Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4079549B2 - Waste cable processing method and apparatus - Google Patents
[go: Go Back, main page]

JP4079549B2 - Waste cable processing method and apparatus - Google Patents

Waste cable processing method and apparatus Download PDF

Info

Publication number
JP4079549B2
JP4079549B2 JP14345899A JP14345899A JP4079549B2 JP 4079549 B2 JP4079549 B2 JP 4079549B2 JP 14345899 A JP14345899 A JP 14345899A JP 14345899 A JP14345899 A JP 14345899A JP 4079549 B2 JP4079549 B2 JP 4079549B2
Authority
JP
Japan
Prior art keywords
groove
furnace
waste cable
waste
coating material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14345899A
Other languages
Japanese (ja)
Other versions
JP2000325919A (en
Inventor
宏明 田中
照直 吉海
秀伸 伊藤
義昭 松本
正実 ▲吉▼竹
敬一 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Furukawa Electric Co Ltd
Mitsui Engineering and Shipbuilding Co Ltd
Mitsui E&S Co Ltd
Original Assignee
Furukawa Electric Co Ltd
Mitsui Engineering and Shipbuilding Co Ltd
Mitsui E&S Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Furukawa Electric Co Ltd, Mitsui Engineering and Shipbuilding Co Ltd, Mitsui E&S Holdings Co Ltd filed Critical Furukawa Electric Co Ltd
Priority to JP14345899A priority Critical patent/JP4079549B2/en
Publication of JP2000325919A publication Critical patent/JP2000325919A/en
Application granted granted Critical
Publication of JP4079549B2 publication Critical patent/JP4079549B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/82Recycling of waste of electrical or electronic equipment [WEEE]

