Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3988652B2 - Tunnel branch and junction structure - Google Patents
[go: Go Back, main page]

JP3988652B2 - Tunnel branch and junction structure - Google Patents

Tunnel branch and junction structure Download PDF

Info

Publication number
JP3988652B2
JP3988652B2 JP2003028719A JP2003028719A JP3988652B2 JP 3988652 B2 JP3988652 B2 JP 3988652B2 JP 2003028719 A JP2003028719 A JP 2003028719A JP 2003028719 A JP2003028719 A JP 2003028719A JP 3988652 B2 JP3988652 B2 JP 3988652B2
Authority
JP
Japan
Prior art keywords
tunnel
branching
shield
merging
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003028719A
Other languages
Japanese (ja)
Other versions
JP2004238902A (en
Inventor
誠 金井
幸三郎 土屋
亜紀 藤井
淳 小泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2003028719A priority Critical patent/JP3988652B2/en
Publication of JP2004238902A publication Critical patent/JP2004238902A/en
Application granted granted Critical
Publication of JP3988652B2 publication Critical patent/JP3988652B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、トンネルの分岐・合流部構造に関し、特に、複数のシールドトンネルの分岐・合流部構造に関するものである。
【0002】
【従来の技術】
地下鉄用ないしは道路用トンネルは、必要に応じて、分岐・合流部が設けられる。シールド工法によりトンネルを構築している場合に、このような分岐・合流部を構築する際には、複数のトンネルを横方向に連結させることになる。
【0003】
特許ないしは非特許文献の開示は、確認していないが、従来、シールドトンネルで分岐・合流部を構築する際には、図4〜図5に示すような構造が用いられていた。同図に示したシールドトンネルは、円形断面で、同じ直径の第1および第2シールドトンネル1,2を備えている。
【0004】
このシールドトンネル1,2は、先端側に配置されたシールド掘進機3の掘進により、図5に示した断面形状の掘削面を形成し、シールド掘進機3の後部側に掘削面に沿ってセグメント4を組立てることにより形成される。
【0005】
第1および第2シールドトンネル1,2は、図5に示すように、円形断面の端部同士が、相互に重なるようにして、横方向に直接的に連結形成し、これらの重合した部分を切除して、隣接するシールドトンネル1,2のセグメント4間の結合部5には、上および下連結セグメントピース6,7が配置される。
【0006】
これらの連結セグメントピース6,7は、両端面がセグメント4にそれぞれ接合され、上下方向に所定の間隔を隔てて対向する上,下連結セグメントピース6,7間には、中柱8が設置されている。
【0007】
このような形状のトンネルにおいては、トンネルを構造的に安定化させるために、中柱8は、図4に示すように、セグメント4の1リング毎に配置されていた。
【0008】
また、複数のシールドトンネルを横方向に連結する構造としては、上記したようにシールドトンネル1,2を直接的に連結する構成以外に、例えば、図6に示すように、一対の円形断面のシールドトンネル1a,2aを、相互に隣接するように平行に近接配置して、両者間に跨る結合部5aを形成して、シールドトンネル1a,2aを間接的に連結する構造もある。
【0009】
このような構造のトンネルにおいても、形状の安定性を確保するために、上下の結合部5a間に中柱8aを設けていた。
【0010】
しかしながら、上述した如き構造のトンネルには、いずれも以下に説明する技術的な課題があった。
【0011】
【発明が解決しようとする課題】
すなわち、図5に示したシールドトンネル1,2を直接的に連結する前者のトンネル、および、図6に示したシールドトンネル1a,2aを間接的に連結する後者のトンネルは、地下鉄のホームなどに利用されることが多く、また、地下鉄の渡り線部や道路トンネルの分岐・分合流部などへの利用が考えられている。
【0012】
ところが、これらのシールドトンネルには、トンネル内を仕切るようにして中柱8,8aが設けられているので、広い空間を確保することが難しく、特に、道路トンネルの分岐・分合流部や地下鉄の渡り線部に採用する場合には、中柱8,8aによりシールドトンネル間で車両や地下鉄の車線変更ができないという問題があった。
【0013】
本発明は、このような従来の問題点に鑑みてなされたものであって、その目的とするところは、中柱を可及的に少なくすることにより、広い空間の確保が可能になり、車線変更が可能になるトンネルおよびその構築工法を提供することにある。
【0014】
【課題を解決するための手段】
上記目的を達成するために、本発明は、複数のシールドトンネルを地中で横方向に連結するトンネルの分岐・合流部構造において、前記分岐・合流部の外周を概略同一平面上で囲繞する水平ビーム部と、前記水平ビーム部に両端が支持され、前記分岐・合流部の長手方向に沿って、その上部側で湾曲するように形成された一対のアーチ部と、前記分岐・合流部を構成する前記シールドトンネルの上部と前記アーチ部との間に設置され複数の吊材とから構成した。
【0015】
このように構成したトンネルの分岐・合流部構造によれば、分岐・合流部の外周を概略同一平面上で囲繞する水平ビーム部に両端が支持されたアーチ部を備え、分岐・合流部を構成するシールドトンネルの上部とアーチ部との間に複数の吊材が設置されているので、分岐・合流部は、吊材を介してアーチ部により吊り下げ支持されるので、アーチ部で分岐・合流部の荷重を支持することで、構造が安定し、中柱は、分岐・合流部の両端側だけに設置すればよい。なお、中柱は、分岐・合流部に全く設けない場合もある。
【0016】
前記分岐・合流部を構成する前記シールドトンネルには、その下部から地盤中に打設された複数のグラウンドアンカーを設けることができる。
【0017】
この構成によれば、分岐・合流部を構成するシールドトンネルは、下方側からもグラウンドアンカーにより支持され、上下方向のバランスが図れるので、より一層構造が安定する。
【0018】
前記水平ビーム部およびアーチ部は、前記シールドトンネル内から構築される発進立坑から発進するシールド掘進機、または、推進機により構築することができる。
【0019】
前記アーチ部は、前記シールド掘進機により構築したシールドトンネル内にコンクリートを充填することができる。
【0020】
【発明の実施の形態】
以下、本発明の好適な実施の形態について、添付図面に基づいて詳細に説明する。図1から図3は、本発明にかかるトンネルの分岐・合流部構造の一実施例を示している。
【0021】
同図に示した分岐・合流部構造は、直径の異なる円形断面の小径シールドトンネル10と、大径シールドトンネル12とが、ほぼ平行になるように隣接構築し、両者間に跨る結合部14を形成して、シールドトンネル10,12を間接的に連結して、分岐・合流部16としている。
【0022】
各シールドトンネル10,12は、分岐・合流部分においてトンネル軸が相互に平行になるように、隣接配置され、これらのシールドトンネル10,12間を、結合部14を介して連結していて、内部同士が相互に連通する2連状態になっている。
【0023】
各シールドトンネル10,12は、円筒体を周および軸方向に複数の分割したセグメント10a,12aを、シールド掘進機により掘削した面に沿って組立てることでその形状が維持されている。結合部14は、上下方向に平行に配置される上結合セグメント14aと下結合セグメント14bを備えている。
【0024】
結合部14の上,下結合セグメント14a,14bは、横方向の両端が各シールドトンネル10,12のセグメント10a,12aを除去した部分に一体的に固設されている。なお、これらの結合セグメント14a,14bは、場所打ちコンクリートに代替することができる。
【0025】
また、分岐・合流部16の外周には、これを概略同一平面上で囲繞する水平ビーム部18が設けられている。本実施例の水平ビーム部18は、シールドトンネル10,12の横断方向に延設された一対の横ビーム部18a,18bと、シールドトンネル10,12の長手軸方向に延設された一対の縦ビーム部18c,18dとから構成されて、概略長方形状になっている。
【0026】
