JP4049695B2 - Heat medium supply equipment - Google Patents
Heat medium supply equipment Download PDFInfo
- Publication number
- JP4049695B2 JP4049695B2 JP2003087117A JP2003087117A JP4049695B2 JP 4049695 B2 JP4049695 B2 JP 4049695B2 JP 2003087117 A JP2003087117 A JP 2003087117A JP 2003087117 A JP2003087117 A JP 2003087117A JP 4049695 B2 JP4049695 B2 JP 4049695B2
- Authority
- JP
- Japan
- Prior art keywords
- heat medium
- terminal
- time
- air bleeding
- heat source
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000740 bleeding effect Effects 0.000 claims description 85
- 238000009434 installation Methods 0.000 claims description 68
- 238000010438 heat treatment Methods 0.000 claims description 36
- 238000013022 venting Methods 0.000 claims description 31
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 15
- 239000002737 fuel gas Substances 0.000 description 9
- 238000002485 combustion reaction Methods 0.000 description 7
- 230000001276 controlling effect Effects 0.000 description 4
- 230000005856 abnormality Effects 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000001035 drying Methods 0.000 description 2
- 238000001704 evaporation Methods 0.000 description 2
- 230000008020 evaporation Effects 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Landscapes
- Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、加熱した熱媒を熱媒循環路を通して端末に供給する熱源機が、加熱していない熱媒を前記熱媒循環路を通して前記端末に供給するエア抜き運転を行うように構成され、前記熱源機の運転を制御する制御手段が設けられ、前記制御手段が、エア抜き用時間が経過するごとに、前記エア抜き運転を実行するように構成されている熱媒供給設備に関する。
【0002】
【従来の技術】
上記のような熱媒供給設備では、リモコンなどからの運転要求により制御手段が熱源機を運転させて、加熱した熱媒を床暖房装置や浴室暖房乾燥装置などの端末に供給し、制御手段が、エア抜き用時間が経過するごとに、エア抜き運転を行うことによって、熱媒循環経路中に入り込んだ空気を抜くようにしているものである。
【0003】
そして、上記のような熱媒供給設備では、制御手段が、エア抜き用時間が経過するごとに、エア抜き運転を行って、熱媒循環経路中に入り込んだ空気を抜くことにより、熱媒循環経路中に入り込んだ空気の量が多量となって、熱媒を適正に循環できない循環不良が生じることを防止したり、熱媒循環経路中に入り込んだ空気の量だけ熱源機に備えられる大気開放式の膨張タンクでの熱媒の貯留量が増加して、膨張タンクから熱媒が溢れる熱媒漏れが生じることを防止するようにしている。
【0004】
従来の熱媒供給設備では、制御手段が、一定のエア抜き用時間(例えば、720時間)が経過するごとに、エア抜き運転を行うようにしていた(例えば、特許文献1参照。)。
【0005】
【特許文献1】
特開2002−162051号公報
【0006】
【発明が解決しようとする課題】
しかしながら、上記従来の熱媒供給設備では、制御手段が、一定のエア抜き用時間が経過するごとに、エア抜き運転を行っているので、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができない虞があった。
【0007】
説明を加えると、例えば、熱源機を1階に、端末を2階に設置して、熱源機の設置位置よりも高い位置に端末を設置した場合には、熱源機の設置位置よりも端末の設置位置の方が高いので、端末から熱源機への熱媒循環経路中が負圧状態となり、その負圧状態によって熱媒循環経路中に空気が入り込みやすいものとなる。
したがって、熱源機の設置位置よりも高い位置に端末を設置した場合には、例えば、熱源機の設置位置と端末の設置位置とをともに1階に設置して、熱源機の設置位置と端末の設置位置とをほぼ同じ高さに設置した場合に比べて、熱媒循環経路中に入り込んだ空気の量が多量となるまでの時間が短く、循環不良や熱媒漏れが発生するまでの時間が短くなる虞がある。
【0008】
また、端末の設置台数が多くなれば、それだけ端末と熱源機との熱媒循環路の本数が増えるので、空気が入り込む可能性のある部分が増えて、熱媒循環経路中に入り込んだ空気の量が多量となるまでの時間が短く、循環不良や熱媒漏れが発生するまでの時間が短くなる。
【0009】
しかしながら、上記従来の熱媒供給設備では、エア抜き用時間を一定としているので、エア抜き用時間を短く設定すると、未だ循環不良や熱媒漏れが発生しないときに、エア抜き運転が行われ、逆に、エア抜き用時間を長く設定すると、循環不良や熱媒漏れが発生したのち、エア抜き運転が行われることになり、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができないことになる。
【0010】
本発明は、かかる点に着目してなされたものであり、その目的は、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができる熱媒供給設備を提供する点にある。
【0011】
【課題を解決するための手段】