Landscapes

  • Processing Of Solid Wastes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、廃ケーブル(銅線などの有価金属を有する廃材を含む)を乾留して銅線などの有価金属を回収する一方、銅線などを被覆しているゴムやポリエチレンなどの高分子材料製の被覆材から燃料油を回収する廃ケーブル処理方法及び装置に関する。
【0002】
【従来の技術】
廃ケーブルを乾留して銅線などの有価金属を回収する一方、銅線などを被覆しているゴムやポリエチレンなどの高分子材料製の被覆材から燃料油を回収するに際し、従来は、乾留炉における伝熱を促進させるための工夫などが、十分、払われていなかったため、乾留炉内に収容したバスケットから炉底に流下した溶融被覆材の熱分解に多くの時間を要し、1回/日のバッチ運転、即ち、商用運転が難しい状況にあった。
【0003】
【発明が解決しようとする課題】
本発明は、係る問題を解消するためになされたものであり、その目的とするところは、少なくとも1回/日のバッチ運転、即ち、商用運転を計り得る廃ケーブル処理方法及び装置を提供することにある。
【0004】
【課題を解決するための手段】
上記の目的を達成するため、請求項1に記載の発明は、熱分解炉内の廃ケーブルを不活性ガスの雰囲気中で乾留させて熱分解油と金属を回収する廃ケーブル処理方法において、乾留中に溶融した溶融被覆材を、廃ケーブル充填用容器に設けた溝形部材に受けた後、前記溝形部材から熱分解炉の炉壁に沿って流下させることを特徴としている。
【0006】
また、請求項に記載の発明は、溶融被覆材を、廃ケーブル充填用容器に設けた溝形部材に受けた後、前記溝形部材から熱分解炉の炉壁に設けたダム式流下溝に導入し、しかる後に、前記ダム式流下溝に設けたスリット状のすき間から熱分解炉の炉壁に沿ってフィルム状に流下させることを特徴としている。
【0007】
一方、請求項に記載の発明は、熱分解炉内の廃ケーブルを不活性ガスの雰囲気中で乾留させて熱分解油と金属を回収する廃ケーブル処理装置において、熱分解炉の内壁面に、乾留中に溶融した溶融被覆材が熱分解炉の長手方向に広がりながら底部のすき間から熱分解炉の内壁面に沿ってフィルム状に流下するダム式流下溝を設けると共に、前記熱分解炉内に廃ケーブル充填用容器を出し入れ自在に設け、かつ、前記廃ケーブル充填用容器に溶融被覆材を前記ダム式流下溝に供給する溝形部材を設けたことを特徴としている。
【0008】
また、請求項に記載の発明は、ダム式流下溝の下方に、溶融被覆材が炉体の内壁面の長手方向に広がる片流れ式の溝をジグザグ状に設けることを特徴としている。
また、請求項に記載の発明は、溝形部材の先端に延長用の溝形部材を着脱自在に取り付けることを特徴としている。
【0009】
また、請求項に記載の発明は、溝形部材に溶融被覆材のみを通す開口を持つ溝蓋を設置することを特徴としている。
また、請求項に記載の発明は、熱分解炉に開閉自在に取り付けられている前扉の内側に溶融被覆材の液溜まりを防ぐ液溜まり防止部材を取り付けることを特徴としている。
【0010】
【発明の実施の形態】
以下、図面により本発明の実施の形態を説明する。
【0011】
図14に示すように、本発明の廃ケーブル(銅線などの有価金属を有する廃材を含む)の処理装置は、熱分解設備A、熱分解油回収設備B及び排ガス処理設備Cから構成されている。
【0012】
熱分解設備Aは、横型間接加熱式熱分解炉(以下、熱分解炉と称する)1、熱風発生炉2、送風機3、油供給ポンプ5、回収油タンク6及び重油タンク7から構成されている。また、熱分解油回収設備Bは、熱分解油ドラム8、凝縮機9、水封槽10、冷却塔11及び冷却水ポンプ12から構成されている。更に、排ガス処理設備Cは、主として、排ガス焼却炉13から構成されている。
【0013】
上記熱分解炉1は、炉体14と、炉体14の開口端に開閉自在に取り付けた前扉15と、炉体14の外側に設けた加熱ジャケット16から構成され、廃ケーブルを乾留する時は、炉体14内に廃ケーブル(不図示)を詰め込んだバスケット30を2個収納するようになっている。
【0014】
熱分解炉1は、酸素濃度検出センサ18、圧力センサ19、温度センサ20を備え、圧力センサ19によって窒素ガス供給管21の流量調整弁22を制御して炉体14内に供給する窒素ガスaの流量を調節する一方、温度センサ20によって油供給管23の流量調整弁24、及び送風管27の流量調整弁28を制御して熱風発生炉2の図示しないバーナに供給するA重油b又は熱分解油fの供給量の調節、並びに燃焼空気dの供給量を調節を行うようになっている。また、油供給管23から分岐させた分岐管23′,23″に設けたバルブ(不図示)を制御することによって燃料油を選択できるようになっている。
【0015】
廃ケーブルの処理に当たっては、炉体14内に窒素ガスaを供給して炉内を不活性ガスの雰囲気にした後、熱風発生炉2から熱風供給管50を経て熱分解炉1の加熱ジャケット16内に熱風kを供給して炉内の廃ケーブルを間接的に加熱する。炉体14内の温度は、温度センサ20によって常時監視され、廃ケーブルの被覆材が熱分解するように、随時、流量調整弁24,28の調節が行われている。
【0016】
廃ケーブルの被覆材(ゴムやポリエチレンなどの高分子材料製)の熱分解が始まると、高温の熱分解ガスeが炉体14から配管40を経て熱分解油ドラム8に流入して冷却され、熱分解ガスe中の高沸点の分解油が熱分解油ドラム8に残留する。高沸点の分解油が除かれた熱分解ガスeは、熱分解油ドラム8に立設されている凝縮器9を通過する間に熱分解ガスe中の熱分解油が凝縮し、熱分解油ドラム8内に流下する。熱分解油ドラム8に溜まった熱分解油fは、配管46を通って回収油タンク6に送出される。なお、余分な熱分解油fは、配管47を通って系外に送出され、別途、燃料などに利用される。
【0017】
一方、熱分解油の除かれた排ガスは、配管41を通って水封槽10に流入した後、配管42を通って排ガス焼却炉13に送出され、焼却される。排ガスの焼却には、燃焼空気d及びガス管43により供給するLPGガスhが補助燃料として使用される。また、熱分解炉1の排ガスjは、配管48を通って排ガス焼灼炉13に導入される。
【0018】
乾留時間の経過後、熱風発生炉2を停止して炉体14を自然冷却させる。その後、熱分解炉1の前扉15を開けて廃ケーブルに含まれていた銅線を回収する。回収された銅線は、不活性ガスの雰囲気中で処理されているため、表面が酸化されておらず、高値で取引される。
【0019】
炉体14の冷却に際して、送風機3による送風を継続すると、炉体14の冷却速度を早めることができる。また、炉体14の温度降下に伴って炉内が減圧状態になるのを防ぐため、炉体14内に窒素ガスaを供給すると、窒素ガスaによって炉内の可燃性ガスを排除され、安全性が高くなる。なお、乾留が終了した時点で炉体14内に供給されている窒素ガスaの供給量を増加させて炉内が減圧状態になるのを避けるようにしてもよい。
【0020】
冷却塔11の工水iは、ポンプ12によって汲み上げられ、熱分解油ドラム8及び恐縮器9を経た後、配管45を通って冷却塔11に戻されるようになっている。
【0021】
さて、熱分解炉及び廃ケーブルを収容するバスケットについて、更に詳しく説明する。
図1に示すように、熱分解炉1は、炉体14の左右の内壁面71にダム式流下溝72を2段ずつ備えている。炉体14の内壁面71の伝熱を有効利用するために、上段のダム式流下溝72aは、炉体14の中心Oを通る水平面mより、若干、下方に位置させることが望ましい。
【0022】
図2に示すように、上下のダム式流下溝72a,72bは、熱分解炉1の中心線nに平行に設けられている。これらのダム式流下溝72の前後一対の面板73は、炉体14の内壁面71に水密状に取り付けられ、その傾斜面74に長尺な側壁板75が水密状に取り付けられている(図1参照)。また、側壁板75は、炉体内壁面71に一定間隔で取り付けた支持体76によって支持されている。その上、図5に示すように、側壁板75の下端にスリット状のすき間77を設けている。このすき間77の間隔Δxは、1〜3mmが望ましい。
【0023】
一方、廃ケーブルを収容するバスケット30は、図3及び図4から分かるように、立方体状の箱型に形成され、その内部は、水平仕切棚80によって複数段に仕切られている。水平仕切棚80及びバスケット底部81は、パンチングメタル床82になっているが、透かし床、格子床、金網床を問わない。また、バスケット30の前面及び背面は、パンチングメタル83によって覆われているが、透かし板、格子、金網を問わない。
【0024】
水平仕切棚の取付け方法は、固定式、移動式、分割挿入式を問わない。また、パンチングメタルの穴径は、約20〜50mmが望ましい。また、バスケット枠は、アングル形鋼により形成されているが、鋼管等の他の形鋼を用いて形成してもよい。
【0025】
図3に示すように、バスケット30は、1段目と3段目の区画64内にバスケット30を横切る溝形部材85を備えている。溝形部材85は、山形を呈し、バスケットの中央に位置している最上部86から先端部87に向かって下り勾配になっている。また、図4に示すように、上段の溝形部材85aは、バスケット30の前面側と背面側に離れて設置され、下段の溝形部材85bは、バスケット30の中央に隣接して設置されている。上段の溝形部材85aがバスケット30の中央側、下段の溝形部材85bが、バスケット30の前面側及び背面側に設置されていてもよい。
【0026】
ここで、バスケット枠内に占める上段溝形部材の合計水平面積をAu、バスケット枠内に占める下段溝形部材の合計水平面積をAl、バスケットの水平断面積をAとすると、上段溝形部材の面積比率αu(=Au/A)は、(1)式の示す範囲が望ましく、また、下段溝形部材の面積比率αl(=Al/A)は、(2)式の示す範囲が望ましい。
【0027】
0<αu<1 ・・・・・ (1)
0<αl<1 ・・・・・ (2)
炉内のガスの対流を考えると、最適値は、αu=0.3〜0.7、αl=0.7〜0.3程度である。図4の例の場合は、αu=αl=0.44である。
【0028】
要するに、αu=αl=1とすると、水平仕切棚でガスの対流が遮断される上、炉体内壁面の熱伝導伝熱を有効に利用することができず、水平仕切棚に未分解プラスチックが残留する恐れがある。上下段の溝形部材は、図4のように配置したが、分解ガスの流れ、及び溶融した被覆材の落下パターンを考慮して設計すると良い。
【0029】
ところで、上段の溝形部材85aが下段の溝形部材85bより外側に突き出していると、廃ケーブルをバスケット30に詰め込むとき、作業の邪魔になるので、上段の溝形部材85aは、先端部を着脱式にしてバスケット30を炉内に搬入する直前に取り付けると便利である。そこで、図6に示すように、バスケット30に設置されている溝形部材185と延長用溝形部材285との重複部分を貫通している二つの孔88に延長用溝形部材の横幅より長い金属棒89が抜き差し自在に装着している。
【0030】
また、溝形部材85の上部には、廃ケーブルが溝形部材85内に落下して溶融被覆材の流れを阻害しないように、パンチングメタル等で製作した溝蓋90を載せている。この溝蓋は、透かし蓋、格子蓋、金網蓋を問わない。
【0031】
図3に示すように、バスケット30の底面には、溝形部材から成る一対の架台91が取り付けられている。そして、この架台91を支持する一方、バスケットの出し入れ時にガイドとなる一対の支持部材92を炉体14の底部に立設されている(図1参照)。
【0032】
一般に、前蓋15は、強度上、さら形、或いは、半円形の鏡板が採用されている上、ガスケット冷却用水ジャケット93で冷却される影響もあって熱分解ガスが凝縮して滴下し易いため、前扉15の下部に凝縮物が溜まるのを防ぐため、ガス抜き穴(図示せず)を設けた液溜まり防止部材94を設置する。この液溜まり防止部材94は、図7に示すように、略かまぼこ形に呈している。また、液溜まり防止部材94の端面95は、図8に示すように、前扉15のフランジ96と面一にすることが望ましい。
【0033】
上記加熱ジャケット16は、隔壁38によって2分されている上、各ジャケット16内は、螺旋状の仕切板39が設けられているため、各加熱ジャケット16a,16b内に導入された加熱ガスが螺旋を描いて通過し、炉内を均一に加熱するようになっている。なお、符号17は、断熱材17を示している。
【0034】
上記の熱分解炉1にて廃ケーブルを乾留すると、銅線を被覆している被覆材が熱分解し、熱分解油fとして熱分解油ドラム8に回収されることは、既に説明した通りであるが、乾留中に溶融した被覆材は、図9に示すように、バスケット30に設けた上下の溝形部材85a,85b内に流下する。そして、上段の溝形部材85a内の溶融被覆材Qは、上段のダム式流下溝72a内に流下する。そして、このダム式流下溝72a内にて炉体の内壁面71の長手方向に広がりながら、ダム式流下溝72の底に設けたスリット状のすき間77から炉体の内壁面71に沿ってフィルム状に流下する間に炉体の内壁面71からの伝熱より低分子に1次熱分解する。
【0035】
また、下段の溝形部材85bから下段のダム式流下溝72b内に流入した溶融被覆材Qも同様にして低分子に1次熱分解する。更に、一対の支持部材92間に流下した溶融被覆材Qは、炉体の谷底97に向かって流れる間に低分子に1次熱分解する。
【0036】
従って、バスケット30に横詰めされた廃ケーブルDは、所定の乾留時間内に完全に低分子に1次熱分解される。その結果、バスケット30には、銅線などの有価金属が残り、炉体14内のカーボン残渣も業務用電気掃除機で簡単に清掃できるようになった。
【0037】
因に、上段溝形部材の被覆材重量比率γu及び下段溝形部材の被覆材重量比率γlは、次のようになる。
【0038】
すなわち、
上段溝形部材の水平棚に落下する被覆材重量をWu、下段溝形部材の水平棚に落下する被覆材重量をWl、バスケットの被覆材総重量をW(=Wu+Wl)とすると、γuは(3)式、γlは(4)式の如くなる。
【0039】
γu=αuWu/W ・・・・・・・・・・・・・・・・・・・ (3)
γl=αlWl/W+αul(1−αu)Wu/W ・・・・・ (4)
上記αul(=Aul/(A−Au)は、上段溝形部材の水平棚からの落下物を下段溝形部材で受け取れる面積比率である。