横および縦ビーム部18a〜18dは、内部が中空な円筒形であって、その交差点には、立方体形状の第1〜第4立坑18e〜18hが配置されている。なお、図1においては、第4立坑18hは、後方に隠れていて、図面上には示されていない。そして、縦ビーム18c,18bの両端に設けられた立坑18e,18g間および立坑18f,18h間には、一対のアーチ部20が設けられている。
【0027】
このアーチ部20は、内部が中空ないしは中実状のものであって、両端がそれぞれ立坑18e〜18hにより支持されていて、小径および大径シールドトンネル10,12の長手軸方向に延設されるとともに、各アーチ部20は、その中央部分が小径および大径シールドトンネル10,12の長手軸上に近接するように、上部側に湾曲し、かつ、シールドトンネル10,12側に向けて所定の角度で傾斜している。
【0028】
そして、分岐・合流部16を構成するシールドトンネル10,12の上部とアーチ部20との間には、複数の吊材22が設置されている。この吊材22は、例えば、鋼棒などで構成され、アーチ部20の両端側を除く中央部分に、相互に平行になるように配置されている。
【0029】
各吊材22は、取付状態の詳細を図2および図3に示すように、シールドトンネル10,12のセグメント10a,12aを貫通して、補強材24を介装して止め具26を装着することにより、下端側が各シールドトンネル10,12に固定される。なお、各吊材22の上端側は、図2,3に示した構造と同じ状態で、アーチ部20の内面に固定される。
【0030】
さらに、本実施例の場合には、分岐・合流部16を構成する小径および大径シールドトンネル10,12には、その下部から地盤中に打設された複数のグラウンドアンカー28が設けられている。
【0031】
本実施例の場合、グラウンドアンカー28は、例えば、所定長さの鋼棒が用いられ、小径および大径シールドトンネル10,12の下部から、一対が両側にハ字形に拡開するように延設され、かつ、トンネル12の長手軸方向に沿って、所定の間隔を隔てて複数が平行になるように配置され、各グラウンドアンカー28の一端は、地盤中に定着されている。
【0032】
また、図1に符号30で示した部材は、小径および大径シールドトンネル10,12の結合部14に設けた中柱であり、本実施例の場合には、この中柱30は、分岐・合流部16の端部側にだけ配置されていて、中央部分には設けられていない。
【0033】
これは、吊材22がアーチ部20の中央部にだけ配置されていて、アーチ部20の端部側にないので、この部分の補強のために設けているが、分岐・合流部16の中央には、中柱30がないので、車両や地下鉄などの車線変更は可能になっている。
【0034】
次に、上記構成の分岐・合流部16の構築工法について説明する。図1に示した構造の分岐・合流部16を構築する際には、小径および大径シールドトンネル10,12が、合流部の構築予定個所の近傍位置まで到達すると、まず、シールドトンネル10,12の内部から、凍結工法などにより地盤改良区域を、両トンネル10,12挟まれた部分に形成する。
【0035】
この地盤改良区域は、シールドトンネル10,12の結合部14の直上および直下外方に対応しており、地盤改良区域が形成されると、セグメント10a,12aを除去して、シールドトンネル10,12を横方向で連結する結合部14が形成される。なお、このような地盤改良区域を形成する際には、小径および大径シールドトンネル10,12の内部に、予め、変形防止用の補強工を行う。
【0036】
次に、大径シールドトンネル12の内部から、セグメント12aの下部を破断して、その下方にシールド掘進機の発進立坑32を形成する。なお、発進立坑32の形成位置は、図に示した場所に限ることはなく、任意の場所に設けることができる。次に、この発進立坑32の内部から左右方向にシールド掘進機を発進させて、水平ビーム部18の横ビーム部18aを形成する。
【0037】
横ビーム部18aが形成されると、その先端側にそれぞれ第1および第2立坑18e,18fを構築し、構築された立坑18a,18bから、それぞれシールド掘進機を発進させて、縦ビーム部18c,18dを横ビーム部18aと直交する方向に構築する。なお、水平ビーム部18やアーチ部20の形成には、シールド掘進機による方法以外に、推進機を用いる推進工法によっても形成することができる。
【0038】
縦ビーム部18c,18dが所定の長さだけ構築されると、その先端に第3および第4立坑18g,18hを構築する。そして、立坑18g,18h間に、シールド掘進機により横ビーム部18bを構築すると、水平ビーム部18が完成する。
【0039】
次に、立坑18eと18g間および立坑18dと18hとの間にアーチ部20をそれぞれシールド掘進機により構築し、しかる後に、シールドトンネル10,12の上部とアーチ部20との間に複数の吊材22を設置する。この吊材22の設置が終了すると、アーチ部20内には、コンクリートを打設して、中空部を中実にしてもよい。
【0040】
そして、小径および大径シールドトンネル10,12の下部から地盤中に向けて、複数のグラントアンカー28を打設すると、図1に示した分岐・合流部16が構築される。なお、中柱30は、結合部14を形成した後の適当な時期に構築すればよい。
【0041】
さて、以上のように構成した分岐・合流部構造によれば、分岐・合流部16の外周を概略同一平面上で囲繞する水平ビーム部18に両端が支持されたアーチ部20を備え、分岐・合流部16を構成するシールドトンネル10,12の上部とアーチ部20との間に複数の吊材22が設置されているので、分岐・合流部16は、吊材22を介してアーチ部20により吊り下げ支持されるので、アーチ部20で分岐・合流部16の荷重を支持することで、構造が安定し、中柱30は、分岐・合流部の両端側だけに設置すればよいし、場合によっては、中柱30を全く設けなくてもよい。
【0042】
このような構造にすると、分岐・合流部16の中央部分には、中柱30を設ける必要がないので、中柱30を可及的に少なくすることが可能になり、分岐・合流部16の中央部分で広い空間が確保され、その結果、中央部分で車両や地下鉄の分岐ないしは合流のための車線変更が可能になる。
【0043】
また、本実施例の場合には、分岐・合流部16を構成するシールドトンネル12には、その下部から地盤中に打設された複数のグラウンドアンカー28を設けている。
【0044】
このため、分岐・合流部16を構成するシールドトンネル12は、下方側からもグラウンドアンカー28により支持され、吊材22との協働により、上下方向のバランスが図れるので、より一層構造が安定する。
【0045】
なお、上記実施例では、本発明を円形断面の2連シールドトンネルに適用した場合を例示したが、本発明の実施は、この構造に限定されることはなく、同一直径の円形断面の2連構造,円形断面の3連構造や、角形など他の断面形状が連続したトンネルにも適用することができる。
【0046】
【発明の効果】
以上、詳細に説明したように、本発明にかかるトンネルの分岐・合流部構造によれば、中柱を可及的に少なくすることにより、広い空間の確保が可能になり、車線変更が可能になる。
【図面の簡単な説明】
【図1】本発明にかかるトンネルの分岐・合流部構造の一実施例を示す説明図である。
【図2】図1の要部横断面説明図である。
【図3】図2の側面説明図である。
【図4】従来のトンネルの一例を示す断面図である。
【図5】図4のA−A線拡大図である。
【図6】従来のトンネルの他の例を示す断面図である。
【符号の説明】
10 小径1シールドトンネル
12 大径シールドトンネル
14 結合部
14a 上結合セグメント
14b 下結合セグメント
16 分岐・合流部
18 水平ビーム部
20 アーチ部
22 吊材
24 補強材
28 グラウンドアンカー
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a branching / merging portion structure of a tunnel, and more particularly to a branching / merging portion structure of a plurality of shield tunnels.
[0002]
[Prior art]
A subway or road tunnel is provided with a branching / merging portion as required. When a tunnel is constructed by the shield method, a plurality of tunnels are connected in the lateral direction when constructing such a branch / merging portion.
[0003]
Although the disclosure of patents or non-patent documents has not been confirmed, conventionally, when constructing a branching / merging portion in a shield tunnel, a structure as shown in FIGS. 4 to 5 has been used. The shield tunnel shown in the figure has first and second shield tunnels 1 and 2 having a circular cross section and the same diameter.
[0004]