この目的を達成するために、加熱した熱媒を熱媒循環路を通して端末に供給する熱源機が、加熱していない熱媒を前記熱媒循環路を通して前記端末に供給するエア抜き運転を行うように構成され、前記熱源機の運転を制御する制御手段が設けられ、前記制御手段が、エア抜き用時間が経過するごとに、前記エア抜き運転を実行するように構成されている熱媒供給設備において、
前記熱源機と前記端末との設置条件に応じて前記エア抜き用時間を変更設定する手動操作式のエア抜き用時間変更設定手段が設けられている。
【0012】
すなわち、エア抜き用時間変更設定手段にて熱源機と端末との設置条件に応じてエア抜き用時間を変更設定することができるので、例えば、熱源機の設置位置よりも高い位置に端末を設置した場合には、熱源機の設置位置と端末の設置位置とをほぼ同じ高さに設置した場合に比べて、エア抜き用時間を短く設定することができることになる。
したがって、熱源機と端末との設置条件に応じて、循環不良や熱媒漏れを防止できる適切な時間が異なっても、エア抜き用時間変更設定手段にて熱源機と端末との設置条件に応じた適切な時間をエア抜き用時間として設定することができることになる。
そして、制御手段は、エア抜き用時間変更設定手段にて設定されたエア抜き用時間が経過するごとに、エア抜き運転を実行するので、熱源機と端末との設置条件に応じた適切なタイミングにてエア抜き運転を行うことができることになる。
【0013】
以上のことから、熱源機と端末との設置条件に応じて、循環不良や熱媒漏れを防止できる適切なタイミングが異なっても、その熱源機と端末との設置条件に適したタイミングにてエア抜き運転を行うことができることとなって、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができる熱媒供給設備を提供できるに至った。
【0014】
請求項2に記載の発明によれば、加熱した熱媒を熱媒循環路を通して端末に供給する熱源機が、加熱していない熱媒を前記熱媒循環路を通して前記端末に供給するエア抜き運転を行うように構成され、前記熱源機の運転を制御する制御手段が設けられ、前記制御手段が、エア抜き用時間が経過するごとに、前記エア抜き運転を実行するように構成されている熱媒供給設備において、
前記制御手段が、前記熱源機と前記端末との設置条件に応じて前記エア抜き用時間を設定するように構成されている。
【0015】
すなわち、制御手段が、熱源機と端末との設置条件に応じてエア抜き用時間を設定するので、例えば、端末の設置台数が多いほど、エア抜き用時間を短く設定することができることになる。
したがって、熱源機と端末との設置条件に応じて、循環不良や熱媒漏れを防止できる適切な時間が異なっても、熱源機と端末との設置条件に応じた適切な時間をエア抜き用時間として自動的に設定することができることになる。
そして、制御手段は、自動的に設定されたエア抜き用時間が経過するごとに、エア抜き運転を実行するので、熱源機と端末との設置条件に応じた適切なタイミングにてエア抜き運転を行うことができることになる。
【0016】
以上のことから、熱源機と端末との設置条件に応じて、循環不良や熱媒漏れを防止できる適切なタイミングが異なっても、その熱源機と端末との設置条件に適したタイミングにてエア抜き運転を行うことができることとなって、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができる熱媒供給設備を提供できるに至った。
【0017】
請求項3に記載の発明によれば、前記制御手段は、設置される前記端末の数が多いほど前記エア抜き用時間を短く設定するように構成されている。
【0018】
すなわち、請求項2の発明において例示した如く、制御手段が、端末の設置台数が多いほど、エア抜き用時間を短く設定するので、端末の設置台数に適したタイミングにてエア抜き運転を行うことができることになる。
したがって、端末の設置台数の増減にかかわらず、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができることになる。
【0019】
請求項4に記載の発明によれば、前記制御手段は、前記熱源機の設置位置よりも前記端末の設置位置の方が高くなるほど前記エア抜き用時間を短く設定するように構成されている。
【0020】
すなわち、制御手段が、熱源機の設置位置よりも端末の設置位置の方が高くなるほど、エア抜き用時間を短く設定するので、循環不良や熱媒漏れを防止するために、熱源機と端末との設置位置の関係に適した時間をエア抜き用時間として自動的に設定することができることになる。
したがって、熱源機と端末との設置位置の関係にかかわらず、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができることになる。
【0021】
請求項5に記載の発明によれば、加熱した熱媒を熱媒循環路を通して端末に供給する熱源機が、加熱していない熱媒を前記熱媒循環路を通して前記端末に供給するエア抜き運転を行うように構成され、前記熱源機の運転を制御する制御手段が設けられ、前記制御手段が、エア抜き用時間が経過するごとに、前記エア抜き運転を実行するように構成されている熱媒供給設備において、
前記熱源機は、膨張タンクに貯留されている熱媒を前記熱媒循環路を通して前記膨張タンクと前記端末との間で循環供給するように構成され、前記制御手段は、前記膨張タンクの熱媒の貯留量が上限設定量以上となる多量状態を検出するたびに、前記エア抜き用時間が短くなるように設定するように構成されている。
【0022】
すなわち、熱源機が、膨張タンクに貯留されている熱媒を熱媒循環路を通して膨張タンクと端末との間で循環供給するように構成されているので、熱媒循環経路中に空気が入り込むと、膨張タンクの熱媒の貯留量が増加して、膨張タンクの熱媒の貯留量が上限設定量以上となる多量状態となって循環不良や熱媒漏れが発生することになる。
そして、制御手段は、多量状態を検出するたびに、エア抜き用時間が短くなるように設定するので、多量状態となって循環不良や熱媒漏れが発生した場合であっても、多量状態の検出によって、エア抜き用時間が短くなるように設定される。
したがって、たとえ、循環不良や熱媒漏れが発生した場合であっても、その後には、循環不良や熱媒漏れを防止できる適切な時間をエア抜き用時間として設定することができることになる。
【0023】
以上のことから、循環不良や熱媒漏れが発生した場合であっても、その後には、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができることとなって、循環不良や熱媒漏れを防止できる適切なタイミングでエア抜き運転を行うことができる熱媒供給設備を提供できるに至った。
【0024】
【発明の実施の形態】
本発明にかかる熱媒供給設備を図面に基づいて説明する。
〔第1実施形態〕
この熱媒供給設備は、図1および図2に示すように、床暖房装置や浴室暖房乾燥装置などの複数の暖房用の端末1、それら複数の端末1に熱媒を熱媒循環路2を通して供給する熱源機3、その熱源機3の運転を制御する制御手段としての制御部4、各端末1に対応して設けられて制御部4と通信自在なリモコン5などを備えて構成されている。
【0025】
そして、この実施形態では、端末1が、第1端末1a、第2端末1b、第3端末1cの3つから構成され、リモコン5も、第1端末1aに対応する第1リモコン5a、第2端末1bに対応する第2リモコン5b、第3端末1cに対応する第3リモコン5cから構成されている。
また、この実施形態では、第1端末1aが2階に設置され、第2端末1bおよび第3端末1cが1階に設置され、熱源機3が1階に設置されている。
【0026】
前記熱源機3は、熱源機内流路6の途中に、熱源機内流路6における熱媒を貯留する大気開放式の膨張タンク7、端末1に熱媒を循環供給させるための循環ポンプ8、熱源機内流路6を通流する熱媒をバーナ9の燃焼により加熱させる熱交換器10などを設けて、バーナ9に燃焼用空気を供給するファン11などを備えて構成されている。
そして、バーナ9に燃料ガスを供給する燃料供給路12には、燃料ガスの供給を断続する燃料ガス開閉弁13、燃料ガス供給量を調整する燃料ガス調整弁14が設けられ、バーナ9に点火するイグナイタ15およびバーナ9の着火を確認するフレームロッド16なども設けられている。
【0027】
また、膨張タンク7には、貯留している熱媒の水位の上限を検出する上限センサ23および下限を検出する下限センサ24が設けられ、膨張タンク7に給水するためのタンク給水路25が接続され、そのタンク給水路25には、補給水電磁弁26が設けられている。
そして、下限センサ24にて熱媒の水位が下限となると、上限センサ23にて熱媒の水位が上限となるまで補給水電磁弁26を開弁させて、膨張タンク7へ熱媒を補給するように構成されている。
【0028】
前記熱源機内流路6における膨張タンク7よりも熱媒循環方向の上流側には、その熱媒の温度を検出する戻りサーミスタ17が設けられ、熱源機内流路6における熱交換器10よりも熱媒循環方向の下流側には、その熱媒の温度を検出する往きサーミスタ18が設けられ、熱源機内流路6において、戻りサーミスタ17の配設箇所よりも熱媒循環方向の上流側と往きサーミスタ18の配設箇所よりも熱媒循環方向の下流側とがバイパス路19にて接続されている。
【0029】
前記熱媒循環路2は、往き側流路2aと戻り側流路2bとから構成され、複数の端末1a〜1cの夫々に対して、往き側流路2aと戻り側流路2bとが接続されている。
そして、熱源機3の熱源機内流路6は、その熱媒往き側が、ヘッダー20により、複数の往き側流路2aに分岐接続され、その熱媒戻し側が、ヘッダー20により、複数の戻り側流路2bに合流接続され、複数の往き側流路1aの夫々には、熱動弁21が設けられている。
前記熱源機3は、複数の熱動弁21を各別に開閉することにより、複数の端末1a〜1cへ各別に熱媒を供給できるように構成されている。
【0030】
前記熱源機3は、バーナ9の燃焼により熱媒を加熱する加熱状態にて熱媒を熱媒循環路2を通して端末1に供給する熱媒供給運転と、バーナ9を燃焼させずに熱媒を加熱しない非加熱状態にて熱媒を熱媒循環路2を通して端末1に熱媒を供給するエア抜き運転とを実行可能に構成されている。
【0031】
前記制御部4と複数の端末1a〜1cに対応して設けられた各リモコン5a〜5cとは、端末1の運転開始や運転停止などの制御情報などを通信自在に構成されている。
そして、制御部4は、リモコン5からの指令に基づいて、複数の端末1a〜1cに対して、熱媒供給運転を各別に行うとともに、エア抜き用時間が経過するごとに、エア抜き運転を行うように構成されている。
ちなみに、制御部4は、前回エア抜き運転を行ってからエア抜き用時間が経過したときに、熱媒供給運転中であると、その熱媒供給運転が終了したのち、エア抜き運転を行うように構成されている。
【0032】
前記熱媒供給運転について説明すると、制御部4は、リモコン5から端末1の運転開始が指令されると、熱源機3の運転を開始させて、そのリモコン5に対応する端末1に対して熱媒供給運転を行い、あらたに他のリモコン5から端末1の運転開始が指令されると、そのリモコン5に対応する端末1に対しても熱媒供給運転を行うように構成されている。
そして、制御部4は、端末1の運転開始を指令したリモコン5のうち、運転停止を指令していないリモコン5があるときには、熱源機3の運転を継続させたまま、そのリモコン5に対応する端末1に対して熱媒供給運転を行い、端末1の運転開始を指令したリモコン5のすべてから端末1の運転停止が指令されると、熱源機3の運転を停止させるように構成されている。
【0033】
前記熱媒供給運転における熱源機3の運転について説明を加えると、まず、ファン11を作動させて、燃料ガス開閉弁13および燃料ガス調整弁14を開弁させてバーナ9の燃焼を開始するとともに、循環ポンプ8を作動させて、熱源機3の運転を開始し、バーナ9の燃焼により加熱した熱媒を、熱媒供給運転の対象となっている端末1に対して供給するように、熱動弁21の開閉を制御するようにしている。
そして、熱媒供給運転を終了するときには、燃料ガス開閉弁13および燃料ガス調整弁14を閉弁させてバーナ9の燃焼を停止したのち、ファン11の作動を停止させるとともに、すべての熱動弁21を閉弁させ、循環ポンプ8の作動を停止させて、熱源機3の運転を停止するようにしている。
【0034】
前記エア抜き運転について説明すると、循環ポンプ8のみを作動させて、バーナ9を燃焼させずに、熱源機3の運転を開始し、すべての熱動弁21を開弁させて、バーナ9を燃焼させずに加熱していない熱媒を、すべての端末1に対して供給するようにしている。
そして、循環ポンプ8を作動させてからエア抜き運転用設定時間(例えば、5〜10分)が経過すると、すべての熱動弁21を閉弁させ、循環ポンプ8の作動を停止させて、熱源機3の運転を停止して、エア抜き運転を終了するようにしている。
【0035】
前記エア抜き用時間について説明を加えると、熱源機3と端末1との設置条件に応じてエア抜き用時間を変更設定する手動操作式のエア抜き用時間変更設定手段としてのディップスイッチ22が設けられている。
そして、エア抜き用時間は、ディップスイッチ22によって、例えば、720時間、600時間、540時間、480時間の4段階に設定可能であり、熱源機3と端末1との設置条件として、熱源機3と端末1との設置位置との高低および端末1の設置台数に応じて、ディップスイッチ22にて4段階の時間のいずれかをエア抜き用時間に設定するようにしている。
【0036】
熱源機3と端末1との設置条件とエア抜き用時間との関係について一例を挙げて説明すると、熱源機3と端末1との設置位置がほぼ同じ高さでかつ端末1の設置台数が3台までの場合は、エア抜き用時間を720時間と設定し、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高くかつ端末1の設置台数が3台までの場合は、エア抜き用時間を600時間と設定する。