【0040】
ここで、max(γu)、max(γl)を求める。
αu=1,Wu/W=0.5とすると、
max(γu)=0.5 ・・・・・ (5)
αl=1,αul=0,Wl/W=0.5とすると、
max(γl)=0.5 ・・・・・ (6)
となる。
【0041】
なお、図5及び図6のものは、
αu=0.44,Wu/W=0.5であるから、
γu=0.22 ・・・・・ (7)
となり、
αl=0.44,αul=0.786,Wl/W=0.5であるから、
γl=0.44 ・・・・・ (8)
となる。
【0042】
上記の溝形部材85は、図10及び図11に示すように設置してもよい。即ち、山形の溝形部材85をバスケット30の前後方向に向けて設置する一方、バスケット30の前面及び背面に溝形部材850をバスケット30の横手方向に向けて設置する。上段の横溝850の先端部850′は、着脱式にすると良いことは、言うまでもない。
【0043】
一方、図12及び図13に示すように、上下各段のダム式流下溝72a,72bの下方に片流れ式の溝78,79をジグザグ状に設置しても同様の効果が得られる。図中、符号72cは、最下段のダム式流下溝である。
【0044】
本発明によれば、廃ケーブルからの有価金属の回収が効率的に処理できる。また、バスケットに収容する廃ケーブルは、一定の長さに切断したものや、ループ状に巻いたものでもよい。
【0045】
以上では、熱分解炉1の排ガスを排ガス焼却炉13で焼却して大気中に放出する場合について説明したが、この排ガスを貯蔵タンク61に貯蔵し、資源の有効利用のために、ガス燃料として使用する案も考えられる。また、被覆材がポリ塩化ビニールなどのハロゲンを含むプラスチック材料の場合は、塩素腐食を考えた材料選択やダイオキシン低減装置の組み込みが必要となる。
【0046】
【発明の効果】
上記のように、本発明によれば、次のような、数々の優れた効果が得られる。
すなわち、
▲1▼ 重量約2,000kgの廃ケーブルを乾留するのに、従来は10時間程度かかっていたが、本発明では、6時間で乾留でき、1回/日のバッチ運転(商用運転)を実現できるようになった。
【0047】
▲2▼ バスケットやダム式下流溝は、簡単な構造ながら溶融被覆材の熱分解能力に優れ、その効果は、絶大である。
【0048】
▲3▼ 溶融被覆材が十分な熱量を得て、効率良く低分子に1次熱分解されるため、回収油量が増加する。その結果、乾留炉の加熱に必要な燃料を回収油によって賄えるようになった。
▲4▼ 溶融被覆材に濡れる炉体の内壁面は、全円周の約1/2まで増加できるため、2次以上の熱分解に伴う低分子のガス量が減少する。その分、熱分解ガスの回収油量が増加し、資源の有効利用となる。
【0049】
▲5▼ 溶融被覆材は、炉体内で完全にカーボン化するため、乾留後の炉内残留物を業務用掃除機で安全に、かつ、短時間に清掃できる。
▲6▼ バスケットには、水平の仕切棚を取り付け、廃ケーブルを水平収容するため、乾留処理後も銅線などの有価金属が炉底に落下することなく、仕切棚上に残り、効率的に回収できるようになった。
【0050】
▲7▼ 溶融被覆材の熱分解に寄与する伝熱面積が増加するため、その分、乾留炉を小型化することができ、コストダウンが可能である。
▲8▼ 熱分解炉の熱効率が高まるため、燃料が節約でき、省エネルギー、省資源化が可能になる。
▲9▼ 前扉下部の未分解残渣が無くなり、作業性の向上及び熱分解炉の寿命の延長が計れる。
【図面の簡単な説明】
【図1】本発明に係る廃ケーブルの処理方法に使用する熱分解炉の要部正面図である。
【図2】図1の熱分解炉の平断面図である。
【図3】バスケットの正面図である。
【図4】バスケットの側面図である。
【図5】ダム式流下溝の要部断面図である。
【図6】溝形部材の延長部の拡大側面図である。
【図7】前扉の要部内壁面を示す正面図である。
【図8】図7のVIII−VIII断面図である。
【図9】本発明の熱分解炉の作用説明図である。
【図10】他のバスケットの正面図である。
【図11】他のバスケットの側面図である。
【図12】ダム式流下溝の他の例を示す側面図である。
【図13】図12のXIII−XIII断面図である。
【図14】本発明に係る廃ケーブル処理システムの概略図である。
【符号の説明】
1 乾留炉
71 炉壁
Q 溶融被覆材
[0001]
BACKGROUND OF THE INVENTION
The present invention recovers valuable metals such as copper wires by dry distillation of waste cables (including waste materials having valuable metals such as copper wires), while polymer materials such as rubber and polyethylene covering copper wires etc. The present invention relates to a waste cable processing method and apparatus for recovering fuel oil from a coating material made of metal.
[0002]
[Prior art]
In the past, carbon dioxide and other valuable metals were recovered by carbonizing waste cables, while fuel oil was recovered from coatings made of polymer materials such as rubber and polyethylene covering copper wires. In order to promote heat transfer in the furnace, it was not paid enough, so it took a lot of time to thermally decompose the molten coating material flowing down from the basket accommodated in the dry distillation furnace to the bottom of the furnace. It was difficult for batch operation of the day, that is, commercial operation.
[0003]
[Problems to be solved by the invention]
The present invention has been made to solve such a problem, and an object of the present invention is to provide a waste cable processing method and apparatus capable of measuring at least once / day batch operation, that is, commercial operation. It is in.
[0004]
[Means for Solving the Problems]
To achieve the above object, the invention according to claim 1, in the waste cable processing method the waste cable pyrolysis furnace by dry distillation in an atmosphere of an inert gas to recover pyrolysis oil and metals, dry distillation The molten coating material melted therein is received by a groove-shaped member provided in the waste cable filling container, and then flows down from the groove-shaped member along the furnace wall of the pyrolysis furnace .
[0006]
The invention according to claim 2, the molten coating material, waste after cable receiving the channel members provided in the filling container, dam falling groove provided from the channel members to the furnace wall of the pyrolysis furnace After that, it is made to flow down in the form of a film along the furnace wall of the pyrolysis furnace from the slit-shaped gap provided in the dam type flow-down groove.
[0007]
On the other hand, the invention described in claim 3, the waste cable pyrolysis furnace by dry distillation in an atmosphere of inert gas in the waste cable processing device for collecting the pyrolysis oil and the metal, the inner wall surface of the pyrolysis furnace In addition, a dam-type downflow groove is provided in which the melt coating material melted during the dry distillation flows in the film shape along the inner wall surface of the pyrolysis furnace while spreading in the longitudinal direction of the pyrolysis furnace, and in the pyrolysis furnace waste cable provided filling container freely out, and is characterized in that the molten coating material to the waste cable filler container provided with a channel members to supply to the dam falling groove on.
[0008]
The invention described in claim 4 is characterized in that a single flow type groove in which the melt coating material extends in the longitudinal direction of the inner wall surface of the furnace body is provided in a zigzag shape below the dam type flow down groove.
The invention according to claim 5 is characterized in that a groove member for extension is detachably attached to the tip of the groove member.
[0009]
The invention described in claim 6 is characterized in that a groove lid having an opening through which only the melt coating material is passed is installed in the groove-shaped member.
The invention according to claim 7 is characterized in that a liquid pool preventing member for preventing liquid pooling of the molten coating material is attached to the inside of the front door that is openably and closably attached to the pyrolysis furnace.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0011]
As shown in FIG. 14, the processing apparatus for waste cables (including waste materials having valuable metals such as copper wires) of the present invention is composed of a pyrolysis facility A, a pyrolysis oil recovery facility B, and an exhaust gas treatment facility C. Yes.
[0012]