The shield tunnels 1 and 2 are formed by excavating the shield machine 3 disposed on the tip side to form the excavation surface having the cross-sectional shape shown in FIG. 5, and are segmented along the excavation surface on the rear side of the shield machine 3. 4 is assembled.
[0005]
As shown in FIG. 5, the first and second shield tunnels 1 and 2 are formed by directly connecting the ends of the circular cross-sections in the lateral direction so as to overlap each other. The upper and lower connecting segment pieces 6 and 7 are arranged at the joint 5 between the segments 4 of the adjacent shield tunnels 1 and 2 by cutting.
[0006]
These connecting segment pieces 6 and 7 are joined to the segment 4 at both end faces, and are opposed to each other with a predetermined interval in the vertical direction. ing.
[0007]
In the tunnel having such a shape, in order to structurally stabilize the tunnel, the middle pillar 8 is arranged for each ring of the segment 4 as shown in FIG.
[0008]
In addition to the configuration in which the shield tunnels 1 and 2 are directly connected as described above, the structure for connecting a plurality of shield tunnels in the horizontal direction is, for example, as shown in FIG. There is also a structure in which the tunnels 1a and 2a are arranged adjacently in parallel so as to be adjacent to each other, and a coupling portion 5a is formed between the two to indirectly connect the shield tunnels 1a and 2a.
[0009]
Even in such a tunnel, the middle pillar 8a is provided between the upper and lower coupling portions 5a in order to ensure the stability of the shape.
[0010]
However, all the tunnels having the above-described structures have technical problems described below.
[0011]
[Problems to be solved by the invention]
That is, the former tunnel that directly connects the shield tunnels 1 and 2 shown in FIG. 5 and the latter tunnel that indirectly connects the shield tunnels 1a and 2a shown in FIG. It is often used, and it is also considered to be used for a crossover line of a subway or a branch / branch junction of a road tunnel.
[0012]
However, because these shield tunnels are provided with the middle pillars 8 and 8a so as to partition the inside of the tunnel, it is difficult to secure a wide space. When employed in the crossover section, there is a problem that the lanes of the vehicle and the subway cannot be changed between the shield tunnels by the middle pillars 8 and 8a.
[0013]
The present invention has been made in view of such conventional problems. The object of the present invention is to reduce the number of central pillars as much as possible, thereby ensuring a wide space and lanes. It is to provide a tunnel that can be changed and its construction method.
[0014]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, the present invention provides a tunnel branch / merging portion structure in which a plurality of shield tunnels are connected laterally in the ground, and a horizontal surface that surrounds the outer periphery of the branch / merging portion on substantially the same plane. Consists of a beam part, a pair of arch parts that are supported at both ends by the horizontal beam part, and curved at the upper side along the longitudinal direction of the branch / merge part, and the branch / merge part And a plurality of suspension members installed between the upper part of the shield tunnel and the arch part.
[0015]
According to the structure of the branching / merging part of the tunnel configured as described above, the branching / merging part is configured by including an arch part supported at both ends by a horizontal beam part that surrounds the outer periphery of the branching / merging part on substantially the same plane. Since there are multiple suspension members installed between the upper part of the shield tunnel and the arch part, the branching / merging part is suspended and supported by the arch part via the suspension member. By supporting the load of the part, the structure is stabilized, and the middle pillars need only be installed on both ends of the branching / merging part. In some cases, the middle column is not provided at the branching / merging portion.
[0016]
The shield tunnel that constitutes the branching / merging portion can be provided with a plurality of ground anchors that are driven into the ground from below.
[0017]
According to this configuration, the shield tunnel constituting the branching / merging portion is supported from the lower side by the ground anchor and can be balanced in the vertical direction, so that the structure is further stabilized.
[0018]
The horizontal beam portion and the arch portion can be constructed by a shield machine or a propulsion device that starts from a start shaft constructed from the shield tunnel.
[0019]
The arch portion can be filled with concrete in a shield tunnel constructed by the shield machine.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described in detail with reference to the accompanying drawings. 1 to 3 show an embodiment of a tunnel branching / merging portion structure according to the present invention.
[0021]
In the branching / merging portion structure shown in the figure, the small-diameter shield tunnel 10 and the large-diameter shield tunnel 12 having a circular cross-section with different diameters are adjacently constructed so as to be substantially parallel to each other, and the joint portion 14 straddling the both is formed. Thus, the shield tunnels 10 and 12 are indirectly connected to form a branching / merging portion 16.
[0022]
The shield tunnels 10 and 12 are arranged adjacent to each other so that the tunnel axes are parallel to each other at the branching / merging portion, and the shield tunnels 10 and 12 are connected to each other through a coupling portion 14. It is in the 2 state which mutually communicates.
[0023]
The shape of each shield tunnel 10, 12 is maintained by assembling a plurality of segments 10a, 12a obtained by dividing a cylindrical body in the circumferential and axial directions along a surface excavated by a shield machine. The coupling portion 14 includes an upper coupling segment 14a and a lower coupling segment 14b that are arranged in parallel in the vertical direction.
[0024]
The upper and lower coupling segments 14a and 14b of the coupling portion 14 are integrally fixed to portions where the segments 10a and 12a of the shield tunnels 10 and 12 are removed at both ends in the lateral direction. In addition, these joint segments 14a and 14b can be replaced with cast-in-place concrete.
[0025]
In addition, a horizontal beam portion 18 is provided on the outer periphery of the branching / merging portion 16 so as to surround it on a substantially same plane. The horizontal beam portion 18 of the present embodiment includes a pair of horizontal beam portions 18 a and 18 b extending in the transverse direction of the shield tunnels 10 and 12 and a pair of vertical beam portions extending in the longitudinal axis direction of the shield tunnels 10 and 12. It is composed of beam portions 18c and 18d and has a substantially rectangular shape.
[0026]
The horizontal and vertical beam portions 18a to 18d have a hollow cylindrical shape inside, and cube-shaped first to fourth shafts 18e to 18h are arranged at intersections thereof. In addition, in FIG. 1, the 4th shaft 18h is hidden behind, and is not shown on drawing. A pair of arch portions 20 are provided between the vertical shafts 18e and 18g and between the vertical shafts 18f and 18h provided at both ends of the vertical beams 18c and 18b.
[0027]
The arch portion 20 is hollow or solid inside, and both ends thereof are supported by shafts 18e to 18h, respectively, and extend in the longitudinal axis direction of the small-diameter and large-diameter shield tunnels 10 and 12. Each arch portion 20 is curved to the upper side so that the central portion thereof is close to the longitudinal axis of the small-diameter and large-diameter shield tunnels 10 and 12, and has a predetermined angle toward the shield tunnels 10 and 12 side. It is inclined at.
[0028]
A plurality of suspension members 22 are installed between the upper portions of the shield tunnels 10 and 12 constituting the branching / merging portion 16 and the arch portion 20. The suspension member 22 is made of, for example, a steel rod, and is disposed so as to be parallel to each other at a central portion excluding both end sides of the arch portion 20.
[0029]
As shown in detail in FIG. 2 and FIG. 3, each suspension member 22 penetrates the segments 10 a, 12 a of the shield tunnels 10, 12 and attaches a stopper 26 with a reinforcing member 24 interposed therebetween. Thus, the lower end side is fixed to the shield tunnels 10 and 12. In addition, the upper end side of each suspension member 22 is fixed to the inner surface of the arch portion 20 in the same state as the structure shown in FIGS.
[0030]
Furthermore, in the case of the present embodiment, the small-diameter and large-diameter shield tunnels 10 and 12 constituting the branching / merging portion 16 are provided with a plurality of ground anchors 28 placed in the ground from the lower part thereof. .
[0031]
In the case of the present embodiment, the ground anchor 28 is made of, for example, a steel rod having a predetermined length, and extends from the lower part of the small-diameter and large-diameter shield tunnels 10 and 12 so that a pair expands in a C shape on both sides. The plurality of ground anchors 28 are arranged in parallel along the longitudinal axis direction of the tunnel 12 at a predetermined interval, and one end of each ground anchor 28 is fixed in the ground.
[0032]
1 is a central pillar provided in the coupling portion 14 of the small-diameter and large-diameter shield tunnels 10 and 12, and in the case of this embodiment, the central pillar 30 It is arranged only on the end side of the merging portion 16 and is not provided in the central portion.
[0033]
This is because the suspension member 22 is arranged only at the central part of the arch part 20 and not at the end part side of the arch part 20, and is provided for reinforcement of this part, but the center of the branching / merging part 16 Since there is no middle pillar 30, lane changes such as vehicles and subways are possible.
[0034]
Next, the construction method of the branching / merging portion 16 having the above configuration will be described. When the branch / merging portion 16 having the structure shown in FIG. 1 is constructed, when the small-diameter and large-diameter shield tunnels 10 and 12 reach positions near the planned construction location of the junction, first, the shield tunnels 10 and 12 are formed. From the inside, a ground improvement area is formed in a portion sandwiched between both tunnels 10 and 12 by a freezing method or the like.
[0035]
This ground improvement area corresponds to the portion directly above and below the connecting portion 14 of the shield tunnels 10 and 12, and when the ground improvement area is formed, the segments 10a and 12a are removed and the shield tunnels 10 and 12 are removed. Are coupled to each other in the lateral direction. In addition, when forming such a ground improvement area, the reinforcement work for a deformation | transformation prevention is performed inside the small diameter and large diameter shield tunnels 10 and 12 in advance.
[0036]
Next, from the inside of the large-diameter shield tunnel 12, the lower part of the segment 12a is broken, and a start shaft 32 of the shield machine is formed below the segment 12a. In addition, the formation position of the start shaft 32 is not restricted to the place shown in the figure, and can be provided in arbitrary places. Next, a shield machine is started in the left-right direction from the inside of the start shaft 32 to form a horizontal beam portion 18 a of the horizontal beam portion 18.
[0037]
When the horizontal beam portion 18a is formed, the first and second shafts 18e and 18f are respectively constructed at the front end sides thereof, and shield shield machines are started from the constructed shafts 18a and 18b, respectively, and the vertical beam portion 18c. , 18d are constructed in a direction perpendicular to the transverse beam portion 18a. The horizontal beam portion 18 and the arch portion 20 can be formed not only by a shield machine but also by a propulsion method using a propulsion device.
[0038]
When the vertical beam portions 18c and 18d are constructed to a predetermined length, the third and fourth shafts 18g and 18h are constructed at the tips thereof. And if the horizontal beam part 18b is constructed | assembled by the shield machine between the shafts 18g and 18h, the horizontal beam part 18 will be completed.
[0039]
Next, the arch part 20 is constructed by the shield machine between the vertical shafts 18e and 18g and between the vertical shafts 18d and 18h. The material 22 is installed. When the installation of the suspension member 22 is finished, concrete may be placed in the arch portion 20 to make the hollow portion solid.
[0040]
When a plurality of grant anchors 28 are driven from the lower part of the small-diameter and large-diameter shield tunnels 10 and 12 into the ground, the branching / merging part 16 shown in FIG. 1 is constructed. In addition, what is necessary is just to construct | assemble the middle pillar 30 in the suitable time after forming the connection part 14. FIG.
[0041]
Now, according to the branching / merging part structure configured as described above, the arch part 20 is supported at both ends by the horizontal beam part 18 surrounding the outer periphery of the branching / merging part 16 on substantially the same plane. Since a plurality of suspension members 22 are installed between the upper portions of the shield tunnels 10 and 12 constituting the junction 16 and the arch portion 20, the branch / merging portion 16 is connected to the arch portion 20 via the suspension member 22. Since it is supported by suspension, the structure is stabilized by supporting the load of the branching / merging part 16 by the arch part 20, and the middle column 30 may be installed only at both ends of the branching / merging part. Depending on the case, the middle pillar 30 may not be provided at all.
[0042]
With such a structure, since it is not necessary to provide the middle pillar 30 in the central portion of the branching / merging portion 16, it is possible to reduce the number of middle pillars 30 as much as possible. A wide space is secured in the central portion, and as a result, lanes can be changed for branching or merging of vehicles and subways in the central portion.
[0043]
In the case of the present embodiment, the shield tunnel 12 constituting the branching / merging portion 16 is provided with a plurality of ground anchors 28 placed in the ground from the lower part thereof.
[0044]
For this reason, the shield tunnel 12 constituting the branching / merging portion 16 is supported by the ground anchor 28 from the lower side and can be balanced in the vertical direction in cooperation with the suspension member 22, thereby further stabilizing the structure. .
[0045]
In the above embodiment, the case where the present invention is applied to a double shield tunnel having a circular cross section is illustrated. However, the implementation of the present invention is not limited to this structure, and the double cross section having the same diameter is used. It can also be applied to tunnels with other cross-sectional shapes such as a structure, a triple structure with a circular cross-section, and a square shape.
[0046]
【The invention's effect】
As described above in detail, according to the tunnel branching / merging portion structure according to the present invention, it is possible to secure a wide space by changing the number of middle pillars as much as possible and to change lanes. Become.
[Brief description of the drawings]
FIG. 1 is an explanatory view showing one embodiment of a tunnel branching / merging portion structure according to the present invention.
FIG. 2 is a cross-sectional explanatory view of a main part of FIG.
FIG. 3 is an explanatory side view of FIG. 2;
FIG. 4 is a cross-sectional view showing an example of a conventional tunnel.
FIG. 5 is an enlarged view taken along line AA in FIG.
FIG. 6 is a cross-sectional view showing another example of a conventional tunnel.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Small diameter 1 shield tunnel 12 Large diameter shield tunnel 14 Joint part 14a Upper joint segment 14b Lower joint segment 16 Branching / merging part 18 Horizontal beam part 20 Arch part 22 Lifting material 24 Reinforcement material 28 Ground anchor

Claims (4)

複数のシールドトンネルを地中で横方向に連結するトンネルの分岐・合流部構造において、
前記分岐・合流部の外周を概略同一平面上で囲繞する水平ビーム部と、
前記水平ビーム部に両端が支持され、前記分岐・合流部の長手方向に沿って、その上部側で湾曲するように形成された一対のアーチ部と、
前記分岐・合流部を構成する前記シールドトンネルの上部と前記アーチ部との間に設置された複数の吊材とからなることを特徴とするトンネルの分岐・合流部構造。
In the tunnel junction / junction structure that connects multiple shield tunnels laterally in the ground,
A horizontal beam portion that surrounds the outer periphery of the branching / merging portion on substantially the same plane;
A pair of arch portions that are supported at both ends by the horizontal beam portion and are curved along the longitudinal direction of the branching / merging portion on the upper side thereof;
A tunnel branching / merging part structure comprising a plurality of suspension members installed between the upper part of the shield tunnel constituting the branching / merging part and the arch part.
前記分岐・合流部を構成する前記シールドトンネルに、その下部から地盤中に打設された複数のグラウンドアンカーを設けたことを特徴とする請求項1記載のトンネルの分岐・合流部構造。2. The tunnel branching / merging part structure according to claim 1, wherein the shield tunnel constituting the branching / merging part is provided with a plurality of ground anchors placed in the ground from below. 前記水平ビーム部およびアーチ部は、前記シールドトンネル内から発進立坑を構築し、前記発進立坑から発進したシールド掘進機、または、推進機により構築することを特徴とする請求項1記載のトンネルの分岐・合流部構造。2. The tunnel branch according to claim 1, wherein the horizontal beam portion and the arch portion are constructed by constructing a start shaft from the shield tunnel, and by a shield machine or a propulsion device started from the start shaft.・ Confluence structure. 前記アーチ部は、前記シールド掘進機により構築したシールドトンネル内にコンクリートを充填することを特徴とする請求項2記載のトンネルの分岐・合流部構造。3. The tunnel branching / merging portion structure according to claim 2, wherein the arch portion is filled with concrete in a shield tunnel constructed by the shield machine.
JP2003028719A 2003-02-05 2003-02-05 Tunnel branch and junction structure Expired - Fee Related JP3988652B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003028719A JP3988652B2 (en) 2003-02-05 2003-02-05 Tunnel branch and junction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003028719A JP3988652B2 (en) 2003-02-05 2003-02-05 Tunnel branch and junction structure

Publications (2)

Publication Number Publication Date
JP2004238902A JP2004238902A (en) 2004-08-26
JP3988652B2 true JP3988652B2 (en) 2007-10-10

Family

ID=32956105

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003028719A Expired - Fee Related JP3988652B2 (en) 2003-02-05 2003-02-05 Tunnel branch and junction structure

Country Status (1)

Country Link
JP (1) JP3988652B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006249734A (en) * 2005-03-09 2006-09-21 Nishimatsu Constr Co Ltd Construction method of crossing underground structure and crossing underground structure
CN109751061B (en) * 2019-03-26 2023-10-17 西南交通大学 A road-rail jointly built single-tube double-layer shield tunnel
CN115075823A (en) * 2022-07-14 2022-09-20 中铁第六勘察设计院集团有限公司 Supporting system for inverted T-shaped cross structure of vault of ultra-deep shaft and tunnel and construction method

Also Published As

Publication number Publication date
JP2004238902A (en) 2004-08-26

Similar Documents

Publication Publication Date Title
KR20130112202A (en) Earth retaining structure having beam
JP3972635B2 (en) Tunnel structure
JP4127161B2 (en) Tunnel merge, branch structure
JP3988652B2 (en) Tunnel branch and junction structure
JP4299455B2 (en) Junction structure and joining method for large-section tunnel segments
JP2006322222A (en) Construction method of large section tunnel
JP3096652B2 (en) Construction method of widening tunnel and emergency parking zone
JP3972633B2 (en) Tunnel and its construction method
JP2001073670A (en) Construction of underground structure and tubular body for roof therefor
JP6619710B2 (en) Tunnel widening method and tunnel reinforcement device
JP3908978B2 (en) Junction structure and junction construction method for large-section tunnel segments
JP4396278B2 (en) Tunnel connection method
JP3972634B2 (en) Tunnel construction method
JP2012046951A (en) Method for constructing large-section tunnel with expanded section
JP4288316B2 (en) Tunnel widening method
JP4730608B2 (en) segment
JP5037997B2 (en) Leading beam construction method and leading beam connection structure
JP4485373B2 (en) Construction method of tunnel junction
JP2002309895A (en) Joint structure of large section tunnel segment
JP2645890B2 (en) Tubular wall for excavation hole lining
JP2670484B2 (en) Method for lining double drill holes
JP2011080310A (en) Construction method of tunnel
JPH0791957B2 (en) Construction method of separated pillars in shield tunnel with composite section
JP4343078B2 (en) Underground structure and method for constructing underground structure
JP6811299B1 (en) Segment set consisting of B segment and K segment, open tunnel and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060117

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070614

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070626

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070709

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100727

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100727

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110727

Year of fee payment: 4

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110727

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110727

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120727

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120727

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130727

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130727

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140727

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees