図は第1図に示す制御装置の系統図であ
る。図で第2図に示す部材と同一部材には同一符
号を付して説明を省略する。17はドレンタンク
レベル検出器14の信号とドレンタンク圧力検出
器15の信号とを乗算する乗算器、18は乗算器
17の信号を比例、積分するPI調節器、19は
信号切換器、20は自動手動切換器である。21
は自動手動切換器20の出力信号、即ちレベル調
節弁7の開度を指示する信号を記憶するアナログ
メモリである。22は火炉管壁温度検出器12と
火炉流体温度検出器13で検出された温度の偏差
を演算する減算器、23は減算器22から出力さ
れる温度偏差が所定の値に達したか否かを検出す
る信号検出器である。温度偏差が所定の値に達し
たとき、信号検出器23からは信号切換器19に
対して切換指令信号が出力される。なお、ボイラ
循環流量調節弁9の制御系統の説明は省略する。 FIG. 2 is a system diagram of the control device shown in FIG. 1. In the figure, the same members as those shown in FIG. 2 are designated by the same reference numerals, and the explanation thereof will be omitted. 17 is a multiplier that multiplies the signal of the drain tank level detector 14 and the signal of the drain tank pressure detector 15; 18 is a PI regulator that proportionally and integrally integrates the signal of the multiplier 17; 19 is a signal switch; and 20 is a It is an automatic manual switch. 21
is an analog memory that stores the output signal of the automatic manual switch 20, that is, a signal instructing the opening degree of the level control valve 7. 22 is a subtractor that calculates the difference between the temperatures detected by the furnace tube wall temperature detector 12 and the furnace fluid temperature detector 13; 23 is a subtractor that determines whether the temperature deviation output from the subtractor 22 has reached a predetermined value; This is a signal detector that detects. When the temperature deviation reaches a predetermined value, the signal detector 23 outputs a switching command signal to the signal switch 19. Note that a description of the control system of the boiler circulation flow rate control valve 9 will be omitted.
次に、本実施例の動作を第3図に示すボイラの
温度特性図を参照して説明する。ボイラ装置の通
常運転時、ドレンタンクレベル検出器14で検出
されたドレンタンク6のレベルは、乗算器17に
おいてドレンタンク圧力検出器15で検出された
圧力を乗算されることにより圧力補正される。こ
の圧力補正されたレベル信号はPI調節器18、
信号切換器19および自動手動切換器20を経て
レベル調節弁7に伝送され、そのレベル信号に応
じてレベル調節弁7の開度を調節する。このよう
な通常運転時の制御において、アナログメモリ2
1はレベル調節弁7に伝送される信号を常時記憶
する。アナログメモリ21に記憶された信号は信
号切換器19に入力されるが、この場合、信号検
出器23から切換指令信号が出力されていないの
で、信号切換器19においてはPI調節器18と
自動手動切換器20とが接続されアナログメモリ
21と自動手動切換器20とは解放されており、
したがつて、アナログメモリ21の信号は信号切
換器19で遮断されている。 Next, the operation of this embodiment will be explained with reference to the boiler temperature characteristic diagram shown in FIG. During normal operation of the boiler device, the level of the drain tank 6 detected by the drain tank level detector 14 is multiplied by the pressure detected by the drain tank pressure detector 15 in a multiplier 17, thereby correcting the pressure. This pressure-corrected level signal is sent to a PI controller 18,
The signal is transmitted to the level control valve 7 via the signal switch 19 and the automatic/manual switch 20, and the opening degree of the level control valve 7 is adjusted according to the level signal. In such control during normal operation, analog memory 2
1 always stores the signal transmitted to the level control valve 7. The signal stored in the analog memory 21 is input to the signal switch 19, but in this case, since the signal detector 23 does not output a switching command signal, the signal switch 19 switches between the PI controller 18 and the automatic/manual switch. The switching device 20 is connected, and the analog memory 21 and the automatic manual switching device 20 are released.
Therefore, the signal of the analog memory 21 is cut off by the signal switch 19.