The pyrolysis equipment A includes a horizontal indirect heating pyrolysis furnace (hereinafter referred to as a pyrolysis furnace) 1, a hot air generation furnace 2, a blower 3, an oil supply pump 5, a recovered oil tank 6, and a heavy oil tank 7. . The pyrolysis oil recovery facility B includes a pyrolysis oil drum 8, a condenser 9, a water seal tank 10, a cooling tower 11, and a cooling water pump 12. Further, the exhaust gas treatment facility C is mainly composed of an exhaust gas incinerator 13.
[0013]
The pyrolysis furnace 1 includes a furnace body 14, a front door 15 attached to the open end of the furnace body 14 so as to be openable and closable, and a heating jacket 16 provided on the outside of the furnace body 14. Is configured to store two baskets 30 filled with waste cables (not shown) in the furnace body 14.
[0014]
The pyrolysis furnace 1 includes an oxygen concentration detection sensor 18, a pressure sensor 19, and a temperature sensor 20, and the nitrogen gas a supplied to the furnace body 14 by controlling the flow rate adjustment valve 22 of the nitrogen gas supply pipe 21 by the pressure sensor 19. While controlling the flow rate adjusting valve 24 of the oil supply pipe 23 and the flow rate adjusting valve 28 of the blower pipe 27 by the temperature sensor 20 and supplying the A heavy oil b or heat supplied to the burner (not shown) of the hot air generating furnace 2. The supply amount of the cracked oil f and the supply amount of the combustion air d are adjusted. Further, the fuel oil can be selected by controlling valves (not shown) provided in the branch pipes 23 ′ and 23 ″ branched from the oil supply pipe 23.
[0015]
In the treatment of the waste cable, after supplying nitrogen gas a into the furnace body 14 to make the inside of the furnace an inert gas atmosphere, the hot jacket 16 of the pyrolysis furnace 1 is passed from the hot air generator 2 through the hot air supply pipe 50. Hot air k is supplied into the inside to indirectly heat the waste cable in the furnace. The temperature in the furnace body 14 is constantly monitored by the temperature sensor 20, and the flow rate adjusting valves 24 and 28 are adjusted as needed so that the covering material of the waste cable is thermally decomposed .
[0016]
When the thermal decomposition of the covering material of the waste cable (made of polymer material such as rubber or polyethylene) starts, the high-temperature pyrolysis gas e flows from the furnace body 14 through the pipe 40 to the pyrolysis oil drum 8 and is cooled, The high boiling cracked oil in the pyrolysis gas e remains in the pyrolysis oil drum 8. The pyrolysis gas e from which the high-boiling cracked oil has been removed passes through the condenser 9 provided on the pyrolysis oil drum 8 while the pyrolysis oil in the pyrolysis gas e is condensed. It flows down into the drum 8. The pyrolysis oil f accumulated in the pyrolysis oil drum 8 is sent to the recovered oil tank 6 through the pipe 46. Excess pyrolysis oil f is sent out of the system through the pipe 47 and is separately used for fuel or the like.
[0017]
On the other hand, the exhaust gas from which pyrolysis oil has been removed flows into the water-sealed tank 10 through the pipe 41, and then is sent to the exhaust gas incinerator 13 through the pipe 42 and incinerated. For incineration of exhaust gas, combustion air d and LPG gas h supplied by the gas pipe 43 are used as auxiliary fuel. Further, the exhaust gas j from the pyrolysis furnace 1 is introduced into the exhaust gas ablation furnace 13 through the pipe 48.
[0018]
After the evaporating time has elapsed, the hot air generating furnace 2 is stopped and the furnace body 14 is naturally cooled. Thereafter, the front door 15 of the pyrolysis furnace 1 is opened and the copper wire contained in the waste cable is recovered. Since the recovered copper wire is treated in an inert gas atmosphere, the surface is not oxidized and is traded at a high price.
[0019]
When cooling the furnace body 14, if the blowing by the blower 3 is continued, the cooling rate of the furnace body 14 can be increased. In addition, when nitrogen gas a is supplied into the furnace body 14 in order to prevent the inside of the furnace from being depressurized as the temperature of the furnace body 14 decreases, the combustible gas in the furnace is eliminated by the nitrogen gas a, which is safe. Increases nature. In addition, you may make it avoid that the supply amount of the nitrogen gas a currently supplied in the furnace body 14 is increased when dry distillation is complete | finished, and the inside of a furnace will be in a pressure-reduced state.
[0020]
The working water i in the cooling tower 11 is pumped up by the pump 12, passes through the pyrolysis oil drum 8 and the constrictor 9, and then returns to the cooling tower 11 through the pipe 45.
[0021]
Now, the basket for accommodating the pyrolysis furnace and the waste cable will be described in more detail.
As shown in FIG. 1, the pyrolysis furnace 1 is provided with two dam-type downflow grooves 72 on the left and right inner wall surfaces 71 of the furnace body 14. In order to effectively use the heat transfer of the inner wall surface 71 of the furnace body 14, it is desirable that the upper dam type flow down groove 72 a is positioned slightly below the horizontal plane m passing through the center O of the furnace body 14.
[0022]
As shown in FIG. 2, the upper and lower dam type downflow grooves 72 a and 72 b are provided in parallel to the center line n of the pyrolysis furnace 1. A pair of front and rear face plates 73 of the dam type downflow grooves 72 are attached to the inner wall surface 71 of the furnace body 14 in a watertight manner, and a long side wall plate 75 is attached to the inclined surface 74 in a watertight manner (see FIG. 1). Further, the side wall plate 75 is supported by a support body 76 attached to the wall surface 71 of the furnace body at regular intervals. In addition, as shown in FIG. 5, a slit-shaped gap 77 is provided at the lower end of the side wall plate 75. The gap Δx of the gap 77 is preferably 1 to 3 mm.
[0023]