また、端末1の設置台数が4台以上の場合は、エア抜き用時間を540時間と設定し、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高くかつ端末1の設置台数が4台以上の場合は、エア抜き用時間を480時間と設定する。
【0037】
そして、この実施形態では、第1端末1aが2階に設置され、熱源機3が1階に設置され、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高く、端末1の設置台数が3台であるので、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高くかつ端末1の設置台数が3台までの場合となり、ディップスイッチ22にてエア抜き用時間を600時間と設定している。
【0038】
また、制御部4は、膨張タンク7の熱媒の貯留量が上限設定量以上となる多量状態を検出するたびに、エア抜き用時間が短くなるように設定するように構成されている。
【0039】
多量状態の検出について説明を加えると、膨張タンク7の熱媒の貯留量が増加すると、多量状態となって膨張タンク7から熱媒が漏れる熱媒漏れが発生するので、その後、膨張タンク7の熱媒の水位が下降し、下限センサ24にて熱媒の水位が下限となる。
したがって、制御部4は、下限センサ24にて熱媒の水位が下限となるのを検出すると、補給水電磁弁26を開弁させて、膨張タンク7へ熱媒を補給することになる。
以上の如く、多量状態となって熱媒漏れが発生したのちには、膨張タンク7への熱媒の補給が行われるので、制御部4は、膨張タンク7への熱媒の補給を行われたことを検出することによって、多量状態を検出するように構成されている。
【0040】
エア抜き用時間の設定について説明を加えると、制御部4は、前回膨張タンク7への熱媒の補給を行ってから漏れ用設定時間(例えば、300時間)以上でかつ正常用設定時間(例えば、720時間)未満であれば、膨張タンク7への熱媒の補給を行うたびに、エア抜き用時間を設定時間(例えば、60時間)短くなるように変更設定するように構成されている。
ちなみに、エア抜き用時間の下限を、例えば、300時間としており、膨張タンク7への熱媒の補給が行われても、エア抜き用時間を300時間未満には変更設定しないように構成されている。
【0041】
すなわち、制御部4は、熱媒循環経路中への空気の入り込みにより膨張タンク7への熱媒の補給を行った場合を対象として、その膨張タンク7への熱媒の補給を行うたびに、エア抜き用時間を設定時間(例えば、60時間)短くなるように変更設定するように構成されている。
【0042】
説明を加えると、膨張タンク7への熱媒の補給を行う場合としては、熱媒循環経路中への空気の入り込み以外に、熱媒循環路2での漏れ異常が発生した場合や、異常は発生していないが、熱媒の蒸発などによって熱媒の貯留量が減少した場合がある。
熱媒循環路2での漏れ異常が発生した場合には、前回膨張タンク7への熱媒の補給を行ってから漏れ用設定時間(例えば、300時間)までに、膨張タンク7への熱媒の補給が行われることになる。
また、異常は発生していないが、熱媒の蒸発などによって熱媒の貯留量が減少した場合には、前回膨張タンク7への熱媒の補給を行ってから正常用設定時間(例えば、720時間)以上が経過したのち、膨張タンク7への熱媒の補給が行われることになる。
【0043】
したがって、前回膨張タンク7への熱媒の補給を行ってから漏れ用設定時間(例えば、300時間)以上でかつ正常用設定時間(例えば、720時間)未満に、膨張タンク7への熱媒の補給が行われると、熱媒循環経路中への空気の入り込みの場合と特定することができるので、制御部4は、その膨張タンク7への熱媒の補給を対象として、膨張タンク7への熱媒の補給を行うたびに、エア抜き用時間が短くなるように変更設定するように構成されている。
【0044】
前記制御部4のエア抜き運転についての制御動作を、図3のフローチャートに基づいて説明を加える。
まず、制御部4は、ディップスイッチ22の設定によって、エア抜き用時間を初期設定し、エア抜き用時間が経過すると、エア抜き運転を行う(ステップ1〜3)。
また、エア抜き運転を一度でも行っていると、前回エア抜き運転を行ってからエア抜き用時間が経過すると、エア抜き運転を行う(ステップ2)
【0045】
そして、補給水電磁弁26を開弁させて膨張タンク7への熱媒の補給を行われたことが検出されて、多量状態を検出すると、前回膨張タンク7への熱媒の補給を行ってから漏れ用設定時間(例えば、300時間)以上でかつ正常用設定時間(例えば、720時間)未満であれば、エア抜き用時間を設定時間(例えば、60時間)短く更新設定する(ステップ5,6)。
【0046】
〔第2実施形態〕
この第2実施形態は、上記第1実施形態におけるエア抜き用時間の設定についての別実施形態であるので、その点を中心に説明する。
ちなみに、その他の構成については、上記第1実施形態と同様であるので、同符号を記すなどによって、その詳細な説明は省略する。
【0047】
上記第1実施形態では、熱源機3と端末1との設置条件に応じて、ディップスイッチ22にてエア抜き用時間を設定するように構成しているが、この構成に代えて、第2実施形態では、制御部4が、熱源機3と端末1との設置条件に応じてエア抜き用時間を設定するように構成されている。
そして、制御部4は、設置される端末1の数が多いほどエア抜き用時間を短く設定するように構成され、また、熱源機3の設置位置よりも端末1の設置位置の方が高くなるほどエア抜き用時間を短く設定するように構成されている。
【0048】
説明を加えると、制御部4は、熱源機3と端末1との設置条件に応じて、エア抜き用時間を、例えば、720時間、600時間、540時間、480時間の4段階に自動的に設定可能に構成されている。
一例を挙げて説明すると、制御部4は、熱源機3と端末1との設置位置がほぼ同じ高さでかつ端末1の設置台数が3台までの場合は、エア抜き用時間を720時間と設定し、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高くかつ端末1の設置台数が3台までの場合は、エア抜き用時間を600時間と設定する。
また、制御部4は、端末1の設置台数が4台以上の場合は、エア抜き用時間を540時間と設定し、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高くかつ端末1の設置台数が4台以上の場合は、エア抜き用時間を480時間と設定する。
【0049】
この実施形態では、第1端末1aが2階に設置され、第2端末1bおよび第3端末1cが1階に設置され、熱源機3が1階に設置され、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高く、端末1の設置台数が3台であるので、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高くかつ端末1の設置台数が3台までの場合となり、エア抜き用時間が600時間に自動的に設定される。
【0050】
ちなみに、端末1の設置台数については、例えば、制御部4が、機器が設置された当初に、リモコン5と通信することによって、端末1の設置台数を判別することができ、熱源機3と端末1との設置位置の高低については、例えば、制御部4が、機器が設置された当初に、膨張タンク7内の水を熱媒循環路2に張るときにかかる時間や人為的な入力に基づいて、熱源機3と端末1との設置位置との高低を判別することができる。
【0051】
前記制御部4のエア抜き運転についての制御動作について説明を加えるが、図3のフローチャートにおいて、ステップ1における初期設定の動作のみ異なるので、その点のみを説明し、その他の制御動作については説明を省略する。
すなわち、この第2実施形態では、図3のステップ1において、制御部4が、熱源機3と端末1との設置条件に応じてエア抜き用時間を初期設定する。
【0052】
〔別実施形態〕
(1)上記第1および第2実施形態では、熱源機3と端末1との設置条件に応じて人為的にまたは自動的にエア抜き用時間を初期設定するようにしているが、例えば、720時間の初期設定時間をエア抜き用時間と初期設定するように構成して実施することも可能である。
【0053】
(2)上記第1および第2実施形態では、熱源機3と端末1との設置条件として、熱源機3と端末1との設置位置の高低の条件と端末1の設置台数の条件を例示したが、熱源機3と端末1との設置条件としては、熱源機3と端末1との設置位置の高低の条件や端末1の設置台数の条件の他に、熱媒循環路2の長さの条件を含めたり、逆に、熱源機3と端末1との設置位置の高低の条件のみとすることが可能である。
すなわち、熱源機3と端末1との設置条件としては、各種の条件が適応可能であり、その条件の数や条件の内容は適宜変更が可能である。
【0054】
例えば、熱源機3と端末1との設置位置の高低の条件のみを熱源機3と端末1との設置条件とした場合には、熱源機3と端末1との設置位置がほぼ同じであると、720時間をエア抜き用時間と設定し、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高いならば、600時間をエア抜き用時間と設定して実施することができる。
【0055】
(3)上記第1および第2実施形態では、制御部4が、多量状態を検出するたびに、エア抜き用時間が短くなるように設定する構成を採用しているが、このような構成を採用しなくてもよい。
【0056】
(4)上記第1および第2実施形態では、制御部4は、膨張タンク7への熱媒の補給を行われたことを検出することによって、多量状態を検出するように構成しているが、例えば、膨張タンク7の熱媒の貯留量が上限設定量以上となる状態や膨張タンク7から熱媒が漏れる状態を検出するセンサを設けて、制御部4は、そのセンサにて膨張タンク7の熱媒の貯留量が上限設定量以上となる状態や膨張タンク7から熱媒が漏れる状態を検出することによって、多量状態を検出するように構成してもよく、多量状態を検出する構成は適宜変更が可能である。
【0057】
(5)上記第1および第2実施形態では、エア抜き用時間を4段階に設定可能に構成されているが、例えば、2段階や5段階以上など適宜変更が可能である。
【0058】
(6)上記第1および第2実施形態では、熱源機3と端末1との設置条件として、熱源機3と端末1との設置位置が熱源機3よりも端末1の方が高くかつ端末1の設置台数が3台までの場合を示したが、使用者の用途や住居の広さなどによって、適宜変更が可能である。
【0059】
(7)上記第1および第2実施形態では、バーナ9の燃焼により熱媒を加熱する構成を例示したが、電気ヒータなどその他の加熱手段を用いて熱媒を加熱することも可能であり、熱媒を加熱する構成については適宜変更が可能である。
【図面の簡単な説明】
【図1】熱媒供給設備の概略構成図
【図2】熱媒供給設備の制御ブロック図
【図3】制御部4の制御動作を示すフローチャート
【符号の説明】
1 端末
2 熱媒循環路
3 熱源機
4 制御手段
22 エア抜き用時間変更設定手段[0001]
BACKGROUND OF THE INVENTION
The present invention is configured such that a heat source device that supplies a heated heat medium to a terminal through a heat medium circulation path performs an air vent operation that supplies an unheated heat medium to the terminal through the heat medium circulation path, The present invention relates to a heat medium supply facility provided with control means for controlling the operation of the heat source machine, wherein the control means is configured to execute the air bleeding operation every time the air bleeding time elapses.
[0002]
[Prior art]
In the heat medium supply facility as described above, the control means operates the heat source device in response to an operation request from a remote controller or the like, supplies the heated heat medium to a terminal such as a floor heating device or a bathroom heating drying device, and the control means Every time the air venting time elapses, the air venting operation is performed to remove the air that has entered the heat medium circulation path.
[0003]
In the heat medium supply facility as described above, the control means performs the air bleeding operation every time the air bleeding time elapses, and removes the air that has entered the heat medium circulation path, thereby circulating the heat medium. The amount of air that has entered the path becomes too large to prevent poor circulation that cannot properly circulate the heat medium, or the air source that is provided in the heat source unit for the amount of air that has entered the heat medium circulation path. The storage amount of the heat medium in the expansion tank of the type is increased, so that the heat medium leaks from overflowing the heat medium from the expansion tank.
[0004]
In a conventional heat medium supply facility, the control means performs an air bleeding operation every time a certain air bleeding time (for example, 720 hours) elapses (for example, see Patent Document 1).
[0005]
[Patent Document 1]
JP 2002-162051 A
[0006]
[Problems to be solved by the invention]
However, in the above-described conventional heat medium supply equipment, the control means performs the air bleeding operation every time a certain air bleeding time elapses. There was a possibility that the unplugging operation could not be performed.
[0007]
For example, if the heat source machine is installed on the first floor and the terminal is installed on the second floor, and the terminal is installed at a position higher than the installation position of the heat source machine, Since the installation position is higher, the heat medium circulation path from the terminal to the heat source machine is in a negative pressure state, and the negative pressure state makes it easier for air to enter the heat medium circulation path.
Therefore, when the terminal is installed at a position higher than the installation position of the heat source machine, for example, the installation position of the heat source machine and the installation position of the terminal are both installed on the first floor, and the installation position of the heat source machine Compared to the case where the installation position is almost the same height, the time until the amount of air that has entered the heat medium circulation path becomes large is shorter, and the time until the poor circulation or heat medium leakage occurs is shorter. There is a risk of shortening.
[0008]
In addition, as the number of installed terminals increases, the number of heat medium circulation paths between the terminals and the heat source equipment increases accordingly, so the number of parts where air can enter increases, and the amount of air entering the heat medium circulation path increases. The time until the amount becomes large is short, and the time until poor circulation or heat medium leakage occurs is shortened.
[0009]
However, in the above-mentioned conventional heat medium supply equipment, since the time for air venting is constant, if the time for air venting is set short, the air venting operation is performed when the circulation failure and the heat medium leakage still do not occur, On the other hand, if the air venting time is set longer, the air venting operation will be performed after the poor circulation or heat medium leakage occurs. You can't do it.
[0010]
The present invention has been made paying attention to such a point, and its purpose is to provide a heat medium supply facility capable of performing an air bleeding operation at an appropriate timing capable of preventing poor circulation and heat medium leakage. is there.
[0011]
[Means for Solving the Problems]
In order to achieve this object, the heat source device that supplies the heated heat medium to the terminal through the heat medium circulation path performs an air vent operation that supplies the unheated heat medium to the terminal through the heat medium circulation path. A heating medium supply facility configured to control the operation of the heat source unit and to perform the air bleeding operation every time the air bleeding time elapses. In
Manual operation type air vent time change setting means for changing and setting the air vent time according to the installation conditions of the heat source device and the terminal is provided.
[0012]
In other words, the air venting time change setting means can change and set the air venting time according to the installation conditions of the heat source machine and the terminal. For example, the terminal is installed at a position higher than the installation position of the heat source machine. In this case, the air venting time can be set shorter than in the case where the installation position of the heat source device and the installation position of the terminal are installed at substantially the same height.
Therefore, depending on the installation conditions between the heat source unit and the terminal, even if the appropriate time for preventing poor circulation and heat medium leakage is different, depending on the installation conditions of the heat source unit and the terminal with the air vent time change setting means Therefore, an appropriate time can be set as the air bleeding time.
The control means executes the air bleeding operation every time the air bleeding time set by the air bleeding time change setting means elapses. Therefore, an appropriate timing according to the installation conditions of the heat source device and the terminal is used. The air bleeding operation can be performed at.
[0013]
Based on the above, even if the appropriate timing that can prevent poor circulation and heat medium leakage differs depending on the installation conditions of the heat source unit and the terminal, the air at the timing suitable for the installation condition of the heat source unit and the terminal. As a result, it is possible to provide a heat medium supply facility capable of performing an air bleeding operation at an appropriate timing capable of preventing poor circulation and heat medium leakage.
[0014]
According to the second aspect of the present invention, the heat source device that supplies the heated heat medium to the terminal through the heat medium circulation path, and the air vent operation that supplies the unheated heat medium to the terminal through the heat medium circulation path. Control means for controlling the operation of the heat source machine is provided, and the control means is configured to perform the air venting operation every time the air venting time elapses. In the medium supply equipment,
The said control means is comprised so that the said time for air bleeding may be set according to the installation conditions of the said heat source machine and the said terminal.
[0015]
That is, since the control means sets the air bleeding time according to the installation conditions of the heat source device and the terminal, for example, the larger the number of installed terminals, the shorter the air bleeding time can be set.
Therefore, depending on the installation conditions of the heat source unit and the terminal, even if the appropriate time for preventing poor circulation and heat medium leakage is different, the appropriate time according to the installation condition of the heat source unit and the terminal is set to the time for air venting. Can be set automatically as
The control means executes the air bleeding operation every time the automatically set time for air bleeding elapses, so the air bleeding operation is performed at an appropriate timing according to the installation conditions of the heat source device and the terminal. Will be able to do.
[0016]
Based on the above, even if the appropriate timing that can prevent poor circulation and heat medium leakage differs depending on the installation conditions of the heat source unit and the terminal, the air at the timing suitable for the installation condition of the heat source unit and the terminal. As a result, it is possible to provide a heat medium supply facility capable of performing an air bleeding operation at an appropriate timing capable of preventing poor circulation and heat medium leakage.
[0017]
According to a third aspect of the present invention, the control means is configured to set the air bleeding time shorter as the number of the installed terminals is larger.
[0018]
That is, as exemplified in the invention of
Therefore, regardless of the increase or decrease in the number of installed terminals, the air bleeding operation can be performed at an appropriate timing that can prevent poor circulation and heat medium leakage.
[0019]
According to a fourth aspect of the present invention, the control means is configured to set the air bleeding time shorter as the installation position of the terminal is higher than the installation position of the heat source unit.
[0020]
In other words, the control means sets the terminal for the air source higher than the position for installing the heat source device, so that the time for air venting is set shorter. Therefore, in order to prevent poor circulation and heat medium leakage, the heat source device and the terminal Therefore, the time suitable for the relationship between the installation positions can be automatically set as the air bleeding time.
Therefore, regardless of the relationship between the installation positions of the heat source device and the terminal, the air bleeding operation can be performed at an appropriate timing that can prevent poor circulation and heat medium leakage.
[0021]
According to the invention described in
The heat source device is configured to circulate and supply a heat medium stored in an expansion tank between the expansion tank and the terminal through the heat medium circulation path, and the control means includes a heat medium of the expansion tank. Each time when a large quantity state where the amount of stored water is equal to or greater than the upper limit set amount is detected, the air bleeding time is set to be short.
[0022]
That is, since the heat source device is configured to circulate and supply the heat medium stored in the expansion tank between the expansion tank and the terminal through the heat medium circulation path, when air enters the heat medium circulation path As a result, the amount of heat medium stored in the expansion tank increases, and the amount of heat medium stored in the expansion tank exceeds the upper limit set amount, resulting in poor circulation and heat medium leakage.
And since the control means sets so that the time for air bleeding is shortened every time a large amount of state is detected, even if the circulation state is poor and the heat medium leaks, The detection is set so that the time for bleeding is shortened.
Therefore, even if the circulation failure or the heat medium leakage occurs, an appropriate time for preventing the circulation failure or the heat medium leakage can be set as the air bleeding time thereafter.
[0023]
From the above, even if a poor circulation or a heat medium leak occurs, the air venting operation can be performed at an appropriate timing that can prevent the poor circulation or the heat medium leak. It has become possible to provide a heat medium supply facility capable of performing an air bleeding operation at an appropriate timing capable of preventing defects and heat medium leakage.
[0024]
DETAILED DESCRIPTION OF THE INVENTION
A heat medium supply facility according to the present invention will be described with reference to the drawings.
[First Embodiment]
As shown in FIG. 1 and FIG. 2, this heating medium supply facility includes a plurality of
[0025]
And in this embodiment, the
In this embodiment, the
[0026]
The
The
[0027]
The expansion tank 7 is provided with an
When the water level of the heat medium becomes the lower limit by the
[0028]
A
[0029]
The heat
The heat source
The
[0030]
The
[0031]
The
And based on the command from the
By the way, when the time for air venting has elapsed since the previous air venting operation has been performed, the
[0032]
The heat medium supply operation will be described. When the
The
[0033]
The operation of the
When the heating medium supply operation is finished, the fuel gas on-off
[0034]
The air bleeding operation will be described. Only the
When a set time for air bleeding operation (for example, 5 to 10 minutes) elapses after the
[0035]
When the air bleed time is described further, a
The bleed time can be set in four stages, for example, 720 hours, 600 hours, 540 hours, and 480 hours by the
[0036]
The relationship between the installation conditions of the
When the number of installed
[0037]
In this embodiment, the
[0038]
Moreover, the
[0039]
If the explanation of the detection of the large quantity state is added, if the storage amount of the heat medium in the expansion tank 7 increases, the heat medium leaks from the expansion tank 7 due to the large quantity state. The water level of the heat medium is lowered, and the water level of the heat medium becomes the lower limit by the
Therefore, when the
As described above, the heat medium is supplied to the expansion tank 7 after the heat medium leaks due to the large quantity, so that the
[0040]
To explain the setting of the air bleeding time, the
Incidentally, the lower limit of the air bleeding time is set to 300 hours, for example, and even if the expansion medium 7 is replenished with the heat medium, the air bleeding time is not changed to less than 300 hours. Yes.
[0041]
That is, every time the
[0042]
In addition, when the heating medium is replenished to the expansion tank 7, in addition to the entry of air into the heating medium circulation path, a leakage abnormality in the heating
When a leakage abnormality occurs in the heating
In addition, although no abnormality has occurred, when the amount of stored heat medium has decreased due to evaporation of the heat medium or the like, a normal set time (for example, 720) since the heat medium was supplied to the expansion tank 7 last time. After the elapse of time, the heating medium is supplied to the expansion tank 7.
[0043]
Therefore, the heat medium to the expansion tank 7 is not less than the set time for leakage (for example, 300 hours) and less than the set time for normal (for example, 720 hours) since the heat medium was supplied to the expansion tank 7 last time. When replenishment is performed, it can be specified that air has entered into the heat medium circulation path. Therefore, the
[0044]
The control operation for the air bleeding operation of the
First, the
In addition, if the air bleed operation is performed once, the air bleed operation is performed when the air bleed time has elapsed since the previous air bleed operation was performed (step 2).
[0045]
Then, when it is detected that the heat medium is supplied to the expansion tank 7 by opening the make-up water
[0046]
[Second Embodiment]
Since the second embodiment is another embodiment of setting the air bleeding time in the first embodiment, the description will focus on that point.
Incidentally, since the other configuration is the same as that of the first embodiment, detailed description thereof will be omitted by marking the same reference numerals.
[0047]
In the said 1st Embodiment, although it has comprised so that the time for air bleeding may be set with the
And the
[0048]
When the explanation is added, the
For example, when the installation position of the
In addition, when the number of installed
[0049]
In this embodiment, the
[0050]
Incidentally, with respect to the number of
[0051]
The control operation for the air bleeding operation of the
That is, in the second embodiment, in
[0052]
[Another embodiment]
(1) In the first and second embodiments, the air venting time is initially set artificially or automatically according to the installation conditions of the
[0053]
(2) In the said 1st and 2nd embodiment, the conditions of the height of the installation position of the heat-
That is, various conditions can be applied as the installation conditions of the
[0054]
For example, when only the high and low conditions of the installation positions of the
[0055]
(3) In the first and second embodiments described above, the
[0056]
(4) In the first and second embodiments, the
[0057]
(5) In the first and second embodiments described above, the air bleeding time is configured to be set to four stages. However, for example, two stages, five stages or more can be appropriately changed.
[0058]
(6) In the first and second embodiments, as the installation conditions for the
[0059]
(7) In the first and second embodiments described above, the configuration in which the heat medium is heated by the combustion of the burner 9 is exemplified, but the heat medium can also be heated using other heating means such as an electric heater, The configuration for heating the heat medium can be changed as appropriate.
[Brief description of the drawings]
FIG. 1 is a schematic configuration diagram of a heat medium supply facility.
[Fig. 2] Control block diagram of heat medium supply equipment
FIG. 3 is a flowchart showing a control operation of the
[Explanation of symbols]
1 terminal
2 Heating medium circuit
3 heat source machine
4 Control means
22 Air change time change setting means
Claims (5)
前記制御手段が、エア抜き用時間が経過するごとに、前記エア抜き運転を実行するように構成されている熱媒供給設備であって、
前記熱源機と前記端末との設置条件に応じて前記エア抜き用時間を変更設定する手動操作式のエア抜き用時間変更設定手段が設けられている熱媒供給設備。The heat source device that supplies the heated heat medium to the terminal through the heat medium circulation path is configured to perform an air bleeding operation to supply an unheated heat medium to the terminal through the heat medium circulation path. A control means for controlling the operation is provided;
The control means is a heat medium supply facility configured to perform the air bleeding operation every time the air bleeding time elapses,
A heating medium supply facility provided with manually operated air bleeding time change setting means for changing and setting the air bleeding time according to installation conditions of the heat source device and the terminal.
前記制御手段が、エア抜き用時間が経過するごとに、前記エア抜き運転を実行するように構成されている熱媒供給設備であって、
前記制御手段が、前記熱源機と前記端末との設置条件に応じて前記エア抜き用時間を設定するように構成されている熱媒供給設備。The heat source device that supplies the heated heat medium to the terminal through the heat medium circulation path is configured to perform an air bleeding operation to supply an unheated heat medium to the terminal through the heat medium circulation path. A control means for controlling the operation is provided;
The control means is a heat medium supply facility configured to perform the air bleeding operation every time the air bleeding time elapses,
A heat medium supply facility configured such that the control means sets the time for bleeding according to installation conditions of the heat source device and the terminal.
前記制御手段が、エア抜き用時間が経過するごとに、前記エア抜き運転を実行するように構成されている熱媒供給設備であって、
前記熱源機は、膨張タンクに貯留されている熱媒を前記熱媒循環路を通して前記膨張タンクと前記端末との間で循環供給するように構成され、
前記制御手段は、前記膨張タンクの熱媒の貯留量が上限設定量以上となる多量状態を検出するたびに、前記エア抜き用時間が短くなるように設定するように構成されている熱媒供給設備。The heat source device that supplies the heated heat medium to the terminal through the heat medium circulation path is configured to perform an air bleeding operation to supply an unheated heat medium to the terminal through the heat medium circulation path. A control means for controlling the operation is provided;
The control means is a heat medium supply facility configured to perform the air bleeding operation every time the air bleeding time elapses,
The heat source device is configured to circulate and supply a heat medium stored in an expansion tank between the expansion tank and the terminal through the heat medium circulation path,
The control means is configured to set the air venting time so as to be shortened each time a large amount state in which the storage amount of the heat medium in the expansion tank is greater than or equal to an upper limit set amount is detected. Facility.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003087117A JP4049695B2 (en) | 2003-03-27 | 2003-03-27 | Heat medium supply equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003087117A JP4049695B2 (en) | 2003-03-27 | 2003-03-27 | Heat medium supply equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004293926A JP2004293926A (en) | 2004-10-21 |
| JP4049695B2 true JP4049695B2 (en) | 2008-02-20 |
Family
ID=33401562
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003087117A Expired - Fee Related JP4049695B2 (en) | 2003-03-27 | 2003-03-27 | Heat medium supply equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4049695B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4989300B2 (en) * | 2007-05-08 | 2012-08-01 | 大阪瓦斯株式会社 | Heat medium supply device |
-
2003
- 2003-03-27 JP JP2003087117A patent/JP4049695B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004293926A (en) | 2004-10-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4049695B2 (en) | Heat medium supply equipment | |
| JP3774615B2 (en) | Test run control method for hot water heater | |
| KR101514896B1 (en) | Heat pump heating system | |
| US11788735B2 (en) | Heating and hot-water supply device | |
| JP6395577B2 (en) | Hot water supply device for bath | |
| JP3773752B2 (en) | Test run control method for hot water heater | |
| JP3730598B2 (en) | Hot water heating system | |
| JP7471247B2 (en) | Fluid circulation heating system | |
| JP5851454B2 (en) | Hot water heating system | |
| JP5829236B2 (en) | Floor heating system | |
| JP3894885B2 (en) | Heat medium supply equipment | |
| JPH10103683A (en) | Heat supply system | |
| JPH06249507A (en) | Circulating warm water heater | |
| JPH0560333A (en) | Control device for hot water heater | |
| JP3965128B2 (en) | Air venting method for heating system | |
| JP4059602B2 (en) | Heat medium supply system | |
| JP3676062B2 (en) | Hot water heater | |
| JP3894884B2 (en) | Heating medium supply type heating equipment | |
| JP2010019523A (en) | Heat source machine for heating | |
| JP2002327931A (en) | Hot water control method and hot water control device | |
| JPH0468226A (en) | Hot water heater device | |
| JP4155684B2 (en) | Heat medium supply system | |
| JP3935759B2 (en) | Heat supply system | |
| JP4215337B2 (en) | Heat supply system | |
| JPH11248174A (en) | Heat supply system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060207 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20071102 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20071115 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20071127 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101207 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131207 Year of fee payment: 6 |
|
| LAPS | Cancellation because of no payment of annual fees |