ボイラ装置の起動時、前述のような火炉流体の
膨出現象が生じる場合がある。そして、この膨出
現象に対しては、ドレンタンクレベル検出器14
以降の上記制御系では前述の理由により対応が困
難である。このため、本実施例においては、火炉
管壁温度検出器12、火炉流体温度検出器13、
減算器22および信号検出器23を設けて膨出現
象に対応させるものである。そこで、まず、膨出
現象の発生を第3図に示すボイラの温度特性に基
づいて判断する手段について述べる。 When starting up the boiler system, the above-mentioned swelling phenomenon of the furnace fluid may occur. In response to this swelling phenomenon, the drain tank level detector 14
It is difficult to cope with the above-mentioned control system for the reasons mentioned above. Therefore, in this embodiment, the furnace tube wall temperature detector 12, the furnace fluid temperature detector 13,
A subtracter 22 and a signal detector 23 are provided to cope with the bulging phenomenon. Therefore, first, a means for determining the occurrence of a bulging phenomenon based on the temperature characteristics of the boiler shown in FIG. 3 will be described.
第3図で横軸には時間、縦軸には温度がとつて
ある。図中、実線Aは火炉流体温度を、又、破線
Bは火炉管壁温度を示す。時刻t1においてボイラ
が点火されると、火炉流体温度と火炉管壁温度と
は上昇してゆくが、暫くの間(約10〜15分)火炉
流体温度の方が火炉管壁温度より高い状態にあ
る。時刻t2に至ると、両者の温度は等しくなり、
それ以降は火炉管壁温度の方が高くなる。火炉流
体の膨出現象は、丁度火炉管壁温度の方が高くな
るタイミングにおいてみられるものである。した
がつて、火炉管壁温度と火炉流体温度とを監視し
ておれば、膨出現象の発生を判断できることにな
る。 In Figure 3, the horizontal axis represents time, and the vertical axis represents temperature. In the figure, a solid line A indicates the furnace fluid temperature, and a broken line B indicates the furnace tube wall temperature. When the boiler is ignited at time t 1 , the furnace fluid temperature and furnace tube wall temperature rise, but for a while (approximately 10 to 15 minutes) the furnace fluid temperature remains higher than the furnace tube wall temperature. It is in. At time t 2 , the temperatures of both become equal,
After that, the furnace tube wall temperature becomes higher. The swelling phenomenon of the furnace fluid is observed just at the timing when the furnace tube wall temperature becomes higher. Therefore, by monitoring the furnace tube wall temperature and furnace fluid temperature, it is possible to determine whether a bulging phenomenon has occurred.
第2図において、火炉管壁温度検出器12と火
炉流体温度検出器13とは膨出現象の発生を判断
するために設けられたものである。両検出器1
2,13の検出信号は減算器22に入力され、両
者の偏差が演算される。この偏差に応じた信号は
信号検出器23に入力され、ここで予め定められ
た所定の値と比較される。当該偏差が所定の値に
達したとき、即ち、膨出現象が発生したと判断さ
れたとき、信号検出器23から信号切換器19に
切換指令信号が出力される。この結果、信号切換
器19は切換えられ、PI調節器18と自動手動
切換器20との間は遮断され、アナログメモリ2
1と自動手動切換器20との間が接続される。こ
のため、レベル調節弁7は、ドレンタンクレベル
検出器14の検出値の如何にかかわらず、アナロ
グメモリ21に記憶された切換直前の信号、即
ち、膨出現象発生前の信号でその開度を制御され
る。前述のように、従来においては、膨出現象が
発生するとドレンタンク6のレベルがみかけ上急
上昇し、このためレベル調節弁7を開いてドレン
タンク6の水を復水器5に排出する制御が行なわ
れ、ドレンタンクレベルの異常低下を招いていた
のであるが、本実施例においては、膨出現象が発
生してもアナログメモリ21に記憶された膨出前
の信号によりレベル調節弁7を制御するので、レ
ベル調節弁7が大きく開くことはなく、ドレンタ
ンクレベルの異常低下は防止される。 In FIG. 2, a furnace tube wall temperature detector 12 and a furnace fluid temperature detector 13 are provided to determine the occurrence of a bulging phenomenon. Both detectors 1
The detection signals 2 and 13 are input to a subtracter 22, and the deviation between the two is calculated. A signal corresponding to this deviation is input to the signal detector 23, where it is compared with a predetermined value. When the deviation reaches a predetermined value, that is, when it is determined that a bulge phenomenon has occurred, a switching command signal is output from the signal detector 23 to the signal switch 19. As a result, the signal switch 19 is switched, the PI controller 18 and the automatic/manual switch 20 are cut off, and the analog memory 2
1 and an automatic/manual switch 20 are connected. Therefore, regardless of the detected value of the drain tank level detector 14, the level control valve 7 uses the signal stored in the analog memory 21 immediately before switching, that is, the signal before the bulging phenomenon occurs, to determine its opening. controlled. As mentioned above, conventionally, when the bulging phenomenon occurs, the level of the drain tank 6 apparently rises rapidly, and for this reason, there is no control to open the level control valve 7 and discharge the water in the drain tank 6 to the condenser 5. However, in this embodiment, even if a bulging phenomenon occurs, the level control valve 7 is controlled by the pre-bulging signal stored in the analog memory 21. Therefore, the level control valve 7 does not open wide, and an abnormal drop in the drain tank level is prevented.
火炉流体の膨出が終了すると、信号検出器23
からの切換指令信号の出力が停止され、信号切換
器19はアナログメモリ21と自動手動切換器2
0とを遮断し、PI調節器18と自動手動切換器
20とを接続する。これにより、ドレンタンクの
レベル制御は通常運転時の制御となる。なお、火
炉流体の膨出の終了は、例えば信号検出器23に
タイマを内蔵し、所定時間が経過したことにより
知ることができる。 When the expansion of the furnace fluid is completed, the signal detector 23
The output of the switching command signal from
0, and connect the PI controller 18 and automatic manual switch 20. As a result, the level control of the drain tank becomes the control during normal operation. Note that the end of the expansion of the furnace fluid can be determined by, for example, incorporating a timer in the signal detector 23 and checking that a predetermined time has elapsed.
このように、本実施例では、火炉管壁温度検出
器で検出された温度と、火炉流体温度検出器で検
出された温度の偏差が所定の値に達したとき、火
炉流体の膨出現象が発生したと判断し、アナログ
メモリに記憶されている膨出現象発生前の信号で
レベル制御弁を制御するようにしたので、ボイラ
起動時におけるドレンタンクレベルの異常低下を
防止することができ、これにより、ボイラ起動を
円滑に行なうことができる。 As described above, in this embodiment, when the deviation between the temperature detected by the furnace tube wall temperature detector and the temperature detected by the furnace fluid temperature detector reaches a predetermined value, the swelling phenomenon of the furnace fluid occurs. The system determines that a bulging phenomenon has occurred and controls the level control valve using the signal stored in the analog memory before the bulging phenomenon occurs, making it possible to prevent an abnormal drop in the drain tank level when starting the boiler. This allows the boiler to be started up smoothly.
〔発明の効果〕
以上述べたように、本発明では、ボイラ起動
時、火炉流体の膨出現象の発生を予測し、膨出現
象が発生すると判断されたとき、通常のレベル制
御を停止してドレンタンクのレベル調節弁を所定
の値で制御するようにしたので、ボイラ起動時に
おけるドレンタンクレベルの異常低下を防止する
ことができ、これにより、ボイラ起動を円滑に行
なうことができる。[Effects of the Invention] As described above, the present invention predicts the occurrence of a swelling phenomenon of the furnace fluid when starting a boiler, and when it is determined that a swelling phenomenon will occur, stops normal level control. Since the level control valve of the drain tank is controlled at a predetermined value, it is possible to prevent the level of the drain tank from abnormally decreasing when the boiler is started, and thereby the boiler can be started smoothly.
第1図は本発明の実施例に係る変圧貫流ボイラ
の起動系統図、第2図は第1図に示す制御装置の
系統図、第3図はボイラの温度特性図である。
1……ボイラ、6……ドレンタンク、7……レ
ベル調節弁、12……火炉管壁温度検出装置、1
3……火炉流体温度検出装置、14……ドレンタ
ンクレベル検出器、15……ドレンタンク圧力検
出器、17……乗算器、18……PI調節器、1
9……信号切換器、20……自動手動切換器、2
1……アナログメモリ、22……減算器、23…
…信号検出器。
FIG. 1 is a startup system diagram of a variable pressure once-through boiler according to an embodiment of the present invention, FIG. 2 is a system diagram of the control device shown in FIG. 1, and FIG. 3 is a temperature characteristic diagram of the boiler. 1...Boiler, 6...Drain tank, 7...Level control valve, 12...Furnace tube wall temperature detection device, 1
3...furnace fluid temperature detection device, 14...drain tank level detector, 15...drain tank pressure detector, 17...multiplier, 18...PI regulator, 1
9... Signal switch, 20... Automatic manual switch, 2
1...Analog memory, 22...Subtractor, 23...
...signal detector.
Claims (1)
タンクと、このドレンタンクのレベルを調節する
レベル調節弁と、前記ドレンタンクのレベルに応
じて前記レベル調節弁を調節するレベル制御手段
とを備えたボイラ装置のドレンタンクレベル制御
装置において、火炉管壁温度および火炉流体温度
に基づいて火炉流体の膨出を予測する膨出予測手
段と、この膨出予測手段によつて火炉流体の膨出
が予測されたとき前記レベル制御手段による制御
を停止して前記レベル調節弁を所定の一定値で制
御するレベル低下防止手段とを設けたことを特徴
とするボイラ装置のドレンタンクレベル制御装
置。1. A drain tank connected to a steam water separator of a boiler device, a level control valve that adjusts the level of the drain tank, and a level control means that adjusts the level control valve according to the level of the drain tank. A drain tank level control device for a boiler device includes a bulge prediction means for predicting the bulge of the furnace fluid based on the furnace tube wall temperature and the furnace fluid temperature, and a bulge prediction means for predicting the bulge of the furnace fluid. A drain tank level control device for a boiler apparatus, characterized in that a drain tank level control device for a boiler device is provided, comprising a level drop prevention device that stops control by the level control device and controls the level control valve at a predetermined constant value when the level control valve is controlled at a predetermined constant value.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1503684A JPS60162107A (en) | 1984-02-01 | 1984-02-01 | Controller for level of drain tank for boiler device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1503684A JPS60162107A (en) | 1984-02-01 | 1984-02-01 | Controller for level of drain tank for boiler device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60162107A JPS60162107A (en) | 1985-08-23 |
| JPH0565763B2 true JPH0565763B2 (en) | 1993-09-20 |
Family
ID=11877606
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1503684A Granted JPS60162107A (en) | 1984-02-01 | 1984-02-01 | Controller for level of drain tank for boiler device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60162107A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01244205A (en) * | 1988-03-23 | 1989-09-28 | Babcock Hitachi Kk | Variable pressure once-through boiler |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5782604A (en) * | 1980-11-10 | 1982-05-24 | Babcock Hitachi Kk | Separation tank level control of benson boiler |
-
1984
- 1984-02-01 JP JP1503684A patent/JPS60162107A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS60162107A (en) | 1985-08-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0081974B1 (en) | Condition control system for heat transfer | |
| JP4987444B2 (en) | Water heater | |
| JPH0565763B2 (en) | ||
| JPH06272802A (en) | Device for controlling the number of heat equipment | |
| JP5370918B2 (en) | Boiler control system | |
| JP2006322690A (en) | Fluid circulation operation equipment and operation method for supercritical constant pressure once-through boiler | |
| JP3461480B2 (en) | Control method of boiler device | |
| JP2861708B2 (en) | Boiler combustion control method | |
| JP2799506B2 (en) | Start-up control device for once-through boiler | |
| JP3814895B2 (en) | How to control the number of fluid heaters | |
| JP2000146103A (en) | Multiple boilers controller and control method | |
| JPH08233204A (en) | Method for automatically controlling the number of fluid heating machine | |
| JPH09269104A (en) | Multiple units control system for fluid heater | |
| JPH07233907A (en) | Method and apparatus for controlling water level of steam boiler | |
| JP3960467B2 (en) | Water supply method in unit control operation of multi-pipe once-through boiler | |
| JP2706996B2 (en) | Boiler water level control method | |
| JPS62169903A (en) | Restart operation method of once-through boiler | |
| JP4071369B2 (en) | Water supply control device combining ON-OFF control and proportional control | |
| JPH01244205A (en) | Variable pressure once-through boiler | |
| JPH0666408A (en) | Controller for recirculation starting system of boiler | |
| JPH05322101A (en) | Device for controlling temperature of steam in variable-pressure once-through boiler | |
| JPS6313081B2 (en) | ||
| JPH0646121B2 (en) | Absorption chiller / heater control method | |
| JP2016148460A (en) | Multi-can installed boiler | |
| JPH11230502A (en) | Control device for steam drum and method of operating exhaust heat recovery boiler provided with steam drum |