On the other hand, as can be seen from FIGS. 3 and 4, the basket 30 that accommodates the waste cable is formed in a cubic box shape, and the inside thereof is partitioned into a plurality of stages by a horizontal partition shelf 80. Although the horizontal partition shelf 80 and the basket bottom part 81 are the punching metal floor 82, a watermark floor, a lattice floor, and a wire-mesh floor are not ask | required. Moreover, although the front surface and the back surface of the basket 30 are covered with the punching metal 83, a watermark plate, a lattice, and a wire mesh are not ask | required.
[0024]
The attachment method of the horizontal partition shelf may be a fixed type, a movable type, or a divided insertion type. Further, the hole diameter of the punching metal is desirably about 20 to 50 mm. Moreover, although the basket frame is formed of angle shaped steel, it may be formed using other shaped steel such as a steel pipe.
[0025]
As shown in FIG. 3, the basket 30 includes a groove-shaped member 85 that traverses the basket 30 in the first-stage and third-stage sections 64. The groove-shaped member 85 has a mountain shape and is inclined downward from the uppermost portion 86 located at the center of the basket toward the tip portion 87. Further, as shown in FIG. 4, the upper groove member 85 a is installed away from the front and back sides of the basket 30, and the lower groove member 85 b is installed adjacent to the center of the basket 30. Yes. The upper channel member 85 a may be installed on the center side of the basket 30, and the lower channel member 85 b may be installed on the front side and the back side of the basket 30.
[0026]
Here, when the total horizontal area of the upper groove member occupying the basket frame is Au, the total horizontal area of the lower groove member occupying the basket frame is Al, and the horizontal sectional area of the basket is A, the upper groove member The area ratio αu (= Au / A) is preferably in the range indicated by the expression (1), and the area ratio αl (= Al / A) of the lower groove-shaped member is preferably in the range indicated by the expression (2).
[0027]
0 <αu <1 (1)
0 <αl <1 (2)
Considering the convection of the gas in the furnace, the optimum values are about αu = 0.3 to 0.7 and αl = 0.7 to 0.3. In the example of FIG. 4, αu = αl = 0.44.
[0028]
In short, if αu = αl = 1, the convection of the gas is blocked by the horizontal partition, and the heat conduction heat transfer on the wall surface of the furnace cannot be used effectively, and undecomposed plastic remains on the horizontal partition. There is a fear. The upper and lower groove members are arranged as shown in FIG. 4, but may be designed in consideration of the flow of cracked gas and the falling pattern of the molten coating material.
[0029]
By the way, if the upper groove member 85a protrudes outward from the lower groove member 85b, when the waste cable is stuffed into the basket 30, it interferes with the work, so the upper groove member 85a It is convenient to attach the basket 30 just before it is brought into the furnace in a detachable manner. Therefore, as shown in FIG. 6, the two holes 88 passing through the overlapping portion of the groove member 185 and the extension groove member 285 installed in the basket 30 are longer than the width of the extension groove member. A metal rod 89 is removably attached.
[0030]
Further, a groove lid 90 made of punching metal or the like is placed on the upper portion of the groove member 85 so that the waste cable does not fall into the groove member 85 and hinder the flow of the molten coating material. The groove lid may be a watermark lid, a lattice lid, or a wire mesh lid.
[0031]
As shown in FIG. 3, a pair of mounts 91 made of channel members are attached to the bottom surface of the basket 30. And while supporting this mount frame 91, a pair of supporting member 92 used as a guide at the time of taking in and out of a basket is standingly arranged in the bottom part of the furnace body 14 (refer FIG. 1).
[0032]
In general, the front lid 15 employs a flat or semi-circular end plate in terms of strength, and is susceptible to being cooled by the gasket cooling water jacket 93 so that the pyrolysis gas is easily condensed and dripped. In order to prevent condensate from accumulating in the lower part of the front door 15, a liquid pool preventing member 94 provided with a gas vent hole (not shown) is installed. As shown in FIG. 7, the liquid pool preventing member 94 has a substantially kamaboko shape. Further, the end surface 95 of the liquid pool preventing member 94 is preferably flush with the flange 96 of the front door 15 as shown in FIG.
[0033]
The heating jacket 16 is divided into two by a partition wall 38, and a spiral partition plate 39 is provided in each jacket 16, so that the heating gas introduced into each heating jacket 16a, 16b is spiral. Is drawn to pass through and the inside of the furnace is heated uniformly. Reference numeral 17 denotes a heat insulating material 17.
[0034]
As described above, when the waste cable is dry-distilled in the pyrolysis furnace 1, the coating material covering the copper wire is pyrolyzed and recovered in the pyrolysis oil drum 8 as pyrolysis oil f. However, the coating material melted during the carbonization flows down into the upper and lower groove members 85a and 85b provided in the basket 30, as shown in FIG. Then, the melt coating material Q in the upper groove member 85a flows down into the upper dam type flow groove 72a. Then, the film extends along the inner wall surface 71 of the furnace body from the slit-shaped gap 77 provided at the bottom of the dam-type downstream groove 72 while spreading in the longitudinal direction of the inner wall surface 71 of the furnace body in the dam-type downstream groove 72a. During the flow down into the shape, the primary thermal decomposition to lower molecules than the heat transfer from the inner wall surface 71 of the furnace body.
[0035]
Similarly, the molten coating material Q that has flowed into the lower dam type flow-down groove 72b from the lower groove-shaped member 85b also undergoes primary thermal decomposition into low molecules. Furthermore, the molten coating material Q flowing down between the pair of support members 92 undergoes primary thermal decomposition into low molecules while flowing toward the valley bottom 97 of the furnace body.
[0036]
Therefore, the waste cable D horizontally packed in the basket 30 is primarily pyrolyzed into low molecules within a predetermined carbonization time. As a result, valuable metals such as copper wires remain in the basket 30, and carbon residues in the furnace body 14 can be easily cleaned with a commercial vacuum cleaner.
[0037]
Incidentally, the covering material weight ratio γu of the upper groove member and the covering material weight ratio γl of the lower groove member are as follows.
[0038]
That is,
When the weight of the covering material falling on the horizontal shelf of the upper groove member is Wu, the weight of the covering material falling on the horizontal shelf of the lower groove member is W1, and the total weight of the basket covering material is W (= Wu + Wl), γu is ( 3) and γl are as shown in (4).
[0039]
γu = αuWu / W (3)
γl = αlWl / W + αul (1-αu) Wu / W (4)
Αul (= Aul / (A−Au)) is an area ratio at which the falling object from the horizontal shelf of the upper groove member can be received by the lower groove member.
[0040]
Here, max (γu) and max (γl) are obtained.
If αu = 1 and Wu / W = 0.5,
max (γu) = 0.5 (5)
If αl = 1, αul = 0, Wl / W = 0.5,
max (γl) = 0.5 (6)
It becomes.
[0041]
5 and 6 are as follows.
Since αu = 0.44, Wu / W = 0.5,
γu = 0.22 (7)
And
Since αl = 0.44, αul = 0.786, and Wl / W = 0.5,
γl = 0.44 (8)
It becomes.
[0042]
The channel member 85 may be installed as shown in FIGS. That is, the mountain-shaped groove member 85 is installed in the front-rear direction of the basket 30, while the groove-shaped member 850 is installed on the front surface and the back surface of the basket 30 in the lateral direction of the basket 30. Needless to say, the tip 850 ′ of the upper lateral groove 850 may be detachable.
[0043]
On the other hand, as shown in FIGS. 12 and 13, the same effect can be obtained even if the single-flow grooves 78 and 79 are arranged in a zigzag shape below the dam-type flow grooves 72 a and 72 b at the upper and lower stages. In the figure, reference numeral 72c denotes the lowermost dam type descent groove.
[0044]
According to the present invention, recovery of valuable metals from waste cables can be efficiently processed. Moreover, the waste cable accommodated in the basket may be cut into a certain length or wound in a loop shape.
[0045]
The case where the exhaust gas from the pyrolysis furnace 1 is incinerated in the exhaust gas incinerator 13 and released into the atmosphere has been described above. However, the exhaust gas is stored in the storage tank 61 and used as a gas fuel for effective use of resources. A plan to use it is also conceivable. In the case where the coating material is a plastic material containing halogen such as polyvinyl chloride, it is necessary to select a material considering chlorine corrosion and to incorporate a dioxin reduction device.
[0046]
【The invention's effect】
As described above, according to the present invention, the following excellent effects can be obtained.
That is,
(1) It took about 10 hours to dry-distill a waste cable with a weight of about 2,000 kg. In the present invention, it can be dry-distilled in 6 hours, realizing a batch operation (commercial operation) once / day. I can do it now.
[0047]
(2) The basket and the dam type downstream groove have a simple structure and excellent thermal decomposition ability of the molten coating material, and the effect is great.
[0048]
(3) Since the molten coating material obtains a sufficient amount of heat and efficiently undergoes primary thermal decomposition into low molecules, the amount of recovered oil increases. As a result, the fuel required for heating the carbonization furnace can be covered by recovered oil.
{Circle around (4)} The inner wall surface of the furnace body that gets wet with the molten coating material can be increased to about ½ of the entire circumference, so the amount of low-molecular gas accompanying secondary or higher thermal decomposition decreases. As a result, the amount of oil recovered from the pyrolysis gas increases, and resources are effectively used.
[0049]
(5) Since the molten coating material is completely carbonized in the furnace, residues in the furnace after dry distillation can be safely and quickly cleaned with a commercial vacuum cleaner.
▲ 6 ▼ A horizontal partition shelf is attached to the basket, and waste cables are stored horizontally, so that valuable metals such as copper wire remain on the partition shelf without falling to the furnace bottom even after the carbonization process. It became possible to collect.
[0050]
(7) Since the heat transfer area that contributes to the thermal decomposition of the molten coating material increases, the carbonization furnace can be reduced in size and the cost can be reduced.
(8) Since the thermal efficiency of the pyrolysis furnace is increased, fuel can be saved and energy and resources can be saved.
(9) Undecomposed residue at the bottom of the front door disappears, improving workability and extending the life of the pyrolysis furnace.
[Brief description of the drawings]
FIG. 1 is a front view of an essential part of a pyrolysis furnace used in a waste cable processing method according to the present invention.
2 is a cross-sectional plan view of the pyrolysis furnace of FIG. 1. FIG.
FIG. 3 is a front view of the basket.
FIG. 4 is a side view of the basket.
FIG. 5 is a cross-sectional view of a main part of a dam type downflow groove.
FIG. 6 is an enlarged side view of an extension portion of the channel member.
FIG. 7 is a front view showing an inner wall surface of a main part of the front door.
8 is a cross-sectional view taken along the line VIII-VIII in FIG.
FIG. 9 is an operation explanatory view of the thermal decomposition furnace of the present invention.
FIG. 10 is a front view of another basket.
FIG. 11 is a side view of another basket.
FIG. 12 is a side view showing another example of a dam type flow down groove.
13 is a sectional view taken along line XIII-XIII in FIG.
FIG. 14 is a schematic view of a waste cable processing system according to the present invention.
[Explanation of symbols]
1 Dry distillation furnace 71 Furnace wall Q Melt coating material

Claims (7)

熱分解炉内の廃ケーブルを不活性ガスの雰囲気中で乾留させて熱分解油と金属を回収する廃ケーブル処理方法において、乾留中に溶融した溶融被覆材を、廃ケーブル充填用容器に設けた溝形部材に受けた後、前記溝形部材から熱分解炉の炉壁に沿って流下させることを特徴とする廃ケーブル処理方法。 In a waste cable processing method for recovering pyrolysis oil and metal by dry distillation of waste cables in a pyrolysis furnace in an inert gas atmosphere, a molten coating material melted during dry distillation is provided in the waste cable filling container. A waste cable processing method , comprising: receiving a groove-shaped member and then flowing down from the groove-shaped member along a furnace wall of a pyrolysis furnace . 溶融被覆材を、廃ケーブル充填用容器に設けた溝形部材に受けた後、前記溝形部材から熱分解炉の炉壁に設けたダム式流下溝に導入し、しかる後に、前記ダム式流下溝に設けたスリット状のすき間から熱分解炉の炉壁に沿ってフィルム状に流下させることを特徴とする請求項1記載の廃ケーブル処理方法。 After the molten coating material is received by the groove-shaped member provided in the waste cable filling container, it is introduced from the groove-shaped member into the dam-type downflow groove provided in the furnace wall of the pyrolysis furnace, and then the dam-type downflow The waste cable processing method according to claim 1, wherein the waste cable is caused to flow in a film shape along a furnace wall of a pyrolysis furnace from a slit-like gap provided in the groove . 熱分解炉内の廃ケーブルを不活性ガスの雰囲気中で乾留させて熱分解油と金属を回収する廃ケーブル処理装置において、熱分解炉の内壁面に、乾留中に溶融した溶融被覆材が熱分解炉の長手方向に広がりながら底部のすき間から熱分解炉の内壁面に沿ってフィルム状に流下するダム式流下溝を設けると共に、前記熱分解炉内に廃ケーブル充填用容器を出し入れ自在に設け、かつ、前記廃ケーブル充填用容器に溶融被覆材を前記ダム式流下溝に供給する溝形部材を設けたことを特徴とする廃ケーブル処理装置。 In waste cable processing equipment that recovers pyrolysis oil and metals by dry distillation of waste cables in the pyrolysis furnace in an inert gas atmosphere, the molten coating material melted during dry distillation is heated on the inner wall of the pyrolysis furnace. A dam-type flow groove that flows in the form of a film along the inner wall of the pyrolysis furnace from the gap at the bottom while spreading in the longitudinal direction of the cracking furnace is provided, and a container for filling waste cables is provided in the pyrolysis furnace so that it can be freely inserted and removed. and it characterized in that the molten coating material to the waste cable filler container provided with a channel members supplied to the dam falling groove waste cable processing apparatus. ダム式流下溝の下方に、溶融被覆材が炉体の内壁面の長手方向に広がる片流れ式の溝をジグザグ状に設けることを特徴とする請求項記載の廃ケーブル処理装置。 4. The waste cable processing apparatus according to claim 3 , wherein a single-flow type groove in which the molten coating material extends in the longitudinal direction of the inner wall surface of the furnace body is provided in a zigzag shape below the dam type flow-down groove . 溝形部材の先端に延長用の溝形部材を着脱自在に取り付けることを特徴とする請求項記載の廃ケーブル処理装置。 4. The waste cable processing apparatus according to claim 3 , wherein an extension channel member is detachably attached to the tip of the channel member . 溝形部材に溶融被覆材のみを通す開口を持つ溝蓋を設置することを特徴とする請求項3又は5記載の廃ケーブル処理装置。 6. The waste cable processing apparatus according to claim 3 , wherein a groove lid having an opening through which only the melt coating material passes is installed in the groove-shaped member . 熱分解炉に開閉自在に取り付けられている前扉の内側に溶融被覆材の液溜まりを防ぐ液溜まり防止部材を取り付けることを特徴とする請求項記載の廃ケーブル処理装置。 4. The waste cable processing apparatus according to claim 3 , wherein a liquid pool preventing member for preventing liquid pooling of the molten coating material is attached to the inside of the front door that is openably and closably attached to the pyrolysis furnace .
JP14345899A 1999-05-24 1999-05-24 Waste cable processing method and apparatus Expired - Fee Related JP4079549B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14345899A JP4079549B2 (en) 1999-05-24 1999-05-24 Waste cable processing method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14345899A JP4079549B2 (en) 1999-05-24 1999-05-24 Waste cable processing method and apparatus

Publications (2)

Publication Number Publication Date
JP2000325919A JP2000325919A (en) 2000-11-28
JP4079549B2 true JP4079549B2 (en) 2008-04-23

Family

ID=15339183

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14345899A Expired - Fee Related JP4079549B2 (en) 1999-05-24 1999-05-24 Waste cable processing method and apparatus

Country Status (1)

Country Link
JP (1) JP4079549B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4836101B2 (en) * 2001-06-18 2011-12-14 北陸電力株式会社 Carbonization equipment
KR101395385B1 (en) 2007-12-07 2014-05-14 주식회사 케이티 Re-fabricating device of un useful copper cable and method of said it

Also Published As

Publication number Publication date
JP2000325919A (en) 2000-11-28

Similar Documents

Publication Publication Date Title
TWI510430B (en) Device and process for the condensation, separation and storage of liquid sulphur in a claus plant
US5271341A (en) Equipment and process for medical waste disintegration and reclamation
KR100846897B1 (en) Pyrolysis treatment system of flammable waste and waste treatment method using the same
CA2006139C (en) Lined hazardous waste incinerator
TWI429487B (en) Appartus for treating waste
FR2571978A1 (en) METHOD AND INSTALLATION FOR THE CLEANING OF WASTE GASES FROM THE TREATMENT OF INDUSTRIAL OR HOUSEHOLD WASTE.
JP4079549B2 (en) Waste cable processing method and apparatus
JP3471239B2 (en) Outlet structure of carbonization furnace
BRPI0414704B1 (en) Procedure for collecting and treating reaction gases from a facility to produce molten metals as well as a corresponding facility to remove dust
JPH11246917A (en) Dry distillation metal recovery method and apparatus
JP3506893B2 (en) Method for producing carbide from waste solid fuel
RU2647187C1 (en) Lithium burning at various temperatures, pressures and gas excesses by using porous tubes as burners
JPH10310774A (en) Carbonization furnace and equipment
JP2608853B2 (en) Carbonization furnace
JP3501925B2 (en) Method for producing carbide from waste solid fuel
CN114939332A (en) Method and device for removing coke by bubbling and spraying molten salt
NO832433L (en) PROCEDURE FOR RECOVERY OF HEAT FROM OVEN FOR PRODUCTION OF ALUMINUM.
RU2859943C1 (en) Method for cleaning pipes of oil grades from asphalt-resin-paraffin deposits and external insulating coating (variants)
JPH1142642A (en) Processing equipment for thermoplastic metal composites
KR101176874B1 (en) Pyrolysis apparatus of petrochemical waste and pyrolysis method using the same
CN112781376A (en) Petrochemical heating furnace
JP5621235B2 (en) Waste pyrolysis treatment equipment
CN223448392U (en) Heat recovery device for garbage incineration
CN219913015U (en) Slag waste heat steam boiler
JP2024121910A (en) Reaction facility structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071016

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071030

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080205

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110215

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120215

Year of fee payment: 4

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130215

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees