JP3972633B2 - Tunnel and its construction method - Google Patents
[go: Go Back, main page]

JP3972633B2 - Tunnel and its construction method - Google Patents

Tunnel and its construction method Download PDF

Info

Publication number
JP3972633B2
JP3972633B2 JP2001340976A JP2001340976A JP3972633B2 JP 3972633 B2 JP3972633 B2 JP 3972633B2 JP 2001340976 A JP2001340976 A JP 2001340976A JP 2001340976 A JP2001340976 A JP 2001340976A JP 3972633 B2 JP3972633 B2 JP 3972633B2
Authority
JP
Japan
Prior art keywords
tunnel
shield
reaching
coupling portion
starting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001340976A
Other languages
Japanese (ja)
Other versions
JP2003138899A (en
Inventor
誠 金井
幸三郎 土屋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2001340976A priority Critical patent/JP3972633B2/en
Publication of JP2003138899A publication Critical patent/JP2003138899A/en
Application granted granted Critical
Publication of JP3972633B2 publication Critical patent/JP3972633B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、トンネルおよびその構築工法に関し、特に、複数のシールドトンネルを横方向に連結形成するトンネルおよびその構築工法に関するものである。
【0002】
【従来の技術】
従来、シールド工法で構築されるトンネルは、構造的に安定した円形断面のトンネルが主流であった。ところが、近時、地下空間利用の多様化,地下構造物の輻輳化,コストダウンへの取組みといった観点から、円形断面を横方向に、2連もしくは3連状に重合させた断面形状のトンネルが構築されている。
【0003】
図11〜図12には、このような形状のトンネルの一例が示されている。同図に示したトンネルは、円形断面で、同じ直径の第1および第2シールドトンネル1,2を備えている。
【0004】
このシールドトンネル1,2は、先端側に配置されたシールド掘進機3の掘進により掘削面を形成し、その後部側に掘削面に沿ってセグメント4を組立てることにより形成される。
【0005】
第1および第2シールドトンネル1,2は、図12に示すように、円形断面の端部同士が、相互に重なるようにして、横方向に直接的に連結形成し、これらの重合した部分を切除して、隣接するシールドトンネル1,2のセグメント4間の結合部5には、上および下連結セグメントピース6,7が配置される。
【0006】
これらの連結セグメントピース6,7は、両端面がセグメント4にそれぞれ接合され、上下方向に所定の間隔を隔てて対向する上,下連結セグメントピース6,7間には、中柱8が設置されている。
【0007】
このような形状のトンネルにおいては、トンネルを構造的に安定化させるために、中柱8は、図11に示すように、セグメント4の1リング毎に配置されていた。
【0008】
また、複数のトンネルを横方向に連結する構造としては、上記したようにシールドトンネル1,2を直接的に連結する構成以外に、例えば、図13に示すように、一対の円形断面のシールドトンネル1a,2aを、相互に隣接するように平行に近接配置して、両者間に跨る結合部5aを形成する構造もある。
【0009】
このような構造のトンネルにおいても、形状の安定性を確保するために、上下の結合部5a間に中柱8aを設けていた。
【0010】
しかしながら、上述した如き構造のトンネルには、いずれも以下に説明する技術的な課題があった。
【0011】
【発明が解決しようとする課題】
すなわち、図11に示したシールドトンネル1,2を直接的に連結する前者のトンネル、および、図13に示したシールドトンネル1a,2aを間接的に連結する後者のトンネルは、地下鉄のホームなどに利用されることが多く、また、地下鉄の渡り線部や道路トンネルの分合流部などへの利用が考えられている。
【0012】
ところが、これらのシールドトンネルには、トンネル内を仕切るようにして中柱8,8aが設けられているので、広い空間を確保することが難しく、特に、道路トンネルの分合流部や地下鉄の渡り線部に採用する場合には、中柱8,8aによりシールドトンネル間で車両や地下鉄の車線変更ができないという問題があった。
【0013】
本発明は、このような従来の問題点に鑑みてなされたものであって、その目的とするところは、中柱を無くすことにより、広い空間の確保が可能になり、分合流部や渡り車線部に採用した場合に、車線変更が可能になるトンネルおよびその構築工法を提供することにある。
【0014】
【課題を解決するための手段】
上記目的を達成するために、横方向に隣接構築される複数のシールドトンネルと、前記シールドトンネル間を、直接的ないしは間接的に連結する結合部とを有するトンネルにおいて、前記結合部の上方地盤中に地中ビームを設け、両端部が前記結合部と前記地中ビームとに定着された吊アンカーを設けたトンネルであって、前記地中ビームは、複数の前記シールドトンネルの外周を覆うように、上方に向けて膨出湾曲するアーチ状に形成され、その長手軸が前記シールドトンネルの軸と交差するように、トンネル軸に沿って所定の間隔を隔てて複数設けられるともに、前記シールドトンネルの側部外方に発進部および到達部を形成し、前記発進部から前記到達部に向けて管体を推進させて形成するアーチ部を有し、前記吊アンカーは、一端側が前記アーチ部の長手方向に沿って配置される複数本から構成され、他端側が前記結合部の上部側に収斂するように、同一面上で放射状に設けられ、前記発進部と前記到達部との間には、結合されたシールドトンネルを貫通して、両端が前記発進部と到達部とにそれぞれ定着されるプレストレス鋼材を設け、前記結合部の下部側から下方地盤中に下部アンカーを設置するようにした
【0015】
このように構成したトンネルによれば、結合部の上方に地中ビームを設け、両端部が結合部と地中ビームとに定着された吊アンカーを設けているので、中柱を設けることなく、吊アンカーによりトンネルに掛かる荷重を受け持たせることができる。
【0016】
このため、広い空間が確保され、分合流部や渡り車線部に採用した場合には、地下鉄や走行車両の車線変更が簡単に行える。
【0021】
また、本発明は、横方向に隣接構築される複数のシールドトンネルと、前記シールドトンネル間を、直接的ないしは間接的に連結する結合部とを有し、前記結合部の上方に、前記シールドトンネルの軸と長手軸が交叉するように所定の間隔をおいて複数配置される地中ビームを設け、前記結合部と前記地中ビームとに両端部を定着する吊アンカーを設けるトンネルの構築工法であって、前記地中ビームは、発進部と到達部との間に設けられるアーチ部を備え、前記シールドトンネルの内部から、側方外部に地盤改良区域を形成し、この地盤改良区域に隣接する前記シールドトンネルのセグメントを除去して、当該地盤改良区域を掘削して、前記発進部および到達部を形成し、前記発進部からの管体の推進により、前記シールドトンネルの上方を半周して前記到達部に至る前記アーチ部を形成し、この後に、前記アーチ部から前記結合部の上部側との間に前記吊りアンカーを設置すること、前記結合部の下部側から下方地盤中に下部アンカーを設置すること、および、結合されたシールドトンネルを貫通して、両端が前記発進部と前記到達部とにそれぞれ定着されるプレストレス鋼材を設けるようにした。
【0023】
【発明の実施の形態】
以下、本発明の好適な実施の形態について、添付図面に基づいて詳細に説明する。図1から図10は、本発明にかかるトンネルおよびその構築工法の一実施例を示している。
【0024】
同図に示したトンネルは、本発明を道路トンネルの分合流部に適用した場合を例示している。この実施例では、小さい円形断面の第1シールドトンネル10が、ランプ線用のものであり、大きい円形断面の第2シールドトンネル12が、本線用のものである。
【0025】
本実施例の場合には、図1および図2に示すように、各シールドトンネル10,12は、トンネル軸が相互に平行になるように、隣接配置され、これらのシールドトンネル10,12間を、結合部14を介して、間接的に連結していて、内部同士が相互に連通する2連状態の道路トンネルが形成される。
【0026】
各シールドトンネル10,12は、円筒体を周および軸方向に複数の分割したセグメント10a,12aを、掘削面に沿って組立てることでその形状が維持されている。
【0027】
結合部14は、各シールドトンネル10,12のトンネル軸方向に沿って所定の長さに延設されていて、上下方向に平行に配置される上版部14aと下版部14bを備えている。
【0028】
結合部14の上,下版部14a,14bは、横方向の両端が各シールドトンネル10,12のセグメント10a,12aを除去した部分に一体的に固設されている。
【0029】
また、結合部14の上方には、地中ビーム16が設けられている。本実施例の地中ビーム16は、各シールドトンネル10,12のトンネル軸と、長手軸がほぼ直交するように設けられていて、かつ、各シールドトンネル10,12のトンネル軸に沿って所定の間隔を隔てて、相互に平行になるようにして、同一構成のものが複数配置されている。
【0030】
各地中ビーム16は、発進部18と到達部20との間に渡設されたアーチ部22を備えている。発進部18は、上下端が閉止された中空角筒状のものであって、その軸線が、第1シールドトンネル10の横断面と平行になるようにして、このシールドトンネル10の側面外方に隣接している。
【0031】
到達部20は、発進部18とほぼ同じ中空角筒状に形成され、その軸線が、第2シールドトンネル12の横断面と平行になるようにして、第2シールドトンネル12の側面外方に隣接している。なお、発進部18と到達部20の形状は、例えば、円筒状などの他の形状であってもよい。
【0032】
アーチ部22は、中空円筒状のものであって、第1および第2シールドトンネル10,12の上部側外周を半周するように、上方に向けて膨出湾曲する半円状に形成され、両端が発進および到達部18,20に一体化されている。
【0033】
このアーチ部22は、複数の中空管体22aの両端を相互に連結したものであって、発進部18の上端側から、中空管体22aを推進工法などにより順次上方地盤中に押し込むことにより、第1および第2シールドトンネル10,12の上部側外周を半周するようにして、その先端を到達部20に到達させることで、このような形状に形成される。
【0034】
また、本実施例の場合には、結合部14と地中ビーム16との間に、複数の吊アンカー24が設置されている。この吊アンカー24は、鋼棒などの棒状体で構成され、地中ビーム16のアーチ部22内から、これを貫通するようにして、結合部14側に向けて打設される。なお、この吊アンカー24は、シールドトンネル10,12内から上方に向けて打設してもよい。
【0035】
各吊アンカー24は、下端側が結合部14の上部に設けられた定着ブロック26の上面および側面に定着固定されているとともに、各吊アンカー24の上端側は、アーチ部22の中空管体22aの側壁に定着固定されている。
【0036】
本実施例の場合、吊アンカー24は、一端側がアーチ部22の長手方向に沿って配置される複数本から構成され、他端側が結合部14に収斂するように、同一面上で放射状に設けられている。
【0037】
このような同一面上に放射状に設けられた吊アンカー24は、図1に示すように、地中ビーム16から直下に垂設することだけでなく、例えば、図2に示すように、結合部14の軸方向の前後にずらせて設けてもよい。
【0038】
定着ブロック26は、本実施例の場合には、断面が長方形状のものであって、結合部14の上版部14a上に一体として突出形成され、上版部14aと同じ長さを備えている。
【0039】
さらに、本実施例の場合には、第1および第2シールドトンネル10,12のインバート部を貫通するようにして、プレストレス鋼材28が設けられている。このプレストレス鋼材28は、シールドトンネル10,12横断面方向に延設され、かつ、トンネル軸方向に沿って、所定の間隔を隔てて複数本配置されている。
【0040】
各プレストレス鋼材28は、緊張力を導入した状態で、一端側が地中ビーム16の発進部18に定着され、他端側が地中ビーム16の到達部20に定着されている。
【0041】
このプレストレス鋼材28は、地中ビーム16のアーチ部22に土圧が作用した際に、アーチ部22の両端側に設けられている発進部18と到達部20との間隔が、この土圧の作用により拡大しようとするのを、規制するために設けられている。
【0042】
また、本実施例の場合には、結合部14から下方の地盤に向けて打設される複数の下部アンカー30が設けられている。各下部アンカー30は、アンカー本体30aと、このアンカー本体30aの両端に設置される上方および下方定着部30b,30cを備えている。
【0043】
上部定着部30bは、アンカー本体30aの基端側にあって、結合部14の下版部14bの下面側に一体に設けられている。下方定着部30cは、アンカー本体30aの先端側にあって、地盤中に設置されている。
【0044】
この下部アンカー30は、地中ビーム16がシールドトンネル10,12の荷重を支持する際に、上下方向の作用力のバランスを採るために設けられている。
【0045】
次に、上記構成のトンネルの構築工法について、図3〜図10に従って説明する。図1に示した構造のトンネルを構築する際には、まず、第1シールドトンネル10が、図3に示すように、第2シールドトンネル12の連結位置まで到達すると、図4に示すように、第1シールドトンネル10の内部から、薬液注入工法などにより地盤改良区域Aを形成する。
【0046】
この地盤改良区域Aは、第1シールドトンネル10の側部外方にあって、地中ビーム16の発進部18を形成する個所に対応しており、地盤改良区域Aが形成されると、この部分のセグメント10aを除去して、図5に示すように、地盤改良区域Aを掘削した後に、上下端が閉塞された中空角筒状の発進部18を形成する。
【0047】
発進部18が形成されると、その上端中央部分から、上方側地盤に向けて円筒状の中空管体22aを推進工法により順次押出して、先端が第2シールドトンネル12の側部外方に至る中空円筒状のアーチ部22を形成する。
【0048】
なお、この場合、アーチ部22の最先端に配置される中空管体22aは、先端が閉止されたものが用いられ、これが到達する第2シールトンネル12の側部外方位置は、到達部20の形成する個所に対応している。
【0049】
このようなアーチ部22が形成され、図6に示すように、第2シールドトンネル12が連結個所に到達すると、第2シールドトンネル12の内部から、薬液注入工法などにより、側部外方に地盤改良区域Bを形成し、セグメント12aを除去して、掘削した後に、下端が閉塞され、上端側がアーチ部22と連通する中空角筒状の到達部20を形成する。
【0050】
なお、この地盤改良区域Bおよび到達部20の形成は、第2シールドトンネル12内から形成することだけでなく、アーチ部22を第2シールドトンネル12側に延設した際に、その先端内部側からこれらを形成することもできる。
【0051】
また、本実施例の場合には、第1シールドトンネル10の側部外方から地中ビーム16の発進部18を形成するようにしているが、地中ビーム16の形成方法は、これに限られることはなく、第1および第2シールドトンネル10,12が平行に隣接形成された状態で地中ビーム16を形成することもできる。
【0052】
この場合、各シールトンネル10,12の側部外方に、地盤改良区域A,Bを形成し、これらの部分にそれぞれ発進部18と到達部20とを形成して、この後に、これらの間にアーチ部22を形成する方法であっても良い。
【0053】
次に、第1および第2シールドトンネル10,12間を間接的に連結する結合部14が形成される。この結合部14を形成する際には、図7に示すように、第1および第2シールドトンネル10,12間に跨る地盤改良区域Cが、薬液注入工法などにより形成される。
【0054】
地盤改良区域Cが形成されると、この部分に対応するセグメント10a,12aを除去して、掘削が行われるが、この掘削に先立って、図8に示すように、地盤改良区域Cの上部側に、長尺鋼管フォアパイル32が複数本隣接するようにして地山に打設され、掘削の安定性を確保する。なお、この長尺鋼管フォアパイル32は、例えば、パイプルーフなどに代替することができる。
【0055】
そして、第1および第2シールドトンネル10,12間に跨る部分が掘削されると、図9に示すように、掘削部の上部に結合部14の上版部14aを形成し、掘削部の下部に下版部14bが形成される。
【0056】
この場合、上版部14aと下版部14bの両端は、セグメント10a,12aにそれぞれ一体化され、これにより結合部14を介して、第1および第2シールドトンネル10,12間が連通される。
【0057】
また、この際に、上版部14a上には、定着ブロック26が一体に形成されるとともに、下版部14bの下面側には、下部アンカー30の上方定着部30bが一体的に形成される。
【0058】
定着ブロック26の形成が終了する、地中ビーム16のアーチ部22内から、吊アンカー24が、管体22aを貫通して、結合部14側に向けて延設され、その下端が、定着ブロック26に定着固定される。
【0059】
この場合、吊アンカー24は、アーチ部22の形状に沿って所定の間隔を隔てて複数突出され、かつ、各吊アンカー24の先端側が、結合部14の一点に向けて収斂するようにして、同一横断面上で放射状態になるように配置され、定着ブロック26の上面と側面に各先端が定着固定される。
【0060】
また、各吊アンカー24の上端側は、アーチ部22の管体22aの壁面に定着固定される。このような吊アンカー24の設置が終了すると、図10に示すように、第1および第2シールドトンネル10,12の各インバート部を貫通するようにして、プレストレス鋼材28が設置される。
【0061】
このプレストレス鋼材28は、シールドトンネル10,12のトンネル軸沿って所定の間隔を隔てて、平行に配置され、緊張力を導入した状態で、両端が発進部18と到達部20とにそれぞれ定着固定される。なお、このプレストレス鋼材28の設置時期は、吊アンカー24を設置する前であってもよい。
【0062】
次いで、下部アンカー30のアンカー本体30aを結合部14の下方地盤中に打設して、その先端を下方定着部30cで固定するとともに、アンカー本体30aの上端側を上方定着部30bに固定する。
【0063】
この際に、本実施例では、下部アンカー30は、一対が概略ハ字形に拡開するように、複数本設置され、このような下部アンカー30が設置されると、シールドトンネルの構築が完了する。なお、ハ字形の下部アンカー30の配置位置は、吊アンカー24と同じ面上になっている。
【0064】
さて、以上のように構成したトンネルおよびその構築工法によれば、結合部14の上方に地中ビーム16を設け、両端部が結合部14と地中ビーム16とに定着された吊アンカー24を設けているので、中柱を設けることなく、吊アンカー24によりシールドトンネル10,12に掛かる荷重を受け持たせることができる。
【0065】
このため、広い空間が確保され、道路トンネルの分合流部や地下鉄の渡り線部に採用した場合には、走行車両や地下鉄の車線変更が簡単に行える。
【0066】
なお、上記実施例では、第1および第2シールドトンネル10,12を平行に隣接形成し、結合部14を設けて、両者間を間接的に連結する場合を例示したが、本発明の実施は、これに限定されることはなく、例えば、図12に示したような、トンネルを、別体の結合部介在させることなく、直接連結する場合にも適用することができる。
【0067】
また、上記実施例では、本発明を円形断面の2連シールドトンネルに適用した場合を例示したが、本発明の実施は、この構造に限定されることはなく、円形断面の3連構造や、角形など他の断面形状が連続したシールドトンネルにも適用することができる。
【0068】
【発明の効果】
以上、詳細に説明したように、本発明にかかるトンネルおよびその構築工法によれば、中柱を無くすことにより、広い空間の確保が可能になり、道路トンネルの分合流部や地下鉄の渡り線部に採用した場合に、車線変更が可能になる。
【図面の簡単な説明】
【図1】本発明にかかるトンネルの第1実施例を示す断面説明図である。
【図2】図1の斜視図である。
【図3】図1に示したトンネルの構築工法を示す初期工程の断面説明図である。
【図4】図3に引き続き行われる工程の断面説明図である。
【図5】図4に引き続き行われる工程の断面説明図である。
【図6】図5に引き続き行われる工程の断面説明図である。
【図7】図6に引き続き行われる工程の断面説明図である。
【図8】図7に引き続き行われる工程の断面説明図である。
【図9】図8に引き続き行われる工程の断面説明図である。
【図10】図9に引き続き行われる工程の断面説明図である。
【図11】従来のトンネルの一例を示す断面図である。
【図12】図11のA−A線拡大図である。
【図13】従来のトンネルの他の例を示す断面図である。
【符号の説明】
10 第1シールドトンネル
12 第2シールドトンネル
14 結合部
14a 上版部
14b 下版部
16 地中ビーム
18 発進部
20 到達部
22 アーチ部
24 吊アンカー
26 定着ブロック
28 プレストレス鋼材
30 下部アンカー
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tunnel and a construction method thereof, and more particularly, to a tunnel in which a plurality of shield tunnels are formed in a lateral direction and a construction method thereof.
[0002]
[Prior art]
Conventionally, tunnels constructed by the shield method have been mainly tunnels with a structurally stable circular cross section. However, recently, from the viewpoint of diversifying use of underground space, congestion of underground structures, and efforts to reduce costs, a tunnel with a cross-sectional shape in which circular cross-sections are polymerized in two or three in a horizontal direction. Has been built.
[0003]
FIGS. 11 to 12 show an example of such a tunnel. The tunnel shown in the figure is provided with first and second shield tunnels 1 and 2 having a circular cross section and the same diameter.
[0004]
The shield tunnels 1 and 2 are formed by forming an excavation surface by excavation by a shield excavator 3 disposed on the tip side, and assembling the segments 4 along the excavation surface on the rear side.
[0005]
As shown in FIG. 12, the first and second shield tunnels 1 and 2 are formed by directly connecting the ends of the circular cross-sections in the lateral direction so that they overlap each other. The upper and lower connecting segment pieces 6 and 7 are arranged at the joint 5 between the segments 4 of the adjacent shield tunnels 1 and 2 by cutting.
[0006]
These connecting segment pieces 6 and 7 are joined to the segment 4 at both end surfaces, and are opposed to each other at a predetermined interval in the vertical direction, and a middle pillar 8 is installed between the upper and lower connecting segment pieces 6 and 7. ing.
[0007]
In the tunnel having such a shape, in order to structurally stabilize the tunnel, the middle pillar 8 is arranged for each ring of the segment 4 as shown in FIG.
[0008]
Further, as a structure for connecting a plurality of tunnels in the lateral direction, a shield tunnel having a pair of circular sections as shown in FIG. There is also a structure in which 1a and 2a are arranged close to each other in parallel so as to be adjacent to each other, and a connecting portion 5a is formed between the two.
[0009]
Even in such a tunnel, the middle pillar 8a is provided between the upper and lower coupling portions 5a in order to ensure the stability of the shape.
[0010]
However, all the tunnels having the above-described structures have technical problems described below.
[0011]
[Problems to be solved by the invention]
That is, the former tunnel directly connecting the shield tunnels 1 and 2 shown in FIG. 11 and the latter tunnel indirectly connecting the shield tunnels 1a and 2a shown in FIG. It is often used, and it is also considered to be used for a crossover part of a subway or a branch and junction part of a road tunnel.
[0012]
However, because these shield tunnels are provided with the middle pillars 8 and 8a so as to partition the inside of the tunnel, it is difficult to secure a wide space, and in particular, the junction part of the road tunnel and the crossover line of the subway In the case of adopting it in the section, there is a problem that the lanes of the vehicle and the subway cannot be changed between the shield tunnels by the middle columns 8 and 8a.
[0013]
The present invention has been made in view of such conventional problems, and the object of the present invention is to make it possible to secure a wide space by eliminating the middle pillar, and to join and merge lanes and crossing lanes. It is to provide a tunnel and its construction method capable of changing lanes when it is adopted in a section.
[0014]
[Means for Solving the Problems]
In order to achieve the above object, in a tunnel having a plurality of shield tunnels constructed adjacently in the lateral direction and a coupling portion that directly or indirectly connects the shield tunnels, A tunnel provided with a suspension anchor fixed to the coupling portion and the underground beam at both ends , the underground beam covering the outer periphery of the plurality of shield tunnels A plurality of arch-shaped bulges upward, the longitudinal axis of which intersects with the axis of the shield tunnel, and is provided at predetermined intervals along the tunnel axis. A start portion and a reaching portion are formed outside the side portion, and an arch portion is formed by propelling a tubular body from the start portion toward the reaching portion. It is composed of a plurality of pieces arranged along the longitudinal direction of the arch part, and is provided radially on the same surface so that the other end side converges on the upper side of the coupling part, and the starting part and the reaching part In between, provide pre-stressed steel material that penetrates the combined shield tunnel, both ends are fixed to the starting part and the reaching part respectively, and the lower anchor is installed in the lower ground from the lower side of the connecting part I tried to do it .
[0015]
According to the tunnel configured in this manner, the underground beam is provided above the coupling portion, and the suspension anchors provided at both ends are fixed to the coupling portion and the underground beam. The load applied to the tunnel can be received by the suspension anchor.
[0016]
For this reason, a wide space is ensured, and when it is adopted as a branching junction or a crossing lane, a lane change of a subway or a traveling vehicle can be easily performed.
[0021]
Further, the present invention includes a plurality of shield tunnel laterally flanked constructed between the shield tunnel, and a coupling portion that directly or indirectly connected, above the coupling portion, the shield tunnel A tunnel construction method in which a plurality of underground beams are arranged at predetermined intervals so that the axis and the longitudinal axis intersect, and suspension anchors that fix both ends of the coupling portion and the underground beam are provided. The underground beam includes an arch portion provided between the start portion and the arrival portion, and forms a ground improvement area from the inside of the shield tunnel to the outside of the side, and is adjacent to the ground improvement area. The shield tunnel segment is removed, and the ground improvement area is excavated to form the starting portion and the reaching portion, and by pushing the pipe body from the starting portion, the upper portion of the shield tunnel Forming the arch portion half to reaching the reaching part, after this, the placing the suspension anchor between the arches and the upper side of the coupling portion, the lower ground in the lower portion of the coupling portion A pre-stress steel material in which both ends are fixed to the starting part and the reaching part through the shield tunnels connected to each other is provided .
[0023]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described in detail with reference to the accompanying drawings. 1 to 10 show an embodiment of a tunnel and its construction method according to the present invention.
[0024]
The tunnel shown in the figure exemplifies the case where the present invention is applied to a junction part of a road tunnel. In this embodiment, the first shield tunnel 10 having a small circular cross section is for a lamp line, and the second shield tunnel 12 having a large circular cross section is for a main line.
[0025]
In the case of this embodiment, as shown in FIGS. 1 and 2, the shield tunnels 10 and 12 are arranged adjacent to each other so that the tunnel axes are parallel to each other. In this way, a two-way road tunnel is formed which is indirectly connected via the connecting portion 14 and communicates with each other.
[0026]
The shape of each shield tunnel 10, 12 is maintained by assembling a plurality of segments 10a, 12a obtained by dividing a cylindrical body in the circumferential and axial directions along the excavation surface.
[0027]
The coupling portion 14 is provided with an upper plate portion 14a and a lower plate portion 14b that extend in a predetermined length along the tunnel axis direction of the shield tunnels 10 and 12, and are arranged in parallel in the vertical direction. .
[0028]
The upper and lower plate portions 14a and 14b of the coupling portion 14 are integrally fixed to the portions where the segments 10a and 12a of the shield tunnels 10 and 12 are removed at both lateral ends.
[0029]
An underground beam 16 is provided above the coupling portion 14. The underground beam 16 of this embodiment is provided so that the tunnel axis of each shield tunnel 10, 12 is substantially orthogonal to the longitudinal axis, and a predetermined axis is provided along the tunnel axis of each shield tunnel 10, 12. A plurality of ones having the same configuration are arranged so as to be parallel to each other at intervals.
[0030]
The beam 16 in each location includes an arch portion 22 provided between the start portion 18 and the arrival portion 20. The starting portion 18 has a hollow rectangular tube shape whose upper and lower ends are closed, and its axis is parallel to the transverse section of the first shield tunnel 10 so that the start portion 18 extends outward from the side surface of the shield tunnel 10. Adjacent.
[0031]
The reaching portion 20 is formed in a hollow rectangular tube shape that is substantially the same as that of the starting portion 18 and is adjacent to the outer side of the second shield tunnel 12 so that its axis is parallel to the transverse section of the second shield tunnel 12. is doing. In addition, the shapes of the start part 18 and the reach | attainment part 20 may be other shapes, such as a cylindrical shape, for example.
[0032]
The arch portion 22 has a hollow cylindrical shape, and is formed in a semicircular shape that bulges and curves upward so as to make a semicircular perimeter on the upper side of the first and second shield tunnels 10 and 12. Is integrated into the start and reach sections 18,20.
[0033]
The arch portion 22 is formed by connecting both ends of a plurality of hollow tube bodies 22a, and the hollow tube body 22a is sequentially pushed into the upper ground from the upper end side of the starting portion 18 by a propulsion method or the like. Thus, the upper and outer peripheries of the first and second shield tunnels 10 and 12 are half-circulated and their tips reach the reaching part 20 to be formed in such a shape.
[0034]
In the case of the present embodiment, a plurality of suspension anchors 24 are installed between the coupling portion 14 and the underground beam 16. The suspension anchor 24 is composed of a rod-shaped body such as a steel rod, and is driven from the inside of the arch portion 22 of the underground beam 16 toward the coupling portion 14 so as to penetrate the arch portion 22. The suspension anchor 24 may be driven upward from the shield tunnels 10 and 12.
[0035]
Each suspension anchor 24 is fixedly fixed to the upper and side surfaces of a fixing block 26 provided at the upper portion of the coupling portion 14 at the lower end side, and the upper end side of each suspension anchor 24 is connected to the hollow tube 22a of the arch portion 22. It is fixed to the side wall.
[0036]
In the case of the present embodiment, the suspension anchor 24 is configured by a plurality of pieces whose one end side is arranged along the longitudinal direction of the arch portion 22, and is provided radially on the same surface so that the other end side converges on the coupling portion 14. It has been.
[0037]
As shown in FIG. 1, the suspension anchors 24 provided radially on the same plane are not only suspended from the underground beam 16 but also, for example, as shown in FIG. 14 may be provided so as to be shifted back and forth in the axial direction.
[0038]
In the case of this embodiment, the fixing block 26 has a rectangular cross section, is integrally formed on the upper plate portion 14a of the coupling portion 14, and has the same length as the upper plate portion 14a. Yes.
[0039]
Furthermore, in the case of the present embodiment, the prestressed steel material 28 is provided so as to penetrate the invert portions of the first and second shield tunnels 10 and 12. A plurality of the prestressed steel members 28 extend in the cross-sectional direction of the shield tunnels 10 and 12 and are arranged at a predetermined interval along the tunnel axis direction.
[0040]
Each pre-stressed steel material 28 is fixed to the starting portion 18 of the underground beam 16 at one end side, and the other end side is fixed to the reaching portion 20 of the underground beam 16 in a state where tension is introduced.
[0041]
The prestressed steel material 28 has a space between the starting portion 18 and the reaching portion 20 provided at both ends of the arch portion 22 when the earth pressure is applied to the arch portion 22 of the underground beam 16. It is provided in order to regulate the enlargement by the action.
[0042]
In the case of the present embodiment, a plurality of lower anchors 30 that are driven from the coupling portion 14 toward the lower ground are provided. Each lower anchor 30 includes an anchor main body 30a and upper and lower fixing portions 30b and 30c installed at both ends of the anchor main body 30a.
[0043]
The upper fixing portion 30b is integrally provided on the lower surface side of the lower plate portion 14b of the coupling portion 14 on the proximal end side of the anchor main body 30a. The lower fixing portion 30c is located on the tip side of the anchor main body 30a and is installed in the ground.
[0044]
The lower anchor 30 is provided to balance the acting force in the vertical direction when the underground beam 16 supports the load of the shield tunnels 10 and 12.
[0045]
Next, the construction method of the tunnel having the above configuration will be described with reference to FIGS. When constructing the tunnel having the structure shown in FIG. 1, first, when the first shield tunnel 10 reaches the connection position of the second shield tunnel 12 as shown in FIG. 3, as shown in FIG. A ground improvement area A is formed from the inside of the first shield tunnel 10 by a chemical injection method or the like.
[0046]
This ground improvement area A is located outside the side of the first shield tunnel 10 and corresponds to the place where the start portion 18 of the underground beam 16 is formed. When the ground improvement area A is formed, After removing the partial segment 10a and excavating the ground improvement area A as shown in FIG. 5, a hollow rectangular tube-shaped starting portion 18 whose upper and lower ends are closed is formed.
[0047]
When the starting portion 18 is formed, the cylindrical hollow tube body 22a is sequentially pushed out from the central portion of the upper end toward the upper ground by the propulsion method, and the tip is outward from the side portion of the second shield tunnel 12. A hollow cylindrical arch portion 22 is formed.
[0048]
In this case, the hollow tube 22a disposed at the foremost end of the arch portion 22 is used with a closed end, and the lateral outer position of the second seal tunnel 12 to which the hollow tube body 22a reaches is the reaching portion. Corresponds to the place where 20 forms.
[0049]
When such an arch portion 22 is formed and the second shield tunnel 12 reaches the connection point as shown in FIG. 6, the ground is formed outward from the side of the second shield tunnel 12 by a chemical injection method or the like. After forming the improved area B, removing the segment 12a, and excavating, the lower end is closed and the upper end side communicates with the arch portion 22 to form a hollow square tubular reaching portion 20.
[0050]
The ground improvement zone B and the reaching portion 20 are formed not only from the second shield tunnel 12 but also when the arch portion 22 is extended to the second shield tunnel 12 side. These can also be formed from
[0051]
In the present embodiment, the starting portion 18 of the underground beam 16 is formed from the outside of the side portion of the first shield tunnel 10, but the formation method of the underground beam 16 is not limited to this. The underground beam 16 may be formed in a state where the first and second shield tunnels 10 and 12 are formed adjacent to each other in parallel.
[0052]
In this case, ground improvement areas A and B are formed outside the side portions of the respective seal tunnels 10 and 12, and a start portion 18 and a reaching portion 20 are formed in these portions, respectively. Alternatively, the arch portion 22 may be formed.
[0053]
Next, a coupling portion 14 that indirectly connects the first and second shield tunnels 10 and 12 is formed. When forming this coupling | bond part 14, as shown in FIG. 7, the ground improvement area C which straddles between the 1st and 2nd shield tunnels 10 and 12 is formed by a chemical injection method.
[0054]
When the ground improvement area C is formed, the segments 10a and 12a corresponding to these portions are removed and excavation is performed. Prior to this excavation, as shown in FIG. In addition, a plurality of long steel pipe fore piles 32 are placed on a natural ground so as to be adjacent to each other, thereby ensuring the stability of excavation. The long steel pipe fore pile 32 can be replaced with, for example, a pipe roof.
[0055]
And when the part straddling between the 1st and 2nd shield tunnels 10 and 12 is excavated, as shown in FIG. 9, the upper plate part 14a of the connection part 14 will be formed in the upper part of an excavation part, and the lower part of an excavation part The lower plate portion 14b is formed in the first.
[0056]
In this case, both ends of the upper plate portion 14a and the lower plate portion 14b are integrated with the segments 10a and 12a, respectively, so that the first and second shield tunnels 10 and 12 are communicated with each other via the coupling portion 14. .
[0057]
At this time, the fixing block 26 is integrally formed on the upper plate portion 14a, and the upper fixing portion 30b of the lower anchor 30 is integrally formed on the lower surface side of the lower plate portion 14b. .
[0058]
A suspension anchor 24 extends from the inside of the arch portion 22 of the underground beam 16 where the formation of the fixing block 26 is finished, penetrates the tubular body 22a toward the coupling portion 14 side, and the lower end thereof is the fixing block. 26 is fixed and fixed.
[0059]
In this case, a plurality of suspension anchors 24 are projected at predetermined intervals along the shape of the arch portion 22, and the distal end side of each suspension anchor 24 converges toward one point of the coupling portion 14, Arranged so as to be in a radial state on the same cross section, each tip is fixedly fixed to the upper surface and the side surface of the fixing block 26.
[0060]
Further, the upper end side of each suspension anchor 24 is fixedly fixed to the wall surface of the tubular body 22 a of the arch portion 22. When the installation of the suspension anchor 24 is completed, the prestressed steel material 28 is installed so as to penetrate through the invert portions of the first and second shield tunnels 10 and 12, as shown in FIG.
[0061]
The prestressed steel material 28 is arranged in parallel at a predetermined interval along the tunnel axis of the shield tunnels 10 and 12, and both ends are fixed to the starting portion 18 and the reaching portion 20 in a state where tension is introduced. Fixed. The prestressing steel material 28 may be installed before the suspension anchor 24 is installed.
[0062]
Next, the anchor main body 30a of the lower anchor 30 is driven into the lower ground of the coupling portion 14, and the tip thereof is fixed by the lower fixing portion 30c, and the upper end side of the anchor main body 30a is fixed to the upper fixing portion 30b.
[0063]
At this time, in this embodiment, a plurality of lower anchors 30 are installed so that a pair expands in a generally C shape, and when such lower anchors 30 are installed, the construction of the shield tunnel is completed. . The arrangement position of the C-shaped lower anchor 30 is on the same plane as the suspension anchor 24.
[0064]
Now, according to the tunnel configured as described above and its construction method, the underground anchor beam 16 is provided above the coupling portion 14, and the suspension anchor 24 having both ends fixed to the coupling portion 14 and the underground beam 16 is provided. Since it is provided, the load applied to the shield tunnels 10 and 12 can be received by the suspension anchor 24 without providing the middle pillar.
[0065]
For this reason, a wide space is secured, and when it is adopted as a junction part of a road tunnel or a crossover part of a subway, it is possible to easily change a lane of a traveling vehicle or a subway.
[0066]
In the above embodiment, the first and second shield tunnels 10 and 12 are formed adjacent to each other in parallel, and the coupling portion 14 is provided to indirectly connect the two. However, the present invention is not limited to this. For example, the present invention can also be applied to a case where a tunnel as shown in FIG. 12 is directly connected without interposing a separate coupling portion.
[0067]
Further, in the above embodiment, the case where the present invention is applied to a double shield tunnel with a circular cross section is illustrated, but the implementation of the present invention is not limited to this structure, The present invention can also be applied to a shield tunnel in which other cross-sectional shapes such as a square shape are continuous.
[0068]
【The invention's effect】
As described above in detail, according to the tunnel and its construction method according to the present invention, it is possible to secure a wide space by eliminating the central pillar, and the junction part of the road tunnel and the crossover part of the subway If it is adopted for lane change, it becomes possible to change lanes.
[Brief description of the drawings]
FIG. 1 is an explanatory cross-sectional view showing a first embodiment of a tunnel according to the present invention.
FIG. 2 is a perspective view of FIG.
FIG. 3 is an explanatory sectional view of an initial process showing a construction method of the tunnel shown in FIG. 1;
4 is an explanatory cross-sectional view of a step performed subsequent to FIG. 3. FIG.
FIG. 5 is an explanatory cross-sectional view of a step performed subsequent to FIG. 4;
6 is an explanatory cross-sectional view of a step performed subsequent to FIG. 5. FIG.
FIG. 7 is an explanatory cross-sectional view of a step performed subsequent to FIG. 6;
8 is an explanatory cross-sectional view of a step performed subsequent to FIG. 7. FIG.
FIG. 9 is a cross-sectional explanatory diagram of the step performed subsequent to FIG. 8;
10 is an explanatory cross-sectional view of a step performed subsequent to FIG. 9. FIG.
FIG. 11 is a cross-sectional view showing an example of a conventional tunnel.
12 is an enlarged view taken along line AA in FIG.
FIG. 13 is a cross-sectional view showing another example of a conventional tunnel.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 1st shield tunnel 12 2nd shield tunnel 14 Joint part 14a Upper plate part 14b Lower plate part 16 Underground beam 18 Starting part 20 Reaching part 22 Arch part 24 Suspension anchor 26 Fixing block 28 Prestressed steel 30 Lower anchor

Claims (2)

横方向に隣接構築される複数のシールドトンネルと、前記シールドトンネル間を、直接的ないしは間接的に連結する結合部とを有するトンネルにおいて、
前記結合部の上方地盤中に地中ビームを設け、両端部が前記結合部と前記地中ビームとに定着された吊アンカーを設けたトンネルであって、
前記地中ビームは、複数の前記シールドトンネルの外周を覆うように、上方に向けて膨出湾曲するアーチ状に形成され、その長手軸が前記シールドトンネルの軸と交差するように、トンネル軸に沿って所定の間隔を隔てて複数設けられるとともに、前記シールドトンネルの側部外方に発進部および到達部を形成し、前記発進部から前記到達部に向けて管体を推進させて形成するアーチ部を有し、
前記吊アンカーは、一端側が前記アーチ部の長手方向に沿って配置される複数本から構成され、他端側が前記結合部の上部側に収斂するように、同一面上で放射状に設けられ、
前記発進部と前記到達部との間には、結合されたシールドトンネルを貫通して、両端が前記発進部と到達部とにそれぞれ定着されるプレストレス鋼材を設け、
前記結合部の下部側から下方地盤中に下部アンカーを設置することを特徴とするトンネル。
In a tunnel having a plurality of shield tunnels constructed adjacent to each other in the lateral direction and a coupling portion that directly or indirectly connects the shield tunnels,
A tunnel provided with underground beams in the ground above the coupling portion, and provided with suspension anchors fixed to the coupling portion and the underground beam at both ends ;
The underground beam is formed in an arch shape that bulges upward and curves so as to cover the outer periphery of the plurality of shield tunnels, and the tunnel axis is formed so that the longitudinal axis thereof intersects the axis of the shield tunnel. And a plurality of arches formed at predetermined intervals along the shield tunnel, and formed with a starting portion and a reaching portion outside the side portion of the shield tunnel and propelling the pipe body from the starting portion toward the reaching portion. Part
The suspension anchor is composed of a plurality of one ends arranged along the longitudinal direction of the arch portion, and is provided radially on the same plane so that the other end converges on the upper side of the coupling portion,
Between the starting part and the reaching part, a prestressed steel material that penetrates the combined shield tunnel and is fixed to the starting part and the reaching part at both ends is provided,
A tunnel characterized in that a lower anchor is installed in the lower ground from the lower side of the coupling part .
横方向に隣接構築される複数のシールドトンネルと、前記シールドトンネル間を、直接的ないしは間接的に連結する結合部とを有し、前記結合部の上方に、前記シールドトンネルの軸と長手軸が交叉するように所定の間隔をおいて複数配置される地中ビームを設け、前記結合部と前記地中ビームとに両端部を定着する吊アンカーを設けるトンネルの構築工法であって、
前記地中ビームは、発進部と到達部との間に設けられるアーチ部を備え、前記シールドトンネルの内部から、側方外部に地盤改良区域を形成し、この地盤改良区域に隣接する前記シールドトンネルのセグメントを除去して、当該地盤改良区域を掘削して、前記発進部および到達部を形成し、前記発進部からの管体の推進により、前記シールドトンネルの上方を半周して前記到達部に至る前記アーチ部を形成し、
この後に、前記アーチ部から前記結合部の上部側との間に前記吊りアンカーを設置すること、前記結合部の下部側から下方地盤中に下部アンカーを設置すること、および、結合されたシールドトンネルを貫通して、両端が前記発進部と前記到達部とにそれぞれ定着されるプレストレス鋼材を設けることを特徴とするトンネルの構築工法
A plurality of shield tunnels constructed adjacent to each other in a lateral direction; and a coupling portion that directly or indirectly couples between the shield tunnels, and an axis and a longitudinal axis of the shield tunnel are disposed above the coupling portion. A tunnel construction method in which a plurality of underground beams are arranged at predetermined intervals so as to cross, and a suspension anchor that fixes both ends of the coupling portion and the underground beam is provided,
The underground beam includes an arch portion provided between a starting portion and a reaching portion, and forms a ground improvement area from the inside of the shield tunnel to the outside of the side, and the shield tunnel adjacent to the ground improvement area. The segment is removed, and the ground improvement area is excavated to form the starting portion and the reaching portion, and by pushing the tubular body from the starting portion, the upper part of the shield tunnel is half-circulated to the reaching portion. Forming the arch to reach,
Thereafter, the suspension anchor is installed between the arch portion and the upper side of the coupling portion, the lower anchor is installed in the lower ground from the lower side of the coupling portion, and the coupled shield tunnel The tunnel construction method is characterized by providing prestressed steel material that penetrates the two ends and is fixed to the starting portion and the reaching portion, respectively .
JP2001340976A 2001-11-06 2001-11-06 Tunnel and its construction method Expired - Fee Related JP3972633B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001340976A JP3972633B2 (en) 2001-11-06 2001-11-06 Tunnel and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001340976A JP3972633B2 (en) 2001-11-06 2001-11-06 Tunnel and its construction method

Publications (2)

Publication Number Publication Date
JP2003138899A JP2003138899A (en) 2003-05-14
JP3972633B2 true JP3972633B2 (en) 2007-09-05

Family

ID=19155094

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001340976A Expired - Fee Related JP3972633B2 (en) 2001-11-06 2001-11-06 Tunnel and its construction method

Country Status (1)

Country Link
JP (1) JP3972633B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4261270B2 (en) * 2003-07-11 2009-04-30 株式会社大林組 Tunnel excavator
JP2005030041A (en) * 2003-07-11 2005-02-03 Ohbayashi Corp Tunnel construction system and propulsion pipe
KR100844147B1 (en) 2007-03-07 2008-07-04 박재현 Two arch tunnel with asymmetric support wall and construction method
CN112065469B (en) * 2020-09-23 2022-09-16 中铁工程装备集团有限公司 Underground large-span space structure and construction method thereof
CN113586079B (en) * 2021-08-24 2024-02-13 中国电建集团中南勘测设计研究院有限公司 Tunnel cross intersection structure and construction method thereof
CN115539051B (en) * 2022-10-11 2025-05-06 新疆北新路桥集团股份有限公司 A method for replacing arches in biased double-arch tunnels

Also Published As

Publication number Publication date
JP2003138899A (en) 2003-05-14

Similar Documents

Publication Publication Date Title
CN108843338B (en) Integrated excavation construction method for converting shaft construction channel into large-section tunnel
CN106545088A (en) The switching node and implementation of a kind of upper strata concrete column and lower floor's steel core concrete column
KR102362257B1 (en) Top-down construction method
CN109235507A (en) A kind of stratum consolidation system and method for reinforcing existing tunnel
JP3972633B2 (en) Tunnel and its construction method
JPH0559719A (en) Constructing method for combined foundation with ground solidification
JP2008101467A (en) Rock fall prevention fence
JP4299455B2 (en) Junction structure and joining method for large-section tunnel segments
JP3972635B2 (en) Tunnel structure
JP3096652B2 (en) Construction method of widening tunnel and emergency parking zone
JP2869877B2 (en) Tunnel merging method and branching method
KR100926501B1 (en) Construction method of non-adhesive tunnel structure combining roof and shield (RSS method) and tunnel structure
JP3896351B2 (en) Construction method of underground wall and construction method of underpass
JP3972634B2 (en) Tunnel construction method
CN211174126U (en) Open cut tunnel structure
JPH03202599A (en) Reinforced structure of twin tunnels
JP3988652B2 (en) Tunnel branch and junction structure
JP2004263501A (en) Beam-column joint structure
JP4396278B2 (en) Tunnel connection method
KR100467244B1 (en) Anchor for supporting retaining wall block
JP4303512B2 (en) Construction method of large section tunnel
JP4750568B2 (en) Tunnel junction construction method and tunnel junction structure
CN113586079A (en) Tunnel crossroad structure and construction method thereof
JPH07208068A (en) Tunnel expansion, contraction, merging and branching methods
JPH051850B2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040927

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061219

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070131

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070522

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070604

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100622

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100622

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110622

Year of fee payment: 4

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110622

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110622

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120622

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120622

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130622

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130622

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140622

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees