JP3972633B2 - Tunnel and its construction method - Google Patents
Tunnel and its construction method Download PDFInfo
- Publication number
- JP3972633B2 JP3972633B2 JP2001340976A JP2001340976A JP3972633B2 JP 3972633 B2 JP3972633 B2 JP 3972633B2 JP 2001340976 A JP2001340976 A JP 2001340976A JP 2001340976 A JP2001340976 A JP 2001340976A JP 3972633 B2 JP3972633 B2 JP 3972633B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- shield
- reaching
- coupling portion
- starting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 13
- 230000008878 coupling Effects 0.000 claims description 41
- 238000010168 coupling process Methods 0.000 claims description 41
- 238000005859 coupling reaction Methods 0.000 claims description 41
- 239000000725 suspension Substances 0.000 claims description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 230000006872 improvement Effects 0.000 claims description 14
- 239000000463 material Substances 0.000 claims description 10
- 238000009412 basement excavation Methods 0.000 description 9
- 238000000034 method Methods 0.000 description 8
- 230000008859 change Effects 0.000 description 4
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 239000000126 substance Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、トンネルおよびその構築工法に関し、特に、複数のシールドトンネルを横方向に連結形成するトンネルおよびその構築工法に関するものである。
【0002】
【従来の技術】
従来、シールド工法で構築されるトンネルは、構造的に安定した円形断面のトンネルが主流であった。ところが、近時、地下空間利用の多様化,地下構造物の輻輳化,コストダウンへの取組みといった観点から、円形断面を横方向に、2連もしくは3連状に重合させた断面形状のトンネルが構築されている。
【0003】
図11〜図12には、このような形状のトンネルの一例が示されている。同図に示したトンネルは、円形断面で、同じ直径の第1および第2シールドトンネル1,2を備えている。
【0004】
このシールドトンネル1,2は、先端側に配置されたシールド掘進機3の掘進により掘削面を形成し、その後部側に掘削面に沿ってセグメント4を組立てることにより形成される。
【0005】
第1および第2シールドトンネル1,2は、図12に示すように、円形断面の端部同士が、相互に重なるようにして、横方向に直接的に連結形成し、これらの重合した部分を切除して、隣接するシールドトンネル1,2のセグメント4間の結合部5には、上および下連結セグメントピース6,7が配置される。
【0006】
これらの連結セグメントピース6,7は、両端面がセグメント4にそれぞれ接合され、上下方向に所定の間隔を隔てて対向する上,下連結セグメントピース6,7間には、中柱8が設置されている。
【0007】
このような形状のトンネルにおいては、トンネルを構造的に安定化させるために、中柱8は、図11に示すように、セグメント4の1リング毎に配置されていた。
【0008】
また、複数のトンネルを横方向に連結する構造としては、上記したようにシールドトンネル1,2を直接的に連結する構成以外に、例えば、図13に示すように、一対の円形断面のシールドトンネル1a,2aを、相互に隣接するように平行に近接配置して、両者間に跨る結合部5aを形成する構造もある。
【0009】
このような構造のトンネルにおいても、形状の安定性を確保するために、上下の結合部5a間に中柱8aを設けていた。
【0010】
しかしながら、上述した如き構造のトンネルには、いずれも以下に説明する技術的な課題があった。
【0011】
【発明が解決しようとする課題】
すなわち、図11に示したシールドトンネル1,2を直接的に連結する前者のトンネル、および、図13に示したシールドトンネル1a,2aを間接的に連結する後者のトンネルは、地下鉄のホームなどに利用されることが多く、また、地下鉄の渡り線部や道路トンネルの分合流部などへの利用が考えられている。
【0012】
ところが、これらのシールドトンネルには、トンネル内を仕切るようにして中柱8,8aが設けられているので、広い空間を確保することが難しく、特に、道路トンネルの分合流部や地下鉄の渡り線部に採用する場合には、中柱8,8aによりシールドトンネル間で車両や地下鉄の車線変更ができないという問題があった。
【0013】
本発明は、このような従来の問題点に鑑みてなされたものであって、その目的とするところは、中柱を無くすことにより、広い空間の確保が可能になり、分合流部や渡り車線部に採用した場合に、車線変更が可能になるトンネルおよびその構築工法を提供することにある。
【0014】
【課題を解決するための手段】
上記目的を達成するために、横方向に隣接構築される複数のシールドトンネルと、前記シールドトンネル間を、直接的ないしは間接的に連結する結合部とを有するトンネルにおいて、前記結合部の上方地盤中に地中ビームを設け、両端部が前記結合部と前記地中ビームとに定着された吊アンカーを設けたトンネルであって、前記地中ビームは、複数の前記シールドトンネルの外周を覆うように、上方に向けて膨出湾曲するアーチ状に形成され、その長手軸が前記シールドトンネルの軸と交差するように、トンネル軸に沿って所定の間隔を隔てて複数設けられるともに、前記シールドトンネルの側部外方に発進部および到達部を形成し、前記発進部から前記到達部に向けて管体を推進させて形成するアーチ部を有し、前記吊アンカーは、一端側が前記アーチ部の長手方向に沿って配置される複数本から構成され、他端側が前記結合部の上部側に収斂するように、同一面上で放射状に設けられ、前記発進部と前記到達部との間には、結合されたシールドトンネルを貫通して、両端が前記発進部と到達部とにそれぞれ定着されるプレストレス鋼材を設け、前記結合部の下部側から下方地盤中に下部アンカーを設置するようにした。
【0015】
このように構成したトンネルによれば、結合部の上方に地中ビームを設け、両端部が結合部と地中ビームとに定着された吊アンカーを設けているので、中柱を設けることなく、吊アンカーによりトンネルに掛かる荷重を受け持たせることができる。
【0016】
このため、広い空間が確保され、分合流部や渡り車線部に採用した場合には、地下鉄や走行車両の車線変更が簡単に行える。
【0021】
また、本発明は、横方向に隣接構築される複数のシールドトンネルと、前記シールドトンネル間を、直接的ないしは間接的に連結する結合部とを有し、前記結合部の上方に、前記シールドトンネルの軸と長手軸が交叉するように所定の間隔をおいて複数配置される地中ビームを設け、前記結合部と前記地中ビームとに両端部を定着する吊アンカーを設けるトンネルの構築工法であって、前記地中ビームは、発進部と到達部との間に設けられるアーチ部を備え、前記シールドトンネルの内部から、側方外部に地盤改良区域を形成し、この地盤改良区域に隣接する前記シールドトンネルのセグメントを除去して、当該地盤改良区域を掘削して、前記発進部および到達部を形成し、前記発進部からの管体の推進により、前記シールドトンネルの上方を半周して前記到達部に至る前記アーチ部を形成し、この後に、前記アーチ部から前記結合部の上部側との間に前記吊りアンカーを設置すること、前記結合部の下部側から下方地盤中に下部アンカーを設置すること、および、結合されたシールドトンネルを貫通して、両端が前記発進部と前記到達部とにそれぞれ定着されるプレストレス鋼材を設けるようにした。
【0023】
【発明の実施の形態】
以下、本発明の好適な実施の形態について、添付図面に基づいて詳細に説明する。図1から図10は、本発明にかかるトンネルおよびその構築工法の一実施例を示している。
【0024】
同図に示したトンネルは、本発明を道路トンネルの分合流部に適用した場合を例示している。この実施例では、小さい円形断面の第1シールドトンネル10が、ランプ線用のものであり、大きい円形断面の第2シールドトンネル12が、本線用のものである。
【0025】
本実施例の場合には、図1および図2に示すように、各シールドトンネル10,12は、トンネル軸が相互に平行になるように、隣接配置され、これらのシールドトンネル10,12間を、結合部14を介して、間接的に連結していて、内部同士が相互に連通する2連状態の道路トンネルが形成される。
【0026】
各シールドトンネル10,12は、円筒体を周および軸方向に複数の分割したセグメント10a,12aを、掘削面に沿って組立てることでその形状が維持されている。
【0027】
結合部14は、各シールドトンネル10,12のトンネル軸方向に沿って所定の長さに延設されていて、上下方向に平行に配置される上版部14aと下版部14bを備えている。
【0028】
結合部14の上,下版部14a,14bは、横方向の両端が各シールドトンネル10,12のセグメント10a,12aを除去した部分に一体的に固設されている。
【0029】
また、結合部14の上方には、地中ビーム16が設けられている。本実施例の地中ビーム16は、各シールドトンネル10,12のトンネル軸と、長手軸がほぼ直交するように設けられていて、かつ、各シールドトンネル10,12のトンネル軸に沿って所定の間隔を隔てて、相互に平行になるようにして、同一構成のものが複数配置されている。
【0030】
各地中ビーム16は、発進部18と到達部20との間に渡設されたアーチ部22を備えている。発進部18は、上下端が閉止された中空角筒状のものであって、その軸線が、第1シールドトンネル10の横断面と平行になるようにして、このシールドトンネル10の側面外方に隣接している。
【0031】
到達部20は、発進部18とほぼ同じ中空角筒状に形成され、その軸線が、第2シールドトンネル12の横断面と平行になるようにして、第2シールドトンネル12の側面外方に隣接している。なお、発進部18と到達部20の形状は、例えば、円筒状などの他の形状であってもよい。
【0032】
アーチ部22は、中空円筒状のものであって、第1および第2シールドトンネル10,12の上部側外周を半周するように、上方に向けて膨出湾曲する半円状に形成され、両端が発進および到達部18,20に一体化されている。
【0033】
このアーチ部22は、複数の中空管体22aの両端を相互に連結したものであって、発進部18の上端側から、中空管体22aを推進工法などにより順次上方地盤中に押し込むことにより、第1および第2シールドトンネル10,12の上部側外周を半周するようにして、その先端を到達部20に到達させることで、このような形状に形成される。
【0034】
また、本実施例の場合には、結合部14と地中ビーム16との間に、複数の吊アンカー24が設置されている。この吊アンカー24は、鋼棒などの棒状体で構成され、地中ビーム16のアーチ部22内から、これを貫通するようにして、結合部14側に向けて打設される。なお、この吊アンカー24は、シールドトンネル10,12内から上方に向けて打設してもよい。
【0035】
各吊アンカー24は、下端側が結合部14の上部に設けられた定着ブロック26の上面および側面に定着固定されているとともに、各吊アンカー24の上端側は、アーチ部22の中空管体22aの側壁に定着固定されている。
【0036】
本実施例の場合、吊アンカー24は、一端側がアーチ部22の長手方向に沿って配置される複数本から構成され、他端側が結合部14に収斂するように、同一面上で放射状に設けられている。
【0037】
このような同一面上に放射状に設けられた吊アンカー24は、図1に示すように、地中ビーム16から直下に垂設することだけでなく、例えば、図2に示すように、結合部14の軸方向の前後にずらせて設けてもよい。
【0038】
定着ブロック26は、本実施例の場合には、断面が長方形状のものであって、結合部14の上版部14a上に一体として突出形成され、上版部14aと同じ長さを備えている。
【0039】
さらに、本実施例の場合には、第1および第2シールドトンネル10,12のインバート部を貫通するようにして、プレストレス鋼材28が設けられている。このプレストレス鋼材28は、シールドトンネル10,12横断面方向に延設され、かつ、トンネル軸方向に沿って、所定の間隔を隔てて複数本配置されている。
【0040】
各プレストレス鋼材28は、緊張力を導入した状態で、一端側が地中ビーム16の発進部18に定着され、他端側が地中ビーム16の到達部20に定着されている。
【0041】
このプレストレス鋼材28は、地中ビーム16のアーチ部22に土圧が作用した際に、アーチ部22の両端側に設けられている発進部18と到達部20との間隔が、この土圧の作用により拡大しようとするのを、規制するために設けられている。
【0042】
また、本実施例の場合には、結合部14から下方の地盤に向けて打設される複数の下部アンカー30が設けられている。各下部アンカー30は、アンカー本体30aと、このアンカー本体30aの両端に設置される上方および下方定着部30b,30cを備えている。
【0043】
上部定着部30bは、アンカー本体30aの基端側にあって、結合部14の下版部14bの下面側に一体に設けられている。下方定着部30cは、アンカー本体30aの先端側にあって、地盤中に設置されている。
【0044】
この下部アンカー30は、地中ビーム16がシールドトンネル10,12の荷重を支持する際に、上下方向の作用力のバランスを採るために設けられている。
【0045】
次に、上記構成のトンネルの構築工法について、図3〜図10に従って説明する。図1に示した構造のトンネルを構築する際には、まず、第1シールドトンネル10が、図3に示すように、第2シールドトンネル12の連結位置まで到達すると、図4に示すように、第1シールドトンネル10の内部から、薬液注入工法などにより地盤改良区域Aを形成する。
【0046】
この地盤改良区域Aは、第1シールドトンネル10の側部外方にあって、地中ビーム16の発進部18を形成する個所に対応しており、地盤改良区域Aが形成されると、この部分のセグメント10aを除去して、図5に示すように、地盤改良区域Aを掘削した後に、上下端が閉塞された中空角筒状の発進部18を形成する。
【0047】
発進部18が形成されると、その上端中央部分から、上方側地盤に向けて円筒状の中空管体22aを推進工法により順次押出して、先端が第2シールドトンネル12の側部外方に至る中空円筒状のアーチ部22を形成する。
【0048】
なお、この場合、アーチ部22の最先端に配置される中空管体22aは、先端が閉止されたものが用いられ、これが到達する第2シールトンネル12の側部外方位置は、到達部20の形成する個所に対応している。
【0049】
このようなアーチ部22が形成され、図6に示すように、第2シールドトンネル12が連結個所に到達すると、第2シールドトンネル12の内部から、薬液注入工法などにより、側部外方に地盤改良区域Bを形成し、セグメント12aを除去して、掘削した後に、下端が閉塞され、上端側がアーチ部22と連通する中空角筒状の到達部20を形成する。
【0050】
なお、この地盤改良区域Bおよび到達部20の形成は、第2シールドトンネル12内から形成することだけでなく、アーチ部22を第2シールドトンネル12側に延設した際に、その先端内部側からこれらを形成することもできる。
【0051】
また、本実施例の場合には、第1シールドトンネル10の側部外方から地中ビーム16の発進部18を形成するようにしているが、地中ビーム16の形成方法は、これに限られることはなく、第1および第2シールドトンネル10,12が平行に隣接形成された状態で地中ビーム16を形成することもできる。
【0052】
この場合、各シールトンネル10,12の側部外方に、地盤改良区域A,Bを形成し、これらの部分にそれぞれ発進部18と到達部20とを形成して、この後に、これらの間にアーチ部22を形成する方法であっても良い。
【0053】
次に、第1および第2シールドトンネル10,12間を間接的に連結する結合部14が形成される。この結合部14を形成する際には、図7に示すように、第1および第2シールドトンネル10,12間に跨る地盤改良区域Cが、薬液注入工法などにより形成される。
【0054】
地盤改良区域Cが形成されると、この部分に対応するセグメント10a,12aを除去して、掘削が行われるが、この掘削に先立って、図8に示すように、地盤改良区域Cの上部側に、長尺鋼管フォアパイル32が複数本隣接するようにして地山に打設され、掘削の安定性を確保する。なお、この長尺鋼管フォアパイル32は、例えば、パイプルーフなどに代替することができる。
【0055】
そして、第1および第2シールドトンネル10,12間に跨る部分が掘削されると、図9に示すように、掘削部の上部に結合部14の上版部14aを形成し、掘削部の下部に下版部14bが形成される。
【0056】
この場合、上版部14aと下版部14bの両端は、セグメント10a,12aにそれぞれ一体化され、これにより結合部14を介して、第1および第2シールドトンネル10,12間が連通される。
【0057】
また、この際に、上版部14a上には、定着ブロック26が一体に形成されるとともに、下版部14bの下面側には、下部アンカー30の上方定着部30bが一体的に形成される。
【0058】
定着ブロック26の形成が終了する、地中ビーム16のアーチ部22内から、吊アンカー24が、管体22aを貫通して、結合部14側に向けて延設され、その下端が、定着ブロック26に定着固定される。
【0059】
この場合、吊アンカー24は、アーチ部22の形状に沿って所定の間隔を隔てて複数突出され、かつ、各吊アンカー24の先端側が、結合部14の一点に向けて収斂するようにして、同一横断面上で放射状態になるように配置され、定着ブロック26の上面と側面に各先端が定着固定される。
【0060】
また、各吊アンカー24の上端側は、アーチ部22の管体22aの壁面に定着固定される。このような吊アンカー24の設置が終了すると、図10に示すように、第1および第2シールドトンネル10,12の各インバート部を貫通するようにして、プレストレス鋼材28が設置される。
【0061】
このプレストレス鋼材28は、シールドトンネル10,12のトンネル軸沿って所定の間隔を隔てて、平行に配置され、緊張力を導入した状態で、両端が発進部18と到達部20とにそれぞれ定着固定される。なお、このプレストレス鋼材28の設置時期は、吊アンカー24を設置する前であってもよい。
【0062】
次いで、下部アンカー30のアンカー本体30aを結合部14の下方地盤中に打設して、その先端を下方定着部30cで固定するとともに、アンカー本体30aの上端側を上方定着部30bに固定する。
【0063】
この際に、本実施例では、下部アンカー30は、一対が概略ハ字形に拡開するように、複数本設置され、このような下部アンカー30が設置されると、シールドトンネルの構築が完了する。なお、ハ字形の下部アンカー30の配置位置は、吊アンカー24と同じ面上になっている。
【0064】
さて、以上のように構成したトンネルおよびその構築工法によれば、結合部14の上方に地中ビーム16を設け、両端部が結合部14と地中ビーム16とに定着された吊アンカー24を設けているので、中柱を設けることなく、吊アンカー24によりシールドトンネル10,12に掛かる荷重を受け持たせることができる。
【0065】
このため、広い空間が確保され、道路トンネルの分合流部や地下鉄の渡り線部に採用した場合には、走行車両や地下鉄の車線変更が簡単に行える。
【0066】
なお、上記実施例では、第1および第2シールドトンネル10,12を平行に隣接形成し、結合部14を設けて、両者間を間接的に連結する場合を例示したが、本発明の実施は、これに限定されることはなく、例えば、図12に示したような、トンネルを、別体の結合部介在させることなく、直接連結する場合にも適用することができる。
【0067】
また、上記実施例では、本発明を円形断面の2連シールドトンネルに適用した場合を例示したが、本発明の実施は、この構造に限定されることはなく、円形断面の3連構造や、角形など他の断面形状が連続したシールドトンネルにも適用することができる。
【0068】
【発明の効果】
以上、詳細に説明したように、本発明にかかるトンネルおよびその構築工法によれば、中柱を無くすことにより、広い空間の確保が可能になり、道路トンネルの分合流部や地下鉄の渡り線部に採用した場合に、車線変更が可能になる。
【図面の簡単な説明】
【図1】本発明にかかるトンネルの第1実施例を示す断面説明図である。
【図2】図1の斜視図である。
【図3】図1に示したトンネルの構築工法を示す初期工程の断面説明図である。
【図4】図3に引き続き行われる工程の断面説明図である。
【図5】図4に引き続き行われる工程の断面説明図である。
【図6】図5に引き続き行われる工程の断面説明図である。
【図7】図6に引き続き行われる工程の断面説明図である。
【図8】図7に引き続き行われる工程の断面説明図である。
【図9】図8に引き続き行われる工程の断面説明図である。
【図10】図9に引き続き行われる工程の断面説明図である。
【図11】従来のトンネルの一例を示す断面図である。
【図12】図11のA−A線拡大図である。
【図13】従来のトンネルの他の例を示す断面図である。
【符号の説明】
10 第1シールドトンネル
12 第2シールドトンネル
14 結合部
14a 上版部
14b 下版部
16 地中ビーム
18 発進部
20 到達部
22 アーチ部
24 吊アンカー
26 定着ブロック
28 プレストレス鋼材
30 下部アンカー[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tunnel and a construction method thereof, and more particularly, to a tunnel in which a plurality of shield tunnels are formed in a lateral direction and a construction method thereof.
[0002]
[Prior art]
Conventionally, tunnels constructed by the shield method have been mainly tunnels with a structurally stable circular cross section. However, recently, from the viewpoint of diversifying use of underground space, congestion of underground structures, and efforts to reduce costs, a tunnel with a cross-sectional shape in which circular cross-sections are polymerized in two or three in a horizontal direction. Has been built.
[0003]
FIGS. 11 to 12 show an example of such a tunnel. The tunnel shown in the figure is provided with first and
[0004]
The
[0005]
As shown in FIG. 12, the first and
[0006]
These connecting
[0007]
In the tunnel having such a shape, in order to structurally stabilize the tunnel, the
[0008]
Further, as a structure for connecting a plurality of tunnels in the lateral direction, a shield tunnel having a pair of circular sections as shown in FIG. There is also a structure in which 1a and 2a are arranged close to each other in parallel so as to be adjacent to each other, and a connecting
[0009]
Even in such a tunnel, the
[0010]
However, all the tunnels having the above-described structures have technical problems described below.
[0011]
[Problems to be solved by the invention]
That is, the former tunnel directly connecting the
[0012]
However, because these shield tunnels are provided with the
[0013]
The present invention has been made in view of such conventional problems, and the object of the present invention is to make it possible to secure a wide space by eliminating the middle pillar, and to join and merge lanes and crossing lanes. It is to provide a tunnel and its construction method capable of changing lanes when it is adopted in a section.
[0014]
[Means for Solving the Problems]
In order to achieve the above object, in a tunnel having a plurality of shield tunnels constructed adjacently in the lateral direction and a coupling portion that directly or indirectly connects the shield tunnels, A tunnel provided with a suspension anchor fixed to the coupling portion and the underground beam at both ends , the underground beam covering the outer periphery of the plurality of shield tunnels A plurality of arch-shaped bulges upward, the longitudinal axis of which intersects with the axis of the shield tunnel, and is provided at predetermined intervals along the tunnel axis. A start portion and a reaching portion are formed outside the side portion, and an arch portion is formed by propelling a tubular body from the start portion toward the reaching portion. It is composed of a plurality of pieces arranged along the longitudinal direction of the arch part, and is provided radially on the same surface so that the other end side converges on the upper side of the coupling part, and the starting part and the reaching part In between, provide pre-stressed steel material that penetrates the combined shield tunnel, both ends are fixed to the starting part and the reaching part respectively, and the lower anchor is installed in the lower ground from the lower side of the connecting part I tried to do it .
[0015]
According to the tunnel configured in this manner, the underground beam is provided above the coupling portion, and the suspension anchors provided at both ends are fixed to the coupling portion and the underground beam. The load applied to the tunnel can be received by the suspension anchor.
[0016]
For this reason, a wide space is ensured, and when it is adopted as a branching junction or a crossing lane, a lane change of a subway or a traveling vehicle can be easily performed.
[0021]
Further, the present invention includes a plurality of shield tunnel laterally flanked constructed between the shield tunnel, and a coupling portion that directly or indirectly connected, above the coupling portion, the shield tunnel A tunnel construction method in which a plurality of underground beams are arranged at predetermined intervals so that the axis and the longitudinal axis intersect, and suspension anchors that fix both ends of the coupling portion and the underground beam are provided. The underground beam includes an arch portion provided between the start portion and the arrival portion, and forms a ground improvement area from the inside of the shield tunnel to the outside of the side, and is adjacent to the ground improvement area. The shield tunnel segment is removed, and the ground improvement area is excavated to form the starting portion and the reaching portion, and by pushing the pipe body from the starting portion, the upper portion of the shield tunnel Forming the arch portion half to reaching the reaching part, after this, the placing the suspension anchor between the arches and the upper side of the coupling portion, the lower ground in the lower portion of the coupling portion A pre-stress steel material in which both ends are fixed to the starting part and the reaching part through the shield tunnels connected to each other is provided .
[0023]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described in detail with reference to the accompanying drawings. 1 to 10 show an embodiment of a tunnel and its construction method according to the present invention.
[0024]
The tunnel shown in the figure exemplifies the case where the present invention is applied to a junction part of a road tunnel. In this embodiment, the
[0025]
In the case of this embodiment, as shown in FIGS. 1 and 2, the
[0026]
The shape of each
[0027]
The
[0028]
The upper and
[0029]
An
[0030]
The
[0031]
The reaching
[0032]
The
[0033]
The
[0034]
In the case of the present embodiment, a plurality of suspension anchors 24 are installed between the
[0035]
Each
[0036]
In the case of the present embodiment, the
[0037]
As shown in FIG. 1, the suspension anchors 24 provided radially on the same plane are not only suspended from the
[0038]
In the case of this embodiment, the fixing
[0039]
Furthermore, in the case of the present embodiment, the
[0040]
Each
[0041]
The
[0042]
In the case of the present embodiment, a plurality of
[0043]
The
[0044]
The
[0045]
Next, the construction method of the tunnel having the above configuration will be described with reference to FIGS. When constructing the tunnel having the structure shown in FIG. 1, first, when the
[0046]
This ground improvement area A is located outside the side of the
[0047]
When the starting
[0048]
In this case, the
[0049]
When such an
[0050]
The ground improvement zone B and the reaching
[0051]
In the present embodiment, the starting
[0052]
In this case, ground improvement areas A and B are formed outside the side portions of the
[0053]
Next, a
[0054]
When the ground improvement area C is formed, the
[0055]
And when the part straddling between the 1st and
[0056]
In this case, both ends of the
[0057]
At this time, the fixing
[0058]
A
[0059]
In this case, a plurality of suspension anchors 24 are projected at predetermined intervals along the shape of the
[0060]
Further, the upper end side of each
[0061]
The
[0062]
Next, the anchor
[0063]
At this time, in this embodiment, a plurality of
[0064]
Now, according to the tunnel configured as described above and its construction method, the
[0065]
For this reason, a wide space is secured, and when it is adopted as a junction part of a road tunnel or a crossover part of a subway, it is possible to easily change a lane of a traveling vehicle or a subway.
[0066]
In the above embodiment, the first and
[0067]
Further, in the above embodiment, the case where the present invention is applied to a double shield tunnel with a circular cross section is illustrated, but the implementation of the present invention is not limited to this structure, The present invention can also be applied to a shield tunnel in which other cross-sectional shapes such as a square shape are continuous.
[0068]
【The invention's effect】
As described above in detail, according to the tunnel and its construction method according to the present invention, it is possible to secure a wide space by eliminating the central pillar, and the junction part of the road tunnel and the crossover part of the subway If it is adopted for lane change, it becomes possible to change lanes.
[Brief description of the drawings]
FIG. 1 is an explanatory cross-sectional view showing a first embodiment of a tunnel according to the present invention.
FIG. 2 is a perspective view of FIG.
FIG. 3 is an explanatory sectional view of an initial process showing a construction method of the tunnel shown in FIG. 1;
4 is an explanatory cross-sectional view of a step performed subsequent to FIG. 3. FIG.
FIG. 5 is an explanatory cross-sectional view of a step performed subsequent to FIG. 4;
6 is an explanatory cross-sectional view of a step performed subsequent to FIG. 5. FIG.
FIG. 7 is an explanatory cross-sectional view of a step performed subsequent to FIG. 6;
8 is an explanatory cross-sectional view of a step performed subsequent to FIG. 7. FIG.
FIG. 9 is a cross-sectional explanatory diagram of the step performed subsequent to FIG. 8;
10 is an explanatory cross-sectional view of a step performed subsequent to FIG. 9. FIG.
FIG. 11 is a cross-sectional view showing an example of a conventional tunnel.
12 is an enlarged view taken along line AA in FIG.
FIG. 13 is a cross-sectional view showing another example of a conventional tunnel.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
前記結合部の上方地盤中に地中ビームを設け、両端部が前記結合部と前記地中ビームとに定着された吊アンカーを設けたトンネルであって、
前記地中ビームは、複数の前記シールドトンネルの外周を覆うように、上方に向けて膨出湾曲するアーチ状に形成され、その長手軸が前記シールドトンネルの軸と交差するように、トンネル軸に沿って所定の間隔を隔てて複数設けられるとともに、前記シールドトンネルの側部外方に発進部および到達部を形成し、前記発進部から前記到達部に向けて管体を推進させて形成するアーチ部を有し、
前記吊アンカーは、一端側が前記アーチ部の長手方向に沿って配置される複数本から構成され、他端側が前記結合部の上部側に収斂するように、同一面上で放射状に設けられ、
前記発進部と前記到達部との間には、結合されたシールドトンネルを貫通して、両端が前記発進部と到達部とにそれぞれ定着されるプレストレス鋼材を設け、
前記結合部の下部側から下方地盤中に下部アンカーを設置することを特徴とするトンネル。In a tunnel having a plurality of shield tunnels constructed adjacent to each other in the lateral direction and a coupling portion that directly or indirectly connects the shield tunnels,
A tunnel provided with underground beams in the ground above the coupling portion, and provided with suspension anchors fixed to the coupling portion and the underground beam at both ends ;
The underground beam is formed in an arch shape that bulges upward and curves so as to cover the outer periphery of the plurality of shield tunnels, and the tunnel axis is formed so that the longitudinal axis thereof intersects the axis of the shield tunnel. And a plurality of arches formed at predetermined intervals along the shield tunnel, and formed with a starting portion and a reaching portion outside the side portion of the shield tunnel and propelling the pipe body from the starting portion toward the reaching portion. Part
The suspension anchor is composed of a plurality of one ends arranged along the longitudinal direction of the arch portion, and is provided radially on the same plane so that the other end converges on the upper side of the coupling portion,
Between the starting part and the reaching part, a prestressed steel material that penetrates the combined shield tunnel and is fixed to the starting part and the reaching part at both ends is provided,
A tunnel characterized in that a lower anchor is installed in the lower ground from the lower side of the coupling part .
前記地中ビームは、発進部と到達部との間に設けられるアーチ部を備え、前記シールドトンネルの内部から、側方外部に地盤改良区域を形成し、この地盤改良区域に隣接する前記シールドトンネルのセグメントを除去して、当該地盤改良区域を掘削して、前記発進部および到達部を形成し、前記発進部からの管体の推進により、前記シールドトンネルの上方を半周して前記到達部に至る前記アーチ部を形成し、
この後に、前記アーチ部から前記結合部の上部側との間に前記吊りアンカーを設置すること、前記結合部の下部側から下方地盤中に下部アンカーを設置すること、および、結合されたシールドトンネルを貫通して、両端が前記発進部と前記到達部とにそれぞれ定着されるプレストレス鋼材を設けることを特徴とするトンネルの構築工法。 A plurality of shield tunnels constructed adjacent to each other in a lateral direction; and a coupling portion that directly or indirectly couples between the shield tunnels, and an axis and a longitudinal axis of the shield tunnel are disposed above the coupling portion. A tunnel construction method in which a plurality of underground beams are arranged at predetermined intervals so as to cross, and a suspension anchor that fixes both ends of the coupling portion and the underground beam is provided,
The underground beam includes an arch portion provided between a starting portion and a reaching portion, and forms a ground improvement area from the inside of the shield tunnel to the outside of the side, and the shield tunnel adjacent to the ground improvement area. The segment is removed, and the ground improvement area is excavated to form the starting portion and the reaching portion, and by pushing the tubular body from the starting portion, the upper part of the shield tunnel is half-circulated to the reaching portion. Forming the arch to reach,
Thereafter, the suspension anchor is installed between the arch portion and the upper side of the coupling portion, the lower anchor is installed in the lower ground from the lower side of the coupling portion, and the coupled shield tunnel The tunnel construction method is characterized by providing prestressed steel material that penetrates the two ends and is fixed to the starting portion and the reaching portion, respectively .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001340976A JP3972633B2 (en) | 2001-11-06 | 2001-11-06 | Tunnel and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001340976A JP3972633B2 (en) | 2001-11-06 | 2001-11-06 | Tunnel and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003138899A JP2003138899A (en) | 2003-05-14 |
| JP3972633B2 true JP3972633B2 (en) | 2007-09-05 |
Family
ID=19155094
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001340976A Expired - Fee Related JP3972633B2 (en) | 2001-11-06 | 2001-11-06 | Tunnel and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3972633B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4261270B2 (en) * | 2003-07-11 | 2009-04-30 | 株式会社大林組 | Tunnel excavator |
| JP2005030041A (en) * | 2003-07-11 | 2005-02-03 | Ohbayashi Corp | Tunnel construction system and propulsion pipe |
| KR100844147B1 (en) | 2007-03-07 | 2008-07-04 | 박재현 | Two arch tunnel with asymmetric support wall and construction method |
| CN112065469B (en) * | 2020-09-23 | 2022-09-16 | 中铁工程装备集团有限公司 | Underground large-span space structure and construction method thereof |
| CN113586079B (en) * | 2021-08-24 | 2024-02-13 | 中国电建集团中南勘测设计研究院有限公司 | Tunnel cross intersection structure and construction method thereof |
| CN115539051B (en) * | 2022-10-11 | 2025-05-06 | 新疆北新路桥集团股份有限公司 | A method for replacing arches in biased double-arch tunnels |
-
2001
- 2001-11-06 JP JP2001340976A patent/JP3972633B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003138899A (en) | 2003-05-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108843338B (en) | Integrated excavation construction method for converting shaft construction channel into large-section tunnel | |
| CN106545088A (en) | The switching node and implementation of a kind of upper strata concrete column and lower floor's steel core concrete column | |
| KR102362257B1 (en) | Top-down construction method | |
| CN109235507A (en) | A kind of stratum consolidation system and method for reinforcing existing tunnel | |
| JP3972633B2 (en) | Tunnel and its construction method | |
| JPH0559719A (en) | Constructing method for combined foundation with ground solidification | |
| JP2008101467A (en) | Rock fall prevention fence | |
| JP4299455B2 (en) | Junction structure and joining method for large-section tunnel segments | |
| JP3972635B2 (en) | Tunnel structure | |
| JP3096652B2 (en) | Construction method of widening tunnel and emergency parking zone | |
| JP2869877B2 (en) | Tunnel merging method and branching method | |
| KR100926501B1 (en) | Construction method of non-adhesive tunnel structure combining roof and shield (RSS method) and tunnel structure | |
| JP3896351B2 (en) | Construction method of underground wall and construction method of underpass | |
| JP3972634B2 (en) | Tunnel construction method | |
| CN211174126U (en) | Open cut tunnel structure | |
| JPH03202599A (en) | Reinforced structure of twin tunnels | |
| JP3988652B2 (en) | Tunnel branch and junction structure | |
| JP2004263501A (en) | Beam-column joint structure | |
| JP4396278B2 (en) | Tunnel connection method | |
| KR100467244B1 (en) | Anchor for supporting retaining wall block | |
| JP4303512B2 (en) | Construction method of large section tunnel | |
| JP4750568B2 (en) | Tunnel junction construction method and tunnel junction structure | |
| CN113586079A (en) | Tunnel crossroad structure and construction method thereof | |
| JPH07208068A (en) | Tunnel expansion, contraction, merging and branching methods | |
| JPH051850B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040927 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061219 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070131 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070522 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070604 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100622 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100622 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110622 Year of fee payment: 4 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110622 Year of fee payment: 4 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110622 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120622 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120622 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130622 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130622 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140622 Year of fee payment: 7 |
|
| LAPS | Cancellation because of no payment of annual fees |